Loading...
HomeMy WebLinkAboutZ17-08 Proposed TIA updated 8.4.17 - FullProject Number: 170224 Original: June 14, 2017 Revision: July 28, 2017 Prepared for Adam Sosne The Landing at Lewis Creek Estates New Hanover County, NC 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 1 The Landing at Lewis Creek Estates – Transportation Impact Analysis Prepared for Adam Sosne New Hanover County, NC July 28, 2017 Table of Contents 1.0 Introduction ............................................................................................................. 2 Figure 1 – Site Plan ..................................................................................................... 3 Figure 2A – Site Location Map .................................................................................... 4 Figure 2B – Vicinity Map .............................................................................................. 5 2.0 Existing Conditions ................................................................................................ 6 2.1 Inventory ................................................................................................................ 6 2.2 Existing Traffic Volumes ........................................................................................ 6 Figure 3 – Existing Lane Geometry ............................................................................. 7 Figure 4 – 2017 Existing Traffic Volumes .................................................................... 8 3.0 Approved Developments and Committed Improvements ................................... 9 3.1 Approved Developments ........................................................................................ 9 3.2 Committed Improvements ...................................................................................... 9 4.0 Methodology ........................................................................................................... 9 4.1 Base Assumptions and Standards ......................................................................... 9 4.2 Trip Generation ...................................................................................................... 9 4.3 Trip Distribution .................................................................................................... 10 4.4 Future No Build Traffic ......................................................................................... 10 4.5 Total Traffic .......................................................................................................... 10 Figure 5 – Primary Trip Distribution ........................................................................... 11 Figure 6 – 2021 Future No Build Volumes ................................................................. 12 Figure 7 – Primary Site Trips ..................................................................................... 13 Figure 8 – 2021 Future Build Volumes ...................................................................... 14 5.0 Capacity Analysis ................................................................................................. 15 5.1 Level of Service Evaluation Criteria ..................................................................... 15 5.2 Level of Service Results ...................................................................................... 16 5.3 Level of Service Summary ................................................................................... 17 Figure 9 – Recommended Improvements .................................................................. 20 6.0 Signal Warrant Analysis ...................................................................................... 21 7.0 Summary and Conclusion ................................................................................... 22 Appendix ...................................................................................................................... 23 Level of Service Analysis ....................................................................................... 24 Trip Generation ...................................................................................................... 28 Traffic Volume Data ............................................................................................... 29 Supporting Documentation ..................................................................................... 30 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 2 The Landing at Lewis Creek Estates – Transportation Impact Analysis Prepared for Adam Sosne New Hanover County, NC July 28, 2017 1.0 Introduction The proposed Landing at Lewis Creek Estates Subdivision is to be located south of Gordon Road and east of I-40 in New Hanover County, North Carolina. The development is planned to consist of 236 single family homes and 192 apartments. The development will utilize one (1) access point on Gordon Road. Figure 1 presents the preliminary site plan. Figures 2A and 2B show the site location map and vicinity map, respectively. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • Gordon Road and NC 132 (N. College Road)/I-40 Eastbound Ramps • Gordon Road and I-40 Westbound Ramps • Gordon Road and Blount Drive/Site Access The above-mentioned intersections were analyzed for the following scenarios: • 2017 Existing Conditions • 2021 Future No Build Conditions • 2021 Future Build-Out Conditions • 2021 Future Build-Out with Improvements (as necessary) The build-out analysis year for this project was assumed to be 2021. The AM (7 am – 9 am) and PM (4 pm – 6 pm) weekday peaks were studied. The North Carolina Department of Transportation (NCDOT), WMPO, and County were contacted to obtain background information and to ascertain the elements to be covered in this Transportation Impact Analysis (TIA). Information regarding the property was provided by Adam Sosne and GSP Consulting, PLLC. FIGURE 1 SITE PLAN FIGURE 2A SITE LOCATION MAP SITE INDICATOR FIGURE 2B VICINITY MAP STUDY INTERSECTIONS BACKGROUND PROPOSED SITE 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 6 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 presents a summary of this review. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Gordon Road SR 2048 Varies between 2-lane undivided with TWLTL, 4-lane divided, and 2-lane undivided Approx. 24’-66’ 45 MPH NCDOT N. College Road NC 132 Varies between 4-lane undivided, and 3-lane dividided Approx. 54’-60’ 45 MPH NCDOT Blount Drive SR 2135 2-lane undivided Approx. 20’ Not Posted NCDOT 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT staff. Table 2.2 below contains the dates these counts were conducted. Schools were in session at the time of traffic counts. Figure 4 shows existing AM and PM peak hour volumes for 2017. The full reports for these volumes can be found in the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: By: Gordon Road and NC 132 (N. College Road)/ I-40 Eastbound Ramps 5/23/2017 DAVENPORT Gordon Road and I-40 Westbound Ramps 5/18/2017 DAVENPORT Gordon Road and Blount Drive 5/18/2017 DAVENPORT ** * N O T T O S C A L E * * * PROJECTNUMBER170224THELANDINGATLEWISCREEKESTATES N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFICMOVEMENT BLACK= EXISTING GREY= UNANALYZED BLUE= PROPOSEDROADWAYLEGEND Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FIGURE3EXISTING LANE GEOMETRYGordonRoad 1, 1 0 0 ' 23 , 0 0 0 A A D T NC 132 (N. College Road) BlountDrive NC 132 (N. College Road) I- 4 0 E B Of f R a m p I-40 5, 6 0 0 A A D T 17 5 ' 75' 250' 22 5 ' FU L L 300' 175' 15 0 ' ME R G E L A N E SPEED LIMIT 45 SP E E D LI M I T 45 SP E E D LI M I T 45 SP E E D LI M I T 45 SP E E D LI M I T 55 SP E E D LI M I T 70 87 0 ' 25 0 ' *** NOT TO SCALE *** PROJECT NUMBER 170224 THELANDINGATLEWISCREEK ESTATES N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 4 2017 EXISTING TRAFFIC VOLUMES 36 / 53 80 / 2 3 Gordon Road NC 1 3 2 (N . C o l l e g e R o a d ) Bl o u n t Dr i v e NC 1 3 2 (N . C o l l e g e R o a d ) I- 4 0 I-40 EB Off Ramp 143 / 313 35 / 19 17 4 / 8 6 20 6 / 1 7 1 479 / 310 366 / 159 302 / 152 42 6 / 4 0 1 56 / 5 7 57 0 / 5 7 2 87 / 126 14 / 3 3 736 / 805 1 / 0 14 0 / 3 6 3 240 / 284 1024 / 698 4 / 5 876 / 979 0 / 2 1285 / 848 0 / 0 2 / 6 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 9 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per NCDOT staff, there is one (1) approved development in the vicinity of this project. This is the Gordon Road Buy and Go development. This development consists of a fueling station with 12 vehicle fueling positions and a 24,800 square foot boat storage center. Site Trips for this approved development were applied based on the TIA for this development. More information can be found in the appendix. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a developer in the area, but not yet constructed. Per NCDOT staff, there is one (1) committed improvement in the vicinity of this project. The above mentioned approved development will construct a westbound right turn lane with approximately 500 feet of storage at the Gordon Road and I-40 Westbound Ramps intersection. This improvement was incorporated into all future scenarios. More information can be found in the appendix. 