Loading...
HomeMy WebLinkAbout15-222 Riverside Development TIA 6-12-15 Sealed Riverside Development Wrightsboro, New Hanover County, NC TRANSPORTATION IMPACT ANALYSIS Prepared for Parker & Associates, Inc. Project Number: 15-222 6/12/15 This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. Home Office: 305 West Fourth Street, Suite 2A Serving the Southeast since 2002 Winston-Salem, NC 27101 Main: 336.744.1636; Fax: 336.458.9377 Transportation Impact Analysis Riverside Development Wrightsboro, New Hanover County, NC Prepared for Parker & Associates, Inc. June 12, 2015 Analysis by: Dionne C. Brown, P.E. Drafting/Graphics by: Dionne C. Brown, P.E. Reviewed by: Frank Amenya, P.E., PTOE Daniel Cumbo, P.E. Sealed by: Daniel R. Cumbo, P.E. This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. 6/12/15 15-222 Riverside Development – Executive Summary i Riverside Development – Transportation Impact Analysis Wrightsboro, New Hanover County, NC Prepared for Parker & Associates, Inc. June 12, 2015 Executive Summary The proposed Riverside Development is located on Riverside Drive off of NC 133 (Castle Hayne Road) in Wrightsboro, New Hanover County, North Carolina. As currently planned, this development will consist of 165 single family detached homes and 72 apartments. This development will be analyzed for two (2) phases. Phase 1 will consist of 100 single family homes. Full Build will consist of 165 single family homes and 72 apartments. Access to the development will be provided by North Kerr Avenue. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue)/ Site Access • SR 1310 (Blue Clay Road) at SR 1322 (North Kerr Avenue) The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions: • 2015 Existing Conditions • 2016 Future No Build Conditions • 2016 Phase 1 Build Conditions • 2016 Phase 1 Build Condition with Mitigation (if necessary) • 2019 Future No Build Conditions • 2019 Full Build Condition • 2019 Full Build Condition with Mitigation (if necessary) The planned build-out year for this development is 2016 for Phase 1 Build and 2019 for Full Build. This Transportation Impact Analysis (TIA) was carried out based on NCDOT typical standards. Information regarding the property was provided by the civil engineer, Parker & Associates, Inc. 6/12/15 15-222 Riverside Development – Executive Summary ii Existing Conditions In order to measure the impact of this project and identify any pre-existing capacity problems, an analysis was conducted for the existing conditions for all the study intersections. Table A summarizes the existing level of service results. Table A - Level of Service Summary Existing Conditions AM Peak PM Peak NC 133 at North Kerr Avenue C (22.0) C (26.9) Blue Clay Road at North Kerr Avenue B (13.6) B (12.8) LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay Phase 1 Build Conditions As discussed in the introduction, Phase 1 considers building 100 single family homes in 2016. Phase 1 Discussion of Results The following section discusses 2016 Phase 1 level of service for each intersection. NC 133 at North Kerr Avenue This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2016 future no build conditions, LOS C is expected in the AM and PM peaks. With the addition of proposed site traffic, LOS C and LOS D are expected in the AM and PM peaks, respectively. With the recommended improvements by the approved developments, no additional improvements are recommended. Blue Clay Road at North Kerr Avenue This signalized intersection currently operates at LOS B during the AM and PM peaks. In 2016 future no build conditions and build conditions, the level of service is expected to remain the same. No improvements are recommended. 6/12/15 15-222 Riverside Development – Executive Summary iii Phase 1 Level of Service Summary Table B summarizes the level of service analysis at the study intersections: Table B - Level of Service Summary AM Peak 2015 Existing 2016 Future No Build 2016 Phase 1 Build NC 133 at North Kerr Avenue C (22.0) C (22.9) C (28.2) Blue Clay Road at North Kerr Avenue B (13.6) B (15.8) B (16.1) PM Peak 2015 Existing 2016 Future No Build 2016 Phase 1 Build NC 133 at North Kerr Avenue C (26.9) C (33.4) D (36.2) Blue Clay Road at North Kerr Avenue B (12.8) B (14.5) B (14.7) LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay Full Build Conditions Full Build considers the development to include a total of 165 single family homes and 72 apartments. This phase of development is envisioned to be completed in 2019. Full Build Discussion of Results The following section discusses 2019 Full Build level of service of each intersection. NC 133 at North Kerr Avenue This signalized intersection is expected to operate at LOS C during the AM peak and LOS D in the PM peak in the 2019 future no build conditions. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS D in the PM peak. To accommodate queuing and the vision of the site plan following are recommended: • Signal modification, eastbound and westbound left turn modified to protected- permitted • Provide a separate eastbound right turn lane with 250 feet of storage • Extend existing eastbound left turn lane with 250 feet of storage 6/12/15 15-222 Riverside Development – Executive Summary iv With these improvements, the intersection is expected to operate at LOS C in the AM peak and LOS D in the PM peak. Blue Clay Road at North Kerr Avenue In 2019 future no build conditions and build conditions, this signalized intersection’s level of service is expected to remain at LOS B. No improvements are recommended. The recommended improvements for Full Build are illustrated in Figure 12 in the report. Full Build Level of Service Summary Table C summarizes the level of service analysis at the study intersections: Table C - Level of Service Summary AM Peak 2019 Future No Build 2019 Full Build 2019 Full Build plus Improvements NC 133 at North Kerr Avenue C (29.9) C (34.3) C (35.0) Blue Clay Road at North Kerr Avenue B (17.1) B (17.5) PM Peak 2019 Future No Build 2019 Full Build 2019 Full Build plus Improvements NC 133 at North Kerr Avenue D (40.9) D (43.8) D (45.1) Blue Clay Road at North Kerr Avenue B (15.3) B (15.6) LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay 6/12/15 15-222 Riverside Development – Executive Summary v Summary and Conclusion The proposed Riverside Development is located on Riverside Drive off of NC 133 (Castle Hayne Road) in Wrightsboro, New Hanover County, North Carolina. As currently planned, this development will consist of 165 single family detached homes and 72 apartments. This development will be analyzed for two (2) phases. Phase 1 will consist of 100 single family homes. Full Build will consist of 165 single family homes and 72 apartments. Access to the development will be provided by North Kerr Avenue. Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 9th Edition), this development has a trip generation potential of 80 net trips in the AM peak and 105 net trips in the PM peak for Phase 1 and 164 net trips in the AM peak and 222 net trips in the PM peak for Full Build. Table D summarizes the recommended improvements for each phase of this development. Recommended improvements are illustrated in Figure 12 for Full Build in the report. Table D – Recommended Improvement Summary Intersection Phase 1 Build Full Build NC 133 at North Kerr Avenue No improvements recommended • Signal modification, eastbound and westbound left turn modified to protected-permitted • Provide a separate eastbound right turn lane with 250 feet of storage • Extend existing eastbound left turn lane with 250 feet of storage Blue Clay Road at North Kerr Avenue No improvements recommended No improvements recommended In conclusion, this study has reviewed the impacts of both background traffic and this development traffic, and has determined that with the recommended improvements in place, there will be adequate capacity to accommodate future traffic. The final design of these improvements will need to be coordinated during the site plan approval process. Please note that all accesses to the site are required to be constructed to NCDOT standards. 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 1 Riverside Development – Transportation Impact Analysis Wrightsboro, New Hanover County, NC Prepared for Parker & Associates, Inc. June 12, 2015 Table of Contents 1.0 Introduction ......................................................................................................................................... 2 Figure 1 – Site Plan .................................................................................................................................. 3 Figure 2A – Site Location Map ................................................................................................................. 4 Figure 2B – Vicinity Map ........................................................................................................................... 5 2.0 Existing Conditions ............................................................................................................................ 6 2.1 Inventory ............................................................................................................................................ 6 2.2 Existing Traffic Volumes .................................................................................................................... 6 Figure 3 – Existing Lane Geometry .......................................................................................................... 7 Figure 4 – 2015 Existing Traffic Volumes ................................................................................................. 8 3.0 Approved Developments and Committed Improvements .............................................................. 9 3.1 Approved Developments ................................................................................................................... 9 3.2 Committed Improvements.................................................................................................................. 9 4.0 Methodology ...................................................................................................................................... 10 4.1 Base Assumptions and Standards .................................................................................................. 10 5.0 Capacity Analysis ............................................................................................................................. 11 5.1 Level of Service Evaluation Criteria ................................................................................................. 11 6.0 Existing Conditions .......................................................................................................................... 12 7.0 Phase 1 Build Conditions ................................................................................................................. 13 7.1 Trip Generation ................................................................................................................................ 13 7.2 Trip Distribution ................................................................................................................................ 13 7.3 2016 Future No Build Traffic ............................................................................................................ 13 7.4 2016 Phase 1 Build Total Traffic ..................................................................................................... 13 Figure 5 – Trip Distribution ..................................................................................................................... 