HomeMy WebLinkAboutSeptember 14 2016 Agenda
Agenda
14September2016,4:00PM
New Hanover County(NHC), Government Center
Finance Conference Room #500
4:00 Call to Order
Welcome/Introductions
Request approval of the Augustmeeting minutes (emailed 12August2016).Vice Chair Andrew has
been reappointed by the City which leaves one City seat open.
The NC Beach Inlet & Waterway Association’s (NCBIWA) Fall Conference Request for Presentations
at
http://www.ncbiwa.org/files/3797907C-155D-0010-
07EBE90E1EE185DE2016%20Annual%20Conference%20Call%20for%20Presentations.pdf.
Current Efforts:
NHC’sWrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR)Project
The US Army Corps of Engineers (USACE) has provided the NC Division of Coastal
Management(NCDCM)with thefederalpermit conditions.
The Refined Coastal Modeling Report for WBisanticipated in November.
Initiating scope, fee and schedule developmentfor FY18 plans and specs.
Mason Inlet Relocation Project(MIRP)
2016/2017 inlet crossing maintenance event initiated(permitting, plans and specs).
Carolina Beach Inlet Permit Modification
Inshore Dredge Material Management Site(IDMMS)permit developmentisin progress.
Carolina Beach CSDR Project, Beach Renourishment Evaluation Report (BRER).
Risk ReductionPlan(non-federal BRER requirement)anticipated in November 2016.
WB/Kure Beach (KB)CSDREconomic Updateby the USACE
USACE’sstakeholder meetingwasheld on18 August.
WB/KB benefit cost ratios respectively, 7.6 and 6.0.
o
WB CSDRprojecthas approx. $6M remaining in the construction cost capacity.
o
FY16 CB/KB CSDR Maintenance Events
Final accountingisongoing.
Carolina Beach Inlet
The nextMerrittmaintenance event isscheduled for tendays inSept/Oct.
Thenextquarterly Shallow DraftInletStakeholders’ meeting is in New Bern on August 22.
Shoreline Mapping
The 2016mappingdata presentation is scheduled for the November PWBC meeting.
Outreach:
Public Comment:
Adjourn