Loading...
Wilmington - S&S CD100 Rev 0 - 2023.01.30_v1WILMINGTON, NC LATITUDE*: 34° 17' 18.9" N LONGITUDE*: 77° 52' 11.1" W DUKE ENERGY WORK ORDER: #TBD CONTACT: ALVIN ETHEREDGE (336)-500-1527 Alvin.Etheredge@duke-energy.com POWER COMPANY: PROPERTY OWNER: D&R MURRAYVILLE PROPERTIES 5425 PAGE RD SUITE DURHAM, NC 27703 CONTACT ENGINEER: MATTHEW SELKIRK, P.E. DEWBERRY ENGINEERS INC. (804) 205-3361 mselkirk@Dewberry.com PROPOSED TESLA EV SITE ADDRESS: *BASED ON GOOGLE EARTH COUNTY: NEW HANOVER COUNTY CONTRACTOR SHALL COMPLETE INSTALL PER THE SIGNED AND SEALED SET OF DRAWINGS. ANY NECESSARY DEVIATIONS FROM THE DRAWINGS MUST BE SUBMITTED THROUGH AN RFI REQUEST PROCESS WITH ENGINEERING FOR AN APPROVAL PRIOR TO CONTRACTOR PROCEEDING WITH A DEVIATION OF THE SIGNED AND SEALED SET OF DRAWINGS. ·INSTALL (3) TESLA SUPERCHARGER CABINETS ·INSTALL (12) TESLA CHARGING POSTS ·INSTALL (1) 1600A, 277/480V SWITCHGEAR 'EV2' ·INSTALL (1) PAD MOUNTED UTILITY TRANSFORMER (SIZED BY UTILITY) PERMITTING JURISDICTION: NEW HANOVER COUNTY APN: R03400-003-011-002 SITE TRT ID: 32814 SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 PARCEL ID: PARCEL ID: R03400-003-011-002 2316 N COLLEGE RD. WILMINGTON, NC 28405 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION N N SITE INFORMATION APPLICABLE CODES PROJECT DESCRIPTION ZONING INFORMATION DRAWING INDEX CONTRACTOR NOTE AERIAL MAP LOCATION MAP CALL BEFORE YOU DIG BEFORE SCALINGSITE SHEET TITLESHT. NO. TITLE SHEET DETAILED SITE PLAN T-1 C-1 EQUIPMENT/PARKING PLAN C-2 C-3 EXISTING CONDITIONS PLAN ELECTRICAL ONE-LINE DIAGRAME-1 GENERAL NOTES IGN-1 GENERAL NOTES IIGN-2 CONSTRUCTION DETAILS I CONSTRUCTION DETAILS IIC-5 ELECTRICAL & UTILITY DETAILSE-2 GROUNDING PLAN, SCHEMATIC & DETAILSG-1 CONSTRUCTION DETAILS IIIC-6 C-4 ALL WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: NORTH CAROLINA STATE UNIFORM BUILDING & ENERGY CODES, CONSISTENT WITH THE FOLLOWING CODES: 2018 NORTH CAROLINA BUILDING CODE 2018 NORTH CAROLINA ENERGY CONSERVATION CODE 2017 NORTH CAROLINA ELECTRIC CODE IN THE EVENT OF CONFLICT, THE MOST RESTRICTIVE CODE SHALL PREVAIL. NORTH CAROLINA 811 811 OR 1-800-632-4949 APPENDIX BGN-3 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION GENERAL NOTES:SITE WORK NOTES: F . EXCEPT WHERE EXCAVATION TO GREATER DEPTH IS INDICATED, FILL DEPRESSIONS RESULTING FROM CLEARING, GRUBBING AND DEMOLITION WORK COMPLETELY WITH GRANULAR FILL. 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION REINFORCED CONCRETE NOTES: ELECTRICAL NOTES: TRAFFIC MANAGEMENT NOTES: HORIZONTAL DIRECT DRILLING NOTES: ’ “” 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTIONN/A N/A 804 28405 lphillips@tesla.com7741842 X 10 N/A N/A X NEW HANOVER N/A N/A 2316 N COLLEGE RD., WILMINGTON, NC WILMINGTON, NC (TRT ID: 32814) 041586JOSEPH GIGANTIELLO, PE 856 780-3677 JGIGANTIELLO@DEWBERRY.COM X 134 1.0 1.0 N/A N/A N/A C X X X X X X X X X X X X X 0.209 0.089 2,000 Lucas Phillips X X 050147MATTHEW C. SELKIRK, PE 804 205-3361 MSELKIRK@DEWBERRY.COM DEWBERRY ENGINEERS INC. DEWBERRY ENGINEERS INC. 01/30/23 CO CO CO SANITARY CLEANOUT SITE BENCHMARK ELECTRIC TRANSFORMER BOLLARD CONIFEROUS TREE MAILBOX MEASURED BEARING AND/OR DISTANCE. WOOD FENCE EXCEPTION NUMBER UNKNOWN LINE (UNDERGROUND) CO E LIGHT POLE FIRE HYDRANT STORM INLET (RECTANGLE) TELEPHONE PEDESTAL ELECTRIC BOX LANDSCAPED AREA SHRUB CONCRETE AREA SIGN CALCULATED BEARING AND/OR DISTANCE. SHRUB LINE TELEPHONE LINE (UNDERGROUND) ELECTRIC LINE (UNDERGROUND) WATER LINE (UNDERGROUND) STORM LINE (UNDERGROUND) AREA OF CONCERN! TREE DRIP LINE GENERATOR RECORD BEARING AND/OR DISTANCE. GREASE TRAP GAS METERGM ELECTRIC CABINET SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION SCALE:1"=60' FOR 11"x17" 1"=30' FOR 22"x34" 30'0'60' DETAILED SITE PLAN LEGEND C-2 1 C-3 1 Existing Parking Stripe (Typ.) Existing Asphalt Existing Underground Storm Line (Typ.) Existing Telephone Pedestal (Typ.) 30'-0" Setback Existing Property Line (Typ.) NOTES: 1.SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OF THE PARCEL DEPICTED IN PLAT BOOK 49, PAGE 347, CITY OF WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA BY DAVID B. JORDAN & ASSOCIATES, PLLC. DATED 11/22/2022. 