14 Figure 6 – 2016 Future No Build Volumes ............................................................................................. 15 Figure 7 – Phase 1 Site Trips ................................................................................................................. 16 Figure 8 – 2016 Phase 1 Build Volumes ................................................................................................ 17 7.5 Phase 1 Discussion of Results ........................................................................................................ 18 7.6 Phase 1 Level of Service Summary ................................................................................................ 18 8.0 Full Build Conditions ........................................................................................................................ 19 8.1 Trip Generation ................................................................................................................................ 19 8.2 Trip Distribution ................................................................................................................................ 19 8.3 2019 Future No Build Traffic ............................................................................................................ 19 8.4 2019 Full Build Traffic ...................................................................................................................... 19 Figure 9 – 2019 Future No Build Volumes ............................................................................................. 20 Figure 10 – Full Build Site Trips .............................................................................................................. 21 Figure 11 – 2019 Full Build Volumes ...................................................................................................... 22 8.5 Full Build Discussion of Results ...................................................................................................... 23 8.6 Full Build Level of Service Summary ............................................................................................... 23 Figure 12 – 2019 Full Build Recommended Improvements ................................................................... 24 9.0 Summary and Conclusion ................................................................................................................ 25 Appendix .................................................................................................................................................... 26 Trip Generation ....................................................................................................................................... 27 Level of Service Analysis ........................................................................................................................ 28 Traffic Volume Data ................................................................................................................................ 31 Supporting Documentation ..................................................................................................................... 32 Approved Development .......................................................................................................................... 33 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 2 Riverside Development – Transportation Impact Analysis Wrightsboro, New Hanover County, NC Prepared for Parker & Associates, Inc. June 12, 2015 1.0 Introduction The proposed Riverside Development is located on Riverside Drive off of NC 133 (Castle Hayne Road) in Wrightsboro, New Hanover County, North Carolina. As currently planned, this development will consist of 165 single family detached homes and 72 apartments. This development will be analyzed for two (2) phases. Phase 1 will consist of 100 single family homes. Full Build will consist of 165 single family homes and 72 apartments. Access to the development will be provided by North Kerr Avenue. Figures 1A and 1B show the site plan. The site location and vicinity map are illustrated in Figures 2A and 2B, respectively. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue)/ Site Access • SR 1310 (Blue Clay Road) at SR 1322 (North Kerr Avenue) The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions: • 2015 Existing Conditions • 2016 Future No Build Conditions • 2016 Phase 1 Build Conditions • 2016 Phase 1 Build Condition with Mitigation (if necessary) • 2019 Future No Build Conditions • 2019 Full Build Condition • 2019 Full Build Condition with Mitigation (if necessary) The planned build-out year for this development is 2016 for Phase 1 Build and 2019 for Full Build. This Transportation Impact Analysis (TIA) was carried out based on NCDOT typical standards. Information regarding the property was provided by the civil engineer, Parker & Associates, Inc. FIGURE 1A SITE PLAN FIGURE 1B SITE PLAN FIGURE 2A SITE LOCATION MAP SITE INDICATOR FIGURE 2B VICINITY MAP STUDY INTERSECTIONS EXISTING PROPOSED 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 6 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 contains the results of this effort. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Castle Hayne Road NC 133 2-3 lanes undivided Varies from 22’ to 33’ 45 MPH NCDOT North Kerr Road SR 1322 2 lane undivided Approx. 22’ 45 MPH NCDOT Blue Clay Road SR 1310 2 lane undivided Approx. 22’ 55 MPH NCDOT 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT staff. Table 2.2 contains the dates these counts were conducted. Traffic volumes were balanced between the study intersections by using the greater of adjacent volumes. School was in session at the time of traffic counts. Figure 4 shows existing AM and PM peak hour volumes. More information can be found in the Traffic Volume Data section of the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: By: NC 133 at North Kerr Road 5/14/2015 DAVENPORT Blue Clay Road at North Kerr Road 5/14/2015 DAVENPORT N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) 50 SP E E D LI M I T 45 SP E E D LI M I T 45 ~3 1 4 0 ' SP E E D LI M I T 55 15 0 ' 125' 260' TWLTL 15 0 ' 26 0 ' 450' 100' 32 1210 0 ' 50 0 ' 16,000AADT 8, 5 0 0 A A D T 8, 5 0 0 A A D T 5,800AADT 11 , 0 0 0 A A D T ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 3 EX I S T I N G L A N E GE O M E T R Y NC 133 (Castle Hayne Road) 0' SR 1310 (Blue Clay Road) TWLTL 5' 25' 14,000AADT 7,100AADT N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 48 / 7 1 28 2 / 3 0 1 19 4 / 1 4 9 21 / 3 8 90 / 47 274 / 110 47 / 39 15 8 / 1 9 5 49 / 5 3 13 9 / 1 2 7 28 / 7 0 61 / 6 0 171 / 169 803 / 576 27 / 12 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 4 20 1 5 E X I S T I N G TR A F F I C V O L U M E S 27 5 / 2 7 0 26 / 1 3 137 / 236 117 / 240 17 / 35 61 / 60 35 / 5 0 90 / 92 381 / 609 22 / 59 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 9 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per the WMPO staff, there are two developments seeking approval in the vicinity of the project that will be incorporated into the analysis. River Bluffs is a multi-development consisting of single family homes, condominiums, small retirement community and a country store located off of Chair Road whose TIA was completed by Ramey Kemp & Associates in 2008. This development is estimated to generate 4,555 daily site trips (251 trips in the AM peak and 393 trips in the PM peak). Trasco Distribution Center is a 205,000 square foot building located on North Kerr Avenue between Blue Clay Road and North Kerr Avenue whose TIA was completed by Ramey Kemp & Associates in 2014. This development is estimated to generate 1,776 daily site trips (360 trips in the AM peak and 340 trips in the PM peak). The site trips for each development were incorporated into all future build conditions. More information can be found in the Supporting Documents section of the Appendix. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT or a developer in the area, but not yet constructed. Per WMPO, there are recommended committed improvements in the study area due to the two approved developments. These improvements were incorporated into all future build conditions. The improvements recommended by the Trasco Distribution Center are to provide a separate westbound right turn lane with 150 feet of storage and extend the westbound through lane to 175 feet of storage. More information can be found in the Supporting Documents section of the Appendix. 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 10 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 2.0% per year for all roadways Analysis Software Synchro/SimTraffic Version 8.0 Base Signal Timing/Phasing NCDOT Lane widths 12-feet unless measured otherwise Truck percentages 2% 4.2 Exceptions to NCDOT Congestion Managements Standards Protected-permitted phasing for the eastbound and westbound lefts of the intersection of NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue) was utilized for the synchro analysis with prior approval from NCDOT and WMPO to more accurately model the intersection operations associated with the traffic volumes of the intersection. 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 11 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents the best conditions and Level of Service “F” represents the worst. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A ≤ 10 A ≤ 10 B > 10 and ≤ 20 B > 10 and ≤ 15 C > 20 and ≤ 35 C > 15 and ≤ 25 D > 35 and ≤ 55 D > 25 and ≤ 35 E > 55 and ≤ 80 E > 35 and ≤ 50 F > 80 F > 50 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 12 6.0 Existing Conditions In order to measure the impact of this project and identify any pre-existing capacity problems, an analysis was conducted for the existing conditions for all the study intersections. Table 6.1 summarizes the existing level of service results. Table 6.1- Level of Service Summary Existing Conditions AM Peak PM Peak NC 133 at North Kerr Avenue C (22.0) C (26.9) Blue Clay Road at North Kerr Avenue B (13.6) B (12.8) LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay NC 133 and North Kerr Avenue – Looking North 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 13 7.0 Phase 1 Build Conditions As discussed in the introduction, Phase 1 considers building 100 single family homes in 2016. 7.1 Trip Generation Trips for this development were projecting using TripGen 2013 software, based on the 9th edition of ITE Trip Generation Manual. Table 7.1 presents the results. Table 7.1 - ITE Trip Generation Riverside Development - Phase 1 Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Volume Enter Exit Enter Exit Single Family Homes 210 100 Dwelling Units 1,050 20 60 66 39 Total Trips 1,050 20 60 66 39 7.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The trip distribution model is shown in Figure 5, and the directional distributions for site trips are as follows: • 40% to and from the south on NC 133 • 30% to and from the north on NC 133 • 20% to and from the east on North Kerr Avenue • 5% to and from north on Blue Clay Road • 5% to and from south on Blue Clay Road 7.3 2016 Future No Build Traffic The 2016 future no build traffic volumes were computed by applying a 2.0% compounded annual growth rate to the 2015 existing traffic volumes and adding approved development trips. Figure 6 shows 2016 future no build traffic volumes for AM and PM peaks. 