Loading...
23148.PE Murrayville ES 4-14-23NOTICE REQUIRED ALL EXISTING UNDERGROUND UTILITIES SHALL BE PHYSICALLY LOCATED PRIOR TO THE BEGINNING OF ANY CONSTRUCTION IN THE VICINITY OF SAID UTILITIES. CONTRACTORS SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. CONTRACTORS SHALL CONTACT OVERHEAD ELECTRIC PROVIDER TO COMPLY WITH FEDERAL OSHA 1910.333 MINIMUM APPROACH DISTANCE TO ENERGIZED POWERLINES AND OSH 29 CFR 1926.1407-1411 MUST BE FOLLOWED. CONTACT THESE UTILITIES NEW HANOVER COUNTY, PLANNING & ENGINEERING ATTN: PLANNING STAFF PH: 910-798-7151 ATTN: JIM IANNUCCI, ENGINEERING PH: 910-798-7139 PIEDMONT NATURAL GAS PH: 910-251-2810 EMERGENCY DIAL 911 POLICE - FIRE - RESCUE CAPE FEAR PUBLIC UTILITY AUTHORITY (WATER & SEWER) ENGINEERING/INSPECTIONS PH: 910-332-6560 OPERATIONS/MAINTENANCE PH: 910-322-6550 DUKE ENERGY PROGRESS DISTRIBUTION CONSTRUCTION SERVICE PH: 910-256-7258 DEP CSC PH: 1-800-452-2777 AT&T/BELL SOUTH ATTN: CHRISSY COSTON PH: 910-341-7664 SPECTRUM PH: 910-763-4638 APRIL 2023 MURRAYVILLE ELEMENTARY WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA DESIGN DOCUMENTS 225 MABEE WAY PREPARED BY: PROJECT # 23148.PE FI N A L D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N 122 Cinema Drive Wilmington, North Carolina 28403 (910) 791-6707 (O) (910) 791-6760 (F) NC License #: C-2846 MURRAYVILLE ELEMENTARY PROJECT CONSULTANTS APRIL, 14 2023 PARAMOUNTE ENGINEERING, INC. 122 CINEMA DRIVE SURVEYOR / ENGINEER / LANDSCAPE ARCHITECT: WILMINGTON, NORTH CAROLINA 28403 ATTN: ROBERT BALLAND, PE SHEET INDEX SHEET NUMBER SHEET TITLE COVER SHEET C-1.0 GENERAL NOTES SITE & GRADING PLANC-2.0 C-3.0 DETAILS I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE LATEST NEW HANOVER COUNTY ORDINANCES AND STORM WATER DESIGN MANUAL. Signature: Name and Title: J. Branch Smith, PE Date:4/14/23 Registration Number:034354 WE HEREBY CERTIFY THAT WE ARE THE CURRENT DEVELOPER OF THE PROPERTY AND THAT UPON RECEIPT OF "AUTHORIZATION TO CONSTRUCT" ANY CLEARING, GRADING, CONSTRUCTION, OR DEVELOPMENT WILL BE PERFORMED IN ACCORDANCE WITH THIS PLAN AND THE APPLICABLE ORDINANCES AND RULES OF NEW HANOVER COUNTY, THE STATE OF NORTH CAROLINA, AND THE FEDERAL GOVERNMENT AND ITS AGENCIES WHICH ARE HEREBY PART OF THIS PLAN. AS THE DEVELOPER, WE ACCEPT FULL RESPONSIBILITY FOR THE CONSTRUCTION AND OPERATION AND MAINTENANCE OF THE PROPOSED FACILITIES. WE WILL NOT ATTEMPT TO TRANSFER THIS RESPONSIBILITY WITHOUT THE WRITTEN AUTHORIZATION OF NEW HANOVER COUNTY. Signature: Name and Title: Irene Sotiriou, Project Manager New Hanover Schools Date: NEW HANOVER COUNTY SCHOOLS 6410 Carolina Beach Road Wilmington NC 28412 Irene Sotiriou VICINITY MAP SCALE: 1" = 1,000' SITE N O R T H CAROLIN A J A M E B A N C H S M PR O F ESSION ENGIN E E R SEAL A L S R ITH 034 3 5 4 PHONE: (910) 791-6707 ATTN: BRANCH SMITH, PE DEMOLITION & EROSION CONTROL PLANC-2.1 DA T E : SC A L E : DE S I G N E D : DR A W N : CH E C K E D : PEI JOB#: CO N C E P T U A L L A Y O U T : PR E L I M I N A R Y L A Y O U T : FI N A L D E S I G N : RE L E A S E D F O R C O N S T : PR O J E C T S T A T U S RE V I S I O N S : DR A W I N G I N F O R M A T I O N SEAL CL I E N T I N F O R M A T I O N : NE W H A N O V E R C O . , N O R T H C A R O L I N A 22 5 M A B E E W A Y , W I L M I N G T O N , N C 2 8 4 1 1 23148.PE MU R R A Y V I L L E E L E M E N T A R Y S C H O O L FI N A L D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N NE W H A N O V E R CO U N T Y S C H O O L S 64 1 0 C a r o l i n a B e a c h R o a d Wi l m i n g t o n N C 2 8 4 1 2 N O R T H CAROLIN A J A M E B A N C H S M PR O FESSION ENGIN E E R SEAL A L S R ITH 0 3 4 3 5 4 12 2 C i n e m a D r i v e W i l m i n g t o n , N o r t h C a r o l i n a 2 8 4 0 3 (9 1 0 ) 7 9 1 - 6 7 0 7 ( O ) ( 9 1 0 ) 7 9 1 - 6 7 6 0 ( F ) NC L i c e n s e # : C - 2 8 4 6 GE N E R A L N O T E S AN D D E T A I L S 4/ 4 / 2 3 NT S JB S JB S RP B C-1.0 COORDINATION NOTES: 1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY/ALL PERMITS REQUIRED FOR CONSTRUCTION OF THESE PLANS. 2. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND WITH NEW HANOVER, AND THE STATE OF NORTH CAROLINA. 3. THE CONTRACTOR IS TO ESTABLISH AND CHECK ALL HORIZONTAL AND VERTICAL CONTROLS TO BE USED WITH THE PROJECT. IN ADDITION, THE CONTRACTOR IS TO COMPUTE THE LAYOUT OF THE ENTIRE SITE PLAN IN ADVANCE OF BEGINNING ANY WORK ASSOCIATED WITH THE SUBJECT PLANS. CONTRACTOR SHALL EMPLOY A PROFESSIONAL SURVEYOR TO PERFORM SITE IMPROVEMENT STAKEOUT(S). 4. ANYTIME WORK IS PERFORMED OFF-SITE OR WITHIN AN EXISTING EASEMENT, THE CONTRACTOR IS TO NOTIFY THE HOLDER OF SAID EASEMENT AS TO THE NATURE OF PROPOSED WORK, AND TO FOLLOW ANY GUIDELINES OR STANDARDS WHICH ARE ASSOCIATED WITH OR REFERENCED IN THE RECORDED EASEMENT. 5. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS BY OTHERS FOR ALL BUILDING DIMENSIONS AND DETAILS. GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1.THE EROSION CONTROL PLAN SHALL INCLUDE PROVISIONS FOR GROUNDCOVER ON ALL EXPOSED PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3:1 WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. GROUND COVER SHALL BE PROVIDED ON ALL OTHER DISTURBED AREAS WITHIN 14 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. 2.UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. (NO SEPARATE PAYMENT). 3.THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 4.ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. 5.A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 6.PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO NEW HANOVER COUNTY FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 7. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER THE REVIEWING AGENCY OR THE ENGINEER. (NO SEPARATE PAYMENT). 8. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 9. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 10.THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF-PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11.ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDEQ'S FINAL APPROVAL IS REQUIRED. 12.TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON-PAVED AREA. 13.WHEN CROSSING CREEK OR DRAINAGE-WAY, THE DIVISION OF WATER QUALITY SHALL BE CONTACTED PRIOR TO DISTURBING A CREEK. THE CONTRACTOR SHALL INSTALL RIP-RAP WITH FABRIC ALONG DISTURBED BANKS AND CHANNEL AND RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED IMMEDIATELY. EXISTING UTILITY NOTES: 1.IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY THE ACTUAL LOCATION AND AVAILABILITY OF ALL EXISTING AND PROPOSED UTILITIES IN THE FIELD PRIOR TO GROUND BREAKING. 2.EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE GROUND, ARE BASED ON A FIELD SURVEY AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY FIELD CONDITIONS PRIOR TO BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE IMMEDIATELY. THE CONTRACTOR SHALL RAISE OR LOWER EXISTING MANHOLES AND STRUCTURES TO MATCH FINAL GRADES. NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4.Provide ponding area for containment of treated Stormwater before discharging offsite. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. HAZARDOUS AND TOXIC WASTE 1.Create designated hazardous waste collection areas on-site. 2.Place hazardous waste containers under cover or in secondary containment. 3.Do not store hazardous chemicals, drums or bagged materials directly on the ground. EQUIPMENT AND VEHICLE MAINTENANCE 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1.Never bury or burn waste. Place litter and debris in approved waste containers. 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6.Anchor all lightweight items in waste containers during times of high winds. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8.Dispose waste off-site at an approved disposal facility. 9.On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3.Contain liquid wastes in a controlled area. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. HERBICIDES, PESTICIDES AND RODENTICIDES 1.Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. CONCRETE WASHOUTS 1.Do not discharge concrete or cement slurry from the site. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. EARTHEN STOCKPILE MANAGEMENT 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3.Provide stable stone access point when feasible. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A A BELOW GRADE WASHOUT STRUCTURE 1:1SIDE SLOPE(TYP.) 10 MILPLASTICLINING 3'-0 " MIN . & X ' MA X . SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURENOT TO SCALE PLAN SECTION B-B HIGHCOHESIVE &LOW FILTRATIONSOIL BERM 8" 6" 2' HIGHCOHESIVE &LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE (TYP.) 10 MILPLASTIC LINING B B 3'- 0 " MIN . & X ' MAX . A SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.) OR STAPLES NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURESSHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THESTRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH AMINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDSTO BE CLEARY MARKED WITH SIGNAGENOTING DEVICE. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CONCRETE WASHOUT CONCRETEWASHOUT PLAN CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.) SILT FENCE 10 ' MIN 10'MIN SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Site Area Description Timeframe variations -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize within this many calendar days after ceasing land disturbance 7 7 7 14 None None (a)Perimeter dikes, swales, ditches, and perimeter slopes (b)High Quality Water (HQW) Zones (c)Slopes steeper than 3:1 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d)Slopes 3:1 to 4:1 (e)Areas with slopes flatter than 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1.E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: (a)This general permit as well as the certificate of coverage, after it is received. (b)Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. (c)All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1.Occurrences that must be reported Permittees shall report the following occurrences: (a)Visible sediment deposition in a stream or wetland. (b)Oil spills if: ·They are 25 gallons or more, ·They are less than 25 gallons but cannot be cleaned up within 24 hours, ·They cause sheen on surface waters (regardless of volume), or ·They are within 100 feet of surface waters (regardless of volume). (a)Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b)Anticipated bypasses and unanticipated bypasses. (c)Noncompliance with the conditions of this permit that may endanger health or the environment. 2.Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. TEMPORARY SEEDING GRASS TYPE LBS/ ACRE TIME OF SEEDING FERTILIZER LIMESTONE RYE GRAIN 50 OCT. - APR.400 LBS/AC. 10-20-20 SWEET SUDAN GRASS 50 JUNE - AUGUST 400 LBS/AC. 10-20-20 GERMAN or BROWNTOP MILLET 50 JUNE - AUGUST 400 LBS/AC. 10-20-20 STRAW MULCH AS NEEDED 4,000 PERMANENT SEEDING (RECLAMATION) GRASS TYPE LBS/ ACRE TIME OF SEEDING FERTILIZER LIMESTONE BERMUDA, HULLED BERMUDA, UNHULLED 10-20 35 MARCH - AUGUST SEPT. - FEB.BY SOIL TEST CENTIPEDE 10 MARCH - AUGUST BY SOIL TEST (NO HIGH PH) TALL FESCUE (COASTAL CULTIVAR RECOMMENDED) 50 MARCH - AUGUST 300 LB/AC 10-20-20 OR BY SOIL TEST SLOPES >= 2:1 SERICEA LESPEDEZA 20 SEPTEMBER-APRIL BY SOIL TEST SWITCHGRASS 3 DECEMBER-APRIL BY SOIL TEST EROSION CONTROL MAINTENANCE PLAN: 1.ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY 1/2-INCH OR GREATER RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2.ALL CONSTRUCTION ENTRANCES WILL BE PERIODICALLY TOP DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. ANY SEDIMENT THAT IS TRACKED INTO THE STREET WILL BE IMMEDIATELY REMOVED. 3.SEDIMENT FENCE / SEDIMENT FENCE OUTLETS - SEDIMENT WILL BE REMOVED BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF-FILLED. THE SEDIMENT FENCE WILL BE BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL, AND SPACED 6 FEET WITH EXTRA STRENGTH FABRIC AND NO WIRE BACKING. STAKE SPACING CAN BE 8 FEET WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS (OR EXCELSIOR WATTLES) ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE THE ROCK OR WATTLE WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS, OR IS DAMAGED. 4.ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS ON THESE PLANS AND CONTRACT SPECIFICATIONS TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. REF. NPDES NCG01 SPECIFICATIONS. 5.INLET PROTECTION - SEDIMENT SHALL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL, BLOCK AND GRAVEL, OR ROCK-PIPE INLETS, WHEN IT REACHES HALF-FILLED. ROCK WILL BE CLEANED OR REPLACED WHEN NO LONGER DRAINS. SILT SACKS, BEAVER DAMS, SANDY SACKS, AND SOCKS NEED CHECKING EVERY WEEK AND AFTER RAIN. 6.OUTLET PROTECTION - INSPECT RIP RAP OUTLET STRUCTURES WEEKLY AND AFTER RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIP RAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER OFFSITE SEDIMENTATION. 7.DIVERSION DITCHES / GRASS SWALES - INSPECT THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. DIVERSIONS SHALL BE LINED OR STABILIZED AS NOTED ON THE PLANS. IF THE DIVERSION WILL BECOME PERMANENT GRASS SWALES. THEN GROW GRASS INTO A HEALTHY, VIGOROUS CONDITION. LININGS OR ROLLED EROSION CONTROL PRODUCTS (RECP) SHALL BE PROPERLY STAKED AND IN CLOSE CONTACT WITH THE GROUND. MONITOR AND REPAIR THE LINING AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED IN THE DITCH. 8.CHECK DAMS - EXCELSIOR OR RIP-RAP - SEDIMENT SHALL BE REMOVED FROM THE DAM WHEN IT REACHES HALF-FILLED. CHECK DAMS SHALL BE REPAIRED OR REPLACED, AND CHANNEL SHALL BE REPAIRED OF RUTS, PIPING, AND SETTLEMENT AROUND THE DAMS AS NEEDED. 9.CONCRETE WASHOUTS - CONCRETE WASHOUTS SHOULD BE INSPECTED DAILY AND AFTER HEAVY RAINS. DAMAGES SHOULD BE REPAIRED PROMPTLY. IF FILLED TO OVER 75% CAPACITY WITH RAIN WATER IT SHOULD BE VACUUMED OR ALLOWED TO EVAPORATE TO AVOID OVERFLOWS. BEFORE HEAVY RAINS THE CONTAINERS LIQUID LEVEL SHOULD BE LOWERED OR THE CONTAINER COVERED TO AVOID AN OVER FLOW DURING RAIN. WHEN SOLIDS HAVE HARDENED THEY SHOULD BE REMOVED AND RECYCLED. GENERAL NOTES: 1. TREE INVENTORY AND TOPOGRAPHIC SURVEY COMPLETED BY PARAMOUNTE ENGINEERING, INC. THE SURVEY SHALL BE FIELD VERIFIED BY CONTRACTOR AND ANY DISCREPANCIES REPORTED TO THE OWNER AND ENGINEER. 