Loading...
2018-05-09 Meeting Agenda Agenda 9 May 2018, 4:00 PM New Hanover County, Government Center Finance Conference Room, 500 4:00 Call to Order Welcome/Introductions Request approval of the April meeting minutes (emailed 12Apr2018). Current Efforts: Wrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR) Project, Validation Report  A public scoping meeting was held on 26Apr2018.  A draft document release date is tentatively June 2019. Carolina Beach (CB) and Kure Beach (KB) FY19 CSDR Project  A preliminary planning meeting was held on 17Apr2018.  NHC’s 2018 shoreline mapping data has been provided to the USACE. CB Beach Renourishment Evaluation Report (BRER)  A public scoping meeting was held on 6Mar2018.  A draft document release date is tentatively May 2019. Mason Inlet Relocation Project (MIRP)  The MIRP’s 2018 project surveys are complete.  The Waterbird Mgt. Area has become very active early this year.  A Clean Sweep presentation is scheduled for 10May2018 at WB Town Hall. Carolina Beach Inlet (CBI)  The is scheduled for a late June, seven-day (12-hrs/day) event. Merritt Shoreline Mapping Program  The 2018 field surveys are complete; the engineering analysis is beginning. Refined Coastal Modeling (RCM)  The CB/KB refined coastal modeling completion is anticipated for mid-summer. DC Delegation Staff  Representative Rouzer’s Communication Director and Senator Tillis’s Regional Representative visited on 1May2018. Public Comment: Adjourn