7.4 2016 Phase 1 Build Total Traffic The 2016 build-out traffic volume was obtained by summing the 2016 future no build volumes and Phase 1 site trips due to the proposed development. Phase 1 site trips are shown in Figure 7. The 2016 future build volumes are shown for AM and PM peaks in Figure 8. More information can be found in the Traffic Volume Data section of the appendix. N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D DE S T I N A T I O N NO D E % 30 % 30 % I N 5%IN 5% 20 % I N 30%IN SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) 20 % ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 5 TR I P D I S T R I B U T I O N 5% 40 % 30 % O U T 40%IN 5%IN 30 % O U T 40 % O U T NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) 20 % O U T 5% O U T 5% O U T N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 58 / 7 9 34 4 / 3 4 9 23 5 / 1 8 0 21 / 3 9 100 / 58 279 / 112 48 / 40 20 5 / 2 6 7 50 / 5 4 17 0 / 1 5 1 29 / 7 1 62 / 6 1 235 / 234 914 / 675 28 / 12 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 6 20 1 6 F U T U R E N O BU I L D V O L U M E S 33 2 / 3 3 5 27 / 1 3 174 / 281 119 / 245 17 / 36 62 / 61 36 / 5 1 118 / 124 432 / 750 22 / 60 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 0 / 0 4 / 1 3 0 / 0 3 / 2 0 / 0 0 / 0 1 / 3 0 / 0 6 / 2 0 0 / 0 18 / 1 2 18 / 1 2 0 / 0 0 / 0 6 / 20 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 7 PH A S E 1 S I T E T R I P S 12 / 8 3 / 2 0 / 0 0 / 0 1 / 3 18 / 12 24 / 1 6 0 / 0 0 / 0 8 / 26 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 58 / 7 9 34 8 / 3 6 2 23 5 / 1 8 0 24 / 4 1 100 / 58 279 / 112 49 / 43 20 5 / 2 6 7 56 / 7 4 17 0 / 1 5 1 47 / 8 3 80 / 7 3 235 / 234 914 / 675 34 / 32 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 8 20 1 6 P H A S E 1 B U I L D VO L U M E S 34 4 / 3 4 3 30 / 1 5 174 / 281 119 / 245 18 / 39 80 / 73 60 / 6 7 118 / 124 432 / 750 30 / 86 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 18 7.5 Phase 1 Discussion of Results The following section discusses 2016 Phase 1 level of service for each intersection. NC 133 at North Kerr Avenue This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2016 future no build conditions, LOS C is expected in the AM and PM peaks. With the addition of proposed site traffic, LOS C and LOS D are expected in the AM and PM peaks, respectively. With the recommended improvements by the approved developments, no additional improvements are recommended. Blue Clay Road at North Kerr Avenue This signalized intersection currently operates at LOS B during the AM and PM peaks. In 2016 future no build conditions and build conditions, the level of service is expected to remain the same. No improvements are recommended. 7.6 Phase 1 Level of Service Summary Table 7.2 summarizes the level of service analysis at the study intersections: Table 7.2 - Level of Service Summary AM Peak 2015 Existing 2016 Future No Build 2016 Phase 1 Build NC 133 at North Kerr Avenue C (22.0) C (22.9) C (28.2) Blue Clay Road at North Kerr Avenue B (13.6) B (15.8) B (16.1) PM Peak 2015 Existing 2016 Future No Build 2016 Phase 1 Build NC 133 at North Kerr Avenue C (26.9) C (33.4) D (36.2) Blue Clay Road at North Kerr Avenue B (12.8) B (14.5) B (14.7) LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 19 8.0 Full Build Conditions Full Build considers the development to include a total of 165 single family homes and 72 apartments. This phase of development is envisioned to be completed in 2019. 8.1 Trip Generation Trips for this development were projected using TripGen 2013 software, based on the 9th edition of ITE Trip Generation Manual. Table 8.1 contains the results. Table 8.1 - ITE Trip Generation Riverside Development - Full Build Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Volume Enter Exit Enter Exit Single Family Homes 210 165 Dwelling Units 1,665 31 94 104 61 Apartments 220 72 Dwelling Units 560 8 31 37 20 Total Trips 2,225 39 125 141 81 8.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The Full Build distribution for site trips is the same as Phase 1, shown in Figure 5. 8.3 2019 Future No Build Traffic The 2019 background volumes were obtained by applying a 2.0% compounded annual growth rate to the 2015 existing traffic volumes and adding approved development trips and Phase 1 trips associated with the proposed development. Figure 9 shows the 2019 future no build traffic volumes for AM and PM peaks. 8.4 2019 Full Build Traffic Full build-out traffic volumes were obtained as the sum of 2019 future no build volumes and site trips due to Full Build. Full Build site trips are shown in Figure 10. The 2019 Full Build future build volumes are shown for AM and PM peaks in Figure 8. More information can be found in the Traffic Volume Data section of the appendix. N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 61 / 8 4 36 6 / 3 8 1 24 8 / 1 8 9 26 / 4 3 106 / 61 297 / 119 52 / 46 21 5 / 2 7 9 59 / 7 7 17 9 / 1 5 9 48 / 8 7 84 / 7 7 246 / 245 964 / 710 35 / 33 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 9 20 1 9 F U T U R E N O BU I L D V O L U M E S 36 1 / 3 6 0 31 / 1 6 183 / 295 127 / 260 19 / 41 84 / 77 62 / 7 0 123 / 129 455 / 788 32 / 90 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 0 / 0 8 / 2 8 0 / 0 6 / 4 0 / 0 0 / 0 2 / 7 0 / 0 12 / 4 2 0 / 0 38 / 2 4 38 / 2 4 0 / 0 0 / 0 12 / 42 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 1 0 FU L L B U I L D S I T E TR I P S 25 / 1 6 6 / 4 0 / 0 0 / 0 2 / 7 38 / 24 50 / 3 2 0 / 0 0 / 0 16 / 56 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 61 / 8 4 37 0 / 3 9 6 24 8 / 1 8 9 29 / 4 5 106 / 61 297 / 119 53 / 50 21 5 / 2 7 9 65 / 9 9 17 9 / 1 5 9 68 / 9 9 10 4 / 8 9 246 / 245 964 / 710 41 / 55 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 1 1 20 1 9 F U L L B U I L D VO L U M E S 37 4 / 3 6 8 34 / 1 8 183 / 295 127 / 260 20 / 45 10 4 / 89 88 / 8 6 123 / 129 455 / 788 40 / 120 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 23 8.5 Full Build Discussion of Results The following section discusses 2019 Full Build level of service of each intersection. NC 133 at North Kerr Avenue This signalized intersection is expected to operate at LOS C during the AM peak and LOS D in the PM peak in the 2019 future no build conditions. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS D in the PM peak. To accommodate queuing and the vision of the site plan following are recommended:  Signal modification, eastbound and westbound left turn modified to protected- permitted  Provide a separate eastbound right turn lane with 250 feet of storage  Extend existing eastbound left turn lane with 250 feet of storage With these improvements, the intersection is expected to operate at LOS C in the AM peak and LOS D in the PM peak. Blue Clay Road at North Kerr Avenue In 2019 future no build conditions and build conditions, this signalized intersection’s level of service is expected to remain at LOS B. No improvements are recommended. The recommended improvements for Full Build are illustrated in Figure 12. 8.6 Full Build Level of Service Summary Table 8.2 summarizes the level of service analysis at the study intersections: Table 8.2 - Level of Service Summary AM Peak 2019 Future No Build 2019 Full Build 2019 Full Build plus Improvements NC 133 at North Kerr Avenue C (29.9) C (34.3) C (35.0) Blue Clay Road at North Kerr Avenue B (17.1) B (17.5) PM Peak 2019 Future No Build 2019 Full Build 2019 Full Build plus Improvements NC 133 at North Kerr Avenue D (40.9) D (43.8) D (45.1) Blue Clay Road at North Kerr Avenue B (15.3) B (15.6) LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D GR E E N = CO M M I T T E D BL U E = PR O P O S E D ROA D W A Y LE G E N D SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) 50 ~3 1 4 0 ' 15 0 ' 260' TWLTL 25 0 ' 26 0 ' 450' 100' 32 1210 0 ' 50 0 ' 25 0 ' 17 5 ' Si g n a l   Mo d i f i c a t i o n 125' ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 1 2 RE C O M M E N D E D IM P R O V E M E N T S NC 133 (Castle Hayne Road) 0' SR 1310 (Blue Clay Road) TWLTL 5' 25' 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 25 9.0 Summary and Conclusion The proposed Riverside Development is located on Riverside Drive off of NC 133 (Castle Hayne Road) in Wrightsboro, New Hanover County, North Carolina. As currently planned, this development will consist of 165 single family detached homes and 72 apartments. This development will be analyzed for two (2) phases. Phase 1 will consist of 100 single family homes. Full Build will consist of 165 single family homes and 72 apartments. Access to the development will be provided by North Kerr Avenue. Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 9th Edition), this development has a trip generation potential of 80 net trips in the AM peak and 105 net trips in the PM peak for Phase 1 and 164 net trips in the AM peak and 222 net trips in the PM peak for Full Build. Table 9.1 summarizes the recommended improvements for each phase of this development. Recommended improvements are illustrated in Figure 12 for Full Build. Table 9.1 – Recommended Improvement Summary Intersection Phase 1 Build Full Build NC 133 at North Kerr Avenue No improvements recommended • Signal modification, eastbound and westbound left turn modified to protected-permitted • Provide a separate eastbound right turn lane with 250 feet of storage • Extend existing eastbound left turn lane with 250 feet of storage Blue Clay Road at North Kerr Avenue No improvements recommended No improvements recommended In conclusion, this study has reviewed the impacts of both background traffic and this development traffic, and has determined that with the recommended improvements in place, there will be adequate capacity to accommodate future traffic. The final design of these improvements will need to be coordinated during the site plan approval process. Please note that all accesses to the site are required to be constructed to NCDOT standards. 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 26 Appendix 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 27 Trip Generation Trip Generation Summary - Riverside Development Project: Alternative: Open Date: Analysis Date: 15-222 15-222 4/20/2015 4/20/2015 ITE Land Use Enter Exit Enter Exit Average Daily Trips Enter Exit TotalTotalTotal AM Peak Hour of Adjacent Street Traffic PM Peak Hour of Adjacent Street Traffic 220 APT 1 72Dwelling Units 57203739318560280280 210SFHOUSE 1 165Dwelling Units 1656110412594311665832833 Unadjusted Volume 1113111222253912516414181222 Internal Capture Trips000000000 000000000 1113111222253912516414181222 Pass-By Trips Volume Added to Adjacent Streets Total AM Peak Hour Internal Capture = 0 Percent Total PM Peak Hour Internal Capture = 0 Percent 1TRIP GENERATION 2014, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 28 Level of Service Analysis 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 29 NC 133 at North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)28613513949158223819017180327 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9450.8850.9710.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017600177016490177018090177018631583 Flt Permitted0.3480.6380.1970.347 Satd. Flow (perm)648176001188164903671809064618631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)723317713461229 Travel Time (s)11.048.120.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)316839154541762442310019089230 Shared Lane Traffic (%) Lane Group Flow (vph)311070154230024523019089230 Turn TypePermNAPermNApm+ptNApm+ptNAPerm Protected Phases485216 Permitted Phases 48266 Detector Phase448852166 Switch Phase Minimum Initial (s)7.07.07.07.07.014.07.014.014.0 Minimum Split (s)21.821.821.821.812.821.612.621.621.6 Total Split (s)25.025.025.025.020.060.020.060.060.0 Total Split (%)23.8%23.8%23.8%23.8%19.0%57.1%19.0%57.1%57.1% Maximum Green (s)19.219.219.219.214.254.414.454.454.4 Yellow Time (s)4.44.44.44.44.