Loading...
Carrington Woods_Ph2_20080307_1534_Jim_Iannucci_final_plat'Harris, Bobby From: lannucci, Jim Sent: Friday, March 07, 2008 3:34 PM To: 'jblair' Cc: Harris, Bobby Subject: RE: Carrington Woods Phase II Jeremy, Once the gate is in place, Engineering will be prepared to sign the place since the surety is in place for the sidewalk and seeding. I will print out and place your engineer's estimate in our files. Thanks for the update. Jim From: jblair [mailto:jblair@paramounte-eng.com] Sent: Friday, March 07, 2008 2:56 PM To: Iannucci, Jim Cc: Harris, Bobby Subject: Carrington Woods Phase II Jim- Although you didn't request it as part of your comments to Planning on Carrington Woods Phase II final plat, the owner went ahead and put up a letter of credit for the sidewalks and any miscellaneous stabilization that might be required. I provided the engineer's estimate for the letter, but I forgot to send it to you. Please find the attached engineer's estimate. The letter of credit has already been executed and provided to Bobby Harris in Planning. I hope this doesn't cause you any confusion. Also, as described in your comments, the offsite waterline has been completed, tested, and certified. The 14' swing gate has not yet been installed across the easement, but it should be in place sometime early next week. I will let you know as soon as it is in place. Give me a call if you have any questions or concerns. Thanks. Jeremy R. Blair, PE PARAMOUNTE ENGINEERING, INC. 5911 Oleander Dri~-e, Suite 201 Wilnrington, NC 2803 (910) 791-6707 (O) (910) 791-6760 (F) www.paramounte-enq.com !SIG:47d19dd6101545315010573!