2. REASONABLE CARE HAS BEEN EXERCISED IN SHOWING THE LOCATION OF EXISTING UTILITIES ON THE PLANS. THE EXACT LOCATION OF ALL EXISTING UTILITIES IS NOT KNOWN IN ALL CASES. THE CONTRACTOR SHALL EXPLORE THE AREA AHEAD OF DITCHING OPERATIONS BY OBSERVATIONS, ELECTRONIC DEVICES, HAND DIGGING AND BY PERSONAL CONTACT WITH THE UTILITY COMPANIES. IN ORDER TO LOCATE EXISTING UTILITIES IN ADVANCE OF TRENCHING OPERATIONS SO AS TO ELIMINATE OR MINIMIZE DAMAGE TO EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS RESULTING FROM ANY DAMAGE TO THE EXISTING UTILITY LINES INCLUDING LOSS OF UTILITY REVENUES. CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF EXISTING UTILITIES, SUCH AS POLES, CONDUITS, FIBER OPTIC CABLES, TELEPHONE CABLES, WATER LINES, ETC. 3. CONTRACTOR SHALL COMPLY WITH THE LATEST REVISIONS AND INTERPRETATIONS OF THE DEPARTMENT OF LABOR SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT. 4. CONTRACTOR SHALL PLAN AND CONSTRUCT WORK SO AS TO CAUSE MINIMUM INCONVENIENCE TO THE OWNER AND THE PUBLIC. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN AT ALL TIMES DURING THE PROGRESS OR TEMPORARY SUSPENSION OF WORK, SUITABLE BARRIERS, FENCES, SIGNS OR OTHER ADEQUATE PROTECTION, INCLUDING FLAGMEN AND WATCHMEN AS NECESSARY TO INSURE THE SAFETY OF THE PUBLIC AS WELL AS THOSE ENGAGED IN THE CONSTRUCTION WORK. CONSTRUCTION SIGNING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF "CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" BY THE USDOT. 5. ALL MATERIAL CLEARED OR DEMOLISHED BY THE CONTRACTOR IN ORDER TO CONSTRUCT THE WORK SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF-SITE. 6. ALL WORK BY THE CONTRACTOR SHALL BE WARRANTED BY THE CONTRACTOR FOR A PERIOD OF ONE YEAR AFTER THE OWNER ACCEPTS THE WORK. 7.CONTRACTOR SHALL CALL THE NORTH CAROLINA ONE-CALL CENTER AT 811 AN ALLOW THE CENTER TO LOCATE EXISTING UTILITIES BEFORE DIGGING. 8.ANY DISCREPANCY IN THIS PLAN AND ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE OWNER PRIOR TO START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS AND DIMENSIONS SHOWN HEREON BEFORE BEGINNING CONSTRUCTION. 9.CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THAT WORKMEN AND PUBLIC SHALL BE PROTECTED FROM INJURY, AND ADJOINING PROPERTY PROTECTED FROM DAMAGE. 10.ACCESS TO UTILITIES, FIRE HYDRANTS, STREET LIGHTING, ETC., SHALL REMAIN UNDISTURBED, UNLESS COORDINATED WITH THE RESPECTIVE UTILITY. 11.DO NOT SCALE THIS DRAWING AS IT IS A REPRODUCTION AND SUBJECT TO DISTORTION. 12.THE GENERAL CONTRACTOR SHALL REMOVE ALL DEBRIS FROM THE SITE UPON COMPLETION OF THE PROJECT AND AT LEAST ONCE A WEEK DURING CONSTRUCTION. 13.THE GENERAL CONTRACTOR SHALL KEEP THE AREA OUTSIDE THE "CONSTRUCTION LIMITS" BROOM CLEAN AT ALL TIMES. 14.ALL STREET SURFACES, DRIVEWAYS, CULVERTS, CURB AND GUTTERS, ROADSIDE DRAINAGE DITCHES AND OTHER STRUCTURES THAT ARE DISTURBED OR DAMAGED IN ANY MANNER AS A RESULT OF CONSTRUCTION SHALL BE REPLACED OR REPAIRED IN ACCORDANCE WITH THE SPECIFICATIONS. 15.CONTRACTOR SHALL MAINTAIN AN "AS-BUILT" SET OF DRAWINGS TO RECORD THE EXACT LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE PROJECT WITH A COPY OF THE TRANSMITTAL LETTER TO THE ENGINEER. 16.IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE GIVEN TO THE OWNER FOR REVIEW, NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE PERMISSION OF THE OWNER, NEW HANOVER COUNTY AND STATE OF NC RESPECTIVELY. 17.CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES. THE LOCATION OF ALL EXISTING UTILITIES ARE NOT NECESSARILY SHOWN ON PLANS AND WHERE SHOWN ARE ONLY APPROXIMATE. THE CONTRACTOR SHALL ON HIS INITIATIVE AND AT NO EXTRA COST HAVE LOCATED ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. NO CLAIMS FOR DAMAGES OR EXTRA COMPENSATION SHALL ACCRUE TO THE CONTRACTOR FROM THE PRESENCE OF SUCH PIPE OTHER OBSTRUCTIONS OR FROM DELAY DUE TO REMOVAL OR REARRANGEMENT OF THE SAME. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UNDERGROUND STRUCTURES. CONTACT NORTH CAROLINA ONE CALL" TOLL FREE 1-800-632-4949 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL NONSUBSCRIBING UTILITIES. 18.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC., THAT MAY BE REQUIRED. 19.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 20.ALL LOT STRIPING AND DIRECTIONAL ARROWS TO BE REFLECTIVE MARKINGS AND SHALL CONFORM TO MUTCD. ALL PARKING STALL MARKINGS AND LANE ARROWS WITHIN THE PARKING AREAS SHALL BE WHITE. 