2.UTILITY CONNECTION TO BE MADE UNDER DUKE ENERGY STANDARDS, CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, DUKE ENERGY WORK ORDER TBD. 3.EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED. 4.EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAG DURING CONSTRUCTION. 5.CONTRACTOR TO CONFIRM ADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2% GRADE IN ALL DIRECTIONS. MAP BOOK 49, PAGE 347 APN: R03400-003-011-022 OWNER: D & R MURRAYVILLE PROPERTIES S73°44' 2 7 " W 5 2 9 . 2 5 ' N 1 5 ° 3 6 ' 1 7 " W 8 5 . 0 9 ' L E A S E A R E A O W N E R : D & R M U R R A Y V I L L E P R O P E R T I E S S73°43' 5 4 " W 1 4 3 . 1 7 ' N73°44' 2 7 " E 3 4 7 . 7 9 ' N73°44'2 7 " E 1 6 6 . 5 5 ' ' Existing Underground Telecommunication Line (Typ.) Existing Underground Sanitary Line (Typ.) Existing Unknown Underground Line (Typ.) Existing Underground Water Line (Typ.) Existing Underground Electric Line (Typ.) Existing Concrete Curb and Gutter (Typ.) Existing Tree (Typ.) Existing Storm Inlet (Typ.) (SEE NOTE 4) Existing Light Pole (Typ.) Existing Shrub (Typ.) Existing Cleanout (Typ.) 25'-0" Setback 35 36 36 36 36 36 36 37 3737 36 3 7 37 38 3 7 38 37 3 7 36 37 38 35 35 Existing Bollard (Typ.) APPROXIMATE LOCATION OF DUKE PRIMARY CABINET (SIZE AND LOCATION TO BE DETERMINED BY UTILITY) CONTRACTOR SHALL STUB OUT (2) 4"Ø CONDUITS WITH 90° ELBOWS FROM PRIMARY WINDOW OF TRANSFORMER PAD CURVE RADIUS ARC LENGTH DELTA ANGLE CHORD BEARING CHORD LENGTH C1 2.00'1.88'53°44'38"N43°18'05"W 1.81' C2 48.59'15.11'17°49'06"N61°32'44"W 15.05' C3 6.00'3.87'36°55'22"N34°07'13"W 3.80' C4 15.00'23.78'90°51'01"N60°51'07"W 21.37' C 1 C2 C 3 C4 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION Existing Underground Water Line (Typ.) PROPOSED TESLA EQUIPMENT PREMISES Existing Bollard (Typ.) Existing Concrete Curb And Gutter (Typ.) Existing Parking Striping (Typ.) (TO BE REMOVED) 9'-0" (Typ.) 18 ' - 8 " (T y p . ) SCALE:1"=20' FOR 11"x17" 1"=10' FOR 22"x34" 10'0'20' EXISTING CONDITIONS PLAN NOTES: 1.SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OF THE PARCEL DEPICTED IN PLAT BOOK 49, PAGE 347, CITY OF WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA BY DAVID B. JORDAN & ASSOCIATES, PLLC. DATED 11/22/2022. 2.UTILITY CONNECTION TO BE MADE UNDER DUKE ENERGY STANDARDS, CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, DUKE ENERGY WORK ORDER TBD. 3.EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED. 4.EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAG DURING CONSTRUCTION. 5.CONTRACTOR TO CONFIRM ADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2% GRADE IN ALL DIRECTIONS. Existing Underground Electric Line (Typ.) Existing Unknown Underground Line (Typ.) 25'-0" Setback 30'-0" Setback Existing Tree (Typ.) Existing Light Post (Typ.) Existing Shrubs (Typ.) Existing Parking Striping (Typ.) Existing Asphalt Existing Tree (Typ.) 3 7 36 37 38 S73°44'27"W 529.25' 37 26 ' - 7 " (T y p . ) Existing Concrete Curb and Gutter (Typ.) (TO BE REMOVED) (±9 LF) Existing Fence (Typ.) (TO BE REMOVED AND REPLACED IN SAME LOCATION) Existing Shrub Line (Typ.) 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION SCALE:1"=20' FOR 11"x17" 1"=10' FOR 22"x34" 10'0'20' EQUIPMENT/PARKING PLAN DISABLED ACCESS SIGN 6" 1'-0" 1' - 6 " 1'-0" ADA VAN NOTES: 1.SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OF THE PARCEL DEPICTED IN PLAT BOOK 49, PAGE 347, CITY OF WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA BY DAVID B. JORDAN & ASSOCIATES, PLLC. DATED 11/22/2022. 2.UTILITY CONNECTION TO BE MADE UNDER DUKE ENERGY STANDARDS, CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, DUKE ENERGY WORK ORDER TBD. 3.EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED. 4.EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAG DURING CONSTRUCTION. 