Loading...
Exton Park_Approval_Letter1®Tew I~anover County Planning Department Chris O'Keefe Planning Director January 25, 2007 Mr. Howard Penton Penton Development 6105 Oleander Drive, Suite 101 Wilmington, NC 28403 Re: Exton Park (Performance Development) Dear Mr. Penton: County Annex Building 230 Marketplace Drive, Suite 7 50 Wilmington, NC 28403 P 910.798.7765 F 910.798.7053 In regular session on January 24, 2007, the County's Technical Review Committee (TRC) approved the preliminary site plan for Exton Park for a total of 114 units as displayed on your site plan design. Please note that site plan approval for the project is valid for a period of two years. The vote by the TRC was 3-0 and comes with the following requirements: 1) A split road entrance from N. College Road will need to be designed and approved by NCDOT during the Driveway Permit application process. If the designed entrance can not be approved, a sprinkler system for the units maybe satisfactory to County Fire Services. 2) Please clarify the 100 year flood zone boundary on the site plan. "Active" rec space out of the flood zone will need to be clarified. 3) All terms and conditions of the CD(R-10) Zoning adopted by the Board of County Commissioners will remain in effect - if applicable. - Attending the meeting were TRC Chairman David Adams (Planning Board), Sam Burgess (Planning staff), Matt Davis (County Fire Services), and Jim Iannucci (County Engineering). Also attending were Bobby Hams (Planning staff), Holt Moore (County Legal), Baird Stewart (developer for the project), Ray Griswold and Tom Sosebee (Fire Services), and you. Exton Park will be valid as a preliminary site plan for two years. If a final plat for all or a portion of the project is not submitted within the 24 month time frame, the plan must be resubmitted as a new preliminary plan in accordance with the Subdivision Regulations. Otherwise, the preliminary approval shall become void. A one year extension to the site plan may be requested through the TRC prior to the expiration of the plan. Penton Letter 2 In the future, this project may be served by County sewer. However, due to the limited capacity of the County's wastewater treatment facilities, sewer capacity may not exist. DEHNR wastewater sewer construction and operations permits and/or final plat approval of sections maybe withheld, if in the opinion of the County Engineer, adequate sewer capacity does not exist. Please note that all other local, State, and Federal regulations will be applicable to Exton Park. As you may know, final plat approval for all or a portion of Exton Park can not be obtained until construction plan drawings are submitted and approved by County Engineering staff. No significant trees were located on the project's Tree Survey. Please share this information with your client. Please also remit 5 full size paper copies of the plan based on the above requirements for TRC Chairman signature. Contact me if you have questions. I may be reached at (910) 798-7441. cc: Planning Board members Ann Hines, Zoning (map) Jim Iannucci, Engineering (map) Matt Davis, Fire Services (map) Mike Kozlosky, City/Co MPO Beth Easley-Wetherill, Engineering File Sincerely, S.A. Burgess Principal Dev. Planner