21.LANDSCAPE PLANTINGS AT ENTRANCE/ EXITS WILL BE INSTALLED AND MAINTAINED SO AS NOT TO INTERFERE WITH SIGHT DISTANCE NEEDS OF DRIVERS IN THE PARKING AREA AND AT ENTRANCE/EXIT LOCATIONS PER LOCAL STANDARDS. 22.ALL DIMENSIONS AND RADII ARE TO OUTSIDE FACE OF BUILDING OR TO FACE OF CURB UNLESS OTHERWISE NOTED. BAY 10BAY 10 3838 38 38 38 38 38 38 38 38 38 37 37 37 37 37 36 >> >> >> SF SF SF SF SF SF SF 19.0' >> >> R2 0 ' R20 ' MA B E E W A Y (P R I V A T E A C C E S S W A Y ) R 6 ' TOP=37.00 INV=35.75 TOP=36.75 INV=35.25 (CL37.88) (EP37.52) PG37.70 EP37.55 EP37.55HP39.08 EXIST. DITCH GRADE 36.22 EXCAVATE DITCH GRADE SET AT 35.00 MATCH EXIST. DITCH GRADE EXCAVATE DITCH 12-15" AND SLOPE 3:1 BACK TO EXISTING CURB HOOK EP38.08 TC38.51 EP37.93 CURB HOOK EP38.08 TC38.51 EP37.93 39 39 39 39 38 37 37 36 36 37 36 37 38 38 38 36 37 37 (CL38.33) MATCH EXISTING TC38.79 MATCH EXISTING TC38.35 SF DA T E : SC A L E : DE S I G N E D : DR A W N : CH E C K E D : PEI JOB#: CO N C E P T U A L L A Y O U T : PR E L I M I N A R Y L A Y O U T : FI N A L D E S I G N : RE L E A S E D F O R C O N S T : PR O J E C T S T A T U S RE V I S I O N S : DR A W I N G I N F O R M A T I O N SEAL CL I E N T I N F O R M A T I O N : NE W H A N O V E R C O . , N O R T H C A R O L I N A 22 5 M A B E E W A Y , W I L M I N G T O N , N C 2 8 4 1 1 23148.PE MU R R A Y V I L L E E L E M E N T A R Y S C H O O L FI N A L D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N NE W H A N O V E R CO U N T Y S C H O O L S 64 1 0 C a r o l i n a B e a c h R o a d Wi l m i n g t o n N C 2 8 4 1 2 N O R T H CAROLIN A J A M E B A N C H S M PR O FESSION ENGIN E E R SEAL A L S R ITH 0 3 4 3 5 4 12 2 C i n e m a D r i v e W i l m i n g t o n , N o r t h C a r o l i n a 2 8 4 0 3 (9 1 0 ) 7 9 1 - 6 7 0 7 ( O ) ( 9 1 0 ) 7 9 1 - 6 7 6 0 ( F ) NC L i c e n s e # : C - 2 8 4 6 N O R T H SI T E & G R A D I N G P L A N 4/ 4 / 2 3 1" = 3 0 ' JB S JB S RP B C-2.0 SITE DATA PROJECT NAME:MURRAYVILLE ELEMENTARY SCHOOL PARKING LOT IMPROVEMENT PROJECT SITE ADDRESS:225 MABEE WAY WILMINGTON, NC 28411 OWNER:NEW HANOVER COUNTY BOARD OF EDUCATION 6410 CAROLINA BEACH RD. WILMINGTON, NC 28412 PARCEL ID:R03500-002-003-000 PARCEL AREA:35 ACRES ZONING:R-15- RESIDENTIAL DISTRICT JURISDICTION:NEW HANOVER COUNTY USE:821 - SCHOOL (GOV-EXEMPT GOVERNMENT) BUILDING CONSTRUCTION TYPE:EXISTING BUILDING (NO PROPOSED CHANGES) PROJECT (DISTURBED) AREA:0.40 ACRES (+/- 17,000 SF) FLOOD INFORMATION:PARCEL IS NOT LOCATED IN SPECIAL FLOOD HAZARD ZONE AS DETERMINED BY FEMA FLOOD PANEL MAP NUMBER 3720324000K, DATED 8/28/2018 CONSERVATION RESOURCES:NONE CAMA LAND USE CLASSIFICATION:URBAN SPECIAL OR OVERLAY DISTRICT:NONE SITE SITE PARKING SCHOOLS - PRIMARY AND SECONDARY EXISTING PARKING SPACES = 85 SITE STACKING (VEHICLE QUEUE) REF. MSTA SCHOOL TRAFFIC CALCULATOR VERSION: 04012021 TOTAL LENGTH OF VEHICLE QUEUE FOR DROP-OFF / PICK UP: REQUIRED: AVERAGE QUEUE LENGTH = 1737 LF HIGH DEMAND LENGTH = 2258 LF PROVIDED: DOUBLE LANES OF DROP-OFF = 850+825 = 1675 LF POTENTIAL NUMBER OF VEHICLE STACKING: 72 VEHICLES (BASED ON 23 LF PER VEHICLE) WETLANDS AND CAMA INFORMATION NO WETLANDS EXIST WITHIN PROJECT LIMITS NO 100-YEAR FLOOD BOUNDARY EXISTS WITHIN PROJECT LIMITS THERE ARE NO SURFACE WATERS WITHIN PROJECT LIMITS THERE ARE NO CAMA AREAS OF CONCERN WITHIN PROJECT LIMITS STORMWATER PERMIT INFORMATION (NCDEQ SW8 030726) POND 1: EXISTING BUA 217,509 SF FUTURE BUA 1,059 SF PROPOSED BUA 1,059 SF (NEW DRIVEWAY) TOTAL POND 1 BUA:218,568 SF (ALLOCATION BY PERMIT) REMAINDER OF SITE (LOW DENSITY): EXISTING BUA 29,777 SF FUTURE BUA 135,241 SF PROPOSED BUA 2900 SF (NEW DRIVEWAY) REMAINDER FUTURE 132,341 SF TOTAL LOW DENSITY BUA:165,018 SF (ALLOCATION BY PERMIT) OVERALL BUA ALLOCATION:383,586 SF (165,018 + 218,568) HISTORICAL & ARCHAEOLOGY NOTES NO KNOWN HISTORIC OR ARCHEOLOGICAL SITES EXIST THE SUBJECT PARCEL SITE UTILITIES NO PROPOSED CHANGES TO EXITING SITE UTILITIES (WATER, SEWER, ELECTRIC AND GAS). NO PROPOSED STRUCTURES. ALL EXISTING UTILITIES TO REMAIN AND PROTECT IN PLACE. TRAFFIC NOTES 1.ALL SIGNS AND PAVEMENT MARKINGS IN AREAS OPEN TO PUBLIC TRAFFIC ARE TO MEET MUTCD STANDARDS. 2.ALL TRAFFIC CONTROL SIGNS AND MARKINGS OFF THE RIGHT-OF-WAY ARE TO BE MAINTAINED BY THE PROPERTY OWNER IN ACCORDANCE WITH MUTCD STANDARDS. 3.ALL PARKING STALL MARKINGS AND LANE ARROWS WITHIN THE PARKING AREAS SHALL BE WHITE. 