Loading...
HomeMy WebLinkAboutTraffic-Impact-WorksheetTraffic Impact Worksheet Prior to submission of nonresidential site plan, this worksheet must be prepared. A Traffic Impact Analysis will be required for all projects generating 100 peak hour trips or more. The scope of the TIA shall be determined by concurrence of the Planning Director, the MPO coordinator and NCDOT traffic engineer. Any mitigation measures required must be included in the final site plan submitted for review. PROJECT NAME __________________________________ PROJECT ADDRESS _______________________________ DEVELOPER/OWNER _____________________________ EXISTING ZONING _______________________________ GROSS FLOOR AREA ________________________ sq. ft. NEAREST INTERSECTION _________________________ BEFORE PROPOSED PROJECT Average Daily Traffic (Date) ____________________ LEVEL OF SERVICE (LOS) ____________________ ITE MANUAL TRAFFIC GENERATION ESTIMATE: *ITE Manual available at Planning Department USE AND VARIABLES: _____________________________________ (Example: Racquet Club; 8 courts; Saturday peaks) AM PEAK HOUR TRIPS ________ PM PEAK HOUR TRIPS ________ (Traffic generation of 100 peak hour trips will require Traffic Impact Analysis Scoping meeting with Planning Department) _______________________________ _______________________________ Person Providing Estimate Signature Peak Hour estimate confirmed by Planning & Zoning on ______________________ (Date) By __________________________________