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 0.5% per year for all roadways Base Signal Timing/Phasing Provided by NCDOT Analysis Software Synchro/SimTraffic Version 9.0 Lane widths 12-feet Truck percentages 2% 4.2 Trip Generation The proposed development will consist of 236 single family homes and 192 apartment dwelling units. The development will utilize one (1) access point on Gordon Road. The projected trip generation potential of the current land use was computed using TripGen 2013 software, based on the 9th Edition of ITE Trip Generation Manual. Tables 4.2 contains the results. 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 10 Table 4.2 - ITE Trip Generation The Landing at Lewis Creek Estates Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two- Way Land Use ITE Land Code Size Type/ Method Volume Enter Exit Enter Exit Single Family Home 210 236 Dwelling Units Adjacent/ Rate 2,247 44 133 149 87 Apartments 220 192 Dwelling Units Adjacent/ Rate 1,287 20 78 80 43 Total Site Trips 3,534 64 211 229 130 4.3 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The directional distributions for the primary site trips are as follows: • 25% to and from the east on Gordon Road • 25% to and from the north on NC 132 (N. College Road) • 20% to and from the west on Gordon Road • 20% to and from the east on I-40 • 10% to and from the west on I-40 The site trip distribution is shown in Figure 5. 4.4 Future No Build Traffic The 2021 future no build traffic volumes were computed by applying a 0.5% compounded annual growth rate to the 2017 existing traffic volumes and adding all approved development trips. Figure 6 shows the 2021 future no build traffic volumes for AM and PM peaks. 4.5 Total Traffic The 2021 build-out traffic volumes were obtained by summing 2021 future no build volumes and site trips due to the proposed project. Site trips are shown in Figure 7. The resulting build volume totals for AM and PM peaks are shown in Figure 8. More information can be found in the Traffic Volume Data section of the appendix *** NOT TO SCALE *** PROJECT NUMBER 170224 THELANDINGATLEWISCREEK ESTATES N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 5SITE TRIP DISTRIBUTION DESTINATION NODE% Si t e Ac c e s s Gordon Road NC 1 3 2 (N . C o l l e g e R o a d ) Bl o u n t Dr i v e NC 1 3 2 (N . C o l l e g e R o a d ) I-40 EB Off Ramp I- 4 0 25% 25%20% 20% 10% 10 % I N 20 % I N 25% IN 25 % O U T 75 % O U T 10% OUT 65% OUT 55% IN20% IN 25 % I N 25% OUT 20% OUT 20% OUT 75% IN *** NOT TO SCALE *** PROJECT NUMBER 170224 THELANDINGATLEWISCREEK ESTATES N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 6 2021 FUTURE NO BUILD VOLUMES 37 / 54 82 / 2 3 Gordon Road NC 1 3 2 (N . C o l l e g e R o a d ) Bl o u n t Dr i v e NC 1 3 2 (N . C o l l e g e R o a d ) I- 4 0 I-40 EB Off Ramp 153 / 328 36 / 19 17 8 / 8 8 21 7 / 1 8 3 510 / 342 387 / 179 322 / 172 44 2 / 4 1 8 57 / 5 8 58 1 / 5 8 4 89 / 129 14 / 3 4 780 / 856 1 / 0 15 0 / 3 7 9 259 / 307 1101 / 780 4 / 5 901 / 1007 0 / 2 1355 / 916 0 / 0 2 / 6 *** NOT TO SCALE *** PROJECT NUMBER 170224 THELANDINGATLEWISCREEK ESTATES N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 7 SITE TRIPS 0 / 0 0 / 0 Gordon Road NC 1 3 2 (N . C o l l e g e R o a d ) Bl o u n t Dr i v e NC 1 3 2 (N . C o l l e g e R o a d ) I- 4 0 I-40 EB Off Ramp 13 / 46 0 / 0 0 / 0 6 / 2 3 42 / 26 42 / 26 53 / 33 16 / 5 7 0 / 0 0 / 0 0 / 0 0 / 0 35 / 126 0 / 0 13 / 4 6 21 / 13 137 / 85 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 Si t e Ac c e s s 48 / 172 16 / 57 0 / 0 15 8 / 9 8 0 / 0 53 / 3 3 *** NOT TO SCALE *** PROJECT NUMBER 170224 THELANDINGATLEWISCREEK ESTATES N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 8 2021 FUTURE BUILD VOLUMES 37 / 54 82 / 2 3 Gordon Road NC 1 3 2 (N . C o l l e g e R o a d ) Bl o u n t Dr i v e NC 1 3 2 (N . C o l l e g e R o a d ) I- 4 0 I-40 EB Off Ramp 166 / 374 36 / 19 17 8 / 8 8 22 4 / 2 0 6 552 / 368 430 / 205 375 / 205 45 8 / 4 7 5 57 / 5 8 58 1 / 5 8 4 89 / 129 14 / 3 4 815 / 982 1 / 0 16 3 / 4 2 5 280 / 320 1238 / 865 4 / 5 901 / 1007 0 / 2 1355 / 916 0 / 0 2 / 6 Si t e Ac c e s s 48 / 172 16 / 57 0 / 0 15 8 / 9 8 0 / 0 53 / 3 3 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 15 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents the best conditions and Level of Service “F” represents the worst. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A  10 A  10 B  10 and  20 B  10 and  15 C  20 and  35 C  15 and  25 D  35 and  55 D  25 and  35 E  55 and  80 E  35 and  50 F  80 F  50 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 16 5.2 Level of Service Results The results of the study are discussed by intersection below: Gordon Road and NC 132 (N. College Road)/I-40 Eastbound Ramps This signalized intersection currently operates at LOS C in the AM and PM peaks. In 2021 future no build conditions, it is expected to operate at LOS E in the AM peak and LOS F in the PM peak. In 2021 future build conditions, it is expected to operate at LOS F in the AM and PM peaks. The following improvements are recommended: • Optimize signal timing • Increase the southbound left turn lane to 650 feet of storage with appropriate taper • Increase the westbound left turn lane to 400 feet of storage with appropriate taper While synchro analysis indicates the westbound left turn lane needs storage higher than the recommended 400 feet, roadway constraints do not allow for a longer turn lane. With improvements in place, this intersection is expected to operate at LOS D in the AM and PM peaks. It should be noted that for future conditions analysis, traffic modeling included protected only phasing for the traffic signal on all approaches which currently operate as protected permitted movements. This is required analysis methodology by review agencies, and why the LOS results change significantly from the existing to build conditions. Gordon Road and I-40 Westbound Ramps This unsignalized intersection currently operates at LOS C in the AM peak and LOS D in the PM peak. In 2021 future no build conditions, it is expected to operate at LOS C in the AM peak and LOS E in the PM peak. In 2021 future build conditions, it is expected to operate at LOS C in the AM peak and LOS F in the PM peak. The LOS E/F condition is typical for stop-controlled approaches onto major streets like Gordon Road, and the delay is expected to be short-lived. No improvements are recommended. Gordon Road and Blount Drive/Site Access This unsignalized intersection currently operates at LOS F in the AM peak and LOS E in the PM peak. In 2021 future no build conditions, it is expected to remain unchanged. In 2021 future build conditions, it is expected to operate at LOS F in the AM and PM peaks. A signal warrant analysis was performed for the intersection of Gordon Road and Blount Drive/Site Access which identified that a traffic signal is warranted. See section 6.0 for additional information. The following improvements are recommended: • Signalize the intersection 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 17 • Provide a westbound left turn lane with 100 feet of storage and appropriate taper • Provide an eastbound right turn lane with 100 feet of storage and appropriate taper • Provide a northbound full left turn lane, along with a northbound full through-right lane that extends back to the first internal driveway • Design site access according to NCDOT standards With these improvements in place, LOS D is expected in the AM peak and LOS C in the PM peak. 5.3 Level of Service Summary Tables 5.2 – 5.4 present the summary of the level of service analysis. Table 5.2 - Gordon Road and NC 132 (N. College Road)/I-40 Eastbound Ramps Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2017 Existing C (25.4) L T R L T R L T R L T R C (34.0) D (41.5) D (41.5) C (27.4) C (21.3) A (9.8) B (16.3) C (33.2) B (16.0) D (37.1) C (27.6) C (27.6) D (40.3) B (18.1) C (22.6) C (31.5) 2021 Future No Build E (76.4) L T R L T R L T R L T R C (34.6) D (42.9) D (42.9) F (129.3) C (22.6) B (11.1) D (45.4) C (32.8) B (16.4) F (296.1) C (31.4) C (31.4) D (41.5) D (46.0) C (27.5) F (139.7) 2021 Future Build F (91.6) L T R L T R L T R L T R C (34.1) D (42.2) D (42.2) F (208.3) C (23.7) B (11.8) D (46.8) C (33.6) B (17.3) F (331.9) C (32.3) C (32.3) D (41.0) E (69.9) C (28.3) F (157.5) 2021 Future Build with Improvements D (45.4) L T R L T R L T R L T R D (49.2) E (68.0) E (68.0) F (87.8) C (28.4) A (7.0) E (64.1) E (64.8) C (24.8) F (80.3) C (32.4) C (32.4) E (65.1) C (36.1) D (46.2) D (52.4) PM Peak Hour 2017 Existing C (27.7) L T R L T R L T R L T R C (26.9) C (35.0) C (35.0) B (16.2) B (13.9) A (6.1) B (19.9) D (36.8) C (22.9) D (44.3) C (30.6) C (30.6) C (33.9) B (10.6) C (26.9) D (35.9) 2021 Future No Build F (84.9) L T R L T R L T R L T R C (27.6) D (37.3) D (37.3) E (55.1) B (14.4) A (6.6) D (46.1) D (36.8) C (22.8) F (359.9) C (31.4) C (31.4) D (36.0) C (20.6) C (28.9) F (160.9) 2021 Future Build F (107.3) L T R L T R L T R L T R C (27.8) D (41.7) D (41.7) E (67.4) B (14.7) A (6.8) D (46.1) D (36.8) C (23.6) F (460.7) C (31.4) C (31.4) D (40.1) C (24.9) C (28.9) F (214.1) 2021 Future Build with Improvements D (44.5) L T R L T R L T R L T R D (35.5) E (71.6) E (71.6) F (97.6) C (21.9) A (4.2) D (52.3) D (52.0) D (36.0) E (66.4) C (27.3) C (27.3) E (67.2) C (33.5) D (41.6) D (43.9) 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 18 Table 5.3 - Gordon Road and I-40 WB Ramps Scenario LOS of Worst Approach Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2017 Existing C (17.9) NB Approach L T R L T R L T R L T R B (14.3) A (0.0) A (0.0) A (0.0) F (61.5) F (61.5) B (13.2) A (1.5) A (0.0) C (17.9) 2021 Future No Build C (19.1) NB Approach L T R L T R L T R L T R B (12.7) A (0.0) A (0.0) A (0.0) F (70.6) F (70.6) B (13.9) A (1.3) A (0.0) C (19.1) 2021 Future Build C (21.0) NB Approach L T R L T R L T R L T R C (14.1) A (0.0) A (0.0) A (0.0) F (90.4) F (90.4) B (14.1) A (1.4) A (0.0) C (21.0) PM Peak Hour 2017 Existing D (32.3) NB Approach L T R L T R L T R L T R B (12.3) A (0.0) A (0.0) A (0.0) F (90.2) F (90.2) D (26.4) A (1.7) A (0.0) D (32.3) 2021 Future No Build E (39.5) NB Approach L T R L T R L T R L T R B (10.7) A (0.0) A (0.0) A (0.0) F (112.4) F (112.4) D (32.2) A (1.4) A (0.0) E (39.5) 2021 Future Build F (76.3) NB Approach L T R L T R L T R L T R B (11.3) A (0.0) A (0.0) A (0.0) F (196.5) F (196.5) F (65.5) A (1.3) A (0.0) F (76.3) 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 19 Table 5.4 - Gordon Road and Blount Drive/Site Access Scenario LOS of Worse Approach Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2017 Existing F (93.9) SB Approach L T R L T R L T R L T R B (12.7) A (0.0) A (0.0) A (0.0) F (93.9) F (93.9) A (0.1) A (0.0) F (93.9) 2021 Future No Build F (109.1) SB Approach L T R L T R L T R L T R B (13.2) A (0.0) A (0.0) A (0.0) F (109.1) F (109.1) A (0.1) A (0.0) F (109.1) 2021 Future Build F (6731.3) NB Approach L T R L T R L T R L T R B (13.2) A (0.0) A (0.0) B (10.6) A (0.0) A (0.0) F (6731.3) F (6731.3) F (6731.3) F (475.5) F (475.5) F (475.5) A (0.1) A (0.1) F (6731.3) F (475.5) 2021 Future Build with Improvements D (48.7) Signal L T R L T R L T R L T R D (51.0) D (51.0) A (5.4) E (70.9) C (34.1) C (34.1) F (163.5) E (67.3) E (67.3) E (60.3) E (60.3) E (60.3) D (48.7) C (34.6) F (138.2) E (60.3) PM Peak Hour 2017 Existing E (38.7) SB Approach L T R L T R L T R L T R B (10.0) A (0.0) A (0.0) A (0.0) E (38.7) E (38.7) A (0.1) A (0.0) E (38.7) 2021 Future No Build E (44.6) SB Approach L T R L T R L T R L T R B (10.3) A (0.0) A (0.0) A (0.0) E (44.6) E (44.6) A (0.1) A (0.0) E (44.6) 2021 Future Build F (3304.7) NB Approach L T R L T R L T R L T R B (10.3) A (0.0) A (0.0) B (12.7) A (0.0) A (0.0) F (3304.7) F (3304.7) F (3304.7) F (251.9) F (251.9) F (251.9) A (0.0) A (0.7) F (3304.7) F (251.9) 2021 Future Build with Improvements C (22.2) Signal L T R L T R L T R L T R C (31.2) C (31.2) A (7.3) D (43.0) A (8.0) A (8.0) E (68.0) D (41.2) D (41.2) D (38.2) D (38.2) D (38.2) C (27.7) B (10.0) E (60.7) D (38.2) ** * N O T T O S C A L E * * * PROJECTNUMBER170224THELANDINGATLEWISCREEKESTATES N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFICMOVEMENTROADWAYLEGEND Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FIGURE9RECOMMENDED IMPROVEMENTSGordonRoad NC 132 (N. College Road) BlountDrive NC 132 (N. College Road) I- 4 0 E B Of f R a m p I-40 17 5 ' 75' 250' 40 0 ' FU L L 650' 175' 15 0 ' ME R G E L A N E SPEED LIMIT 45 SP E E D LI M I T 45 SP E E D LI M I T 45 SP E E D LI M I T 45 SP E E D LI M I T 55 SP E E D LI M I T 70 50 0 ' BLACK= EXISTING GREY= UNANALYZED GREEN= COMMITTED BLUE= PROPOSED SiteAccess Op t i m i z e S i g n a l 100'100'FULLFULL TO INTERNAL DRIVEWAY De s i g n s i t e a c c e s s a c c o r d i n g t o NC D O T s t a n d a r d s 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 21 6.0 Signal Warrant Analysis A signal warrant analysis was conducted for the intersection of Gordon Road and Blount Drive/Site Access. The analysis was conducted using PC-Warrants software. The Federal Highway Administration on Uniform Traffic Control Devices (MUTCD 2009 Edition), has established nine criteria that can be used to justify the installation of a Traffic Signal, which are the following: • Warrant 1, Eight-Hour Vehicular Volume • Warrant 2, Four-Hour Vehicular Volume • Warrant 3, Peak Hour • Warrant 4, Pedestrian Volume • Warrant 5, School Crossing • Warrant 6, Coordinated Signal system • Warrant 7, Crash Experience • Warrant 8, Roadway Network • Warrant 9, Intersection Near a Grade Crossing For the purpose of this analysis, warrants 1-3 were evaluated, which are related to traffic volumes. Based on the results, this intersection satisfies all three (3) warrants for signalization; eight-hour volume, four-hour volume, and peak hour volume warrants. Based on MUTCD criteria, signalization may be considered when one or more of these criteria is satisfied. It should be noted that these warrants are satisfied even with a reduction of 50% of minor street right turn volumes, and with a reduction of 100% of minor street right turn volumes. Additional information can be found in the appendix. 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 22 7.0 Summary and Conclusion The proposed Landing at Lewis Creek Estates Subdivision is to be located south of Gordon Road and east of I-40 in New Hanover County, North Carolina. The development is planned to consist of 236 single family homes and 192 apartments. The development will utilize one (1) access point on Gordon Road. The trip generation indicates that the proposed development is expected to generate a net total of 3,534 trips per day with 275 trips in the AM peak and 359 trips in the PM peak. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. It is recommended to optimize signal timing at the intersection of Gordon Road and NC 132 (N. College Road)/I-40 Eastbound Ramps. Additionally, it is recommended to increase the southbound left turn lane to 650 feet of storage with appropriate taper and to increase the westbound left turn lane to 400 feet of storage with appropriate taper. A signal warrant analysis was performed for the intersection of Gordon Road and Blount Drive/Site Access. Based on projected volumes, this intersection is projected to satisfy three (3) criteria for signalization, which are the eight-hour volume warrant, four-hour volume warrant, and peak hour warrant. These criteria are met, even with the exclusion of 100% of minor street right turn traffic. MUTCD criteria state that signalization may be considered when one or more of these criteria is met. Based on these results and the capacity analysis, we recommend signalizing this intersection. Also, it is recommended to provide a westbound left turn lane with 100 feet of storage and appropriate taper, an eastbound right turn lane with 100 feet of storage and appropriate taper, and to provide a northbound full left turn lane along with a full through-right lane that extends to the first internal driveway. These recommendations are summarized in Figure 9. In conclusion, this study has reviewed the impacts of both background traffic and proposed development traffic, and has provided recommendations to accommodate future traffic. Please note the proposed site access should be designed according to NCDOT standards. 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 23 Appendix 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 24 Level of Service Analysis 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 25 Gordon Road and NC 132 (N. College Road)/I-40 Eastbound Ramps Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM Exist C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)36143353023664798017420642657056 Future Volume (vph)36143353023664798017420642657056 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)17502250752503000 Storage Lanes10111110 Taper Length (ft)50100150150 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.000.950.95 Frt0.9700.8500.8500.987 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018070177018631583177018631583177034930 Flt Permitted0.5230.3520.3540.427 Satd. Flow (perm)97418070656186315836591863158379534930 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)582864661734 Travel Time (s)8.813.110.011.1 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)40159393364075328919322947363362 Shared Lane Traffic (%) Lane Group Flow (vph)401980336407532891932294736950 Turn TypePermNApm+ptNApm+ovpm+ptNApm+ovpm+ptNA Protected Phases8 74516752 Permitted Phases844662 Detector Phase88 74516752 Switch Phase Minimum Initial (s)7.07.07.07.07.07.012.07.07.012.0 Minimum Split (s)25.025.014.025.014.014.025.014.014.025.0 Total Split (s)35.035.020.035.020.015.090.020.020.090.0 Total Split (%)21.2%21.2%12.1%21.2%12.1%9.1%54.5%12.1%12.1%54.5% Maximum Green (s)29.129.114.429.113.98.983.514.413.983.5 Yellow Time (s)4.54.53.04.53.03.04.83.03.04.8 All-Red Time (s)1.41.42.61.43.13.11.72.63.11.7 Lost Time Adjust (s)-0.9-0.9-0.6-0.9-1.1-1.1-1.5-0.6-1.1-1.5 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.0 Lead/LagLagLagLeadLeadLeadLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.06.02.02.06.