Anchors Bend_Ph3_20080610_Jim_IannucciMr. Jim lannucci
New Hanover County Engineering Departzxient
230 Government Center Drive, Suite 106
Wilmington, North Carolina 28403
Re: Anchors Bend Subdivision
Phase 3 Bonding
ESP Project No. TB30.400
Dear Mr. Iannucci:
Subtotal for Phase 3
ESP Associates is subn~ittiz~g a line item estimate for unfinished constxuc#ion facilities that will be banded
for by Atlantic Blue Management, Inc. as part of the Phase 3 plat approval for Anchoxs Bend. This phase,
Phase 3, consists of 41 lots; 60-79 & 133-153.Phase 2 has been put temporarily an hold and will consist
of the remaining 40 lots of lots 1-54.
Anchors Bend Bond Estimate Summary Table for Phase 3
Tree Mitigation Caliper inches
NHC Fee per 3 Inches
New 3 Caliper Inch Trees Planted
Tree Mitigation Fee
Tree Mitigation Fee per Lot (205 Lats)
Lots Recorded in Phase 3
Tree Mitigation Fee to Bond
Street Signs in Phase 3
Street Sign Costs to Bond
Tree Mitigation Fee to Bond
Bond Release Pram Phase 7
Fire Hydrant (2 @ $5000}
Street Signs (23 @ $300)
Subtotal for Phase 3 Bond
Bond Release from Phase 1
Tune 10, 2008
2,696
$ 295.00
899
$ 265,205.00
$ 1,293.68
41
$ 52,763.95
32 @ $300 each T $9,600.00
Bond Release Subtotal
5ubto#al for Phase 3
$ 9,soo.oo
52,763.95
$ 62,363.95
$ (10,000.00}
$ (6,900.00}
$ (16,900.00)
$ 62,363.95
(16,900.00)
$ 45,463.95
2II Racine Drive W"ilmingtan, 3~C 2S4D3
91D.313.6fi4S fax 9Ip.313.6523
~....
Page 2
Please do not hesitate to contact me if you any additional comments or cancerzas.
Sincerely,
ESP Associates, P.A.
Gam"
J'im Campton, P.E.