Loading...
HomeMy WebLinkAboutS17-02 TIA 3.8.17Project Number: 160257 Date: January 6, 2017 Prepared for Yosef, LLC Buy Quick Convenience Store New Hanover County, NC 1/6/17 160257 Buy Quick Convenience Mart – Executive Summary i Buy Quick Convenience Store – Transportation Impact Analysis New Hanover County, NC Prepared for Yosef, LLC January 6, 2017 Executive Summary The proposed Buy Quick Convenience Store is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. The proposed development will include 8,000 square feet of office and a gas station with convenience mart and car wash with 16 vehicle fueling positions. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • US 17 Business (Market Street) at SR 2734 (Marsh Oaks Drive)/ SR 2290 (Mendenhall Drive) • US 17 Business (Market Street) at Bump Along Road • US 17 Business (Market Street) U-turn Break (approx. 800 feet south from Alexander Road) • Bump Along Road at Site Access 1 • Bump Along Road at Site Access 2 • SR 2146 (Raintree Road) at Site Access 3 As part of the analysis, the Wilmington Metropolitan Planning Organization (WMPO) has requested that the study include two (2) alternatives: Alternative 1 includes connection to Raintree Road and Alternative 2 excludes the connection to Raintree Road. The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions: • 2016 Existing Conditions • 2018 Future No Build Conditions • 2018 Alternative 1 - Future Build Conditions (With Site Access 3) • 2018 Alternative 1 - Future Build Condition with Mitigation (if necessary) • 2018 Alternative 2 - Future Build Conditions (Without Site Access 3) • 2018 Alternative 2 - Future Build Condition with Mitigation (if necessary) The build-out analysis year for this project was assumed to be 2018. The AM (7-9 am) and PM (4-6 pm) peaks were studied. The WMPO, County and the North Carolina Department of Transportation (NCDOT) were contacted to obtain background information and to ascertain the elements to be 1/6/17 160257 Buy Quick Convenience Mart – Executive Summary ii covered in this Transportation Impact Analysis (TIA). Information regarding the property was provided by Design Solutions. Level of Service Results – Alternative 1 (Connection to Raintree Road) The following section discusses level of service for each intersection. Market Street at Marsh Oaks Drive This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2018 future no build conditions, LOS C is expected in the AM peak and LOS D in the PM peak. With the addition of proposed site traffic, LOS D is expected in the AM and PM peaks. No improvements are recommended. Market Street at Bump Along Road This unsignalized intersection currently operates at LOS A during the AM peak and LOS B in the PM peak. In 2018 future no build condition, LOS B is expected in the AM and PM peaks With the addition of proposed site traffic, LOS B is expected in the AM and PM peaks. Since Bump Along Road is the main entry into the development and based on NCDOT Driveway Manual, it is recommended to provide a southbound right turn lane with 175 feet of storage with 50 feet of full lane width deceleration and appropriate taper at this intersection to accommodate the projected site traffic trips. Bump Along Road at Site Access 1 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Bump Along Road at Site Access 2 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Raintree Road at Site Access 3 In 2018 future build condition, LOS A is expected in the AM and PM peaks. Based on the Alternative 1 scenario which considers connection to Raintree Road, it is recommended to provide interconnectivity of the development site to Raintree Road by providing a two-way, two lane road connection matching the pavement width and typical section at the property line. 1/6/17 160257 Buy Quick Convenience Mart – Executive Summary iii Market Street at Future U-turn Break A U-turn break will be built as part of TIP Project U-4902, approximately 800 feet south from Alexander Road, in order to accommodate southbound u-turns o Market Street. In 2018 future no build conditions, LOS B is expected in the AM peak and LOS C in the PM peak. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS F in the PM peak. Based on NCDOT cross-product warrant analysis for channelized directional intersections, a traffic signal is warranted for the southbound u-turn movement in the PM peak future build conditions. However, site u-turning traffic may be less than projected if site trips are more pass-by oriented for the convenience store. Since signal warrants are met during only the PM peak hour and due to the uncertainty of actual future site trip distribution, it is recommended that an evaluation of this u-turn intersection be performed following build-out of the development to confirm whether or not a traffic signal would be required based upon traffic volume warrants, safety, and operational performance. The committed turn lane storage and taper roadway improvements are expected to accommodate the future volumes at this intersection in the unsignalized or signalized condition. If the signalization improvement is provided, this intersection is expected to operate at LOS A in the AM peak and LOS B in the PM peak. The recommended improvements are illustrated in Figure 12 in the report. 1/6/17 160257 Buy Quick Convenience Mart – Executive Summary iv Level of Service Summary Table A summarizes the level of service analysis at the study intersections: Table A - Level of Service Summary AM Peak 2016 Existing 2018 No Build 2018 Build Alternative 1 2018 Build with Improvements Alternative 1 Market Street at Marsh Oaks Drive C (20.6) C (31.3) D (36.4) Market Street at Bump Along Road A (9.9) EB Approach B (10.5) EB Approach B (12.4) EB Approach B (12.3) EB Approach Bump Along Road at Site Access 1 A (8.7) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Raintree Road at Site Access 3 A (0) NB Approach Market Street at U-turn B (14.4) EB Approach C (16.6) EB Approach A (8.5) Signalized PM Peak 2016 Existing 2018 No Build 2018 Build Alternative 1 2018 Build with Improvements Alternative 1 Market Street at Marsh Oaks Drive C (20.4) D (35.2) D (42.3) Market Street at Bump Along Road B (10.2) EB Approach B (10.5) EB Approach B (14.3) EB Approach B (13.9) EB Approach Bump Along Road at Site Access 1 A (9.1) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Raintree Road at Site Access 3 A (0) NB Approach Market Street at U-turn C (23.7) EB Approach F (50.4) EB Approach B (14.0) Signalized LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay 1/6/17 160257 Buy Quick Convenience Mart – Executive Summary v Level of Service Results – Alternative 2 (Without Connection to Raintree Road) Alternative 2 illustrates the development without the access to Raintree Road. All intersections retained the same level of service and are expected to function with the same recommended improvements as Alternative 1. Figure 13 illustrates the recommended improvements for this alternative in the report. Level of Service Summary Table B presents the summary of the level of service analysis. Table B - Level of Service Summary AM Peak 2016 Existing 2018 No Build 2018 Build Alternative 2 2018 Build with Improvements Alternative 2 Market Street at Marsh Oaks Drive C (20.6) C (31.3) D (36.8) Market Street at Bump Along Road A (9.9) EB Approach B (10.5) EB Approach B (12.6) EB Approach B (12.4) EB Approach Bump Along Road at Site Access 1 A (8.7) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Market Street at U-turn B (14.4) EB Approach C (16.6) EB Approach A (8.5) Signalized PM Peak 2016 Existing 2018 No Build 2018 Build Alternative 2 2018 Build with Improvements Alternative 2 Market Street at Marsh Oaks Drive C (20.4) D (35.2) D (42.5) Market Street at Bump Along Road B (10.2) EB Approach B (10.5) EB Approach B (14.6) EB Approach B (14.2) EB Approach Bump Along Road at Site Access 1 A (9.1) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Market Street at U-turn C (23.7) EB Approach F (50.4) EB Approach B (14.0) Signalized LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay 1/6/17 160257 Buy Quick Convenience Mart – Executive Summary vi Summary and Conclusion The proposed Buy Quick Convenience Store is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. The proposed development will include 8,000 square feet of office and a gas station with convenience mart and car wash with 16 vehicle fueling positions. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 9th Edition), this development has a trip generation potential of 214 trips in the AM peak and 310 trips in the PM peak. Based on the analysis, it is expected that each study intersection is to operate at LOS D or better in the AM and PM peaks with recommended improvements for Alternative 1 and Alternative 2. For both alternatives, it is recommended to provide a southbound right turn lane of 175 feet of storage with 50 feet of full lane width deceleration and appropriate taper to the intersection of US 17 Business (Market Street) and Bump Along Road. It is also recommended to evaluate signalization to the U-turn at Market Street based on the cross-product analysis after the development is built. The turn lane warrant analysis indicates the site accesses on Bump Along Road are not expected to warrant turn lanes due to the low traffic volumes. In conclusion, this study has reviewed the impacts of both background traffic and this development traffic, and has determined that with the recommended improvements in place, there will be adequate capacity to accommodate future traffic. The final design of these improvements will need to be coordinated during the site plan approval process. Please note that all accesses to the site are required to be constructed to NCDOT standards. 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 1 Buy Quick Convenience Store – Transportation Impact Analysis New Hanover County, NC Prepared for Yosef, LLC January 6, 2017 Table of Contents 1.0 Introduction ............................................................................................................. 2 Figure 1 – Site Plan ..................................................................................................... 4 Figure 2A – Site Location Map .................................................................................... 5 Figure 2B – Vicinity Map .............................................................................................. 6 2.0 Existing Conditions ................................................................................................ 7 2.1 Inventory ................................................................................................................ 7 2.2 Existing Traffic Volumes ........................................................................................ 7 Figure 3 – Existing Lane Geometry ............................................................................. 8 Figure 4 – 2016 Existing Traffic Volumes .................................................................... 9 3.0 Approved Developments and Committed Improvements ................................. 10 3.1 Approved Developments ...................................................................................... 10 3.2 Committed Improvements .................................................................................... 10 4.0 Methodology ......................................................................................................... 11 4.1 Base Assumptions and Standards ....................................................................... 11 4.2 Trip Generation .................................................................................................... 11 4.3 Trip Distribution .................................................................................................... 12 4.4 2018 Future No Build Traffic ................................................................................ 12 4.5 2018 Future Build Total Traffic ............................................................................. 12 Figure 5 – Alternative 1 – Primary Trip Distribution ................................................... 13 Figure 6 – Alternative 2 – Primary Trip Distribution ................................................... 14 Figure 7 – 2018 Future No Build Volumes ................................................................. 15 Figure 8 – Alternative 1 – Primary Site Trips ............................................................. 16 Figure 9 – Alternative 2 – Primary Site Trips ............................................................. 17 Figure 10 – Alternative 1 – 2018 Future Build Volumes ............................................. 18 Figure 11 – Alternative 2 – 2018 Future Build Volumes ............................................. 19 5.0 Capacity Analysis ................................................................................................. 20 5.1 Level of Service Evaluation Criteria ..................................................................... 20 5.2 Level of Service Results – Alternative 1 (Connection to Raintree Road) ............. 21 5.3 Level of Service Summary ................................................................................... 23 Figure 12 – Alternative 1 – Recommended Improvements ........................................ 24 5.4 Level of Service Results – Alternative 2 (Without Connection to Raintree Road) 25 5.5 Level of Service Summary ................................................................................... 25 Figure 13 – Alternative 2 – Recommended Improvements ........................................ 26 6.0 Summary and Conclusion ................................................................................... 27 Appendix ...................................................................................................................... 28 Trip Generation .......................................................................................................... 29 Level of Service Analysis ........................................................................................... 30 Traffic Volume Data ................................................................................................... 37 Supporting Documentation ........................................................................................ 38 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 2 Buy Quick Convenience Store – Transportation Impact Analysis New Hanover County, NC Prepared for Yosef, LLC January 6, 2017 1.0 Introduction The proposed Buy Quick Convenience Store is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. The proposed development will include 8,000 square feet of office and a gas station with convenience mart and car wash with 16 vehicle fueling positions. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. Figure 1 shows the site plan. The site location and vicinity map are illustrated in Figures 2A and 2B, respectively. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • US 17 Business (Market Street) at SR 2734 (Marsh Oaks Drive)/ SR 2290 (Mendenhall Drive) • US 17 Business (Market Street) at Bump Along Road • US 17 Business (Market Street) U-turn Break (approx. 800 feet south from Alexander Road) • Bump Along Road at Site Access 1 • Bump Along Road at Site Access 2 • SR 2146 (Raintree Road) at Site Access 3 As part of the analysis, the Wilmington Metropolitan Planning Organization (WMPO) has requested that the study include two (2) alternatives: Alternative 1 includes connection to Raintree Road and Alternative 2 excludes the connection to Raintree Road. The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions: • 2016 Existing Conditions • 2018 Future No Build Conditions • 2018 Alternative 1 - Future Build Conditions (With Site Access 3) • 2018 Alternative 1 - Future Build Condition with Mitigation (if necessary) • 2018 Alternative 2 - Future Build Conditions (Without Site Access 3) • 2018 Alternative 2 - Future Build Condition with Mitigation (if necessary) The build-out analysis year for this project was assumed to be 2018. The AM (7-9 am) and PM (4-6 pm) peaks were studied. 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 3 The WMPO, County and the North Carolina Department of Transportation (NCDOT) were contacted to obtain background information and to ascertain the elements to be covered in this Transportation Impact Analysis (TIA). Information regarding the property was provided by Design Solutions. US 17 Business (Market Street) at Bump Along Road Facing East FIGURE 1 SITE PLAN FIGURE 2A SITE LOCATION MAP SITE INDICATOR FIGURE 2B VICINITY MAP STUDY INTERSECTIONS EXISTING PROPOSED 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 7 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 contains the results of this effort. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Market Street US 17 BUS 5 lane undivided Approx. 63’ 45 MPH NCDOT Marsh Oaks Drive SR 2734 2 lane undivided Approx. 34’ 35 MPH NCDOT Mendenhall Road SR 2290 2 lane undivided Approx. 27’ 55 MPH* NCDOT Bump Along Road N/A 1 lane undivided Approx. 12’ Not Posted City of Wilmington Raintree Road SR 2146 2 lane undivided Approx. 22’ 55 MPH* NCDOT *According to NCDOT Speed Limit Maps 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT staff. Table 2.2 contains the dates these counts were conducted. Traffic volumes were balanced between the study intersections by using the greater of adjacent volumes. School was in session at the time of traffic counts. Figure 4 shows existing AM and PM peak hour volumes. More information can be found in the Traffic Volume Data section of the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: By: US 17 BUS (Market Street) at Marsh Oaks Drive 3/9/2016 1/4/2017 DAVENPORT US 17 BUS (Market Street) at Bump Along Road 12/13/2016 DAVENPORT SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND SPEED LIMIT 45 20 0 ' 125' Mendenhall Drive Marsh Oaks Drive SPEED LIMIT 35 15 0 ' FU L L TL 2013 AADT VOLUME10,000 32,000 125' *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE3 EXISTINGLANE GEOMETRY US 1 7 B u s i n e s s (M a r k e t S t r e e t ) TW L T SPEEDLIMIT45 Bump Along  Road ~4 6 5 ' SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 106 / 66 131 / 6915 5 3 / 1 6 3 9 11 3 3 / 1 6 8 1 20 / 20 21 / 11 9 / 1 1 30 / 3 8 6 / 7 3 / 2 32 / 1 1 8 38 / 8 9 0 / 0 26 / 2 8 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT 17 0 5 / 1 7 1 6 12 0 1 / 1 8 0 8 0 / 0 1 / 2 0 / 3 1 / 1 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 4 EXISTING TRAFFIC VOLUMES US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Alexander Road Ra i n t r e e Ro a d 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 10 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per WMPO staff, there are two (2) approved developments to be considered in this analysis, the ALDI at Marsh Oaks and Amberleigh Shores Phase 2. The ALDI at Marsh Oaks’ TIA was conducted by DAVENPORT in June 2016. This development is planned to consist of 18,900 square feet of discount supermarket and will be located at the southeast corner of US 17 Business (Market Street) and Marsh Oaks Road. The Amberleigh Shores development TIA was conducted by Ramey Kemp & Associates in April 2016 and it is partially constructed. The portion remaining to be built is Phase 2, which will consist of 288 apartment units and is located east of Market Street at its intersection with Alexander Road and south of Marsh Oaks Drive. Site trips for these developments were incorporated in the analysis based on the TIA for each development, and Figure A in the Appendix illustrates these traffic volumes. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a developer in the area, but not yet constructed. Per WMPO, there is one (1) committed improvement in the study area. NCDOT TIP U-4902 C/D is a roadway improvement project that consists of two parts. U-4902 C is adjacent to the proposed development, which will consist of median installation on US 17 Business (Market Street) from Lendire Road to Marsh Oaks Drive. The anticipated completion date is 2018. Imporovements identified in the TIA for the Amberleigh Shores approved development were also included in the analysis. Therefore, both improvement projects were incorporated in the analysis. More information on the above mentioned projects can be found in the Supporting Documentation in the Appendix. 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 11 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 1.0% per year for all roadways Analysis Software Synchro/SimTraffic Version 9.0 Base Signal Timing/Phasing City of Wilmington/ NCDOT Lane widths 12-feet Truck percentages 2% 4.2 Trip Generation Trips for this development were projected using TripGen 2013 software, based on the 9th edition of ITE Trip Generation Manual. Table 4.2 presents the results. Table 4.2 - ITE Trip Generation Buy Quick Convenience Store Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Method - Type Volume Enter Exit Enter Exit Office 710 8.00 Th.Sq.Ft. GFA Equation - Adjacent 193 22 3 15 73 Gas Station with Convenience Mart and Car Wash 946 16 Vehicle Fueling Positions Rate - Adjacent 2,445 96 93 113 109 Total Trips 2,638 118 96 128 182 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 12 4.3 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The trip distribution model is shown in Figure 5 and Figure 6 for the two alternatives, and the directional distributions for site trips are as follows: • 45% to and from the north on Market Street • 40% to and from the south on Market Street (45% for Alternative 2) • 10% to and from the east on Marsh Oaks Drive • 5% to and from south Raintree Road (for Alternative 1 only) 4.4 2018 Future No Build Traffic The 2018 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2016 existing traffic volumes and adding approved development trips. During the future year 2018, NCDOT TIP U-4902 was assumed to be in place. With this committed improvement, it is assumed there will be rerouted trips due to the limited access on Market Street. Therefore, rerouted volumes is illustrated in Figure B in the Appendix. Figure 7 shows 2018 future no build traffic volumes for AM and PM peaks. 4.5 2018 Future Build Total Traffic The 2018 build-out traffic volume was obtained by summing the 2018 future no build volumes and site trips due to the proposed development. Site trips for the two alternatives are shown in Figures 8 and 9, respectively. The 2018 future build volumes are shown for AM and PM peaks in Figures 10 and 11 for the two alternatives. More information can be found in the Traffic Volume Data section of the Appendix. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND Mendenhall Drive Marsh Oaks Drive DESTINATION NODE% 45% 10% 10% IN 10 % O U T 95% OUT 95 % I N 45 % I N usi n e s s Str e e t ) Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road 3 40 % I N 45 % O U T 85% IN10% IN 85 % O U T 10 % O U T RIGHTIN / RIGHTOUT DIRECTIONAL CROSSOVER 10% OUT 10% IN 40 % I N + 55 % O U T T *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. 40% FIGURE5 ALTERNATIVE 1 PRIMARY TRIP DISTRIBUTION US 1 7 B u (M a r k e t S Alexander Road Si t e Ac c e s s 3 Ra i n t r e e Ro a d 95 % O U T 40 % I N + 55 % O U T 55 % O U T 40 % O U T 40 % I N 5% O U T 5% I N 5% SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND Mendenhall Drive Marsh Oaks Drive DESTINATION NODE% 45% 10% 10% IN 10 % O U T 100% OUT 10 0 % I N 45 % I N usi n e s s Str e e t ) Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road 45 % I N 45 % O U T 90% IN10% IN 90 % O U T 10 % O U T RIGHTIN / RIGHTOUT DIRECTIONAL CROSSOVER 45 % I N + 55 % O U T 10% OUT 10% IN *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. 45% FIGURE6 ALTERNATIVE 2 PRIMARY TRIP DISTRIBUTION US 1 7 B u (M a r k e t S Alexander Road Ra i n t r e e Ro a d 10 0 % O U T 45 % I N + 55 % O U T 55 % O U T 45 % O U T 45 % I N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 108 / 104 163 / 12815 8 4 / 1 6 6 6 12 2 0 / 1 7 4 1 20 / 20 21 / 11 9 / 1 1 31 / 3 9 6 / 7 3 / 2 45 / 2 0 0 39 / 9 1 42 / 2 2 27 / 2 9 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT 18 0 9 / 1 8 2 3 13 3 1 / 1 9 3 7 1 / 2 1 / 4 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 7 2018 FUTURE NO BUILD VOLUMES US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Alexander Road 19 1 1 / 1 7 3 8 11 6 1 / 1 9 9 5 Ra i n t r e e Ro a d 18 / 1 0 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 0 / 0 12 / 1353 / 5 8 43 / 8 2 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 10 / 1 8 47 / 5 1 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive Marsh Oaks Drive e ss1 e ss2 Bump Along Road RIGHTIN / RIGHTOUT 0 / 0 10 0 / 1 5 1 91 / 173 11 2 / 1 2 2 100 / 109 0 / 0 0 / 0 12 / 13 10 / 18 82 / 1 5 5 12 / 13 0 / 0 0 / 0 0 / 0 0 / 0 10 / 1 8 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 8 ALTERNATIVE 1 - PRIMARY SITE TRIPS US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s Si t Ac c e s Alexander Road 43 / 8 2 53 / 5 8 Si t e Ac c e s s 3 Ra i n t r e e Ro a d 5 / 9 6 / 6 53 / 1 0 0 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 0 / 0 12 / 1353 / 5 8 43 / 8 2 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 10 / 1 8 53 / 5 8 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive Marsh Oaks Drive e ss1 e ss2 Bump Along Road RIGHTIN / RIGHTOUT 0 / 0 10 6 / 1 5 8 96 / 182 11 8 / 1 2 8 106 / 115 0 / 0 0 / 0 12 / 13 10 / 18 86 / 1 6 4 12 / 13 0 / 0 0 / 0 0 / 0 0 / 0 10 / 1 8 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 9 ALTERNATIVE 2 - PRIMARY SITE TRIPS US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s Si t Ac c e s Alexander Road 43 / 8 2 53 / 5 8 Ra i n t r e e Ro a d 53 / 1 0 0 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 108 / 104 175 / 14116 3 7 / 1 7 2 4 12 6 3 / 1 8 2 3 20 / 20 21 / 11 9 / 1 1 31 / 3 9 6 / 7 3 / 2 45 / 2 0 0 49 / 1 0 9 89 / 7 3 27 / 2 9 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive Marsh Oaks Drive e ss1 e ss2 Bump Along Road RIGHTIN / RIGHTOUT 18 0 9 / 1 8 2 3 14 3 1 / 2 0 8 8 92 / 175 11 3 / 1 2 6 100 / 109 0 / 0 0 / 0 13 / 17 11 / 20 82 / 1 5 5 12 / 13 0 / 0 0 / 0 1 / 4 1 / 2 10 / 1 8 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 10 ALTERNATIVE 1 - 2018 FUTURE BUILD US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s Si t Ac c e s Alexander Road 19 5 4 / 1 8 2 0 12 1 4 / 2 0 5 3 Si t e Ac c e s s 3 Ra i n t r e e Ro a d 5 / 9 6 / 6 71 / 1 1 0 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 108 / 104 175 / 14116 3 7 / 1 7 2 4 12 6 3 / 1 8 2 3 20 / 20 21 / 11 9 / 1 1 31 / 3 9 6 / 7 3 / 2 45 / 2 0 0 49 / 1 0 9 95 / 8 0 27 / 2 9 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive Marsh Oaks Drive e ss1 e ss2 Bump Along Road RIGHTIN / RIGHTOUT 18 0 9 / 1 8 2 3 14 3 7 / 2 0 9 5 97 / 184 11 9 / 1 3 2 106 / 115 0 / 0 0 / 0 13 / 17 11 / 20 86 / 1 6 4 12 / 13 0 / 0 0 / 0 1 / 4 1 / 2 10 / 1 8 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 11 ALTERNATIVE 2 - 2018 FUTURE BUILD US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s Si t Ac c e s Alexander Road 19 5 4 / 1 8 2 0 12 1 4 / 2 0 5 3 Ra i n t r e e Ro a d 71 / 1 1 0 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 20 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents the best conditions and Level of Service “F” represents the worst. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A ≤ 10 A ≤ 10 B > 10 and ≤ 20 B > 10 and ≤ 15 C > 20 and ≤ 35 C > 15 and ≤ 25 D > 35 and ≤ 55 D > 25 and ≤ 35 E > 55 and ≤ 80 E > 35 and ≤ 50 F > 80 F > 50 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 21 5.2 Level of Service Results – Alternative 1 (Connection to Raintree Road) The following section discusses level of service for each intersection. Market Street at Marsh Oaks Drive This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2018 future no build conditions, LOS C is expected in the AM peak and LOS D in the PM peak. With the addition of proposed site traffic, LOS D is expected in the AM and PM peaks. No improvements are recommended. Market Street at Bump Along Road This unsignalized intersection currently operates at LOS A during the AM peak and LOS B in the PM peak. In 2018 future no build condition, LOS B is expected in the AM and PM peaks With the addition of proposed site traffic, LOS B is expected in the AM and PM peaks. Since Bump Along Road is the main entry into the development and based on NCDOT Driveway Manual, it is recommended to provide a southbound right turn lane with 175 feet of storage with 50 feet of full lane width deceleration and appropriate taper at this intersection to accommodate the projected site traffic trips. Bump Along Road at Site Access 1 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Bump Along Road at Site Access 2 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Raintree Road at Site Access 3 In 2018 future build condition, LOS A is expected in the AM and PM peaks. Based on the Alternative 1 scenario which considers connection to Raintree Road, it is recommended to provide interconnectivity of the development site to Raintree Road by providing a two-way, two lane road connection matching the pavement width and typical section at the property line. 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 22 Market Street at Future U-turn Break A U-turn break will be built as part of TIP Project U-4902, approximately 800 feet south from Alexander Road, in order to accommodate southbound u-turns o Market Street. In 2018 future no build conditions, LOS B is expected in the AM peak and LOS C in the PM peak. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS F in the PM peak. Based on NCDOT cross-product warrant analysis for channelized directional intersections, a traffic signal is warranted for the southbound u-turn movement in the PM peak future build conditions. However, site u-turning traffic may be less than projected if site trips are more pass-by oriented for the convenience store. Since signal warrants are met during only the PM peak hour and due to the uncertainty of actual future site trip distribution, it is recommended that an evaluation of this u-turn intersection be performed following build-out of the development to confirm whether or not a traffic signal would be required based upon traffic volume warrants, safety, and operational performance. The committed turn lane storage and taper roadway improvements are expected to accommodate the future volumes at this intersection in the unsignalized or signalized condition. If the signalization improvement is provided, this intersection is expected to operate at LOS A in the AM peak and LOS B in the PM peak. The recommended improvements are illustrated in Figure 12. 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 23 5.3 Level of Service Summary Table 5.2 summarizes the level of service analysis at the study intersections: Table 5.2 - Level of Service Summary AM Peak 2016 Existing 2018 No Build 2018 Build Alternative 1 2018 Build with Improvements Alternative 1 Market Street at Marsh Oaks Drive C (20.6) C (31.3) D (36.4) Market Street at Bump Along Road A (9.9) EB Approach B (10.5) EB Approach B (12.4) EB Approach B (12.3) EB Approach Bump Along Road at Site Access 1 A (8.7) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Raintree Road at Site Access 3 A (0) NB Approach Market Street at U-turn B (14.4) EB Approach C (16.6) EB Approach A (8.5) Signalized PM Peak 2016 Existing 2018 No Build 2018 Build Alternative 1 2018 Build with Improvements Alternative 1 Market Street at Marsh Oaks Drive C (20.4) D (35.2) D (42.3) Market Street at Bump Along Road B (10.2) EB Approach B (10.5) EB Approach B (14.3) EB Approach B (13.9) EB Approach Bump Along Road at Site Access 1 A (9.1) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Raintree Road at Site Access 3 A (0) NB Approach Market Street at U-turn C (23.7) EB Approach F (50.4) EB Approach B (14.0) Signalized LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 40 0 ' 125' Mendenhall Drive Marsh Oaks Drive 50 0 ' FU L L 125' Bump Along  Road 2 17 5 ' s 1 *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE12 ALTERNATIVE 1 - RECOMMENDED IMPROVEMENTS US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s s 2 Alexander Road Si t e Ac c e s s 3 Ra i n t r e e Ro a d 30 0 ' 30 0 ' Si t e Ac c e s s 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 25 5.4 Level of Service Results – Alternative 2 (Without Connection to Raintree Road) Alternative 2 illustrates the development without the access to Raintree Road. All intersections retained the same level of service and are expected to function with the same recommended improvements as Alternative 1. Figure 13 illustrates the recommended improvements for this alternative. 5.5 Level of Service Summary Table 5.3 presents the summary of the level of service analysis. Table 5.3 - Level of Service Summary AM Peak 2016 Existing 2018 No Build 2018 Build Alternative 2 2018 Build with Improvements Alternative 2 Market Street at Marsh Oaks Drive C (20.6) C (31.3) D (36.8) Market Street at Bump Along Road A (9.9) EB Approach B (10.5) EB Approach B (12.6) EB Approach B (12.4) EB Approach Bump Along Road at Site Access 1 A (8.7) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Market Street at U-turn B (14.4) EB Approach C (16.6) EB Approach A (8.5) Signalized PM Peak 2016 Existing 2018 No Build 2018 Build Alternative 2 2018 Build with Improvements Alternative 2 Market Street at Marsh Oaks Drive C (20.4) D (35.2) D (42.5) Market Street at Bump Along Road B (10.2) EB Approach B (10.5) EB Approach B (14.6) EB Approach B (14.2) EB Approach Bump Along Road at Site Access 1 A (9.1) NB Approach Bump Along Road at Site Access 2 A (8.4) NB Approach Market Street at U-turn C (23.7) EB Approach F (50.4) EB Approach B (14.0) Signalized LOS (delay in seconds) Note for unsignalized conditions, LOS and delay indicates only minor street approach with longest delay SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 40 0 ' 125' Mendenhall Drive Marsh Oaks Drive 50 0 ' FU L L 125' Bump Along  Road 2 17 5 ' s 1 *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE13 ALTERNATIVE 2 - RECOMMENDED IMPROVEMENTS US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s s 2 Alexander Road Ra i n t r e e Ro a d 30 0 ' 30 0 ' Si t e Ac c e s s 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 27 6.0 Summary and Conclusion The proposed Buy Quick Convenience Store is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. The proposed development will include 8,000 square feet of office and a gas station with convenience mart and car wash with 16 vehicle fueling positions. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 9th Edition), this development has a trip generation potential of 214 trips in the AM peak and 310 trips in the PM peak. Based on the analysis, it is expected that each study intersection is to operate at LOS D or better in the AM and PM peaks with recommended improvements for Alternative 1 and Alternative 2. For both alternatives, it is recommended to provide a southbound right turn lane of 175 feet of storage with 50 feet of full lane width deceleration and appropriate taper to the intersection of US 17 Business (Market Street) and Bump Along Road. It is also recommended to evaluate signalization to the U-turn at Market Street based on the cross-product analysis after the development is built. The turn lane warrant analysis indicates the site accesses on Bump Along Road are not expected to warrant turn lanes due to the low traffic volumes. In conclusion, this study has reviewed the impacts of both background traffic and this development traffic, and has determined that with the recommended improvements in place, there will be adequate capacity to accommodate future traffic. The final design of these improvements will need to be coordinated during the site plan approval process. Please note that all accesses to the site are required to be constructed to NCDOT standards. 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 28 Appendix 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 29 Trip Generation Trip Generation Summary - Alternative 1 Project: Alternative: Open Date: Analysis Date: 160257 Alternative 1 8/19/2016 8/19/2016 ITE Land Use Enter Exit Enter Exit Average Daily Trips Enter Exit TotalTotalTotal AM Peak Hour of Adjacent Street Traffic PM Peak Hour of Adjacent Street Traffic 710OFFICEGENERAL 1 8Gross Floor Area 1000 SF 877215253221939697 946GASMARKETWASH 1 16Vehicle Fueling Positions 2221091131899396244512221223 Unadjusted Volume 13201318263811896214128181309 Internal Capture Trips000000000 000000000 13201318263811896214128181309 Pass-By Trips Volume Added to Adjacent Streets Total AM Peak Hour Internal Capture = 0 Percent Total PM Peak Hour Internal Capture = 0 Percent 1TRIP GENERATION 2014, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 30 Level of Service Analysis 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 31 US 17 BUS (Market Street) at Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart AM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBUSBLSBT Lane Configurations Traffic Volume (vph)2032113161063011333826321553 Future Volume (vph)2032113161063011333826321553 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)012501251500200 Storage Lanes0101111 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.8500.999 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583177035391583017703536 Flt Permitted0.6430.7180.0820.170 Satd. Flow (perm)0119815830133715831533539158303173536 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)55354545 Link Distance (ft)6857344291243 Travel Time (s)8.514.36.518.8 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)2232314671183312594229361726 Shared Lane Traffic (%) Lane Group Flow (vph)025230153118331259420651736 Turn TypePermNApm+ovPermNApm+ovpm+ptNAPermcustompm+ptNA Protected Phases4581!5216 Permitted Phases4488221!6 Detector Phase 445881522116 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.012.012.07.07.012.0 Minimum Split (s)24.624.613.324.624.613.313.324.524.513.313.324.5 Total Split (s)45.045.020.045.045.020.020.087.087.020.020.087.