HomeMy WebLinkAbout2013 TIA Report_N_College_Rd
COLLEGE ROAD DEVELOPMENT
New Hanover County, NC
TRANSPORTATION IMPACT ANALYSIS
Prepared for College Road Development Partners
www.davenportworld.com
Project Number: 13-208
3/4/13
DAVEN>ORT
Transportation Impact Analysis
College Road Development
New Hanover County,NC
Prepared for College Road Development Partners
March 4,2013
Analysis by:Mary Morgan,P.E.
Drafting/Graphics by:Mary Morgan,P.E.
Trisha Hartzell,P.E.
Reviewed by:Trisha Hartzell,P.E.
Dan Cumbo,P.E.
Sealed by:Dan Cumbo,P.E.
SEAL
This document,together with the concepts and designs presented herein,is intended only for the specific purpose and
client for which it was prepared.Reuse of,or improper reliance on,this document by others without written authorization
and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement
between DAVENPORT and the client.
Home Office:
305 \X!estFourth Street.Suite 2..-\(27101)
1'.0.Box-+131.\X'illstoll-Salcm.NC 27115-4131
\lain:336.744.1636;Fax:336.-+58.9377
~M
~
Serving the Southeast since 2002
3/4/13 13-208 College Road Development – Executive Summary i
College Road Development – Transportation Impact Analysis
New Hanover County, NC Prepared for College Road Development Partners
March 4, 2013
Executive Summary
The proposed College Road Mixed-Use Development is located along the eastside of US 117/NC 132 (North College Road) just north of the intersection with Long Ridge Drive in New Hanover
County, North Carolina. As currently planned, the site will consist of a mixed-use building that has 120 residential apartment units with 6,400 square feet of commercial/office space on the first floor
of the building. The site also has a future parcel to the south, which is planned for a 4,500 square foot fast food restaurant. The site will be accessed by two (2) driveways on North College Road
which will directly serve the mixed-use building. Access will be provided internally to the future fast food parcel via two locations. Additionally, per the request of the North Carolina Department of
Transportation (NCDOT) and New Hanover County, cross access from the fast food parcel will also be planned for to the vacant parcel to the south (D.B. 5354-2729).
DAVENPORT was retained to determine the potential traffic impacts of this development and to
identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the
study:
• US 117/NC 132 (North College Road) at Murrayville Road/Bavarian Lane
• US 117/NC 132 (North College Road) at Long Ridge Drive
• US 117/NC 132 (North College Road) at Proposed North Access
• US 117/NC 132 (North College Road) at Proposed South Access
The above-mentioned intersections were analyzed for the following scenarios:
• 2013 Existing Conditions
• 2014 Future No Build Conditions
• 2014 Future Build-Out Conditions
• 2014 Future Build-Out with Improvements (as necessary)
The build-out analysis year for this project was assumed to be 2014. The AM (7:00-9:00 am) and PM
(3:30-6:00 pm) peaks were studied.
The NCDOT and Wilmington MPO were contacted to obtain background information and to
ascertain the elements to be covered in this Transportation Impact Analysis. Information regarding
the property was provided by both Design Solutions and GSP Consulting, PLLC.
3/4/13 13-208 College Road Development – Executive Summary ii
Level of Service Results
The results of the study are discussed by intersection below:
North College Road at Murrayville Road/Bavarian Lane
This signalized intersection currently operates at LOS D during the existing AM and PM peaks. In
2014 future no build conditions, LOS D is expected in AM and PM peaks. With the addition of site traffic, this is expected to remain unchanged.
An improvement to the southbound left turn lane is committed by the Northside Baptist Church
Development. However, this improvement is not committed until Phase 2 of the development, which is anticipated in 2017. Due to potential queuing issues of the southbound approach, it is
recommended that this improvement be in place at the buildout of this development. Therefore, the following improvements are recommended:
• Share the cost to extend the southbound left turn lane and tie into the two-way left turn lane.
• Share the cost to modify the traffic signal operations to eight phases and remove the split
side phasing.
North College Road at Long Ridge Drive
The westbound approach of this unsignalized intersection currently operates at LOS F during the AM and PM peaks. With the improvements in place committed by the Northside Baptist Church
Development, the westbound approach will operate at LOS C during the AM and PM peaks in 2014 future no build conditions. After the addition of project traffic, the westbound approach will operate
at LOS D during the AM peak and LOS C during the PM peak. No improvements are recommended at this intersection.
North College Road at Proposed South Access
In future build-out conditions, this proposed site access is expected to operate at LOS F in the AM
and PM peaks. The following improvements are recommended:
• Extend the two-way left turn lane to tie into existing two-way left turn lane to the north on
North College Road.
• Restripe the outer northbound lane, currently striped as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage and appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage and appropriate taper into the site.
• Provide two lanes for exiting traffic, one left turn lane and one right turn lane.
With these improvements in place, it is anticipated that this site access will operate at LOS E during
the AM and PM peaks.
3/4/13 13-208 College Road Development – Executive Summary iii
North College Road at Proposed North Access
In future build-out conditions, this proposed site access is expected to operate at LOS F in the AM
and PM peaks. The following improvements are recommended:
• Extend the two-way left turn lane to tie into existing two-way left turn lane to the north on North College Road.
• Restripe the outer northbound lane, currently striped as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage and appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage and appropriate taper into the site.
• Provide one lane for exiting traffic.
With these improvements in place, it is anticipated that this site access will operate at LOS E during
the AM peak and LOS D during the PM peak.
North College Road at Long Ridge Drive looking north
3/4/13 13-208 College Road Development – Executive Summary iv
Level of Service Summary
Table A presents the summary of the level of service analysis.
Table 5.2 - Level of Service Summary
AM Peak 2013 Existing 2014 Future No Build 2014 Future Build
2014 Future Build with
Improvements
North College Road at
Murrayville
Road/Bavarian Lane
D (37.5) D (42.7) D (44.1) D (44.1)
North College Road at
Long Ridge Drive
F (88.7) C (24.5) D (26.7)
WB Approach WB Approach WB Approach
North College Road at
Proposed South Access F (6042.4) E (44.9)
WB Approach WB Approach
North College Road at
Proposed North Access F (860.6) E (36.0)
WB Approach WB Approach
PM Peak 2013 Existing 2014 Future
No Build
2014 Future
Build
2014 Future Build
with Improvements
North College Road at Murrayville
Road/Bavarian Lane
D (39.4) D (44.3) D (45.5) D (45.5)
North College Road at Long Ridge Drive
F (55.0) C (21.0) C (23.1)
WB Approach WB Approach WB Approach
North College Road at
Proposed South Access F (6221.4) E (39.7)
WB Approach WB Approach
North College Road at Proposed North Access F (759.0) D (31.7)
WB Approach WB Approach
LOS (delay in seconds per vehicle)
Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest
delay
3/4/13 13-208 College Road Development – Executive Summary v
Summary and Conclusion
This analysis has been conducted based on the scope given by the Wilmington MPO and NCDOT. We have identified all areas of deficiency and made recommendations for improvements where
necessary.
The ITE trip generation indicates that based on the current site plan, the College Road Development has a trip generation potential of 2,159 net trips per day. This is based on the
development plan of 120 residential apartment units with 6,400 square feet of commercial/office space on the first floor of the building. The site also has a future parcel to the south, which is
planned for a 4,500 square foot fast food restaurant.
Per the Wilmington MPO and NCDOT, this analysis included the approved developments of the Northside Baptist Church Property Development and Dollar General. The future traffic associated
with these developments as well as roadway improvements committed by them were included in future no build and build scenarios.
The results of this analysis show that the intersection of North College Road at Murrayville
Road/Bavarian Lane is anticipated to operate at LOS D in future build conditions. However, the committed improvement (committed by the Northside Baptist Church Property Development) to
extend the southbound left turn lane at this intersection will not take place until 2017. Due to potential queuing issues of the southbound approach, it is recommended that this improvement be
in place at the buildout of this development. Therefore, it is recommended that this development share the cost to extend the southbound left turn lane and tie into the two-way left turn lane. In
addition, it is recommended that this development share the cost to modify the traffic signal operations to eight phases and remove the split side phasing.
In addition, improvements are recommended at the proposed site accesses. These include extending
the two-way left turn lane to connect with the existing two-way left turn lane north of the site. The outer northbound lane should be restriped as a through lane. Additionally, left and right turn lanes
are recommended at both driveways. It should be noted that an interconnection between the Dollar General development, which is currently being reviewed by New Hanover County, and this
development may be required.
In conclusion, this study has determined the potential traffic impacts of this development and identified transportation improvements that will be required to accommodate the impacts of both
background traffic and new development traffic. The recommended improvements are summarized in Table B.
3/4/13 13-208 College Road Development – Executive Summary vi
Table B - Recommended Improvement Summary
North College Road at Murrayville
Road/ Bavarian Lane
• Share the cost of committed improvement to
extend the southbound left turn lane and tie into
the two-way left turn lane.
• Share the cost of committed improvement to modify traffic signal operations to eight phases and
North College Road at Long Ridge Drive/ Northern Access • None.
North College Road at
Proposed South Access
• Extend the two-way left turn lane to tie into existing two-way left turn lane to the north on
North College Road.
• Restripe the outer northbound lane, currently
striped as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage and appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage
and appropriate taper into the site.
• Provide two lanes for exiting traffic, one left turn
lane and one right turn lane.
North College Road at Proposed North Access
• Extend the two-way left turn lane to tie into
existing two-way left turn lane to the north on North College Road.
• Restripe the outer northbound lane, currently
striped as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage
and appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage and appropriate taper into the site.
• Provide one lane for exiting traffic.
3/4/13 13-208 College Road Development – Transportation Impact Analysis 1
College Road Development – Transportation Impact Analysis
New Hanover County, NC Prepared for College Road Development Partners
March 4, 2013
Table of Contents
1.0 Introduction ........................................................................................................................ 2 Figure 1 – Site Plan ....................................................................................................................................... 3
Figure 2A – Site Location Map ................................................................................................................... 4 Figure 2B – Vicinity Map ............................................................................................................................. 5
2.0 Existing Conditions ........................................................................................................... 6 2.1 Inventory ................................................................................................................................................. 6
2.2 Existing Traffic Volumes ...................................................................................................................... 6 Figure 3 – Existing Lane Geometry ........................................................................................................... 7
Figure 4 – 2013 Existing Traffic Volumes ................................................................................................ 8 3.0 Approved Developments and Committed Improvements ................................................. 9
3.1 Approved Developments...................................................................................................................... 9 Figure 5A – Dollar General Trip Distribution ........................................................................................ 10
Figure 5B – Dollar General Pass-by Trip Distribution ......................................................................... 11 3.2 Committed Improvements ................................................................................................................. 12
4.0 Methodology..................................................................................................................... 13 4.1 Base Assumptions and Standards ...................................................................................................... 13
4.2 Trip Generation.................................................................................................................................... 13 4.3 Trip Distribution .................................................................................................................................. 14
4.4 Future No Build Traffic ...................................................................................................................... 14 4.5 Total Traffic .......................................................................................................................................... 14
Figure 6A – Primary Trip Distribution .................................................................................................... 15 Figure 6B – Pass-by Trip Distribution ..................................................................................................... 16
Figure 7 – 2014 Future No Build Volumes ............................................................................................. 17 Figure 8 – Primary Site Trips ..................................................................................................................... 18
Figure 9 – Pass-by Site Trips ..................................................................................................................... 19 Figure 10 – 2014 Future Build Volumes .................................................................................................. 20
5.0 Capacity Analysis ............................................................................................................. 21 5.1 Level of Service Evaluation Criteria .................................................................................................. 21
5.2 Level of Service Results ...................................................................................................................... 22 5.3 Level of Service Summary .................................................................................................................. 24
6.0 Summary and Conclusion ................................................................................................ 25 Figure 11 – Recommended Improvements ............................................................................................. 27
Appendix .................................................................................................................................. 28 Level of Service Analysis ....................................................................................................................... 29
Trip Generation ...................................................................................................................................... 34 Traffic Volume Data .............................................................................................................................. 35
Supporting Documentation ................................................................................................................... 36
3/4/13 13-208 College Road Development – Transportation Impact Analysis 2
College Road Development – Transportation Impact Analysis
New Hanover County, NC Prepared for College Road Development Partners
March 4, 2013
1.0 Introduction
The proposed College Road Mixed-Use Development is located along the eastside of US 117/NC 132 (North College Road) just north of the intersection with Long Ridge Drive in New Hanover
County, North Carolina. As currently planned, the site will consist of a mixed-use building that has 120 residential apartment units with 6,400 square feet of commercial/office space on the first floor
of the building. The site also has a future parcel to the south, which is planned for a 4,500 square foot fast food restaurant. The site will be accessed by two (2) driveways on North College Road
which will directly serve the mixed-use building. Access will be provided internally to the future fast food parcel via two locations. Additionally, per the request of the North Carolina Department of
Transportation (NCDOT) and New Hanover County, cross access from the fast food parcel will also be planned for to the vacant parcel to the south (D.B. 5354-2729). Figure 1 presents the site
plan.
DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both
background traffic and new development traffic. The following intersections were included in the study:
• US 117/NC 132 (North College Road) at Murrayville Road/Bavarian Lane
• US 117/NC 132 (North College Road) at Long Ridge Drive
• US 117/NC 132 (North College Road) at Proposed North Access
• US 117/NC 132 (North College Road) at Proposed South Access
The above-mentioned intersections were analyzed for the following scenarios:
• 2013 Existing Conditions
• 2014 Future No Build Conditions
• 2014 Future Build-Out Conditions
• 2014 Future Build-Out with Improvements (as necessary)
The build-out analysis year for this project was assumed to be 2014. The AM (7:00-9:00 am) and PM
(3:30-6:00 pm) peaks were studied.
The NCDOT and Wilmington MPO were contacted to obtain background information and to
ascertain the elements to be covered in this Transportation Impact Analysis (TIA). Information
regarding the property was provided by both Design Solutions and GSP Consulting, PLLC.
3/4/13 13-208 College Road Development – Transportation Impact Analysis 3
Figure 1 – Site Plan
FI
G
U
R
E
2
A
SI
T
E
L
O
C
A
T
I
O
N
M
A
P
SI
T
E
I
N
D
I
C
A
T
O
R
FI
G
U
R
E
2
B
VI
C
I
N
I
T
Y
M
A
P
ST
U
D
Y
I
N
T
E
R
S
E
C
T
I
O
N
S
EX
I
S
T
I
N
G
PR
O
P
O
S
E
D
3/4/13 13-208 College Road Development – Transportation Impact Analysis 6
2.0 Existing Conditions
2.1 Inventory
A field investigation was conducted by DAVENPORT staff to determine the existing roadway
conditions in the study area. Table 2.1 presents a summary of this review. Figure 3 illustrates the
existing lane geometry.
Table 2.1 - Street Inventory
Facility Name Route # Cross
Section
Pavement
Width
Speed
Limit
Maintained
By
North College Road NC 132 / US 117
2-5 lane
undivided &
divided
Varies from 24’ to 60’ 55 MPH NCDOT
Murrayville Road SR 1322 2-5 lane
undivided
Varies from
22’ to 60’ 45 MPH NCDOT
Bavarian Lane SR 2124 3-6 lane undivided &
divided
Varies from
36’ to 68’ 45 MPH NCDOT
Long Ridge Drive SR 2160 2-lane undivided Approx. 20’ Not Posted NCDOT
2.2 Existing Traffic Volumes
Existing traffic volumes for this project were collected by DAVENPORT staff. Table 2.2 below
contains the dates these counts were conducted. Figure 4 shows existing AM and PM peak hour
volumes. The full reports for these volumes can be found in the appendix.
