Loading...
2018-07-11 Meeting Agenda Agenda 11 July 2018, 4:00PM New Hanover County, Government Center Finance Conference Room, 500 4:00 Call to Order Welcome/Introductions Request approval of the June meeting minutes (emailed 15 June 2018). Current Efforts: Wrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR) Project, Post Authorization Change Report (PACR) A US Army Corps of Engineers (USACE) draft document release date is tentatively June 2019. Carolina Beach (CB), Beach Renourishment Evaluation Report (BRER) A USACE draft document release date is tentatively May 2019. CB and Kure Beach (KB) FY19 CSDR Project The release of plans and specifications is anticipated in late July. Placement volumes are estimated at ~650,000 cubic yards and ~450,000 cubic yards respectively. Efforts to potentially include a CB Inlet maintenance event with the FY19 CB CSDR event continue. Mason Inlet Relocation Project (MIRP) The MIRP’s 2018 Engineering Report is in final editing; a FY19 relocation event is not warranted at this time (2016-2018 bathymetrics attached). At non-federal expense, the Mason Creek Atlantic Intracoastal Waterway (AIWW) crossing is tentatively included in the USACE FY19 AIWW scope of work. Carolina Beach Inlet (CBI) TheMurdenis scheduled for a mid-July, seven-day (12-hrs/day) event. http://saw-nav.usace.army.mil/INLETS/CAROLINA_BEACH/Carolina_Beach_Inlet.pdf Shoreline Mapping Program The 2018 field surveys are complete; the engineering analysis is underway. Refined Coastal Modeling (RCM) The CB and KB refined coastal modeling DRAFT reports are anticipated in late July. Legislative Update: NC General Assembly FY 19, House Bill 374, Page 9 (c1) The Commission may authorize the repair or replacement of a temporary erosion control structure that was originally permitted prior to July 1, 1995, if the Commission finds that (i) the structure is located adjacent to an intertidal marine rock outcropping designated by the State as a Natural Heritage Area pursuant to Part 42 of Article 2 of Chapter 143B of the General Statutes and (ii) the replacement structure will comply with all applicable laws and with all rules, other than the rule or rules with respect to which the Commission granted the variance, that are in effect at the time the structure is replaced. Public Comment: Adjourn