HomeMy WebLinkAboutTraffic-Impact-WorksheetTraffic Impact Worksheet
Prior to submission of nonresidential site plan, this worksheet must be prepared. A
Traffic Impact Analysis will be required for all projects generating 100 peak hour trips
or more. The scope of the TIA shall be determined by concurrence of the Planning
Director, the MPO coordinator and NCDOT traffic engineer. Any mitigation measures
required must be included in the final site plan submitted for review.
PROJECT NAME __________________________________
PROJECT ADDRESS _______________________________
DEVELOPER/OWNER _____________________________
EXISTING ZONING _______________________________
GROSS FLOOR AREA ________________________ sq. ft.
NEAREST INTERSECTION _________________________
BEFORE PROPOSED PROJECT
Average Daily Traffic (Date) ____________________
LEVEL OF SERVICE (LOS) ____________________
ITE MANUAL TRAFFIC GENERATION ESTIMATE:
*ITE Manual available at Planning Department
USE AND VARIABLES: _____________________________________
(Example: Racquet Club; 8 courts; Saturday peaks)
AM PEAK HOUR TRIPS ________ PM PEAK HOUR TRIPS ________
(Traffic generation of 100 peak hour trips will require Traffic Impact Analysis Scoping
meeting with Planning Department)
_______________________________ _______________________________
Person Providing Estimate Signature
Peak Hour estimate confirmed by Planning & Zoning on ______________________
(Date)
By __________________________________