Table 2.2 - Traffic Volume Data
Count Location: Date Taken: By:
North College Road @ Murrayville Road/Bavarian Lane 2/6/2013 DAVENPORT
North College Road @ Long Ridge Road 2/6/2013 DAVENPORT
*** NOT TO SCALE ***
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
ROADWAY
LEGEND
Murrayville Road
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
FIGURE 3EXISTING LANE GEOMETRY
SPEEDLIMIT55
SPEEDLIMIT45
1,3
0
0
'
Bavarian Lane
Long Ridge Drive SPEEDLIMITNP
SPEEDLIMIT45
SIGNALIZED
INTERSECTION
60
0
'
12
5
'
250'
125'
250'
125'
42
5
'
95
0
'
250'
200'62
5
'
65
0
'
*** NOT TO SCALE ***
FIGURE 4
EXISTING TRAFFIC
VOLUMES
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
UNSIGNALIZED
INTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
AM PEAK / PM PEAK
324 / 108
239 / 94
187 / 117
253 / 275
49 / 20485 / 56
12
9
/
2
6
8
51
9
/
5
8
8
22
0
/
1
4
1
57
/
1
7
4
70
6
/
6
9
5
18
2
/
1
7
7
6 / 3
6 / 2
0
/
6
86
2
/
9
9
5
3
/
5
12
8
0
/
1
0
7
3
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
SIGNALIZED
INTERSECTION
3/4/13 13-208 College Road Development – Transportation Impact Analysis 9
3.0 Approved Developments and Committed Improvements
3.1 Approved Developments
Approved developments are developments that have been recently approved in the area, but not yet
constructed. Per NCDOT and New Hanover County staff, there are two approved developments to
be included in this analysis: Northside Baptist Church Property Development and Dollar General.
These are discussed below.
Northside Baptist Church Property Development
The buildout of the Northside Baptist Church Property Development, which includes a fast food
restaurant and a 260,000 square foot church, is considered in this analysis. The TIA which was
prepared by DAVENPORT and approved by NCDOT and New Hanover County in January 2012,
was utilized.
Dollar General
Per the Wilmington MPO, the 9,100 square foot Dollar General development located at the
northeast corner of the intersection of US 117/NC 132 (North College Road) at Long Ridge Drive
was included in this analysis. The trip generation for this development was estimated and is provided
in Table 3.1. The trip distribution was also assumed for this development and is provided in Figures
5A and 5B. It should be noted that this development is still in the review process and an
interconnection between the Dollar General and the College Road Development may be required.
Table 3.1 - ITE Trip Generation
Approved Development - Dollar General
Average Weekday Driveway Volumes 24 Hour AM Peak
Hour
PM Peak
Hour Two-Way
Land Use ITE Land
Code Size Volume Enter Exit Enter Exit
Free-Standing
Discount Store 815 9.1 Th.Sq.Ft.GLA 521 7 3 23 23
Total Unadjusted Trips 521 7 3 23 23
Free-Standing Discount Store Pass-by Reduction
(17% PM) -89 0 0 -4 -4
Total Adjusted Trips 432 7 3 19 19
*** NOT TO SCALE ***
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
Proposed South Access
FIGURE 5ADOLLAR GENERALTRIP DISTRIBUTION
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
IN = ENTERING
OUT = EXITING
ORIGIN
NODE%
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZEDINTERSECTION
15%
35%
15%
35%
35%
35
%
I
N
15
%
O
U
T
15
%
O
U
T
35
%
O
U
T
15% IN
15% IN
65
%
I
N
35
%
O
U
T
65% OUT
35% OUT35
%
I
N
35
%
I
N
35
%
O
U
T
35
%
I
N
*** NOT TO SCALE ***
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
Proposed South Access
FIGURE 5BDOLLAR GENERAL PASS-BYTRIP DISTRIBUTION
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
IN = ENTERING
OUT = EXITING
ORIGIN
NODE%
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZEDINTERSECTION
50%
35%
50%
+5
0
%
I
N
-5
0
%
I
N
+50% OUT
+50% OUT+5
0
%
I
N
-5
0
%
I
N
3/4/13 13-208 College Road Development – Transportation Impact Analysis 12
3.2 Committed Improvements
Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a
developer in the area, but not yet constructed. The Northside Baptist Church Property
Development has committed roadway improvements and proposed access driveways along the
North College Road corridor. The following improvements have been included in all no build and
build analysis conditions:
• Northern Site Access @ Long Ridge Drive o Create fourth leg to intersection and include a 100 foot southbound left turn lane, an
additional southbound 200 foot combination through and right lane, and a northbound left turn lane with full width to connect to existing two-way-left-turn-
lane
• Main Site Access o Construct access approximately 300 feet south of Northern Site Access and include
an additional southbound combination through and right lane with full width to the
Northern Site Access
• Southern Site Access o Construct access approximately 440 feet south of Main Site Access to operate under
Right-In/Right-Out movement only.
• North College Road @ Murrayville Road/Bavarian Lane o Extend the southbound, left turn lane storage to 400 feet o Modify the traffic signal operations to an 8-phase operation (remove the split side phasing)
3/4/13 13-208 College Road Development – Transportation Impact Analysis 13
4.0 Methodology
4.1 Base Assumptions and Standards
In general, the analysis for this project was conducted utilizing commonly accepted NCDOT
standards. The following table contains a summary of the base assumptions:
Table 4.1 - Assumptions
Peak Hour Factor 0.90
Background Traffic Annual Growth Rate 3.0% per year for all roadways
Base Signal Timing/Phasing Provided by NCDOT
Analysis Software Synchro/SimTraffic Version 7.0
Lane widths 12-feet
Truck percentages 2%
4.2 Trip Generation
As currently planned, this development will include 3,200 square feet of retail space, 3,200 square
feet of office space, 120 multi-family units and a 4,500 square foot fast food restaurant. The Institute of Transportation Engineers (ITE) Trip Generation software was used to develop the projected
trips created by this development. Table 4.2 contains the results.
Table 4.2 - ITE Trip Generation
Average Weekday Driveway Volumes 24 Hour AM Peak
Hour
PM Peak
Hour Two-Way
Land Use ITE Land Code Size Volume Enter Exit Enter Exit
Apartments 220 120 Dwelling
Units 851 13 50 54 29
General Office
Building 710 3.2 Th.Sq.Ft.GLA 94 11 1 14 68
Shopping Center 820 3.2 Th.Sq.Ft.GLA 725 12 8 31 32
Fast Food with Drive-
Thru 934 4.5 Th.Sq.Ft.GLA 2233 113 109 79 73
Total Unadjusted Trips 3903 149 168 178 202
15 % Internal Capture Reduction -585 0 0 -27 -30
Subtotal with Internal Capture 3318 149 168 151 172
Retail Pass-by Reduction (34% PM) -210 0 0 -9 -9
Fast Food Pass-by Reduction (49% AM, 50% PM) -949 -55 -53 -34 -31
Total Adjusted Trips 2159 94 115 109 131
3/4/13 13-208 College Road Development – Transportation Impact Analysis 14
Mixed-use developments of this type are designed to combine a number of uses into one site,
allowing people to live, work and shop in the same area and without dependence on a vehicle. This proposed development meets the criteria as defined in the ITE Trip Generation Handbook for a
“multi-use” development. Therefore, the trips for this development were reduced using the method prescribed in Chapter 7 of the ITE handbook. A reduction of 15% was applied to daily and PM
peak hour trips for apartment, retail and office land uses. The worksheets for the internal capture are shown in the trip generation section of the Appendix.
Developments of this type also generate what are called “pass-by” trips. The ITE Trip Generation
Manual defines “pass-by” trips as trips that are generated by the development, but are already on the adjacent roadway. These trips are not new trips, but are a part of the existing background traffic on
North College Road. A “pass by” reduction of 34% was applied to retail trips in the PM peak hour. For the fast food restaurant, an AM peak hour “pass by” reduction of 49% was applied and 50% in
the PM peak hour.
4.3 Trip Distribution
Site trips for this proposed development were distributed based on the existing traffic patterns and
engineering judgment. The directional distributions for the primary site trips are as follows:
• 35% to/from the south on North College Road
• 35% to/from the north on North College Road
• 15% to/from the east on Murrayville Road
• 15% to/from the west on Bavarian Lane
The primary trip distribution is shown in Figure 6A. 50% of pass-by trips were assumed to originate from the south and north on North College Road. The pass-by trip distribution for this
development is illustrated in Figure 6B.
4.4 Future No Build Traffic
The 2014 future no build traffic volumes were computed by applying a 3.0% compounded annual
growth rate to the 2013 existing traffic volumes. Approved development traffic was also included in
the future no build traffic volumes. Figure 7 shows the 2014 future no build traffic volumes for AM
and PM peaks.
4.5 Total Traffic
The 2014 build-out traffic volumes were obtained by summing 2014 future no build volumes and primary and pass-by site trips due to the proposed project. Primary site trips are shown in Figure 8.
Pass-by trips are shown in Figure 9. The resulting build volume totals for AM and PM peaks are shown in Figure 10. More information can be found in the Traffic Volume Data section of the
appendix.
*** NOT TO SCALE ***
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
Proposed South Access
FIGURE 6ATRIP DISTRIBUTION
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
IN = ENTERING
OUT = EXITING
ORIGIN
NODE%
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZEDINTERSECTION
15%
35%
15%
35%
35%
35
%
I
N
15
%
O
U
T
15
%
O
U
T
35
%
O
U
T
15% IN
15% IN
65
%
I
N
65
%
O
U
T
40
%
I
N
25
%
I
N
25
%
I
N
20
%
O
U
T
40% OUT
20% OUT
25% OUT
15% OUT15
%
I
N
20
%
I
N
20
%
I
N
25
%
O
U
T
*** NOT TO SCALE ***
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
Proposed South Access
FIGURE 6APASS-BYTRIP DISTRIBUTION
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
IN = ENTERING
OUT = EXITING
ORIGIN
NODE%
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZEDINTERSECTION
50%
35%
50%
+4
0
%
I
N
-4
0
%
I
N
+1
0
%
I
N
-1
0
%
I
N
+40% OUT
+40% OUT
+10% OUT
+10% OUT+1
0
%
I
N
-1
0
%
I
N
+4
0
%
I
N
-4
0
%
I
N
*** NOT TO SCALE ***
FIGURE 7
2014 FUTURE NO
BUILD VOLUMES
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
UNSIGNALIZED
INTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
AM PEAK / PM PEAK
353 / 127
251 / 100193 / 121
271 / 29253 / 21494 / 66
14
7
/
2
9
2
57
2
/
6
5
3
23
5
/
1
5
3
59
/
1
7
9
77
8
/
7
6
1
19
6
/
1
8
9
7 / 13
8 / 19
2
/
1
6
88
3
/
1
0
2
0
8
/
2
2
13
0
4
/
1
1
0
2
Proposed South Access
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZED
INTERSECTION
0 / 0
0 / 0
0
/
0
94
2
/
1
0
6
5
0
/
0
13
6
1
/
1
1
4
7
0 / 0
0 / 0
0
/
0
94
2
/
1
0
6
5
0
/
0
13
6
1
/
1
1
4
7
Northside Baptist
Church
63
/
4
5
0 / 0
51
/
3
4
49 / 320 / 061 / 48
*** NOT TO SCALE ***
FIGURE 8
PRIMARY SITE TRIPS
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
UNSIGNALIZED
INTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
AM PEAK / PM PEAK
14 / 16
0 / 00 / 0
14 / 160 / 00 / 0
17
/
2
0
40
/
4
6
17
/
2
0
0
/
0
33
/
3
8
0
/
0
0 / 0
0 / 0
0
/
0
74
/
8
5
0
/
0
61
/
7
1
Proposed South Access
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZED
INTERSECTION
17 / 20
29 / 33
14
/
1
6
19
/
2
2
23
/
2
7
23
/
2
6
23 / 26
46 / 53
19
/
2
2
29
/
3
3
37
/
4
4
23
/
2
7
Northside Baptist
Church
0
/
0
0 / 0
0
/
0
0 / 00 / 00 / 0
*** NOT TO SCALE ***
FIGURE 9
PASSBY SITE TRIPS
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
UNSIGNALIZED
INTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
AM PEAK / PM PEAK
0 / 0
0 / 00 / 0
0 / 00 / 00 / 0
0
/
0
0
/
0
0
/
0
0
/
0
0
/
0
0
/
0
0 / 0
0 / 0
0
/
0
0
/
0
0
/
0
0
/
0
Proposed South Access
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZED
INTERSECTION
5 / 4
5 / 4
6
/
4
-6
/
-
4
6
/
4
-6
/
-
4
21 / 16
21 / 16
22
/
1
7
-2
2
/
-
1
7
22
/
1
7
-2
2
/
-
1
7
Northside Baptist
Church
0
/
0
0 / 0
0
/
0
0 / 00 / 00 / 0
*** NOT TO SCALE ***
FIGURE 10
2014 FUTURE BUILD
VOLUMES
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
Thisdocument,together withtheconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
UNSIGNALIZED
INTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
ROADWAY
LEGEND
AM PEAK / PM PEAK
367 / 143
251 / 100193 / 121
285 / 30853 / 21494 / 66
16
4
/
3
1
2
61
2
/
6
9
9
25
2
/
1
7
3
59
/
1
7
9
81
1
/
7
9
9
19
6
/
1
8
9
7 / 13
8 / 19
2
/
1
6
95
7
/
1
1
0
5
8
/
2
2
13
6
5
/
1
1
7
3
Proposed South Access
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge Drive
Proposed North Access
SIGNALIZED
INTERSECTION
22 / 24
34 / 37
20
/
2
0
95
5
/
1
0
8
3
29
/
3
1
13
7
8
/
1
1
6
9
44 / 42
67 / 69
41
/
3
9
94
9
/
1
0
8
1
59
/
6
1
13
6
2
/
1
1
5
7
Northside Baptist
Church
63
/
4
5
0 / 0
51
/
3
4
49 / 320 / 061 / 48
3/4/13 13-208 College Road Development – Transportation Impact Analysis 21
5.0 Capacity Analysis
5.1 Level of Service Evaluation Criteria
The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of
service” to measure how traffic operates in intersections and on roadway segments. There are
currently six levels of service ranging from A to F. Level of service “A” represents the best
conditions and Level of Service “F” represents the worst. Synchro Traffic Modeling software was
used to determine the level of service for studied intersections. Note for unsignalized intersection
analysis, the level of service noted is for the worst approach of the intersection. This is typically the
left turn movement for the side street approach, due to the number of opposing movements. All
worksheet reports from the analyses can be found in the Appendix.
