Loading...
2018-08-08 Agenda Agenda 8 August 2018, 4:00PM New Hanover County, Government Center Finance Conference Room, 500 4:00 Call to Order Welcome/Introductions Request approval of the July meeting minutes (emailed 13 July 2018). Current Efforts: Wrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR) Project, Post Authorization Change Report (PACR) A US Army Corps of Engineers (USACE) draft document release date is tentatively June 2019. Carolina Beach (CB), Beach Renourishment Evaluation Report (BRER) A USACE draft document release date is tentatively May 2019. CB and Kure Beach (KB) FY19 CSDR Project The plans and specifications release are anticipated in mid-August. Placement volumes are estimated at ~650,000 cubic yards and ~450,000 cubic yards respectively. Efforts to potentially include a CB Inlet maintenance option within the FY19 CB CSDR scope continue. Mason Inlet Relocation Project (MIRP) The MIRP’s 2018 Engineering Report has determined a FY19 relocation event is not warranted. At non-federal expense, the Mason Creek Atlantic Intracoastal Waterway (AIWW) crossing is tentatively included in the USACE FY19 AIWW scope of work as an option. Carolina Beach Inlet (CBI) th On July 30, the Murdenbegan working a ten-day (12-hrs/day) event. http://saw-nav.usace.army.mil/INLETS/CAROLINA_BEACH/Carolina_Beach_Inlet.pdf Shoreline Mapping Program The 2018 shoreline mapping analysis is underway. Refined Coastal Modeling (RCM) The CB refined coastal modeling DRAFT documents are under review; the DRAFT KB analysis is anticipated in mid-August. Coastal Resources Commission (CRC) Meeting: thth The September 19 & 20 CRC meeting is scheduled in Wilmington, location to be announced. Legislative Update: WRDA18 is anticipated in the fall. Public Comment: Adjourn