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.83.63.63.63.6 Lead/LagLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)19.019.019.019.065.456.570.866.166.1 Actuated g/C Ratio0.200.200.200.200.670.580.730.680.68 v/c Ratio0.250.310.670.720.060.500.320.710.03 Control Delay38.936.451.650.34.814.85.815.97.6 Queue Delay0.00.00.00.00.00.00.00.00.0 Total Delay38.936.451.650.34.814.85.815.97.6 LOSDDDDABABA Approach Delay37.050.814.413.9 Approach LOSDDBB Queue Length 50th (ft)1657891344189332675 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM Existing Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)45108#163222112925561320 Internal Link Dist (ft)643309712661149 Turn Bay Length (ft)50125260 Base Capacity (vph)141383259359500105066012641074 Starvation Cap Reductn000000000 Spillback Cap Reductn000000000 Storage Cap Reductn000000000 Reduced v/c Ratio0.220.280.590.640.050.500.290.710.03 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 97.4 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 22.0Intersection LOS: C Intersection Capacity Utilization 79.6%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2016 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)296236170502052243211823591428 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9450.8500.9680.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017600177018631583177018030177018631583 Flt Permitted0.7200.6320.1250.283 Satd. Flow (perm)1341176001177186315832331803052718631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72328613461229 Travel Time (s)11.04.320.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)3269401895622824480131261101631 Shared Lane Traffic (%) Lane Group Flow (vph)32109018956228246110261101631 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)21.821.821.821.812.612.821.612.621.621.6 Total Split (s)24.024.024.024.023.612.857.423.668.268.2 Total Split (%)22.9%22.9%22.9%22.9%22.5%12.2%54.7%22.5%65.0%65.0% Maximum Green (s)18.218.218.218.218.07.051.818.062.662.6 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)19.419.419.419.435.465.056.272.067.267.2 Actuated g/C Ratio0.200.200.200.200.360.660.570.730.680.68 v/c Ratio0.120.320.820.150.400.080.600.490.800.03 Control Delay35.637.967.235.426.64.817.37.519.57.0 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay35.637.967.235.426.64.817.37.519.57.0 LOSDDEDCABABA Approach Delay37.443.916.916.8 Approach LOSDDBB Queue Length 50th (ft)1657111281024240463365 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2016 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)45116#247671781037171#86719 Internal Link Dist (ft)64320612661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)274361241382693293102563612661076 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.120.300.780.150.330.080.600.410.800.03 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 98.8 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 22.9Intersection LOS: C Intersection Capacity Utilization 80.0%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentAM 2016 Phase 1 Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)478060170562053043211823591434 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9360.8500.9680.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017440177018631583177018030177018631583 Flt Permitted0.7170.5630.0800.236 Satd. Flow (perm)1336174401049186315831491803044018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72328613461229 Travel Time (s)11.04.320.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)5289671896222833480131261101638 Shared Lane Traffic (%) Lane Group Flow (vph)52156018962228336110261101638 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)21.821.821.821.812.612.821.612.621.621.6 Total Split (s)33.233.233.233.223.612.848.223.659.059.0 Total Split (%)31.6%31.6%31.6%31.6%22.5%12.2%45.9%22.5%56.2%56.2% Maximum Green (s)27.427.427.427.418.07.042.618.053.453.4 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)22.622.622.622.640.256.147.264.657.657.6 Actuated g/C Ratio0.240.240.240.240.420.590.500.680.610.61 v/c Ratio0.160.380.760.140.340.140.680.530.900.04 Control Delay30.233.153.729.419.28.625.210.632.211.2 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay30.233.153.729.419.28.625.210.632.211.2 LOSCCDCBACBCB Approach Delay32.434.124.427.3 Approach LOS CCCC Queue Length 50th (ft)2683111319862715559810 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentAM 2016 Phase 1 Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)571401936413618501102#98228 Internal Link Dist (ft)64320612661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)4205483305867812448985841132962 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.120.280.570.110.290.140.680.450.900.04 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 94.7 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 28.2Intersection LOS: C Intersection Capacity Utilization 84.6%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)488462179592153245512324696435 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9360.8500.9680.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017440177018631583177018030177018631583 Flt Permitted0.7140.5330.0710.238 Satd. Flow (perm)133017440993186315831321803044318631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72328613461229 Travel Time (s)11.04.320.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)5393691996623936506137273107139 Shared Lane Traffic (%) Lane Group Flow (vph)53162019966239366430273107139 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)21.821.821.821.812.612.821.612.621.621.6 Total Split (s)26.526.526.526.524.212.854.324.265.765.7 Total Split (%)25.2%25.2%25.2%25.2%23.0%12.2%51.7%23.0%62.6%62.6% Maximum Green (s)20.720.720.720.718.67.048.718.660.160.1 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)22.622.622.622.639.862.854.071.063.663.6 Actuated g/C Ratio0.220.220.220.220.390.620.530.700.630.63 v/c Ratio0.180.420.900.160.380.160.670.560.910.04 Control Delay35.138.480.034.224.27.221.89.931.58.8 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay35.138.480.034.224.27.221.89.931.58.8 LOSDDECCACACA Approach Delay37.647.521.026.6 Approach LOS DDCC Queue Length 50th (ft)29951323611762825464610 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)64160#273741691545883#97724 Internal Link Dist (ft)64320612661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)2993932234197372289635821173997 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.180.410.890.160.320.160.670.470.910.04 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 101 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 29.9Intersection LOS: C Intersection Capacity Utilization 88.0%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 Full Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)6810488179652154045512324696441 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9310.8500.9680.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017340177018631583177018030177018631583 Flt Permitted0.7100.4600.0760.209 Satd. Flow (perm)132317340857186315831421803038918631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72328613461229 Travel Time (s)11.04.320.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)76116981997223944506137273107146 Shared Lane Traffic (%) Lane Group Flow (vph)76214019972239446430273107146 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)21.821.821.821.812.612.821.612.621.621.6 Total Split (s)29.429.429.429.424.012.851.624.062.862.8 Total Split (%)28.0%28.0%28.0%28.0%22.9%12.2%49.1%22.9%59.8%59.8% Maximum Green (s)23.623.623.623.618.47.046.018.457.257.2 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)25.725.725.725.743.959.150.368.360.960.9 Actuated g/C Ratio0.250.250.250.250.430.580.500.670.600.60 v/c Ratio0.230.490.920.150.350.190.720.590.960.05 Control Delay33.537.683.731.820.99.126.412.240.210.1 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay33.537.683.731.820.99.126.412.240.210.1 LOSCDFCCACBDB Approach Delay36.646.925.333.7 Approach LOS DDCC Queue Length 50th (ft)4112413238110930661~73013 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 Full Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)82200#277771531950793#101330 Internal Link Dist (ft)64320612661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)3344382164717782278945401119950 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.230.490.920.150.310.190.720.510.960.05 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 101.4 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 34.3Intersection LOS: C Intersection Capacity Utilization 90.7%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentAM 2019 Full Build + Imp Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)6810488179652154045512324696441 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)250250015050100125260 Storage Lanes11111011 Taper Length (ft)10025100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9680.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018030177018631583 Flt Permitted0.7100.4380.0700.230 Satd. Flow (perm)132318631583816186315831301803042818631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)31027713461229 Travel Time (s)4.74.220.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)76116981997223944506137273107146 Shared Lane Traffic (%) Lane Group Flow (vph)761169819972239446430273107146 Turn Typepm+ptNApm+ovpm+ptNApm+ovpm+ptNApm+ptNApm+ov Protected Phases 74538152167 Permitted Phases4488266 Detector Phase 74538152167 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.014.07.014.07.0 Minimum Split (s)14.012.812.814.012.812.612.821.612.619.614.0 Total Split (s)14.012.812.814.012.820.812.857.420.865.414.0 Total Split (%)13.3%12.2%12.2%13.3%12.2%19.8%12.2%54.7%19.8%62.3%13.3% Maximum Green (s)7.07.07.07.07.015.27.051.815.259.87.0 Yellow Time (s)5.04.44.05.04.44.04.04.44.04.45.0 All-Red Time (s)2.01.41.82.01.41.61.81.21.61.22.0 Lost Time Adjust (s)-2.0-2.00.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.03.85.85.03.83.63.83.63.63.65.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMaxNoneMaxNone Act Effct Green (s)16.89.019.817.912.029.764.555.773.063.175.7 Actuated g/C Ratio0.160.090.190.170.120.290.620.540.700.610.73 v/c Ratio0.300.720.320.890.330.530.200.660.570.940.04 Control Delay38.171.740.277.750.337.28.122.010.137.44.7 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay38.171.740.277.750.337.28.122.010.137.44.7 LOSDEDEDDACBDA Approach Delay52.354.821.130.9 Approach LOS DDCC Queue Length 50th (ft)437757120471428290556518 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentAM 2019 Full Build + Imp Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)84#166108#231942151845084#98118 Internal Link Dist (ft)23019712661149 Turn Bay Length (ft)25025015050125260 Base Capacity (vph)25316130222321550422396852411341156 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.300.720.320.890.330.470.200.660.520.940.04 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 103.6 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 35.0Intersection LOS: C Intersection Capacity Utilization 83.2%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)70605012753195596099216957612 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9320.8820.9800.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017360177016430177018250177018631583 Flt Permitted0.2820.6100.3130.176 Satd. Flow (perm)525173601136164305831825032818631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)723317713461229 Travel Time (s)11.048.120.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)786756141592176667710218864013 Shared Lane Traffic (%) Lane Group Flow (vph)781230141276066779018864013 Turn TypePermNAPermNApm+ptNApm+ptNAPerm Protected Phases485216 Permitted Phases 48266 Detector Phase448852166 Switch Phase Minimum Initial (s)7.07.07.07.07.014.07.014.014.0 Minimum Split (s)21.821.821.821.812.821.612.621.621.6 Total Split (s)25.025.025.025.020.060.020.060.060.0 Total Split (%)23.8%23.8%23.8%23.8%19.0%57.1%19.0%57.1%57.1% Maximum Green (s)19.219.219.219.214.254.414.454.454.4 Yellow Time (s)4.44.44.44.44.