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%57.2%57.2%13.2%13.2%57.2% Maximum Green (s)38.438.413.738.438.413.713.780.580.513.713.780.5 Yellow Time (s)3.83.83.03.83.83.03.04.54.53.03.04.5 All-Red Time (s)2.82.83.32.82.83.33.32.02.03.33.32.0 Lost Time Adjust (s)0.00.00.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.56.36.5 Lead/LagLeadLeadLeadLagLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNoneNoneC-Min Act Effct Green (s)22.736.422.736.7109.7102.5102.5111.7105.5 Actuated g/C Ratio0.150.240.150.240.720.670.670.730.69 v/c Ratio0.140.060.770.310.180.530.040.210.71 Control Delay54.741.985.047.87.814.410.17.117.9 Queue Delay0.00.00.00.00.00.00.00.00.0 Total Delay54.741.985.047.87.814.410.17.117.9 LOSDDFDABBAB Approach Delay48.668.814.117.5 Approach LOSDEBB Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart AM Existing Dionne C. Brown, PE Page 2 Lane GroupSBR Lane Configurations Traffic Volume (vph)9 Future Volume (vph)9 Ideal Flow (vphpl)1900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.95 Frt Flt Protected Satd. Flow (prot)0 Flt Permitted Satd. Flow (perm)0 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor0.90 Adj. Flow (vph)10 Shared Lane Traffic (%) Lane Group Flow (vph)0 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart AM Existing Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBUSBLSBT Queue Length 50th (ft)22181489773081314538 Queue Length 95th (ft)4940218145204453333748 Internal Link Dist (ft)6056543491163 Turn Bay Length (ft)125125150200 Base Capacity (vph)302448337448262238510673732453 Starvation Cap Reductn00 0000000 Spillback Cap Reductn00 0000000 Storage Cap Reductn00 0000000 Reduced v/c Ratio0.080.050.450.260.130.530.040.170.71 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 20.6Intersection LOS: C Intersection Capacity Utilization 73.4%ICU Level of Service D Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart AM Existing Dionne C. Brown, PE Page 4 Lane GroupSBR Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart AM No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)20321163610842311220392745 Future Volume (vph)20321163610842311220392745 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500400 Storage Lanes01 01111 Taper Length (ft)25250100 Lane Util. Factor1.001.001.001.001.001.000.951.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583017703539158301770 Flt Permitted0.6570.7160.9500.950 Satd. Flow (perm)012241583013341583017703539158301770 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22323181712047341356433050 Shared Lane Traffic (%) Lane Group Flow (vph)025230188120081135643080 Turn TypePermNApm+ovPermNApm+ovpm+ptProtNAPermProtProt Protected Phases45!81!5!521!1 Permitted Phases44882!2 Detector Phase 445881552211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.615.324.624.615.315.315.324.524.515.315.3 Total Split (s)45.045.020.045.045.020.020.020.087.087.020.020.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%13.2%57.2%57.2%13.2%13.2% Maximum Green (s)38.038.013.038.038.013.013.013.080.080.013.013.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLeadLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNoneNone Act Effct Green (s)28.747.528.755.113.886.986.921.4 Actuated g/C Ratio0.190.310.190.360.090.570.570.14 v/c Ratio0.110.050.750.210.500.670.050.32 Control Delay48.732.475.532.676.226.117.262.2 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay48.732.475.532.676.226.117.262.2 LOSDCECECBE Approach Delay40.958.828.6 Approach LOSDEC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart AM No Build Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)15849 Future Volume (vph)15849 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)176010 Shared Lane Traffic (%) Lane Group Flow (vph)17700 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)87.0 Total Split (%)57.2% Maximum Green (s)80.0 Yellow Time (s)5.0 All-Red Time (s)2.0 Lost Time Adjust (s)-2.0 Total Lost Time (s)5.0 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Min Act Effct Green (s)94.5 Actuated g/C Ratio0.62 v/c Ratio0.81 Control Delay27.2 Queue Delay0.0 Total Delay27.2 LOSC Approach Delay28.7 Approach LOSC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart AM No Build Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Queue Length 50th (ft)211617880784901971 Queue Length 95th (ft)463425112313462142131 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125400 Base Capacity (vph)3225133515741812060921249 Starvation Cap Reductn00000000 Spillback Cap Reductn00000000 Storage Cap Reductn00000000 Reduced v/c Ratio0.080.040.540.210.450.660.050.32 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBTU and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 31.3Intersection LOS: C Intersection Capacity Utilization 81.8%ICU Level of Service D Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart AM No Build Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)675 Queue Length 95th (ft)957 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2197 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.81 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)20321175610889311263492745 Future Volume (vph)20321175610889311263492745 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500400 Storage Lanes01 01111 Taper Length (ft)25250100 Lane Util. Factor1.001.001.001.001.001.000.951.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583017703539158301770 Flt Permitted0.6530.7150.9500.950 Satd. Flow (perm)012161583013321583017703539158301770 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22323194712099341403543050 Shared Lane Traffic (%) Lane Group Flow (vph)0252302011200133140354080 Turn TypePermNApm+ovPermNApm+ovProtProtNAPermProtProt Protected Phases45!81!5!521!1 Permitted Phases44882 Detector Phase 445881552211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.615.324.624.615.315.315.324.524.515.315.3 Total Split (s)45.045.020.045.045.020.020.020.087.087.020.020.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%13.2%57.2%57.2%13.2%13.2% Maximum Green (s)38.038.013.038.038.013.013.013.080.080.013.013.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLeadLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNoneNone Act Effct Green (s)30.252.330.259.317.182.782.724.2 Actuated g/C Ratio0.200.340.200.390.110.540.540.16 v/c Ratio0.100.040.760.190.670.730.060.28 Control Delay47.430.075.230.481.029.918.260.3 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay47.430.075.230.481.029.918.260.3 LOSDCECFCBE Approach Delay39.158.533.8 Approach LOSDEC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)16379 Future Volume (vph)16379 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)181910 Shared Lane Traffic (%) Lane Group Flow (vph)18290 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)87.0 Total Split (%)57.2% Maximum Green (s)80.0 Yellow Time (s)5.0 All-Red Time (s)2.0 Lost Time Adjust (s)-2.0 Total Lost Time (s)5.0 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Min Act Effct Green (s)89.7 Actuated g/C Ratio0.59 v/c Ratio0.88 Control Delay33.7 Queue Delay0.0 Total Delay33.7 LOSC Approach Delay34.8 Approach LOSC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Queue Length 50th (ft)2115190721275992767 Queue Length 95th (ft)4634265125#23564449134 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125400 Base Capacity (vph)3205473506172031980885281 Starvation Cap Reductn00000000 Spillback Cap Reductn00000000 Storage Cap Reductn00000000 Reduced v/c Ratio0.080.040.570.190.660.710.060.28 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 36.4Intersection LOS: D Intersection Capacity Utilization 84.7%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)812 Queue Length 95th (ft)#1082 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2087 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.88 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)20321175610895311263492745 Future Volume (vph)20321175610895311263492745 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500400 Storage Lanes01 01111 Taper Length (ft)25250100 Lane Util. Factor1.001.001.001.001.001.000.951.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583017703539158301770 Flt Permitted0.6530.7150.9500.950 Satd. Flow (perm)012161583013321583017703539158301770 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)223231947120106341403543050 Shared Lane Traffic (%) Lane Group Flow (vph)0252302011200140140354080 Turn TypePermNApm+ovPermNApm+ovProtProtNAPermProtProt Protected Phases45!81!5!521!1 Permitted Phases44882 Detector Phase 445881552211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.615.324.624.615.315.315.324.524.515.315.3 Total Split (s)45.045.020.045.045.020.020.020.087.087.020.020.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%13.2%57.2%57.2%13.2%13.2% Maximum Green (s)38.038.013.038.038.013.013.013.080.080.013.013.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLeadLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNoneNone Act Effct Green (s)30.252.730.259.617.682.482.424.4 Actuated g/C Ratio0.200.350.200.390.120.540.540.16 v/c Ratio0.100.040.760.190.680.730.060.28 Control Delay47.429.975.230.381.230.118.260.2 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay47.429.975.230.381.230.118.260.2 LOSDCECFCBE Approach Delay39.058.434.2 Approach LOSDEC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)16379 Future Volume (vph)16379 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)181910 Shared Lane Traffic (%) Lane Group Flow (vph)18290 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)87.0 Total Split (%)57.2% Maximum Green (s)80.0 Yellow Time (s)5.0 All-Red Time (s)2.0 Lost Time Adjust (s)-2.0 Total Lost Time (s)5.0 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Min Act Effct Green (s)89.3 Actuated g/C Ratio0.59 v/c Ratio0.88 Control Delay34.3 Queue Delay0.0 Total Delay34.3 LOSC Approach Delay35.4 Approach LOSD Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Queue Length 50th (ft)2115190721335992767 Queue Length 95th (ft)4634265125#25464449134 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125400 Base Capacity (vph)3205513506202071974882284 Starvation Cap Reductn00000000 Spillback Cap Reductn00000000 Storage Cap Reductn00000000 Reduced v/c Ratio0.080.040.570.190.680.710.060.28 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 36.8Intersection LOS: D Intersection Capacity Utilization 85.0%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)824 Queue Length 95th (ft)#1082 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2076 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.88 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart PM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)202111697663816818928118 Future Volume (vph)202111697663816818928118 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)012501251500200 Storage Lanes 0101111 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9560.9570.9500.950 Satd. Flow (prot)017811583001783158317703539158301770 Flt Permitted0.6700.7280.0650.071 Satd. Flow (perm)0124815830013561583121353915830132 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)222121778734218689931131 Shared Lane Traffic (%) Lane Group Flow (vph)02412008673421868990162 Turn TypePermNApm+ovPermPermNApm+ovpm+ptNAPermpm+ptpm+pt Protected Phases4581!521!1 Permitted Phases44888226!6 Detector Phase 445888152211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.613.324.624.624.613.313.324.524.513.313.3 Total Split (s)30.030.025.030.030.030.030.025.092.092.030.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%60.5%60.5%19.7%19.7% Maximum Green (s)23.423.418.723.423.423.423.718.785.585.523.723.7 Yellow Time (s)3.83.83.03.83.83.83.03.04.54.53.03.0 All-Red Time (s)2.82.83.32.82.82.83.33.32.02.03.33.3 Lost Time Adjust (s)0.00.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.56.3 Lead/LagLeadLagLeadLeadLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNoneNone Act Effct Green (s)14.928.914.934.5104.9104.7104.7113.2 Actuated g/C Ratio0.100.190.100.230.690.690.690.74 v/c Ratio0.200.040.650.200.260.770.090.68 Control Delay64.447.587.046.013.620.29.853.0 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay64.447.587.046.013.620.29.853.0 LOSEDFDBCAD Approach Delay58.868.119.5 Approach LOSEEB Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart PM Existing Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)163911 Future Volume (vph)163911 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)182112 Shared Lane Traffic (%) Lane Group Flow (vph)18330 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)97.0 Total Split (%)63.8% Maximum Green (s)90.5 Yellow Time (s)4.5 All-Red Time (s)2.0 Lost Time Adjust (s)0.0 Total Lost Time (s)6.5 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Min Act Effct Green (s)113.0 Actuated g/C Ratio0.74 v/c Ratio0.70 Control Delay13.7 Queue Delay0.0 Total Delay13.7 LOSB Approach Delay16.9 Approach LOSB Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart PM Existing Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBLNBTNBRSBUSBL Queue Length 50th (ft)22108459125913067 Queue Length 95th (ft)5228140943491368153 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125150200 Base Capacity (vph)19241820835628624371090363 Starvation Cap Reductn00 000000 Spillback Cap Reductn00 000000 Storage Cap Reductn00 000000 Reduced v/c Ratio0.130.030.410.210.150.770.090.45 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 20.4Intersection LOS: C Intersection Capacity Utilization 87.6%ICU Level of Service E Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/31/2017 160257 Buy Quick Convenience Mart PM Existing Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)491 Queue Length 95th (ft)691 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2628 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.70 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart PM No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Lane Configurations Traffic Volume (vph)2021111287104223917419129 Future Volume (vph)2021111287104223917419129 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500 Storage Lanes 010111 Taper Length (ft)25250 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.850 Flt Protected0.9560.9550.950 Satd. Flow (prot)017811583001779158301770353915830 Flt Permitted0.6190.7200.950 Satd. Flow (perm)011531583001341158301770353915830 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553530 Link Distance (ft)685734429 Travel Time (s)8.514.39.8 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22212114281162443193410132 Shared Lane Traffic (%) Lane Group Flow (vph)024120015111606719341010 Turn TypePermNApm+ovPermPermNApm+ovpm+ptProtNAPermProt Protected Phases45!81!5!521! Permitted Phases448882!2 Detector Phase 445888155221 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.07.012.012.07.0 Minimum Split (s)24.624.615.324.624.624.615.315.315.324.524.515.3 Total Split (s)30.030.025.030.030.030.030.025.025.092.092.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%16.4%60.5%60.5%19.7% Maximum Green (s)23.023.018.023.023.023.023.018.018.085.085.023.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNone Act Effct Green (s)22.340.422.351.813.190.290.2 Actuated g/C Ratio0.150.270.150.340.090.590.59 v/c Ratio0.140.030.770.220.440.920.11 Control Delay57.138.186.835.974.136.814.6 Queue Delay0.00.00.00.00.00.00.0 Total Delay57.138.186.835.974.136.814.6 LOSEDFDEDB Approach Delay50.864.736.9 Approach LOSDED Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart PM No Build Dionne C. Brown, PE Page 2 Lane GroupSBLSBTSBR Lane Configurations Traffic Volume (vph)200166611 Future Volume (vph)200166611 Ideal Flow (vphpl)190019001900 Storage Length (ft)4000 Storage Lanes10 Taper Length (ft)100 Lane Util. Factor1.000.950.95 Frt0.999 Flt Protected0.950 Satd. Flow (prot)177035360 Flt Permitted0.950 Satd. Flow (perm)177035360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)30 Link Distance (ft)1243 Travel Time (s)28.3 Peak Hour Factor0.900.900.90 Adj. Flow (vph)222185112 Shared Lane Traffic (%) Lane Group Flow (vph)25418630 Turn TypeProtNA Protected Phases16 Permitted Phases Detector Phase16 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)15.324.5 Total Split (s)30.097.0 Total Split (%)19.7%63.8% Maximum Green (s)23.090.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/LagLagLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)24.5104.4 Actuated g/C Ratio0.160.69 v/c Ratio0.890.77 Control Delay93.720.7 Queue Delay0.00.0 Total Delay93.720.7 LOSFC Approach Delay29.4 Approach LOSC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart PM No Build Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Queue Length 50th (ft)219144806491244 Queue Length 95th (ft)5025#234130115#113074 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125 Base Capacity (vph)1894922205342322100939 Starvation Cap Reductn0000000 Spillback Cap Reductn0000000 Storage Cap Reductn0000000 Reduced v/c Ratio0.130.020.690.220.290.920.11 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBTU and 6:SBT, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 35.2Intersection LOS: D Intersection Capacity Utilization 89.8%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience Mart PM No Build Dionne C. Brown, PE Page 4 Lane GroupSBLSBTSBR Queue Length 50th (ft)249671 Queue Length 95th (ft)#408854 Internal Link Dist (ft)1163 Turn Bay Length (ft)400 Base Capacity (vph)2912427 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.870.77 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Lane Configurations Traffic Volume (vph)20211114171047339182310929 Future Volume (vph)20211114171047339182310929 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500 Storage Lanes 010111 Taper Length (ft)25250 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.850 Flt Protected0.9560.9550.950 Satd. Flow (prot)017811583001779158301770353915830 Flt Permitted0.5970.7190.950 Satd. Flow (perm)011121583001339158301770353915830 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22212115781168143202612132 Shared Lane Traffic (%) Lane Group Flow (vph)0241200166116012420261210 Turn TypePermNApm+ovPermPermNApm+ovProtProtNAPermProt Protected Phases45!81!5!521! Permitted Phases448882 Detector Phase 445888155221 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.07.012.012.07.0 Minimum Split (s)24.624.615.324.624.624.615.315.315.324.524.515.3 Total Split (s)30.030.025.030.030.030.030.025.025.092.092.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%16.4%60.5%60.5%19.7% Maximum Green (s)23.023.018.023.023.023.023.018.018.085.085.023.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNone Act Effct Green (s)23.245.323.252.617.189.489.4 Actuated g/C Ratio0.150.300.150.350.110.590.59 v/c Ratio0.140.030.810.210.630.970.13 Control Delay57.035.391.035.578.045.115.0 Queue Delay0.00.00.00.00.00.00.0 Total Delay57.035.391.035.578.045.115.0 LOSEDFDEDB Approach Delay49.768.245.3 Approach LOSDED Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupSBLSBTSBR Lane Configurations Traffic Volume (vph)200172411 Future Volume (vph)200172411 Ideal Flow (vphpl)190019001900 Storage Length (ft)4000 Storage Lanes10 Taper Length (ft)100 Lane Util. Factor1.000.950.95 Frt0.999 Flt Protected0.950 Satd. Flow (prot)177035360 Flt Permitted0.950 Satd. Flow (perm)177035360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.900.90 Adj. Flow (vph)222191612 Shared Lane Traffic (%) Lane Group Flow (vph)25419280 Turn TypeProtNA Protected Phases16 Permitted Phases Detector Phase16 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)15.324.5 Total Split (s)30.097.0 Total Split (%)19.7%63.8% Maximum Green (s)23.090.