8 March 2017
Meeting Minutes
Chairman Barbour called the Port, Waterway & Beach Commission (PWBC) meeting to order at
~4:00 and introductions were made by each; the meeting’s attendance sheet is attached. New
members were welcomed and urged to participate.
The February 2017 meeting minutes were approved.
Current Efforts:
New Hanover County’s (NHC) Wrightsville Beach (WB) Coastal Storm Damage Reduction
(CSDR) Project:
The group discussed the federal project’s status and the underlying local approach in
preparation for the fiscal year (FY) 2018 WB CSDR maintenance event. The US
Army Corps of Engineers’(USACE) FY18 and/or FY17 workplan budgets are major
decision points effecting next fall’s WB maintenance cycle. In the event the local
authorization is triggered, NHC has initiated development of WB CSDR plans and
specifications. WB’s refined coastal modeling is nearing completion and will be
considered if NHC implements a local FY18 strategy.
The 1986 Water Resources Development Act (WRDA) Section 902 mandated
construction cost limits and the WB CSDR cost limit will be met in the next federal
CSDR implementation. The South Atlantic Wilmington District (SAW) USACE is
proactively initiating post authorization change report (PACR) discussions and
approaches within the USACE echelon as a PACR will be required justifying a
Section 902 construction cost capacity increase. On 30June2016, USACE Head
Quarter’s (HQ) guidance was released implementing Change Control Boards (CCB).
The attached CCB guidance process must be completed/addressed before the PACR
process can be initiated.
Mason Inlet Relocation Project (MIRP)
Marcol Dredging has yet to begin maintenance dredging at the Atlantic Intracoastal
Waterway (AIWW) & Mason Inlet crossing. The sand will be managed in the upland
confined disposal facility 241 located adjacent and north of the Mason Creek and
AIWW crossing.
The one-year post-construction (2016) permit stipulation addressing sand
compaction was met on 24Feb2017. Compliance documentation was provided by
the NC Wildlife Resources Commission (NCWRC) and the US Fish and Wildlife
Service (USFWS) following the onsite assessment.
As mandated by permit and north of WB proper, a 2017 natural resource contract has
been executed for waterbird and seabeach amaranthmonitoring
(Amaranthus pumilus)
including infrastructure maintenance.
Carolina Beach Inlet Permit Modifications
The inshore dredge material management site (IDMMS) permit application and
supporting documents have been transmitted by the USACE to the US Fish and
Wildlife Service (USFWS) and the National Marine Fisheries Service (Habitat
Conservation & Protected Resources). An optimistic timeline would be to have all
permits by mid to late summer. In the interim, the NC Division of Coastal
Management and the Division of Water Resources have placed the IDMMS review
on hold until such time as the federal agencies provide responses.
A minor modification request to extend the placement location of the AIWW and
Carolina Beach Inlet maintenance material south overlapping the CSDR template, is
under review.
Carolina Beach CSDR Project, Beach Renourishment Evaluation Report (BRER).
The SAW has initiated the BRER study with a kickoff meeting at Carolina Beach
th
Town Hall on February 10. SAW’s initial efforts will center on a modified cost
sharing agreement followed by the development of the scope, tasks, fee and schedule.
A non-federal stakeholder share ($25K) will be requested to match the federal
participation for scope development. NHC’s draft Risk Reduction Plan (non-federal
BRER requirement) is in house.
FY16 CB/KB CSDR Maintenance Events
SAW and the dredging contractor Marinex have agreed on the project’s final
accounting. The project’s books have been closed and a non-federal refund of
approximately $1.1M will be returned to NHC and equally shared with the NC
Division of Water Resources and NHC’s room occupancy account.
Carolina Beach Inlet
SAW received $500K Emergency Supplemental Hurricane Matthew operation and
maintenance funding. These federal funds will be expended starting with the 10-day
Merritt maintenance event scheduled in the March/April timeframe. Once these Matthew
funds are used, local/state dollars will resume.