4.ANY BROKEN OR MISSING SIDEWALKS PANELS AND CURBING, DURING CONSTRUCTION WITHIN THE LIMITS OF DISTURBANCE, SHALL BE REPLACED. TRIP GENERATION 1. BASED ON THE MUNICIPAL AND SCHOOL TRANSPORTATION ASSISTANCE (MSTA) TRAFFIC SCHOOL CALCULATOR 0 15 30 60 120 SCALE: 1" = 30' GRAPHIC SCALE TREE PROTECTION FENCING DRAINAGE SWALE IMPROVEMENT TO RELIEVE EXIST DRIVEWAY STANDING WATER PAVE 40SF ASPHALT FLUME TO PROPOSED DITCH GRADE 15" RCP DRIVEWAY PIPE PROPOSED DOUBLE STACKING LANES TOTAL LENGTH = 1675 LF SAW-CUT 1-FT OF ASPHALT FOR NEW JOINT (SEE DETAIL) PROPOSED DOUBLE STACKING LANES TOTAL LENGTH = 1675 LF LEGEND: LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION FENCING FENCING, TYPE AS SPECIFIED COIR FIBER BAFFLES WATER LINE FORCEMAIN LINE SANITARY SEWER LINE SANITARY SEWER LATERAL/SERVICE STORM DRAIN LINE ROOF DRAIN LINE PROPOSED CONTOURS LOD LOD SF SF 20 SPOT GRADES DRAINAGE FLOW ARROWS TC 20.50 EP 20.00 EXCAVATE SWALE (SEE DETAILS) (2) DO NOT ENTER SIGNS and (2) STOP SIGNS (SEE DETAILS) 40LF OF DITCH EXCAVATION 2670 SF ASPHALT MODIFIED VALLEY CURB (SEE DETAILS) STANDARD CURB TRANSITION TO VALLEY CURB (SEE DETAILS) EXCAVATE SWALE (SEE DETAILS) 1.)SEE GENERAL NOTES SHEET (C-1.0) FOR GRADING, DRAINAGE AND EROSION CONTROL NOTES AND DETAILS FOR MORE INFORMATION. 2.)ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS AND/OR TECHNICAL SPECIFICATIONS SEALED AS PART OF THESE CONSTRUCTION DOCUMENTS. 3.)GEOTECHNICAL TESTING SHALL BE PERFORMED ON-SITE. A GEOTECHNICAL ENGINEER SHALL BE CONSULTED TO CONFIRM SUITABILITY OF SUBGRADE MATERIAL AND PROPER COMPACTION IN FILL AREAS. 4.)CONTRACTOR SHALL CONSULT THE GEOTECHNICAL ENGINEER TO CONFIRM SUITABILITY OF SUBGRADE MATERIAL FOR STORM PIPES AND STRUCTURES. GRADING NOTES: 1.)SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITALBE MATERIAL AND PROVIDE CUT/FILL OPERATIONS TO PROVIDE A COMPACTED CONTROLLED SUBGRADE, IN ACCORDANCE WITH THE SUBSURFACE GEOTECHNICAL EXPLORATION AND TECHNICAL SPECIFICATIONS. ASPHALT AREA NOTE:EP =PROPOSED EDGE OF PAVEMENT EC =EDGE OF CONCRETE DI =DROP INLET PG =PROPOSED GRADE CI =CURB INLET HP =HIGH POINT ELEVATION SW =SIDEWALK ELEVATION MH =STORM MANHOLE YI =YARD INLET RP =RAMP PAD =DUMPSTER PAD ELEVATION RD =ROOF DRAIN CONNECTION NOTATION: DRAINAGE NOTES: 1.)DRAINAGE EASEMENT AND STORMWATER SYSTEM MAINTENANCE IS THE RESPONSIBILITY OF THE DEVELOPER, INCLUDING PIPES, STRUCTURES, AND STORMWATER CONTROL MEASURES AS PERMITTED WITH THE STATE OR LOCAL JURISDICTION. 2.)ALL IMPERVIOUS MUST DRAIN TO THE DESIGNED STORMWATER SYSTEM UNLESS SHOWN OTHERWISE. 3.)CONTRACTOR SHALL ADJUST ALL FRAMES OF EX. UTILITY INFRASTRUCTURE WITHIN ASPHALT OVERLAY AREAS TO MATCH PROPOSED GRADES. 4.)THE CONTRACTOR SHALL USE EITHER RCP or HP PIPE FOR THE STORM DRAINAGE SYSTEM. BC/TC = TOP OF CURB ELEVATION TS =TOP OF WALK (SIDEWALK) ELEVATION INV =INVERT FES =FLARED END SECTION TWL =TOP OF WALL ELEVATION BWL =BOTTOM OF WALL ELEVATION (EG)=EXISTING GRADE (XX)=EXISTING ELEVATIONS, TYP. 1. CONTRACTOR SHALL MAINTAIN AN ALL WEATHER ACCESS FOR EMERGENCY VEHICLES AT ALL TIMES DURING CONSTRUCTION. FIRE AND LIFE SAFETY NOTES LOAK 12 PNE 16PNE 10 PNE 16 GUM 8 PNE 14 GUM 15 GUM 8 GUM 8 GUM 12 GUM 10 GUM 10 GUM 14 GUM 8 GUM 8 PNE 16 BAY 10BAY 10 GUM 14GUM 8 PNE 20 GUM 12 GUM 10 GUM 8 GUM 10 PNE 16 GUM 8 GUM 12 GUM 8 GUM 8 GUM 8 GUM 10 GUM 8 GUM 10 GUM 16 GUM 9 GUM 12 GUM 11 GUM 10 3838 38 38 38 38 38 38 38 38 37 37 37 37 37 36 LO D LO D LO D LO D LOD LOD LOD LODLODLOD LOD LOD LOD LO D LO D LO D LO D LO D SF SF SF SF SF SF SF MA B E E W A Y (P R I V A T E A C C E S S W A Y ) LO D LO D LO D LO D LO D SF DA T E : SC A L E : DE S I G N E D : DR A W N : CH E C K E D : PEI JOB#: CO N C E P T U A L L A Y O U T : PR E L I M I N A R Y L A Y O U T : FI N A L D E S I G N : RE L E A S E D F O R C O N S T : PR O J E C T S T A T U S RE V I S I O N S : DR A W I N G I N F O R M A T I O N SEAL CL I E N T I N F O R M A T I O N : NE W H A N O V E R C O . , N O R T H C A R O L I N A 22 5 M A B E E W A Y , W I L M I N G T O N , N C 2 8 4 1 1 23148.PE MU R R A Y V I L L E E L E M E N T A R Y S C H O O L FI N A L D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N NE W H A N O V E R CO U N T Y S C H O O L S 64 1 0 C a r o l i n a B e a c h R o a d Wi l m i n g t o n N C 2 8 4 1 2 N O R T H CAROLIN A J A M E B A N C H S M PR O FESSION ENGIN E E R SEAL A L S R ITH 0 3 4 3 5 4 12 2 C i n e m a D r i v e W i l m i n g t o n , N o r t h C a r o l i n a 2 8 4 0 3 (9 1 0 ) 7 9 1 - 6 7 0 7 ( O ) ( 9 1 0 ) 7 9 1 - 6 7 6 0 ( F ) NC L i c e n s e # : C - 2 8 4 6 N O R T H SI T E D E M O L I T I O N A N D ER O S I O N C O N T R O L P L A N 4/ 4 / 2 3 1" = 3 0 ' JB S JB S RP B C-2.1 SITE DATA PROJECT NAME:MURRAYVILLE ELEMENTARY SCHOOL PARKING LOT IMPROVEMENT PROJECT SITE ADDRESS:225 MABEE WAY WILMINGTON, NC 28411 OWNER:NEW HANOVER COUNTY BOARD OF EDUCATION 6410 CAROLINA BEACH RD. WILMINGTON, NC 28412 PARCEL ID:R03500-002-003-000 PARCEL AREA:35 ACRES ZONING:R-15- RESIDENTIAL DISTRICT JURISDICTION:NEW HANOVER COUNTY USE:821 - SCHOOL (GOV-EXEMPT GOVERNMENT) BUILDING CONSTRUCTION TYPE:EXISTING BUILDING (NO PROPOSED CHANGES) PROJECT (DISTURBED) AREA:0.40 ACRES (+/- 17,000 SF) FLOOD INFORMATION:PARCEL IS NOT LOCATED IN SPECIAL FLOOD HAZARD ZONE AS DETERMINED BY FEMA FLOOD PANEL MAP NUMBER 3720324000K, DATED 8/28/2018 CONSERVATION RESOURCES:NONE CAMA LAND USE CLASSIFICATION:URBAN SPECIAL OR OVERLAY DISTRICT:NONE SYMBOLS LEGEND EXISTING CONCRETE TO BE REMOVED EXISTING ASPHALT TO BE REMOVED TREE PROTECTION FENCING EXISTING TREE/SHRUBS TO BE REMOVED EXISTING TREE TO REMAIN AND PROTECT IN PLACE SITE 0 15 30 60 120 SCALE: 1" = 30' GRAPHIC SCALE TREE PROTECTION FENCING AND SILT FENCE (SEE DETAILS) 116 SF CURB REMOVAL EXISTING ROADSIDE DITCH TREE REMOVAL 115 SF ASPHALT REMOVAL OVERHEAD ELECTRIC BURIED TELEPHONE LINE BURIED GAS LINE BURIED TV CABLE BURIED FIBER OPTIC WATER LINE FORCEMAIN LINE SANITARY SEWER LINE STORM DRAINAGE LINE WETLAND DELINEATION CHAINLINK FENCE EXISTING CONTOUR RIGHT OF WAY/BOUNDARY BOUNDARY LINE ADJOINER LINE XX FO GAS GAS UTV OHE UGT LEGEND: IRON PIPE FOUND IRON ROD FOUND IRON ROD SET PK NAIL FOUND PK NAIL SET CONCRETE MONUMENT FOUND LIGHT POLE UTILITY POLE GUY ANCHOR TRANSFORMER TELEPHONE RISER WATER METER WATER VALVE FIRE HYDRANT CLEAN-OUT SANITARY SEWER MANHOLE STORM DRAINAGE MANHOLE WELL CURB INLET CATCH BASIN GAS METER MAILBOX TREES C.O. S D W LEGEND: TREE REMOVAL INSTALL TEMPORARY CONSTRUCTION ENTRANCE IF NEEDED (SEE DETAILS) 9400 SF LIMITS OF DISTURBANCE 960 SF LIMITS OF DISTURBANCE 1.)SEE GENERAL NOTES SHEET (C-1.0) FOR GRADING, DRAINAGE AND EROSION CONTROL NOTES AND DETAILS FOR MORE INFORMATION. 2.)ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS AND/OR TECHNICAL SPECIFICATIONS SEALED AS PART OF THESE CONSTRUCTION DOCUMENTS. 3.)GEOTECHNICAL TESTING SHALL BE PERFORMED ON-SITE. A GEOTECHNICAL ENGINEER SHALL BE CONSULTED TO CONFIRM SUITABILITY OF SUBGRADE MATERIAL AND PROPER COMPACTION IN FILL AREAS. 4.)CONTRACTOR SHALL CONSULT THE GEOTECHNICAL ENGINEER TO CONFIRM SUITABILITY OF SUBGRADE MATERIAL FOR STORM PIPES AND STRUCTURES. GRADING NOTES: 1.)SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITALBE MATERIAL AND PROVIDE CUT/FILL OPERATIONS TO PROVIDE A COMPACTED CONTROLLED SUBGRADE, IN ACCORDANCE WITH THE SUBSURFACE GEOTECHNICAL EXPLORATION AND TECHNICAL SPECIFICATIONS. ASPHALT AREA NOTE: 1. CONTRACTOR SHALL MAINTAIN AN ALL WEATHER ACCESS FOR EMERGENCY VEHICLES AT ALL TIMES DURING CONSTRUCTION. FIRE AND LIFE SAFETY NOTES DEMOLITION NOTES: 1.CONTRACTOR TO COORDINATE WITH THE OWNER TO PROPERLY MAINTAIN OR RELOCATE EXISTING SERVICE CONNECTIONS WHEN NECESSARY. 2.CONTRACTOR IS TO WALK THE SITE AND BECOME FAMILIAR WITH THE SCOPE OF DEMOLITION REQUIRED. ALL DEMOLITION WORK REQUIRED TO CONSTRUCT NEW SITE IMPROVEMENTS WILL BE PERFORMED BY THE CONTRACTOR AND WILL BE CONSIDERED UNCLASSIFIED EXCAVATION. 3.DEMOLITION SHALL INCLUDE BUT IS NOT LIMITED TO THE EXCAVATION, HAULING AND OFFSITE DISPOSAL OF CONCRETE PADS, CONCRETE DITCHES, FOUNDATIONS, SLABS, STEPS, AND STRUCTURES; ABANDONED UTILITIES, BUILDINGS, PAVEMENTS AND ALL MATERIALS CLEARED AND STRIPPED TO THE EXTENT NECESSARY AS DIRECTED BY THE GEOTECHNICAL ENGINEER FOR THE INSTALLATION OF THE NEW IMPROVEMENTS AND WITHIN THE LIMITS OF CLEARING AND GRADING AND AS SHOWN ON THESE PLANS. 4.THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTY, STRUCTURES AND UTILITIES ON THE PROPERTY NOT TO BE DEMOLISHED. DAMAGE TO PROPERTIES OF OTHERS DUE TO THE CONTRACTOR'S ACTIVITIES SHALL BE REPLACED IN KIND BY THE CONTRACTOR AT NO COST TO OWNER. 5.ELECTRIC, TELEPHONE, SANITARY SEWER, WATER AND STORM SEWER UTILITIES THAT SERVICE OFF-SITE PROPERTIES SHALL BE MAINTAINED DURING THE CONSTRUCTION PROCESS BY THE CONTRACTOR. 6.THE CONTRACTOR SHALL PRODUCE A PHOTOGRAPHIC RECORD (DIGITAL) OF DEVELOPMENT COMMENCING WITH A RECORD OF THE SITE AS IT APPEARS BEFORE DEMOLITION HAS BEGUN. AFTERWARDS, A PHOTOGRAPHIC RECORD SHALL BE MAINTAINED WEEKLY DURING CONSTRUCTION AND ENDING WITH A PHOTOGRAPHIC RECORD OF THE DEVELOPMENT AS IT APPEARS AFTER DEMOLITION. THIS RECORD SHALL BE DELIVERED TO THE OWNER. 7.EXISTING CURB AND GUTTER, LIGHTS, SIDEWALK, AND UTILITIES NOT INTENDED FOR DEMOLITION SHALL BE MAINTAINED, PROTECTED AND UNDISTURBED DURING DEMOLITION. 8.ALL EXISTING IMPROVEMENTS INDICATED OR REQUIRED TO BE DEMOLISHED SHALL INCLUDE REMOVAL FROM THE PROPERTY AND PROPER DISPOSAL. 9.CONTRACTOR SHALL COORDINATE RELOCATION OF ALL EXISTING OVERHEAD AND UNDERGROUND UTILITIES INCLUDING CABLE, GAS, TELEPHONE AND ELECTRIC AND ANY OTHER UTILITIES THROUGH THE SITE WITH THE RESPECTIVE COMPANIES. 10.CONTRACTOR SHALL MAINTAIN REQUIRED DISTANCES FROM HIGH VOLTAGE OVERHEAD LINES AND REMOVE TREES SO THEY DO NOT FALL TOWARDS OVERHEAD ELECTRICITY. 11.PROVIDE SMOOTH SAW CUT OF EXISTING PAVEMENTS, CURBS AND GUTTERS AND SIDEWALKS TO BE DEMOLISHED. 