Loading...
Exton Park_Ph1_correspondencePage 1 of 1 Burgess, Sate From: Griswold, Raymond Sent: Tuesday, March 18, 2008 3:36 PM To: Burgess, Sam Subject: EXTON PARK TOWNHOUSES - 1 Sam - I did a site visit and reviewed the requested memo & plan review. The following items were observed. 1. The roadway is graveled in. Per the contractor on-site the road will be paved next week. 2. All the fire hydrants are in as shown on the plan, however they are bagged and per Jim Craig, they are not turned on 3. Fire hydrants need to be flow tested 4. All other items are completed. Any questions, please feel free to contact me at any time. Raymond Griswold Deputy Fire Marshal 798-7448 (off.) 512-3689 (cell) 3/18/2008 Page 1 of 1 Burgess, Sam From: Wetherill, Beth Sent: Thursday, April 10, 2008 12:15 PM To: lannucci, Jim; Burgess, Sam; Pearsall, Robert Cc: Nichols, Steve; 'heather@pentondevelopment.com'; Clark, Timothy; Craig, Jim; Ihnat, Dennis; McCollum, Alvin; McSmith, Gary; Neal, Chris; Pinnix, William Subject: RE: Exton Park SD # 1307 Exton Park owes a land disturbing fee of $6200 BEFORE issuance of a CO. From: Iannucci, Jim Sent: Thursday, April 10, 2008 10:52 AM To: Burgess, Sam Cc: Nichols, Steve; 'heather@pentondevelopment.com'; Clark, Timothy; Alvin; McSmith, Gary; Neal, Chris; Pinnix, William; Wetherill, Beth Subject: Exton Park SD # 1307 Sam, Engineering, Com__ments: All improvements for Phase 1 are complete. Craig, Jim; Ihnat, Dennis; McCollum, However, we need a partial or final Stormwater ATC Certification that indicates stormwater improvements are in place for Phase 1. Upon receipt of the stormwater certification from the engineer and field verification of the stormwater for Phase 1, Engineering is prepared to sign the plat. Thanks, Jim James P. Iannucci, PE, CFM Chief Project Engineer New Hanover County Engineering Department 230 Government Center Drive, Suite 160 Wilmington, NC 28403 www.nhcgov.com 4/14/2008 Page 1 of 1 Burgess, Sam From: lannucci, Jim Sent: Thursday, April 10, 2008 10:52 AM To: Burgess, Sam Cc: Nichols, Steve; 'heather@pentondevelopment.com'; Clark, Timothy; Craig, Jim; Ihnat, Dennis; McCollum, Alvin; McSmith, Gary; Neal, Chris; Pinnix, William; Wetherill, Beth Subject: Exton Park SD # 1307 Sam, Engineering Comments: All improvements for Phase 1 are complete. However, we need a partial or final Stormwater ATC Certification that indicates stormwater improvements are in place for Phase 1. Upon receipt of the stormwater certification from the engineer and field verification of the stormwater for Phase 1, Engineering is prepared to sign the plat. Thanks, Jim James P. Iannucci, PE, CFM Chief Project Engineer New Hanover County Engineering Department 230 Government Center Drive, Suite 160 Wilmington, NC 28403 www.nhcgov.com 4/14/2008 Page 1 of 1 Burgess, Sam From: Griswold, Raymond Sent: Tuesday, April 15, 2008 7:49 AM To: Burgess, Sam Subject: EXTON PARK DEVELOPEMENT Sam - I made a site visit late yesterday afternoon. Castle Hayne Fire Dept. conducted flow testing on the hydrants through out the developement and one hydrane along N. College Road. It appears we have plenty of water at this site for fire protection purposes. The front Phase of the project is fully paved, up to & including the cut through between the main loop road. The back half is graveled in, but not paved. Fire Services has no reason to hold -up any bond release on the front phase or the release of turning power onto this area. Any questions, please feel free to contact me at any time. Raymond Griswold Deputy Fire Marshal 798-7448 (off.) 512-3689 (cell) 4/15/2008 Page 1 of 1 Burgess, Sam From: Iannucci, Jim Sent: Friday, April 18, 2008 12:14 PM To: Burgess, Sam Cc: 'heather@pentondevelopment.com' Subject: Exton Park SD #1307 Sam, Engineering Comments Plat is ready. I performed a site inspection this morning with Mark Stogner and approved the partial stormwater cert. I have signed the mylars and Jennifer is headed your way with them. Thanks, Jim James P. Iannucci, PE, CFM Chief Project Engineer New Hanover County Engineering Department 230 Government Center Drive, Suite 160 Wilmington, NC 28403 www.nhegov.com 4/20/2008