USACE surveys can be found here:
http://www.saw.usace.army.mil/Missions/Navigation/Hydrographic-Surveys/Inlets-
Crossings/
Shoreline Mapping 2017
The work has begun, starting at WB.
There was a general discussion of federal timelines and maintenance cycles. Target
milestones include the FY18 budget and FY17 workplan funding for the next WB CSDR
event, WRDA 2018 and revised 15-year BRER start date narrative, FY19 appropriations
for Pleasure Island’s next CSDR event, WRDA 2020 inclusive of the BRER and PACR
authorizations allowing potential appropriations for the FY22 CSDR maintenance cycle for
all three CSDR projects.
Public Comment:
A reminder of the NC Beach Inlet and Waterway Association’s NC General Assembly
breakfast scheduled for 9Mar2017 at the Legislature’s cafeteria.
Meeting adjourned:
Ľ◘Ċ╙ ľĵʼnʼnś■Ċ Ă■ŕ źĵĊĵʼnś ♫ʼn◘╨śľĊśŕ ■śśŕℓ Ă■ŕ
?
ﺨو
?
ﻵ
ﯿﻵ
و
ﺨ
?
ĽśĂľ╙ ■◘ĵʼn╜ℓ╙▓ś■Ċ źĵ■ŕ ╜ℓ ﺨﻰﮭ ▓╜▄▄╜◘■ Ċ◘ ﺨﻲﮭ ▓╜▄▄╜◘■ Ă■■ĵĂ▄▄Ŧ
L
?wh
Ă■ŕ Ŏ╜Ċ╙ ▓ĵ▄Ċ╜♫▄╜śʼnℓ ﺨﻰﯾﻰ.
◘ľśĂ■źʼn◘■Ċ b/ ľ◘ĵ■Ċ╜śℓ
Ċ◘ ▓śśĊ
?
ﺨو.
?
?
ĂĊĊʼn╜ĽĵĊśŕ Ċ◘ ■◘■
ي
? ╜ℓ ĂŕśijĵĂĊś
ﻲﻲ
ﺨ
?
L
?wh
śŝ♫ś■ŕ╜Ċĵʼnśℓ ◘ź ﺨوﻲﻲ.
źĵ■ŕ ?ﺨوﻵ ▓╜▄▄╜◘■?Ŧʼn
hź Ċ╙ś ﺨﻰﯾﻰ. Ă■ŕ ﻰﯿﯾوﯿ ╨◘Ľℓ ﺨوﻰو. Ă■ŕ وﮭﮭﯾﯾ ╨◘Ľℓ Ăʼnś
/Ăʼn◘▄╜■╜Ă■ℓ
ľ◘ĂℓĊĂ▄ b◘ʼnĊ╙ /Ăʼn◘▄╜■╜Ă■ℓ
Ç╙ś ♫ʼn◘♫śʼnĊŦ ōĂ▄ĵś ĂĊ?■śĂʼn Ċ╙ś ◘ľśĂ■źʼn◘■Ċ ╜ℓ ﺨووو.
/Ăʼn◘▄╜■╜Ă■ℓ
? ╜ℓ ◘Ŏ■śŕ ĽŦ ľ◘ĂℓĊĂ▄ b◘ʼnĊ╙ /Ăʼn◘▄╜■╜Ă■ℓ
ś■śʼnĂĊśŕ ﺨوييa ╜■ \[◘ľĂ▄ ĊĂŝ ʼnśōś■ĵś
╙ś ♫ʼnś▄╜▓╜■ĂʼnŦ ʼnśľ◘▓▓ś■ŕĂĊ╜◘■ ź◘ʼn Ă {ĊĂĊś?\[◘ľĂ▄
ś■śʼnĂĊśŕ ﺨوﻲىa ╜■ b/ ĊĂŝ ʼnśōś■ĵś
ʼnśℓ╜ŕś■Ċℓ
? ╜ℓ ◘Ŏ■śŕ ĽŦ ◘ĵĊ ◘ź ℓĊĂĊś ʼnśℓ╜ŕś■Ċℓ
ľ◘ĂℓĊĂ▄ b◘ʼnĊ╙
╜■▄śĊ
? ╜ℓ ◘Ŏ■śŕ ĽŦ ľ◘ĂℓĊĂ▄ b◘ʼnĊ╙
ŕ╜ʼnśľĊ
ℓĊĂĊś
ℓ╙Ă▄▄◘Ŏ ŕʼnĂźĊ
ℓĊĂĊśŎ╜ŕś◘ĵĊ ◘ź
??
