Loading...
Colonial Ridge_20090217_Jim IannucciHarris, Bobby From: lannucci, Jim Sent: Friday, February 13, 2009 9:25 AM To: Harris, Bobby Cc: Burgess, Sam; Ihnat, Dennis; Clark, Timothy Jason; Wetherill, Beth; William Pinnix Subject: Colonial Ridge SD # 1392 Follow Up Flag: Follow up Flag Status: Flagged Bobby, Engineering Comments: • Utilities to be coordinated through CFPUA. Utility availability will be tied to the proposed Tarin Woods subdivision that is adjacent to this tract. • All appropriate easements will need to be coordinated through Engineering and CFPUA including the 10 foot UE included in note 12. • Proposed stormwater controls rely on infiltration. Infiltration rates and separation to the seasonal high ground water table must be verified during the design phase. Stormwater design constraints including proximity to wetlands could affect lot layout. • Any possible wetland impacts must be identified and may need to be mitigated. • Proximity to Battle Park property could impact this project in the future. Chickamauga Drive? Thanks, Jim James P. Iannucci, PE, CFM Chief Engineer New Hanover County Engineering Department 230 Government Center Drive, Suite 160 Wilmington, NC 28403 www.nhcgov.com No virus found in this incoming message. Checked by AVG - www.avq.com Version: 8.0.237 / Virus Database: 270.10.23/1951 - Release Date: 02/13/09 06:51:00 1