Table 5.1 – Highway Capacity Manual
Levels of Service and Control Delay Criteria
Signalized Intersection Unsignalized Intersection
Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec)
A ≤ 10 A ≤ 10
B > 10 and ≤ 20 B > 10 and ≤ 15
C > 20 and ≤ 35 C > 15 and ≤ 25
D > 35 and ≤ 55 D > 25 and ≤ 35
E > 55 and ≤ 80 E > 35 and ≤ 50
F > 80 F > 50
3/4/13 13-208 College Road Development – Transportation Impact Analysis 22
5.2 Level of Service Results
The results of the study are discussed by intersection below:
North College Road at Murrayville Road/Bavarian Lane
This signalized intersection currently operates at LOS D during the existing AM and PM peaks. In
2014 future no build conditions, LOS D is expected in AM and PM peaks. With the addition of site
traffic, this is expected to remain unchanged.
An improvement to the southbound left turn lane is committed by the Northside Baptist Church
Development. However, this improvement is not committed until Phase 2 of the development,
which is anticipated in 2017. Due to potential queuing issues of the southbound approach, it is
recommended that this improvement be in place at the buildout of this development. Therefore, the
following improvements are recommended:
• Share the cost to extend the southbound left turn lane and tie into the two-way left turn lane.
• Share the cost to modify the traffic signal operations to eight phases and remove the split
side phasing.
North College Road at Long Ridge Drive
The westbound approach of this unsignalized intersection currently operates at LOS F during the
AM and PM peaks. With the improvements in place committed by the Northside Baptist Church
Development, the westbound approach will operate at LOS C during the AM and PM peaks in 2014
future no build conditions. After the addition of project traffic, the westbound approach will operate
at LOS D during the AM peak and LOS C during the PM peak. No improvements are
recommended at this intersection.
North College Road at Proposed South Access
In future build-out conditions, this proposed site access is expected to operate at LOS F in the AM
and PM peaks. The following improvements are recommended:
• Extend the two-way left turn lane to tie into existing two-way left turn lane to the north on
North College Road.
• Restripe the outer northbound lane, currently striped as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage and appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage and appropriate taper into the site.
• Provide two lanes for exiting traffic, one left turn lane and one right turn lane.
With these improvements in place, it is anticipated that this site access will operate at LOS E during
the AM and PM peaks.
3/4/13 13-208 College Road Development – Transportation Impact Analysis 23
North College Road at Proposed North Access
In future build-out conditions, this proposed site access is expected to operate at LOS F in the AM
and PM peaks. The following improvements are recommended:
• Extend the two-way left turn lane to tie into existing two-way left turn lane to the north on North College Road.
• Restripe the outer northbound lane, currently striped as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage and appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage and appropriate taper into the site.
• Provide one lane for exiting traffic.
With these improvements in place, it is anticipated that this site access will operate at LOS E during
the AM peak and LOS D during the PM peak.
North College Road at Long Ridge Drive looking north
3/4/13 13-208 College Road Development – Transportation Impact Analysis 24
5.3 Level of Service Summary
Table 5.2 presents the summary of the level of service analysis.
Table 5.2 - Level of Service Summary
AM Peak 2013 Existing 2014 Future
No Build
2014 Future
Build
2014 Future Build with
Improvements
North College Road at
Murrayville
Road/Bavarian Lane
D (37.5) D (42.7) D (44.1) D (44.1)
North College Road at
Long Ridge Drive
F (88.7) C (24.5) D (26.7)
WB Approach WB Approach WB Approach
North College Road at
Proposed South Access F (6042.4) E (44.9)
WB Approach WB Approach
North College Road at
Proposed North Access F (860.6) E (36.0)
WB Approach WB Approach
PM Peak 2013 Existing 2014 Future
No Build
2014 Future
Build
2014 Future Build
with Improvements
North College Road at Murrayville
Road/Bavarian Lane
D (39.4) D (44.3) D (45.5) D (45.5)
North College Road at Long Ridge Drive
F (55.0) C (21.0) C (23.1)
WB Approach WB Approach WB Approach
North College Road at Proposed South Access F (6221.4) E (39.7)
WB Approach WB Approach
North College Road at Proposed North Access F (759.0) D (31.7)
WB Approach WB Approach
LOS (delay in seconds per vehicle)
Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest
delay
3/4/13 13-208 College Road Development – Transportation Impact Analysis 25
6.0 Summary and Conclusion
This analysis has been conducted based on the scope given by the Wilmington MPO and NCDOT.
We have identified all areas of deficiency and made recommendations for improvements where necessary.
The ITE trip generation indicates that based on the current site plan, the College Road
Development has a trip generation potential of 2,159 net trips per day. This is based on the development plan of 120 residential apartment units with 6,400 square feet of commercial/office
space on the first floor of the building. The site also has a future parcel to the south, which is planned for a 4,500 square foot fast food restaurant.
Per the Wilmington MPO and NCDOT, this analysis included the approved developments of the
Northside Baptist Church Property Development and Dollar General. The future traffic associated with these developments as well as roadway improvements committed by them were included in
future no build and build scenarios.
The results of this analysis show that the intersection of North College Road at Murrayville Road/Bavarian Lane is anticipated to operate at LOS D in future build conditions. However, the
committed improvement (committed by the Northside Baptist Church Property Development) to extend the southbound left turn lane at this intersection will not take place until 2017. Due to
potential queuing issues of the southbound approach, it is recommended that this improvement be in place at the buildout of this development. Therefore, it is recommended that this development
share the cost to extend the southbound left turn lane and tie into the two-way left turn lane. In addition, it is recommended that this development share the cost to modify the traffic signal
operations to eight phases and remove the split side phasing.
In addition, improvements are recommended at the proposed site accesses. These include extending the two-way left turn lane to connect with the existing two-way left turn lane north of the site. The
outer northbound lane should be restriped as a through lane. Additionally, left and right turn lanes are recommended at both driveways. It should be noted that an interconnection between the Dollar
General development, which is currently being reviewed by New Hanover County, and this development may be required.
The recommended improvements are summarized in Table 6.1 on the following page and are
illustrated in Figure 11.
In conclusion, this study has determined the potential traffic impacts of this development and identified transportation improvements that will be required to accommodate the impacts of both
background traffic and new development traffic.
3/4/13 13-208 College Road Development – Transportation Impact Analysis 26
Table 6.1 - Recommended Improvement Summary
North College Road at Murrayville Road/ Bavarian
Lane
• Share the cost of committed improvement to extend
the southbound left turn lane and tie into the two-way
left turn lane.
• Share the cost of committed improvement to modify traffic signal operations to eight phases and remove
split side phasing.
North College Road at
Long Ridge Drive/ Northern Access • None.
North College Road at Proposed South Access
• Extend the two-way left turn lane to tie into existing
two-way left turn lane to the north on North College Road.
• Restripe the outer northbound lane, currently striped
as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage and
appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage and
appropriate taper into the site.
• Provide two lanes for exiting traffic, one left turn lane and one right turn lane.
North College Road at
Proposed North Access
• Extend the two-way left turn lane to tie into existing
two-way left turn lane to the north on North College
Road.
• Restripe the outer northbound lane, currently striped as right turn lane, to a through lane.
• Provide a right turn lane with 100 feet of storage and
appropriate taper into the site.
• Provide a left turn lane with 100 feet of storage and
appropriate taper into the site.
• Provide one lane for exiting traffic.
UNSIGNALIZED
INTERSECTION
TRAFFIC MOVEMENT
ROADWAY
LEGEND
SIGNALIZED
INTERSECTION
Proposed South Access
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Proposed North Access
BLACK = EXISTING
GREEN = COMMITTED
BLUE = PROPOSED
20
0
'
10
0
'
10
0
'
10
0
'
Extend TWLTL and tie into
existing TWLTL to the north
Extend TWLTL
10
0
'
10
0
'
Restripe outer northbound lane
to a through lane
Extend TWLTL
Restripe outer northbound lane
to a through lane
*** NOT TO SCALE ***
PROJECT NUMBER 13-208
NORTH COLLEGE ROAD
MIXED-USE DEVELOPMENT
This document,together with the concepts and designs presented
herein,isintendedonlyforthespecificpurposeandclientforwhichit
wasprepared.Reuseof,orimproperrelianceon,thisdocumentby
otherswithoutwrittenauthorizationandadaptationbyDavenport
TransportationConsultingshallbewithoutliabilitytoDavenport
TransportationConsultingandshallbeaviolationoftheagreement
betweenDavenportTransportationConsultingandtheclient.
FIGURE 11
RECOMMENDED
IMPROVEMENTS
Murrayville Road
No
r
t
h
Co
l
l
e
g
e
R
o
a
d
Bavarian Lane
Long Ridge DriveNorthside Baptist
Church
60
0
'
250'
125'
250'
125'
42
5
'
95
0
'
250'
200'62
5
'
65
0
'
Ex
t
e
n
d
T
W
L
T
L
Share cost of committed improvement to
modify traffic signal operations to
8 phase (remove split side phasing)
Sharecost of committed
improvement to extend existing
southbound left turn lane to tie
into the TWLTL
*** NOT TO SCALE ***
3/4/13 13-208 College Road Development – Transportation Impact Analysis 28
Appendix
3/4/13 13-208 College Road Development – Transportation Impact Analysis 29
Level of Service Analysis
3/4/13 13-208 College Road Development – Transportation Impact Analysis 30
North College Road at
Murrayville Road/Bavarian Lane
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2013 Existing
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)253498518723932418270657129519220
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)2502001251256256501250
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)281549420826636020278463143577244
Shared Lane Traffic (%)
Lane Group Flow (vph)281549420826636020278463143577244
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeSplitpm+ovSplitpm+ovProtPermProtPerm
Protected Phases4453315216
Permitted Phases4326
Detector Phase445331522166
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2013 Existing
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.014.0
Minimum Split (s)14.014.014.014.014.014.014.021.021.014.021.021.0
Total Split (s)30.030.025.030.030.030.025.060.060.030.065.065.0
Total Split (%)20.0%20.0%16.7%20.0%20.0%20.0%16.7%40.0%40.0%20.0%43.3%43.3%
Maximum Green (s)23.323.318.723.523.524.118.754.254.224.158.958.9
Yellow Time (s)4.54.53.04.54.53.03.04.54.53.04.54.5
All-Red Time (s)2.22.23.32.02.02.93.31.31.32.91.61.6
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)4.74.74.34.54.53.94.33.83.83.94.14.1
Lead/LagLagLagLeadLeadLeadLeadLeadLagLagLeadLagLag
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinMin
Act Effct Green (s)17.017.036.322.822.840.214.434.134.116.835.835.8
Actuated g/C Ratio0.160.160.340.210.210.370.130.310.310.160.330.33
v/c Ratio0.520.180.180.290.680.610.440.700.130.520.490.47
Control Delay48.046.029.440.252.020.649.837.329.552.630.932.8
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay48.046.029.440.252.020.649.837.329.552.630.932.8
LOSDDCDDCDDCDCC
Approach Delay43.735.539.234.6
Approach LOSDDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 108.3
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 37.5Intersection LOS: D
Intersection Capacity Utilization 60.8%ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2014 No Build
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)271539419325135319677859147572235
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)25020012512562565000
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)3015910421427939221886466163636261
Shared Lane Traffic (%)
Lane Group Flow (vph)3015910421427939221886466163636261
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeProtpm+ovProtpm+ovProtPermProtpm+ov
Protected Phases74538152167
Permitted Phases4826
Detector Phase745381522167
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2014 No Build
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.07.0
Minimum Split (s)23.034.020.323.034.014.920.323.023.014.923.023.0
Total Split (s)25.040.020.523.038.031.420.555.655.631.466.525.0
Total Split (%)16.7%26.7%13.7%15.3%25.3%20.9%13.7%37.1%37.1%20.9%44.3%16.7%
Maximum Green (s)18.033.013.516.031.024.413.548.648.624.459.518.0
Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
Lead/LagLeadLagLeadLeadLagLeadLeadLagLagLeadLagLead
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinNone
Walk Time (s)5.05.05.05.05.05.05.05.0
Flash Dont Walk (s)11.011.011.011.011.011.011.011.0
Pedestrian Calls (#/hr)00000000
Act Effct Green (s)17.625.541.121.725.649.914.439.339.319.144.066.8
Actuated g/C Ratio0.140.210.340.180.210.410.120.320.320.160.360.55
v/c Ratio0.610.150.200.350.720.610.540.760.130.590.500.30
Control Delay58.142.829.253.958.534.360.343.333.160.632.316.5
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay58.142.829.253.958.534.360.343.333.160.632.316.5
LOSEDCDECEDCECB
Approach Delay49.746.646.032.8
Approach LOSDDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 122.4
Natural Cycle: 105
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 42.7Intersection LOS: D
Intersection Capacity Utilization 67.3%ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2014 Build
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)285539419325136719681159164612252
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)25020012512562565000
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)3175910421427940821890166182680280
Shared Lane Traffic (%)
Lane Group Flow (vph)3175910421427940821890166182680280
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeProtpm+ovProtpm+ovProtPermProtpm+ov
Protected Phases74538152167
Permitted Phases4826
Detector Phase745381522167
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2014 Build
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.07.0
Minimum Split (s)23.034.020.323.034.014.920.323.023.014.923.023.0
Total Split (s)25.040.020.523.038.032.020.555.055.032.066.525.0
Total Split (%)16.7%26.7%13.7%15.3%25.3%21.3%13.7%36.7%36.7%21.3%44.3%16.7%
Maximum Green (s)18.033.013.516.031.025.013.548.048.025.059.518.0
Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
Lead/LagLeadLagLeadLeadLagLeadLeadLagLagLeadLagLead
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinNone
Walk Time (s)5.05.05.05.05.05.05.05.0
Flash Dont Walk (s)11.011.011.011.011.011.011.011.0
Pedestrian Calls (#/hr)00000000
Act Effct Green (s)18.126.141.822.026.151.814.441.041.020.547.070.3
Actuated g/C Ratio0.140.210.330.170.210.410.110.320.320.160.370.56
v/c Ratio0.640.150.200.360.720.630.560.790.130.630.520.32
Control Delay60.744.030.555.660.735.662.645.433.763.132.616.6
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay60.744.030.555.660.735.662.645.433.763.132.616.6
LOSEDCEEDEDCECB