ﻰﯿﯾوﯿ ╜■ŕ╜ō╜ŕĵĂ▄ℓ
? ╜ℓ ◘Ŏ■śŕ ĽŦ ■◘■? ╜ℓ ◘Ŏ■śŕ ĽŦ ■◘■
? ╜ℓ ◘Ŏ■śŕ ĽŦ
ś╜┼╙Ċ ◘ľśĂ■źʼn◘■Ċ
b/ ĽśĂľ╙śℓ ┼ś■śʼnĂĊśŕ
śŕ╜ľĂĊśŕ
5ĂĊĂ .Ăℓś
ℓ╙◘ĵ▄ŕ Ľś ╫ś♫Ċ Ăℓ ╜ℓ
b/ .Lat Ü♫ŕĂĊś
b/ ĽśĂľ╙śℓ ┼b/ ĽśĂľ╙śℓ ┼
ŕ
Ç╙ś ľĵʼnʼnś■Ċ
ي
وﯾﻰﻰووﯿوﻮﯿىيىﻲ
ś▓♫▄◘Ŧ╜■┼
ﻮﮭوﻰ
ﯿ
يﻮ
?
ﻮﮭوى
b/
Ç
AIWW Atlantic Intracoastal Waterway
ASMFC Atlantic States Marine Fisheries Commission
BA Biological Assessment
BO Biological Opinion
BOEM Bureau of Ocean Energy Management
BRER Beach Renourishment Evaluation Report
CBI Carolina Beach Inlet
CCB Change Control Boards
CDF Confined Disposal Facility
CFR Code of Federal Register
CG Construction General
CSDR Coastal Storm Damage Reduction
DMMP Dredge Material Management Plan
EA Environmental Assessment
EIS Environmental Impact Statement
EFH Essential Fish Habitat
ESA Endangered Species Act
FEMA Federal Emergency Management Agency
FMC Fishery Management Councils
FMP Fishery Management Plans
FONSI Finding of No Significant Impact
GI General Investigation
GP General Permit
GPS Global Positioning System
GRR General Re-evaluation Report
HAPC Habitat Areas of Particular Concern
HMS Highly Migratory Species
IP Individual Permit
IDMMS Inshore Dredge Material Management Site
MAFMC Mid-Atlantic Fishery Management Council
MIPG Mason Inlet Preservation Group
MIRP Mason Inlet Relocation Project
MBNP Master Beach Nourishment Plan
MMPA Marine Mammal Protection Act
MOA Memorandum of Agreement
MSFCMA Magnuson-Stevens Fishery Conservation and Management Act
NAVD North American Vertical Datum
NC North Carolina
NCAC North Carolina Administrative Code
NCBIWA North Carolina Beach Inlet and Waterway Association
NCDCM North Carolina Division of Coastal Management
NCDMF North Carolina Division of Marine Fisheries
NCDWR North Carolina Division of Water Resources
NCWRC North Carolina Wildlife Resources Commission
NEPA National Environmental Policy Act
NGVD National Geodetic Vertical Datum
NMFS National Marine Fisheries Service
NOAA National Oceanic and Atmospheric Administration
NRHP National Register of Historic Places
OCS Outer Continental Shelf
OCSLA Outer Continental Shelf Lands Act
ODMDS Ocean Dredged Material Disposal Site
O&M Operation and Maintenance
OSHA Occupational Safety and Health Administration
PACR Post Authorization Change Report
PWBC Port, Waterway and Beach Commission
PEIS Programmatic Environmental Impact Statement
PNA Primary Nursery Area
RCM Refined Coastal Modeling
RBO Regional Biological Opinion
RRP Risk Reduction Plan
ROT Room Occupancy Tax
SAB South Atlantic Bight
SAFMP South Atlantic Fishery Management Plan
SAV Submerged Aquatic Vegetation
SAW South Atlantic Wilmington District
SDI Shallow Draft Inlets
SPO Shore Protection Office
SMP Shoreline Mapping Program
SPP Species
T&E Threatened and Endangered
UAB Underwater Archaeology Branch
USACE United States Army Corps of Engineers
USDOI United States Department of the Interior
USEPA United States Environmental Protection Agency
USFWS United States Fish and Wildlife Service