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/LagLagLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)24.596.7 Actuated g/C Ratio0.160.64 v/c Ratio0.890.86 Control Delay93.728.1 Queue Delay0.00.0 Total Delay93.728.1 LOSFC Approach Delay35.7 Approach LOSD Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Queue Length 50th (ft)21815979119~102354 Queue Length 95th (ft)5125#271130189#122787 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125 Base Capacity (vph)1825012205422322080930 Starvation Cap Reductn0000000 Spillback Cap Reductn0000000 Storage Cap Reductn0000000 Reduced v/c Ratio0.130.020.750.210.530.970.13 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 42.3Intersection LOS: D Intersection Capacity Utilization 92.0%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 4 Lane GroupSBLSBTSBR Queue Length 50th (ft)249805 Queue Length 95th (ft)#408964 Internal Link Dist (ft)1163 Turn Bay Length (ft)400 Base Capacity (vph)2912250 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.870.86 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Lane Configurations Traffic Volume (vph)20211114171048039182310929 Future Volume (vph)20211114171048039182310929 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500 Storage Lanes 010111 Taper Length (ft)25250 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.850 Flt Protected0.9560.9550.950 Satd. Flow (prot)017811583001779158301770353915830 Flt Permitted0.5970.7190.950 Satd. Flow (perm)011121583001339158301770353915830 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22212115781168943202612132 Shared Lane Traffic (%) Lane Group Flow (vph)0241200166116013220261210 Turn TypePermNApm+ovPermPermNApm+ovProtProtNAPermProt Protected Phases45!81!5!521! Permitted Phases448882 Detector Phase 445888155221 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.07.012.012.07.0 Minimum Split (s)24.624.615.324.624.624.615.315.315.324.524.515.3 Total Split (s)30.030.025.030.030.030.030.025.025.092.092.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%16.4%60.5%60.5%19.7% Maximum Green (s)23.023.018.023.023.023.023.018.018.085.085.023.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneNoneC-MinC-MinNone Act Effct Green (s)23.245.623.252.617.489.489.4 Actuated g/C Ratio0.150.300.150.350.110.590.59 v/c Ratio0.140.030.810.210.650.970.13 Control Delay57.035.291.035.579.345.115.0 Queue Delay0.00.00.00.00.00.00.0 Total Delay57.035.291.035.579.345.115.0 LOSEDFDEDB Approach Delay49.768.245.5 Approach LOSDED Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupSBLSBTSBR Lane Configurations Traffic Volume (vph)200172411 Future Volume (vph)200172411 Ideal Flow (vphpl)190019001900 Storage Length (ft)4000 Storage Lanes10 Taper Length (ft)100 Lane Util. Factor1.000.950.95 Frt0.999 Flt Protected0.950 Satd. Flow (prot)177035360 Flt Permitted0.950 Satd. Flow (perm)177035360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.900.90 Adj. Flow (vph)222191612 Shared Lane Traffic (%) Lane Group Flow (vph)25419280 Turn TypeProtNA Protected Phases16 Permitted Phases Detector Phase16 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)15.324.5 Total Split (s)30.097.0 Total Split (%)19.7%63.8% Maximum Green (s)23.090.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/LagLagLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)24.596.4 Actuated g/C Ratio0.160.63 v/c Ratio0.890.86 Control Delay93.728.4 Queue Delay0.00.0 Total Delay93.728.4 LOSFC Approach Delay36.0 Approach LOSD Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Queue Length 50th (ft)21815979126~102354 Queue Length 95th (ft)5125#271130200#122787 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125 Base Capacity (vph)1825012205422322080930 Starvation Cap Reductn0000000 Spillback Cap Reductn0000000 Storage Cap Reductn0000000 Reduced v/c Ratio0.130.020.750.210.570.970.13 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 42.5Intersection LOS: D Intersection Capacity Utilization 92.0%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 4 Lane GroupSBLSBTSBR Queue Length 50th (ft)249815 Queue Length 95th (ft)#408964 Internal Link Dist (ft)1163 Turn Bay Length (ft)400 Base Capacity (vph)2912242 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.870.86 Intersection Summary 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 32 US 17 BUS (Market Street) at Bump Along Road HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 01/31/2017 160257 Buy Quick Convenience Mart AM Existing Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)011120117050 Future Volume (Veh/h)011120117050 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)011133418940 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeTWLTLTWLTL Median storage veh)22 Upstream signal (ft)429 pX, platoon unblocked0.680.680.68 vC, conflicting volume25639471894 vC1, stage 1 conf vol1894 vC2, stage 2 conf vol669 vCu, unblocked vol236001380 tC, single (s)6.86.94.1 tC, 2 stage (s)5.8 tF (s)3.53.32.2 p0 queue free %100100100 cM capacity (veh/h)127740336 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total116676671263631 Volume Left 010000 Volume Right 100000 cSH7403361700170017001700 Volume to Capacity0.000.000.390.390.740.37 Queue Length 95th (ft)000000 Control Delay (s)9.915.70.00.00.00.0 Lane LOSAC Approach Delay (s)9.90.00.0 Approach LOSA Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 57.1%ICU Level of Service B Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience Mart AM No Build Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)010133118091 Future Volume (Veh/h)010133118091 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)010147920101 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.600.600.60 vC, conflicting volume250410062011 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol217901364 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %100100100 cM capacity (veh/h)24656302 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total14934934931340671 Volume Left 000000 Volume Right 100001 cSH65617001700170017001700 Volume to Capacity0.000.290.290.290.790.39 Queue Length 95th (ft)000000 Control Delay (s)10.50.00.00.00.00.0 Lane LOSB Approach Delay (s)10.50.00.0 Approach LOSB Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 60.0%ICU Level of Service B Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)092014311809113 Future Volume (Veh/h)092014311809113 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0102015902010126 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.540.540.54 vC, conflicting volume260310682136 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol226601403 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10083100 cM capacity (veh/h)19587261 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total1025305305301340796 Volume Left 000000 Volume Right102 0000126 cSH58717001700170017001700 Volume to Capacity0.170.310.310.310.790.47 Queue Length 95th (ft)16 00000 Control Delay (s)12.40.00.00.00.00.0 Lane LOSB Approach Delay (s)12.40.00.0 Approach LOSB Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 66.0%ICU Level of Service C Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartAM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)092014311809113 Future Volume (Veh/h)092014311809113 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0102015902010126 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.550.550.55 vC, conflicting volume254010052136 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol216301428 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10083100 cM capacity (veh/h)22596259 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2SB 3 Volume Total10253053053010051005126 Volume Left 0000000 Volume Right102 00000126 cSH596170017001700170017001700 Volume to Capacity0.170.310.310.310.590.590.07 Queue Length 95th (ft)15 000000 Control Delay (s)12.30.00.00.00.00.00.0 Lane LOSB Approach Delay (s)12.30.00.0 Approach LOSB Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 62.4%ICU Level of Service B Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)097014371809119 Future Volume (Veh/h)097014371809119 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0108015972010132 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.540.540.54 vC, conflicting volume260810712142 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol227101404 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10081100 cM capacity (veh/h)18583259 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total1085325325321340802 Volume Left 000000 Volume Right108 0000132 cSH58317001700170017001700 Volume to Capacity0.190.310.310.310.790.47 Queue Length 95th (ft)17 00000 Control Delay (s)12.60.00.00.00.00.0 Lane LOSB Approach Delay (s)12.60.00.0 Approach LOSB Intersection Summary Average Delay 0.4 Intersection Capacity Utilization 66.5%ICU Level of Service C Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartAM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)097014371809119 Future Volume (Veh/h)097014371809119 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0108015972010132 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.550.550.55 vC, conflicting volume254210052142 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol216301430 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10082100 cM capacity (veh/h)22593258 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2SB 3 Volume Total10853253253210051005132 Volume Left 0000000 Volume Right108 00000132 cSH593170017001700170017001700 Volume to Capacity0.180.310.310.310.590.590.08 Queue Length 95th (ft)17 000000 Control Delay (s)12.40.00.00.00.00.00.0 Lane LOSB Approach Delay (s)12.40.00.0 Approach LOSB Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 62.7%ICU Level of Service B Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 01/31/2017 160257 Buy Quick Convenience Mart PM Existing Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)021180817163 Future Volume (Veh/h)021180817163 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)021200919073 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeTWLTLTWLTL Median storage veh)22 Upstream signal (ft)429 pX, platoon unblocked0.700.700.70 vC, conflicting volume29159551910 vC1, stage 1 conf vol1908 vC2, stage 2 conf vol1006 vCu, unblocked vol2878601433 tC, single (s)6.86.94.1 tC, 2 stage (s)5.8 tF (s)3.53.32.2 p0 queue free %100100100 cM capacity (veh/h)115691327 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total21100410041271639 Volume Left 010000 Volume Right 200003 cSH6913271700170017001700 Volume to Capacity0.000.000.590.590.750.38 Queue Length 95th (ft)000000 Control Delay (s)10.216.00.00.00.00.0 Lane LOSBC Approach Delay (s)10.20.00.0 Approach LOSB Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 60.0%ICU Level of Service B Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience Mart PM No Build Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)020193718234 Future Volume (Veh/h)020193718234 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)020215220264 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.610.610.61 vC, conflicting volume274510152030 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol258201410 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %100100100 cM capacity (veh/h)13661293 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total27177177171351679 Volume Left 000000 Volume Right 200004 cSH66117001700170017001700 Volume to Capacity0.000.420.420.420.790.40 Queue Length 95th (ft)000000 Control Delay (s)10.50.00.00.00.00.0 Lane LOSB Approach Delay (s)10.50.00.0 Approach LOSB Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 60.5%ICU Level of Service B Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)0175020881823126 Future Volume (Veh/h)0175020881823126 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0194023202026140 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.530.530.53 vC, conflicting volume286910832166 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol275501438 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10067100 cM capacity (veh/h)8579250 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total1947737737731351815 Volume Left 000000 Volume Right194 0000140 cSH57917001700170017001700 Volume to Capacity0.330.450.450.450.790.48 Queue Length 95th (ft)37 00000 Control Delay (s)14.30.00.00.00.00.0 Lane LOSB Approach Delay (s)14.30.00.0 Approach LOSB Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 71.9%ICU Level of Service C Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartPM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)0175020881823126 Future Volume (Veh/h)0175020881823126 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0194023202026140 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.550.550.55 vC, conflicting volume279910132166 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol263501481 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10067100 cM capacity (veh/h)10595247 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2SB 3 Volume Total19477377377310131013140 Volume Left 0000000 Volume Right194 00000140 cSH595170017001700170017001700 Volume to Capacity0.330.450.450.450.600.600.08 Queue Length 95th (ft)35 000000 Control Delay (s)13.90.00.00.00.00.00.0 Lane LOSB Approach Delay (s)13.90.00.0 Approach LOSB Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 67.9%ICU Level of Service C Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)0184020951823132 Future Volume (Veh/h)0184020951823132 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0204023282026147 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.530.530.53 vC, conflicting volume287610862173 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol276601445 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10065100 cM capacity (veh/h)8577247 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2 Volume Total2047767767761351822 Volume Left 000000 Volume Right204 0000147 cSH57717001700170017001700 Volume to Capacity0.350.460.460.460.790.48 Queue Length 95th (ft)40 00000 Control Delay (s)14.60.00.00.00.00.0 Lane LOSB Approach Delay (s)14.60.00.0 Approach LOSB Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 72.7%ICU Level of Service C Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 200: Market Street & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartPM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)0184020951823132 Future Volume (Veh/h)0184020951823132 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)0204023282026147 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft)429 pX, platoon unblocked0.550.550.55 vC, conflicting volume280210132173 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol263801489 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %10066100 cM capacity (veh/h)10594245 Direction, Lane #EB 1NB 1NB 2NB 3SB 1SB 2SB 3 Volume Total20477677677610131013147 Volume Left 0000000 Volume Right204 00000147 cSH594170017001700170017001700 Volume to Capacity0.340.460.460.460.600.600.09 Queue Length 95th (ft)38 000000 Control Delay (s)14.20.00.00.00.00.00.0 Lane LOSB Approach Delay (s)14.20.00.0 Approach LOSB Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 68.5%ICU Level of Service C Analysis Period (min)15 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 33 US 17 BUS (Market Street) U-Turn HCM Unsignalized Intersection Capacity Analysis 11: Market Street & U-turn 02/17/2017 160257 Buy Quick Convenience Mart AM No Build Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)1800116100 Future Volume (Veh/h)1800116100 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)2000129000 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume64500 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol64500 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %95100100 cM capacity (veh/h)40510841622 Direction, Lane #EB 1NB 1NB 2 Volume Total20645645 Volume Left2000 Volume Right000 cSH40517001700 Volume to Capacity0.050.380.38 Queue Length 95th (ft)400 Control Delay (s)14.40.00.0 Lane LOSB Approach Delay (s)14.40.0 Approach LOSB Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 66.7%ICU Level of Service C Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 11: 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)7100121400 Future Volume (Veh/h)7100121400 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)7900134900 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume67400 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol67400 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %80100100 cM capacity (veh/h)38810841622 Direction, Lane #EB 1NB 1NB 2 Volume Total79674674 Volume Left7900 Volume Right000 cSH38817001700 Volume to Capacity0.200.400.40 Queue Length 95th (ft)1900 Control Delay (s)16.60.00.0 Lane LOSC Approach Delay (s)16.60.0 Approach LOSC Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 69.8%ICU Level of Service C Analysis Period (min)15 Lanes, Volumes, Timings 11: 02/17/2017 160257 Buy Quick Convenience MartAM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)7100121400 Future Volume (vph)7100121400 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)303030 Link Distance (ft)609162510 Travel Time (s)1.420.857.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)7900134900 Shared Lane Traffic (%) Lane Group Flow (vph)7900134900 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)25.025.0 Total Split (s)33.0119.0 Total Split (%)21.7%78.3% Maximum Green (s)26.0112.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)14.1127.9 Actuated g/C Ratio0.090.84 v/c Ratio0.480.45 Control Delay88.63.8 Queue Delay0.00.0 Total Delay88.63.8 LOSFA Approach Delay88.63.8 Approach LOSFA Queue Length 50th (ft)79144 Queue Length 95th (ft)m99212 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: 02/17/2017 160257 Buy Quick Convenience MartAM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)3262976 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.240.45 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.48 Intersection Signal Delay: 8.5Intersection LOS: A Intersection Capacity Utilization 69.8%ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: HCM Unsignalized Intersection Capacity Analysis 11: Market Street & U-turn 02/17/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)7100121400 Future Volume (Veh/h)7100121400 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)7900134900 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume67400 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol67400 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %80100100 cM capacity (veh/h)38810841622 Direction, Lane #EB 1NB 1NB 2 Volume Total79674674 Volume Left7900 Volume Right000 cSH38817001700 Volume to Capacity0.200.400.40 Queue Length 95th (ft)1900 Control Delay (s)16.60.00.0 Lane LOSC Approach Delay (s)16.60.0 Approach LOSC Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 70.0%ICU Level of Service C Analysis Period (min)15 Lanes, Volumes, Timings 11: Market Street & U-turn 02/17/2017 160257 Buy Quick Convenience MartAM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)7100121400 Future Volume (vph)7100121400 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)303030 Link Distance (ft)609162510 Travel Time (s)1.420.857.