Loading...
CommitteeMeeting_Building_0201114 New Hanover County ABC Board Meeting Minutes — Real Estate/Building Committee The New Hanover County ABC Board Real Estate/Building Committee attended a construction meeting hosted by Bordeaux Construction Company, on-site at 210 Judges Road, Wilmington, NC on February 11, 2014 at 10:30 AM in their construction trailer. 1. Attendees: NHC ABC Board: Board Members: Robert Martenis,Vice Chair and David Matthews, Committee Member. Staff: Gary Cain,Retail &LBD Operations Manager and Dan Sykes CEO. Board Consultant: T.J. Land, Construction Manager. LS3P Associates, LLC: Taylor Simms, Senior Associate/Project Manager. Bordeaux Construction Company, Inc.: Ben Warren, Project Manager; and Ben Brisson, on- site Project Superintendent. 2. Mr. Warren and Mr. Brisson provided information regarding several subjects as follows: See Attachment"A" dated 2/11/2014. 3. Change order #2 is being considered for bathroom floor drains, storm structure drains and skylights (warehouse) but the total dollar amount was not yet available pending final pricing on the skylights. 4. The scheduled substantial completion date is 8/31/2014. The final completion will be about 30 days later. 5. The next construction meeting is scheduled for March 4, 2014 at 10:30 AM on-site (construction trailer near 210 Judges Road entrance). The .' -ting adjourned about 11:30 AM. Robert Martenis, ice Chair Date Attachment A: Bordeaux Construction Company information dated 2/11/2014 Re: NI-IC ABC Headquarters Facility Page 1 of 1 Bordeaux Construction Company New Hanover County ABC Board Headquarters Facility Date: 2/11/14 aPide 941.4 o� Outstanding Coordination and Design Issues ' -Status of permits: CFPUA ROW issues (this permit is holding up utility installation). — Preconstruction conference was held this morning. -Schedule roofing pre-installation conference (flashing sample for review). -Roof drainage RFI and how it relates to and affects underground and metal/composite wall panels. -Status of site lighting order. Work Progress for the Past 30 Daps SITEWORK Grade road areas 70% Storm drainage 99% Permanent pond construction 90% Roof drain installation 100% Sewer installation 0% Water installation 0% BUILDING Building foundations 100% Plumbing SOG R/I 100% Electrical SOG R/1 100% Concrete SOG (Office & Sales) 100% SOG Preparation(Storage) 90% Concrete SOG (Storage) 0% Steel Erection 0% Current Contract Completed—19% (per the 1/20 pay application) Current Schedule Completed—30% (as of 1/20) Work Progress for the Next 30 Days SITEWORK Complete storm drain installation,permanent pond installation, and grading roadways Start and complete sewer installation Start water installation 4—WA stn �r t/2-- Bordeaux Construction Company New Hanover County ABC Board Headquarters Facility BUILDING Complete steel erection - rAJ Place and cure storage area SOG Receive PEMB delivery SUBMITTALS Submittal Status 65% Submittals which require action: HM/HW/Wood doors (1/7), Roofing(1/31),Engineered framing (1/20) RFI Log and Comments (10) RFI's generated, (2) outstanding Change Proposal Log (5) Contractor Proposals Generated with(1) Change Orders Issued (3) Proposals Outstanding, (0)Forthcoming Project Substantial Completion Dates Original Contract Substantial Completion Date: 8/17/14 Revised Contract date with change order#2: 8/31/14 Scheduled Substantial Completion Date: 8/31/14 ✓ Outstanding Safety Issues ,f All persons entering the job site are to wear proper attire including long pants,boots, and Hard hats. Proper safety attire is required when necessary (gloves, goggles, ear plugs, dust masks,respirators, etc...). Personnel observed in non-compliance with this policy will be issued a verbal warning for the first occurrence, a written warning for the second occurrence, and will be asked to leave the job site for the third occurrence. We reserve the right to remove anyone from the jobsite without prior warning for egregious safety violations (drugs, alcohol, fighting, blatant OSHA violations, etc...). We take safety seriously and appreciate everyone's help in maintaining a safe jobsite. N1 3/A Aofr 'T'ug5 . to--30