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.015.00.00.015.0 Time To Reduce (s)0.00.00.00.00.00.045.00.00.045.0 Recall ModeNoneNoneNoneNoneNoneNoneMinNoneNoneMin Act Effct Green (s)14.514.534.734.754.926.517.737.937.927.0 Actuated g/C Ratio0.180.180.420.420.660.320.210.460.460.33 v/c Ratio0.240.620.700.520.510.270.480.320.870.61 Control Delay34.041.527.421.39.816.333.216.037.127.6 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay34.041.527.421.39.816.333.216.037.127.6 Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM Exist C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSCDCCABCBDC Approach Delay40.318.122.631.5 Approach LOSDBCC Queue Length 50th (ft)1894117147115258771172164 Queue Length 95th (ft)50178#23426825056160135#381248 Internal Link Dist (ft)502784581654 Turn Bay Length (ft)17522575250300 Base Capacity (vph)3566624791137105035718117255423452 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.110.300.700.360.510.250.110.320.870.20 Intersection Summary Area Type:Other Cycle Length: 165 Actuated Cycle Length: 82.7 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 25.4Intersection LOS: C Intersection Capacity Utilization 76.7%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 132 (N. College Rd) & Gordon Road Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM FNB C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)37153363223875108217821744258157 Future Volume (vph)37153363223875108217821744258157 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)17502250752503000 Storage Lanes10111110 Taper Length (ft)50100150150 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.000.950.95 Frt0.9710.8500.8500.987 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018090177018631583177018631583177034930 Flt Permitted0.5120.9500.9500.950 Satd. Flow (perm)95418090177018631583177018631583177034930 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)582864661734 Travel Time (s)8.813.110.011.1 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)41170403584305679119824149164663 Shared Lane Traffic (%) Lane Group Flow (vph)412100358430567911982414917090 Turn TypePermNAProtNApm+ovProtNApm+ovProtNA Protected Phases8 74516752 Permitted Phases846 Detector Phase88 74516752 Switch Phase Minimum Initial (s)7.07.07.07.07.07.012.07.07.012.0 Minimum Split (s)25.025.014.025.014.014.025.014.014.025.0 Total Split (s)35.035.020.035.020.015.090.020.020.090.0 Total Split (%)21.2%21.2%12.1%21.2%12.1%9.1%54.5%12.1%12.1%54.5% Maximum Green (s)29.129.114.429.113.98.983.514.413.983.5 Yellow Time (s)4.54.53.04.53.03.04.83.03.04.8 All-Red Time (s)1.41.42.61.43.13.11.72.63.11.7 Lost Time Adjust (s)-0.9-0.9-0.6-0.9-1.1-1.1-1.5-0.6-1.1-1.5 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.0 Lead/LagLagLagLeadLeadLeadLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.06.02.02.06.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.015.00.00.015.0 Time To Reduce (s)0.00.00.00.00.00.045.00.00.045.0 Recall ModeNoneNoneNoneNoneNoneNoneMinNoneNoneMin Act Effct Green (s)15.315.315.135.555.79.719.339.515.124.7 Actuated g/C Ratio0.180.180.180.420.650.110.230.460.180.29 v/c Ratio0.240.651.140.550.550.450.470.331.560.70 Control Delay34.642.9129.322.611.145.432.816.4296.131.4 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay34.642.9129.322.611.145.432.816.4296.131.4 Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM FNB C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSCDFCBDCBFC Approach Delay41.546.027.5139.7 Approach LOSDDCF Queue Length 50th (ft)19105~225168143469178~374176 Queue Length 95th (ft)51189#461288279104165145#656258 Internal Link Dist (ft)502784581654 Turn Bay Length (ft)17522575250300 Base Capacity (vph)3396433141105103520918167343143440 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.120.331.140.390.550.440.110.331.560.21 Intersection Summary Area Type:Other Cycle Length: 165 Actuated Cycle Length: 85.1 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.56 Intersection Signal Delay: 76.4Intersection LOS: E Intersection Capacity Utilization 79.2%ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 132 (N. College Rd) & Gordon Road Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM Future Build C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)37166363754305528217822445858157 Future Volume (vph)37166363754305528217822445858157 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)17502250752503000 Storage Lanes10111110 Taper Length (ft)50100150150 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.000.950.95 Frt0.9730.8500.8500.987 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018120177018631583177018631583177034930 Flt Permitted0.4900.9500.9500.950 Satd. Flow (perm)91318120177018631583177018631583177034930 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)582864661734 Travel Time (s)8.813.110.011.1 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)41184404174786139119824950964663 Shared Lane Traffic (%) Lane Group Flow (vph)412240417478613911982495097090 Turn TypePermNAProtNApm+ovProtNApm+ovProtNA Protected Phases8 74516752 Permitted Phases846 Detector Phase88 74516752 Switch Phase Minimum Initial (s)7.07.07.07.07.07.012.07.07.012.0 Minimum Split (s)25.025.014.025.014.014.025.014.014.025.0 Total Split (s)35.035.020.035.020.015.090.020.020.090.0 Total Split (%)21.2%21.2%12.1%21.2%12.1%9.1%54.5%12.1%12.1%54.5% Maximum Green (s)29.129.114.429.113.98.983.514.413.983.5 Yellow Time (s)4.54.53.04.53.03.04.83.03.04.8 All-Red Time (s)1.41.42.61.43.13.11.72.63.11.7 Lost Time Adjust (s)-0.9-0.9-0.6-0.9-1.1-1.1-1.5-0.6-1.1-1.5 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.0 Lead/LagLagLagLeadLeadLeadLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.06.02.02.06.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.015.00.00.015.0 Time To Reduce (s)0.00.00.00.00.00.045.00.00.045.0 Recall ModeNoneNoneNoneNoneNoneNoneMinNoneNoneMin Act Effct Green (s)16.516.515.236.757.09.819.539.815.224.9 Actuated g/C Ratio0.190.190.180.420.660.110.230.460.180.29 v/c Ratio0.240.651.350.610.590.460.470.341.650.71 Control Delay34.142.2208.323.711.846.833.617.3331.932.3 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay34.142.2208.323.711.846.833.617.3331.932.3 Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM Future Build C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSCDFCBDCBFC Approach Delay41.069.928.3157.5 Approach LOSDECF Queue Length 50th (ft)19113~298195165479282~402178 Queue Length 95th (ft)51199#571326313109172160#708271 Internal Link Dist (ft)502784581654 Turn Bay Length (ft)17522575250300 Base Capacity (vph)3196343091088104120617757263093407 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.130.351.350.440.590.440.110.341.650.21 Intersection Summary Area Type:Other Cycle Length: 165 Actuated Cycle Length: 86.6 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.65 Intersection Signal Delay: 91.6Intersection LOS: F Intersection Capacity Utilization 83.7%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 132 (N. College Rd) & Gordon Road Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM Exist C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)5331319152159310238617140157257 Future Volume (vph)5331319152159310238617140157257 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)17502250752503000 Storage Lanes10111110 Taper Length (ft)50100150150 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.000.950.95 Frt0.9910.8500.8500.986 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018460177018631583177018631583177034900 Flt Permitted0.6460.2640.3660.556 Satd. Flow (perm)1203184604921863158368218631583103634900 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)582864661734 Travel Time (s)8.813.110.011.1 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)5934821169177344269619044663663 Shared Lane Traffic (%) Lane Group Flow (vph)59369016917734426961904466990 Turn TypePermNApm+ptNApm+ovpm+ptNApm+ovpm+ptNA Protected Phases8 74516752 Permitted Phases844662 Detector Phase88 74516752 Switch Phase Minimum Initial (s)7.07.07.07.07.07.012.07.07.012.0 Minimum Split (s)25.025.014.025.014.014.025.014.014.025.0 Total Split (s)35.035.020.035.020.015.090.020.020.090.0 Total Split (%)21.2%21.2%12.1%21.2%12.1%9.1%54.5%12.1%12.1%54.5% Maximum Green (s)29.129.114.429.113.98.983.514.413.983.5 Yellow Time (s)4.54.53.04.53.03.04.83.03.04.8 All-Red Time (s)1.41.42.61.43.13.11.72.63.11.7 Lost Time Adjust (s)-0.9-0.9-0.6-0.9-1.1-1.1-1.5-0.6-1.1-1.5 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.0 Lead/LagLagLagLeadLeadLeadLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.06.02.02.06.