Approach Delay52.148.247.933.5
Approach LOSDDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 126.4
Natural Cycle: 105
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.79
Intersection Signal Delay: 44.1Intersection LOS: D
Intersection Capacity Utilization 69.5%ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2014 Build with Improvements
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)285539419325136719681159164612252
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)25020012512562565000
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)3175910421427940821890166182680280
Shared Lane Traffic (%)
Lane Group Flow (vph)3175910421427940821890166182680280
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftLeft
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane Yes
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeProtpm+ovProtpm+ovProtPermProtpm+ov
Protected Phases74538152167
Permitted Phases4826
Detector Phase745381522167
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development AM 2014 Build with Improvements
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.07.0
Minimum Split (s)23.034.020.323.034.014.920.323.023.014.923.023.0
Total Split (s)25.040.020.523.038.032.020.555.055.032.066.525.0
Total Split (%)16.7%26.7%13.7%15.3%25.3%21.3%13.7%36.7%36.7%21.3%44.3%16.7%
Maximum Green (s)18.033.013.516.031.025.013.548.048.025.059.518.0
Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
Lead/LagLeadLagLeadLeadLagLeadLeadLagLagLeadLagLead
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinNone
Walk Time (s)5.05.05.05.05.05.05.05.0
Flash Dont Walk (s)11.011.011.011.011.011.011.011.0
Pedestrian Calls (#/hr)00000000
Act Effct Green (s)18.126.141.822.026.151.814.441.041.020.547.070.3
Actuated g/C Ratio0.140.210.330.170.210.410.110.320.320.160.370.56
v/c Ratio0.640.150.200.360.720.630.560.790.130.630.520.32
Control Delay60.744.030.555.660.735.662.645.433.763.132.616.6
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay60.744.030.555.660.735.662.645.433.763.132.616.6
LOSEDCEEDEDCECB
Approach Delay52.148.247.933.5
Approach LOSDDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 126.4
Natural Cycle: 105
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.79
Intersection Signal Delay: 44.1Intersection LOS: D
Intersection Capacity Utilization 69.5%ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2013 Existing
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)2752045611794108177695174268588141
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)2502001251256256501250
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)30622762130104120197772193298653157
Shared Lane Traffic (%)
Lane Group Flow (vph)30622762130104120197772193298653157
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeSplitpm+ovSplitpm+ovProtPermProtPerm
Protected Phases4453315216
Permitted Phases4326
Detector Phase445331522166
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2013 Existing
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.014.0
Minimum Split (s)14.014.014.014.014.014.014.021.021.014.021.021.0
Total Split (s)30.030.025.030.030.030.025.060.060.030.065.065.0
Total Split (%)20.0%20.0%16.7%20.0%20.0%20.0%16.7%40.0%40.0%20.0%43.3%43.3%
Maximum Green (s)23.323.318.723.523.524.118.754.254.224.158.958.9
Yellow Time (s)4.54.53.04.54.53.03.04.54.53.04.54.5
All-Red Time (s)2.22.23.32.02.02.93.31.31.32.91.61.6
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)4.74.74.34.54.53.94.33.83.83.94.14.1
Lead/LagLagLagLeadLeadLeadLeadLeadLagLagLeadLagLag
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinMin
Act Effct Green (s)20.920.939.914.014.040.614.234.534.525.945.545.5
Actuated g/C Ratio0.190.190.350.120.120.360.130.310.310.230.400.40
v/c Ratio0.480.660.110.300.450.210.450.710.400.730.460.25
Control Delay45.354.326.949.355.215.351.639.234.554.826.825.2
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay45.354.326.949.355.215.351.639.234.554.826.825.2
LOSDDCDEBDDCDCC
Approach Delay46.839.540.534.1
Approach LOSDDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 112.7
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.73
Intersection Signal Delay: 39.4Intersection LOS: D
Intersection Capacity Utilization 65.0%ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2014 No Build
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)29221466121100127189761179292653153
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)25020012512562565000
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)32423873134111141210846199324726170
Shared Lane Traffic (%)
Lane Group Flow (vph)32423873134111141210846199324726170
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeProtpm+ovProtpm+ovProtPermProtpm+ov
Protected Phases74538152167
Permitted Phases4826
Detector Phase745381522167
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2014 No Build
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.07.0
Minimum Split (s)23.034.020.323.034.014.920.323.023.014.923.023.0
Total Split (s)24.035.020.323.034.042.020.350.050.042.071.724.0
Total Split (%)16.0%23.3%13.5%15.3%22.7%28.0%13.5%33.3%33.3%28.0%47.8%16.0%
Maximum Green (s)17.028.013.316.027.035.013.343.043.035.064.717.0
Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
Lead/LagLeadLagLeadLeadLagLeadLeadLagLagLeadLagLead
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinNone
Walk Time (s)5.05.05.05.05.05.05.05.0
Flash Dont Walk (s)11.011.011.011.011.011.011.011.0
Pedestrian Calls (#/hr)00000000
Act Effct Green (s)17.723.442.712.718.353.314.238.438.429.854.076.9
Actuated g/C Ratio0.140.190.340.100.150.430.110.310.310.240.430.62
v/c Ratio0.670.680.130.380.410.210.540.780.410.770.470.17
Control Delay61.360.632.459.955.924.061.546.539.659.326.811.5
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay61.360.632.459.955.924.061.546.539.659.326.811.5
LOSEECEECEDDECB
Approach Delay57.745.647.933.3
Approach LOSEDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 125
Natural Cycle: 115
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 44.3Intersection LOS: D
Intersection Capacity Utilization 71.0%ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2014 Build
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)30821466121100143189799179312699173
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)25020012512562565000
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)34223873134111159210888199347777192
Shared Lane Traffic (%)
Lane Group Flow (vph)34223873134111159210888199347777192
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeProtpm+ovProtpm+ovProtPermProtpm+ov
Protected Phases74538152167
Permitted Phases4826
Detector Phase745381522167
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2014 Build
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.07.0
Minimum Split (s)23.034.020.323.034.014.920.323.023.014.923.023.0
Total Split (s)23.034.020.323.034.042.020.351.051.042.072.723.0
Total Split (%)15.3%22.7%13.5%15.3%22.7%28.0%13.5%34.0%34.0%28.0%48.5%15.3%
Maximum Green (s)16.027.013.316.027.035.013.344.044.035.065.716.0
Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
Lead/LagLeadLagLeadLeadLagLeadLeadLagLagLeadLagLead
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinNone
Walk Time (s)5.05.05.05.05.05.05.05.0
Flash Dont Walk (s)11.011.011.011.011.011.011.011.0
Pedestrian Calls (#/hr)00000000
Act Effct Green (s)17.623.642.912.718.655.414.240.640.631.657.980.7
Actuated g/C Ratio0.140.180.330.100.140.430.110.310.310.240.450.63
v/c Ratio0.730.700.140.400.410.230.550.800.400.800.490.19
Control Delay66.063.333.861.757.024.663.747.939.562.326.711.6
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay66.063.333.861.757.024.663.747.939.562.326.711.6
LOSEECEECEDDECB
Approach Delay61.445.849.233.9
Approach LOSEDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 129
Natural Cycle: 115
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 45.5Intersection LOS: D
Intersection Capacity Utilization 73.1%ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2014 Build with Improvements
DAVENPORT Page 1
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (vph)30821466121100143189799179312699173
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Storage Length (ft)25020012512562565000
Storage Lanes21212111
Taper Length (ft)1001001001001001002000
Lane Util. Factor0.971.001.000.971.001.000.970.951.001.000.951.00
Frt 0.8500.8500.8500.850
Flt Protected0.9500.9500.9500.950
Satd. Flow (prot)343318631583343318631583343335391583177035391583
Flt Permitted0.9500.9500.9500.950
Satd. Flow (perm)343318631583343318631583343335391583177035391583
Right Turn on RedNoNoNoNo
Satd. Flow (RTOR)
Link Speed (mph)30304545
Link Distance (ft)910944955438
Travel Time (s)20.721.514.56.6
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Adj. Flow (vph)34223873134111159210888199347777192
Shared Lane Traffic (%)
Lane Group Flow (vph)34223873134111159210888199347777192
Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo
Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftLeft
Median Width(ft)24242424
Link Offset(ft)0000
Crosswalk Width(ft)16161616
Two way Left Turn Lane Yes
Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00
Turning Speed (mph)159159159159
Number of Detectors 121121121121
Detector Template LeftThruRightLeftThruRightLeftThruRightLeftThruRight
Leading Detector (ft)2010020201002020100202010020
Trailing Detector (ft)000000000000
Detector 1 Position(ft)000000000000
Detector 1 Size(ft)20620206202062020620
Detector 1 TypeCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+ExCl+Ex
Detector 1 Channel
Detector 1 Extend (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Queue (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 1 Delay (s)0.00.00.00.00.00.00.00.00.00.00.00.0
Detector 2 Position(ft)94949494
Detector 2 Size(ft)6666
Detector 2 TypeCl+ExCl+ExCl+ExCl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.00.00.00.0
Turn TypeProtpm+ovProtpm+ovProtPermProtpm+ov
Protected Phases74538152167
Permitted Phases4826
Detector Phase745381522167
Lanes, Volumes, Timings
100: Bavarian Ln & N College Rd 3/1/2013
13-208 N. College Rd. Development PM 2014 Build with Improvements
DAVENPORT Page 2
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Switch Phase
Minimum Initial (s)7.07.07.07.07.07.07.014.014.07.014.07.0
Minimum Split (s)23.034.020.323.034.014.920.323.023.014.923.023.0
Total Split (s)23.034.020.323.034.042.020.351.051.042.072.723.0
Total Split (%)15.3%22.7%13.5%15.3%22.7%28.0%13.5%34.0%34.0%28.0%48.5%15.3%
Maximum Green (s)16.027.013.316.027.035.013.344.044.035.065.716.0
Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0
Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0
Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0
Lead/LagLeadLagLeadLeadLagLeadLeadLagLagLeadLagLead
Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneNoneNoneMinMinNoneMinNone
Walk Time (s)5.05.05.05.05.05.05.05.0
Flash Dont Walk (s)11.011.011.011.011.011.011.011.0
Pedestrian Calls (#/hr)00000000
Act Effct Green (s)17.623.642.912.718.655.414.240.640.631.657.980.7
Actuated g/C Ratio0.140.180.330.100.140.430.110.310.310.240.450.63
v/c Ratio0.730.700.140.400.410.230.550.800.400.800.490.19
Control Delay66.063.333.861.757.024.663.747.939.562.326.711.6
Queue Delay0.00.00.00.00.00.00.00.00.00.00.00.0
Total Delay66.063.333.861.757.024.663.747.939.562.326.711.6
LOSEECEECEDDECB
Approach Delay61.445.849.233.9
Approach LOSEDDC
Intersection Summary
Area Type:Other
Cycle Length: 150
Actuated Cycle Length: 129
Natural Cycle: 115
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 45.5Intersection LOS: D
Intersection Capacity Utilization 73.1%ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 100: Bavarian Ln & N College Rd
3/4/13 13-208 College Road Development – Transportation Impact Analysis 31
North College Road at
Long Ridge Drive/Northern Access
HCM Unsignalized Intersection Capacity Analysis
200: Long Ridge Dr & N College Rd 2/27/2013
13-208 N. College Rd. Development AM 2013 Existing
DAVENPORT Page 4
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)66128030862
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)77142230958
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeNoneNone
Median storage veh)
Upstream signal (ft)1291
pX, platoon unblocked0.810.810.81
vC, conflicting volume23827131426
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol22381801059
tC, single (s)6.86.94.1
tC, 2 stage (s)
tF (s)3.53.32.2
p0 queue free %7799100
cM capacity (veh/h)29674530
Direction, Lane #WB 1NB 1NB 2SB 1
Volume Total13948477958
Volume Left7000
Volume Right7030
cSH5617001700530
Volume to Capacity0.240.560.280.00
Queue Length 95th (ft)20000
Control Delay (s)88.70.00.00.0
Lane LOSF
Approach Delay (s)88.70.00.0
Approach LOSF
Intersection Summary
Average Delay 0.5
Intersection Capacity Utilization 55.4%ICU Level of Service B
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
200: Northside Baptist Church & N College Rd 2/28/2013
13-208 N. College Rd. Development AM 2014 No Build
DAVENPORT Page 4
MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (veh/h)490618076313048288351
Sign ControlStopStopFreeFree
Grade0%0%0%0%
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Hourly flow rate (vph)540689087014499298157
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTLNone
Median storage veh)2
Upstream signal (ft)1291
pX, platoon unblocked0.790.790.790.790.790.79
vC, conflicting volume188626125192156263672910381458
vC1, stage 1 conf vol1014101415931593
vC2, stage 2 conf vol87215985631042
vCu, unblocked vol158825085191930253812110381045
tC, single (s)7.56.56.97.56.56.94.14.1
tC, 2 stage (s)6.55.56.55.5
tF (s)3.54.03.33.54.03.32.22.2
p0 queue free %7510086931009989100
cM capacity (veh/h)222147502123136716666522
Direction, Lane #EB 1EB 2WB 1NB 1NB 2NB 3SB 1SB 2SB 3
Volume Total546817709664922654384
Volume Left54097000200
Volume Right06880090057
cSH2225022016661700170052217001700
Volume to Capacity0.250.140.080.110.570.290.000.380.23
Queue Length 95th (ft)23127900000
Control Delay (s)26.413.324.511.00.00.011.90.00.0
Lane LOSDBCBB
Approach Delay (s)19.124.50.50.0
Approach LOSCC
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 57.2%ICU Level of Service B
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
200: Northside Baptist Church & N College Rd 2/28/2013
13-208 N. College Rd. Development AM 2014 Build
DAVENPORT Page 4
MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (veh/h)490618076313658295751
Sign ControlStopStopFreeFree
Grade0%0%0%0%
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Hourly flow rate (vph)5406890870151792106357
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTLNone
Median storage veh)2
Upstream signal (ft)1291
pX, platoon unblocked0.780.780.780.780.780.78
vC, conflicting volume200227625602265278676311201526
vC1, stage 1 conf vol1096109616611661
vC2, stage 2 conf vol90616666041124
vCu, unblocked vol171326935602052272311411201098
tC, single (s)7.56.56.97.56.56.94.14.1
tC, 2 stage (s)6.55.56.55.5
tF (s)3.54.03.33.54.03.32.22.2
p0 queue free %7310086921009989100
cM capacity (veh/h)200134472111122711619489
Direction, Lane #EB 1EB 2WB 1NB 1NB 2NB 3SB 1SB 2SB 3
Volume Total5468177010115142709411
Volume Left54097000200
Volume Right06880090057
cSH2004721836191700170048917001700
Volume to Capacity0.270.140.090.110.590.300.000.420.24
Queue Length 95th (ft)271271000000
Control Delay (s)29.613.926.711.60.00.012.40.00.0
Lane LOSDBDBB
Approach Delay (s)20.926.70.50.0
Approach LOSCD
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 58.9%ICU Level of Service B
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
200: Northside Baptist Church & N College Rd 3/1/2013
13-208 N. College Rd. DevelopmentAM 2014 Build with Improvements
DAVENPORT Page 4
MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (veh/h)490618076313658295751
Sign ControlStopStopFreeFree
Grade0%0%0%0%
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Hourly flow rate (vph)5406890870151792106357
