TECHNICAL REVIEW COMMITTEE REPORT
JUNE 2015
The County’s Technical Review Committee (TRC) met once during the month of June and
reviewed two (2) existing site plan requests involving the re-designation of a road network
from “public” to “private” and extending the preliminary validity period of a performance
project for one year.
Rockhill Subdivision (Road Re-Designation)
Rockhill Subdivision is located in the northern portion of our jurisdiction near the 1900 block of
Rockhill Road. The single family residential project was preliminarily approved by the TRC in
December,A2014AforA37Alots.A sAaApartAofApreliminaryAapproval,AtheAsiteAplanAincludedAaA“public”A
road network that would be petitioned for NCDOT State maintenance once residency
requirements were met. The developer for the project proposed that the roads be re-
designatedAfromA“public”AtoA“private”AwithAnoAgates,AtrafficAcalmingAdevices,AorAotherA
obstructions to allow for the road inter-connectivity requirements to be met between Rockhill
Road and Oakley Circle.
In a vote of 5-0,AtheATRCAapprovedAtheAdeveloper’sArequestAtoAre-designate the road network in
RockhillASubdivisionAfromA“public”AtoA“private”AwithAtheAexceptionAofAFarmhouseARoadAthatA
connects Rockill Road with Oakley Circle (see site map).
Deer Crossing: Phase 3 (One Year Preliminary Extension)
Deer Crossing is located in the southern portion of our jurisdiction near the 6500 block of
Myrtle Grove Road. The single family residential project phase contains 39 lots and was
preliminarily approved in July, 2013 for two (2) years. The developer for the project requested a
one year preliminary site plan extension based on past economic conditions.
In a vote of 5-0, the TRC approved a one year extension to Deer Crossing: Phase 3 with existing
original terms and conditions remaining from the July, 2013 site plan.