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.015.00.00.015.0 Time To Reduce (s)0.00.00.00.00.00.045.00.00.045.0 Recall ModeNoneNoneNoneNoneNoneNoneMinNoneNoneMin Act Effct Green (s)30.130.148.848.868.824.816.635.336.731.8 Actuated g/C Ratio0.320.320.510.510.720.260.170.370.380.33 v/c Ratio0.160.640.390.190.300.100.300.320.870.60 Control Delay26.935.016.213.96.119.936.822.944.330.6 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay26.935.016.213.96.119.936.822.944.330.6 Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM Exist C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSCCBBABDCDC Approach Delay33.910.626.935.9 Approach LOSCBCD Queue Length 50th (ft)25184495154105281224172 Queue Length 95th (ft)633191021051262797134#374280 Internal Link Dist (ft)502784581654 Turn Bay Length (ft)17522575250300 Base Capacity (vph)378581452977114030416626085133290 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.160.640.370.180.300.090.060.310.870.21 Intersection Summary Area Type:Other Cycle Length: 165 Actuated Cycle Length: 95.5 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 27.7Intersection LOS: C Intersection Capacity Utilization 67.4%ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 132 (N. College Rd) & Gordon Road Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM FNB C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)5432819172179342238818341858458 Future Volume (vph)5432819172179342238818341858458 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)17502250752503000 Storage Lanes10111110 Taper Length (ft)50100150150 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.000.950.95 Frt0.9920.8500.8500.987 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018480177018631583177018631583177034930 Flt Permitted0.6330.9500.9500.950 Satd. Flow (perm)117918480177018631583177018631583177034930 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)582864661734 Travel Time (s)8.813.110.011.1 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)6036421191199380269820346464964 Shared Lane Traffic (%) Lane Group Flow (vph)60385019119938026982034647130 Turn TypePermNAProtNApm+ovProtNApm+ovProtNA Protected Phases8 74516752 Permitted Phases846 Detector Phase88 74516752 Switch Phase Minimum Initial (s)7.07.07.07.07.07.012.07.07.012.0 Minimum Split (s)25.025.014.025.014.014.025.014.014.025.0 Total Split (s)35.035.020.035.020.015.090.020.020.090.0 Total Split (%)21.2%21.2%12.1%21.2%12.1%9.1%54.5%12.1%12.1%54.5% Maximum Green (s)29.129.114.429.113.98.983.514.413.983.5 Yellow Time (s)4.54.53.04.53.03.04.83.03.04.8 All-Red Time (s)1.41.42.61.43.13.11.72.63.11.7 Lost Time Adjust (s)-0.9-0.9-0.6-0.9-1.1-1.1-1.5-0.6-1.1-1.5 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.0 Lead/LagLagLagLeadLeadLeadLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.06.02.02.06.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.015.00.00.015.0 Time To Reduce (s)0.00.00.00.00.00.045.00.00.045.0 Recall ModeNoneNoneNoneNoneNoneNoneMinNoneNoneMin Act Effct Green (s)30.130.115.050.170.28.317.237.215.032.1 Actuated g/C Ratio0.310.310.150.510.720.090.180.380.150.33 v/c Ratio0.160.680.700.210.330.170.300.341.700.62 Control Delay27.637.355.114.46.646.136.822.8359.931.4 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay27.637.355.114.46.646.136.822.8359.931.4 Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM FNB C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSCDEBADDCFC Approach Delay36.020.628.9160.9 Approach LOSDCCF Queue Length 50th (ft)251941085861155387~401176 Queue Length 95th (ft)65345#2331231534499142#671288 Internal Link Dist (ft)502784581654 Turn Bay Length (ft)17522575250300 Base Capacity (vph)364570273959114018216306052733236 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.160.680.700.210.330.140.060.341.700.22 Intersection Summary Area Type:Other Cycle Length: 165 Actuated Cycle Length: 97.4 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.70 Intersection Signal Delay: 84.9Intersection LOS: F Intersection Capacity Utilization 70.3%ICU Level of Service C Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 132 (N. College Rd) & Gordon Road Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM Future Build C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)5437419205205368238820647558458 Future Volume (vph)5437419205205368238820647558458 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)17502250752503000 Storage Lanes10111110 Taper Length (ft)50100150150 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.000.950.95 Frt0.9930.8500.8500.987 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018500177018631583177018631583177034930 Flt Permitted0.6160.9500.9500.950 Satd. Flow (perm)114718500177018631583177018631583177034930 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45454545 Link Distance (ft)582864661734 Travel Time (s)8.813.110.011.1 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)6041621228228409269822952864964 Shared Lane Traffic (%) Lane Group Flow (vph)60437022822840926982295287130 Turn TypePermNAProtNApm+ovProtNApm+ovProtNA Protected Phases8 74516752 Permitted Phases846 Detector Phase88 74516752 Switch Phase Minimum Initial (s)7.07.07.07.07.07.012.07.07.012.0 Minimum Split (s)25.025.014.025.014.014.025.014.014.025.0 Total Split (s)35.035.020.035.020.015.090.020.020.090.0 Total Split (%)21.2%21.2%12.1%21.2%12.1%9.1%54.5%12.1%12.1%54.5% Maximum Green (s)29.129.114.429.113.98.983.514.413.983.5 Yellow Time (s)4.54.53.04.53.03.04.83.03.04.8 All-Red Time (s)1.41.42.61.43.13.11.72.63.11.7 Lost Time Adjust (s)-0.9-0.9-0.6-0.9-1.1-1.1-1.5-0.6-1.1-1.5 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.0 Lead/LagLagLagLeadLeadLeadLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.06.02.02.06.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.015.00.00.015.0 Time To Reduce (s)0.00.00.00.00.00.045.00.00.045.0 Recall ModeNoneNoneNoneNoneNoneNoneMinNoneNoneMin Act Effct Green (s)30.130.115.050.170.28.317.237.215.032.1 Actuated g/C Ratio0.310.310.150.510.720.090.180.380.150.33 v/c Ratio0.170.770.840.240.360.170.300.381.930.62 Control Delay27.841.767.414.76.846.136.823.6460.731.4 Queue Delay0.00.00.00.00.00.00.00.00.00.0 Total Delay27.841.767.414.76.846.136.823.6460.731.4 Lanes, Volumes, Timings 100: NC 132 (N. College Rd) & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM Future Build C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSCDEBADDCFC Approach Delay40.124.928.9214.1 Approach LOSDCCF Queue Length 50th (ft)2522913268671553100~480176 Queue Length 95th (ft)66#436#2951401684499161#769288 Internal Link Dist (ft)502784581654 Turn Bay Length (ft)17522575250300 Base Capacity (vph)354571273959114018216306052733236 Starvation Cap Reductn00 00000000 Spillback Cap Reductn00 00000000 Storage Cap Reductn00 00000000 Reduced v/c Ratio0.170.770.840.240.360.140.060.381.930.22 Intersection Summary Area Type:Other Cycle Length: 165 Actuated Cycle Length: 97.4 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.93 Intersection Signal Delay: 107.3Intersection LOS: F Intersection Capacity Utilization 77.7%ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: NC 132 (N. College Rd) & Gordon Road 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 26 Gordon Road and I-40 Westbound Ramps HCM 2010 TWSC 200: I-40 WB Off Ramp/I-40 WB On Ramp & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM Exist C. Steiss Page 1 Intersection Int Delay, s/veh1.8 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h87736001024240141140000 Future Vol, veh/h87736001024240141140000 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--Stop--None Storage Length150-------175--- Veh in Median Storage, #-0--0--0--16965- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow97818001138267161156000 Major/MinorMajor1Major2Minor1 Conflicting Flow All14040---015802415409 Stage 1------10111011- Stage 2------5691404- Critical Hdwy4.14-----6.846.546.94 Critical Hdwy Stg 1------5.845.54- Critical Hdwy Stg 2------5.845.54- Follow-up Hdwy2.22-----3.524.023.32 Pot Cap-1 Maneuver482-00--10032592 Stage 1--00--312315- Stage 2--00--530204- Platoon blocked, %--- Mov Cap-1 Maneuver482-----800592 Mov Cap-2 Maneuver------800- Stage 1------2490- Stage 2------5300- ApproachEBWBNB HCM Control Delay, s1.5017.9 HCM LOSC Minor Lane/Major MvmtNBLn1NBLn2EBLEBTWBTWBR Capacity (veh/h)80592482--- HCM Lane V/C Ratio0.2080.2630.201--- HCM Control Delay (s)61.513.214.3--- HCM Lane LOSFBB--- HCM 95th %tile Q(veh)0.710.7--- HCM 2010 TWSC 200: I-40 WB Off Ramp/I-40 WB On Ramp & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM FNB C. Steiss Page 1 Intersection Int Delay, s/veh1.8 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h89780001101259141150000 Future Vol, veh/h89780001101259141150000 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--Stop--None Storage Length150----0--175--- Veh in Median Storage, #-0--0--0--16965- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow99867001223288161167000 Major/MinorMajor1Major2Minor1 Conflicting Flow All12230---016762287433 Stage 1------10641064- Stage 2------6121223- Critical