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeTWLTLTWLTL
Median storage veh)22
Upstream signal (ft)1291
pX, platoon unblocked0.780.780.780.780.780.78
vC, conflicting volume200227625602265278676311201526
vC1, stage 1 conf vol1096109616611661
vC2, stage 2 conf vol90616666041124
vCu, unblocked vol171326935602052272311411201098
tC, single (s)7.56.56.97.56.56.94.14.1
tC, 2 stage (s)6.55.56.55.5
tF (s)3.54.03.33.54.03.32.22.2
p0 queue free %7310086921009989100
cM capacity (veh/h)200134472111122711619489
Direction, Lane #EB 1EB 2WB 1NB 1NB 2NB 3SB 1SB 2SB 3
Volume Total5468177010115142709411
Volume Left540970 00200
Volume Right068 80090057
cSH2004721836191700170048917001700
Volume to Capacity0.270.140.090.110.590.300.000.420.24
Queue Length 95th (ft)2712710 00000
Control Delay (s)29.613.926.711.60.00.012.40.00.0
Lane LOSDBDBB
Approach Delay (s)20.926.70.50.0
Approach LOSCD
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 58.9%ICU Level of Service B
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
200: Long Ridge Dr & N College Rd 2/28/2013
13-208 N. College Rd. Development PM 2013 Existing
DAVENPORT Page 4
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)23107356995
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)231192671106
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeNoneNone
Median storage veh)
Upstream signal (ft)1291
pX, platoon unblocked0.810.810.81
vC, conflicting volume23145991198
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol215542780
tC, single (s)6.86.94.1
tC, 2 stage (s)
tF (s)3.53.32.2
p0 queue free %9310099
cM capacity (veh/h)33827676
Direction, Lane #WB 1NB 1NB 2SB 1
Volume Total67954031112
Volume Left2007
Volume Right3060
cSH7817001700676
Volume to Capacity0.070.470.240.01
Queue Length 95th (ft)6001
Control Delay (s)55.00.00.00.4
Lane LOSFA
Approach Delay (s)55.00.00.4
Approach LOSF
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 67.1%ICU Level of Service C
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
200: Northside Baptist Church & N College Rd 2/28/2013
13-208 N. College Rd. Development PM 2014 No Build
DAVENPORT Page 4
MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (veh/h)32048190134511022216102034
Sign ControlStopStopFreeFree
Grade0%0%0%0%
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Hourly flow rate (vph)36053210145012242418113338
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTLNone
Median storage veh)2
Upstream signal (ft)1291
pX, platoon unblocked0.790.790.790.790.790.79
vC, conflicting volume191425375861992254362411711249
vC1, stage 1 conf vol1188118813371337
vC2, stage 2 conf vol72713496561207
vCu, unblocked vol162524135861724242201171782
tC, single (s)7.56.56.97.56.56.94.14.1
tC, 2 stage (s)6.55.56.55.5
tF (s)3.54.03.33.54.03.32.22.2
p0 queue free %801008888100989297
cM capacity (veh/h)182166454176152856592656
Direction, Lane #EB 1EB 2WB 1NB 1NB 2NB 3SB 1SB 2SB 3
Volume Total3653365081643318756416
Volume Left3602150001800
Volume Right0531400240038
cSH1824542605921700170065617001700
Volume to Capacity0.200.120.140.080.480.250.030.440.24
Queue Length 95th (ft)181012700200
Control Delay (s)29.514.021.011.60.00.010.60.00.0
Lane LOSDBCBB
Approach Delay (s)20.221.00.40.2
Approach LOSCC
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 52.6%ICU Level of Service A
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
200: Northside Baptist Church & N College Rd 2/28/2013
13-208 N. College Rd. Development PM 2014 Build
DAVENPORT Page 4
MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (veh/h)32048190134511732216110534
Sign ControlStopStopFreeFree
Grade0%0%0%0%
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Hourly flow rate (vph)36053210145013032418122838
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTLNone
Median storage veh)2
Upstream signal (ft)1291
pX, platoon unblocked0.780.780.780.780.780.78
vC, conflicting volume204827106332118271766412661328
vC1, stage 1 conf vol1282128214161416
vC2, stage 2 conf vol76614287031301
vCu, unblocked vol177326266331864263501266845
tC, single (s)7.56.56.97.56.56.94.14.1
tC, 2 stage (s)6.55.56.55.5
tF (s)3.54.03.33.54.03.32.22.2
p0 queue free %781008787100989197
cM capacity (veh/h)160149423157133841545611
Direction, Lane #EB 1EB 2WB 1NB 1NB 2NB 3SB 1SB 2SB 3
Volume Total3653365086945918819447
Volume Left3602150001800
Volume Right0531400240038
cSH1604232345451700170061117001700
Volume to Capacity0.220.130.150.090.510.270.030.480.26
Queue Length 95th (ft)201113800200
Control Delay (s)33.914.723.112.30.00.011.10.00.0
Lane LOSDBCBB
Approach Delay (s)22.423.10.40.2
Approach LOSCC
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 52.6%ICU Level of Service A
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
200: Northside Baptist Church & N College Rd 3/1/2013
13-208 N. College Rd. DevelopmentPM 2014 Build with Improvements
DAVENPORT Page 4
MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurations
Volume (veh/h)32048190134511732216110534
Sign ControlStopStopFreeFree
Grade0%0%0%0%
Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90
Hourly flow rate (vph)36053210145013032418122838
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeTWLTLTWLTL
Median storage veh)22
Upstream signal (ft)1291
pX, platoon unblocked0.780.780.780.780.780.78
vC, conflicting volume204827106332118271766412661328
vC1, stage 1 conf vol1282128214161416
vC2, stage 2 conf vol76614287031301
vCu, unblocked vol177326266331864263501266845
tC, single (s)7.56.56.97.56.56.94.14.1
tC, 2 stage (s)6.55.56.55.5
tF (s)3.54.03.33.54.03.32.22.2
p0 queue free %781008787100989197
cM capacity (veh/h)160149423157133841545611
Direction, Lane #EB 1EB 2WB 1NB 1NB 2NB 3SB 1SB 2SB 3
Volume Total3653365086945918819447
Volume Left3602150001800
Volume Right0531400240038
cSH1604232345451700170061117001700
Volume to Capacity0.220.130.150.090.510.270.030.480.26
Queue Length 95th (ft)201113 800200
Control Delay (s)33.914.723.112.30.00.011.10.00.0
Lane LOSDBCBB
Approach Delay (s)22.423.10.40.2
Approach LOSCC
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 52.6%ICU Level of Service A
Analysis Period (min)15
3/4/13 13-208 College Road Development – Transportation Impact Analysis 32
North College Road at
Proposed South Access
HCM Unsignalized Intersection Capacity Analysis
300: South Site Access & N College Rd 2/28/2013
13-208 N. College Rd. Development AM 2014 Build
DAVENPORT Page 6
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)674413625941949
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)7449151366461054
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeNoneNone
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume26927891579
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol26927891579
tC, single (s)6.86.94.1
tC, 2 stage (s)
tF (s)3.53.32.2
p0 queue free %08589
cM capacity (veh/h)16333413
Direction, Lane #WB 1WB 2NB 1NB 2SB 1
Volume Total744910095701100
Volume Left7400046
Volume Right0490660
cSH1633317001700413
Volume to Capacity4.800.150.590.340.11
Queue Length 95th (ft)Err13009
Control Delay (s)Err17.70.00.04.7
Lane LOSFCA
Approach Delay (s)6042.40.04.7
Approach LOSF
Intersection Summary
Average Delay 267.8
Intersection Capacity Utilization 93.6%ICU Level of Service F
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
300: South Site Access & N College Rd 3/1/2013
13-208 N. College Rd. DevelopmentAM 2014 Build with Improvements
DAVENPORT Page 6
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)674413625941949
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)7449151366461054
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeTWLTLTWLTL
Median storage veh)22
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume26597571579
vC1, stage 1 conf vol1513
vC2, stage 2 conf vol1146
vCu, unblocked vol26597571579
tC, single (s)6.86.94.1
tC, 2 stage (s)5.8
tF (s)3.53.32.2
p0 queue free %438689
cM capacity (veh/h)132350413
Direction, Lane #WB 1WB 2NB 1NB 2NB 3SB 1SB 2
Volume Total744975775766461054
Volume Left74 0000460
Volume Right049006600
cSH1323501700170017004131700
Volume to Capacity0.570.140.450.450.040.110.62
Queue Length 95th (ft)7012 00090
Control Delay (s)63.216.90.00.00.014.80.0
Lane LOSFCB
Approach Delay (s)44.90.00.6
Approach LOSE
Intersection Summary
Average Delay 2.2
Intersection Capacity Utilization 60.3%ICU Level of Service B
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
300: South Site Access & N College Rd 2/28/2013
13-208 N. College Rd. Development PM 2014 Build
DAVENPORT Page 6
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)6942115761391081
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)7747128668431201
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeNoneNone
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume26076771353
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol26076771353
tC, single (s)6.86.94.1
tC, 2 stage (s)
tF (s)3.53.32.2
p0 queue free %08891
cM capacity (veh/h)18395504
Direction, Lane #WB 1WB 2NB 1NB 2SB 1
Volume Total77478574961244
Volume Left7700043
Volume Right0470680
cSH1839517001700504
Volume to Capacity4.200.120.500.290.09
Queue Length 95th (ft)Err10007
Control Delay (s)Err15.30.00.04.1
Lane LOSFCA
Approach Delay (s)6221.40.04.1
Approach LOSF
Intersection Summary
Average Delay 283.8
Intersection Capacity Utilization 98.9%ICU Level of Service F
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
300: South Site Access & N College Rd 3/1/2013
13-208 N. College Rd. DevelopmentPM 2014 Build with Improvements
DAVENPORT Page 6
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)6942115761391081
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)7747128668431201
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeTWLTLTWLTL
Median storage veh)22
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume25736431353
vC1, stage 1 conf vol1286
vC2, stage 2 conf vol1288
vCu, unblocked vol25736431353
tC, single (s)6.86.94.1
tC, 2 stage (s)5.8
tF (s)3.53.32.2
p0 queue free %478991
cM capacity (veh/h)145416504
Direction, Lane #WB 1WB 2NB 1NB 2NB 3SB 1SB 2
Volume Total774764364368431201
Volume Left77 0000430
Volume Right047006800
cSH1454161700170017005041700
Volume to Capacity0.530.110.380.380.040.090.71
Queue Length 95th (ft)65 900070
Control Delay (s)54.914.70.00.00.012.80.0
Lane LOSFBB
Approach Delay (s)39.70.00.4
Approach LOSE
Intersection Summary
Average Delay 2.0
Intersection Capacity Utilization 67.4%ICU Level of Service C
Analysis Period (min)15
3/4/13 13-208 College Road Development – Transportation Impact Analysis 33
North College Road at
Proposed North Access
HCM Unsignalized Intersection Capacity Analysis
400: North Site Access & N College Rd 2/28/2013
13-208 N. College Rd. Development AM 2014 Build
DAVENPORT Page 8
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)342213782920955
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)3824153132221061
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeNoneNone
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume26537821563
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol26537821563
tC, single (s)6.86.94.1
tC, 2 stage (s)
tF (s)3.53.32.2
p0 queue free %09395
cM capacity (veh/h)18337419
Direction, Lane #WB 1NB 1NB 2SB 1
Volume Total6210215431083
Volume Left380022
Volume Right240320
cSH2817001700419
Volume to Capacity2.220.600.320.05
Queue Length 95th (ft)186004
Control Delay (s)860.60.00.02.2
Lane LOSFA
Approach Delay (s)860.60.02.2
Approach LOSF
Intersection Summary
Average Delay 20.7
Intersection Capacity Utilization 76.3%ICU Level of Service D
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
400: North Site Access & N College Rd 3/1/2013
13-208 N. College Rd. DevelopmentAM 2014 Build with Improvements
DAVENPORT Page 8
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)342213782920955
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)3824153132221061
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeTWLTLTWLTL
Median storage veh)22
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume26377661563
vC1, stage 1 conf vol1531
vC2, stage 2 conf vol1106
vCu, unblocked vol26377661563
tC, single (s)6.86.94.1
tC, 2 stage (s)5.8
tF (s)3.53.32.2
p0 queue free %729395
cM capacity (veh/h)135346419
Direction, Lane #WB 1NB 1NB 2NB 3SB 1SB 2
Volume Total6276676632221061
Volume Left38000220
Volume Right24003200
cSH1771700170017004191700
Volume to Capacity0.350.450.450.020.050.62
Queue Length 95th (ft)37 00040
Control Delay (s)36.00.00.00.014.10.0
Lane LOSEB
Approach Delay (s)36.00.00.3
Approach LOSE
Intersection Summary
Average Delay 0.9
Intersection Capacity Utilization 60.3%ICU Level of Service B
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
400: North Site Access & N College Rd 2/28/2013
13-208 N. College Rd. Development PM 2014 Build
DAVENPORT Page 8
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)3724116931201083
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)4127129934221203
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeNoneNone
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume25646671333
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol25646671333
tC, single (s)6.86.94.1
tC, 2 stage (s)
tF (s)3.53.32.2
p0 queue free %09396
cM capacity (veh/h)20402513
Direction, Lane #WB 1NB 1NB 2SB 1
Volume Total688664671226
Volume Left410022
Volume Right270340
cSH3317001700513
Volume to Capacity2.080.510.270.04
Queue Length 95th (ft)192003
Control Delay (s)759.00.00.02.0
Lane LOSFA
Approach Delay (s)759.00.02.0
Approach LOSF
Intersection Summary
Average Delay 20.5
Intersection Capacity Utilization 83.2%ICU Level of Service E
Analysis Period (min)15
HCM Unsignalized Intersection Capacity Analysis
400: North Site Access & N College Rd 3/1/2013
13-208 N. College Rd. DevelopmentPM 2014 Build with Improvements
DAVENPORT Page 8
MovementWBLWBRNBTNBRSBLSBT
Lane Configurations
Volume (veh/h)3724116931201083
Sign ControlStopFreeFree
Grade0%0%0%
Peak Hour Factor0.900.900.900.900.900.90
Hourly flow rate (vph)4127129934221203
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median typeTWLTLTWLTL
Median storage veh)22
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume25476491333
vC1, stage 1 conf vol1299
vC2, stage 2 conf vol1248
vCu, unblocked vol25476491333
tC, single (s)6.86.94.1
tC, 2 stage (s)5.8
tF (s)3.53.32.2
p0 queue free %739496
cM capacity (veh/h)151412513
Direction, Lane #WB 1NB 1NB 2NB 3SB 1SB 2
Volume Total6864964934221203
Volume Left41000220
Volume Right27003400
cSH2011700170017005131700
Volume to Capacity0.340.380.380.020.040.71
Queue Length 95th (ft)35 00030
Control Delay (s)31.70.00.00.012.30.0
Lane LOSDB
Approach Delay (s)31.70.00.2
Approach LOSD
Intersection Summary
Average Delay 0.9
Intersection Capacity Utilization 67.2%ICU Level of Service C
Analysis Period (min)15
3/4/13 13-208 College Road Development – Transportation Impact Analysis 34
Trip Generation
College Road Development Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes February 07, 2013 ____________________________________________________________________
24 Hour AM Pk Hour PM Pk Hour Two-Way Land Use Size Volume Enter Exit Enter Exit ____________________________________________________________________
Apartments 120 Dwelling Units 851 13 50 54 29 General Office Building 3.2 Th.Sq.Ft. GFA 94 11 1 14 68 Shopping Center 3.2 Th.Sq.Ft. GLA 725 12 8 31 32 Fast-Food Restaurant with Drive-Thru 4.5 Th.Sq.Ft. GFA 2233 113 109 79 73 ____________________________________________________________________
Total Driveway Volume 3903 149 168 178 202
Total Peak Hour Pass-By Trips 55 53 73 71
Total Peak Hour Vol. Added to Adjacent Streets 94 115 105 131
____________________________________________________________________
Note: A zero indicates no data available.
TRIP GENERATION BY MICROTRANS
3/4/13 13-208 College Road Development – Transportation Impact Analysis 35
Traffic Volume Data
(Including Intersection Photographs)
DA
V
E
N
P
O
R
T
T
R
A
N
S
P
O
R
T
I
O
N
C
O
N
S
U
L
T
I
N
G
P
r
o
j
e
c
t
N
o
.