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.83.63.63.63.6 Lead/LagLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)20.420.420.420.465.456.469.960.960.9 Actuated g/C Ratio0.210.210.210.210.660.570.710.620.62 v/c Ratio0.730.340.600.820.130.750.480.560.01 Control Delay74.837.048.058.15.222.28.714.68.8 Queue Delay0.00.00.00.00.00.00.00.00.0 Total Delay74.837.048.058.15.222.28.714.68.8 LOSEDDEACABA Approach Delay51.754.720.913.2 Approach LOSDDCB Queue Length 50th (ft)46668116611350332403 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM Existing Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)#129124152#308225505435111 Internal Link Dist (ft)643309712661149 Turn Bay Length (ft)50125260 Base Capacity (vph)11237224335261010414751146974 Starvation Cap Reductn000000000 Spillback Cap Reductn000000000 Storage Cap Reductn000000000 Reduced v/c Ratio0.700.330.580.780.110.750.400.560.01 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 98.9 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 26.9Intersection LOS: C Intersection Capacity Utilization 81.0%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2016 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)716151151542676075012423467512 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9320.8500.9790.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017360177018631583177018240177018631583 Flt Permitted0.7180.5760.2860.062 Satd. Flow (perm)1337173601073186315835331824011518631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72327713461229 Travel Time (s)11.04.220.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)796857168602976783313826075013 Shared Lane Traffic (%) Lane Group Flow (vph)7912501686029767971026075013 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)21.821.821.821.812.612.821.612.621.621.6 Total Split (s)22.022.022.022.020.012.863.020.070.270.2 Total Split (%)21.0%21.0%21.0%21.0%19.0%12.2%60.0%19.0%66.9%66.9% Maximum Green (s)16.216.216.216.214.47.057.414.464.664.6 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)18.118.118.118.137.168.459.678.368.268.2 Actuated g/C Ratio0.170.170.170.170.360.660.570.750.660.66 v/c Ratio0.340.410.900.180.530.150.930.790.610.01 Control Delay42.843.388.238.930.44.737.144.013.87.2 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay42.843.388.238.930.44.737.144.013.87.2 LOSDDFDCADDBA Approach Delay43.149.835.021.4 Approach LOS DDDC Queue Length 50th (ft)477611235154105721162833 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2016 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)94134#2407323919#881#23340410 Internal Link Dist (ft)64319712661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)234303187326584458104534812221039 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.340.410.900.180.510.150.930.750.610.01 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 103.9 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 33.4Intersection LOS: C Intersection Capacity Utilization 85.0%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentPM 2016 Phase 1 Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)837367151742678675012423467532 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9280.8500.9790.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017290177018631583177018240177018631583 Flt Permitted0.6980.5310.2660.066 Satd. Flow (perm)130017290989186315834951824012318631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72327713461229 Travel Time (s)11.04.220.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)928174168822979683313826075036 Shared Lane Traffic (%) Lane Group Flow (vph)9215501688229796971026075036 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)12.812.812.812.812.612.821.612.619.619.6 Total Split (s)25.925.925.925.920.112.859.020.166.366.3 Total Split (%)24.7%24.7%24.7%24.7%19.1%12.2%56.2%19.1%63.1%63.1% Maximum Green (s)20.120.120.120.114.57.053.414.560.760.7 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)20.720.720.720.739.564.655.774.464.464.4 Actuated g/C Ratio0.200.200.200.200.390.630.540.730.630.63 v/c Ratio0.350.440.840.220.490.230.980.790.640.04 Control Delay39.740.673.936.126.76.549.042.516.48.9 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay39.740.673.936.126.76.549.042.516.48.9 LOSDDEDCADDBA Approach Delay40.342.645.222.6 Approach LOS DDDC Queue Length 50th (ft)53911084614417~6421163179 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentPM 2016 Phase 1 Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)102155#2248822331#930#23245223 Internal Link Dist (ft)64319712661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)2803732144036344239913551169994 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.330.420.790.200.470.230.980.730.640.04 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 102.5 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 36.2Intersection LOS: D Intersection Capacity Utilization 89.6%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)877770159772799078812924571033 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9290.8500.9790.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017300177018631583177018240177018631583 Flt Permitted0.6850.5000.2460.064 Satd. Flow (perm)127617300931186315834581824011918631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72327713461229 Travel Time (s)11.04.220.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)9786781778631010087614327278937 Shared Lane Traffic (%) Lane Group Flow (vph)971640177863101001019027278937 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)12.812.812.812.812.612.821.612.619.619.6 Total Split (s)24.024.024.024.019.612.861.419.668.268.2 Total Split (%)22.9%22.9%22.9%22.9%18.7%12.2%58.5%18.7%65.0%65.0% Maximum Green (s)18.218.218.218.214.07.055.814.062.662.6 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)20.220.220.220.239.266.657.876.666.466.4 Actuated g/C Ratio0.190.190.190.190.380.640.550.740.640.64 v/c Ratio0.390.490.980.240.520.251.010.830.660.04 Control Delay42.543.4106.437.929.06.254.648.316.28.1 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay42.543.4106.437.929.06.254.648.316.28.1 LOSDDFDCADDBA Approach Delay43.154.250.323.9 Approach LOS DDDC Queue Length 50th (ft)57991204915816~6841253279 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)110166#2609524330#970#25746722 Internal Link Dist (ft)64319712661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)247335180361608405101234111871008 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.390.490.980.240.510.251.010.800.660.04 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 104.2 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.01 Intersection Signal Delay: 40.9Intersection LOS: D Intersection Capacity Utilization 93.4%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 Full Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)9989861599927912078812924571055 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)01000150500125260 Storage Lanes11111011 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9260.8500.9790.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177017250177018631583177018240177018631583 Flt Permitted0.6370.4560.2120.066 Satd. Flow (perm)118717250849186315833951824012318631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)72327713461229 Travel Time (s)11.04.220.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)110999617711031013387614327278961 Shared Lane Traffic (%) Lane Group Flow (vph)11019501771103101331019027278961 Turn TypePermNAPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases488266 Detector Phase44 88152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.014.07.014.014.0 Minimum Split (s)12.812.812.812.812.612.821.612.619.619.6 Total Split (s)26.026.026.026.019.012.960.019.066.166.1 Total Split (%)24.8%24.8%24.8%24.8%18.1%12.3%57.1%18.1%63.0%63.0% Maximum Green (s)20.220.220.220.213.47.154.413.460.560.5 Yellow Time (s)4.44.44.44.44.04.04.44.04.44.4 All-Red Time (s)1.41.41.41.41.61.81.21.61.21.2 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)3.83.83.83.83.63.83.63.63.63.6 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneMaxNoneMaxMax Act Effct Green (s)22.222.222.222.240.965.856.975.462.562.5 Actuated g/C Ratio0.210.210.210.210.390.630.540.720.600.60 v/c Ratio0.440.540.990.280.500.361.030.850.710.06 Control Delay42.543.1107.837.027.78.262.350.819.59.2 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay42.543.1107.837.027.78.262.350.819.59.2 LOSDDFDCAEDBA Approach Delay42.853.156.126.5 Approach LOSDDEC Queue Length 50th (ft)651171196215424~74312634816 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 Full Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)121192#26011323842#987#26349734 Internal Link Dist (ft)64319712661149 Turn Bay Length (ft)15050125260 Base Capacity (vph)2503641793936243669883291108942 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.440.540.990.280.500.361.030.830.710.06 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 105 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.03 Intersection Signal Delay: 43.8Intersection LOS: D Intersection Capacity Utilization 95.0%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentPM 2019 Full Build + Imp Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)9989861599927912078812924571055 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)250250015050100125260 Storage Lanes11111011 Taper Length (ft)10025100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9790.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018240177018631583 Flt Permitted0.4990.5550.1990.065 Satd. Flow (perm)930186315831034186315833711824012118631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)31027713461229 Travel Time (s)4.74.220.418.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)110999617711031013387614327278961 Shared Lane Traffic (%) Lane Group Flow (vph)11099961771103101331019027278961 Turn Typepm+ptNApm+ovpm+ptNApm+ovpm+ptNApm+ptNApm+ov Protected Phases 74538152167 Permitted Phases4488266 Detector Phase 74538152167 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.014.07.014.07.0 Minimum Split (s)14.012.812.814.012.812.612.821.612.619.614.0 Total Split (s)14.012.812.814.012.816.012.862.216.065.414.0 Total Split (%)13.3%12.2%12.2%13.3%12.2%15.2%12.2%59.2%15.2%62.3%13.3% Maximum Green (s)7.07.07.07.07.010.47.056.610.459.87.0 Yellow Time (s)5.04.44.05.04.44.04.04.44.04.45.0 All-Red Time (s)2.01.41.82.01.41.61.81.21.61.22.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.03.83.85.03.83.63.83.63.63.65.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMaxNoneMaxNone Act Effct Green (s)16.89.021.816.89.025.267.458.674.261.874.4 Actuated g/C Ratio0.160.090.210.160.090.240.640.560.710.590.71 v/c Ratio0.500.620.290.780.690.820.371.000.970.720.05 Control Delay43.964.338.061.569.756.48.353.076.820.24.8 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay43.964.338.061.569.756.48.353.076.820.24.8 LOSDEDEEEADECA Approach Delay48.760.447.933.1 Approach LOSDEDC Queue Length 50th (ft)6365551067319825~65013235411 Lanes, Volumes, Timings 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentPM 2019 Full Build + Imp Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)114#135103#171#155#34043#960#29950623 Internal Link Dist (ft)23019712661149 Turn Bay Length (ft)25025015050125260 Base Capacity (vph)220159328228159379358101728010961121 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.500.620.290.780.690.820.371.000.970.720.05 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 105 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 45.1Intersection LOS: D Intersection Capacity Utilization 88.4%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 133 (Castle Hayne Road) & North Kerr Avenue 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 30 Blue Clay Road at North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)212752619428248171171379027447 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9870.