HomeMy WebLinkAboutAgenda 14 June 20171► I► 11I► AIILl Lei to] �ML'IWiTAmoU1L' [OIT /4Oki
PORT, WATERWAY & BEACH COMMISSION
Agenda
14 June 2017, 4:00 PM
New Hanover County (NHC), Government Center
Finance Conference Room, 500
4:00 Call to Order
Welcome /Introductions
Request approval of the May meeting minutes (emailed 11 May 2017).
Current Efforts:
Wrightsville Beach (WB) Coastal Storm Damage Reduction (CSDR) Project
• The US Army Corps of Engineers Fiscal Year 2017 (USAGE FY) workplan sufficiently includes the
WB CSDR FYI maintenance event.
• The NHC team provided the USACE an overview of our proposed (45% south and 55% north) plans
and specifications.
• WB's Refined Coastal Modeling Report is nearing completion.
• The next Validation Report project delivery team meeting is on 15 May 2017.
Mason Inlet Relocation Project (MIRP)
• The MIRP's 2017 Atlantic Intracoastal Waterway (AIWW) crossing project successfully cost shared
with the NC Division of Water Resources'(NCDWR) Shallow Draft Inlet Fund.
• The MIRP's 2017 physical monitoring report is being drafted.
Carolina Beach Inlet (CBI) Major Permit Modification Inshore Dredge Material Management Site (IDMMS)
• The major permit modification has been issued.
• NHC has requested a meeting with USACE Navigation to begin FY18 maintenance dredging
scheduling inclusive of the IDMMS.
Carolina Beach Inlet Minor Permit Modification
• NHC requested an extension of the CBI maintenance material placement area overlaying the CSDR
template; the application is under agency review.
Carolina Beach (CB) CSDR Project, Beach Renourishment Evaluation Report (BRER)
• The NHC team provided the USACE an overview of our DRAFT engineering assessment of value
lost should the 15 -year extension be denied.
• The USACE FYI workplan sufficiently includes the CB CSDR FYI maintenance event.
Kure Beach (KB) CSDR Project
• The USACE FYI workplan sufficiently includes the KB CSDR FYI maintenance event.
Carolina Beach Inlet
• The NCDWR's quarterly Shallow Draft Inlet meeting was held in New Bern the morning of 14 June.
• The USACE anticipates the next Merritt maintenance dredging event to begin the week of 12 June.
Shoreline Mapping 2017
• Shoreline transects are complete for the 2017 shoreline mapping program.
Legislative Update:
Public Comment:
Adjourn