Loading...
Meeting Package 8 July 2015 8July2015 Meeting Minutes Chairman Barbour called themeetingto order at 4:00and introductions were made by each;the meeting’sattendance sheetisattached.The Junemeeting minutes were approved and the current PWBC fund balance was noted at ~$3631.98. Former Congressman Mike McIntyreand nowDirector of Government RelationsatPoyner Spruill Law Firmprovided brief introductory comments regarding his new private sector role and ambitions.There was a brief discussion regarding offshore energy exploration, potential volumes and potential revenue sharing inclusive of the coastal communities. Current Efforts: NHC’s Wrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR)Project Permitting The application preparation continues with data acquisition and supporting documentation development. Application submittal is anticipated bythis fall. Mason Inlet Relocation Project (MIRP) A meeting with the Mason Inlet Preservation Groupisscheduled to discuss the US Fish and Wildlife Services’ (USFWS) revised Biological Opinion, NHC’s Habitat Mgt. Plan, monitoring mandates and the next potential maintenance event. Shallow Draft Inlet (SDI) Permitting TheStateand Federalreview of the joint applicationis underway. An amended Biological Assessmentand Essential Fish Habitat Assessmentarein production. The supplemental documentation submittal is anticipated for late fall. Shoreline Mapping Program (SMP) 2015 The coastal engineer has thesurveyor’stransect dataand the analysis is in progress.The 2015 monitoring report is anticipated in late fall. CB15-year Extension To date, theUS Army Corps of Engineers(USACE)Headquarters (HQ) has not releasedformal implementing guidance oftheWater Resources Reform Development Act (WRRDA) 2014, Section 1037.Our understanding is the Assistant Secretary of the Army(ASA)for Civil Works (CW)has provided comments including omission of a Chief’s Report.This is currently a point of discussion within HQ.NHC requested the ASA(CW)complete the guidance and consider funding the 15-year extension study from the FY15 work plan, a Federal participationestimate of $500K was suggested. NHC isdeveloping,with the selected contractor, the non-federal Risk Reduction Plan’sscope of work.Once a scope, fee and schedule have been negotiated;the NHC Commissionerswill have final approval.NHC is scoping as optional tasks preliminary modeling efforts for each CSDR project. Having these optionalmodelingstepsscoped willbeginfacilitatingreach specific attributesshould NHC construction WB in FY18 and CB in FY19. A non-Federal proposal is being developedthrough Section 7001 of WRRDA 2014. The proposal will request afundable,two-cyclemaintenanceextension(six years)of the CB CSDR project(2023). This proposal would bridge the time lapse betweenhistorical maintenance cycles andthe 15-year study effort.The proposal would serve as an ongoing placeholder and current reference document should a WRDA 2016 provide the delegation additional alternatives. WB Economic Update The economic update is under way. The USACE has projected the total cost at $333K and NHC has provided the non-federal share ($116.5K). The resulting benefit cost ratio (BCR) and the cost control board(CCB)resolution will provide the Wilmington District its budgetingsubmittal support(Spring 2016). WBValidation Report The Validation Report’s scope, fee and schedulehave not been developed; aseparateValidation Reportscoping meeting will be scheduled by the USACE.The new BCR will be used in the Validation Report which will be the decision document supporting the Section 902 increase requestin a future WRDA Bill. A non-Federal proposal is being developed through Section 7001 of WRRDA 2014. The proposal will request an increase inthe Section 902 construction cost of the WB CSDR project (2036). The proposal would serve as an ongoing placeholder andcurrentreference document should a WRDA 2016 provide the delegation additional alternatives. CB Inlet Maintenance Dredging NHC has proposedto the USACEa maintenance dredging event for either July or August. The cost estimate is in the $70K to $90K range facilitating the side-castdredge Merritt.Based on a 1 July survey, there is approximately 7K cubic yards of sand in the eight-foot template. The cost estimate above would provide approximately five dredging days and mobilization costs. NHC has also requested a tentative hopper dredge event in the fall, side-cast event in the winter and another hopper event in the spring. Inter-local Agreement The initial working group has met and made good progress. A second meeting is being scheduled. Public Comments: Mr. Kellam noted the Supplemental Environmental Impact Statement for Figure 8’s north-end stabilization effortis anticipated for release by the USACE this Friday. Mr. Shuttleworth questioned the proposed NC Senate action of removing the southern portion of Zeke’s wall. General discussionnoted concerns with the action. Mr. Shuttleworth questioned the status of the revised NC Division of Coastal Management’s sediment quality standards. Vice-chair Andrew noted proposed modifications are moving through the NCDCM rules’ process. The meeting was adjourned at ~4:55. Agenda 8July2015,4:00–5:00 PM New Hanover County(NHC), Government Center Finance Conference Room #500 4:00Call to Order Welcome/Introductions Request approval of the Junemeeting minutes (emailed 12June2015). Port, Waterway & Beach Commission (PWBC)fundbalanceis~$3631.98. Guest Comments: Former Congressman Mike McIntyre,Director of Government Relations, Poyner Spruill Law Firm Current Efforts: NHC’sWrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR)ProjectPermit Preparation Ongoing Mason Inlet Relocation Project(MIRP) Proposedpermit modifications, re-consultation and revised managementplanoverviewis scheduled withthe Mason Inlet Preservation Group. Shallow DraftInlet(SDI-5)Permitting State/Federalpermit review is underway. Shoreline Mapping Program (SMP) 2015 Field work complete. CB15-YearExtension US Army Corps of Engineers (USACE) Head Quarters (HQ)guidance not yet finalized. Non-federal Risk Reduction Planscopeof work under review. FY15 work plan funding requested ($500K) for jump starting study efforts. WRRDA 2014, Section 7001 Proposal, Two-cycle extension. WBCSDREconomic Update Wilmington District USACE economic updateisunder way. WB Validation Report (Supporting Section 902) Scope/fee/schedule yet to bedeveloped. WRRDA 2014, Section 7001 Proposal, Section 902 increase augmentingthesubsequent Validation Report CB Inlet Maintenance Dredging Mid-summer surveysconducted 1 Julyand shoaled volumes are being calculated. Inter-local Agreement (ILA) Kick-off meeting Public Comment: Adjourn