1
3
-
2
0
8
US
1
1
7
/
N
C
1
3
2
a
t
L
o
n
g
R
i
d
g
e
D
r
i
v
e
,
W
i
l
m
i
n
g
t
o
n
,
N
C
US
1
1
7
/
N
C
1
3
2
a
t
L
o
n
g
R
i
d
g
e
D
r
i
v
e
lo
o
k
i
n
g
N
o
r
t
h
US
1
1
7
/
N
C
1
3
2
a
t
L
o
n
g
R
i
d
g
e
D
r
i
v
e
lo
o
k
i
n
g
S
o
u
t
h
US
1
1
7
/
N
C
1
3
2
a
t
L
o
n
g
R
i
d
g
e
D
r
i
v
e
lo
o
k
i
n
g
E
a
s
t
US
1
1
7
/
N
C
1
3
2
a
t
L
o
n
g
R
i
d
g
e
D
r
i
v
e
lo
o
k
i
n
g
W
e
s
t
File Name : 13-208 N. College Rd & Long Ridge
Site Code : 00013208
Start Date : 2/6/2013
Page No : 1
Counted By: B. Whitaker, J. Williams
Weather: Clear
Groups Printed- Cars - Trucks - Bikes
College Road
Southbound
Long Ridge Drive
Westbound
College Road
Northbound
N/A
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total07:00 AM 0 56 0 0 56 1 0 1 0 2 0 57 0 0 57 0 0 0 0 0 115
07:15 AM 1 91 0 0 92 3 0 2 0 5 0 76 0 0 76 0 0 0 0 0 173
07:30 AM 0 113 0 0 113 0 0 0 0 0 0 92 0 0 92 0 0 0 0 0 205
07:45 AM 1 158 0 0 159 0 0 0 0 0 0 235 0 0 235 0 0 0 0 0 394
Total 2 418 0 0 420 4 0 3 0 7 0 460 0 0 460 0 0 0 0 0 887
08:00 AM 0 169 0 0 169 1 0 2 0 3 0 135 2 0 137 0 0 0 0 0 309
08:15 AM 0 167 0 0 167 2 0 1 0 3 0 197 1 0 198 0 0 0 0 0 368
08:30 AM 0 234 0 0 234 2 0 0 0 2 0 267 0 0 267 0 0 0 0 0 503
08:45 AM 0 241 0 0 241 1 0 3 0 4 0 363 0 1 364 0 0 0 0 0 609
Total 0 811 0 0 811 6 0 6 0 12 0 962 3 1 966 0 0 0 0 0 1789
03:30 PM 1 306 0 0 307 0 0 1 0 1 0 217 1 0 218 0 0 0 0 0 526
03:45 PM 0 286 0 0 286 1 0 0 0 1 0 200 1 0 201 0 0 0 0 0 488
Total 1 592 0 0 593 1 0 1 0 2 0 417 2 0 419 0 0 0 0 0 1014
04:00 PM 1 250 0 0 251 0 0 0 0 0 0 231 2 0 233 0 0 0 0 0 484
04:15 PM 0 212 0 0 212 0 0 0 0 0 0 263 4 0 267 0 0 0 0 0 479
04:30 PM 2 282 1 1 286 0 0 2 3 5 0 193 1 1 195 0 0 0 0 0 486
04:45 PM 3 223 0 0 226 0 0 1 0 1 0 232 2 0 234 0 0 0 1 1 462
Total 6 967 1 1 975 0 0 3 3 6 0 919 9 1 929 0 0 0 1 1 1911
05:00 PM 1 238 0 0 239 1 0 1 0 2 0 206 1 0 207 0 0 0 0 0 448
05:15 PM 1 258 0 0 259 0 0 0 0 0 0 247 0 0 247 0 0 0 0 0 506
05:30 PM 1 257 0 0 258 1 0 1 0 2 0 305 2 0 307 0 0 0 0 0 567
05:45 PM 0 204 1 0 205 0 0 1 0 1 0 230 7 0 237 0 0 0 0 0 443
Total 3 957 1 0 961 2 0 3 0 5 0 988 10 0 998 0 0 0 0 0 1964
Grand Total 12 3745 2 1 3760 13 0 16 3 32 0 3746 24 2 3772 0 0 0 1 1 7565
Apprch %0.3 99.6 0.1 0 40.6 0 50 9.4 0 99.3 0.6 0.1 0 0 0 100
Total %0.2 49.5 0 0 49.7 0.2 0 0.2 0 0.4 0 49.5 0.3 0 49.9 0 0 0 0 0
Cars 12 3590 3623
% Cars 100 95.9 100 100 95.9 100 0 93.8 100 96.9 0 96.7 91.7 100 96.7 0 0 0 100 100 96.3
Trucks 0 153 0 0 153 0 0 1 0 1 0 120 2 0 122 0 0 0 0 0 276
% Trucks 0 4.1 0 0 4.1 0 0 6.2 0 3.1 0 3.2 8.3 0 3.2 0 0 0 0 0 3.6
Bikes 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 5
% Bikes 0 0.1 0 0 0.1 0 0 0 0 0 0 0.1 0 0 0.1 0 0 0 0 0 0.1
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
File Name : 13-208 N. College Rd & Long Ridge
Site Code : 00013208
Start Date : 2/6/2013
Page No : 2
Counted By: B. Whitaker, J. Williams
Weather: Clear
College Road
N
/
A
L
o
n
g
R
i
d
g
e
D
r
i
v
e
College Road
Right
2
0
0
2
Thru
3590
153
2
3745
Left
12
0
0
12
Peds
1
0
0
1
InOut Total
3638 3605 7243
121 153 274
3 2 5
3762 7522 3760
Rig
h
t
15
1 0
16
Th
r
u
0 0 0 0
Le
f
t
13
0 0
13
Pe
d
s
3 0 0 3
Ou
t
To
t
a
l
In
34
31
65
2
1
3
0
0
0
36
68
32
Left
0
0
0
0
Thru
3623
120
3
3746
Right
22
2
0
24
Peds
2
0
0
2
Out TotalIn
3603 3647 7250
153 122 275
2 3 5
3758 7530 3772
Le
f
t
0 0 0 0
Th
r
u
0 0 0 0
Rig
h
t
0 0 0 0
Pe
d
s
1 0 0 1
To
t
a
l
Ou
t
In
2
1
3
0
0
0
0
0
0
2
3
1
2/6/2013 07:00 AM
2/6/2013 05:45 PM
Cars
Trucks
Bikes
North
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
File Name : 13-208 N. College Rd & Long Ridge
Site Code : 00013208
Start Date : 2/6/2013
Page No : 3
Counted By: B. Whitaker, J. Williams
Weather: Clear
College Road
Southbound
Long Ridge Drive
Westbound
College Road
Northbound
N/A
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 0 169 0 0 169 1 0 2 0 3 0 135 2 0 137 0 0 0 0 0 309
08:15 AM 0 167 0 0 167 2 0 1 0 3 0 197 1 0 198 0 0 0 0 0 368
08:30 AM 0 234 0 0 234 2 0 0 0 2 0 267 0 0 267 0 0 0 0 0 503
08:45 AM 0 241 0 0 241 1 0 3 0 4 0 363 0 1 364 0 0 0 0 0 609
Total Volume 0 811 0 0 811 6 0 6 0 12 0 962 3 1 966 0 0 0 0 0 1789
% App. Total 0 100 0 0 50 0 50 0 0 99.6 0.3 0.1 0 0 0 0
PHF .000 .841 .000 .000 .841 .750 .000 .500 .000 .750 .000 .663 .375 .250 .663 .000 .000 .000 .000 .000 .734
College Road
N
/
A
L
o
n
g
R
i
d
g
e
D
r
i
v
e
College Road
Right
0
Thru
811
Left
0
Peds
0
InOut Total
968 811 1779
Ri
g
h
t
6
Th
r
u
0
Le
f
t
6
Pe
d
s
0
Ou
t
To
t
a
l
In
3
12
15
Left
0
Thru
962
Right
3
Peds
1
Out TotalIn
817 966 1783
Le
f
t
0
Th
r
u
0
Rig
h
t
0
Pe
d
s
0
To
t
a
l
Ou
t
In
0
0
0
Peak Hour Begins at 08:00 AM
Cars
Trucks
Bikes
Peak Hour Data
North
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
File Name : 13-208 N. College Rd & Long Ridge
Site Code : 00013208
Start Date : 2/6/2013
Page No : 4
Counted By: B. Whitaker, J. Williams
Weather: Clear
College Road
Southbound
Long Ridge Drive
Westbound
College Road
Northbound
N/A
Eastbound
Start
Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 3 223 0 0 226 0 0 1 0 1 0 232 2 0 234 0 0 0 1 1 462
05:00 PM 1 238 0 0 239 1 0 1 0 2 0 206 1 0 207 0 0 0 0 0 448
05:15 PM 1 258 0 0 259 0 0 0 0 0 0 247 0 0 247 0 0 0 0 0 506
05:30 PM 1 257 0 0 258 1 0 1 0 2 0 305 2 0 307 0 0 0 0 0 567
Total Volume 6 976 0 0 982 2 0 3 0 5 0 990 5 0 995 0 0 0 1 1 1983
% App. Total 0.6 99.4 0 0 40 0 60 0 0 99.5 0.5 0 0 0 0 100
PHF .500 .946 .000 .000 .948 .500 .000 .750 .000 .625 .000 .811 .625 .000 .810 .000 .000 .000 .250 .250 .874
College Road
N
/
A
L
o
n
g
R
i
d
g
e
D
r
i
v
e
College Road
Right
0
Thru
976
Left
6
Peds
0
InOut Total
993 982 1975
Ri
g
h
t
3
Th
r
u
0
Le
f
t
2
Pe
d
s
0
Ou
t
To
t
a
l
In
11
5
16
Left
0
Thru
990
Right
5
Peds
0
Out TotalIn
978 995 1973
Le
f
t
0
Th
r
u
0
Ri
g
h
t
0
Pe
d
s
1
To
t
a
l
Ou
t
In
0
1
1
Peak Hour Begins at 04:45 PM
Cars
Trucks
Bikes
Peak Hour Data
North
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
DA
V
E
N
P
O
R
T
P
r
o
j
e
c
t
N
o
.
1
3
-
2
0
8
N.
C
o
l
l
e
g
e
R
d
(
N
C
1
3
2
)
a
t
M
u
r
r
a
y
v
i
l
l
e
R
d
&
B
a
v
a
r
i
a
n
D
r
,
N
e
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
N.
C
o
l
l
e
g
e
R
d
(
N
C
1
3
2
)
a
t
M
u
r
r
a
y
v
i
l
l
e
R
d
&
Ba
v
a
r
i
a
n
D
r
l
o
o
k
i
n
g
w
e
s
t
N.
C
o
l
l
e
g
e
R
d
(
N
C
1
3
2
)
a
t
M
u
r
r
a
y
v
i
l
l
e
R
d
&
Ba
v
a
r
i
a
n
D
r
l
o
o
k
i
n
g
n
o
r
t
h
N.
C
o
l
l
e
g
e
R
d
(
N
C
1
3
2
)
a
t
M
u
r
r
a
y
v
i
l
l
e
R
d
&
Ba
v
a
r
i
a
n
D
r
l
o
o
k
i
n
g
s
o
u
t
h
N.