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)7900134900 Shared Lane Traffic (%) Lane Group Flow (vph)7900134900 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)25.025.0 Total Split (s)33.0119.0 Total Split (%)21.7%78.3% Maximum Green (s)26.0112.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)14.1127.9 Actuated g/C Ratio0.090.84 v/c Ratio0.480.45 Control Delay88.53.8 Queue Delay0.00.0 Total Delay88.53.8 LOSFA Approach Delay88.53.8 Approach LOSFA Queue Length 50th (ft)79144 Queue Length 95th (ft)m98212 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: Market Street & U-turn 02/17/2017 160257 Buy Quick Convenience MartAM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)3262976 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.240.45 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.48 Intersection Signal Delay: 8.5Intersection LOS: A Intersection Capacity Utilization 70.0%ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: Market Street & U-turn HCM Unsignalized Intersection Capacity Analysis 11: Market Street 02/17/2017 160257 Buy Quick Convenience Mart PM No Build Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)1000199500 Future Volume (Veh/h)1000199500 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)1100221700 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume110800 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol110800 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %95100100 cM capacity (veh/h)20410841622 Direction, Lane #EB 1NB 1NB 2 Volume Total1111081108 Volume Left1100 Volume Right000 cSH20417001700 Volume to Capacity0.050.650.65 Queue Length 95th (ft)400 Control Delay (s)23.70.00.0 Lane LOSC Approach Delay (s)23.70.0 Approach LOSC Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 67.2%ICU Level of Service C Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 11: 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)11000205300 Future Volume (Veh/h)11000205300 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)12200228100 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume114000 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol114000 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %37100100 cM capacity (veh/h)19410841622 Direction, Lane #EB 1NB 1NB 2 Volume Total12211401140 Volume Left12200 Volume Right000 cSH19417001700 Volume to Capacity0.630.670.67 Queue Length 95th (ft)9000 Control Delay (s)50.40.00.0 Lane LOSF Approach Delay (s)50.40.0 Approach LOSF Intersection Summary Average Delay 2.6 Intersection Capacity Utilization 73.2%ICU Level of Service D Analysis Period (min)15 Lanes, Volumes, Timings 11: 02/17/2017 160257 Buy Quick Convenience MartPM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)11000205300 Future Volume (vph)11000205300 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)303030 Link Distance (ft)609162510 Travel Time (s)1.420.857.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)12200228100 Shared Lane Traffic (%) Lane Group Flow (vph)12200228100 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)25.025.0 Total Split (s)33.0119.0 Total Split (%)21.7%78.3% Maximum Green (s)26.0112.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)17.8124.2 Actuated g/C Ratio0.120.82 v/c Ratio0.590.79 Control Delay80.310.4 Queue Delay0.00.0 Total Delay80.310.4 LOSFB Approach Delay80.310.4 Approach LOSFB Queue Length 50th (ft)109513 Queue Length 95th (ft)m129751 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: 02/17/2017 160257 Buy Quick Convenience MartPM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)3262892 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.370.79 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 14.0Intersection LOS: B Intersection Capacity Utilization 73.2%ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: HCM Unsignalized Intersection Capacity Analysis 11: 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (veh/h)11000205300 Future Volume (Veh/h)11000205300 Sign ControlStopFreeFree Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)12200228100 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume114000 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol114000 tC, single (s)6.86.94.1 tC, 2 stage (s) tF (s)3.53.32.2 p0 queue free %37100100 cM capacity (veh/h)19410841622 Direction, Lane #EB 1NB 1NB 2 Volume Total12211401140 Volume Left12200 Volume Right000 cSH19417001700 Volume to Capacity0.630.670.67 Queue Length 95th (ft)9000 Control Delay (s)50.40.00.0 Lane LOSF Approach Delay (s)50.40.0 Approach LOSF Intersection Summary Average Delay 2.6 Intersection Capacity Utilization 73.5%ICU Level of Service D Analysis Period (min)15 Lanes, Volumes, Timings 11: 02/17/2017 160257 Buy Quick Convenience MartPM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)11000205300 Future Volume (vph)11000205300 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)303030 Link Distance (ft)609162510 Travel Time (s)1.420.857.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)12200228100 Shared Lane Traffic (%) Lane Group Flow (vph)12200228100 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)25.025.0 Total Split (s)33.0119.0 Total Split (%)21.7%78.3% Maximum Green (s)26.0112.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)17.8124.2 Actuated g/C Ratio0.120.82 v/c Ratio0.590.79 Control Delay80.310.4 Queue Delay0.00.0 Total Delay80.310.4 LOSFB Approach Delay80.310.4 Approach LOSFB Queue Length 50th (ft)109513 Queue Length 95th (ft)m130751 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: 02/17/2017 160257 Buy Quick Convenience MartPM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)3262892 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.370.79 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 14.0Intersection LOS: B Intersection Capacity Utilization 73.5%ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 34 Bump Along Road at Site Access 1 HCM Unsignalized Intersection Capacity Analysis 300: Site Access 1 & Bump Along Road 01/31/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)11010013082 Future Volume (Veh/h)11010013082 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)12011114091 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume1224812 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol1224812 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9310091 cM capacity (veh/h)16076891069 Direction, Lane #EB 1WB 1NB 1 Volume Total1212591 Volume Left01110 Volume Right0091 cSH170016071069 Volume to Capacity0.010.070.09 Queue Length 95th (ft)067 Control Delay (s)0.06.68.7 Lane LOSAA Approach Delay (s)0.06.68.7 Approach LOSA Intersection Summary Average Delay 7.1 Intersection Capacity Utilization 24.6%ICU Level of Service A Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 300: Site Access 1 & Bump Along Road 01/31/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)11010613086 Future Volume (Veh/h)11010613086 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)12011814096 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume1226212 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol1226212 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9310091 cM capacity (veh/h)16076741069 Direction, Lane #EB 1WB 1NB 1 Volume Total1213296 Volume Left01180 Volume Right0096 cSH170016071069 Volume to Capacity0.010.070.09 Queue Length 95th (ft)067 Control Delay (s)0.06.78.7 Lane LOSAA Approach Delay (s)0.06.78.7 Approach LOSA Intersection Summary Average Delay 7.2 Intersection Capacity Utilization 25.2%ICU Level of Service A Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 300: Site Access 1 & Bump Along Road 01/31/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)200109170155 Future Volume (Veh/h)200109170155 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)220121190172 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume2228322 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol2228322 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9210084 cM capacity (veh/h)15936531055 Direction, Lane #EB 1WB 1NB 1 Volume Total22140172 Volume Left01210 Volume Right00172 cSH170015931055 Volume to Capacity0.010.080.16 Queue Length 95th (ft)0615 Control Delay (s)0.06.59.1 Lane LOSAA Approach Delay (s)0.06.59.1 Approach LOSA Intersection Summary Average Delay 7.4 Intersection Capacity Utilization 29.9%ICU Level of Service A Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 300: Site Access 1 & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)200115170164 Future Volume (Veh/h)200115170164 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)220128190182 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume2229722 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol2229722 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9210083 cM capacity (veh/h)15936381055 Direction, Lane #EB 1WB 1NB 1 Volume Total22147182 Volume Left01280 Volume Right00182 cSH170015931055 Volume to Capacity0.010.080.17 Queue Length 95th (ft)0716 Control Delay (s)0.06.69.1 Lane LOSAA Approach Delay (s)0.06.69.1 Approach LOSA Intersection Summary Average Delay 7.5 Intersection Capacity Utilization 30.8%ICU Level of Service A Analysis Period (min)15 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 35 Bump Along Road at Site Access 2 HCM Unsignalized Intersection Capacity Analysis 400: Site Access 2 & Bump Along Road 01/31/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)10121010 Future Volume (Veh/h)10121010 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)10131011 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume1281 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol1281 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9910099 cM capacity (veh/h)16229791084 Direction, Lane #EB 1WB 1NB 1 Volume Total11411 Volume Left0130 Volume Right0011 cSH170016221084 Volume to Capacity0.000.010.01 Queue Length 95th (ft)011 Control Delay (s)0.06.78.4 Lane LOSAA Approach Delay (s)0.06.78.4 Approach LOSA Intersection Summary Average Delay 7.2 Intersection Capacity Utilization 17.4%ICU Level of Service A Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 400: Site Access 2 & Bump Along Road 01/31/2017 160257 Buy Quick Convenience MartAM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)10121010 Future Volume (Veh/h)10121010 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)10131011 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume1281 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol1281 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9910099 cM capacity (veh/h)16229791084 Direction, Lane #EB 1WB 1NB 1 Volume Total11411 Volume Left0130 Volume Right0011 cSH170016221084 Volume to Capacity0.000.010.01 Queue Length 95th (ft)011 Control Delay (s)0.06.78.4 Lane LOSAA Approach Delay (s)0.06.78.4 Approach LOSA Intersection Summary Average Delay 7.2 Intersection Capacity Utilization 17.4%ICU Level of Service A Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 400: Site Access 2 & Bump Along Road 01/31/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)20134018 Future Volume (Veh/h)20134018 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)20144020 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume2342 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol2342 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9910098 cM capacity (veh/h)16209711082 Direction, Lane #EB 1WB 1NB 1 Volume Total21820 Volume Left0140 Volume Right0020 cSH170016201082 Volume to Capacity0.000.010.02 Queue Length 95th (ft)011 Control Delay (s)0.05.68.4 Lane LOSAA Approach Delay (s)0.05.68.4 Approach LOSA Intersection Summary Average Delay 6.7 Intersection Capacity Utilization 17.6%ICU Level of Service A Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 400: Site Access 2 & Bump Along Road 02/17/2017 160257 Buy Quick Convenience MartPM Build - Alternative 2 Dionne C. Brown, PE Page 1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Volume (veh/h)20134018 Future Volume (Veh/h)20134018 Sign ControlFreeFreeStop Grade0%0%0% Peak Hour Factor0.900.900.900.900.900.90 Hourly flow rate (vph)20144020 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume2342 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol2342 tC, single (s)4.16.46.2 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %9910098 cM capacity (veh/h)16209711082 Direction, Lane #EB 1WB 1NB 1 Volume Total21820 Volume Left0140 Volume Right0020 cSH170016201082 Volume to Capacity0.000.010.02 Queue Length 95th (ft)011 Control Delay (s)0.05.68.4 Lane LOSAA Approach Delay (s)0.05.68.4 Approach LOSA Intersection Summary Average Delay 6.7 Intersection Capacity Utilization 17.6%ICU Level of Service A Analysis Period (min)15 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 36 Raintree Road at Site Access 3 HCM Unsignalized Intersection Capacity Analysis 500: Site Access 3/Site Access 2 01/31/2017 160257 Buy Quick Convenience MartAM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (veh/h)000000060050 Future Volume (Veh/h)000000060050 Sign ControlStopStopFreeFree Grade0%0%0%0% Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Hourly flow rate (vph)000000070060 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume131361313767 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol131361313767 tC, single (s)7.16.56.27.16.56.24.14.1 tC, 2 stage (s) tF (s)3.54.03.33.54.03.32.22.2 p0 queue free %100100100100100100100100 cM capacity (veh/h)100488110771004881107516151614 Direction, Lane #NB 1SB 1 Volume Total76 Volume Left00 Volume Right00 cSH17001700 Volume to Capacity0.000.00 Queue Length 95th (ft)00 Control Delay (s)0.00.0 Lane LOS Approach Delay (s)0.00.0 Approach LOS Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 6.7%ICU Level of Service A Analysis Period (min)15 HCM Unsignalized Intersection Capacity Analysis 500: Site Access 3/Site Access 2 01/31/2017 160257 Buy Quick Convenience MartPM Build - Alternative 1 Dionne C. Brown, PE Page 1 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (veh/h)000000060090 Future Volume (Veh/h)000000060090 Sign ControlStopStopFreeFree Grade0%0%0%0% Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Hourly flow rate (vph)0000000700100 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume17171017177107 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol17171017177107 tC, single (s)7.16.56.27.16.56.24.14.1 tC, 2 stage (s) tF (s)3.54.03.33.54.03.32.22.2 p0 queue free %100100100100100100100100 cM capacity (veh/h)9988771071998877107516101614 Direction, Lane #NB 1SB 1 Volume Total710 Volume Left00 Volume Right00 cSH17001700 Volume to Capacity0.000.01 Queue Length 95th (ft)00 Control Delay (s)0.00.0 Lane LOS Approach Delay (s)0.00.0 Approach LOS Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 6.7%ICU Level of Service A Analysis Period (min)15 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 37 Traffic Volume Data File Name : 16-0257 Marsh Oaks and Mendenhall at Market Street 7-9am Site Code : 00160257 Start Date : 1/4/2017 Page No : 1 Counted By: James Huntley *Note: Peds Column under Bikes group contains U-turns Weather: Clear Groups Printed- Cars - Buses and Trucks - Bikes on Road Market Street Southbound Marsh Oaks Drive Westbound Market Street Northbound Mendenhall Drive Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total07:00 AM 3 309 3 8 323 20 1 29 0 50 1 183 2 0 186 6 0 3 0 9 568 07:15 AM 5 425 5 7 442 18 0 35 0 53 6 240 5 0 251 8 0 7 0 15 761 07:30 AM 2 380 5 7 394 34 2 35 0 71 17 268 5 0 290 7 2 4 0 13 768 07:45 AM 1 322 11 7 341 31 4 30 0 65 6 332 9 0 347 1 0 6 0 7 760 Total 11 1436 24 29 1500 103 7 129 0 239 30 1023 21 0 1074 22 2 20 0 44 2857 08:00 AM 1 368 11 5 385 23 0 31 0 54 9 293 11 0 313 5 1 3 0 9 761 08:15 AM 2 318 12 5 337 22 1 36 0 59 10 291 7 0 308 5 0 5 0 10 714 08:30 AM 3 360 9 9 381 18 0 25 0 43 10 286 7 0 303 2 0 3 0 5 732 08:45 AM 5 319 10 4 338 17 0 29 0 46 5 300 11 0 316 7 1 2 0 10 710 Total 11 1365 42 23 1441 80 1 121 0 202 34 1170 36 0 1240 19 2 13 0 34 2917 Grand Total 22 2801 66 52 2941 183 8 250 0 441 64 2193 57 0 2314 41 4 33 0 78 5774 Apprch %0.7 95.2 2.2 1.8 41.5 1.8 56.7 0 2.8 94.8 2.5 0 52.6 5.1 42.3 0 Total %0.4 48.5 1.1 0.9 50.9 3.2 0.1 4.3 0 7.6 1.1 38 1 0 40.1 0.7 0.1 0.6 0 1.4 Cars 20 2766 63 12 2861 179 7 249 0 435 63 2158 57 0 2278 41 4 33 0 78 5652 % Cars 90.9 98.8 95.5 23.1 97.3 97.8 87.5 99.6 0 98.6 98.4 98.4 100 0 98.4 100 100 100 0 100 97.9 Buses and Trucks 2 35 3 0 40 4 1 1 0 6 1 35 0 0 36 0 0 0 0 0 82 % Buses and Trucks 9.1 1.2 4.5 0 1.4 2.2 12.5 0.4 0 1.4 1.6 1.6 0 0 1.6 0 0 0 0 0 1.4 Bikes on Road 0 0 0 40 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40 % Bikes on Road 0 0 0 76.9 1.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 16-0257 Marsh Oaks and Mendenhall at Market Street 7-9am Site Code : 00160257 Start Date : 1/4/2017 Page No : 2 Counted By: James Huntley *Note: Peds Column under Bikes group contains U-turns Weather: Clear Market Street M e n d e n h a l l D r i v e M a r s h O a k s D r i v e Market Street Right 20 2 0 22 Thru 2766 35 0 2801 Left 63 3 0 66 Peds 12 0 40 52 InOut Total 2370 2861 5231 39 40 79 0 40 40 2409 5350 2941 Rig h t 17 9 4 0 18 3 Th r u 7 1 0 8 Le f t 24 9 1 0 25 0 Pe d s 0 0 0 0 Ou t To t a l In 13 0 43 5 56 5 4 6 10 0 0 0 13 4 57 5 44 1 Left 57 0 0 57 Thru 2158 35 0 2193 Right 63 1 0 64 Peds 0 0 0 0 Out TotalIn 3056 2278 5334 36 36 72 0 0 0 3092 5406 2314 Le f t 33 0 0 33 Th r u 4 0 0 4 Ri g h t 41 0 0 41 Pe d s 0 0 0 0 To t a l Ou t In 84 78 16 2 3 0 3 0 0 0 87 16 5 78 1/4/2017 07:00 AM 1/4/2017 08:45 AM Cars Buses and Trucks Bikes on Road North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 16-0257 Marsh Oaks and Mendenhall at Market Street 7-9am Site Code : 00160257 Start Date : 1/4/2017 Page No : 3 Counted By: James Huntley *Note: Peds Column under Bikes group contains U-turns Weather: Clear Market Street Southbound Marsh Oaks Drive Westbound Market Street Northbound Mendenhall Drive Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. TotalPeak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 5 425 5 7 442 18 0 35 0 53 6 240 5 0 251 8 0 7 0 15 761 07:30 AM 2 380 5 7 394 34 2 35 0 71 17 268 5 0 290 7 2 4 0 13 768 07:45 AM 1 322 11 7 341 31 4 30 0 65 6 332 9 0 347 1 0 6 0 7 760 08:00 AM 1 368 11 5 385 23 0 31 0 54 9 293 11 0 313 5 1 3 0 9 761 Total Volume 9 1495 32 26 1562 106 6 131 0 243 38 1133 30 0 1201 21 3 20 0 44 3050 % App. Total 0.6 95.7 2 1.7 43.6 2.5 53.9 0 3.2 94.3 2.5 0 47.7 6.8 45.5 0 PHF .450 .879 .727 .929 .883 .779 .375 .936 .000 .856 .559 .853 .682 .000 .865 .656 .375 .714 .000 .733 .993 Cars 8 1476 31 5 1520 103 5 131 0 239 37 1113 30 0 1180 21 3 20 0 44 2983 % Cars 88.9 98.7 96.9 19.2 97.3 97.2 83.3 100 0 98.4 97.4 98.2 100 0 98.3 100 100 100 0 100 97.8 Buses and Trucks 1 19 1 0 21 3 1 0 0 4 1 20 0 0 21 0 0 0 0 0 46 % Buses and Trucks 11.1 1.3 3.1 0 1.3 2.8 16.7 0 0 1.6 2.6 1.8 0 0 1.7 0 0 0 0 0 1.5 Bikes on Road 0 0 0 21 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 % Bikes on Road 0 0 0 80.8 1.