Hdwy4.14-----6.846.546.94 Critical Hdwy Stg 1------5.845.54- Critical Hdwy Stg 2------5.845.54- Follow-up Hdwy2.22-----3.524.023.32 Pot Cap-1 Maneuver566-00--8639571 Stage 1--00--293298- Stage 2--00--504250- Platoon blocked, %--- Mov Cap-1 Maneuver566-----710571 Mov Cap-2 Maneuver------710- Stage 1------2420- Stage 2------5040- ApproachEBWBNB HCM Control Delay, s1.3019.1 HCM LOSC Minor Lane/Major MvmtNBLn1NBLn2EBLEBTWBTWBR Capacity (veh/h)71571566--- HCM Lane V/C Ratio0.2350.2920.175--- HCM Control Delay (s)70.613.912.7--- HCM Lane LOSFBB--- HCM 95th %tile Q(veh)0.81.20.6--- HCM 2010 TWSC 200: I-40 WB Off Ramp/I-40 WB On Ramp & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM Future Build C. Steiss Page 1 Intersection Int Delay, s/veh1.9 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h89815001238280141163000 Future Vol, veh/h89815001238280141163000 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--Stop--None Storage Length150----0--175--- Veh in Median Storage, #-0--0--0--16965- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow99906001376311161181000 Major/MinorMajor1Major2Minor1 Conflicting Flow All13760---017912479453 Stage 1------11031103- Stage 2------6881376- Critical Hdwy4.14-----6.846.546.94 Critical Hdwy Stg 1------5.845.54- Critical Hdwy Stg 2------5.845.54- Follow-up Hdwy2.22-----3.524.023.32 Pot Cap-1 Maneuver494-00--7229554 Stage 1--00--279285- Stage 2--00--460211- Platoon blocked, %--- Mov Cap-1 Maneuver494-----580554 Mov Cap-2 Maneuver------580- Stage 1------2230- Stage 2------4600- ApproachEBWBNB HCM Control Delay, s1.4021 HCM LOSC Minor Lane/Major MvmtNBLn1NBLn2EBLEBTWBTWBR Capacity (veh/h)58554494--- HCM Lane V/C Ratio0.2870.3270.2--- HCM Control Delay (s)90.414.614.1--- HCM Lane LOSFBB--- HCM 95th %tile Q(veh)11.40.7--- HCM 2010 TWSC 200: I-40 WB Off Ramp/I-40 WB On Ramp & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM Exist C. Steiss Page 1 Intersection Int Delay, s/veh6.3 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h12680500698284334363000 Future Vol, veh/h12680500698284334363000 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--Stop--None Storage Length150-------175--- Veh in Median Storage, #-0--0--0--16965- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow14089400776316374403000 Major/MinorMajor1Major2Minor1 Conflicting Flow All10910---015622265447 Stage 1------11741174- Stage 2------3881091- Critical Hdwy4.14-----6.846.546.94 Critical Hdwy Stg 1------5.845.54- Critical Hdwy Stg 2------5.845.54- Follow-up Hdwy2.22-----3.524.023.32 Pot Cap-1 Maneuver635-00--10340559 Stage 1--00--256264- Stage 2--00--655289- Platoon blocked, %--- Mov Cap-1 Maneuver635-----800559 Mov Cap-2 Maneuver------800- Stage 1------2000- Stage 2------6550- ApproachEBWBNB HCM Control Delay, s1.7032.3 HCM LOSD Minor Lane/Major MvmtNBLn1NBLn2EBLEBTWBTWBR Capacity (veh/h)80559635--- HCM Lane V/C Ratio0.5140.7220.22--- HCM Control Delay (s)90.226.412.3--- HCM Lane LOSFDB--- HCM 95th %tile Q(veh)2.260.8--- HCM 2010 TWSC 200: I-40 WB Off Ramp/I-40 WB On Ramp & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM FNB C. Steiss Page 1 Intersection Int Delay, s/veh8.5 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h12985600780307344379000 Future Vol, veh/h12985600780307344379000 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--Stop--None Storage Length150----0--175--- Veh in Median Storage, #-0--0--0--16965- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow14395100867341384421000 Major/MinorMajor1Major2Minor1 Conflicting Flow All8670---016712105476 Stage 1------12381238- Stage 2------433867- Critical Hdwy4.14-----7.546.546.94 Critical Hdwy Stg 1------6.545.54- Critical Hdwy Stg 2------6.545.54- Follow-up Hdwy2.22-----3.524.023.32 Pot Cap-1 Maneuver772-00--6351535 Stage 1--00--186246- Stage 2--00--571368- Platoon blocked, %--- Mov Cap-1 Maneuver772-----5442535 Mov Cap-2 Maneuver------5442- Stage 1------152200- Stage 2------571368- ApproachEBWBNB HCM Control Delay, s1.4047.2 HCM LOSE Minor Lane/Major MvmtNBLn1NBLn2EBLEBTWBTWBR Capacity (veh/h)52535772--- HCM Lane V/C Ratio0.8120.7870.186--- HCM Control Delay (s)196.532.210.7--- HCM Lane LOSFDB--- HCM 95th %tile Q(veh)3.47.30.7--- HCM 2010 TWSC 200: I-40 WB Off Ramp/I-40 WB On Ramp & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract PM Future Build C. Steiss Page 1 Intersection Int Delay, s/veh13.3 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h12998200865320344425000 Future Vol, veh/h12998200865320344425000 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--Stop--None Storage Length150----0--175--- Veh in Median Storage, #-0--0--0--16965- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow143109100961356384472000 Major/MinorMajor1Major2Minor1 Conflicting Flow All9610---018592339546 Stage 1------13781378- Stage 2------481961- Critical Hdwy4.14-----6.846.546.94 Critical Hdwy Stg 1------5.845.54- Critical Hdwy Stg 2------5.845.54- Follow-up Hdwy2.22-----3.524.023.32 Pot Cap-1 Maneuver712-00--6536482 Stage 1--00--199210- Stage 2--00--588333- Platoon blocked, %--- Mov Cap-1 Maneuver712-----520482 Mov Cap-2 Maneuver------520- Stage 1------1590- Stage 2------5880- ApproachEBWBNB HCM Control Delay, s1.3076.3 HCM LOSF Minor Lane/Major MvmtNBLn1NBLn2EBLEBTWBTWBR Capacity (veh/h)52482712--- HCM Lane V/C Ratio0.8120.980.201--- HCM Control Delay (s)196.565.511.3--- HCM Lane LOSFFB--- HCM 95th %tile Q(veh)3.412.70.7--- 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 27 Gordon Road and Blount Drive/Site Access HCM 2010 TWSC 300: Gordon Road & Blount Drive 7/28/2017 170224 Gordon Road Lewis Tract AM Exist C. Steiss Page 2 Intersection Int Delay, s/veh0.3 MovementEBLEBTWBTWBRSBLSBR Lane Configurations Traffic Vol, veh/h48761285442 Future Vol, veh/h48761285442 Conflicting Peds, #/hr000000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #-00-0- Grade, %-00-0- Peak Hour Factor909090909090 Heavy Vehicles, %222222 Mvmt Flow49731428442 Major/MinorMajor1Major2Minor2 Conflicting Flow All14320-024121430 Stage 1----1430- Stage 2----982- Critical Hdwy4.12---6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy2.218---3.5183.318 Pot Cap-1 Maneuver474---36165 Stage 1----221- Stage 2----363- Platoon blocked, %--- Mov Cap-1 Maneuver474---35165 Mov Cap-2 Maneuver----35- Stage 1----221- Stage 2----356- ApproachEBWBSB HCM Control Delay, s0.1093.9 HCM LOSF Minor Lane/Major MvmtEBLEBTWBTWBRSBLn1 Capacity (veh/h)474---47 HCM Lane V/C Ratio0.009---0.142 HCM Control Delay (s)12.70--93.9 HCM Lane LOSBA--F HCM 95th %tile Q(veh)0---0.5 HCM 2010 TWSC 300: Gordon Road & Blount Drive 7/28/2017 170224 Gordon Road Lewis Tract AM FNB C. Steiss Page 2 Intersection Int Delay, s/veh0.3 MovementEBLEBTWBTWBRSBLSBR Lane Configurations Traffic Vol, veh/h49011355442 Future Vol, veh/h49011355442 Conflicting Peds, #/hr000000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #-00-0- Grade, %-00-0- Peak Hour Factor909090909090 Heavy Vehicles, %222222 Mvmt Flow410011506442 Major/MinorMajor1Major2Minor2 Conflicting Flow All15100-025181508 Stage 1----1508- Stage 2----1010- Critical Hdwy4.12---6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy2.218---3.5183.318 Pot Cap-1 Maneuver443---31148 Stage 1----202- Stage 2----352- Platoon blocked, %--- Mov Cap-1 Maneuver443---30148 Mov Cap-2 Maneuver----30- Stage 1----202- Stage 2----345- ApproachEBWBSB HCM Control Delay, s0.10109.1 HCM LOSF Minor Lane/Major MvmtEBLEBTWBTWBRSBLn1 Capacity (veh/h)443---41 HCM Lane V/C Ratio0.01---0.163 HCM Control Delay (s)13.20--109.1 HCM Lane LOSBA--F HCM 95th %tile Q(veh)0---0.5 HCM 2010 TWSC 300: Site Access/Blount Drive & Gordon Road 7/28/2017 170224 Gordon Road Lewis Tract AM Future Build C. Steiss Page 2 Intersection Int Delay, s/veh568.8 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h4901481613554158453442 Future Vol, veh/h4901481613554158453442 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--None--None Storage Length------------ Veh in Median Storage, #-0--0--0--0- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow41001531815064176459442 Major/MinorMajor1Major2Minor1Minor2 Conflicting Flow All151000105400258425831028261126061508 Stage 1------10371037-15431543- Stage 2------15471546-10681063- Critical Hdwy4.12--4.12--7.126.526.227.126.526.22 Critical Hdwy Stg 1------6.125.52-6.125.52- Critical Hdwy Stg 2------6.125.52-6.125.52- Follow-up Hdwy2.218--2.218--3.5184.0183.3183.5184.0183.318 Pot Cap-1 Maneuver443--661--~ 17252841625148 Stage 1------279308-144176- Stage 2------~ 143176-268300- Platoon blocked, %---- Mov Cap-1 Maneuver443--661--~ 1220284920148 Mov Cap-2 Maneuver------~ 1220-920- Stage 1------273301-141146- Stage 2------~ 113146-205293- ApproachEBWBNBSB HCM Control Delay, s0.10.1$ 6731.3$ 475.5 HCM LOSFF Minor Lane/Major MvmtNBLn1EBLEBTEBRWBLWBTWBRSBLn1 Capacity (veh/h)16443--661--15 HCM Lane V/C Ratio14.9310.01--0.027--0.741 HCM Control Delay (s)$ 6731.313.20-10.60-$ 475.5 HCM Lane LOSFBA-BA-F HCM 95th %tile Q(veh)30.80--0.1--1.8 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 300: Site Access/Blount Drive & Gordon Road 7/28/2017 170224 Gordon Road Lewis TractAM Future Build with Imps C. Steiss Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)4901481613554158453442 Future Volume (vph)4901481613554158453442 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)010010000000 Storage Lanes01101000 Taper Length (ft)251002525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8600.973 Flt Protected0.9500.9500.980 Satd. Flow (prot)018631583177018630177016020017760 Flt Permitted0.6980.9500.7510.900 Satd. Flow (perm)013001583177018630139916020016310 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45452525 Link Distance (ft)685891505609 Travel Time (s)10.413.513.816.