Loading...
Anchors Bend_Ph3_20080610_Jim_IannucciMr. Jim lannucci New Hanover County Engineering Departzxient 230 Government Center Drive, Suite 106 Wilmington, North Carolina 28403 Re: Anchors Bend Subdivision Phase 3 Bonding ESP Project No. TB30.400 Dear Mr. Iannucci: Subtotal for Phase 3 ESP Associates is subn~ittiz~g a line item estimate for unfinished constxuc#ion facilities that will be banded for by Atlantic Blue Management, Inc. as part of the Phase 3 plat approval for Anchoxs Bend. This phase, Phase 3, consists of 41 lots; 60-79 & 133-153.Phase 2 has been put temporarily an hold and will consist of the remaining 40 lots of lots 1-54. Anchors Bend Bond Estimate Summary Table for Phase 3 Tree Mitigation Caliper inches NHC Fee per 3 Inches New 3 Caliper Inch Trees Planted Tree Mitigation Fee Tree Mitigation Fee per Lot (205 Lats) Lots Recorded in Phase 3 Tree Mitigation Fee to Bond Street Signs in Phase 3 Street Sign Costs to Bond Tree Mitigation Fee to Bond Bond Release Pram Phase 7 Fire Hydrant (2 @ $5000} Street Signs (23 @ $300) Subtotal for Phase 3 Bond Bond Release from Phase 1 Tune 10, 2008 2,696 $ 295.00 899 $ 265,205.00 $ 1,293.68 41 $ 52,763.95 32 @ $300 each T $9,600.00 Bond Release Subtotal 5ubto#al for Phase 3 $ 9,soo.oo 52,763.95 $ 62,363.95 $ (10,000.00} $ (6,900.00} $ (16,900.00) $ 62,363.95 (16,900.00) $ 45,463.95 2II Racine Drive W"ilmingtan, 3~C 2S4D3 91D.313.6fi4S fax 9Ip.313.6523 ~.... Page 2 Please do not hesitate to contact me if you any additional comments or cancerzas. Sincerely, ESP Associates, P.A. Gam" J'im Campton, P.E.