C
o
l
l
e
g
e
R
d
(
N
C
1
3
2
)
a
t
M
u
r
r
a
y
v
i
l
l
e
R
d
&
Ba
v
a
r
i
a
n
D
r
l
o
o
k
i
n
g
e
a
s
t
File Name : 13-208 College at Murrayville - Bavarian
Site Code : 00000000
Start Date : 2/6/2013
Page No : 1
Counted By: L. Reid
Weather: Clear
Groups Printed- Cars - Trucks - Bikes
College Street
Southbound
Murrayville Road
Westbound
College Street
Northbound
Bavarian Lane
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total07:00 AM 29 94 23 0 146 33 44 22 0 99 31 79 31 0 141 20 16 22 0 58 444
07:15 AM 21 84 25 0 130 49 43 24 2 118 50 120 35 0 205 32 19 35 0 86 539
07:30 AM 21 137 52 0 210 72 96 40 0 208 51 163 17 0 231 50 16 14 1 81 730
07:45 AM 26 103 54 1 184 59 52 72 0 183 52 166 15 0 233 52 12 26 1 91 691
Total 97 418 154 1 670 213 235 158 2 608 184 528 98 0 810 154 63 97 2 316 2404
08:00 AM 56 151 62 0 269 32 51 122 0 205 45 196 15 0 256 84 12 31 0 127 857
08:15 AM 26 128 52 0 206 24 40 90 0 154 34 181 10 0 225 67 9 14 0 90 675
08:30 AM 57 135 49 0 241 31 42 31 0 104 23 93 8 0 124 39 10 23 1 73 542
08:45 AM 30 131 27 0 188 33 22 26 0 81 41 120 12 0 173 34 13 16 0 63 505
Total 169 545 190 0 904 120 155 269 0 544 143 590 45 0 778 224 44 84 1 353 2579
03:30 PM 56 215 36 0 307 26 16 19 0 61 31 148 22 0 201 54 31 17 1 103 672
03:45 PM 61 178 48 0 287 21 28 25 0 74 31 110 26 0 167 62 24 24 0 110 638
Total 117 393 84 0 594 47 44 44 0 135 62 258 48 0 368 116 55 41 1 213 1310
04:00 PM 70 151 34 0 255 24 32 24 0 80 34 122 24 1 181 47 26 15 0 88 604
04:15 PM 40 155 27 0 222 22 17 25 0 64 40 151 28 1 220 57 40 29 0 126 632
04:30 PM 62 160 50 0 272 22 14 19 0 55 33 123 32 0 188 58 34 27 0 119 634
04:45 PM 48 136 33 0 217 24 21 27 0 72 32 151 37 1 221 60 41 11 1 113 623
Total 220 602 144 0 966 92 84 95 0 271 139 547 121 3 810 222 141 82 1 446 2493
05:00 PM 73 126 44 0 243 28 20 33 0 81 48 143 41 0 232 54 42 19 0 115 671
05:15 PM 80 168 27 0 275 36 29 21 0 86 44 181 47 0 272 76 66 21 0 163 796
05:30 PM 67 158 37 0 262 29 24 27 0 80 53 220 49 1 323 85 55 5 0 145 810
05:45 PM 38 116 41 1 196 30 24 20 0 74 39 156 33 0 228 80 25 14 0 119 617
Total 258 568 149 1 976 123 97 101 0 321 184 700 170 1 1055 295 188 59 0 542 2894
Grand Total 861 2526 721 2 4110 595 615 667 2 1879 712 2623 482 4 3821 1011 491 363 5 1870 11680
Apprch %20.9 61.5 17.5 0 31.7 32.7 35.5 0.1 18.6 68.6 12.6 0.1 54.1 26.3 19.4 0.3
Total %7.4 21.6 6.2 0 35.2 5.1 5.3 5.7 0 16.1 6.1 22.5 4.1 0 32.7 8.7 4.2 3.1 0 16
Cars 854 2486 2565 11488
% Cars 99.2 98.4 98.6 100 98.6 100 99 98.1 100 99 98.7 97.8 99.6 100 98.2 96.8 99.4 96.7 100 97.5 98.4
Trucks 7 35 10 0 52 0 6 13 0 19 7 57 1 0 65 30 2 11 0 43 179
% Trucks 0.8 1.4 1.4 0 1.3 0 1 1.9 0 1 1 2.2 0.2 0 1.7 3 0.4 3 0 2.3 1.5
Bikes 0 5 0 0 5 0 0 0 0 0 2 1 1 0 4 2 1 1 0 4 13
% Bikes 0 0.2 0 0 0.1 0 0 0 0 0 0.3 0 0.2 0 0.1 0.2 0.2 0.3 0 0.2 0.1
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
File Name : 13-208 College at Murrayville - Bavarian
Site Code : 00000000
Start Date : 2/6/2013
Page No : 2
Counted By: L. Reid
Weather: Clear
College Street
B
a
v
a
r
i
a
n
L
a
n
e
M
u
r
r
a
y
v
i
l
l
e
R
o
a
d
College Street
Right
711
10
0
721
Thru
2486
35
5
2526
Left
854
7
0
861
Peds
2
0
0
2
InOut Total
4198 4053 8251
100 52 152
3 5 8
4301 8411 4110
Rig
h
t
65
4
13
0
66
7
Th
r
u 60
9
6 0
61
5
Le
f
t
59
5
0 0
59
5
Pe
d
s
2 0 0 2
Ou
t
To
t
a
l
In
18
2
2
18
6
0
36
8
2
10
19
29
2
0
2
18
3
4
37
1
3
18
7
9
Left
703
7
2
712
Thru
2565
57
1
2623
Right
480
1
1
482
Peds
4
0
0
4
Out TotalIn
3432 3752 7184
46 65 111
6 4 10
3484 7305 3821
Le
f
t
97
9
30
2
10
1
1
Th
r
u48
8
2 1
49
1
Rig
h
t
35
1
11
1
36
3
Pe
d
s
5 0 0 5
To
t
a
l
Ou
t
In
20
2
3
18
2
3
38
4
6
23
43
66
2
4
6
20
4
8
39
1
8
18
7
0
2/6/2013 07:00 AM
2/6/2013 05:45 PM
Cars
Trucks
Bikes
North
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
File Name : 13-208 College at Murrayville - Bavarian
Site Code : 00000000
Start Date : 2/6/2013
Page No : 3
Counted By: L. Reid
Weather: Clear
College Street
Southbound
Murrayville Road
Westbound
College Street
Northbound
Bavarian Lane
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 21 137 52 0 210 72 96 40 0 208 51 163 17 0 231 50 16 14 1 81 730
07:45 AM 26 103 54 1 184 59 52 72 0 183 52 166 15 0 233 52 12 26 1 91 691
08:00 AM 56 151 62 0 269 32 51 122 0 205 45 196 15 0 256 84 12 31 0 127 857
08:15 AM 26 128 52 0 206 24 40 90 0 154 34 181 10 0 225 67 9 14 0 90 675
Total Volume 129 519 220 1 869 187 239 324 0 750 182 706 57 0 945 253 49 85 2 389 2953
% App. Total 14.8 59.7 25.3 0.1 24.9 31.9 43.2 0 19.3 74.7 6 0 65 12.6 21.9 0.5
PHF .576 .859 .887 .250 .808 .649 .622 .664 .000 .901 .875 .901 .838 .000 .923 .753 .766 .685 .500 .766 .861
College Street
B
a
v
a
r
i
a
n
L
a
n
e
M
u
r
r
a
y
v
i
l
l
e
R
o
a
d
College Street
Right
220
Thru
519
Left
129
Peds
1
InOut Total
1283 869 2152
Ri
g
h
t
32
4
Th
r
u
23
9
Le
f
t
18
7
Pe
d
s
0
Ou
t
To
t
a
l
In
23
5
75
0
98
5
Left
182
Thru
706
Right
57
Peds
0
Out TotalIn
791 945 1736
Le
f
t
25
3
Th
r
u
49
Rig
h
t
85
Pe
d
s
2
To
t
a
l
Ou
t
In
64
1
38
9
10
3
0
Peak Hour Begins at 07:30 AM
Cars
Trucks
Bikes
Peak Hour Data
North
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
File Name : 13-208 College at Murrayville - Bavarian
Site Code : 00000000
Start Date : 2/6/2013
Page No : 4
Counted By: L. Reid
Weather: Clear
College Street
Southbound
Murrayville Road
Westbound
College Street
Northbound
Bavarian Lane
Eastbound
Start
Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 48 136 33 0 217 24 21 27 0 72 32 151 37 1 221 60 41 11 1 113 623
05:00 PM 73 126 44 0 243 28 20 33 0 81 48 143 41 0 232 54 42 19 0 115 671
05:15 PM 80 168 27 0 275 36 29 21 0 86 44 181 47 0 272 76 66 21 0 163 796
05:30 PM 67 158 37 0 262 29 24 27 0 80 53 220 49 1 323 85 55 5 0 145 810
Total Volume 268 588 141 0 997 117 94 108 0 319 177 695 174 2 1048 275 204 56 1 536 2900
% App. Total 26.9 59 14.1 0 36.7 29.5 33.9 0 16.9 66.3 16.6 0.2 51.3 38.1 10.4 0.2
PHF .838 .875 .801 .000 .906 .813 .810 .818 .000 .927 .835 .790 .888 .500 .811 .809 .773 .667 .250 .822 .895
College Street
B
a
v
a
r
i
a
n
L
a
n
e
M
u
r
r
a
y
v
i
l
l
e
R
o
a
d
College Street
Right
141
Thru
588
Left
268
Peds
0
InOut Total
1078 997 2075
Ri
g
h
t
10
8
Th
r
u
94
Le
f
t
11
7
Pe
d
s
0
Ou
t
To
t
a
l
In
64
6
31
9
96
5
Left
177
Thru
695
Right
174
Peds
2
Out TotalIn
761 1048 1809
Le
f
t
27
5
Th
r
u
20
4
Ri
g
h
t
56
Pe
d
s
1
To
t
a
l
Ou
t
In
41
2
53
6
94
8
Peak Hour Begins at 04:45 PM
Cars
Trucks
Bikes
Peak Hour Data
North
Davenport Transportation Consulting
305 West Fourth Street, Suite 2A
Winston Salem, NC 27101
10
0
10
0
AM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Of
f
s
i
t
e
Do
l
l
a
r
Ge
n
e
r
a
l
SIT
E
TR
I
P
S
PA
S
S
B
Y
TR
I
P
S
20
1
4
Fu
t
u
r
e
N
o
Bu
i
l
d
20
1
4
Fu
t
u
r
e
Bu
i
l
d
PM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Offsite Dollar
Ge
n
e
r
a
l
SITE TRIPSPASS BY TRIPS2014 Future No Build2014 Future Build
EB
L
2
5
3
2
5
3
2
6
1
9
1
1
4
2
7
1
2
8
5
E
B
L
2
7
5
2
7
5
2
8
3
6
3
1
6
2
9
2
3
0
8
EB
T
4
9
4
9
5
0
3
53
5
3
E
B
T
2
0
4
2
0
4
2
1
0
4
214214
EB
R
8
5
8
5
8
8
6
94
9
4
E
B
R
5
6
5
6
5
8
8
6666
WB
L
18
7
18
7
19
3
0
19
3
19
3
WB
L
11
7
11
7
12
1
0
121121
WB
T
23
9
23
9
24
6
5
25
1
25
1
WB
T
94
94
97
3
100100
WB
R
3
2
4
3
2
4
3
3
4
1
8
1
1
4
3
5
3
3
6
7
W
B
R
1
0
8
1
0
8
1
1
1
1
3
3
1
6
1
2
7
1
4
3
NB
L
1
8
2
1
8
2
1
8
7
9
19
6
1
9
6
N
B
L
1
7
7
1
7
7
1
8
2
7
189189
NB
T
70
6
70
6
72
7
49
2
33
77
8
81
1
NB
T
69
5
69
5
71
6
37
838761799
NB
R
5
7
5
7
5
9
0
59
5
9
N
B
R
1
7
4
1
7
4
1
7
9
0
179179
SB
L
12
9
12
9
13
3
14
0
17
14
7
16
4
SB
L
26
8
26
8
27
6
13
320292312
SB
T
51
9
51
9
53
5
36
1
40
57
2
61
2
SB
T
58
8
58
8
60
6
39
846653699
SB
R
22
0
22
0
22
7
8
0
17
23
5
25
2
SB
R
14
1
14
1
14
5
5
320153173
To
t
a
l
29
5
0
0
29
5
0
30
3
9
15
6
5
13
5
0
32
0
2
33
3
7
To
t
a
l
28
9
7
0
28
9
7
29
8
4
13
4
28156031473303
20
0
20
0
AM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Of
f
s
i
t
e
Do
l
l
a
r
Ge
n
e
r
a
l
Tr
i
p
s
SIT
E
TR
I
P
S
PA
S
S
B
Y
TR
I
P
S
20
1
4
Fu
t
u
r
e
N
o
Bu
i
l
d
20
1
4
Fu
t
u
r
e
Bu
i
l
d
PM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Offsite Dollar
Ge
n
e
r
a
l
TripsSITE TRIPSPASS BY TRIPS2014 Future No Build2014 Future Build
EB
L
0
0
0
49
49
49
EB
L
0
0
0
32
3232
EB
T
0
0
0
0
0
0
EB
T
0
0
0
0
00
EB
R
0
0
0
61
61
61
EB
R
0
0
0
48
4848
WB
L
6
6
6
0
2
8
8
WB
L
2
2
2
0
171919
WB
T
0
0
0
0
0
0
WB
T
0
0
0
0
00
WB
R
6
6
6
0
1
7
7
WB
R
3
3
3
0
101313
NB
L
0
0
0
63
63
63
NB
L
0
0
0
45
4545
NB
T
96
2
31
8
12
8
0
13
1
8
-1
4
0
61
13
0
4
13
6
5
NB
T
99
0
83
10
7
3
11
0
5
-1
-27111021173
NB
R
3
3
3
0
5
8
8
NB
R
5
5
5
0
172222
SB
L
0
0
0
0
2
2
2
SB
L
6
6
6
0
101616
SB
T
81
1
51
86
2
88
8
-5
0
74
88
3
95
7
SB
T
97
6
19
99
5
10
2
5
-3
-28510201105
SB
R
0
0
0
51
51
51
SB
R
0
0
0
34
3434
To
t
a
l
17
8
8
0
21
5
7
22
2
2
20
5
10
13
5
0
24
3
6
25
7
1
To
t
a
l
19
8
2
0
20
8
4
21
4
7
15
5
50156023512507
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
M
u
r
r
a
y
v
i
l
l
e
R
o
a
d
/
B
a
v
a
r
i
a
n
L
a
n
e
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
M
u
r
r
a
y
v
i
l
l
e
R
o
a
d
/
B
a
v
a
r
i
a
n
L
a
n
e
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
L
o
n
g
R
i
d
g
e
D
r
i
v
e
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
L
o
n
g
R
i
d
g
e
D
r
i
v
e
30
0
30
0
AM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Of
f
s
i
t
e
Do
l
l
a
r
Ge
n
e
r
a
l
Tr
i
p
s
SIT
E
TR
I
P
S
PA
S
S
B
Y
TR
I
P
S
20
1
4
Fu
t
u
r
e
N
o
Bu
i
l
d
20
1
4
Fu
t
u
r
e
Bu
i
l
d
PM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Offsite Dollar
Ge
n
e
r
a
l
TripsSITE TRIPSPASS BY TRIPS2014 Future No Build2014 Future Build
EB
L
0
0
0
0
EB
L
0
0
00
EB
T
0
0
0
0
EB
T
0
0
00
EB
R
0
0
0
0
EB
R
0
0
00
WB
L
0
0
46
21
0
67
WB
L
0
0
5316069
WB
T
0
0
0
0
WB
T
0
0
00
WB
R
0
0
23
21
0
44
WB
R
0
0
2616042
NB
L
0
0
0
0
NB
L
0
0
00
NB
T
12
8
6
13
2
5
35
1
23
-2
2
13
6
1
13
6
2
NB
T
10
7
6
11
0
8
31
827-1711471157
NB
R
0
0
37
22
0
59
NB
R
0
0
4417061
SB
L
0
0
19
22
0
41
SB
L
0
0
2217039
SB
T
86
8
89
4
46
2
29
-2
2
94
2
94
9
SB
T
99
7
10
2
7
30
833-1710651081
SB
R
0
0
0
0
SB
R
0
0
00
To
t
a
l
0
0
21
5
4
22
1
9
81
4
17
7
43
23
0
3
25
2
2
To
t
a
l
0
0
20
7
3
21
3
5
61
162053222122449
40
0
40
0
AM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Of
f
s
i
t
e
Do
l
l
a
r
Ge
n
e
r
a
l
Tr
i
p
s
SIT
E
TR
I
P
S
PA
S
S
B
Y
TR
I
P
S
20
1
4
Fu
t
u
r
e
N
o
Bu
i
l
d
20
1
4
Fu
t
u
r
e
Bu
i
l
d
PM
P
E
A
K
20
1
3
TM
C
Ba
l
a
n
c
i
n
g
20
1
3
Ba
s
e
20
1
4
Pr
o
j
e
c
t
e
d
Of
f
s
i
t
e
No
r
t
h
s
i
d
e
Tr
i
p
s
Offsite Dollar
Ge
n
e
r
a
l
TripsSITE TRIPSPASS BY TRIPS2014 Future No Build2014 Future Build
EB
L
0
0
0
EB
L
0
00
EB
T
0
0
0
EB
T
0
00
EB
R
0
0
0
EB
R
0
00
WB
L
0
29
5
0
34
WB
L
0
334037
WB
T
0
0
0
WB
T
0
00
WB
R
0
17
5
0
22
WB
R
0
204024
NB
L
0
0
0
NB
L
0
00
NB
T
12
8
6
13
2
5
35
1
23
-6
13
6
1
13
7
8
NB
T
10
7
6
11
0
8
31
826-411471169
NB
R
0
23
6
0
29
NB
R
0
274031
SB
L
0
14
6
0
20
SB
L
0
164020
SB
T
86
8
89
4
46
2
19
-6
94
2
95
5
SB
T
99
7
10
2
7
30
822-410651083
SB
R
0
0
0
SB
R
0
00
To
t
a
l
0
0
21
5
4
22
1
9
81
4
12
5
11
23
0
3
24
3
8
To
t
a
l
0
0
20
7
3
21
3
5
61
16144822122364
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
P
r
o
p
o
s
e
d
N
o
r
t
h
A
c
c
e
s
s
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
P
r
o
p
o
s
e
d
N
o
r
t
h
A
c
c
e
s
s
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
P
r
o
p
o
s
e
d
S
o
u
t
h
A
c
c
e
s
s
No
r
t
h
C
o
l
l
e
g
e
R
o
a
d
a
t
P
r
o
p
o
s
e
d
S
o
u
t
h
A
c
c
e
s
s
3/4/13 13-208 College Road Development – Transportation Impact Analysis 36
Supporting Documentation
N
SIGNALIZED
INTERSECTION
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
GREY = UNANALYZED
BLUE = PROPOSED
ROADWAY
LEGEND
AM / PM PEAKS
0 / 0
0 / 0
0 / 0
0 / 0
0 / 0
0
/
0
0
/
0
35
/
2
5
Main Site
Access
Long Ridge
Drive
0
/
0
0
/
0
23
/
1
4
22 / 13
0 / 0
34 / 23
35
/
2
5
0
/
0
34
/
2
3
0
/
0
34
/
2
3
0
/
0
Southern Site
Northern
Site Access
*** NOT TO SCALE ***
PROJECT NUMBER 11-252
NORTHSIDE BAPTIST CHURCH
NEW HANOVER COUNTY, NC
This document,together with the concepts and designs presented herein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuse of,or improper reliance on,this document by others without writtenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
Ow
l
s
La
n
e
FIGURE 7
PHASE I PRIMARY
TRIPS
8
/
5
17
/
1
3
8
/
5
Bavarian Lane
35
/
2
5
0
/
0
8 / 5
0 / 0
6 / 40 / 0
0
/
0
3
/
2
0 / 00 / 0
Re
d
Ha
w
k
0
/
0
17
/
1
4
0
/
0
0 / 0
9 / 6
0 / 0
0 / 0
0 / 0
6 / 4
0 / 0
0 / 0
8 / 5
0
/
0
0
/
0
Fa
r
l
e
y
Dr
i
v
e
Southern Site
Access
Murrayville Road
N.