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)41001531815064176459442 Shared Lane Traffic (%) Lane Group Flow (vph)010055318151001766300100 Turn TypePermNAPermProtNAPermNAPermNA Protected Phases21648 Permitted Phases2248 Detector Phase 222164488 Switch Phase Minimum Initial (s)12.012.012.07.012.07.07.07.07.0 Minimum Split (s)19.019.019.014.019.014.014.014.014.0 Total Split (s)114.0114.0114.014.0128.022.022.022.022.0 Total Split (%)76.0%76.0%76.0%9.3%85.3%14.7%14.7%14.7%14.7% Maximum Green (s)107.0107.0107.07.0121.015.015.015.015.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.0 Lead/LagLagLagLagLead Lead-Lag Optimize?YesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.0 Recall ModeMinMinMinNoneMinMaxMaxMaxMax Act Effct Green (s)114.6114.69.0123.017.017.017.0 Actuated g/C Ratio0.760.760.060.820.110.110.11 v/c Ratio1.010.040.170.991.110.350.05 Control Delay51.05.470.934.1163.567.360.3 Queue Delay0.00.00.00.00.00.00.0 Total Delay51.05.470.934.1163.567.360.3 LOSDAECFEE Approach Delay48.734.6138.260.3 Approach LOSDCFE Lanes, Volumes, Timings 300: Site Access/Blount Drive & Gordon Road 7/28/2017 170224 Gordon Road Lewis TractAM Future Build with Imps C. Steiss Page 5 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 50th (ft)~108113171166~196589 Queue Length 95th (ft)#13422645#1779#35710829 Internal Link Dist (ft)605811425529 Turn Bay Length (ft)100100 Base Capacity (vph)99312091061527158181184 Starvation Cap Reductn 0000000 Spillback Cap Reductn 0000000 Storage Cap Reductn 0000000 Reduced v/c Ratio1.010.040.170.991.110.350.05 Intersection Summary Area Type:Other Cycle Length: 150 Actuated Cycle Length: 150 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 48.7Intersection LOS: D Intersection Capacity Utilization 99.9%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 300: Site Access/Blount Drive & Gordon Road HCM 2010 TWSC 300: Gordon Road & Blount Drive 7/28/2017 170224 Gordon Road Lewis Tract PM Exist C. Steiss Page 2 Intersection Int Delay, s/veh0.3 MovementEBLEBTWBTWBRSBLSBR Lane Configurations Traffic Vol, veh/h5979848246 Future Vol, veh/h5979848246 Conflicting Peds, #/hr000000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #-00-0- Grade, %-00-0- Peak Hour Factor909090909090 Heavy Vehicles, %222222 Mvmt Flow61088942247 Major/MinorMajor1Major2Minor2 Conflicting Flow All9440-02042943 Stage 1----943- Stage 2----1099- Critical Hdwy4.12---6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy2.218---3.5183.318 Pot Cap-1 Maneuver727---62318 Stage 1----379- Stage 2----319- Platoon blocked, %--- Mov Cap-1 Maneuver727---61318 Mov Cap-2 Maneuver----61- Stage 1----379- Stage 2----312- ApproachEBWBSB HCM Control Delay, s0.1038.7 HCM LOSE Minor Lane/Major MvmtEBLEBTWBTWBRSBLn1 Capacity (veh/h)727---118 HCM Lane V/C Ratio0.008---0.094 HCM Control Delay (s)100--38.7 HCM Lane LOSAA--E HCM 95th %tile Q(veh)0---0.3 HCM 2010 TWSC 300: Gordon Road & Blount Drive 7/28/2017 170224 Gordon Road Lewis Tract PM FNB C. Steiss Page 2 Intersection Int Delay, s/veh0.3 MovementEBLEBTWBTWBRSBLSBR Lane Configurations Traffic Vol, veh/h51007916246 Future Vol, veh/h51007916246 Conflicting Peds, #/hr000000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #-00-0- Grade, %-00-0- Peak Hour Factor909090909090 Heavy Vehicles, %222222 Mvmt Flow611191018247 Major/MinorMajor1Major2Minor2 Conflicting Flow All10200-021491019 Stage 1----1019- Stage 2----1130- Critical Hdwy4.12---6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy2.218---3.5183.318 Pot Cap-1 Maneuver680---53288 Stage 1----348- Stage 2----308- Platoon blocked, %--- Mov Cap-1 Maneuver680---52288 Mov Cap-2 Maneuver----52- Stage 1----348- Stage 2----301- ApproachEBWBSB HCM Control Delay, s0.1044.6 HCM LOSE Minor Lane/Major MvmtEBLEBTWBTWBRSBLn1 Capacity (veh/h)680---102 HCM Lane V/C Ratio0.008---0.109 HCM Control Delay (s)10.30--44.6 HCM Lane LOSBA--E HCM 95th %tile Q(veh)0---0.4 HCM 2010 TWSC 300: Gordon Road & Blount Drive 7/28/2017 170224 Gordon Road Lewis Tract PM Future Build C. Steiss Page 2 Intersection Int Delay, s/veh195.1 MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Vol, veh/h5100717257916298433446 Future Vol, veh/h5100717257916298433446 Conflicting Peds, #/hr000000000000 Sign Control FreeFreeFreeFreeFreeFreeStopStopStopStopStopStop RT Channelized--None--None--None--None Storage Length------------ Veh in Median Storage, #-0--0--0--0- Grade, %-0--0--0--0- Peak Hour Factor909090909090909090909090 Heavy Vehicles, %222222222222 Mvmt Flow611191916310182109437447 Major/MinorMajor1Major2Minor1Minor2 Conflicting Flow All102000131000237723731214239224671019 Stage 1------12261226-11461146- Stage 2------11511147-12461321- Critical Hdwy4.12--4.12--7.126.526.227.126.526.22 Critical Hdwy Stg 1------6.125.52-6.125.52- Critical Hdwy Stg 2------6.125.52-6.125.52- Follow-up Hdwy2.218--2.218--3.5184.0183.3183.5184.0183.318 Pot Cap-1 Maneuver680--528--~ 24352212330288 Stage 1------218251-242274- Stage 2------241274-213226- Platoon blocked, %---- Mov Cap-1 Maneuver680--528--~ 15242211321288 Mov Cap-2 Maneuver------~ 1524-1321- Stage 1------210242-234198- Stage 2------167198-168218- ApproachEBWBNBSB HCM Control Delay, s00.7$ 3304.7251.9 HCM LOSFF Minor Lane/Major MvmtNBLn1EBLEBTEBRWBLWBTWBRSBLn1 Capacity (veh/h)20680--528--27 HCM Lane V/C Ratio7.50.008--0.12--0.576 HCM Control Delay (s)$ 3304.710.30-12.70-251.9 HCM Lane LOSFBA-BA-F HCM 95th %tile Q(veh)19.20--0.4--1.8 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 300: Gordon Road & Blount Drive 7/28/2017 170224 Gordon Road Lewis TractPM Future Build with Imps C. Steiss Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)5100717257916298433446 Future Volume (vph)5100717257916298433446 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)010010000000 Storage Lanes01101000 Taper Length (ft)251002525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8650.937 Flt Protected0.9500.9500.987 Satd. Flow (prot)018631583177018630177016110017230 Flt Permitted0.9950.9500.7480.905 Satd. Flow (perm)018531583177018630139316110015800 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)45453025 Link Distance (ft)685794525609 Travel Time (s)10.412.011.916.6 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)611191916310182109437447 Shared Lane Traffic (%) Lane Group Flow (vph)0112519163102001094100150 Turn TypePermNAPermProtNAPermNAPermNA Protected Phases21648 Permitted Phases2248 Detector Phase 222164488 Switch Phase Minimum Initial (s)12.012.012.07.012.07.07.07.07.0 Minimum Split (s)19.019.019.014.019.014.014.014.014.0 Total Split (s)62.062.062.014.076.014.014.014.014.0 Total Split (%)68.9%68.9%68.9%15.6%84.4%15.6%15.6%15.6%15.6% Maximum Green (s)55.055.055.07.069.07.07.07.07.0 Yellow Time (s)5.05.05.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.05.0 Lead/LagLagLagLagLead Lead-Lag Optimize?YesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.0 Recall ModeMinMinMinNoneMinMinMinMinMin Act Effct Green (s)54.954.99.265.49.29.29.2 Actuated g/C Ratio0.650.650.110.770.110.110.11 v/c Ratio0.940.190.330.710.730.240.09 Control Delay31.27.343.08.068.041.238.2 Queue Delay0.00.00.00.00.00.00.0 Total Delay31.27.343.08.068.041.238.2 LOSCADAEDD Approach Delay27.710.060.738.2 Approach LOSCBED Lanes, Volumes, Timings 300: Gordon Road & Blount Drive 7/28/2017 170224 Gordon Road Lewis TractPM Future Build with Imps C. Steiss Page 5 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Queue Length 50th (ft)537413420462228 Queue Length 95th (ft)#8857074317#1515427 Internal Link Dist (ft)605714445529 Turn Bay Length (ft)100100 Base Capacity (vph)126910841911548150174171 Starvation Cap Reductn 0000000 Spillback Cap Reductn 0000000 Storage Cap Reductn 0000000 Reduced v/c Ratio0.890.180.330.660.730.240.09 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 84.8 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 22.2Intersection LOS: C Intersection Capacity Utilization 77.4%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 300: Gordon Road & Blount Drive 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 28 Trip Generation Trip Generation Summary - Alternative 1 Project: Alternative: Open Date: Analysis Date: New Project Alternative 1 5/31/2017 5/31/2017 ITE Land Use Enter Exit Enter Exit Average Daily Trips Enter Exit TotalTotalTotal AM Peak Hour of Adjacent Street Traffic PM Peak Hour of Adjacent Street Traffic 210SFHOUSE 1 