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7 Market Street M e n d e n h a l l D r i v e M a r s h O a k s D r i v e Market Street Right 8 1 0 9 Thru 1476 19 0 1495 Left 31 1 0 32 Peds 5 0 21 26 InOut Total 1236 1520 2756 23 21 44 0 21 21 1259 2821 1562 Ri g h t 10 3 3 0 10 6 Th r u 5 1 0 6 Le f t 13 1 0 0 13 1 Pe d s 0 0 0 0 Ou t To t a l In 71 23 9 31 0 2 4 6 0 0 0 73 31 6 24 3 Left 30 0 0 30 Thru 1113 20 0 1133 Right 37 1 0 38 Peds 0 0 0 0 Out TotalIn 1628 1180 2808 19 21 40 0 0 0 1647 2848 1201 Le f t 20 0 0 20 Th r u 3 0 0 3 Rig h t 21 0 0 21 Pe d s 0 0 0 0 To t a l Ou t In 43 44 87 2 0 2 0 0 0 45 89 44 Peak Hour Begins at 07:15 AM Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US 17 at Marsh Oaks Drive 03.09.2016 Site Code : 00160210 Start Date : 3/9/2016 Page No : 1 Counted By: A. Ayuninjam *Bank 2 + Peds = U-Turns Weather: Clear, Sunny Groups Printed- Cars - Trucks and Buses - Bicycles US 17 (Market Street) Southbound Marsh Oaks Drive Westbound US 17 (Market Street) Northbound Mendenhall Drive Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total04:00 PM 1 371 26 7 398 17 2 20 0 39 17 392 8 4 417 6 1 4 0 11 11 865 876 04:15 PM 3 399 28 6 430 20 1 14 0 35 27 410 7 0 444 1 1 0 0 2 6 911 917 04:30 PM 4 416 31 10 451 15 2 13 1 30 22 421 10 0 453 0 0 6 0 6 11 940 951 04:45 PM 1 422 24 5 447 18 3 13 0 34 15 414 7 0 436 2 1 5 0 8 5 925 930 Total 9 1608 109 28 1726 70 8 60 1 138 81 1637 32 4 1750 9 3 15 0 27 33 3641 3674 05:00 PM 3 402 35 7 440 13 1 29 0 43 25 436 14 0 475 8 0 9 0 17 7 975 982 05:15 PM 1 429 39 2 469 15 1 29 0 45 20 342 9 0 371 2 1 3 0 6 2 891 893 05:30 PM 0 413 33 5 446 13 2 23 1 38 26 303 4 0 333 6 1 3 0 10 6 827 833 05:45 PM 3 378 33 7 414 28 0 26 0 54 29 507 23 0 559 3 0 4 0 7 7 1034 1041 Total 7 1622 140 21 1769 69 4 107 1 180 100 1588 50 0 1738 19 2 19 0 40 22 3727 3749 Grand Total 16 3230 249 49 3495 139 12 167 2 318 181 3225 82 4 3488 28 5 34 0 67 55 7368 7423 Apprch %0.5 92.4 7.1 43.7 3.8 52.5 5.2 92.5 2.4 41.8 7.5 50.7 Total %0.2 43.8 3.4 47.4 1.9 0.2 2.3 4.3 2.5 43.8 1.1 47.3 0.4 0.1 0.5 0.9 0.7 99.3 Cars 15 3188 247 3450 136 11 165 312 181 3188 82 3455 27 5 32 64 0 0 7281 % Cars 93.8 98.7 99.2 0 97.3 97.8 91.7 98.8 0 97.5 100 98.9 100 100 98.9 96.4 100 94.1 0 95.5 0 0 98.1 Trucks and Buses 1 42 2 45 3 1 2 6 0 37 0 37 1 0 2 3 0 0 91 % Trucks and Buses 6.2 1.3 0.8 0 1.3 2.2 8.3 1.2 0 1.9 0 1.1 0 0 1.1 3.6 0 5.9 0 4.5 0 0 1.2 Bicycles 0 0 0 49 0 0 0 2 0 0 0 0 0 0 0 0 0 0 51 % Bicycles 0 0 0 100 1.4 0 0 0 100 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0.7 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US 17 at Marsh Oaks Drive 03.09.2016 Site Code : 00160210 Start Date : 3/9/2016 Page No : 2 US 17 (Market Street) M e n d e n h a l l D r i v e M a r s h O a k s D r i v e US 17 (Market Street) Right 15 1 0 16 Thru 3188 42 0 3230 Left 247 2 0 249 InOut Total 3356 3450 6806 42 45 87 0 0 0 3398 6893 3495 Ri g h t 13 6 3 0 13 9 Th r u 11 1 0 12 Le f t 16 5 2 0 16 7 Ou t To t a l In 43 3 31 2 74 5 2 6 8 0 0 0 43 5 75 3 31 8 Left 82 0 0 82 Thru 3188 37 0 3225 Right 181 0 0 181 Out TotalIn 3380 3451 6831 45 37 82 0 0 0 3425 6913 3488 Le f t 32 2 0 34 Th r u 5 0 0 5 Ri g h t 27 1 0 28 To t a l Ou t In 10 8 64 17 2 2 3 5 0 0 0 11 0 17 7 67 3/9/2016 04:00 PM 3/9/2016 05:45 PM Cars Trucks and Buses Bicycles North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US 17 at Marsh Oaks Drive 03.09.2016 Site Code : 00160210 Start Date : 3/9/2016 Page No : 3 US 17 (Market Street) Southbound Marsh Oaks Drive Westbound US 17 (Market Street) Northbound Mendenhall Drive Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM 3 399 28 430 20 1 14 35 27 410 7 444 1 1 0 2 911 04:30 PM 4 416 31 451 15 2 13 30 22 421 10 453 0 0 6 6 940 04:45 PM 1 422 24 447 18 3 13 34 15 414 7 436 2 1 5 8 925 05:00 PM 3 402 35 440 13 1 29 43 25 436 14 475 8 0 9 17 975 Total Volume 11 1639 118 1768 66 7 69 142 89 1681 38 1808 11 2 20 33 3751 % App. Total 0.6 92.7 6.7 46.5 4.9 48.6 4.9 93 2.1 33.3 6.1 60.6 PHF .688 .971 .843 .980 .825 .583 .595 .826 .824 .964 .679 .952 .344 .500 .556 .485 .962 Cars 10 1615 117 1742 65 7 68 140 89 1658 38 1785 11 2 19 32 3699 % Cars 90.9 98.5 99.2 98.5 98.5 100 98.6 98.6 100 98.6 100 98.7 100 100 95.0 97.0 98.6 Trucks and Buses 1 24 1 26 1 0 1 2 0 23 0 23 0 0 1 1 52 % Trucks and Buses 9.1 1.5 0.8 1.5 1.5 0 1.4 1.4 0 1.4 0 1.3 0 0 5.0 3.0 1.4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 US 17 (Market Street) M e n d e n h a l l D r i v e M a r s h O a k s D r i v e US 17 (Market Street) Right 10 1 0 11 Thru 1615 24 0 1639 Left 117 1 0 118 InOut Total 1742 1742 3484 25 26 51 0 0 0 1767 3535 1768 Rig h t 65 1 0 66 Th r u 7 0 0 7 Le f t 68 1 0 69 Ou t To t a l In 20 8 14 0 34 8 1 2 3 0 0 0 20 9 35 1 14 2 Left 38 0 0 38 Thru 1658 23 0 1681 Right 89 0 0 89 Out TotalIn 1694 1785 3479 25 23 48 0 0 0 1719 3527 1808 Le f t 19 1 0 20 Th r u 2 0 0 2 Rig h t 11 0 0 11 To t a l Ou t In 55 32 87 1 1 2 0 0 0 56 89 33 Peak Hour Begins at 04:15 PM Cars Trucks and Buses Bicycles Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 1 Groups Printed- Lights - Other Vehicles - Pedestrians US 17 Southbound Bump Along Road Westbound US 17 Northbound Bump Along Road Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Exclu. Total Inclu. Total Int. Total07:00 0 447 0 0 447 0 0 0 0 0 0 224 0 0 224 0 0 0 0 0 0 671 671 07:15 0 521 0 0 521 0 0 0 0 0 0 269 0 1 269 1 0 0 0 1 1 791 792 07:30 0 397 1 0 398 0 0 0 0 0 1 314 1 0 316 0 0 0 0 0 0 714 714 07:45 0 340 1 0 341 1 0 0 0 1 0 332 0 0 332 0 0 0 0 0 0 674 674 Total 0 1705 2 0 1707 1 0 0 0 1 1 1139 1 1 1141 1 0 0 0 1 1 2850 2851 08:00 0 343 1 0 344 0 0 2 0 2 2 267 0 0 269 0 0 1 0 1 0 616 616 08:15 0 333 1 0 334 0 0 0 0 0 2 304 1 0 307 1 0 0 0 1 0 642 642 08:30 0 376 0 0 376 0 0 1 0 1 1 299 0 0 300 0 0 0 0 0 0 677 677 08:45 0 386 6 0 392 2 0 0 0 2 1 288 0 0 289 0 0 0 0 0 0 683 683 Total 0 1438 8 0 1446 2 0 3 0 5 6 1158 1 0 1165 1 0 1 0 2 0 2618 2618 16:00 1 381 1 0 383 2 0 0 0 2 0 407 0 0 407 0 0 0 0 0 0 792 792 16:15 0 392 1 0 393 1 0 0 0 1 2 417 0 0 419 0 0 0 0 0 0 813 813 16:30 1 374 1 0 376 2 0 2 0 4 1 430 1 0 432 0 0 1 0 1 0 813 813 16:45 1 415 1 0 417 2 0 0 0 2 2 448 1 0 451 1 0 0 0 1 0 871 871 Total 3 1562 4 0 1569 7 0 2 0 9 5 1702 2 0 1709 1 0 1 0 2 0 3289 3289 17:00 0 426 0 1 426 2 0 0 0 2 1 443 0 0 444 0 0 0 0 0 1 872 873 17:15 0 412 1 0 413 3 0 0 0 3 2 447 0 0 449 0 0 0 0 0 0 865 865 17:30 2 399 1 0 402 1 0 0 0 1 3 432 0 0 435 1 0 0 0 1 0 839 839 17:45 1 352 0 0 353 0 0 0 0 0 5 418 1 0 424 0 0 1 0 1 0 778 778 Total 3 1589 2 1 1594 6 0 0 0 6 11 1740 1 0 1752 1 0 1 0 2 1 3354 3355 Grand Total 6 6294 16 1 6316 16 0 5 0 21 23 5739 5 1 5767 4 0 3 0 7 2 12111 12113 Apprch %0.1 99.7 0.3 76.2 0 23.8 0.4 99.5 0.1 57.1 0 42.9 Total %0 52 0.1 52.2 0.1 0 0 0.2 0.2 47.4 0 47.6 0 0 0 0.1 0 100 Lights 6 6192 16 6215 16 0 5 21 23 5634 4 5662 3 0 3 6 0 0 11904 % Lights 100 98.4 100 100 98.4 100 0 100 0 100 100 98.2 80 100 98.2 75 0 100 0 85.7 0 0 98.3 Other Vehicles 0 102 0 102 0 0 0 0 0 105 1 106 1 0 0 1 0 0 209 % Other Vehicles 0 1.6 0 0 1.6 0 0 0 0 0 0 1.8 20 0 1.8 25 0 0 0 14.3 0 0 1.7 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 2 US 17 B u m p A l o n g R o a d B u m p A l o n g R o a d US 17 Right 6 0 0 6 Thru 6192 102 0 6294 Left 16 0 0 16 InOut Total 5653 6214 11867 105 102 207 0 0 0 5758 12074 6316 Ri g h t 16 0 0 16 Th r u 0 0 0 0 Le f t 5 0 0 5 Ou t To t a l In 39 21 60 0 0 0 0 0 0 39 60 21 Left 4 1 0 5 Thru 5634 105 0 5739 Right 23 0 0 23 Out TotalIn 6200 5661 11861 103 106 209 0 0 0 6303 12070 5767 Le f t 3 0 0 3 Th r u 0 0 0 0 Rig h t 3 1 0 4 To t a l Ou t In 10 6 16 1 1 2 0 0 0 11 18 7 12/13/2016 07:00 12/13/2016 18:00 Lights Other Vehicles Pedestrians North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 3 US 17 Southbound Bump Along Road Westbound US 17 Northbound Bump Along Road Eastbound Start Time App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 11:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 07:00 0 447 0 447 0 0 0 0 0 224 0 224 0 0 0 0 671 07:15 0 521 0 521 0 0 0 0 0 269 0 269 1 0 0 1 791 07:30 0 397 1 398 0 0 0 0 1 314 1 316 0 0 0 0 714 07:45 0 340 1 341 1 0 0 1 0 332 0 332 0 0 0 0 674 Total Volume 0 1705 2 1707 1 0 0 1 1 1139 1 1141 1 0 0 1 2850 % App. Total 0 99.9 0.1 100 0 0 0.1 99.8 0.1 100 0 0 PHF .000 .818 .500 .819 .250 .000 .000 .250 .250 .858 .250 .859 .250 .000 .000 .250 .901 Lights 0 1661 2 1663 1 0 0 1 1 1108 1 1110 1 0 0 1 2775 % Lights 0 97.4 100 97.4 100 0 0 100 100 97.3 100 97.3 100 0 0 100 97.4 Other Vehicles 0 44 0 44 0 0 0 0 0 31 0 31 0 0 0 0 75 % Other Vehicles 0 2.6 0 2.6 0 0 0 0 0 2.7 0 2.7 0 0 0 0 2.6 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 US 17 B u m p A l o n g R o a d B u m p A l o n g R o a d US 17 Right 0 0 0 0 Thru 1661 44 0 1705 Left 2 0 0 2 InOut Total 1109 1663 2772 31 44 75 0 0 0 1140 2847 1707 Rig h t 1 0 0 1 Th r u 0 0 0 0 Le f t 0 0 0 0 Ou t To t a l In 3 1 4 0 0 0 0 0 0 3 4 1 Left 1 0 0 1 Thru 1108 31 0 1139 Right 1 0 0 1 Out TotalIn 1662 1110 2772 44 31 75 0 0 0 1706 2847 1141 Le f t 0 0 0 0 Th r u 0 0 0 0 Ri g h t 1 0 0 1 To t a l Ou t In 1 1 2 0 0 0 0 0 0 1 2 1 Peak Hour Begins at 07:00 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 4 US 17 Southbound Bump Along Road Westbound US 17 Northbound Bump Along Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 to 18:00 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 1 415 1 417 2 0 0 2 2 448 1 451 1 0 0 1 871 17:00 0 426 0 426 2 0 0 2 1 443 0 444 0 0 0 0 872 17:15 0 412 1 413 3 0 0 3 2 447 0 449 0 0 0 0 865 17:30 2 399 1 402 1 0 0 1 3 432 0 435 1 0 0 1 839 Total Volume 3 1652 3 1658 8 0 0 8 8 1770 1 1779 2 0 0 2 3447 % App. Total 0.2 99.6 0.2 100 0 0 0.4 99.5 0.1 100 0 0 PHF .375 .969 .750 .973 .667 .000 .000 .667 .667 .988 .250 .986 .500 .000 .000 .500 .988 Lights 3 1636 3 1642 8 0 0 8 8 1752 1 1761 2 0 0 2 3413 % Lights 100 99.0 100 99.0 100 0 0 100 100 99.0 100 99.0 100 0 0 100 99.0 Other Vehicles 0 16 0 16 0 0 0 0 0 18 0 18 0 0 0 0 34 % Other Vehicles 0 1.0 0 1.0 0 0 0 0 0 1.0 0 1.0 0 0 0 0 1.0 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 US 17 B u m p A l o n g R o a d B u m p A l o n g R o a d US 17 Right 3 0 0 3 Thru 1636 16 0 1652 Left 3 0 0 3 InOut Total 1760 1642 3402 18 16 34 0 0 0 1778 3436 1658 Rig h t 8 0 0 8 Th r u 0 0 0 0 Le f t 0 0 0 0 Ou t To t a l In 11 8 19 0 0 0 0 0 0 11 19 8 Left 1 0 0 1 Thru 1752 18 0 1770 Right 8 0 0 8 Out TotalIn 1638 1761 3399 16 18 34 0 0 0 1654 3433 1779 Le f t 0 0 0 0 Th r u 0 0 0 0 Ri g h t 2 0 0 2 To t a l Ou t In 4 2 6 0 0 0 0 0 0 4 6 2 Peak Hour Begins at 16:45 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 1 Groups Printed- Lights - Other Vehicles - Pedestrians T-intersection Southbound Bump Along Road Westbound Raintree Road Northbound Bump Along Road Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Exclu. Total Inclu. Total Int. Total07:00 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 07:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 1 1 07:30 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 Total 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 1 0 0 1 0 3 3 08:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 1 1 08:15 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 Total 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 2 2 16:00 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 16:30 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 2 2 16:45 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 1 0 0 1 0 3 3 Total 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 0 2 0 0 2 0 6 6 17:30 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 0 2 2 17:45 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 2 0 0 2 0 4 4 Total 0 0 0 0 0 0 2 2 0 4 0 0 0 0 0 0 2 0 0 2 0 6 6 Grand Total 0 0 0 0 0 0 7 4 0 11 0 0 0 0 0 0 6 0 0 6 0 17 17 Apprch %0 0 0 0 63.6 36.4 0 0 0 0 100 0 Total %0 0 0 0 0 41.2 23.5 64.7 0 0 0 0 0 35.3 0 35.3 0 100 Lights 0 0 0 0 0 6 4 10 0 0 0 0 0 6 0 6 0 0 16 % Lights 0 0 0 0 0 0 85.7 100 0 90.9 0 0 0 0 0 0 100 0 0 100 0 0 94.1 Other Vehicles 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 % Other Vehicles 0 0 0 0 0 0 14.3 0 0 9.1 0 0 0 0 0 0 0 0 0 0 0 0 5.9 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 2 T-intersection B u m p A l o n g R o a d B u m p A l o n g R o a d Raintree Road Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Ri g h t 0 0 0 0 Th r u 6 1 0 7 Le f t 4 0 0 4 Ou t To t a l In 6 10 16 0 1 1 0 0 0 6 17 11 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 4 0 4 0 0 0 0 0 0 4 4 0 Le f t 0 0 0 0 Th r u 6 0 0 6 Rig h t 0 0 0 0 To t a l Ou t In 6 6 12 1 0 1 0 0 0 7 13 6 12/13/2016 07:00 12/13/2016 17:45 Lights Other Vehicles Pedestrians North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 3 T-intersection Southbound Bump Along Road Westbound Raintree Road Northbound Bump Along Road Eastbound Start Time App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 11:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 07:00 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 1 07:15 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 1 07:30 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 07:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Volume 0 0 0 0 0 1 1 2 0 0 0 0 0 1 0 1 3 % App. Total 0 0 0 0 50 50 0 0 0 0 100 0 PHF .000 .000 .000 .000 .000 .250 .250 .500 .000 .000 .000 .000 .000 .250 .000 .250 .750 Lights 0 0 0 0 0 1 1 2 0 0 0 0 0 1 0 1 3 % Lights 0 0 0 0 0 100 100 100 0 0 0 0 0 100 0 100 100 Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T-intersection B u m p A l o n g R o a d B u m p A l o n g R o a d Raintree Road Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Rig h t 0 0 0 0 Th r u 1 0 0 1 Le f t 1 0 0 1 Ou t To t a l In 1 2 3 0 0 0 0 0 0 1 3 2 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 1 0 1 0 0 0 0 0 0 1 1 0 Le f t 0 0 0 0 Th r u 1 0 0 1 Ri g h t 0 0 0 0 To t a l Ou t In 1 1 2 0 0 0 0 0 0 1 2 1 Peak Hour Begins at 07:00 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 4 T-intersection Southbound Bump Along Road Westbound Raintree Road Northbound Bump Along Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:00 16:00 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 16:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16:30 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 2 16:45 0 0 0 0 0 2 0 2 0 0 0 0 0 1 0 1 3 Total Volume 0 0 0 0 0 3 1 4 0 0 0 0 0 2 0 2 6 % App. Total 0 0 0 0 75 25 0 0 0 0 100 0 PHF .000 .000 .000 .000 .000 .375 .250 .500 .000 .000 .000 .000 .000 .500 .000 .500 .500 Lights 0 0 0 0 0 3 1 4 0 0 0 0 0 2 0 2 6 % Lights 0 0 0 0 0 100 100 100 0 0 0 0 0 100 0 100 100 Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T-intersection B u m p A l o n g R o a d B u m p A l o n g R o a d Raintree Road Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Rig h t 0 0 0 0 Th r u 3 0 0 3 Le f t 1 0 0 1 Ou t To t a l In 2 4 6 0 0 0 0 0 0 2 6 4 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 1 0 1 0 0 0 0 0 0 1 1 0 Le f t 0 0 0 0 Th r u 2 0 0 2 Ri g h t 0 0 0 0 To t a l Ou t In 3 2 5 0 0 0 0 0 0 3 5 2 Peak Hour Begins at 16:00 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 10 0 10 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i p s AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i p s ALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 2 0 2 0 2 0 2 0 2 0 2 0 E B L 2 0 2 0 2 0 2 0 2 0 2 0 EB T 3 3 3 3 3 3 E B T 2 2 2 2 2 2 EB R 2 1 2 1 2 1 2 1 2 1 2 1 E B R 1 1 1 1 1 1 1 1 1 1 1 1 WB L 1 3 1 1 3 1 1 3 4 2 9 1 6 3 1 2 1 7 5 1 2 1 7 5 W B L 6 9 6 9 7 0 5 8 1 2 8 1 3 1 4 1 1 3 1 4 1 WB T 6 6 6 6 6 6 W B T 7 7 7 7 7 7 WB R 10 6 1 0 6 1 0 8 1 0 8 1 0 8 1 0 8 W B R 66 6 6 6 7 3 7 1 0 4 1 0 4 1 0 4 NB L 3 0 3 0 3 1 3 1 3 1 3 1 N B L 3 8 3 8 3 9 3 9 3 9 3 9 NB T 1 1 3 3 1 1 3 3 1 1 5 6 4 6 1 8 1 2 2 0 4 3 1 2 6 3 4 3 1 2 6 3 N B T 1 6 8 1 1 6 8 1 1 7 1 5 1 6 1 0 1 7 4 1 8 2 1 8 2 3 8 2 1 8 2 3 NB R 3 8 3 8 3 9 3 9 1 0 4 9 1 0 4 9 N B R 8 9 8 9 9 1 9 1 1 8 1 0 9 1 8 1 0 9 SB L 3 2 3 2 3 3 1 2 4 5 4 5 4 5 S B L 1 1 8 1 1 8 1 2 0 8 0 2 0 0 2 0 0 2 0 0 SB T 1 4 9 5 5 8 1 5 5 3 1 5 8 4 1 5 8 4 5 3 1 6 3 7 5 3 1 6 3 7 S B T 1 6 3 9 1 6 3 9 1 6 7 2 - 6 1 6 6 6 5 8 1 7 2 4 5 8 1 7 2 4 SB R 9 9 9 9 9 9 S B R 1 1 1 1 1 1 1 1 1 1 1 1 EB U 00 0 0 0 0 E B U 00 0 0 0 0 WB U 0 0 0 0 0 0 W B U 1 1 1 1 1 1 NB U 0 0 0 4 1 1 4 2 4 7 8 9 5 3 9 5 N B U 0 0 0 2 1 1 2 2 5 1 7 3 5 8 8 0 SB U 2 6 2 6 2 7 2 7 2 7 2 7 S B U 2 8 2 8 2 9 2 9 2 9 2 9 To t a l 3 0 5 0 5 8 3 0 8 2 3 1 4 4 8 7 3 2 4 9 1 1 8 0 3 3 6 7 1 1 8 0 3 3 6 7 T o t a l 3 7 8 0 0 3 7 5 1 3 8 2 6 1 8 5 4 0 2 1 1 7 1 0 4 1 9 1 1 7 1 0 4 1 9 1 20 0 20 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 0 E B L 00 0 0 0 0 EB T 0 0 0 0 0 0 E B T 0 0 0 0 0 0 EB R 1 1 1 1 9 1 9 2 9 6 9 7 E B R 2 2 2 2 1 7 3 1 7 5 1 8 2 1 8 4 WB L 00 0 0 0 0 W B L 00 0 0 0 0 WB T 0 0 0 0 0 0 W B T 0 0 0 0 0 0 WB R 11 1 1 1 1 W B R 88 8 8 8 8 NB L 11 1 - 1 0 0 0 N B L 11 1 - 1 0 0 0 NB T 1 1 3 9 6 2 1 2 0 1 1 2 2 5 8 7 1 9 1 3 3 1 1 0 0 1 4 3 1 1 0 6 1 4 3 7 N B T 1 7 7 0 3 8 1 8 0 8 1 8 4 4 8 2 1 1 1 9 3 7 1 5 1 2 0 8 8 1 5 8 2 0 9 5 NB R 11 1 1 1 1 N B R 88 8 8 8 8 SB L 2 2 2 2 2 2 S B L 3 3 3 3 3 3 SB T 1 7 0 5 1 7 0 5 1 7 3 9 7 0 1 8 0 9 1 8 0 9 1 8 0 9 S B T 1 6 5 2 6 4 1 7 1 6 1 7 5 0 7 3 1 8 2 3 1 8 2 3 1 8 2 3 SB R 0 0 0 1 1 1 1 2 1 1 3 1 1 8 1 1 9 S B R 3 3 3 1 4 1 2 2 1 2 6 1 2 8 1 3 2 To t a l 2 8 5 0 6 2 2 9 1 2 2 9 7 1 1 5 7 3 1 4 7 3 0 3 0 3 4 4 9 3 2 0 0 3 4 6 6 T o t a l 3 4 4 7 1 0 2 3 5 4 9 3 6 2 0 1 5 5 3 7 8 6 4 4 6 0 4 2 3 1 4 6 8 0 4 2 5 3 30 0 30 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 1 0 1 1 1 1 0 1 1 1 0 1 1 E B T 2 0 2 2 2 1 8 2 0 1 8 2 0 EB R 00 0 0 0 E B R 00 0 0 0 WB L 0 0 0 1 0 0 1 0 0 1 0 6 1 0 6 W B L 0 0 0 1 0 9 1 0 9 1 1 5 1 1 5 WB T 1 0 1 1 1 1 2 1 3 1 2 1 3 W B T 4 0 4 4 4 1 3 1 7 1 3 1 7 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 0 0 0 0 0 N B T 0 0 0 0 0 NB R 00 0 8 2 8 2 8 6 8 6 N B R 0 0 0 1 5 5 1 5 5 1 6 4 1 6 4 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 0 0 0 0 0 S B T 0 0 0 0 0 SB R 0 0 0 0 0 S B R 0 0 0 0 0 To t a l 2 0 2 2 0 2 2 0 3 0 2 0 6 2 1 4 0 2 1 6 T o t a l 6 0 6 6 0 6 2 9 5 0 3 0 1 3 1 0 0 3 1 6 US 1 7 B U S a t M a r s h O a k s R o a d US 1 7 B U S a t B u m p A l o n g R o a d Bu m p A l o n g R o a d a t S i t e A c c e s s 1 Bu m p A l o n g R o a d a t S i t e A c c e s s 1 US 1 7 B U S a t B u m p A l o n g R o a d US 1 7 B U S a t M a r s h O a k s R o a d 40 0 40 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 1 0 1 1 1 1 1 E B T 2 0 2 2 2 2 2 EB R 00 0 0 0 E B R 00 0 0 0 WB L 00 0 1 2 1 2 1 2 1 2 W B L 00 0 1 3 1 3 1 3 1 3 WB T 1 0 1 1 1 1 1 W B T 4 0 4 4 4 4 4 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 0 0 0 0 0 N B T 0 0 0 0 0 NB R 00 0 1 0 1 0 1 0 1 0 N B R 00 0 1 8 1 8 1 8 1 8 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 0 0 0 0 0 S B T 0 0 0 0 0 SB R 0 0 0 0 0 S B R 0 0 0 0 0 To t a l 2 0 2 2 0 2 2 1 0 2 4 2 1 0 2 4 T o t a l 6 0 6 6 0 6 3 1 0 3 7 3 1 0 3 7 50 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 0 0 0 0 0 E B T 0 0 0 0 0 EB R 00 0 0 0 E B R 00 0 0 0 WB L 00 0 0 0 W B L 00 0 0 0 WB T 0 0 0 0 