12.ALL DEMOLITION WORK SHALL BE DONE IN STRICT ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS AS WELL AS OSHA REGULATIONS. 13.EXISTING FIRE HYDRANTS ON OR NEAR THE SITE ARE TO REMAIN IN SERVICE. 14.INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATIONS. DA T E : SC A L E : DE S I G N E D : DR A W N : CH E C K E D : PEI JOB#: CO N C E P T U A L L A Y O U T : PR E L I M I N A R Y L A Y O U T : FI N A L D E S I G N : RE L E A S E D F O R C O N S T : PR O J E C T S T A T U S RE V I S I O N S : DR A W I N G I N F O R M A T I O N SEAL CL I E N T I N F O R M A T I O N : NE W H A N O V E R C O . , N O R T H C A R O L I N A 22 5 M A B E E W A Y , W I L M I N G T O N , N C 2 8 4 1 1 23148.PE MU R R A Y V I L L E E L E M E N T A R Y S C H O O L FI N A L D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N NE W H A N O V E R CO U N T Y S C H O O L S 64 1 0 C a r o l i n a B e a c h R o a d Wi l m i n g t o n N C 2 8 4 1 2 N O R T H CAROLIN A J A M E B A N C H S M PR O FESSION ENGIN E E R SEAL A L S R ITH 0 3 4 3 5 4 12 2 C i n e m a D r i v e W i l m i n g t o n , N o r t h C a r o l i n a 2 8 4 0 3 (9 1 0 ) 7 9 1 - 6 7 0 7 ( O ) ( 9 1 0 ) 7 9 1 - 6 7 6 0 ( F ) NC L i c e n s e # : C - 2 8 4 6 GE N E R A L N O T E S CI V I L S I T E D E T A I L S 4/ 4 / 2 3 NT S JB S JB S RP B C-3.0 PUB L I C R O A D 6" DIVERSION TO DIRECT RUNOFF FROM R/W SECTION VIEW PLAN VIEW 50' MIN. 50' M I N . 20' MIN. 2-3" COARSE AGGREGATE 6" THICKNESS TEMPORARY CONSTRUCTION ENTRANCE NOT TO SCALE BOTTOM STRAND MIN. #14 GAUGE TOP STRAND MIN. #14 GAUGE STEEL POST FILL S L O P E STAY AND LINE WIRES MIN. #14 GAUGE 4" X 8" TRENCH LINED W/ 12" OF FABRIC AND COMPACTED FILL ON TOP NOTES: 1. WIRE FENCE (IF USED) SHALL BE MINIMUM 14 GAUGE WITH A MAXIMUM MESH OPENING OF 6-INCHES. 2. SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFIN'S OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461 AND ALSO SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS ACCORDING TO ASTM D 4355. 3. SEE THE NC EROSION CONTROL MANUAL FOR SPECIFICATIONS INSTALLING SEDIMENT FENCE USING THE SLICING METHOD MACHINERY. 8' MAX. SPACING WITH WIRE FENCE OR 6' MAX SPACING WITH NO WIRE 3' - 0 " M I N . 2'- 0 " M I N . 2' - 0 " MA X . TEMPORARY SILT FENCE TREE PROTECTION FENCE DRIPLINE EXISTING TREE 3' MIN. STAKE HEIGHT ABOVE GRADE NOTE TREES TO BE SAVED WILL BE CLEARLY MARKED PRIOR TO CONSTRUCTION AND A PROTECTIVE BARRIER IS TO BE INSTALLED AT THE DRIPLINE. DRIP LINE - THE AREA OF SOIL DIRECTLY BENEATH THE TREE EXTENDING OUT TO THE TIPS OF THE OUTERMOST BRANCHES. FENCING SHALL INCLUDE SIGNS EVERY 50' WITH MIN. 2 SIGNS. SEE ABOVE FOR SIGN. PROTECTIVE BARRIER TREE PROTECTION AREA DO NOT ENTER ZONA DE PROTECSION PARA ARBOLES - NO ENTRE 3 1 SEED AND MULCH OR SOD PER LANDSCAPE PLANS. MUST BE DENSELY VEGETATED. 1 FT 3:1 MA X . VEGETATED SWALE BACKSLOPE ADJACENT TO LOTS CAN BE FIELD ADJUSTED FOR LOT GRADING. CONSULT ENGINEER PRIOR TO RE-GRADING. EXCELSIOR MATTING (AMERICAN EXCELSIOR CURLEX 1.73 SINGLE NET OR APPROVED SUBSTITUTE UNLESS OTHERWISE NOTED) 7" 6" 12 " MODIFIED VALLEY CURB 2'-0" 1'-0"1'-0" 6" AGGREGATE BASE COURSE UNDER CURB. STOP NOTE: SIGNS SHALL BE FABRICATED USING S/F 0.08 NON-ILLUMINATED ALUMINUM WITH VINYL COPY APPLIED TO THE FIRST SURFACE. RED 'REFLECTIVE' COLOR WHITE 'REFLECTIVE' COLOR3"x3" SQUARE ALUMINUM TUBING, DARK BRONZE COLOR OR AS REQUIRED BY LOCAL JURISDICTION OR LANDLORD REQUIREMENTS. 30" 30 " 7'- 0 " 2'- 0 " ( M I N . ) 1" 8"Ø CONCRETE BASE A STOP SIGN & STANDARD MOUNTING POST (MUTCD R 1-1) 6" DIA. SCH. 80 STEEL PIPE BOLLARD FILLED WITH CONCRETE. PAINT DARK BRONZE (TOP 12" PAINTED YELLOW) 4000 PSI CONCRETE 2' - 6 " 6" 2'-0" 7' - 0 " T O B O T T O M O F L O W E S T R E Q U I R E D S I G N 2"X2" SQUARE TUBING PAINT CONCRETE BLACK AFTER CURING AT ASPHALT LOCATIONS 3' - 0 " DIRECTIONAL SIGNS AND MOUNTED POST DETAILS R5-1 SIGN 30"x30" R 1-1 SIGN 30"x30" 6" - COMPACTED AGGREGATE BASE COURSE COMPACTED SUBGRADE TO 98-100% ASTM D698 2.0" - SF9.5C SURFACE IN ACCORDANCE WITH NCDOT SPECIFICATIONS ASPHALT PAVEMENT SECTION NOT TO SCALE 3' R PAINT SOLID PAINT SOLID 1' - 2 " 1' - 8 " 1'- 8 " 1'- 2 " 3'-0" 1'-0"1'-2"1'-0"1'-2" 3' - 0 " 3'- 0 " DIRECTIONAL ARROW NOT TO SCALE 6'-0" 6'- 0 " DRIVEWAY PIPE AND DITCH DETAIL 24" WIDTH VALLEY GUTTER 24" WIDTH CURB AND GUTTER TRANSITION CURB SECTION 1" PER FOOT TRANSITION EDGE OF PAVEMENT BACK OF CURB TRANSITION VALLEY CURB TO STANDARD CURB EDGE TREATMENT FOR EXISTING PAVEMENT ADJACENT TO PROPOSED PAVEMENT NOT TO SCALE 1-ft NEW ASPHALT SECTION (SEE SECTION) EXISTING PAVEMENT MILL & OVERLAY (1.5") FOR 1-FT OF EX. SURFACE ADJACENT TO NEW PAVEMENT TO LOCK SEAM AND/OR 1' MIN. BEYOND LANE LINE TO REMOVE EX. PAVEMENT MARKINGS