2019-02-13 Minutes 13 February 2019 Meeting Minutes Staff called the Port, Waterway & Beach Commission (PWBC) meeting to order at ~4:00. Participant introductions were made; attendance sheet is attached. The January 2019 meeting minutes were approved. Current Efforts The US Army Corp of Engineers (USACE) Carolina Beach (CB) and Kure Beach (KB) Fiscal Year (FY) 2019 Coastal Storm Damage Reduction (CSDR) Projects: The Wilmington District USACE (SAW), including Weeks Marine; Pleasure Island th officials and New Hanover County staff, held pre-construction meetings on January 16 th (District Office) and 18 (on site). The CB pre-construction surveys have been completed with a revised calculated placement volume of approx. 1.1 million cubic th yards. A construction start-date of February 16 and a CB project completion date of mid-March have been provided by Weeks Marine. The KB pre-construction surveys and revised volume calculations are underway. The KB schedule will be provided as the th project progresses; the contract completion date is April 30. The USACE presented a th CB project status (pdf attached) to the CB Town Council on February 12 and will provide a similar presentation to the KB Town Council as that phase approaches. Wrightsville Beach (WB) CSDR: The SAW has provided the South Atlantic Division a post-Florence Project Information Report (PIR). The Division continues the PIRs review. Atlantic Intracoastal Waterway (AIWW) Maintenance Contract: th On February 12, SAW provided an initial construction schedule. As a contract option, the Mason Creek AIWW crossing is anticipated to be dredged in mid-April. Mason Inlet Relocation Project (MIRP) The 2019 scope of work includes routine annual surveys and preparation for a relocation event beginning in the fall of 2019. Carolina Beach Inlet (CBI): The sidecast dredge Merritt completed the first post-refurbishment maintenance event on th February 5. The eight-day event moved 6683 cubic yards from the inlet template. Following the dredging, the US Coast Guard used the Merritt to reposition the aids to navigation. The April/May and August/September maintenance events have also been tentatively scheduled. Staff has requested a hopper dredge making use of the inshore dredge material management site. Recent surveys can be found at http://saw-nav.usace.army.mil/INLETS/CAROLINA_BEACH/Carolina_Beach_Inlet.pdf. WB CSDR Project, Post Authorization Change Report (PACR): On 7 December, the USACE provided stakeholders a project status update. The PACR st remains within budget and a Chiefs Report deliverable remains in the 1 Quarter 2020. source location, remains a challenge. CB, Beach Renourishment Evaluation Report (BRER): st SAW will provide a status update to CB on the 21 of February. CBRA is an issue here as well; however, an offshore borrow site for Pleasure Island is currently in place. The Risk Reduction Plan, a non-federal stakeholder deliverable and appendix to the BRER, is completed and in production. Copies will be supplied to both CB and KB. KB and CB Refined Coastal Modeling: Both reports are final and in production. Summaries for each will be scheduled within upcoming PWBC meetings. Public Comment: Mayor Bloszinsky questioned SAWs preparation for an environmental window extension for the KB CSDR. Perhaps a potential topic for the USACEs KB CSDR project update to the KB Town Council. S. Rogers noted the upcoming revision to the Inlet Hazard Area via the Division of Coastal Management. The subject will be on the Coastal Resources Commission agenda at the Morehead City February meeting. Mayor Benson asked about the potential CB CSDR 15-year extension; staff noted Congressman Rouzers WRDA 18 success ensuring access to the full 15-year extension once the BRER was approved and authorized in the targeted WRDA 20. The required USACE benefit cost ratio of 1:1 and the somewhat targeted ratio of 2.5 from the Office of Management and Budget was briefly discussed. Adjourn Agenda 13 February 2019, 4:00 PM New Hanover County, Government Center Finance Conference Room, 500 4:00 Call to Order Welcome/Introductions Request approval of the January meeting minutes (emailed 10 January 2019). Current Efforts: Carolina Beach (CB) and Kure Beach (KB) Fiscal Year (FY) 2019 Coastal Storm Damage Reduction (CSDR) Projects The US Army Corps of Engineers (USACE) held a preconstruction meeting with the stakeholders and Weeks Marine on 16 January 2019. The USACE held an onsite resource agency focused preconstruction meeting with stakeholders and Weeks Marine on 18 January. Construction will begin following the final pre-placement volume calculations. Wrightsville Beach (WB) CSDR The USACE post-Florence Project Information Report (PIR) is under review by the Atlanta South Atlantic Division (SAD). Atlantic Intracoastal Waterway (AIWW) Maintenance Contract A construction schedule including the Mason Creek crossing has been requested. . Mason Inlet Relocation Project (MIRP) The 2019 scope of work includes an inlet relocation event depending on inlet shoaled volumes. Beneficial reuse would take place on Figure 8 and potentially the northern third of Wrightsville Beach. Carolina Beach Inlet (CBI) The sidecast dredge Merritt completed an eight-day maintenance event on 5 February 2019. The USCG repositioned the buoys with the Merritt. The next maintenance event is scheduled in the April/May timeframe; the available dredge plant is unknown at this time. WB, Post Authorization Change Report (PACR) Based on the U 7 December project update, the PACR is on schedule and within budget. The Coastal Barrier Resource Act (CBRA) continues as a borrow site challenge. CB, Beach Renourishment Evaluation Report (BRER) A project update has been requested. The USACE draft BRER release date is tentatively May 2019. The CBRA continues as a borrow site challenge. The non-federal Risk Reduction Plan is final. KB and CB Refined Coastal Modeling (RCM) Both RCM reports are final. Summaries will be scheduled within upcoming PWBC agendas. Public Comment: Adjourn CAROLINA BEACH 2019 SHORELINE SAND PLACEMENT PROJECT Presented to the Town of Carolina Beach Jim Medlock Project Manager Wilmington District U.S. Army Corps of Engineers February 12, 2019 Agenda •Project Contract •Project Area Map •Project Schedule •Questions EW Ellefsen Project Contract •Contract Awarded to Weeks Marine •Total Contract Value -$17.4 million •Includes Carolina Beach and Kure Beach projects •Estimated Carolina Beach Cost -$7.8 million •Cost Sharing Sponsors: •Town of Carolina Beach •New Hanover County •State of North Carolina Project Map ARCHEOLOGICAL SITES Note: This placement footprint is an estimate and is subject to change based on pre-placement surveys. Project Schedule •Anticipated Start: February 16, 2019 •Anticipated Carolina Beach Completion: Mid-March 2019 •Contract Completion: April 30, 2019 Placement Tracking Tool EXAMPLE http://www.saw.usace.army.mil/ Corps of Engineers -Wilmington District Point of Contact Jim Medlock Project Manager (910) 251-4836 james.m.medlock@usace.army.mil Questions