0 W B T 0 0 0 0 0 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 0 0 0 6 6 0 N B T 0 0 0 6 6 0 NB R 00 0 0 0 N B R 00 0 0 0 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 0 0 0 5 5 0 S B T 0 0 0 9 9 0 SB R 0 0 0 0 0 S B R 0 0 0 0 0 To t a l 0 0 0 0 0 0 1 1 0 1 1 0 0 0 T o t a l 0 0 0 0 0 0 1 6 0 1 5 0 0 0 60 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 0 0 0 0 0 E B T 0 0 0 0 0 EB R 00 0 0 0 E B R 00 0 0 0 WB L 00 0 0 0 W B L 00 0 0 0 WB T 0 0 0 0 0 W B T 0 0 0 0 0 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 1 1 2 1 1 1 2 1 1 1 4 4 1 7 1 1 6 1 5 3 1 2 1 4 5 3 1 2 1 4 N B T 1 8 5 4 1 8 5 4 1 8 9 1 1 0 4 1 9 9 5 5 8 2 0 5 3 5 8 2 0 5 3 NB R 00 0 0 0 N B R 00 0 0 0 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 1 8 0 5 1 8 0 5 1 8 4 1 7 0 1 9 1 1 4 3 1 9 5 4 4 3 1 9 5 4 S B T 1 6 3 2 1 6 3 2 1 6 6 5 7 3 1 7 3 8 8 2 1 8 2 0 8 2 1 8 2 0 SB R 0 0 0 0 0 S B R 0 0 0 0 0 NB U 0 0 0 0 0 N B U 0 0 0 0 0 SB U 0 0 1 8 1 8 5 3 7 1 5 3 7 1 S B U 0 0 1 0 1 0 1 0 0 1 1 0 1 0 0 1 1 0 To t a l 2 9 2 6 0 2 9 2 6 2 9 8 5 8 7 3 0 7 2 9 6 0 3 1 6 8 9 6 0 3 1 6 8 T o t a l 3 4 8 6 0 3 4 8 6 3 5 5 6 1 7 7 3 7 3 3 1 4 0 0 3 8 7 3 1 4 0 0 3 8 7 3 Ra i n t r e e R o a d a t S i t e A c c e s s 3 Ra i n t r e e R o a d a t S i t e A c c e s s 3 Bu m p A l o n g R o a d a t S i t e A c c e s s 2 Bu m p A l o n g R o a d a t S i t e A c c e s s 2 US 1 7 B U S U - t u r n US 1 7 B U S U - t u r n 1/6/17 160257 Buy Quick Convenience Mart – Transportation Impact Analysis 38 Supporting Documentation T BRICK WALL 28"X39" BRICK WALL 28"X39" CB DI DI DIT BRICK WALL 28"X39" BRICK WALL 28"X39" CB DI DI DI 51 21 22 61 62 41 42 8182 MP#2 NOTES PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND TABLE OF OPERATION FACE SIGNAL PHASE SIGNAL FACE I.D. FLASH 0 1 + 6 0 1 + 5 02+502+604+8 SHEET NO.PROJECT REFERENCE NO. PREPARED BY: SIG. INVENTORY NO. SCALEREVISIONS REVIEWED BY: INIT.DATE REVIEWED BY:PLAN DATE: 0 Division 3 New Hanover County Wilmington Sterling 1"=40’ 40 03-1027 40238.1.1 Sig. 1 N k g p e e d i n S : \ I T S & S U \ I T S S i g n a l s \ S i g n a l D e s i g n S e c t i o n \ E a s t e r n R e g i o n \ D i v - 0 3 \ P O R \ 0 3 - 1 0 2 7 \ 0 3 1 0 2 7 _ s i g _ P O R _ 2 0 1 5 m m d d . d g n 1 6 - S E P - 2 0 1 5 1 6 : 2 7 FEATURE PHASE 124568 MIN RECALLMIN RECALL YELLOWYELLOW ONON 159020159020 ---- ------ ---- -- ---- ----1515 3434 3.03.0 4.54.5 --ON--ON ---- ---- ONONONON is shown. Min Green for all other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what Simultaneous Gap Dual Entry Vehicle Call Memory Recall Mode Minimum Gap Time To Reduce * Time Before Reduction * Max Variable Initial * Seconds Per Actuation * Don’t Walk 1 Walk 1 * Red Clearance Yellow Clearance Max Green 1 * Extension 1 * Min Green 1 * 2.02.02.02.0 6.06.0 71277127 ---- ---- 3030 Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSEDEXISTING Sign Modified Signal HeadN/A Junction Box N/ARight of Way TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH NE W C A R D N E W L O O P FU L L T I M E D E L A Y EX T E N S I O N CA L L I N G SY S T E M L O O P 1A 1B 2A 2B 4A 5A 5B 6A 6B 8A 6X40 6X40 6X40 6X40 6X40 6X40 +5 0 0 +5 0 0 6X6 6X6 6X6 6X6 300 300 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 5 5 5 5 Y Y Y Y Y Y Y Y Y Y Y YY Y Y Y Y Y Y Y Y Y Y Y - - - - Y - - - - - - - - - - - - - - - - - Y -10 10 15 15 1 1 6 2 2 4 5 2 5 6 6 8 0% Grade 45 MPH 0% Grade 45 MPH = FLASHING YELLOW ARROW 51 1 1 81 61, 62 41 21, 22 82 42 1 1 21, 22 41 42 51 61, 62 81 82 R RR R R R G GG G G G G G Y Y RRR R R R R R RRR RRR R R R R R RRR 3.0 1.5 3.0 1.5 SR 2290 (Mendenhall Drive) SR 2734 (Marsh Oaks Drive)/ at US 17 Business (Market Street) Metal Pole with Mastarmexisting existing existing existing October 2008 PHASING DIAGRAM 01+5 04+8 02+6 02+5 01+6 300 300 3 3 - - - - - - - - - - - -- - - - - - All Heads L.E.D. R Y FY 12" R Y G 12" R YY G 12" existing existing existing existing SIGN 32"X68" MP#1 ex ex ex ex ex ex exe x ex ex US 17 Business (Market Street) US 17 Business (Market Street) S R 2 7 3 4 ( M a r s h O a k s D r i v e ) S R 2 2 9 0 ( Me n d e n h a l l D r i v e ) 1 SIGN clearance timing Relocate Market Street stopbars and adjust exex ex ex ex ex Plan of Record - - - - - - - - - - - - - - - - - - - - - - - - Pla1/27/10 PREPARED BY:DATE: DATE:REVIEWED BY: COMMENTS Plan of Record its original state. by field personnel. This plan may have been modified from This plan of record reflects existing field conditions as submitted DATE: SIGNATURE: K.G. Peedin, Jr June 2015 P.L. Alexander June 2015 Wilmington Signal System Fully Actuated 5 Phase 1. Refer to "Roadway Standard Drawings NCDOT" dated January 2012 and "Standard Specifications for Roads and Structures" dated January 2012. 2. Do not program signal for late night flashing operation unless otherwise directed by the Engineer. 3. Phase 1 and/or phase 5 may be lagged. 4. Set all detector units to presence mode. 5. Maximum times shown in timing chart are for free-run operation only. Coordinated signal system timing values supersede these values. 6. Signal system data: Controller Asset #: 1027. OASIS 2070 TIMING CHART 2 2 3.3 2.0 3.32.02.8 DATE NORTH CAR OLI N A ENGINEER PROFESSIO NAL P A MEL A L . ALEXAN DER 023489 SEAL REVISION SEAL 2 as to the revisions. This document is only certified on 10/09/2008 Robert J. Ziemba, PE-026486 issued and sealed by This document originally Only as to the Revisions - to the Original Document but Not a certified document as AA "U-TURN YIELD TO RIGHT TURN" Sign (R10-16) 3.8 + 1 % G r a d e 2 5 M P H F Y F Y F Y F Y Y Y Adjust clearance timing OASIS 2070 LOOP & DETECTOR INSTALLATION CHART ( D e s i g n S p e e d 3 5 MP H ) 0 % G r a d e 5 5 MP H 3.8 2.8 11 speed limits. ciled stop bar locations, added sign, revised Added to city system, revised loop delay, recon- 5A 8A1B 1A 4A 5B 6B 6A 2A 2B TN T T I N D E P A R T ME N OF TRASPORT A IO N STA E OFNORTH C AROL A noisi v i D ytefaS dna ytiliboM noit atrop sn a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared in the Offices of: A 9/17/2015 9/17/2015 9/17/2015 Policy On Street And Driveway Access to North Carolina Highways Page 80July 2003 Policy On Street And Driveway Access to North Carolina Highways Page 80July 2003 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 0 / 37 29 / 580 / - 6 46 / 1 6 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 12 / 8 0 0 / 0 41 / 2 1 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT 70 / 7 3 87 / 8 2 0 / 0 0 / 0 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE A APPROVED DEVELOPMENTS US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Alexander Road 70 / 7 3 17 / 1 0 4 Ra i n t r e e Ro a d 0 / 0 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND 0 / 0 0 / 00 / 0 18 / 1 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 1 / 1 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT 0 / 0 19 / 1 1 0 / 0 1 / 1 DIRECTIONAL CROSSOVER *** NOT TO SCALE *** PROJECT NUMBER 160257 BUY QUICK CONVENIENCE MART WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE B REROUTED VOLUMES US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Alexander Road 0 / 0 0 / 0 Ra i n t r e e Ro a d 18 / 1 0 Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 6 Site Trip Distribution X% (Y%) XX% Entering Trip Distribution Exiting Trip Distribution Regional Trip Distribution N LEGEND SignalizedIntersection Unsignalized Intersection Site Right-In/Right-Out Intersection 13 60% 40% (5%) (7 0 % ) 5% (6 0 % ) (25%) (3 5 % ) 40 % 5% 55 % (6 0 % ) (2 5 % ) 40% (70%) (4 0 % ) Left-Over Intersection Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 7 Primary Site Trip Assignment N LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Traffic Right-In/Right-Out Intersection 14 Site 6/3 81 / 4 3 1/ 6 70 / 3 7 29/16 12 / 4 6 1/ 6 16 / 6 2 70 / 3 7 29 / 1 6 12/46 81/43 41 / 2 1 46 / 2 5 Left-Over Intersection DAVEN>ORT Transportation Impact Analysis ALDI Marsh Oaks Drive Site Wilmington, NC Prepared for ALDI, Inc. March 31, 2016 Analysis by: Monisha Badarinath SE.\L Mary Morgan, P.E. Drafting/Graphics by: Monisha Badarinath Reviewed by: Mary Morgan, P.E. Dan Cumbo, P.E. Sealed by: Mary Morgan, P.E. This report is printed on recycled paper with 30% post-consumer content. ~MAll paper is FSC Certified. The entire document, including binding, is 100% recyclable. ~ This document , together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Home Office: ."(J~ \\ ',"" !'" un h :'!t'lT'. :'Uilc 2.\ \\ i";,,," :'ak lll. -«: :r' I(J I vluin: .'>36.~· 1 · 1. 1 (, %; !','X: .".\(..·1:'0' ) "--;­ *** NOT TO SCALE *** PROJECT NUMBER 160210 ALDI -MARSH OAKS DRIVE SITE WILMINGTON, NC This document,together with the concepts and designs presented herein,is intended only for the specific purpose and client for which it was prepared. Reuse of,or improper reliance on,this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORTand the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND FIGURE 7A SITE TRIP DISTRIBUTIONS 32 / 28 41 / 360 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 32 / 2 8 0 / 0 0 / 0 0 / 0 0 / 0 SAT MIDDAY PEAK/ WEEKDAY PM 0 / 0Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Am b e r l e i g h Sh o r e s A c c e s s 18 / 16 0 / 0 73 / 6 3 18 / 1 6 0 / 0 0 / 0 Site Access 1 Si t e Ac c e s s 2 73 / 63 32 / 28 0 / 0 0 / 0 41 / 3 6 41 / 3 6 Site Access 3 91 / 79 0 / 0 0 / 0 0 / 0 0 / 0 18 / 1 6 *** NOT TO SCALE *** PROJECT NUMBER 160210 ALDI -MARSH OAKS DRIVE SITE WILMINGTON, NC This document,together with the concepts and designs presented herein,is intended only for the specific purpose and client for which it was prepared. Reuse of,or improper reliance on,this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORTand the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND FIGURE 7B SITE PASS-BY TRIPS 0 / 9 0 / 60 / -6 0 / -90 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 6 0 / 0 0 / 0 0 / 0 0 / 0 SAT MIDDAY PEAK/ WEEKDAY PM 0 / 0Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Am b e r l e i g h Sh o r e s A c c e s s 0 / 2 0 / -2 0 / 1 7 0 / 0 0 / 0 0 / 0 Site Access 1 Si t e Ac c e s s 2 0 / 15 0 / 6 0 / 0 0 / -9 0 / 9 0 / 0 Site Access 3 0 / 17 0 / 0 0 / 0 0 / 0 0 / 0 0 / 2 BM14 1 5 " R C P - I V 1 5 " R C P - I V 15 " R C P - I V 15 " R C P - I V 2 4 " R C P - I V 18" RCP-III RCP-III15" 42" RCP-III 1 5 " R C P - I I I 2 4 " R C P - I I I 15 " R C P - I V 15 " R C P - I I I 1 5 " R C P - I I I R C P - I I I 1 8 " G eotextile Sl o p e F i l l RE T A I N 15" RCP-IV R C P - I V 1 5 " R E M O V E R E M O V E R E M O V E R E M O V E R E M O V E ES T . 1 2 S Y G F E S T . 4 T O N S C L A S S ' I ' R I P - R A P RE M O V E R E M O V E R E M O V E REMOVE REMOVE R E M O V E RE M O V E RE M O V E RE M O V E R E M O V E R E M O V E R E M O V E R E M O V E RE M O V E RE M O V E RE M O V E RE M O V E RE M O V E RE M O V E REMOVE REMOVEREMOVEREMOVEREMOVEREMOVE SE E D E T A I L C SP E C I A L L A T . ' V ' D I T C H EST. 200 SYGFEST. 90 TONSDDE = 340 CYS=6.4114%SEE DETAIL D VAR. WIDTH BASE DITCH RETAINRETAIN M B 9 P G 1 6 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 1 3 6 9 P G 5 6 4 LOST TREE LLCBROWN JOHNNY E B R O W N G E O R G E E D W A R D E T A L D B 1 2 0 0 P G 4 7 1 D B 7 8 8 P G 1 4 6 D B 5 3 1 3 P G 1 8 9 9 M B 3 1 1 P G 3 1 2 D B 6 8 1 P G 1 0 8 D B 1 2 0 0 P G 4 7 1 P R I D G E N D A R L E N E R M B 3 1 1 P G 3 1 2 D B 1 2 0 0 P G 4 7 1 D B 5 1 9 9 P G 1 6 5 B A Y S H O R E E S T A T E S I N C D B 6 8 1 P G 1 0 7 D B 3 2 6 5 P G 2 1 9 D B 2 8 3 0 P G 5 4 D B 1 2 0 5 P G 1 3 2 1 D B 1 4 0 3 P G 1 2 5 6 D B 1 6 4 9 P G 1 2 2 D B 3 2 6 5 P G 2 1 9 D B 2 8 3 0 P G 6 9 D B 1 2 1 0 P G 1 5 4 D B 1 2 1 4 P G 4 4 7 D B 1 6 4 9 P G 1 2 4 D O W N I N G A N N S DOWNING ANN S DB 841 PG 602DB 1210 PG 154DB 1646 PG 1384 DB 2889 PG 1354MINI STORAGE INCOCEAN HIGHWAY MB 21 PG 31DB 1326 PG 1144DB 1878 PG 308HOWELL ROBERT RHRSMOORE THERESA DB 1389 PG 1122DB 1397 PG 656DB 97GS PG 1442DB 862 PG 475 DB 1389 PG 1122DB 1397 PG 656DB 97GS PG 1442DB 1637 PG 1536DB 474 PG 621 C N S P R O P E R T I E S L L C D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 2 7 4 5 P G 8 7 9 D B 3 0 6 7 P G 2 6 D B 3 2 3 2 P G 5 2 5 D B 1 3 0 5 P G 1 2 8 9 D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 1 9 9 8 P G 2 2 5 D B 3 3 0 0 P G 9 1 9 P I E R P A N H E N R Y J M O N I C A M 7 6 4 3 M A R K E T S T R E E T L L C D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 5 6 1 7 P G 2 5 9 0 D B 5 7 4 5 P G 2 0 4 4 D B 5 7 9 9 P G 1 4 4 7 C H R I S T S S A N C T I F I E D H O L Y C H U R C H M B 3 1 P G 2 6 4 D B 1 5 6 9 P G 5 3 5 D B 1 6 4 9 P G 1 1 9 M B 5 0 P G 3 3 6 D B 5 1 6 6 P G 2 5 6 1 DB 5687 PG 2119DB 2889 PG 135420' ACCESS EASEMENT DB 2830 PG 69 30' SEWER EASEMENT DB 3067 PG 2610' WATER EASEMENT D B 3 3 0 0 P G 9 1 9 3 0 ' S E W E R E A S E M E N T MB 50 PG 33610' UTILITY EASEMENT (PRIVATE) M B 5 0 P G 3 3 6 2 6 ' S E W E R E A S E M E N T MB 50 PG 33626' SEWER EASEMENT DB 5799 PG 1447 10' ACCESS EASEMENT DB 5799 PG 144710' ACCESS EASEMENT E I P EI P B E N T E I P M B A R E A LA N D S C A P E EI P P I N C H E I P P I N C H GRAVEL GRAVEL E I P C URB ASPHALT FLUME S 6 " C O N C C U R B 6 "CO NC C URB CONC CONC ASPHALT EI P P I N C H 6 " C U R B 6 "C O NC CU RB CONC GRAVEL GRAVELGRAVELGRAVELCONC36"SRFS36"SRFEIPDIST CONC70"WPF6"CONC CURB CONC6"CURB6"CURB SS ASPHALT6"ASPHALT CURBSOIL8"ASPHALT CURBASPHALTSHOUSEPUMPS60"CHL60"CHL60'CHL60'CHLEIPPINCH CANBUS1SMTLBUS1SBLKBUS1SMTL B U S 1S M T L B U S 1S W D 1S F D B U S 1S W D MONNCGSMKRTELSGRAVELS 2 4 "BL KWA L L ASPHALT S S S E I P E I P S E I R B E N T EIREIR S OIL GRAVEL BUS1SBLK 3 6 " R C P 3 0 " RC P 15 " R C P 18 " R C P 30 " R C P 2 4 " R C P 24" RCP 15 " R C P 18" CMP 18 " RCP 18" RCP 18" RCP 8 " P VC 8" PVC 8" PVC 8 " P V C 60" CMP 36" RCP 18" RCP 12 " R C P 12 " R C P 12" RCP JB NOT FOUND.UNDER GROUND S EXISTING R/W EXISTING R/W 6 0. 0 0' 100.00'60.00' E X I S T I N G R / W EX I S T I N G R / W EXISTING R/W GRAVEL ASPHALT GRAVEL60' BST M A R K E T S T R E E T U S H W Y 1 7 ALEXANDER ROAD 19' BSTSR 1345 C B C B C B C B C B C B C B CBCBCB GR A V E L D I D I D I DI DI WOOD ASPHALT HEADWALL HEADWALL HEADWALL HE A D W A L L HEADWALLDB 1637 PG 153615' DRAINAGE EASEMENT 3 0 " R C P SOIL/GRAVELDB 1637 PG 153635' DRAINAGE EASEMENT 60" CMP18" RCP S S S S SSMB S 12" HDPE12" HDPE DI DI30" RCP BST VARIES GREENVIEW DRSR 2082 60 . 5 ' B S T M A R K E T S T R E E T U S H W Y 1 7 JR D O R O T H Y B A L K C U M J A M E S T R/WEXISTING P R O P E R T I E S I N C S H E L L I N G T O N B A R B A R A A N N J O R D A N 60" CM P 24" RCP HOWELL ROBERT R I IIIIH lcb bIIII b HHIHHl bbHH|b|b b | E O R I C EORI T T 16 SEE SHEET 15 MATCH LINE -L- 244+00.00 SEE SHEET 17 MATCH LINE -L- 258+00.00 1 . A L L D R I V E W A Y R A D I I A R E 2 0 ' U N L E S S N O T E D O N P L A N S . N O T E : R E M O V E D P E R D A V I D L E O N A R D E M A I L 3 0 . 0 0 ' R T + 2 5 . 0 0 - Y 3 1 - 6 2 . 0 0 ' L T + 2 0 . 0 0 - L - 1 5 5 C J R E T A L B R I N K L E Y L L O Y D SEE SHEET 2B-4FOR INTERSECTION DETAIL OF -Y32-, FOR -Y32- PROFILE, SEE SHEET 33FOR -Y31- PROFILE, SEE SHEET 33FOR -L- PROFILE, SEE SHEET 27 7 5 . 0 0 ' L T + 2 1 . 6 3 - L - CAT-1 F F F F F F F FFFFCCFCFFFF F F F F F F FF F F F F F F F F C - B L - 1 3 -BL- 14 - B L - ? 6 2 . 0 0 ' R T 7 2 . 0 0 ' R T 8 0 . 0 0 ' R T + 8 3 . 0 0 - L - 7 5 . 0 0 ' R T + 9 3 . 8 6 - L - 1 0 6 . 0 0 ' R T + 4 6 . 0 0 - L - 1 0 6 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T + 3 9 . 0 9 - L - 6 2 . 0 0 ' R T 7 2 . 0 0 ' R T 8 0 . 0 0 ' R T + 0 3 . 0 0 - L - 72.00' RT+72.32 -L-283.00' RT+88.00 -L-62.00' RT+73.00 -L-281.00' RT+58.00 -L-72.00' RT+02.32 -L-62.00' RT+03.00 -L-62.00' RT+33.00 -L-75.00' RT+42.00 -L-62.00' RT+82.00 -L-75.00' RT+91.00 -L- 3 0 . 0 0 ' L T + 2 5 . 0 0 - Y 3 1 - 6 2 . 0 0 ' L T + 1 6 . 0 0 - L - 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 0 0 . 0 0 - L - 81.00' LT+34.00 -L-62.00' LT+70.00 -L-76.00' LT96.00' LT+09.00 -L-62.00' LT76.00' LT+27.00 -L-62.00' LT135.00' LT+40.00 -L-62.00' LT135.00' LT+10.00 -L- 1 5 7 1 5 8 1 5 9 1 6 3 1 6 4 166167170172169 1 6 0 1 6 1 1 6 2 1 6 5 1 6 8 171171 30.00' LT+50.00 -Y32-30.00' RT+50.00 -Y32- 62 . 0 0 ' L T 75 . 0 0 ' L T 8 1 . 0 0 ' L T + 8 9 . 0 0 - L - 81.00' LT96.00' LT+87.00 -L- 6 2 . 0 0 ' R T + 7 2 . 0 0 - L - B E G I N C / A 6 2 . 0 0 ' R T + 8 0 . 0 0 - L - E N D C / A 3 0 . 0 0 ' L T + 2 5 . 0 0 - Y 3 1 - 43.71' RT+39.00 -Y32-72.00' RT+39.92 -L- 8 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T + 5 5 . 0 0 - L - 6 2 . 0 0 ' L T + 0 0 . 0 0 - L - 45.00' RT+09.00 -Y32-81.00' LT+63.38 -L- REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:48 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_16.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED G T D G T D G TD G TD 1 5 " R C P - I V 1 6 0 5 1 6 0 6 15 " R C P - I V C B - F 15" RC P-IV 1 5 " R C P- I V 1 6 0 9 1 6 1 5 1 6 1 8 1 6 1 7 1 6 1 9 1 6 2 0 REM O VE 1 6 2 1 1 6 2 2 1 5 " R C P - I V REMO VE 1 6 2 5 1 6 2 6 1 5 " R C P - I V 24 " R C P - I V 24 " R C P - I V 1 6 2 7 1631RCP-IV15"1632 1633163515" RCP-IV15" RCP-IV1637 REMOVE 1 6 0 3 1 6 0 4 C B - G REMO VE 1 6 0 8 C B - G 1 6 0 7 D I 1 6 1 1 C B - G 1 6 1 0 D I 1 6 1 2 C B - G 16 1 3 D I REM O VE 16 1 4 C B - G REM O VE 1 6 2 3 1 6 2 4 C B - G D I 1 6 2 8 C B - G REMOVE42" RCP-IVCB-G 1634CB-G1636 42" RCP-IV 164016301629DI1638CB-G1639CB-EREMOVE C B - E C B - E 1 6 4 1 1 6 4 2 18" RCP-III36" RCP-III 36 " RC P-III 3 6 " RCP- III 3 6 " R C P - I I I 3 0 " R C P - I I I 3 0 " R C P - I I I 3 0 " R C P - I I I 15 " R C P - I V 2:12:1D( Not to Scale)STANDARD BASE DITCH Bd FRO M - L- STA. 256+58 TO -L- STA. 256+96DETAIL D G ro und N atural GroundNatural Typ e o f Lin er= Class 'I' Rip-Rap GTD ( N o t t o S c a l e ) SP E C I A L L A T E R A L ' V ' D I T C H 3:1 D F R O M - Y 3 1 - S T A . 1 1 + 3 0 T O S T A . 1 1 + 9 5 L T . M i n . D = 1 . 0 F t . D E T A I L C G r o u n d N a t u r a l Flatter 4:1 or C B - F C B - F 3 0 " RC P - I I I C B - F C B - F D I D I D I C B - F C B - F D I C B - F CB-FGTDDIDI CB-FCB-FCB-FCB-ERETAINRCP-IV15" B= VAR. Ft.Max. d= 5.0 Ft.Min. D= 2.0 Ft.1643 DI-SD 1 @ 96" RCP-III1 @ 96" RCP-IIIDI15" RCP-III E XI S T. 0 2 + 3 5. 5 0 INC21' 0 2 0 2 0 1 0 0 0 20 1 + 0 3. 4 9 025 CR CR CR CR C R CR CR 025 CR 24'24' 24' +97.80 5 0 ' R 1 5' 1 5' 50' R +29.98 50' +16.00 4 5 ' 24' 3.5' 3 5 ' R 3.5' 8.75' 8.75' +56.00 1 5 0 ' M E D I A N B A Y T A P E R 24'+51.00 41.5'30.17' 3 0 . 0 ' R 6 2 . 7 5 ' L T + 1 5 . 7 7 - L - 30' M O U N TED ) (SURFAC E C O N C . ISLAN D M O N O LITH IC PRO P. 5 " PR O P . 1 0 ' M U L T I - U S E P A T H PR O P . 5 ' S I D E W A L K 29.50' 1 0 . 0 ' R 5 2 . 9 2 ' R T + 0 9 . 2 2 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 1 0 . 0 3 - L - C O N C . C U R B P R O P . 8 " X 1 8 " PA T H M U L T I - U S E P R O P . 1 0 ' PA T H M U L T I - U S E P R O P . 1 0 ' P R O P . 5 ' S I D E W A L K 5 0 . 0 ' R 2 3 . 5 0 ' R T + 7 6 . 0 0 - L - 1 5 . 0 ' R 4 7 . 7 5 ' R T + 1 6 . 8 7 - L - + 7 7. 9 0 - Y3 1 - 7 5 . 0 ' R 1 1 3 . 2 5 ' R T + 8 3 . 9 5 - L - 2 . 0 ' R 8 . 7 5 ' L T + 6 6 . 0 0 - L - 17.5' 2 . 0 ' R 7 . 0 ' R T + 7 6 . 0 0 - L - 24' 17.5'24' 3 0 . 0 ' R 7 4 . 7 5 ' L T + 9 5 . 9 3 - L - M O U N T E D ) (S U R F A C E C O N C . I S L A N D M O N O L I T H I C P R O P . 