Loading...
Timberworks - Project Narrative 2/11/2020    Project Narrative  Timberworks    The 4.00 acre site is located on Harnett Avenue, between Castle Hayne Road and Blue Clay  Road in an unincorporated portion of New Hanover County, NC.  The site and adjoining  properties to the north, south, and east are zoned A‐I.  Adjoining properties to the west are  zoned A‐R.  Proposed improvements are consistent with this zoning and include 24,350 sf of  warehouse space and associated parking and drive aisles.      The site is presently vacant.  A +/‐ 50’ wide strip along the western side of the site is vegetated  with a stand trees which is to be left in place to serve as a buffer.  The remainder of the site is  cleared.  The site drains towards an existing ditch along the western boundary, which then  flows south.            Access to the site is by an existing full‐movement driveway off of Castle Hayne Road at Harnett  Avenue.  Internal drive aisle widths are sufficient to allow fire apparatus access and a 96’  diameter turnaround area is provided in the rear of the building.  An all‐weather driving surface  consisting of 6” of ABC will be provided on drive aisles.  Parking stalls will be concrete.         Water service and a fire hydrant will be provided at the site by extending a 6” water main along  Harnett Avenue.  This extension will tie to an existing 16” CFPUA main located in Castle Hayne  Road.  The site will be sewered by onsite septic.  The daily water usage is calculated to be 150  GPD based on NCDEQ rules which prescribe 25 GPD per employee.     Stormwater runoff will be collected in swales and conveyed to a wet pond designed detain and  release the 1.5” storm in 72 hours.  Additional volume in the basin is used to attenuate the 25  year storm in accordance with the NHC stormwater ordinance.      Erosion control is accomplished through the temporary use of gravel construction entrances  and silt fence  The stormwater basin will be used as a skimmer basin during site construction  and will be cleaned out and regraded once the site is stabilized.  Riprap aprons will be installed  and left in place at all pipe outlets.