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018390177018631583177018631583177018631583 Flt Permitted0.5420.4970.5420.674 Satd. Flow (perm)10101839092618631583101018631583125518631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)317775916601086 Travel Time (s)48.111.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)2330629216313531913015210030452 Shared Lane Traffic (%) Lane Group Flow (vph)233350216313531913015210030452 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)19.119.118.418.418.420.820.820.820.520.520.5 Actuated g/C Ratio0.390.390.370.370.370.420.420.420.420.420.42 v/c Ratio0.060.470.620.450.090.040.160.230.190.390.08 Control Delay9.113.321.113.59.710.811.011.611.913.110.8 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay9.113.321.113.59.710.811.011.611.913.110.8 LOSABCBABBBBBB Approach Delay13.016.011.312.5 Approach LOS BBBB Queue Length 50th (ft)468486493212517568 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM Existing Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)14119104114251561725213630 Internal Link Dist (ft)309767915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)1010183992618631583428790672525779662 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.020.180.230.170.030.040.160.230.190.390.08 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 49.1 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.62 Intersection Signal Delay: 13.6Intersection LOS: B Intersection Capacity Utilization 53.6%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2016 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)2133227235344581711917410027948 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9890.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018420177018631583177018631583177018631583 Flt Permitted0.4710.4390.5110.673 Satd. Flow (perm)877184208181863158395218631583125418631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289075916601086 Travel Time (s)43.811.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)2336930261382641913219311131053 Shared Lane Traffic (%) Lane Group Flow (vph)233990261382641913219311131053 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)23.523.522.822.822.821.121.121.120.820.820.8 Actuated g/C Ratio0.440.440.420.420.420.390.390.390.390.390.39 v/c Ratio0.060.500.750.480.100.050.180.310.230.430.09 Control Delay8.112.727.612.98.814.214.115.515.516.613.9 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay8.112.727.612.98.814.214.115.515.516.613.9 LOSABCBABBBBBB Approach Delay12.418.014.916.1 Approach LOS BBBB Queue Length 50th (ft)48465821142539226810 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2016 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)131401421362719761107017138 Internal Link Dist (ft)281067915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)877184281818631583372729619483718610 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.030.220.320.210.040.050.180.310.230.430.09 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 53.8 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 15.8Intersection LOS: B Intersection Capacity Utilization 59.2%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentAM 2016 Phase 1 Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)2434430235348581811917410027949 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9880.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018400177018631583177018631583177018631583 Flt Permitted0.4670.4240.5090.673 Satd. Flow (perm)870184007901863158394818631583125418631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289075916601086 Travel Time (s)43.811.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)2738233261387642013219311131054 Shared Lane Traffic (%) Lane Group Flow (vph)274150261387642013219311131054 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)23.923.923.223.223.221.121.121.120.820.820.8 Actuated g/C Ratio0.440.440.430.430.430.390.390.390.380.380.38 v/c Ratio0.070.510.770.490.090.050.180.310.230.430.09 Control Delay8.212.829.512.98.714.514.415.815.817.014.2 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay8.212.829.512.98.714.514.415.815.817.014.2 LOSABCBABBBBBB Approach Delay12.618.615.216.4 Approach LOS BBBB Queue Length 50th (ft)58966831142640236910 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentAM 2016 Phase 1 Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)151461461372720771127217539 Internal Link Dist (ft)281067915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)870184079018631583368724615480713606 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.030.230.330.210.040.050.180.310.230.430.09 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 54.2 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 16.1Intersection LOS: B Intersection Capacity Utilization 60.1%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)2636131248366611912718310629752 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9880.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018400177018631583177018631583177018631583 Flt Permitted0.4520.4120.4740.667 Satd. Flow (perm)842184007671863158388318631583124218631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289075916601086 Travel Time (s)43.811.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)2940134276407682114120311833058 Shared Lane Traffic (%) Lane Group Flow (vph)294350276407682114120311833058 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)25.825.825.125.125.121.221.221.220.920.920.9 Actuated g/C Ratio0.460.460.450.450.450.380.380.380.370.370.37 v/c Ratio0.080.520.810.490.100.060.200.340.260.480.10 Control Delay7.912.532.012.58.316.215.917.517.619.015.7 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay7.912.532.012.58.316.215.917.517.619.015.7 LOSABCBABBBBBB Approach Delay12.219.316.818.3 Approach LOS BBBB Queue Length 50th (ft)59474891243045267912 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)151521621432823891298320444 Internal Link Dist (ft)281067915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)842184076718631583332701595460690586 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.030.240.360.220.040.060.200.340.260.480.10 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 56.3 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 17.1Intersection LOS: B Intersection Capacity Utilization 72.1%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 Full Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)2937434248370612012718310629753 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9870.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018390177018631583177018631583177018631583 Flt Permitted0.4490.3960.4690.667 Satd. Flow (perm)836183907381863158387418631583124218631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289075916601086 Travel Time (s)43.811.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)3241638276411682214120311833059 Shared Lane Traffic (%) Lane Group Flow (vph)324540276411682214120311833059 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)26.626.625.925.925.921.221.221.220.920.920.9 Actuated g/C Ratio0.470.470.450.450.450.370.370.370.370.370.37 v/c Ratio0.080.530.830.490.090.070.200.350.260.480.10 Control Delay7.912.634.312.38.216.916.518.118.219.716.3 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay7.912.634.312.38.216.916.518.118.219.716.3 LOSABCBABBBBBB Approach Delay12.320.017.419.0 Approach LOS BBBB Queue Length 50th (ft)610075901253148278313 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development AM 2019 Full Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)161601681442824911328520946 Internal Link Dist (ft)281067915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)836183973818631583324691587454681578 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.040.250.370.220.040.070.200.350.260.480.10 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 57.2 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 17.5Intersection LOS: B Intersection Capacity Utilization 73.0%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)382701314930171352402364711039 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9930.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018500177018631583177018631583177018631583 Flt Permitted0.5110.5170.6790.587 Satd. Flow (perm)9521850096318631583126518631583109318631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)317775916601086 Travel Time (s)48.111.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)423001416633479392672625212243 Shared Lane Traffic (%) Lane Group Flow (vph)42314016633479392672625212243 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)20.020.020.020.020.020.020.020.020.020.020.0 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)17.217.216.516.516.520.820.820.820.520.520.5 Actuated g/C Ratio0.370.370.350.350.350.440.440.440.440.440.44 v/c Ratio0.120.460.490.510.140.070.330.380.110.150.06 Control Delay10.613.817.615.110.89.210.711.69.89.69.2 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay10.613.817.615.110.89.210.711.69.89.69.2 LOSBBBBBABBAAA Approach Delay13.415.211.09.6 Approach LOS BBBA Queue Length 50th (ft)763346914643438186 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM Existing Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)22114781253522101105275023 Internal Link Dist (ft)309767915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)952185096318631583557821697474809687 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.040.170.170.180.050.070.330.380.110.150.06 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 47.1 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.51 Intersection Signal Delay: 12.8Intersection LOS: B Intersection Capacity Utilization 60.3%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2016 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)393351318034979362452815811240 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9950.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018530177018631583177018631583177018631583 Flt Permitted0.4520.4370.6770.569 Satd. Flow (perm)8421853081418631583126118631583106018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289975916601086 Travel Time (s)43.911.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)433721420038888402723126412444 Shared Lane Traffic (%) Lane Group Flow (vph)43386020038888402723126412444 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)19.519.518.818.818.820.920.920.920.620.620.6 Actuated g/C Ratio0.390.390.380.380.380.420.420.420.420.420.42 v/c Ratio0.130.530.650.550.150.080.350.470.150.160.07 Control Delay10.014.123.315.010.211.112.714.712.011.511.1 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay10.014.123.315.010.211.112.714.712.011.511.1 LOSABCBBBBBBBB Approach Delay13.716.813.611.5 Approach LOS BBBB Queue Length 50th (ft)8814583166485810207 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2016 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)221391021433726123152386027 Internal Link Dist (ft)281967915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)842185381418631583531785667440773657 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.050.210.250.210.060.080.350.470.150.160.07 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 49.6 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 14.5Intersection LOS: B Intersection Capacity Utilization 63.1%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentPM 2016 Phase 1 Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)413431518036279392452815811243 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9940.