5.CONTRACTOR TO CONFIRM ADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2% GRADE IN ALL DIRECTIONS. PARKING STALL SCHEDULE QUANTITYDESCRIPTION PROPOSED TESLA STALLS 12 NET PARKING STALL CHANGE -2 EXISTING STALLS (TO BE MODIFIED)15 STANDARD STALLS TO REMAIN 1 PROPOSED ACCESSIBLE PARKING STRIPING (TYP.) (SEE NOTE 5) PROPOSED McCUE REBOUNDING BOLLARD W/GRAY SLIP COVER & DISABLED ACCESS SIGNAGE PROPOSED PAD MOUNTED UTILITY TRANSFORMER (SIZED BY UTILITY) Existing Underground Water Line (Typ.) Existing Bollard (Typ.) Existing Concrete Curb And Gutter (Typ.) PROPOSED PARKING STRIPING (TYP.) Existing Underground Electric Line (Typ.) Existing Unknown Underground Line (Typ.) 25'-0" Setback 30'-0" Setback Existing Tree (Typ.) Existing Light Post (Typ.) Existing Shrubs (Typ.) Existing Parking Striping (Typ.) Existing Asphalt Existing Tree (Typ.) 3 7 36 37 38 S73°44'27"W 529.25' 37 PROPOSED UNDERGROUND ELECTRICAL CONDUCTOR ROUTED TO PROPOSED CHARGE STALLS PROPOSED SUPERCHARGER CABINET (TYP.-3) AND 1600A EV2 SWITCHGEAR MOUNTED ON CONCRETE PAD PROPOSED TESLA CHARGE POST (TYP.-12) 10'-0" (TYP.) 9'-6"5'-0"11'-0"10'-4" 1B1C1D2A2B2C2D3B3C3D 11'-8" 27 ' - 4 " C-3 2 CONTRACTOR SHALL STUB OUT (2) 4"Ø CONDUITS WITH 90° ELBOWS FROM PRIMARY WINDOW OF TRANSFORMER PAD 2 13 1A 3A 9'-4" 3'-6" PROPOSED RECYCLING BIN (TYP.-1) AND TRASH BIN (TYP.-1) PROPOSED FENCE (REPLACED IN SAME LOCATION AS EXISTING) 13 ' - 9 " PROPOSED CONCRETE CURBE AND GUTTER (TYP.) (±10 LF) C-6 2 E-2 2 C-5 1-3 C-6 4 C-4 1-3 C-5 4 C-6 3 Existing Shrub Line (Typ.) 18 ' - 0 " (T y p . ) Existing Underground Electrical Line (Typ.) (SEE NOTE 3) ENLARGED PROPOSED CURB AREA PROPOSED OPTIONAL McCUE REBOUNDING BOLLARD W/GRAY SLIP COVER (TYP.-12). CONTRACTOR TO CONFIRM WITH CONSTRUCTION MANAGER. C-6 2 3'-0" 1'-10" R3' - 0 " R1'-0" C-3 3 E-2 1 PROPOSED OPTIONAL WHEEL STOPS (TYP.-12). CONTRACTOR TO CONFIRM WITH CONSTRUCTION MANAGERC-6 5 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION NOTES: 1.54" MAX HEIGHT OF SUPERCHARGER HANDLE AT ACCESSIBLE CHARGE POSTS FROM SURFACE OF VEHICULAR WAY WHEN INSTALLED ON EXISTING CURBS. SCALE:3/8"=1' FOR 11"x17" 3/4"=1' FOR 22"x34" 0'1'2'3' CABLE HANDLE ACCESSIBILITY ATTACHMENT DETAIL (N) CABLE HANDLE ATTACHMENT OPERABLE PART V3 TESLA SUPERCHARGER POST FINISHED GRADE (N) CABLE HANDLE ATTACHMENT OPERABLE PART ALTERNATIVE TESLA SUPERCHARGER POST 48 " M A X . T O CE N T E R O F HA N D L E AT T A C H M E N T 48 " M A X . T O CE N T E R O F HA N D L E AT T A C H M E N T 5' - 6 1 / 4 " TESLA SUPERCHARGER HANDLE V3 TESLA SUPERCHARGER POST WEIGHT: 140 LBS BOLLARD W/ SIGNPOST FRONT VIEW NATIVE SOIL (N) TESLA SUPERCHARGER POST PROPOSED OR EXISTING CURB SIDE VIEW BOLLARD W/ SIGNPOST SCALE:N.T.S. V3 SUPERCHARGER POST CAST-IN-PLACE FOUNDATION DETAIL 6" MIN. COMPACTED CLASS 2 AGGREGATE BASE 2'-7 3/4" 1' - 6 " 0'-6" 0'-6" 1' - 6 " 2'-10" 4'-10" EXPANSION JOINT 2'-2 3/4" 6' - 4 1 / 2 " TESLA SUPERCHARGER HANDLE BOLLARD W/ SIGNPOST FRONT VIEW NATIVE SOIL (N) ALTERNATIVE TESLA SUPERCHARGER POST NATIVE SOIL SIDE VIEW ALTERNATIVE TESLA SUPERCHARGER POST WEIGHT: 200 LBS 1/2"Ø HILTI KWIK BOLT TZ2 SS W/2-1/2" EFFECTIVE EMBEDMENT (TYP.-4) SCALE:N.T.S. ALTERNATIVE SUPERCHARGER POST CAST-IN-PLACE FOUNDATION DETAIL 2'-10" 0'-6" 1' - 6 " 1' - 6 " 0'-6" 6" MIN. COMPACTED CLASS 2 AGGREGATE BASE PROPOSED OR EXISTING CURB EXPANSION JOINT 1/2"Ø HILTI KWIK BOLT TZ2 SS W/2-1/2" EFFECTIVE EMBEDMENT (TYP.-4) #3 TIES @ 8" O.C. (4) #5 CONTINUOUS REBAR AT T&B @ 8" O.C. (4) #5 CONTINUOUS REBAR AT T&B @ 8" O.C. #3 @ 8" O.C. BOLLARD ANCHORS (3) 1/2"Ø SS HILTI KWIK-BOLT TZ2 WITH 2.5" MIN EMBEDMENT AND MIN 5" FROM EDGE OF PAD 5" (MIN.) 51 4" 51 4" 6 0 ° 2'-3" 4'-10" 1'-8" 2' - 1 0 " OFFSET BOLLARD W/SIGNPOSTCAR SIDE NOTES: 1.BACKFILL FOOTING WITH EXCAVATED SOIL COMPACTED TO SAME DENSITY AS UNDISTURBED SOIL. 2.CONTRACTOR TO PROVIDE A MINIMUM OF 6" OF COMPACTED CRUSHED STONE FOR CAPILLARY BREAK AND CONSTRUCTION CONTROL UNDER ALL CONCRETE SLABS. 3.CONTRACTOR SHALL IDENTIFY POOR DRAINING SOILS AND PROVIDE ADDITIONAL COMPACTED, WELL GRADED COURSE-GRAINED SOIL BACKFILL TO FROST DEPTH. CONTRACTOR TO NOTIFY TESLA CM AND ENGINEER. #3 TIES @ 8" O.C. (4) #5 CONTINUOUS REBAR AT T&B @8" O.C. (4) #5 CONTINUOUS REBAR AT T&B @ 8" O.C. #3 @ 8" O.C. OFFSET BOLLARD W/SIGNPOST Existing GradeExisting Grade BOLLARD ANCHORS 5" (MIN.) 51 4" 51 4" 6 0 ° (3) 1/2"Ø SS HILTI KWIK-BOLT TZ2 WITH 2.5" MIN EMBEDMENT AND MIN 5" FROM EDGE OF PAD 3"3" OPTIONAL REAR BOLLARD (AS NEEDED) OPTIONAL REAR BOLLARD (AS NEEDED) 0'-2"0'-2" 1" CHAMFER (TYP.) 1" CHAMFER (TYP.) PROPOSED OR EXISTING CURB PROPOSED OR EXISTING CURB HANDLE ATTACHMENT (TYP.) HANDLE ATTACHMENT (TYP.) 1'-0" 0'-7" TOP VIEW FRONT 2' - 1 0 " 1'-0" 4'-10" 0'-5 1/2" OFFSET BOLLARD W/SIGNPOST OPTIONAL REAR BOLLARD (AS NEEDED) TOP VIEW FRONT ALTERNATIVE POSITION BASED ON CHARGE POST ORIENTATION ALTERNATIVE POSITION BASED ON CHARGE POST ORIENTATION 2'-4"1'-7" 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION NOTES: 1.IF FREE OF ORGANIC OR OTHER DELETERIOUS MATERIAL, EXCAVATED MATERIAL MAY BE USED FOR BACKFILL. 