HomeMy WebLinkAboutColonial Ridge_20090217_Jim IannucciHarris, Bobby
From: lannucci, Jim
Sent: Friday, February 13, 2009 9:25 AM
To: Harris, Bobby
Cc: Burgess, Sam; Ihnat, Dennis; Clark, Timothy Jason; Wetherill, Beth; William Pinnix
Subject: Colonial Ridge SD # 1392
Follow Up Flag: Follow up
Flag Status: Flagged
Bobby,
Engineering Comments:
• Utilities to be coordinated through CFPUA. Utility availability will be tied to the proposed Tarin Woods
subdivision that is adjacent to this tract.
• All appropriate easements will need to be coordinated through Engineering and CFPUA including the 10 foot UE
included in note 12.
• Proposed stormwater controls rely on infiltration. Infiltration rates and separation to the seasonal high ground
water table must be verified during the design phase. Stormwater design constraints including proximity to
wetlands could affect lot layout.
• Any possible wetland impacts must be identified and may need to be mitigated.
• Proximity to Battle Park property could impact this project in the future. Chickamauga Drive?
Thanks,
Jim
James P. Iannucci, PE, CFM
Chief Engineer
New Hanover County Engineering Department
230 Government Center Drive, Suite 160
Wilmington, NC 28403
www.nhcgov.com
No virus found in this incoming message.
Checked by AVG - www.avq.com
Version: 8.0.237 / Virus Database: 270.10.23/1951 - Release Date: 02/13/09 06:51:00
1