C
o
l
l
e
g
e
R
o
a
d
9 / 66 / 4
8 / 5
*** NOT TO SCALE ***client.
N
SIGNALIZED
INTERSECTION
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
GREY = UNANALYZED
BLUE = PROPOSED
ROADWAY
LEGEND
AM / PM PEAKS
-28
/
-20
28
/
2
0
Main Site
Access
Long Ridge
Drive
-28
/
-20
28
/
2
0
27 / 19
27 / 19
Southern Site
Northern
Site Access
*** NOT TO SCALE ***
PROJECT NUMBER 11-252
NORTHSIDE BAPTIST CHURCH
NEW HANOVER COUNTY, NC
This document,together with the concepts and designs presented herein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuse of,or improper reliance on,this document by others without writtenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandtheclient.
Ow
l
s
La
n
e
FIGURE 8
PHASE I PASS-BY
TRIPS
Bavarian Lane
Re
d
Ha
w
k
Fa
r
l
e
y
Dr
i
v
e
Southern Site
Access
Murrayville Road
N.
C
o
l
l
e
g
e
R
o
a
d
*** NOT TO SCALE ***client.
SPEED
LIMIT
55
0'0'
N
LEGEND
Long Ridge
Drive
Northern
Site Access
20
0
10
0
TW
L
T
L
(Align with Long Ridge Drive)
SIGNALIZED
INTERSECTION
UNSIGNALIZED
INTERSECTION
ROADWAY
LEGEND
Main Site
Access
~3
0
0
'
FU
L
L
(Shift ~200'north)
TW
L
T
L
TRAFFIC MOVEMENT
BLACK =EXISTING
GREY =UNANALYZED
BLUE =PROPOSED
SouthernSite
TW
L
T
L
Ex
t
e
n
d
T
W
L
T
L
~4
4
0
'
(Shift200north)
Ow
l
s
L
a
n
e
Re
d
H
a
w
k
SouthernSite
Access
. C
o
l
l
e
g
e
Ro
a
d
10
0
'
~5
5
0
'
Murrayville Road
N.
150'FULL
TWLTL
SPEED
LIMIT
45
SPEED
LIMIT
45300'
150'
FULL
FU
L
L
13
0
'
FIGURE 4
2011 EXISTING
TRAFFIC VOLUMES
Bavarian Lane
Fa
r
l
e
y
Dr
i
v
e
63
5
'
TWLTL
SPEED
300
200'63
5
'
SPEED
FIGURE10
PHASE 1
RECOMMENDED
IMPROVEMENTS
*** NOT TO SCALE ***
PROJECT NUMBER 11-252
NORTHSIDE BAPTIST CHURCH
NEW HANOVER COUNTY, NC
Thisdocument,togetherwiththeconceptsanddesignspresentedherein,is
intendedonlyforthespecificpurposeandclientforwhichitwasprepared.
Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten
authorizationandadaptationbyDavenportTransportationConsultingshallbe
withoutliabilitytoDavenportTransportationConsultingandshallbeaviolation
oftheagreementbetweenDavenportTransportationConsultingandtheclient.
LIMIT
55
LIMIT
55
N
SIGNALIZEDINTERSECTION
UNSIGNALIZEDINTERSECTION
TRAFFIC MOVEMENT
BLACK = EXISTING
GREY = UNANALYZED
BLUE = PROPOSED
ROADWAY
LEGEND
AM / PM PEAKS
0 / 0
0 / 0
0 / 0
14 / 19
19 / 26
0
/
0
14
/
1
9
0
/
0
Main Site
Access
Long Ridge
Drive
0
/
0
23
/
1
7
0
/
0
0 / 0
0 / 0
0 / 0
41
/
3
0
5
/
3
18
/
1
3
19
/
2
6
5 /
3
SouthernSite
Northern
Site Access
0 /
0
***NOTTOSCALE ***
PROJECT NUMBER 11-252
NORTHSIDE BAPTIST CHURCH
NEW HANOVER COUNTY, NC
Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDavenportTransportationConsultingshallbewithoutliabilitytoDavenportTransportationConsultingandshallbeaviolationoftheagreementbetweenDavenportTransportationConsultingandthelit
Ow
l
s
L
a
n
e
FIGURE 15
PHASE II, SCENARIO 2
PRIMARY TRIPS
(CHURCH EXPANSION)
6
/
8
19
/
2
6
0 /
0
Bavarian Lane
41
/
3
0
5 / 3
9 / 7
8 / 110 / 0
3
/
4
0
/
0
6 / 8
Re
d
H
a
w
k
0
/
0
32
/
2
3
9
/
7
5 / 3
9 / 7
0 / 0
3 / 4
6 / 8
3 / 4
5 / 3
14 / 10
0 / 0
8
/
1
1
6
/
8
Fa
r
l
e
y
Dr
i
v
e
Southern Site
Access
Murrayville Road
N.
C
o
l
l
e
ge
R
o
a
d
0 / 08 / 11
14 / 10
NOT TO SCALE client.
SPEED
LIMIT
55
0'0'
N
LEGEND
Long Ridge
Drive
Northern
Site Access
20
0
10
0
TW
L
T
L
SIGNALIZED
INTERSECTION
UNSIGNALIZED
INTERSECTION
ROADWAY
LEGEND
Main Site
Access
~3
0
0
'
FU
L
L
TW
L
T
L
TRAFFIC MOVEMENT
BLACK =EXISTING
GREY =UNANALYZED
BLUE =PROPOSED
SouthernSite
TW
L
T
L
~4
4
0
'
Under Scenario2, modifyand restrict
Ow
l
s
L
a
n
e
Re
d
H
a
w
k
SouthernSite
Access
. C
o
l
l
e
g
e
Ro
a
d
ora
ge
t
o
4
0
0
'
~5
5
0
'
Modify traffic signal operations to
access to right-in and right-out
movements
Murrayville Road
N.
150'FULL
TWLTL
SPEED
LIMIT
45
SPEED
LIMIT
45300'
150'
FULL
FU
L
L
Ex
t
e
n
d
s
t
o y gp
8 phase (remove split side phasing)
FIGURE 4
2011 EXISTING
TRAFFIC VOLUMES
Bavarian Lane
Fa
r
l
e
y
Dr
i
v
e
63
5
'
TWLTL
SPEED
300
200'63
5
'
SPEED
FIGURE18
PHASE 2
RECOMMENDED
IMPROVEMENTS
*** NOT TO SCALE ***
PROJECT NUMBER 11-252
NORTHSIDE BAPTIST CHURCH
NEW HANOVER COUNTY, NC
Thisdocument,togetherwiththeconceptsanddesignspresentedherein,is
intendedonlyforthespecificpurposeandclientforwhichitwasprepared.
Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten
authorizationandadaptationbyDavenportTransportationConsultingshallbe
withoutliabilitytoDavenportTransportationConsultingandshallbeaviolation
oftheagreementbetweenDavenportTransportationConsultingandtheclient.
LIMIT
55
LIMIT
55
Summary of Trip Generation Calculation
For 9.1 Th.Sq.Ft. GFA of Free-Standing Discount Store
February 28, 2013
____________________________________________________________________
Average Standard Adjustment Driveway
Rate Deviation Factor Volume
____________________________________________________________________
Avg. Weekday 2-Way Volume 57.24 19.54 1.00 521
7-9 AM Peak Hour Enter 0.72 0.00 1.00 7
7-9 AM Peak Hour Exit 0.34 0.00 1.00 3
7-9 AM Peak Hour Total 1.06 1.22 1.00 10
4-6 PM Peak Hour Enter 2.50 0.00 1.00 23
4-6 PM Peak Hour Exit 2.50 0.00 1.00 23
4-6 PM Peak Hour Total 5.00 2.60 1.00 46
AM Pk Hr, Generator, Enter 2.79 0.00 1.00 25
AM Pk Hr, Generator, Exit 2.69 0.00 1.00 24
AM Pk Hr, Generator, Total 5.48 3.03 1.00 50
PM Pk Hr, Generator, Enter 2.79 0.00 1.00 25
PM Pk Hr, Generator, Exit 2.79 0.00 1.00 25
PM Pk Hr, Generator, Total 5.57 2.82 1.00 51
Saturday 2-Way Volume 71.07 15.44 1.00 647
Saturday Peak Hour Enter 3.77 0.00 1.00 34
Saturday Peak Hour Exit 3.62 0.00 1.00 33
Saturday Peak Hour Total 7.39 3.10 1.00 67
Sunday 2-Way Volume 56.36 10.89 1.00 513
Sunday Peak Hour Enter 3.81 0.00 1.00 35
Sunday Peak Hour Exit 3.51 0.00 1.00 32
Sunday Peak Hour Total 7.32 2.90 1.00 67
____________________________________________________________________
Note: A zero indicates no data available.
Source: Institute of Transportation Engineers
Trip Generation, 8th Edition, 2008.
TRIP GENERATION BY MICROTRANS
Dear Mr. Cumbo:
Based on the information provided, and conversations held to date, it is our
understanding that the proposed development will consist of a mixed use
building with 120 residential apartment units and 6400 sq/ft of commercial
space on the first floor of the building (estimated 50/50 split of office and
retail) and an adjacent 4,500 sq/ft fast food restaurant.
The site(s) will contain the following external access points:
Two full access driveway connections to/from US 117/NC 132 (N.
College Road)
Below please find the scope to be used for the Traffic Impact Analysis:
1. Data Collection - Analysis Parameters:
a. Existing Conditions
i. Turning movement counts weekday AM (7:00 AM – 9:00 AM)
and PM (3:30 PM – 6:00 PM) peak periods, Signal Timing (if
applicable) and Lane Geometry;
US 117/NC 132 (N. College Road) and Murrayville
Road/Bavarian Lane (signalized intersection)
US 117/NC 132 (N. College Road) and Long Ridge
Drive/McDonalds site access
US 117/NC 132 (N. College Road) and two (2) site access
points to the development property
WILMINGTON URBAN AREA
Metropolitan Planning Organization P.O. Box 1810 Wilmington, North Carolina 28402 910 341 3258 910 341 7801 FAX
Members:
City of WILMINGTON
Lead Planning Agency Town of
CAROLINA BEACH Town of
KURE BEACH Town of WRIGHTSVILLE BEACH
NEW HANOVER County
Town of BELVILLE
Town of LELAND
Town of NAVASSA
BRUNSWICK
County
PENDER County
CAPE FEAR
Public Transportation Authority
North Carolina
BOARD OF TRANSPORTATION
27 February 2013
Mr. Dan Cumbo, PE
Davenport Transportation Consulting
P.O. Box 15997
Wilmington, NC 28408
RE: Scope for the Traffic Impact Analysis associated with the proposed
North College Road Mixed Use Building
New Hanover County, NC
ii. Signal plans may be acquired by sending an email request to
NCDOT Traffic Services: Ross Kimbro, rkimbro@ncdot.gov or
by calling (910) 341-0300
b. Site Trip Generation, Site Trip Distribution and Background Traffic
Assumptions
i. Site Trip Generation Estimate
See below
ii. Site Trip Distribution
35% to/from the south on North College Road
35% to/from the north on North College Road
15% to/from the east on Murrayville Road
15% to/from the west on Bavarian Lane
iii. Adjacent Development (approved (but as of yet to be built)
development including but limited to;
McDonalds fast food restaurant
Northside Baptist Church Master Plan – All Phases
Dollar General
iv. Planned Roadway Improvements
Developer required improvements associated with the
McDonalds TIA.
Developer required improvements associated with the
Northside Baptist Church Master Plan TIA.
v. Background Traffic Assumptions
Horizon year – 2014
Growth rate – 3% per year
Pass-by capture – See Trip Generation Estimate below
2. Capacity Analysis: Week day AM & PM Peak Hour (as listed and for
locations per 1.a.i)
a. Existing - 2013
b. Background – 2014 [existing + 3% background growth]
c. Combined - 2014 [existing + background growth + site trips]
3. Final Report Submittal:
a. Completed TIA Application
b. Signed and sealed by a Professional Engineer
c. Four copies and one PDF
d. Synchro analysis files in digital format
4. Notes:
i. This scope shall remain valid for three months from the date of this
letter.
ii. Please note that if any changes occur (including but not limited to; land
use, intensity and/or site access) additional analysis may be required.
Please contact me if you have any questions regarding this scope.
Regards,
Tara S. Murphy, RLA/LEED AP
Associate Transportation Planner
Wilmington MPO
Co
p
y
:
Anthony Law, District Engineer, NCDOT Nicole Dreibelbis, NHCo Planning
Katie Hite, Division Traffic Engineer, NCDOT Jessi Booker, NCDOT
Mike Kozlosky, Executive Director, WMPO Don Bennett, CofW Traffic Engineer
Estimated Site Trip Generation
(Exhibit provided by Davenport Consulting Engineers)
Trip Generation Estimate
Average Weekday Driveway Volumes
24 Hour AM Peak
Hour
PM Peak
Hour Two-
Way
Land Use
ITE
Land Code Size Volume Enter Exit Enter Exit
Apartments 220 120 Dwelling Units 851 13 50 54 29
General Office Building 710 3.2 Th.Sq.Ft.GLA 94 11 1 14 68
Shopping Center 820 3.2 Th.Sq.Ft.GLA 725 12 8 31 32
Fast Food with Drive-Thru 934 4.5 Th.Sq.Ft.GLA 2233 113 109 79 73
Total Unadjusted Trips 3903 149 168 178 202
15 % Internal Capture Reduction -585 0 0 -27 -30
Subtotal with Internal Capture 3318 149 168 151 172
Retail Pass-by Reduction (34% PM) -210 0 0 -9 -9
Fast Food Pass-by Reduction (49% AM, 50% PM) -949 -55 -53 -34 -31
Total Adjusted Trips 2159 94 115 109 131
Location Map
(NHCo GIS with site outline by WMPO)
North
Conceptual Site Plan
(Provided by Davenport Consulting Engineers)
North