2.IF NOT, PROVIDE CLEAN, COMPACTIBLE MATERIAL. COMPACT IN 8" LIFTS. REMOVE ANY LARGE ROCKS PRIOR TO BACKFILLING. CONTRACTOR TO VERIFY LOCATION OF EXISTING U/G UTILITIES PRIOR TO DIGGING. 3.CONCRETE ENCASE CONDUIT WHEN TRENCHING UNDER SITE ACCESS ROAD. 4.ANY PAVEMENT DAMAGE DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO PRE CONSTRUCTION CONDITIONS OR BETTER. 5.MAINTAIN 12" SEPARATION MIN. BETWEEN AC OR DC CONDUCTORS AND COMMUNICATION CABLES. 6.MAINTAIN 2" SEPARATION MINIMUM BETWEEN OUTER WALLS OF CONDUITS. 7.CONFIRM ALL DEPTHS W/UTILITY & NEC PRIOR TO CONSTRUCTION. 1'-10" DC BUS- UP TO (10) 3" CONDUIT (AS NEEDED TO FEED 'STAR-CENTER' MASTER CABINET)DC POST-(4) 4" CONDUIT AC-(2) 4" CONDUITS CONDUIT OPENING (6) #5 BARS EQUALLY SPACED (1) #5 BARS #5 BARS AT EACH CORNER (2) #5 BARS (2) #5 BARS (4) #5 BARS EQUALLY SPACED(1) #5 BARS NOTES: 1.SEE CONCRETE NOTES ON SHEET GN-1. 2.DETAIL SHOWN AS TYPICAL FOR (1) V3 SUPERCHARGER CABINET. PAD TO BE INCREASED AS NEEDED FOR ADDITIONAL CABINETS OR ELECTRICAL EQUIPMENT. 3.CONTRACTOR TO PROVIDE A MIN OF 6" OF COMPACTED CRUSHED STONE FOR CAPILLARY BREAK AND CONSTRUCTION CONTROL UNDER ALL CONCRETE SLABS. CONTRACTOR SHALL IDENTIFY POOR DRAINING SOILS AND PROVIDE ADDITIONAL COMPACTED, WELL GRADED COURSE-GRAINED SOIL BACKFILL TO FROST DEPTH. CONTRACTOR TO NOTIFY TESLA CM AND ENGINEER. CAST IN PLACE PLAN (OPTION#1) SCALE:3/8"=1' FOR 11"x17" 3/4"=1' FOR 22"x34" 0'1'2'3' V3 CABINET FOUNDATION PLAN CONDUIT OPENING 5'-3" 0'-9" 3- 6 " 0'-4" 0'-5" PROPOSED 8" THICK, 4000 PSI CONCRETE PAD 3/4" CHAMFER (TYP.- ALL SIDES) V3 METAL GUIDE TEMPLATE PROPOSED 6" CLEAN COMPACTED GRAVEL (SEE NOTE 3) PROPOSED GRADE PREPARED SUBGRADE (95% STANDARD PROCTOR) PROPOSED 8" CONCRETE PAD (OPTION #1:CAST IN PLACE) (OPTION #2:PRECAST) 0'-8" COMMUNICATION CABLE (CAT6) IN 1" CONDUIT PROPOSED SUPERCHARGER CABINET ANCHOR. SEE NOTES ON DETAIL 1/C-6 FOR ANCHOR INFORMATION CAST IN PLACE REBAR PLAN (OPTION#1) PRECAST PLAN (OPTION#2) 5'-3 3/8" 3' - 8 1 / 2 " 2' - 8 1 1 / 1 6 " 9 5/8" EASED EDGE R 1/2" ALL OUTSIDE EDGES (4) 5/8"Øx6" LOOP INSERT 8" PRECAST SECTION (OPTION#2) HEBA-T ANCHOR FOR LIFTING V3 CONCRETE CABINET BASE (P/N 1648207-00-A) V3 CONCRETE CABINET BASE (P/N 1648207-00-A) V3 SUPERCHARGER CABINET (2448 LBS.) 3/4" CHAMFER (TYP.- ALL SIDES) 2' - 6 " 1'-9" 1"-2" CAST IN PLACE (OPTION#1) & PRECAST (OPTION#2) SCALE:N.T.S. TESLA SUPERCHARGER CABINET DETAIL 52.76" 33 . 8 6 " 60 " 49.38" 69 . 9 4 " 89 . 5 0 " 17.81" 49.21" 54.72"9.43" 35.83" 88 . 3 2 " 37.80" 41.98" .75"Ø (TYP.-4) (SEE NOTE 2) NOTES: 1.SEE NOTE #31 ON SHEET GN-2 FOR CABINET NOTES. 2.ANCHOR TO CIP CONCRETE WITH (4) 1/2"Ø HILTI KWIK BOLT TZ2 (OR EQUIVALENT) WITH 3-1/4" EFFECTIVE EMBEDMENT W/ OVERSIZE WASHER. 3.ANCHOR TO PRECAST SLAB WITH (4) 5/8"Ø HEAVY HEX BOLT WITH 1/1/2" THREAD LENGTH, ASTM 320 GRADE B AND LOCK WASHER (OR APPROVED EQUIVALENT) TESLA SUPERCHARGER ENCLOSURE DATA: IP67 - NEMA 4 WEIGHT: 2448 LBS. MINIMUM CLEARANCE: OVERHEAD: 3'-0" SIDE: 0'-6" FRONT: 6'-0" REAR : 0'-6" FRONT VIEW SIDE VIEW TOP VIEW SERVICE AREA 2" CLR GRADE SCALE:N.T.S. CONCRETE PAD DETAIL #5 BARS @ 12" O.C.EACH WAY PROPOSED 8" THICK CONCRETE PAD SEE TABLE FOR PAD SIZE 3/4" CHAMFER (TYP.- ALL SIDES) NOTE: 1.SEE CONCRETE NOTES ON SHEET GN-2. PROPOSED COMPACTED CLEAN GRAVEL PREPARED SUBGRADE (95% STANDARD PROCTOR) 4" M I N 8" CONCRETE PAD DIMENSIONS PAD TYPE CONCRETE 4000 PSI L 19'-9" W 4'-3" t (THICKNESS) 8" AREA 88.875 SFEQUIPMENT 6" SCALE:N.T.S. TYP. BURIED CONDUIT TRENCH DETAILS 6 ML YELLOW WARNING TAPE NATIVE SOD 18 " 6" UNDISTURBED SOIL (TYP.) CLEAN GRANULAR BACKFILL, 6" LIFT MAXIMUM, PLATE TAMP (1/2") 95% COMPACTION MIN. NATIVE BACKFILL PE R U T I L I T Y & N E C CONCRETE SIDEWALK (MATCH EXISTING WHERE NEEDED) STONE BED (MATCH EXISTING) Existing Grade 12" 12"2" MAX MILL AND REPLACE WITH BITUMINOUS PAVEMENT SURFACE COURSE, (2") I-5 REPLACE EXISTING BASE WITH BITUMINOUS PAVEMENT BASE COURSE, (4") I-2 6" DENSE GRADED AGGREGATE BASE COURSE NOTES: 1.IF FREE OF ORGANIC OR OTHER DELETERIOUS MATERIAL, EXCAVATED MATERIAL MAY BE USED FOR BACKFILL. 