Loading...
Carrington Woods_Ph2_20080307_1532_Jeremy_Blair_final_platHarris, Bobby From: jblair [jblair@paramounte-eng.com] Sent: Friday, March 07, 2008 3:52 PM To: Sosebee, Thomas Cc: Harris, Bobby Subject: Carrington Woods Phase II Final Plat Tom- Bill Clark Homes has posted a check for $4000.00 with Bobby Harris in Planning to bond the two hydrants in Carrington Woods Phase 2. The water system is complete, tested, and certified, but John Malone has not released the system yet for water meters or hydrant flow tests. We will order the flow tests once the system has been released, but in the meantime, this bond will allow you to sign off on the final plat. If you have any questions, please feel free to give me a call. Thank you, Jeremy R. Blair, PE PARAMOUNTE ENGINEERING, INC. 5911 Oleander Drive, Smite 201 Wilnungton, NC 2803 (910) 791-6707 (O) (910) 791-6760 (F) www.paramounte-enq.com !SIG:47d1aaffZ41442082790005! No virus found in this incoming message. Checked by AVG - http://www.avq.com Version: 8.0.169 /Virus Database: 270.6.9/1637 -Release Date: 8/27/2008 7:01 AM