WMA Waterbird Management Area
WRDA Water Resources Development Act
WIS Wave Information Study
Agenda
8 March 2017, 4:00PM
New Hanover County (NHC), Government Center
Finance Conference Room, 500
4:00 Call to Order
Welcome/Introductions
Request approval of the February meeting minutes (emailed 10 February / 2 March 2017).
Current Efforts:
NHC’s Wrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR) Project
The draft final Refined Coastal Modeling Report for WB is anticipated in March.
Non-federal draft final fiscal year (FY)18 CSDR maintenance plans and specifications are
anticipated in April.
Post authorization change report (PACR) discussions and potential change control board (CCB)
applicability are ongoing with the US Army Corps of Engineers (USACE).
Waiting for the federal FY18 budget and the USACE’s FY17 workplan release.
Mason Inlet Relocation Project (MIRP)
Maintenance dredging at the Atlantic Intracoastal Waterway (AIWW) & Mason Creek crossing is
anticipated soon.
The one-year, post-project, compaction site (F8) assessment was completed (24Feb2017).
2017 annual waterbird monitoring contract and services is being initiated.
Carolina Beach Inlet Major Permit Modification
Inshore dredge material management site (IDMMS) permit application and supporting documents
have been transmitted by the USACE to the US Fish and Wildlife Service and the National Marine
Fisheries Service (Habitat Conservation & Protected Resources).
The NCDCM and the Division of Water Resources have placed the IDMMS review on hold until
such time as the federal agencies respond.
Carolina Beach Inlet Minor Permit Modification
Authorization request to extend the AIWW and Carolina Beach Inlet maintenance material
placement area south, within the CSDR template, is under review.
Carolina Beach CSDR Project, Beach Renourishment Evaluation Report (BRER).
A kickoff meeting was held at Carolina Beach Town Hall on the 10Feb2017.
The initial deliverable is Atlanta’s approval of the District’s cost-sharing agreement.
A draft Risk Reduction Plan (non-federal BRER requirement) is anticipated in early March 2017.
FY16 CB/KB CSDR Maintenance Events
A final accounting (Marinex and the USACE) was agreed to in late December; project closure is
anticipated in March.
Carolina Beach Inlet
The USACE has received $500K in Post-Hurricane Matthewfunds for maintenance dredging.
The Division of Water Resources’ and the USACE’s next quarterly inlet dredging meeting is scheduled
for 15March2017 in the NC History Center in New Bern from 10:30 a.m. to 12:00 p.m.; the facility
address is 529 South Front Street, New Bern, NC.
A 10-day Merritt maintenance event is scheduled for March/April.
SAW surveys can be found here: http://www.saw.usace.army.mil/Missions/Navigation/Hydrographic-
Surveys/Inlets-Crossings/
Shoreline Mapping 2017
The 2017 contract has been executed.
Public Comment:
The NC Beach, Inlet & Waterway Association’s (NCBIWA) is hosting a NC General Assembly