2.IF NOT, PROVIDE CLEAN, COMPACTIBLE MATERIAL. COMPACT IN 8" LIFTS. REMOVE ANY LARGE ROCKS PRIOR TO BACKFILLING. CONTRACTOR TO VERIFY LOCATION OF EXISTING U/G UTILITIES PRIOR TO DIGGING. 3.CONCRETE ENCASE CONDUIT WHEN TRENCHING UNDER SITE ACCESS ROAD. 4.ANY PAVEMENT DAMAGE DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO PRE CONSTRUCTION CONDITIONS OR BETTER. 5.MAINTAIN 12" SEPARATION MIN. BETWEEN AC OR DC CONDUCTORS AND COMMUNICATION CABLES. 6.MAINTAIN 2" SEPARATION MINIMUM BETWEEN OUTER WALLS OF CONDUITS. 7.CONFIRM ALL DEPTHS W/UTILITY & NEC PRIOR TO CONSTRUCTION. T.B.D. 6" MIN PER TABLE HAND TAMPED 1/2" GRANULAR BACKFILL 4" DC POST CONDUIT (TYP.-CLUSTER OF 16 MAX.) 24" MIN 6" MIN MINIMUM CENTER TO CENTER CONDUIT SPACING SWITCHGEAR TO CABINETS DC (BUSS)7.5" O.C. 7.5" O.C. 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTIONNOTE: 1.THIS TEMPORARY PROTECTION FOR EXISTING CATCH BASIN INLETS TO BE REMOVED BY CONTRACTOR AFTER COMPLETION OF WORK. 2.DETAIL SIMILAR FOR ROUND INLET. INSTALLATION DETAIL 1" REBAR FOR BAG REMOVAL FROM INLET (REBAR NOT INCLUDED) OVERFLOW SILTSACK DUMP LOOPS (REBAR NOT INCLUDED) EXPANSION RESTRAINT FOAM EXISTING GRATE CATCH BASIN INLET PROTECTION DETAIL 6' - 6 " 2" 2" 9" 1'-0" 5 1/4"Ø 5 3/4" 5 1 / 2 " 5 3 / 4 " 5 3 / 4 " 3/4" 3' - 4 " 5 1/4"Ø 4 1/4" 4" BOLT PATTERN FRONT OF SLAB PROPOSED TESLA SIGN 0.41"Ø (TYP.-2) 1' - 3 " (3) 5/8" DIA SS HILTI KWIK-BOLT TZ2 WITH 4" MIN EFFECTIVE EMBEDMENT PER ESR-1917 SCALE:N.T.S. McCUE REBOUNDING BOLLARD & SIGN 0'-6" 6" MANUFACTURER U LINE H-4608B/WMODEL No 6' RUBBERDESCRIPTION 72"x6"x4"DIMS (LxWxD) 34 LBSWEIGHT NOTES: 1.INSTALL PER MANUFACTURERS SPECIFICATIONS & TESLA STANDARDS. 2.CONTRACTOR TO SUBSTITUTE PRODUCT AS NEEDED W/ TESLA CM APPROVAL. 0'-0" SCALE:N.T.S. RUBBER CURB STOP DETAIL SCALE:N.T.S. CURB & GUTTER DETAIL NOTES: 1.SAW CUT AREA TO BE REPAIRED/REPLACED. DISPOSE OF DEBRIS PROPERLY OFF SITE. 2.INSTALL FORMS AS NECESSARY. 3.COMPACT EXISTING SUBGRADE MATERIAL TO ACHIEVE 95% COMPACTION. 4.CONCRETE TO BE 4000 PSI AIR ENTRAINED CONCRETE. 5.INSTALL CONTROL JOINTS EVERY 10 LINEAR FEET. 6.CONTRACTOR TO MATCH EXISTING SLOPE TO ALLOW PROPER DRAINAGE. MATCH EXISTING 6" PATCH OR REPAIR PAVEMENT AS REQUIRED EXISTING PAVED PARKING STALL CLEAN COMPACTED GRANULAR BACKFILL MATCH EXISTING CONDITIONS PROPOSED 6" CLEAN COMPACTED GRAVEL PROPOSED REINFORCEMENT (TO MATCH EXISTING CURB/GUTTER) TOP VIEW BOTTOM VIEW CONCRETE SURFACES: ANCHOR WITH (4) MANUFACTURER PROVIDED CONCRETE ANCHORS LANDSCAPE AREAS: ANCHOR WITH (4) MIN. 12" LONG J-HOOK REBAR ANCHORS Ø0.5" ANCHOR HOLE (TYP.) CONCRETE SLAB OR LANDSCAPE FRONT VIEW NOTE: TRASH & RECYCLING BINS TO BE PROVIDED BY TESLA RECYCLE ONLY USE BLUE BIN W/ "RECYCLE" TEXT & SYMBOLS IN LOCATIONS INDICATED ON SITE PLAN (IF ANY) SCALE:N.T.S. WASTE MANAGEMENT BIN DETAIL 11 " 3' - 6 " 2'-4"Ø 8.73" 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION * MODIFIED PER NEC 250.64 (A)(2) ** PER UL 615A AND NEC 253, LISTED HDPE CONDUIT PERMITTED. CONTRACTOR TO CONFIRM USE W/ TESLA CM *** INSTALL APPLICABLE WIRING CONFIGURATION CORRESPONDING WITH CHARGE POST TYPE INSTALLED 1 SCALE:N.T.S. SYSTEM ONE-LINE DIAGRAM UTILITY TRANSFORMER 480/277V, 3Ø W/INTERNAL CTs (INSTALLED BY OTHERS) 2000A MAIN BREAKER (SET FOR 1600A) 80% RATED NE U T GR N D MAIN BREAKER 600A, 3P AC BUS SUPERCHARGER CABINET #1 INTERGRAL FUSING ON INPUT SIDE AC/DC CONVERTER SUPERCHARGER CABINET #2 'STAR CENTER' 600A, 3P INTEGRAL DISCONNECT FOR EACH CHARGING PORT FOR SERVICING OF EQUIPMENT PROPOSED VEHICLE CHARGING POSTS (TYP.