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018520177018631583177018631583177018631583 Flt Permitted0.4380.4250.6770.567 Satd. Flow (perm)8161852079218631583126118631583105618631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289975916601086 Travel Time (s)43.911.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)463811720040288432723126412448 Shared Lane Traffic (%) Lane Group Flow (vph)46398020040288432723126412448 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)20.020.019.319.319.320.920.920.920.620.620.6 Actuated g/C Ratio0.400.400.390.390.390.420.420.420.410.410.41 v/c Ratio0.140.540.660.560.140.080.350.470.150.160.07 Control Delay10.114.223.815.110.111.312.915.012.211.611.3 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay10.114.223.815.110.111.312.915.012.211.611.3 LOSBBCBBBBBBBB Approach Delay13.817.013.811.7 Approach LOS BBBB Queue Length 50th (ft)8844687167485911218 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside DevelopmentPM 2016 Phase 1 Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)231431041493728124153396130 Internal Link Dist (ft)281967915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)816185279218631583526777660434766651 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.060.210.250.220.060.080.350.470.150.160.07 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 50 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.66 Intersection Signal Delay: 14.7Intersection LOS: B Intersection Capacity Utilization 63.8%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)433601618938184412602956111946 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9940.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018520177018631583177018631583177018631583 Flt Permitted0.4180.4080.6730.543 Satd. Flow (perm)7791852076018631583125418631583101118631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289975916601086 Travel Time (s)43.911.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)484001821042393462893286813251 Shared Lane Traffic (%) Lane Group Flow (vph)48418021042393462893286813251 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)20.820.820.120.120.120.920.920.920.620.620.6 Actuated g/C Ratio0.410.410.390.390.390.410.410.410.400.400.40 v/c Ratio0.150.550.700.580.150.090.380.500.170.180.08 Control Delay10.114.226.315.29.912.013.816.213.212.411.9 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay10.114.226.315.29.912.013.816.213.212.411.9 LOSBBCBABBBBBB Approach Delay13.817.714.912.5 Approach LOS BBBB Queue Length 50th (ft)8894993178546612238 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 No Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)241511141573831139170436732 Internal Link Dist (ft)281967915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)779185276018631583515765650409754640 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.060.230.280.230.060.090.380.500.170.180.08 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 50.9 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.70 Intersection Signal Delay: 15.3Intersection LOS: B Intersection Capacity Utilization 65.9%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 Full Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)453681818939684452602956111950 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)2600500100325125450100 Storage Lanes10111111 Taper Length (ft)100100100100 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.9930.8500.8500.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018500177018631583177018631583177018631583 Flt Permitted0.4020.3980.6730.540 Satd. Flow (perm)7491850074118631583125418631583100618631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45455555 Link Distance (ft)289975916601086 Travel Time (s)43.911.520.613.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)504092021044093502893286813256 Shared Lane Traffic (%) Lane Group Flow (vph)50429021044093502893286813256 Turn TypePermNAPermNAPermPermNAPermPermNAPerm Protected Phases 2684 Permitted Phases2668844 Detector Phase22 666888444 Switch Phase Minimum Initial (s)12.012.012.012.012.07.07.07.07.07.07.0 Minimum Split (s)22.822.823.523.523.522.322.322.322.622.622.6 Total Split (s)80.080.080.080.080.025.025.025.025.025.025.0 Total Split (%)76.2%76.2%76.2%76.2%76.2%23.8%23.8%23.8%23.8%23.8%23.8% Maximum Green (s)73.273.272.572.572.518.718.718.718.418.418.4 Yellow Time (s)4.44.44.64.64.65.35.35.35.35.35.3 All-Red Time (s)2.42.42.92.92.91.01.01.01.31.31.3 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)4.84.85.55.55.54.34.34.34.64.64.6 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneMaxMaxMaxMaxMaxMax Act Effct Green (s)21.321.320.620.620.621.021.021.020.720.720.7 Actuated g/C Ratio0.410.410.400.400.400.410.410.410.400.400.40 v/c Ratio0.160.560.710.590.150.100.380.510.170.180.09 Control Delay10.114.226.915.39.712.414.216.713.612.812.4 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay10.114.226.915.39.712.414.216.713.612.812.4 LOSBBCBABBBBBB Approach Delay13.817.915.312.9 Approach LOS BBBB Queue Length 50th (ft)9925098178556712239 Lanes, Volumes, Timings 200: Blue Clay Road & North Kerr Avenue 6/19/2015 15-222 Riverside Development PM 2019 Full Build Dionne C. Brown, PE Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 95th (ft)251551151643833144176447036 Internal Link Dist (ft)281967915801006 Turn Bay Length (ft)260500100325125450100 Base Capacity (vph)749185074118631583510758644403747635 Starvation Cap Reductn00 000000000 Spillback Cap Reductn00 000000000 Storage Cap Reductn00 000000000 Reduced v/c Ratio0.070.230.280.240.060.100.380.510.170.180.09 Intersection Summary Area Type:Other Cycle Length: 105 Actuated Cycle Length: 51.5 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 15.6Intersection LOS: B Intersection Capacity Utilization 66.4%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 200: Blue Clay Road & North Kerr Avenue 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 31 Traffic Volume Data File Name : NC_133_(Castle_Hayne_Road)_and_SR_1322_(North_Kerr_Avenue) Site Code : 15-222.100 Start Date : 5/14/2015 Page No : 1 Counted By: Miovision Weather: Clear Groups Printed- All Vehicles (no classification) Castle Hayne Road Southbound North Kerr Avenue Westbound Castle Hayne Road Northbound North Kerr Avenue Eastbound Start Time Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Int. Total 07:00 AM 43 164 6 0 213 31 4 24 0 59 2 75 18 0 95 10 6 2 0 18 385 07:15 AM 34 176 4 0 214 29 12 38 0 79 9 77 16 0 102 2 10 3 0 15 410 07:30 AM 40 223 3 0 266 37 4 51 0 92 1 94 24 0 119 14 6 7 0 27 504 07:45 AM 58 212 14 0 284 41 6 41 0 88 3 98 25 0 126 8 12 11 0 31 529 Total 175 775 27 0 977 138 26 154 0 318 15 344 83 0 442 34 34 23 0 91 1828 08:00 AM 39 192 6 0 237 32 5 28 0 65 9 112 25 0 146 11 16 7 0 34 482 08:15 AM 29 138 10 0 177 31 9 28 0 68 6 92 15 0 113 12 8 4 0 24 382 08:30 AM 41 139 8 0 188 31 9 29 0 69 3 89 22 0 114 10 6 7 0 23 394 08:45 AM 35 98 4 0 137 27 4 34 0 65 4 64 24 0 92 3 10 8 0 21 315 Total 144 567 28 0 739 121 27 119 0 267 22 357 86 0 465 36 40 26 0 102 1573 09:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 37 137 7 0 181 24 9 45 0 78 13 120 19 1 153 16 8 7 0 31 443 04:15 PM 39 120 4 0 163 27 8 43 0 78 16 152 21 0 189 14 8 12 0 34 464 04:30 PM 49 127 1 0 177 22 5 38 0 65 13 134 35 0 182 19 11 15 0 45 469 04:45 PM 36 148 4 0 188 31 12 50 0 93 15 135 22 0 172 15 7 9 0 31 484 Total 161 532 16 0 709 104 34 176 0 314 57 541 97 1 696 64 34 43 0 141 1860 DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 File Name : NC_133_(Castle_Hayne_Road)_and_SR_1322_(North_Kerr_Avenue) Site Code : 15-222.100 Start Date : 5/14/2015 Page No : 2 Groups Printed- All Vehicles (no classification) Castle Hayne Road Southbound North Kerr Avenue Westbound Castle Hayne Road Northbound North Kerr Avenue Eastbound Start Time Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Int. Total 05:00 PM 40 158 3 0 201 31 15 54 0 100 15 168 28 0 211 15 7 11 0 33 545 05:15 PM 49 132 4 0 185 32 12 40 0 84 12 154 21 0 187 24 14 14 0 52 508 05:30 PM 44 138 4 0 186 33 14 51 0 98 17 152 21 0 190 16 4 16 0 36 510 05:45 PM 44 97 10 0 151 27 9 47 0 83 14 136 18 0 168 26 7 14 0 47 449 Total 177 525 21 0 723 123 50 192 0 365 58 610 88 0 756 81 32 55 0 168 2012 Grand Total 657 2399 92 0 3148 486 137 641 0 1264 152 1852 354 1 2359 215 140 147 0 502 7273 Apprch %20.9 76.2 2.9 0 38.4 10.8 50.7 0 6.4 78.5 15 0 42.8 27.9 29.3 0 Total %9 33 1.3 0 43.3 6.7 1.9 8.8 0 17.4 2.1 25.5 4.9 0 32.4 3 1.9 2 0 6.9 Castle Hayne Road N o r t h K e r r A v e n u e N o r t h K e r r A v e n u e Castle Hayne Road Right 92 Thru 2399 Left 657 U-Turn 0 InOut Total 2708 3148 5856 Ri g h t 64 1 Th r u 13 7 Le f t 48 6 U- T u r n 0 Ou t To t a l In 11 5 1 12 6 4 24 1 5 Left 152 Thru 1852 Right 354 U-Turn 1 Out TotalIn 3032 2359 5391 Le f t 21 5 Th r u 14 0 Ri g h t 14 7 U- T u r n 0 To t a l Ou t In 38 1 50 2 88 3 5/14/2015 07:00 AM 5/14/2015 05:45 PM All Vehicles (no classification) North DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 File Name : NC_133_(Castle_Hayne_Road)_and_SR_1322_(North_Kerr_Avenue) Site Code : 15-222.100 Start Date : 5/14/2015 Page No : 3 Castle Hayne Road Southbound North Kerr Avenue Westbound Castle Hayne Road Northbound North Kerr Avenue Eastbound Start Time Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Int. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 34 176 4 0 214 29 12 38 0 79 9 77 16 0 102 2 10 3 0 15 410 07:30 AM 40 223 3 0 266 37 4 51 0 92 1 94 24 0 119 14 6 7 0 27 504 07:45 AM 58 212 14 0 284 41 6 41 0 88 3 98 25 0 126 8 12 11 0 31 529 08:00 AM 39 192 6 0 237 32 5 28 0 65 9 112 25 0 146 11 16 7 0 34 482 Total Volume 171 803 27 0 1001 139 27 158 0 324 22 381 90 0 493 35 44 28 0 107 1925 % App. Total 17.1 80.2 2.7 0 42.9 8.3 48.8 0 4.5 77.3 18.3 0 32.7 41.1 26.2 0 PHF .737 .900 .482 .000 .881 .848 .563 .775 .000 .880 .611 .850 .900 .000 .844 .625 .688 .636 .000 .787 .910 Castle Hayne Road N o r t h K e r r A v e n u e N o r t h K e r r A v e n u e Castle Hayne Road Right 27 Thru 803 Left 171 U-Turn 0 InOut Total 574 1001 1575 Ri g h t 15 8 Th r u 27 Le f t 13 9 U- T u r n 0 Ou t To t a l In 30 5 32 4 62 9 Left 22 Thru 381 Right 90 U-Turn 0 Out TotalIn 970 493 1463 Le f t 35 Th r u 44 Ri g h t 28 U- T u r n 0 To t a l Ou t In 76 10 7 18 3 Peak Hour Begins at 07:15 AM All Vehicles (no classification) Peak Hour Data North DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 File Name : NC_133_(Castle_Hayne_Road)_and_SR_1322_(North_Kerr_Avenue) Site Code : 15-222.100 Start Date : 5/14/2015 Page No : 4 Castle Hayne Road Southbound North Kerr Avenue Westbound Castle Hayne Road Northbound North Kerr Avenue Eastbound Start Time Left Thr u Rig ht U-Turn App. Total Left Thr u Right U-Turn App. Total Left Thr u Right U-Turn App. Total Left Thr u Right U-Turn App. Total Int. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 36 148 4 0 188 31 12 50 0 93 15 135 22 0 172 15 7 9 0 31 484 05:00 PM 40 158 3 0 201 31 15 54 0 100 15 168 28 0 211 15 7 11 0 33 545 05:15 PM 49 132 4 0 185 32 12 40 0 84 12 154 21 0 187 24 14 14 0 52 508 05:30 PM 44 138 4 0 186 33 14 51 0 98 17 152 21 0 190 16 4 16 0 36 510 Total Volume 169 576 15 0 760 127 53 195 0 375 59 609 92 0 760 70 32 50 0 152 2047 % App. Total 22.2 75.8 2 0 33.9 14.1 52 0 7.8 80.1 12.1 0 46.1 21.1 32.9 0 PHF .862 .911 .938 .000 .945 .962 .883 .903 .000 .938 .868 .906 .821 .000 .900 .729 .571 .781 .000 .731 .939 Castle Hayne Road N o r t h K e r r A v e n u e N o r t h K e r r A v e n u e Castle Hayne Road Right 15 Thru 576 Left 169 U-Turn 0 InOut Total 874 760 1634 Ri g h t 19 5 Th r u 53 Le f t 12 7 U- T u r n 0 Ou t To t a l In 29 3 37 5 66 8 Left 59 Thru 609 Right 92 U-Turn 0 Out TotalIn 753 760 1513 Le f t 70 Th r u 32 Ri g h t 50 U- T u r n 0 To t a l Ou t In 12 7 15 2 27 9 Peak Hour Begins at 04:45 PM All Vehicles (no classification) Peak Hour Data North DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 DAVENPORT Project No. 15-222 NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue) NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue) Looking East NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue) Looking North NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue) Looking West NC 133 (Castle Hayne Road) at SR 1322 (North Kerr Avenue) Looking South File Name : SR_1322_(North_Kerr_Avenue)_and_SR_1310_(Blue_Clay_Road) Site Code : 15-222.100 Start Date : 5/13/2015 Page No : 1 Counted By: Miovision Weather: Clear Groups Printed- All Vehicles (no classification) Blue Clay Road Southbound North Kerr Avenue Westbound Blue Clay Road Northbound North Kerr Avenue Eastbound Start Time Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Int. Total 07:00 AM 20 59 12 0 91 45 49 1 0 95 1 19 23 0 43 8 59 4 0 71 300 07:15 AM 17 73 13 0 103 41 77 9 0 127 4 23 35 0 62 4 69 6 0 79 371 07:30 AM 14 71 13 0 98 50 71 21 0 142 1 32 35 0 68 7 57 2 0 66 374 07:45 AM 35 84 11 0 130 58 79 9 0 146 7 29 35 0 71 5 90 11 0 106 453 Total 86 287 49 0 422 194 276 40 0 510 13 103 128 0 244 24 275 23 0 322 1498 08:00 AM 24 46 10 0 80 45 55 9 0 109 5 33 32 0 70 5 59 7 0 71 330 08:15 AM 22 53 6 0 81 50 80 14 0 144 3 21 27 0 51 11 59 10 0 80 356 08:30 AM 11 41 11 0 63 32 80 10 0 122 7 15 32 0 54 1 76 13 0 90 329 08:45 AM 7 32 10 0 49 33 52 10 0 95 11 21 32 0 64 6 55 4 0 65 273 Total 64 172 37 0 273 160 267 43 0 470 26 90 123 0 239 23 249 34 0 306 1288 09:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 9 23 16 0 48 29 62 10 0 101 8 38 36 0 82 10 44 3 0 57 288 04:15 PM 5 23 9 0 37 48 54 18 0 120 7 54 26 0 87 1 66 8 0 75 319 04:30 PM 13 30 11 0 54 27 83 10 0 120 8 55 31 0 94 7 76 5 0 88 356 04:45 PM 15 29 8 0 52 38 70 17 0 125 7 63 44 0 114 8 67 3 0 78 369 Total 42 105 44 0 191 142 269 55 0 466 30 210 137 0 377 26 253 19 0 298 1332 DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 File Name : SR_1322_(North_Kerr_Avenue)_and_SR_1310_(Blue_Clay_Road) Site Code : 15-222.100 Start Date : 5/13/2015 Page No : 2 Groups Printed- All Vehicles (no classification) Blue Clay Road Southbound North Kerr Avenue Westbound Blue Clay Road Northbound North Kerr Avenue Eastbound Start Time Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Int. Total 05:00 PM 13 33 12 0 58 48 61 16 0 125 10 70 57 0 137 10 79 7 0 96 416 05:15 PM 9 20 8 0 37 32 93 20 0 145 9 56 72 0 137 10 60 1 0 71 390 05:30 PM 10 28 11 0 49 31 74 18 0 123 9 51 63 0 123 10 64 2 0 76 371 05:45 PM 11 23 8 0 42 37 84 15 0 136 3 46 41 0 90 9 52 5 0 66 334 Total 43 104 39 0 186 148 312 69 0 529 31 223 233 0 487 39 255 15 0 309 1511 Grand Total 235 668 169 0 1072 644 1124 207 0 1975 100 626 621 0 1347 112 1032 91 0 1235 5629 Apprch %21.9 62.3 15.8 0 32.6 56.9 10.5 0 7.4 46.5 46.1 0 9.1 83.6 7.4 0 Total %4.2 11.9 3 0 19 11.4 20 3.7 0 35.1 1.8 11.1 11 0 23.9 2 18.3 1.6 0 21.9 Blue Clay Road N o r t h K e r r A v e n u e N o r t h K e r r A v e n u e Blue Clay Road Right 169 Thru 668 Left 235 U-Turn 0 InOut Total 945 1072 2017 Ri g h t 20 7 Th r u 11 2 4 Le f t 64 4 U- T u r n 0 Ou t To t a l In 18 8 8 19 7 5 38 6 3 Left 100 Thru 626 Right 621 U-Turn 0 Out TotalIn 1403 1347 2750 Le f t 11 2 Th r u 10 3 2 Ri g h t 91 U- T u r n 0 To t a l Ou t In 13 9 3 12 3 5 26 2 8 5/13/2015 07:00 AM 5/13/2015 05:45 PM All Vehicles (no classification) North DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 File Name : SR_1322_(North_Kerr_Avenue)_and_SR_1310_(Blue_Clay_Road) Site Code : 15-222.100 Start Date : 5/13/2015 Page No : 3 Blue Clay Road Southbound North Kerr Avenue Westbound Blue Clay Road Northbound North Kerr Avenue Eastbound Start Time Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Left Thru Right U-Turn App. Total Int. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 17 73 13 0 103 41 77 9 0 127 4 23 35 0 62 4 69 6 0 79 371 07:30 AM 14 71 13 0 98 50 71 21 0 142 1 32 35 0 68 7 57 2 0 66 374 07:45 AM 35 84 11 0 130 58 79 9 0 146 7 29 35 0 71 5 90 11 0 106 453 08:00 AM 24 46 10 0 80 45 55 9 0 109 5 33 32 0 70 5 59 7 0 71 330 Total Volume 90 274 47 0 411 194 282 48 0 524 17 117 137 0 271 21 275 26 0 322 1528 % App. Total 21.9 66.7 11.4 0 37 53.8 9.2 0 6.3 43.2 50.6 0 6.5 85.4 8.1 0 PHF .643 .815 .904 .000 .790 .836 .892 .571 .000 .897 .607 .886 .979 .000 .954 .750 .764 .591 .000 .759 .843 Blue Clay Road N o r t h K e r r A v e n u e N o r t h K e r r A v e n u e Blue Clay Road Right 47 Thru 274 Left 90 U-Turn 0 InOut Total 186 411 597 Ri g h t 48 Th r u 28 2 Le f t 19 4 U- T u r n 0 Ou t To t a l In 50 2 52 4 10 2 6 Left 17 Thru 117 Right 137 U-Turn 0 Out TotalIn 494 271 765 Le f t 21 Th r u 27 5 Ri g h t 26 U- T u r n 0 To t a l Ou t In 34 6 32 2 66 8 Peak Hour Begins at 07:15 AM All Vehicles (no classification) Peak Hour Data North DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 File Name : SR_1322_(North_Kerr_Avenue)_and_SR_1310_(Blue_Clay_Road) Site Code : 15-222.100 Start Date : 5/13/2015 Page No : 4 Blue Clay Road Southbound North Kerr Avenue Westbound Blue Clay Road Northbound North Kerr Avenue Eastbound Start Time Left Thr u Rig ht U-Turn App. Total Left Thr u Right U-Turn App. Total Left Thr u Right U-Turn App. Total Left Thr u Right U-Turn App. Total Int. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 15 29 8 0 52 38 70 17 0 125 7 63 44 0 114 8 67 3 0 78 369 05:00 PM 13 33 12 0 58 48 61 16 0 125 10 70 57 0 137 10 79 7 0 96 416 05:15 PM 9 20 8 0 37 32 93 20 0 145 9 56 72 0 137 10 60 1 0 71 390 05:30 PM 10 28 11 0 49 31 74 18 0 123 9 51 63 0 123 10 64 2 0 76 371 Total Volume 47 110 39 0 196 149 298 71 0 518 35 240 236 0 511 38 270 13 0 321 1546 % App. Total 24 56.1 19.9 0 28.8 57.5 13.7 0 6.8 47 46.2 0 11.8 84.1 4 0 PHF .783 .833 .813 .000 .845 .776 .801 .888 .000 .893 .875 .857 .819 .000 .932 .950 .854 .464 .000 .836 .929 Blue Clay Road N o r t h K e r r A v e n u e N o r t h K e r r A v e n u e Blue Clay Road Right 39 Thru 110 Left 47 U-Turn 0 InOut Total 349 196 545 Ri g h t 71 Th r u 29 8 Le f t 14 9 U- T u r n 0 Ou t To t a l In 55 3 51 8 10 7 1 Left 35 Thru 240 Right 236 U-Turn 0 Out TotalIn 272 511 783 Le f t 38 Th r u 27 0 Ri g h t 13 U- T u r n 0 To t a l Ou t In 37 2 32 1 69 3 Peak Hour Begins at 04:45 PM All Vehicles (no classification) Peak Hour Data North DAVENPORT 305 West 4th Street Suite 2A Winston Salen, NC 27101 Ph:(336)744-1636 DAVENPORT Project No. 15-222 SR 1310 (Blue Clay Road) at SR 1322 (North Kerr Avenue) SR 1310 (Blue Clay Road) at SR 1322 (North Kerr Avenue) Looking East SR 1310 (Blue Clay Road) at SR 1322 (North Kerr Avenue) Looking North SR 1310 (Blue Clay Road) at SR 1322 (North Kerr Avenue) Looking West SR 1310 (Blue Clay Road) at SR 1322 (North Kerr Avenue) Looking South 10 0 10 0 AM Pe a k 20 1 5 TM C Ba l a n c i n g 20 1 5 Ba s e 20 1 6 Pr o j e c t e d Ap p d De v 20 1 6 Fu t u r e N o Bu i l d Ph a s e 1 Pr i m a r y Tr i p s Pa s s - b y Tr i p s Ph a s e 1 20 1 6 Bu i l d 20 1 9 Fu t u r e No B u i l d Fu l l B u i l d Pr i m a r y Tr i p s Fu l l B u i l d 20 1 9 Bu i l d PM P e a k 20 1 5 TM C Ba l a n c i n g 20 1 5 Ba s e 20 1 6 Pr o j e c t e d Ap p d De v 20 1 6 Fu t u r e N o Bu i l d Ph a s e 1 Pr i m a r y Tr i p s Pa s s - b y Tr i p s Ph a s e 1 20 1 6 Bu i l d 20 1 9 Fu t u r e No B u i l d Fu l l B u i l d Pr i m a r y Tr i p s Fu l l B u i l d 20 1 9 Bu i l d EB L 2 8 2 8 2 9 2 9 1 8 4 7 4 8 3 8 6 8 E B L 7 0 7 0 7 1 7 1 1 2 8 3 8 7 2 4 9 9 EB T 4 4 1 7 6 1 6 2 6 2 1 8 8 0 8 4 3 8 1 0 4 E B T 3 2 2 8 6 0 6 1 6 1 1 2 7 3 7 7 2 4 8 9 EB R 3 5 3 5 3 6 3 6 2 4 6 0 6 2 5 0 8 8 E B R 5 0 5 0 5 1 5 1 1 6 6 7 7 0 3 2 8 6 WB L 1 3 9 1 3 9 1 4 2 2 8 1 7 0 1 7 0 1 7 9 1 7 9 W B L 1 2 7 1 2 7 1 3 0 2 1 1 5 1 1 5 1 1 5 9 1 5 9 WB T 2 7 2 2 4 9 5 0 5 0 6 5 6 5 9 1 2 6 5 W B T 5 3 5 3 5 4 5 4 2 0 7 4 7 7 4 2 9 9 WB R 1 5 8 1 5 8 1 6 1 4 4 2 0 5 2 0 5 2 1 5 2 1 5 W B R 1 9 5 1 9 5 1 9 9 6 8 2 6 7 2 6 7 2 7 9 2 7 9 NB L 2 2 2 2 2 2 2 2 8 3 0 3 2 1 6 4 0 N B L 5 9 5 9 6 0 6 0 2 6 8 6 9 0 5 6 1 2 0 NB T 3 8 1 3 8 1 3 8 9 4 3 4 3 2 4 3 2 4 5 5 4 5 5 N B T 6 0 9 6 0 9 6 2 1 1 2 9 7 5 0 7 5 0 7 8 8 7 8 8 NB R 9 0 9 0 9 2 2 6 1 1 8 1 1 8 1 2 3 1 2 3 N B R 9 2 9 2 9 4 3 0 1 2 4 1 2 4 1 2 9 1 2 9 SB L 1 7 1 1 7 1 1 7 4 6 1 2 3 5 2 3 5 2 4 6 2 4 6 S B L 1 6 9 1 6 9 1 7 2 6 2 2 3 4 2 3 4 2 4 5 2 4 5 SB T 8 0 3 8 0 3 8 1 9 9 5 9 1 4 9 1 4 9 6 4 9 6 4 S B T 5 7 6 5 7 6 5 8 8 8 7 6 7 5 6 7 5 7 1 0 7 1 0 SB R 2 7 2 7 2 8 2 8 6 3 4 3 5 1 2 4 1 S B R 1 2 1 2 1 2 1 2 2 0 3 2 3 3 4 2 5 5 To t a l 1 9 2 5 3 9 1 9 6 4 2 0 0 3 2 9 7 2 3 0 0 8 0 0 2 3 8 1 2 5 0 3 1 6 4 2 5 8 8 T o t a l 2 0 4 4 2 8 2 0 7 2 2 1 1 3 3 9 7 2 5 1 0 1 0 5 0 2 6 1 6 2 7 4 5 2 2 2 2 8 5 8 20 0 20 0 AM Pe a k 20 1 5 TM C Ba l a n c i n g 20 1 5 Ba s e 20 1 6 Pr o j e c t e d Ap p d De v 20 1 6 Fu t u r e N o Bu i l d Ph a s e 1 Pr i m a r y Tr i p s Pa s s - b y Tr i p s Ph a s e 1 20 1 6 Bu i l d 20 1 9 Fu t u r e No B u i l d Fu l l B u i l d Pr i m a r y Tr i p s Fu l l B u i l d 20 1 9 Bu i l d PM P e a k 20 1 5 TM C Ba l a n c i n g 20 1 5 Ba s e 20 1 6 Pr o j e c t e d Ap p d De v 20 1 6 Fu t u r e N o Bu i l d Ph a s e 1 Pr i m a r y Tr i p s Pa s s - b y Tr i p s Ph a s e 1 20 1 6 Bu i l d 20 1 9 Fu t u r e No B u i l d Fu l l B u i l d Pr i m a r y Tr i p s Fu l l B u i l d 20 1 9 Bu i l d EB L 2 1 2 1 2 1 2 1 3 2 4 2 6 6 2 9 E B L 3 8 3 8 3 9 3 9 2 4 1 4 3 4 4 5 EB T 2 7 5 2 7 5 2 8 1 5 2 3 3 2 1 2 3 4 4 3 6 1 2 5 3 7 4 E B T 2 7 0 2 7 0 2 7 5 6 0 3 3 5 8 3 4 3 3 6 0 1 6 3 6 8 EB R 2 6 2 6 2 7 2 7 3 3 0 3 1 6 3 4 E B R 1 3 1 3 1 3 1 3 2 1 5 1 6 4 1 8 WB L 1 9 4 1 9 4 1 9 8 3 8 2 3 5 2 3 5 2 4 8 2 4 8 W B L 1 4 9 1 4 9 1 5 2 2 8 1 8 0 1 8 0 1 8 9 1 8 9 WB T 2 8 2 2 8 2 2 8 8 5 6 3 4 4 4 3 4 8 3 6 6 8 3 7 0 W B T 2 9 8 3 3 0 1 3 0 7 4 2 3 4 9 1 3 3 6 2 3 8 1 2 8 3 9 6 WB R 4 8 4 8 4 9 9 5 8 5 8 6 1 6 1 W B R 7 1 7 1 7 2 7 7 9 7 9 8 4 8 4 NB L 1 7 1 7 1 7 1 7 1 1 8 1 9 2 2 0 N B L 3 5 3 5 3 6 3 6 3 3 9 4 1 7 4 5 NB T 1 1 7 1 1 7 1 1 9 1 1 9 1 1 9 1 2 7 1 2 7 N B T 2 4 0 2 4 0 2 4 5 2 4 5 2 4 5 2 6 0 2 6 0 NB R 1 3 7 1 3 7 1 4 0 3 4 1 7 4 1 7 4 1 8 3 1 8 3 N B R 2 3 6 2 3 6 2 4 1 4 0 2 8 1 2 8 1 2 9 5 2 9 5 SB L 9 0 9 0 9 2 9 1 0 0 1 0 0 1 0 6 1 0 6 S B L 4 7 4 7 4 8 1 0 5 8 5 8 6 1 6 1 SB T 2 7 4 2 7 4 2 7 9 2 7 9 2 7 9 2 9 7 2 9 7 S B T 1 1 0 1 1 0 1 1 2 1 1 2 1 1 2 1 1 9 1 1 9 SB R 4 7 4 7 4 8 4 8 1 4 9 5 2 2 5 3 S B R 3 9 3 9 4 0 4 0 3 4 3 4 6 7 5 0 To t a l 1 5 2 8 0 1 5 2 8 1 5 5 9 1 9 8 1 7 5 7 2 4 0 1 7 7 8 1 8 7 6 4 9 1 9 0 2 T o t a l 1 5 4 6 0 1 5 4 9 1 5 8 0 1 8 7 1 7 6 7 3 2 0 1 7 9 8 1 8 9 5 6 7 1 9 3 0 NC 1 3 3 a t N . K e r r A v e NC 1 3 3 a t N . K e r r A v e Bl u e C l a y R d a t N . K e r r A v e Bl u e C l a y R d a t N . K e r r A v e 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 32 Supporting Documentation 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 33 Approved Development N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D AM / P M 9 / 7 56 / 4 2 38 / 2 8 0 / 0 9 / 10 0 / 0 0 / 0 44 / 6 8 0 / 0 28 / 2 1 0 / 0 0/ 0 61 / 62 95 / 87 0 / 0 SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E A AP P R O V E D DE V E L O P M E N T S 52 / 6 0 0 / 0 34 / 40 0 / 0 0 / 0 0 / 0 0 / 0 26 / 30 43 / 129 0 / 0 NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) Scanned by CamScanner