5 " 2 . 0 ' R 7 . 0 ' L T + 2 5 . 0 0 - L - 245 250 255-Y32- POT Sta. 10+00.00 -Y31- - Y 3 1 - P O T S T A 1 2 + 5 0 . 0 9 - L - P O T S T A 2 4 4 + 7 9 . 1 0 = - Y 3 2 - P O T S T A 1 3 + 0 2 . 1 0 - L - P O T S T A 2 5 4 + 2 5 . 7 0 = 1 0 - Y 3 1- P O T S t a . 10 + 0 0 . 0 0 - Y 3 1 - P O T S T A 1 1 + 2 5 . 0 0 B E G I N C O N S T R U C T I O N -Y32- POT STA 11+50.00BEGIN CONSTRUCTION - L - -Y32- 106' 62' 62' 62'62'NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C. T TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT 15" RCP-IV15" RCP-IV15" RCP-IV15" RCP-IV 15" RCP-III 15" RCP-IV15" RCP-IV 15 " R C P - I I I RETAINRETAIN FOR 2:1 SLOPESROCK PLATING R E M O V E R E M O V E R E M O V E RE M O V E RE M O V E RE M O V E RE M O V E REMOVEREMOVEREMOVEREMOVEREMOVE REMOVEREMOVEREMOVEREMOVE SEE DETAIL E (DO W N STREAM ) IM PRO VEMEN TS C U LVERT C H AN N EL E S T . 2 0 0 S Y G F E S T . 9 0 T O N S D D E = 3 4 0 C Y S = 6 . 4 1 1 4 % S E E D E T A I L D VA R . W I D T H B A S E D I T C H MB 57 PG 207 & 208MB 39 PG 178MB 37 PG 101DB 2304 PG 351DB 2519 PG 813DB 5075 PG 464DB 5524 PG 734DB 5691 PG 1629 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 1 6 3 7 P G 1 5 3 6 D B 4 7 4 P G 6 2 1 W I L S O N S H I R L E Y C A P E F E A R M A R I N E G R O U P L L C D B 2 4 7 2 P G 3 2 3 D B 4 8 8 8 P G 9 1 O G D E N 1 2 P R O P E R T I E S L L C D B 2 4 9 1 P G 8 2 8 D B 2 4 9 1 P G 8 3 1 D B 5 3 9 6 P G 1 6 2 1 D B 5 2 8 0 P G 1 0 7 6 D B 2 4 9 1 P G 8 3 4 D B 5 3 9 6 P G 1 6 2 1 D B 5 2 8 0 P G 1 0 7 6 L E E E S T H E R F LEE ESTHER FDB 1173 PG 1613DB 1389 PG 1122DB 1397 PG 656DB 1630 PG 1534POTTER WALTER LARRY VIRGINIA SDB 875 PG 194DB 1389 PG 1122DB 1397 PG 656DB 97GS PG 1442DB 2745 PG 886DB 5195 PG 1317 M B 2 5 P G 1 7 4 D B 1 3 2 2 P G 3 9 8 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 4 3 3 5 P G 3 3 1 D B 5 1 3 5 P G 1 2 2 4 P O R T E R S N E C K B U S I N E S S P K C O A I N C K R U E G E R J E A N A F A M I L Y T R U S T M B 2 5 P G 1 7 4 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 8 8 5 P G 1 6 M B 2 5 P G 1 7 4 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 4 5 4 P G 9 1 5 D B 2 7 0 6 P G 5 7 5 P O N D S E D G E O F F I C E H O A I N C D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 4 6 7 4 P G 5 4 8 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 1 2 9 1 P G 1 9 0 8 H R S M O O R E T H E R E S A D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 8 6 2 P G 4 7 5 M B 4 7 P G 4 2 D B 4 6 3 8 P G 3 0 5 D B 3 9 5 2 P G 3 3 3 M B 4 7 P G 4 2 D B 4 6 3 8 P G 3 0 9 D B 4 6 9 6 P G 1 6 0 D B 5 0 6 5 P G 2 2 0 4 D B 5 2 8 9 P G 1 7 8 5 D B 3 9 5 2 P G 3 3 3 D B 4 5 7 2 P G 2 6 9 M B 5 4 P G 7 9 D B 1 3 2 0 P G 4 2 D B 5 2 8 2 P G 2 6 7 8 MB 54 PG 79DB 5410 PG 2110DB 5799 PG 2954 M B 4 7 P G 4 2 10 ' U T I L I T Y E A S E M E N T M B 5 4 P G 7 9 30 ' S E W E R & U T I L I T Y E A S E M E N T MB 54 PG 7910' UTILITY EASEMENT MB 57 PG 20715' ACCESS EASEMENT (PRIVATE)DB 2745 PG 886SEWER EASEMENT30' WATER & 60'CHL EI P P I N C H ASPHALT 8 "C O NC C UR B S FL A G CONC ASPHALT E I P E I P E I P S 24"C&G 24"C&G EI R E I P O L D GUY BOXALPHAMKRFO SOILGRAVELROPEFENCESCONCROPEFENCECONCASPHALTEIRGATESGRAVELRIPRAPS V A U L T E I P P I N C H EI R S P I E R BR K P I E R B R K E I P 6"C UR B 6"CURB 6 " C U R B SOIL E I R WDSHED GRAVELSOIL15" RCP 15" RCP 15 " R CP 15" RCP 18" RCP15" HDPE 3 0 " R C P 18" RCP 15" RCP 18" RCP24" RCP15" RCP24" RCPSSS 100.00' 60.00'100.00'EXISTING R/WEXISTING R/W E X I S T I N G R / W E X I S T I N G R / W A S P H A L T GRASS ISL 84" SWALEXANDER ROAD 20' BSTSR 1345 C B C B CB C B CBCBCBMARKET STREET BST VARIESUS HWY 17 D I DISSSSSS 60" CM P C U R B 8 "C ON C II I E T A L G E O R G E E S A U N D E R S P R O P E R T Y L L C T H R E E O A K CATHLEEN ETALPADGETT G O R D O N E T A L E V E R E T T II I E T A L G E O R G E E S A U N D E R S H O W E L L R O B E R T R D B 5 6 8 7 P G 2 1 1 9 | | |b IIIH II I b aIlI|b | lHcaI l H bb b 12" D.I. LINE IN 24" STL. CASING12 ", D.I., CFPU IPIV V A L V E F S S VALVEFSS VALVEFSSC EOI EOI HH T T17SEE SHEET 18 MATCH LINE -L- STA 272+00.00 SEE SHEET 16 MATCH LINE -L- STA 258+00.00 1 . A L L D R I V E W A Y R A D I I A R E 2 0 ' U N L E S S N O T E D O N P L A N S . N O T E : R E M O V E D P E R D A V I D L E O N A R D E M A I L D A T E D 7 / 1 7 / 1 5 AMBERLEIGH SHORES LLC FOR INTERSECTION DETAIL FOR -Y33-, SEE SHEET 2B-4FOR -Y33- PROFILE, SEE SHEET 33FOR -L- PROFILE, SEE SHEET 28 1 7 1 B R O W N J O H N N Y E ST E E L B E A M G U A R D R A I L GROUNDORIGINAL 2 ' 1' C L E A R A N C E M I N . 18 " C L A S S I V S E L E C T M A T E R I A L ( A B C ) 10' MAX. 3' M I N . NECESSARY M IN. IF 5' O VERLAP (S E E N O T E 3 ) 2 ' T H I C K R I P R A P RO C K P L A N T I N G GE O T E X T I L E F O R OVERLAP DETAILSEE GEOTEXTILE (TOE OF SLOPE)CONSTRUCTION LIMITSLOPE STAKE POINT ANDFLATTER FILL SLOPE1.5:1(H:V) ORBREAK POINT (TOP SLOPE)SHOULDER OR BERM R O C K P L A T I N G D E T A I L - T Y P I C A L S E C T I O N FI N I S H E D G R A D E D E T A I L S SE E R O A D W A Y T Y P I C A L S F O R - L - S T A . 2 7 1 + 0 0 T O S T A . 2 7 8 + 5 0 R T 21 0 . 0 0 ' R T + 3 7 . 0 0 - L - G R A U - 3 5 0 GRAU 350 F F F F F F F F F FFFF F F F F F F F FF F - B L - 1 5 16-BL- 6 7 . 0 0 ' R T + 0 0 . 0 0 - L - 78.00' RT+62.00 -L-85.00' RT+00.00 -L- 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 4 0 . 0 0 - L - 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 0 0 . 0 0 - L - 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 3 3 . 0 0 - L - 26.37' RT+65.00 -Y33-33.63' LT+65.00 -Y33-62.00' LT+56.00 -L- 1 7 3 1 7 4 1 7 5 1 7 7 1 8 2 1 8 3 187 1 7 6 1 7 9 1 8 0 1 8 4 185189 1 7 2 1 8 1 7 5 . 0 0 ' R T 9 5 . 0 0 ' R T + 7 9 . 0 0 - L - 7 5 . 0 0 ' R T 9 5 . 0 0 ' R T + 4 4 . 0 0 - L - 10 ' AT&T EASEM EN T 8 5 . 0 0 ' L T + 0 8 . 0 0 - L - 62.00' LT+55.00 -L- 6 7 . 0 0 ' R T + 9 5 . 0 0 - L - 1 0 5 . 0 0 ' R T + 8 9 . 0 0 - L - 78.00' RT+94.00 -L-78.00' RT+94.00 -L- 7 5 . 0 0 ' R T + 9 2 . 0 0 - L - 1 0 5 . 0 0 ' R T + 0 2 . 0 0 - L - 1 7 8 186 2 4 8 . 0 0 ' R T + 0 0 . 0 0 - L - 2 3 0 . 0 0 ' R T + 0 0 . 0 0 - L - 2 5 4 . 0 0 ' R T + 3 7 . 0 0 - L - 6 2 . 0 0 ' R T 8 8 . 0 0 ' R T 11 3 . 0 0 ' R T + 7 1 . 0 0 - L - 62.00' RT89.00' RT113.00' RT+36.00 -L-26.65' RT+15.00 -Y33-62.00' LT+10.00 -L-75.00' LT+21.14 -L-HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:49 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_17.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED G TD G T D GTDGTD 1 7 0 2 15 " RC P- IV 1 7 0 3 1 7 0 8 1 7 0 1 C B - F 1 7 0 4 1 7 0 5 C B - F D I 1 7 0 6 1 7 0 7 C B - G D I 1 7 0 9 C B - G 15 " RC P- IV 15 " RC P- IV REM O VE 1 7 1 0 C B - E 15 " RC P- IV RCP-IV 15" 1 7 1 3 1 7 1 4 CB-G D I 15 " RC P- IV 1716 15" RCP-IV17191720CB-G CB-G172117221723DICB-GCB-F 24" RCP-IVCB-G1728 24" RCP-IV17301731CB-GDI 24" RCP-IV C B - E 1 7 1 5 REMOVEREMOVE1732 CB-F 1729CB-F 1724CB-FDIDIDI172717261725RCP-IV15" 1718171715" RCP-IV CB-FCB-F 15 " R C P - I V 15" RCP-IV C B - G 15 " R C P - I V 1 7 1 1 1 7 1 2 RCP-III 15" 15 " RC P- III 15 " RC P- III 15 " RC P- III 15 " RCP- III d ( N o t t o S c a l e ) D E T A I L E (V a r i a b l e ) Ch a n n e l B e d N a t u r a l G r o u n d VA R. 1 . 5 ' M i n . D V A R. N a t u r a l G r o u n d C l a s s I R i p r a p M a x . d = 7 . 0 F t . ( T o T o p o f B a n k ) D = V a r i e s (D O W N S T R E A M ) CU L V E R T C H A N N E L I M P R O V E M E N T S ES T . 4 5 S Y G E O T E X T I L E F A B R I C ES T . 2 5 T O N S C L A S S I R I P R A P ES T . 5 C Y E X C A V A T I O N C B - G C B - G C B - G C B - F PLUG PL U G C B - E PLUG PLUG RCP-IV24"RETAINRETAIN 1 @ 96" RCP-III 1 @ 96" RCP-III 24" RCP-IV 025 025 CR CR CR CR CR CR CR CR CR CR 24' 36'24' 24'24' 2 0 . 0 ' R 6 7 . 0 0 ' R T + 1 3 . 8 5 - L - 2 0 0 ' B A Y T A P E R R T 36' +72.08 50' R C U R B EX I S T I N G TI E T O 5 0 ' R C U R B EX I S T I N G T I E T O +19.08 10 0 ' B A Y T A P E R R T 36' 17.5'24'32.75' 2 5 . 0 ' R 5 7 . 7 5 ' L T + 0 1 . 2 6 - L - +20.00 +86.00 P R O P . 5 ' S I D E W A L K P R O P . 1 0 ' M U L T I - U S E P A T H 5 . 0 ' R 5 7 . 9 2 ' R T + 6 8 . 9 3 - L - 5 . 0 ' R 5 7 . 9 2 ' R T + 3 2 . 9 3 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 7 9 . 8 5 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 7 3 . 7 2 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 1 3 . 7 2 - L - C U R B EX I S T I N G T I E T O P R O P . 1 0 ' M U L T I - U S E P A T H PA T H M U L T I - U S E P R O P . 1 0 ' P R O P . 1 0 ' M U L T I - U S E P A T H PROP. 10' MULTI-USE PATH +13.00 41.5' 24'+35.00 20 0 ' M E D I A N B A Y T A P E R 5 . 5 ' R 6 1 . 5 ' R T + 3 9 . 5 8 - L - +20.73 W I D T H 1 1 . 5 ' M E D . M O U N T E D ) (S U R F A C E C O N C . I S L A N D M O N O L I T H I C P R O P . 5 " C O N C . C U R B P R O P . 8 " X 1 8 " C O N C . C U R B P R O P . 8 " X 1 8 " 17.5' 2 5 . 0 ' R 5 7 . 7 5 ' L T + 1 9 . 8 7 - L - 17.5' 17.5' 24'32.75' 24' 20' -Y33- 260 265 27010-Y33- POT Sta. 10+00.00 -Y33- POT STA 12+50.70-L- POT STA 269+08.94 =-L- - L - -Y33- POT STA 11+65.00BEGIN CONSTRUCTION 62'62' 62'62'NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C. 5 4 " R C P - I I I 5 4 " R C P - I I I F O R 2 : 1 S L O P E S R O C K P L A T I N G F O R 2 : 1 S L O P E S R O C K P L A T I N G RE M O V E RE M O V E RE M O V E R E M O V E R E M O V E R E M O V E REMOVE R E M O V E REMOVE REMOVEREMOVE REMOVE REMOVEREMOVEREMOVEREMOVEREMOVE RE M O V E REMOVE RE M O V E RE M O V E RE M O V E R E M O V E R E M O V E E S T . 6 2 S Y G F E S T . 3 3 T O N S C L A S S ' I ' R I P - R A P D B 1 1 7 3 P G 1 6 1 3 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 1 6 3 0 P G 1 5 3 4 A M B E R L E I G H S H O R E S L L C D B 1 3 0 8 P G 1 2 6 0 D B 5 5 8 0 P G 1 6 4 4 BARBARA WFURR JAMES S DB 1223 PG 198DB 3013 PG 435DASJA INCORPORATED DB 1393 PG 1096DB 1915 PG 690DB 5399 PG 2823BAYSHORE ESTATES INCEAST CAROLINA BANKLIBERTY BAPTIST CHURCH OF WILM INC MB 16 PG 32DB 97GS PG 1442DB 1389 PG 1122DB 5690 PG 2878DB 5777 PG 2392 Y O S E F I N C M B 1 6 P G 3 2 M B 1 6 P G 3 1 D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 5 7 7 7 P G 2 3 9 2 D B 5 7 7 7 P G 2 3 9 6 M B 1 6 P G 3 1 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 1 0 5 0 P G 3 2 0 D B 1 7 6 2 P G 1 2 5 1 C A P E F E A R P U B L I C U T I L I T Y A U T H O R I T Y M B 1 6 P G 3 1 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 5 7 9 0 P G 9 6 1 G R A T H W O L P R O P E R T Y H O L D I N G S L L C E T A L M B 1 6 P G 3 1 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 5 4 7 0 P G 1 6 6 8 G E O R G E R O N A L D E M B 1 6 P G 3 1 D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 5 1 7 5 P G 1 8 1 2 D B 5 1 7 5 P G 1 8 0 3 S H I N B O O M I N MB 50 PG 225DB 5109 PG 2229DB 5361 PG 2881DB 5452 PG 1468DB 5492 PG 772 M B 5 7 P G 2 0 7 & 2 0 8 M B 3 9 P G 1 7 8 M B 3 7 P G 1 0 1 D B 2 3 0 4 P G 3 5 1 D B 2 5 1 9 P G 8 1 3 D B 5 0 7 5 P G 4 6 4 D B 5 5 2 4 P G 7 3 4 D B 5 6 9 1 P G 1 6 2 9 M B 5 7 P G 2 0 7 10 ' U T I L I T Y E A S E M E N T M B 5 7 P G 2 0 7 10 ' U T I L I T Y E A S E M E N T M B 5 7 P G 2 0 7 EA S E M E N T 30 ' N C D O T D R A I N A G E MB 57 PG 20730' ACCESS EASEMENTMB 57 PG 207 & 208DB 681 PG 109DB 5691 PG 1638 MB 57 PG 20820' UTILITY EASEMENTMB 50 PG 22530' SEWER EASEMENTMB 50 PG 22510' AT&T EASEMENT DB 5690 PG 287835' PUBLIC UTILITY EASEMENT EI R S 1 . 5 S F B U S CONCS CANNAILMAGASPHALT2SFBUSRRTIESSHOUSEPUMPEIRFLAGSASPHALTWDWDEIPEIPEIREIPS E I P E I P E I P 24"BRKWALL 24"BRKWALLEIRCAPEIPDISTEIR6"CONC CURB36"BLKW ALL 8" PVC 2 4 " R C P 15" RCP 24" RCP24" RCP24" RCP24" RCP 12" RCP12" RCP 2 4 " R C P 36" RCP 3 0 " R C P 15" RCP 30" RCP 36 " RCP 30" RCP 3 0 " R C P S 12" RCP 12 " R C P S S S 100.00'EXISTING R/W E X I S T I N G R / W E X I S T I N G R / W 8 4" S W C O N C I S L GRASS ISLASPHALT 8 4 " S W ASPHALT M A R K E T S T R E E T 6 0 ' B S T U S H W Y 1 7 72' BSTMARKET STREETUS HWY 17 MARSH OAKS DRIVE 24.5' BSTSR 2734 C B C B C B C B C B C B CBCBCBCBDIDIDIMENDENHALL LANE BST VARIES S S S S S S SS S S P R O P E R T I E S L L C W Q G O O D M A N ISL CONC 24" RCP HHdIHc l | | HH IH ARV EOI VALVEFSS V A L V E F S S T 18 SEE SHEET 17 MATCH LINE -L- STA 272+00.00 SEE SHEET 19 MATCH LINE -L- STA 286+00.00 FOR -L- PROFILE, SEE SHEET 28 1 . A L L D R I V E W A Y R A D I I A R E 2 0 ' U N L E S S N O T E D O N P L A N S . N O T E : BM 1 7 1 8 7 V I R G I N I A S P O T T E R W A L T E R L A R R Y ( - L - S T A . 2 7 9 + 0 0 . 0 0 I S L A N D ) D E T A I L 1 8 - A 1 4' 18' 2 . 0 ' R 6 0 . 4 1 ' R T + 0 3 . 5 8 2 . 0 ' R 4 8 . 2 5 ' R T + 9 6 . 5 0 2 . 0 ' R 4 0 . 7 5 ' R T + 8 9 . 2 5 2 . 0 ' R 4 0 . 7 5 ' R T + 1 6 . 2 9 2 . 0 ' R 4 8 . 2 5 ' R T + 0 9 . 9 8 2 . 0 ' R 5 7 . 2 5 ' R T + 0 2 . 1 6 2 . 0 ' R 5 7 . 2 5 ' R T + 0 4 . 8 8 IS L A N D ( S U R F A C E M O U N T ) P R O P . 5 " M O N O L I T H I C C O N C . STEEL BEAM GUARDRAIL GROUNDORIGINAL2'1' CLEARANCE MIN.18" CLASS IV SELECT MATERIAL(ABC)10' MAX.3' MIN.NECESSARYMIN. IF5' OVERLAP (SEE NOTE 3)2' THICK RIP RAPROCK PLANTINGGEOTEXTILE FOROVERLAP DETAILSEE GEOTEXTILE (TOE OF SLOPE)CONSTRUCTION LIMITSLOPE STAKE POINT ANDFLATTER FILL SLOPE1.5:1(H:V) ORBREAK POINT (TOP SLOPE)SHOULDER OR BERM ROCK PLATING DETAIL- TYPICAL SECTION F I N I S H E D G R A D E D E T A I L S S E E R O A D W A Y T Y P I C A L S F O R -L- STA. 271+00 TO STA. 278+50 RT A T - 1 F F F FFFCF FF FFF F 1 7 - B L - 8 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 5 . 0 0 ' R T + 0 0 . 0 0 - L - 6 2 . 0 0 ' R T 7 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T 8 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T 8 5 . 0 0 ' R T 10 1 . 0 0 ' R T + 0 8 . 0 0 - L - 7 2 . 0 0 ' R T 8 5 . 0 0 ' R T 1 0 1 . 0 0 ' R T + 3 3 . 0 0 - L - 8 5 . 0 0 ' R T + 4 7 . 0 0 - L - 1 0 5 . 0 0 ' R T + 9 0 . 0 0 - L - 1 0 5 . 0 0 ' R T + 3 7 . 0 0 - L - 8 5 . 0 0 ' R T + 5 7 . 0 0 - L - 72.00' RT85.00' RT+00.00 -L-72.00' RT+75.00 -L- 7 2 . 0 0 ' L T + 0 0 . 0 0 - L - 7 2 . 0 0 ' L T + 5 0 . 0 0 - L - 6 2 . 0 0 ' L T + 0 5 . 0 0 - L - 62.00' LT75.00' LT+70.00 -L-62.00' LT75.00' LT+50.00 -L-62.00' LT84.00' LT+67.00 -L-88.00' LT+93.00 -L- 1 8 8 1 9 0 1 8 9 1 9 1 1 9 2 1 9 3 197 198 196194195 6 2 . 0 0 ' L T + 3 5 . 0 0 - L - 50.52' RT+18.98 -Y35- REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:49 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_18.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 2 4 " RC P- IV 2 4 " RC P- IV 1 8 0 1 C B - E 2 4 " RC P- IV C B - F 1 8 0 3 2 4 " RC P- III 1 8 0 5 C B - G 2 4 " RC P- III 1 8 0 7 C B - E 1 8 0 9 C B - F 1 8 1 9 REMOVE 3 0 " RC P- III 1 8 1 0 C B - G RE M O V E R E M O V E 1 8 1 1 15 " RC P- III C B - F 15" RCP-IV1814 1816CB-FCB-F RCP-IV 15" 1815DI REMOVEREMOVE REMOVE1818CB-G15" RCP-IV 1813CB-G15" RCP-IV1817CB-GRCP-IV 15" C B - G 1 8 1 2 18 " RC P- IV 18 " R C P - I I I RE M O V E 1 8 0 8 C B - E 1 8 0 6 C B - F 2 4 " RC P- III 24 " RC P-III 2 4 " R C P - I V 1 8 0 4 C B - G 1 8 0 2 C B - E C B - F 2 4 " R C P - I V 2 4 " R C P - I V PL U G PL U G 5 4 " R C P - I I I RE T A I N HW 025 025 025025 CR CR CRCR 10 0 ' B A Y T A P E R R T +07.0024' 36' 2.0' R6.0' LT+86.00 C U R B EX I S T I N G T I E T O C U R B EX I S T I N G TI E T O 2 0 0 ' M E D I A N B A Y T A P E R +86.00 24' 5.5'24' 3 5 ' R 24'8.75'44.75'5.5'30'500' FULL STORAGE LANE 35' R35' R 15 0 ' F U L L L A N E S T O R A G E PROP. 10' MULTI-USE PATHPROP. 5' SIDEWALK +86.03 24' 3 5 ' R M U L T I - U S E P A T H P R O P . 1 0 ' PA T H M U L T I - U S E P R O P . 1 0 ' SI D E W A L K P R O P . 5 ' +10.00 W I D T H 1 1 . 5 ' M E D . M O U N T E D ) (S U R F A C E C O N C . I S L A N D M O N O L I T H I C P R O P . 5 " 17.5'24'24' 48'48' 1 8 - A SE E D E T A I L 275 280 285 - L - 62' 72'62' 62' NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C. T TT T T T T T T T T T T T T T T T T T T T TT TT T T T T T T T T T T T T T T T T T T T T T BMU49029 M B 5 7 P G 2 0 7 & 2 0 8 D B 6 8 1 P G 1 0 9 D B 5 6 9 1 P G 1 6 3 8 O C E A N S 1 0 L L C C L A R K J U D I T H J B A Y S H O R E E S T A T E S I N C M B 7 P G 6 9 D B 1 6 4 9 P G 1 2 8 D B 2 1 2 8 P G 3 1 3 D B 2 3 0 4 P G 3 5 1 D B 2 5 1 9 P G 8 1 3 D B 3 3 6 0 P G 2 7 D B 5 0 7 5 P G 4 6 4 D B 5 5 2 4 P G 7 3 4 D B 6 8 1 P G 1 0 9 D B 5 7 7 6 P G 1 7 6 1 D B 5 2 3 6 P G 7 6 3 B L U E G E M I N C M B 1 6 P G 3 2 M B 4 0 P G 4 9 M B 2 6 P G 1 0 3 D B 1 2 4 4 P G 1 6 5 6 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 7 4 9 P G 1 0 3 D B 2 8 5 5 P G 8 9 D B 5 7 1 7 P G 1 6 1 3 D B 5 7 9 5 P G 1 6 8 9 M B 4 4 P G 1 2 1 M B 3 9 P G 2 0 0 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 7 5 6 P G 6 9 2 D B 2 7 7 8 P G 8 6 8 D B 3 1 1 7 P G 9 6 8 D B 4 0 6 8 P G 3 3 D B 5 3 5 2 P G 1 7 7 D B 5 3 6 1 P G 2 8 8 1 MB 57 PG 208 20' UTILITY EASEMENT MB 44 PG 121UTILITY EASEMENT42' ACCESS & MB 4 4 P G 12 1 2 0' L A N D S C A P E B U F F E R M B 4 4 P G 1 2 1 30 ' S E W E R E A S E M E N T E I R C A P S S S 2 4 " B R K W A L L 6 "C O NC CURB A S P H A L T S ASPHALT 6" C O N C C U R B M B ASPHALT ASPH ALT 6" C O N C C U R B SOIL S 2 4 " C & G S E I P 2 4 " C & G S IC V S S E I R E I P P I N C H E I R E I P D I S T B O X T R A F E I P CONC 12 " R C P 15" RCP 8 " P V C 5 0. 0 0' EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W E X I S T I N G R / W EX I S T I N G R / W ASPHALT ASPHALT A S P H A L T 6 0 ' B S T M A R K E T S T R E E T U S H W Y 1 7 MARSH OAKS DRIVE 24.5' BST SR 2734 MARSH OAKS DRIVE 24.5' BSTSR 2734 MENDENHALL LANE BST VARIES D I D I S S S S S S S S S S S D E V E L O P M E N T L L C L I V E O A K p HH HH HH b I b a I a | l a c | IH I Q c V A L V E F S S PI P I N G F O U N D N O A S S O C I A T E D WM HH H H HH HH T 19 SEE SHEET 18 MATCH LINE -L- STA 286+00.00 3 7 1 7 7 3 7 6 2 3 2 0 3 6 2 0 1 6 3 8 8 2 9 3 8 2 3 7 2 9 4 0 2 1 2 5 2 5 2 9 1 9 3 7 - L - 6 0 9 2 4 2 4 0 1 8 5 9 6 7 4 6 1 8 2 4 8 M A R S H O A K S D R I V E - S R 2 7 3 4 ( - Y 3 5 - ) M E N D E N H A L L D R I V E ( - Y 3 4 - ) A N D I N T E R S E C T I O N O F U S 1 7 B U S I N E S S ( - L - ) , 3 1 0 0 1 1 0 0 FOR -L- PROFILE, SEE SHEET 29 E N D C O N S T R U C T I O N - L - P O T S T A . 2 8 9 + 5 0 . 7 5 E N D T I P P R O J E C T U - 4 9 0 2 C / D -Y34--Y35- E X I S T I N G S I G N A L 2 5 . 0 0 ' R T + 1 3 . 0 0 - Y 3 4 - 8 7 . 0 0 ' L T + 0 9 . 7 3 - L - 5 0 . 5 2 ' R T + 1 8 . 9 8 - Y 3 5 - 1 9 6 B A Y S H O R E E S T A T E S I N C FF 5 0 . 0 0 ' L T 7 3 . 0 0 ' L T + 2 6 . 0 0 - L - 1 9 9 2 0 1 2 0 2 2 0 0 2 5 . 0 0 ' L T + 4 2 . 0 0 - Y 3 4 - 5 0 . 0 0 ' R T 8 3 . 0 0 ' R T + 2 7 . 0 0 - L - 5 0 . 0 0 ' R T 8 3 . 0 0 ' R T + 5 1 . 0 0 - L - REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:49 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_19.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CR CR 4 0 . 0 ' R 8 4 . 8 0 ' L T + 9 9 . 1 1 4 0 . 0 ' R 8 4 . 7 5 ' R T + 9 6 . 8 6 C U R B EX I S T I N G T I E T O C U R B EX I S T I N G T I E T O E N D P R O P . 5 ' S I D E W A L K M U L T I - U S E P A T H E N D P R O P . 1 0 ' -Y34- 290 295 10 - Y3 4 - P O T S t a . 10 + 0 0 . 0 0 - Y3 5 - P OT S ta . 12 + 5 3 .6 9 - Y 3 4 - P O T S T A 1 3 + 2 2 . 8 0 - L - P O T S T A 2 8 6 + 8 1 . 5 1 = - Y 3 5 - P O T S T A 1 0 + 0 0 . 0 0 - L - P O T S T A 2 8 6 + 8 3 . 6 1 = -Y35- - L - NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C.