-4 PER SUPERCHARGER) 1A 1B 1C 1D 2A 2B 2C 2D GFI 600A, 3P SUPERCHARGER CABINET #3 3A 3B 3C SITE MASTER CONTROLLER MANUFACTURER-PROVIDED MAIN BONDING JUMPER PER NEC 250.24(A)(4), 250.28(C), 250.8(A)(7) #4 AWG BARE Cu GROUNDING ELECTRODE CONDUCTOR PER NEC 250.66(B) CONCRETE ENCASED ELECTRODE PER NEC 250.52(A)(3) OR (2) #3/0 Cu PER NEC 250.66 WIRING PRE-INSTALLED BY MANUFACTURER 1600A SWITCHBOARD 480/277V, 3Ø, 4W, 65kAIC 333 4 4 2 5 M UTILITY APPROVED METER ENCLOSURE #6 AWG BARE Cu GROUNDING ELECTRODE CONDUCTOR PER NEC 250.66(A) GROUNDING ELECTRODE 5/8"x8'-0" COPPER GLAD GROUND ROD INSTALLATION PER NEC 250.52(A)(5), 250.53(A) & 250.68 6'-0" MIN. SYSTEM GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC. ADD ADDITIONAL GROUND RODS AS NEEDED TO SYSTEM UNTIL RESISTANCE IS MET. COORDINATE WITH VENDOR FOR REQUIRED SYSTEM GROUNDING RESISTANCE BEYOND 25Ω SERVICE ELECTRICAL CIRCUIT SCHEDULE FROM TO CONFIGURATION TRANSFORMER1 2 NO: [5 SETS] (3) 600MCM AL (THWN-2) & (1) 600MCM AL (THWN-2) NEUT IN 4" PVC CONDUIT PROPOSED TESLA SUPERCHARGER (TYP.-3) 3A [2 SETS] (3) 500MCM AL (THWN-2) (1) 500MCM AL (THWN-2) NEUT (1) #1 AWG CU EGC OR 2/0 AL EGC* IN 4" PVC/HDPE CONDUIT** 4 PROPOSED TESLA SUPERCHARGER PROPOSED TESLA POST (TYP.-12) DC BUS BETWEEN PROPOSED SUPERCHARGERS DC BUS BETWEEN PROPOSED SUPERCHARGERS SITE CONTROLLER SHIELDED 600v CAT6+ IN 1" PVC CONDUIT (1 PER SUPERCHARGER) (SEE SCHEDULE #2) SUPERCHARGER (TYP.-3)5 PROPOSED 1600A SWITCHGEAR INCOMING [2 SETS] (2) 600MCM AL (XHHW-2) (1) 1/0 CU GROUND & (1) 3/0 AWG AL DC MID 1000V RATED IN 3" PVC/HDPE CONDUIT PROPOSED SERVICE BREAKER (600A) (TYP.-3) 3B PROPOSED TESLA SUPERCHARGER PROPOSED TESLA POST (TYP.-12) ALT POST: [1 SET PER POST:] (4) 600KCMIL AL (XHHW-2) (1000V RATED) (1) 2/0 AWG CU EGC & (2) #6 CU (1000V RATED) & SHIELDED COMM CABLE (1000V RATED) (PER TESLA) IN 4" PVC/HDPE CONDUIT** V3 POST: [1 SET PER POST:] (4) 350MCM AL (XHHW-2) (1000V RATED) (1) #1 AWG CU EGC OR 2/0 AL EGC & SHIELDED CAT6+ COMM CABLE (1000V RATED) (PER TESLA) IN 4" PVC/HDPE CONDUIT** NOTES: 1.CONDUCTOR LENGTHS ARE ESTIMATES ONLY. FINAL CONDUCTOR ROUTING PATH AND LENGTHS SHALL BE DETERMINED BY THE CONTRACTOR IN THE FILED BASED ON PHYSICAL MEASUREMENTS. CONTRACTOR TO ORDER CONDUCTORS BASED ON FIELD MEASUREMENTS (MUST BE APPROVED BY TESLA INSTALLATION MANAGER). 2.ALL ELECTRICAL WORK AND RELATED ACTIVITIES PREFORMED ON-SITE SHALL BE DONE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND UTILITY COMPANY STANDARDS. 3.NEUTRAL MUST BE INCLUDED FOR PROPER OPERATION OF TESLA SUPERCHARGERS. 4.ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION. 5.ALL EQUIPMENT SHALL BE HOUSED IN LOCKABLE, NEMA 3R ENCLOSURE. 6.USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS AN APPROVED ASSEMBLY 7.DC RUN LENGTH MAXIMUM IS 340' INCLUDING BURIED DEPTH. ANY DC RUN LENGTHS OVER THE MAXIMUM SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF TESLA. 8.UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY ENGINEER AT TIME OF PRE CONSTRUCTION MEETING TO ENSURE ACCURACY OF INSTALLATION. 9.UTILITY CONDUITS, CONNECTORS, TRANSFORMER PAD & TRANSFORMER FOUNDATION TO BE INSTALLED PER UTILITY SPECIFICATION. CONFIRM LATEST SPECIFICATIONS PRIOR TO CONSTRUCTION. 10.EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED. 11.CONTRACTOR RESPONSIBLE FOR ALL TRAFFIC SAFETY MEASURES THROUGHOUT DURATION OF CONSTRUCTION. COORDINATE ANY ACCESS ROAD CLOSURES W/OWNER. 12.CONTRACTOR TO GROUND SYSTEM TO CONCRETE-ENCASED GROUNDING ELECTRODE PER NEC 250.50. GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC. CONTRACTOR TO ADD GROUND RODS TO SYSTEM UNTIL PROPER RESISTANCE IS MET. 13.THE DC BUS SHALL BE CONFIGURED IN A RADIAL FASHION WHERE ALL CONDUCTORS ROUTE FROM EACH 'TYPICAL' SUPERCHARGER CABINET, TO THE ONE, 'STAR-CENTER' SUPERCHARGER CABINET. 14.USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS AN APPROVED ASSEMBLY. (SEE TUV CERTIFICATION ON SHEET E-2). 3D UTILITY PRIMARY TRENCHING SCOPE OF WORK X CATEGORY DUKE ENERGY ITEMS INSTALL PRIMARY CONDUIT INSTALL PULL ROPE INSTALL PRIMARY FEEDERS PROVIDE ROAD CUTS/ROAD BORES PAVEMENT REPLACEMENT PROVIDE PRIMARY FEEDERSPRIMARY TESLA UTILITY X X X X X X INSTALL TRANSFORMER PAD PROVIDE TRANSFORMER INSTALL TRANSFORMER INSTALL CONNECTIONS-PRIMARY INSTALL CONNECTIONS-SECD TRANSFORMER PROVIDE METER INSTALL METER LAND SECONDARY FEEDERS SWITCHBOARD SECONDARY TRENCHING INSTALL SECONDARY CONDUIT INSTALL PULL ROPE INSTALL SECONDARY FEEDERS PROVIDE ROAD CUTS/ROAD BORES PAVEMENT REPLACEMENT PROVIDE SECONDARY FEEDERSSECONDARY X X X X X X X X X X X X X X X INTEGRATED 277 VAC. SUB-PANEL 15A, 2P 15A, 2P NOTES: 1.SEE SHEET E-3 FOR WIRE CONFIGURATION. * AC CONDUCTORS: 25 FT IS ADDED TO THE HORIZONTAL RUN LENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS. **ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATED LENGTH X 4 WIRES PER SET ***LENGTH OF AL WIRE PER DISCONNECT =ESTIMATED TOTAL LENGTH OF AL WIRE X # WIRE SETS SECONDARY SERVICE LENGTHS LINEAR LENGTH ESTIMATED LENGTH* TRANSFORMER TO SWITCHGEAR 7'32' TOTAL LENGTH OF AC AL WIRE**:128' NUMBER OF WIRE SETS:2 TOTAL LENGTH OF AL WIRE***:256' DC CHARGING POST LENGTHS SUPERCHARGER CHARGE POST LINEAR LENGTH ESTIMATED DC WIRE LENGTH* 1 1A 26'48' 1B 63'85' 1C 77'99' 1D 87'109' 2 2A 92'114' 2B 102'124' 2C 112'134' 2D 122'144' 3 3A 127'149' 3B 137'159' 3C 147'169' 3D 157'179' CONDUIT LENGTH:1513' TOTAL CONDUCTOR LENGTH**:6052' TOTAL LENGTH OF EGC & COMM CABLE:1513' AC SUPERCHARGER LENGTHS SUPERCHARGER LINEAR LENGTH BREAKER PANEL TO SUPERCHARGER ESTIMATED LENGTH* 1 5'30' LENGTH OF AC AL WIRE PER CONDUIT**:120' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE ***:240' 2 10'35' LENGTH OF AC AL WIRE PER CONDUIT**:140' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:280' 3 14'39' LENGTH OF AC AL WIRE PER CONDUIT**:156' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:312' TOTAL LENGTH OF AC AL WIRE****:832' TOTAL LENGTH OF EGC*****:208' NOTES: 1. SEE SHEET E-1 FOR WIRE CONFIGURATION. * AC CONDUCTORS: 25 FT IS ADDED TO THE HORIZONTAL RUN LENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS. ** ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATED LENGTH X 4 WIRES PER SUPERCHARGER *** LENGTH = LENGTH OF AC AL WIRE PER CONDUIT X # OF CONDUITS **** TOTAL LENGTH = SUM OF AC LENGTHS ***** TOTAL LENGTH OF EGC = LENGTH X # SETS NOTES: 1.SEE SHEET E-1 FOR WIRE CONFIGURATION. 2.ANY DC RUN OVER 340' SHALL BE BROUGHT TO THE ATTENTION OF TESLA CM. *22 FT IS ADDED TO THE HORIZONTAL RUN LENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS. ** ESTIMATED LENGTH OF DC AL WIRE = SUM OF ESTIMATED LENGTH X 4 WIRES PER SUPERCHARGER UTILITY FAULT CURRENT TRANSFORMER: 1000 KVA SECONDARY VOLTAGE: 277/480V SECONDARY FAULT CURRENT: XXXX AIC *FINAL FAULT CURRENT INFORMATION PROVIDED BY DUKE ENERGY. BREAKER TRIP SETTINGS 1600A MAIN BREAKER: (SQUARE-D CAT. #PJP1600 W/MICROLOGIC 6.0) - LTPU (lr)= 1 - LT BAND (tr) = 16 - STPU (lsd) = 6 - ST BAND (tsd) = 0.1 (OFF) - INST (li) = 15 - GROUND FAULT (lg) = D - tg = 0.3 (OFF) 600A SUPERCHARGER BREAKER: (SQUARE-D CAT. #MJP366OOYP) - TRIP = FIXED (600A) - INST. = 5 BREAKER TRIP SETTINGS 2000A MAIN BREAKER (SET FOR 1600A): (ABB CAT No.: Z2SFUKBFZ0LA000000XX) - Ir (LTPU) = 0.8 - Tr (LT BAND) = 8 - Isd (STPU) = 8 - tsd (ST BAND) = 0.2 - li (INST) = 12 - lg (GROUND PICK UP) = 0.4 - tg (GROUND BAND) = 0.4 600A SUPERCHARGER BREAKER: (ABB CAT No.: XT5HU360BBFN00HXXX) - INST. = MED 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION SERVICE SWITCHBOARD SS-TESLA 1600A, 3Ø, 4W, 480Y/277V FRONT ACCESSIBLE - NEMA -3R [65KA SHORT CIRCUIT RATING] LIFTING HOOKS (REMOVED AFTER GEAR PLACEMENT) ROOF SCALE:N.T.S. 1600A EV-2 MCB SWITCHBOARD FRONT VIEW (EXTERIOR DOORS SHOWN) LEFT-SIDE VIEW (END SECTION) PLAN VIEW (DOOR OPEN) 3'-11" 3' - 4 " 7"2'-9"4" 1' - 1 0 " 10 " 10" INCOMING AREA OUTGOING AREA ANTENNA 3'-4"3'-11" 6' - 6 " PROPOSED #4 REBAR (TYP.) SEE NOTE 6 (TYP. 4 PLACES) TOP VIEW SIDE VIEW FINISHED GRADE 28 " 10 4 " 6" 98" 14"38"32"14" 8" (TYP.) 8" (TYP.) PRIMARY CONDUITS WINDOW SECONDARY CONDUITS WINDOW ALL SERVICE CONDUITS TO BE WITHIN THE 32" WIDE WINDOW 6" PROPOSED #4 REBAR (TYP.) 3" 4" 6" 40 " UTILITY NOTES: 1.MAINTAIN 2 IN. OF CLEAR CONCRETE BETWEEN REBAR AND ALL OUTER SURFACES. 2.REINFORCE WITH No 4 REBARS WITH 8"x8" GRID, 3-1/2 IN. BELOW TOP OF PAD EXCEPT AS SHOWN ABOVE. 3.CONCRETE SHALL HAVE A MINIMUM ULTIMATE 28 DAY COMPRESSIVE STRENGTH OF NOT LESS THAN 3,000 PSI, PAD SHALL BE CURED NOT LESS THAN 72 HOURS. 4.MAXIMUM WEIGHT OF PAD IS 4,370 POUNDS. 5.MOUNTING SURFACE SHALL BE LEVEL, SMOOTH AND UNIFORM WITH MINIMAL IRREGULARITIES. 6.PRECAST PAD SUPPLIERS ARE REQUIRED TO PROVIDE THE PAD WITH RECESSED "A/V" ANCHORS, TO BE USED FOR LIFTING THE PAD. NOTES: 1.PRECAST OR POURED IN PLACE CONCRETE PAD FOR 3 PHASE PAD-MOUNTED TRANSFORMER, 12 KV THRU 25 KV PRIMARY VOLTAGE, 500 KVA TO 2500 KVA RADIAL STEP-UP/DOWN, 500-3750 KVA LOOP FEED. 2.SPECIFICATION BASED ON DUKE ENERGY THREE-PHASE PAD-MOUNTED TRANSFORMER CONCRETE FOUNDATION SPECIFICATIONS, DATED JUNE 2020. CONTRACTOR TO CONFIRM FINAL SPECIFICATION WITH UTILITY PRIOR TO CONSTRUCTION. SCALE:3/8"=1' FOR 11"x17" 3/4"=1' FOR 22"x34" 0'1'2'3' TRANSFORMER PAD NOTES: 1.SPECIFICATION BASED ON DUKE ENERGY LARGE FLAT PAD FOR THREE-PHASE PAD MOUNTED TRANSFORMERS, DATED JUNE 2020. 2.CONTRACTOR TO VERIFY APPROVED VENDORS W/ UTILITY IF ORDERING PRECAST FOUNDATION. 3.CONTRACTOR TO CONFIRM LATEST SPECIFICATIONS W/ UTILITY PRIOR TO CONSTRUCTION OR ORDERING. 01/30/23 SUBMITTALS APPROVED BY: CHECKED BY:DSW MCS REV.DATE DESCRIPTION SITE NAME: WILMINGTON, NC (TRT ID: 32814) SITE ADDRESS: 2316 N COLLEGE RD. WILMINGTON, NC 28405 DRAWN BY:SL Dewberry Engineers Inc. 2835 BRANDYWINE ROAD SUITE 100 ATLANTA, GA 30341-4015 PHONE: 678.530.002 GA LIC. NO. PEF002398 (6/30/2024) PROJECT #:50123704 JOB #:50156996 3500 DEER CREEK ROAD PALO ALTO, CA 94304 (650) 681-5000 A 01/26/23 ISSUED FOR 90% REVIEW 0 01/30/23 ISSUED AS FINAL NOT FOR CONSTRUCTION CADWELD CONNECTIONS (OR APPROVED EQUAL) BURNDY CONNECTIONS (OR APPROVED EQUAL) PARALLEL HORIZONTAL CONDUCTORS PARALLEL THROUGH CONNECTION OF HORIZONTAL TYPE PT THROUGH CABLE TO GROUND ROD THROUGH CABLE TO TOP OF GROUND ROD TYPE GT HORIZONTAL SPLICE SPLICE OF HORIZONTAL CABLES HORIZONTAL STEEL SURFACE TO FLAT STEEL SURFACE OR HORIZONTAL PIPE TYPE HS VERTICAL STEEL SURFACE CABLE DOWN AT 45° TO VERTICAL STEEL SURFACE INCLUDING PIPE TYPE VS VERTICAL PIPE CABLE DOWN AT 45° TO RANGE OF VERTICAL PIPES TYPE VS "C" CONNECTOR HYPRESS TYPE YGHC BOND JUMPER FIELD FABRICATED GREEN STRANDED INSULATED TYPE 2-YA-2 COPPER LUGS TWO HOLE - LONG BARREL LENGTH TYPE YA-2 SCALE:N.T.S. GROUND CONNECTION DETAILS GRADE CONCRETE ENCASED ELECTRODE DETAIL NOTE: 1.REBAR BONDED TOGETHER WITH STEEL TIE WIRES. PROPOSED CONCRETE PAD #4 AWG COPPER EQUIPMENT GROUNDING CONDUCTORNON-METALLIC PROTECTIVE SLEEVE LISTED CONNECTION SCALE: N.T.S. SEE NOTE 1 GRND NE U T PANELBOARD GROUNDING SCHEMATIC #3/0 Cu PER NEC 250.66 MANUFACTURER-PROVIDED MAIN BONDING JUMPER PER NEC 250.24(A)(4), 250.28(C), 250.8(A)(7) #4 AWG BARE Cu GROUNDING ELECTRODE CONDUCTOR PER NEC 250.66(B) CONCRETE ENCASED ELECTRODE PER NEC 250.52(A)(3) OR (2) #6 AWG BARE Cu GROUNDING ELECTRODE CONDUCTOR PER NEC 250.66(A) GROUNDING ELECTRODE 5/8"x8'-0" WITH 12" MIN. DEPTH COPPER GLAD GROUND ROD INSTALLATION PER NEC 250.52(A)(5), 250.53(A) & 250.68 PROPOSED 4" UNDERGROUND CONDUIT (TYP.) #1 AWG CU EGC OR 2/0 AL EGC (PER NEC 250.64(A)(2)) SEE ITEM NUMBER 3 ON SERVICE ELECTRICAL CIRCUIT SCHEDULE FOR ALLOWABLE GROUNDING CONDUCTOR TESLA CHARGING POST (TYP.) VEHICLE CONNECTOR (TYP.) SEE ITEM NUMBER 3 ON SERVICE ELECTRICAL CIRCUIT SCHEDULE FOR ALLOWABLE GROUNDING CONDUCTOR TESLA SUPERCHARGER (TYP.) PROPOSED 4" UNDERGROUND CONDUIT (TYP.) FACTORY INSTALLED GROUND BAR (TYP.) CHARGE POST A: SEE ITEM NUMBER 3 ON SERVICE ELECTRICAL CIRCUIT SCHEDULE FOR ALLOWABLE GROUNDING CONDUCTOR #1 AWG CU EGC OR 2/0 AL EGC (PER NEC 250.64(A)(2)) CONTRACTOR SUPPLIED GROUNDING LUG SIZED PER APPLICABLE GROUNDING CONDUCTOR (TYP.) CHASSIS MOUNT GROUND BAR (TYP.) SCALE: N.T.S. CHARGE POST C: SEE ITEM NUMBER 3 ON SERVICE ELECTRICAL CIRCUIT SCHEDULE FOR ALLOWABLE GROUNDING CONDUCTOR CHARGE POST D: SEE ITEM NUMBER 3 ON SERVICE ELECTRICAL CIRCUIT SCHEDULE FOR ALLOWABLE GROUNDING CONDUCTOR CHARGE POST B: SEE ITEM NUMBER 3 ON SERVICE ELECTRICAL CIRCUIT SCHEDULE FOR ALLOWABLE GROUNDING CONDUCTOR (1) #2/0 CU GROUNDING CONDUCTOR (TYP.) PROPOSED 3" UNDERGROUND CONDUIT (DC BUS) (TYP.) #2/0 COPPER DC BUS GROUNDING CONDUCTOR (TYP.-EACH SUPERCHARGER) 6'-0" MIN. SYSTEM GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC. ADD ADDITIONAL GROUND RODS AS NEEDED TO SYSTEM UNTIL RESISTANCE IS MET. COORDINATE WITH VENDOR FOR REQUIRED SYSTEM GROUNDING RESISTANCE BEYOND 25Ω 01/30/23