236Dwelling Units 2368714917713344224711231124 220 APT 1 192Dwelling Units 12343809878201287643644 Unadjusted Volume 17681766353464211275229130359 Internal Capture Trips000000000 000000000 17681766353464211275229130359 Pass-By Trips Volume Added to Adjacent Streets Total AM Peak Hour Internal Capture = 0 Percent Total PM Peak Hour Internal Capture = 0 Percent 1TRIP GENERATION 2014, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 29 Traffic Volume Data File Name : 1. Gordan Road and I40 EB Ramps Site Code : 00170224 Start Date : 5/23/2017 Page No : 1 Counted By: N.Baskett *Note: Peds Column under Bikes group group contains U-turns Weather: Raining Groups Printed- Cars - Buses and Trucks - Bikes on Road College Road Southbound Gordan Road Westbound I-40 EB Ramps Northbound Gordan Road Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total07:00 AM 14 132 86 0 232 71 75 95 1 241 57 23 5 0 85 8 34 6 0 48 1 606 607 07:15 AM 7 118 92 0 217 61 52 81 0 194 34 22 8 0 64 3 17 3 0 23 0 498 498 07:30 AM 9 153 84 0 246 98 98 85 0 281 64 34 24 0 122 8 39 2 0 49 0 698 698 07:45 AM 14 110 114 0 238 129 92 94 0 315 64 46 32 0 142 11 28 5 0 44 0 739 739 Total 44 513 376 0 933 359 317 355 1 1031 219 125 69 0 413 30 118 16 0 164 1 2541 2542 08:00 AM 13 155 112 0 280 137 91 66 0 294 43 44 14 0 101 10 41 16 0 67 0 742 742 08:15 AM 20 152 116 0 288 115 85 57 0 257 35 50 10 0 95 6 35 13 0 54 0 694 694 08:30 AM 9 109 93 2 211 54 53 55 0 162 23 13 0 0 36 7 19 5 0 31 2 440 442 08:45 AM 13 156 85 0 254 53 38 52 0 143 36 17 5 1 58 5 29 4 0 38 1 493 494 Total 55 572 406 2 1033 359 267 230 0 856 137 124 29 1 290 28 124 38 0 190 3 2369 2372 04:00 PM 13 192 89 0 294 78 49 49 0 176 32 21 4 0 57 8 59 5 0 72 0 599 599 04:15 PM 7 149 94 0 250 70 39 53 0 162 43 19 1 1 63 13 49 10 0 72 1 547 548 04:30 PM 14 149 84 1 247 63 44 44 0 151 39 14 2 2 55 9 58 3 0 70 3 523 526 04:45 PM 13 133 73 0 219 57 50 37 0 144 24 16 5 0 45 7 51 6 0 64 0 472 472 Total 47 623 340 1 1010 268 182 183 0 633 138 70 12 3 220 37 217 24 0 278 4 2141 2145 05:00 PM 13 148 101 0 262 72 39 37 0 148 39 29 2 0 70 3 63 9 0 75 0 555 555 05:15 PM 15 164 128 0 307 86 52 45 0 183 68 26 8 0 102 3 109 23 0 135 0 727 727 05:30 PM 12 111 87 1 210 73 32 31 0 136 31 13 9 0 53 2 72 9 0 83 1 482 483 05:45 PM 17 149 85 1 251 79 36 39 1 154 33 18 4 0 55 11 69 12 0 92 2 552 554 Total 57 572 401 2 1030 310 159 152 1 621 171 86 23 0 280 19 313 53 0 385 3 2316 2319 Grand Total 203 2280 1523 5 4006 1296 925 920 2 3141 665 405 133 4 1203 114 772 131 0 1017 11 9367 9378 Apprch %5.1 56.9 38 41.3 29.4 29.3 55.3 33.7 11.1 11.2 75.9 12.9 Total %2.2 24.3 16.3 42.8 13.8 9.9 9.8 33.5 7.1 4.3 1.4 12.8 1.2 8.2 1.4 10.9 0.1 99.9 Cars 197 2251 1499 3947 1264 918 912 3095 635 390 132 1160 112 768 130 1010 0 0 9212 % Cars 97 98.7 98.4 0 98.4 97.5 99.2 99.1 50 98.5 95.5 96.3 99.2 75 96.1 98.2 99.5 99.2 0 99.3 0 0 98.2 Buses and Trucks 6 28 24 58 31 7 6 44 30 15 1 46 2 3 1 6 0 0 154 % Buses and Trucks 3 1.2 1.6 0 1.4 2.4 0.8 0.7 0 1.4 4.5 3.7 0.8 0 3.8 1.8 0.4 0.8 0 0.6 0 0 1.6 Bikes on Road 0 1 0 6 1 0 2 4 0 0 0 1 0 1 0 1 0 0 12 % Bikes on Road 0 0 0 100 0.1 0.1 0 0.2 50 0.1 0 0 0 25 0.1 0 0.1 0 0 0.1 0 0 0.1 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 1. Gordan Road and I40 EB Ramps Site Code : 00170224 Start Date : 5/23/2017 Page No : 2 College Road G o r d a n R o a d G o r d a n R o a d I-40 EB Ramps Right 197 6 0 203 Thru 2251 28 1 2280 Left 1499 24 0 1523 InOut Total 1784 3947 5731 47 58 105 1 1 2 1832 5838 4006 Rig h t 12 6 4 31 1 12 9 6 Th r u 91 8 7 0 92 5 Le f t 91 2 6 2 92 0 Ou t To t a l In 29 0 2 30 9 4 59 9 6 57 44 10 1 1 3 4 29 6 0 61 0 1 31 4 1 Left 132 1 0 133 Thru 390 15 0 405 Right 635 30 0 665 Out TotalIn 3275 1157 4432 36 46 82 3 0 3 3314 4517 1203 Le f t 13 0 1 0 13 1 Th r u76 8 3 1 77 2 Ri g h t 11 2 2 0 11 4 To t a l Ou t In 12 4 7 10 1 0 22 5 7 14 6 20 0 1 1 12 6 1 22 7 8 10 1 7 5/23/2017 07:00 AM 5/23/2017 05:45 PM Cars Buses and Trucks Bikes on Road North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 1. Gordan Road and I40 EB Ramps Site Code : 00170224 Start Date : 5/23/2017 Page No : 3 College Road Southbound Gordan Road Westbound I-40 EB Ramps Northbound Gordan Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 9 153 84 246 98 98 85 281 64 34 24 122 8 39 2 49 698 07:45 AM 14 110 114 238 129 92 94 315 64 46 32 142 11 28 5 44 739 08:00 AM 13 155 112 280 137 91 66 294 43 44 14 101 10 41 16 67 742 08:15 AM 20 152 116 288 115 85 57 257 35 50 10 95 6 35 13 54 694 Total Volume 56 570 426 1052 479 366 302 1147 206 174 80 460 35 143 36 214 2873 % App. Total 5.3 54.2 40.5 41.8 31.9 26.3 44.8 37.8 17.4 16.4 66.8 16.8 PHF .700 .919 .918 .913 .874 .934 .803 .910 .805 .870 .625 .810 .795 .872 .563 .799 .968 Cars 53 558 419 1030 473 365 302 1140 195 170 79 444 34 142 35 211 2825 % Cars 94.6 97.9 98.4 97.9 98.7 99.7 100 99.4 94.7 97.7 98.8 96.5 97.1 99.3 97.2 98.6 98.3 Buses and Trucks 3 12 7 22 5 1 0 6 11 4 1 16 1 1 1 3 47 % Buses and Trucks 5.4 2.1 1.6 2.1 1.0 0.3 0 0.5 5.3 2.3 1.3 3.5 2.9 0.7 2.8 1.4 1.6 Bikes on Road 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 % Bikes on Road 0 0 0 0 0.2 0 0 0.1 0 0 0 0 0 0 0 0 0.0 College Road G o r d a n R o a d G o r d a n R o a d I-40 EB Ramps Right 53 3 0 56 Thru 558 12 0 570 Left 419 7 0 426 InOut Total 678 1030 1708 10 22 32 1 0 1 689 1741 1052 Ri g h t 47 3 5 1 47 9 Th r u 36 5 1 0 36 6 Le f t 30 2 0 0 30 2 Ou t To t a l In 75 6 11 4 0 18 9 6 19 6 25 0 1 1 77 5 19 2 2 11 4 7 Left 79 1 0 80 Thru 170 4 0 174 Right 195 11 0 206 Out TotalIn 894 444 1338 13 16 29 0 0 0 907 1367 460 Le f t 35 1 0 36 Th r u14 2 1 0 14 3 Rig h t 34 1 0 35 To t a l Ou t In 49 7 21 1 70 8 5 3 8 0 0 0 50 2 71 6 21 4 Peak Hour Begins at 07:30 AM Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 1. Gordan Road and I40 EB Ramps Site Code : 00170224 Start Date : 5/23/2017 Page No : 4 College Road Southbound Gordan Road Westbound I-40 EB Ramps Northbound Gordan Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 13 148 101 262 72 39 37 148 39 29 2 70 3 63 9 75 555 05:15 PM 15 164 128 307 86 52 45 183 68 26 8 102 3 109 23 135 727 05:30 PM 12 111 87 210 73 32 31 136 31 13 9 53 2 72 9 83 482 05:45 PM 17 149 85 251 79 36 39 154 33 18 4 55 11 69 12 92 552 Total Volume 57 572 401 1030 310 159 152 621 171 86 23 280 19 313 53 385 2316 % App. Total 5.5 55.5 38.9 49.9 25.6 24.5 61.1 30.7 8.2 4.9 81.3 13.8 PHF .838 .872 .783 .839 .901 .764 .844 .848 .629 .741 .639 .686 .432 .718 .576 .713 .796 Cars 56 567 398 1021 303 157 151 611 168 83 23 274 19 313 53 385 2291 % Cars 98.2 99.1 99.3 99.1 97.7 98.7 99.3 98.4 98.2 96.5 100 97.9 100 100 100 100 98.9 Buses and Trucks 1 5 3 9 7 2 1 10 3 3 0 6 0 0 0 0 25 % Buses and Trucks 1.8 0.9 0.7 0.9 2.3 1.3 0.7 1.6 1.8 3.5 0 2.1 0 0 0 0 1.1 Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 College Road G o r d a n R o a d G o r d a n R o a d I-40 EB Ramps Right 56 1 0 57 Thru 567 5 0 572 Left 398 3 0 401 InOut Total 439 1021 1460 10 9 19 0 0 0 449 1479 1030 Rig h t 30 3 7 0 31 0 Th r u 15 7 2 0 15 9 Le f t 15 1 1 0 15 2 Ou t To t a l In 87 9 61 1 14 9 0 6 10 16 0 0 0 88 5 15 0 6 62 1 Left 23 0 0 23 Thru 83 3 0 86 Right 168 3 0 171 Out TotalIn 737 274 1011 6 6 12 0 0 0 743 1023 280 Le f t 53 0 0 53 Th r u 31 3 0 0 31 3 Ri g h t 19 0 0 19 To t a l Ou t In 23 6 38 5 62 1 3 0 3 0 0 0 23 9 62 4 38 5 Peak Hour Begins at 05:00 PM Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 2. Gordon Road and I40 WB Ramps Site Code : 00170224 Start Date : 5/18/2017 Page No : 1 Counted By: N. Baskett *Note: Peds Column under Bikes group group contains U-turns Weather: Clear Groups Printed- Cars - Buses and Trucks - Bikes on Road I-40 West On Ramp Southbound Gordon Road Westbound I-40 West Off Ramp Northbound Gordon Road Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total07:00 0 0 0 0 0 59 192 0 0 251 46 0 6 0 52 0 127 26 0 153 0 456 456 07:15 0 0 0 0 0 44 242 0 0 286 29 0 4 0 33 0 202 23 0 225 0 544 544 07:30 0 0 0 1 0 82 274 0 0 356 31 0 3 0 34 0 155 22 0 177 1 567 568 07:45 0 0 0 0 0 61 244 0 0 305 39 1 3 0 43 0 195 21 0 216 0 564 564 Total 0 0 0 1 0 246 952 0 0 1198 145 1 16 0 162 0 679 92 0 771 1 2131 2132 08:00 0 0 0 0 0 53 264 0 0 317 41 0 4 0 45 0 184 21 0 205 0 567 567 08:15 0 0 0 0 0 34 229 0 0 263 47 3 4 0 54 0 181 22 0 203 0 520 520 08:30 0 0 0 0 0 35 165 0 0 200 44 0 3 0 47 0 162 14 0 176 0 423 423 08:45 0 0 0 0 0 30 151 0 0 181 34 0 6 0 40 0 147 11 0 158 0 379 379 Total 0 0 0 0 0 152 809 0 0 961 166 3 17 0 186 0 674 68 0 742 0 1889 1889 16:00 0 0 0 0 0 59 167 0 0 226 70 0 7 0 77 0 184 25 0 209 0 512 512 16:15 0 0 0 0 0 56 164 0 0 220 114 1 7 0 122 0 157 28 0 185 0 527 527 16:30 0 0 0 0 0 83 169 0 0 252 73 0 3 0 76 0 168 23 0 191 0 519 519 16:45 0 0 0 0 0 70 155 0 6 225 76 0 8 0 84 0 191 28 0 219 6 528 534 Total 0 0 0 0 0 268 655 0 6 923 333 1 25 0 359 0 700 104 0 804 6 2086 2092 17:00 0 0 0 0 0 85 174 0 0 259 94 0 7 0 101 0 216 41 0 257 0 617 617 17:15 0 0 0 0 0 72 197 0 0 269 104 0 8 0 112 0 211 25 0 236 0 617 617 17:30 0 0 0 0 0 57 172 0 0 229 89 0 10 0 99 0 187 32 1 219 1 547 548 17:45 0 0 0 0 0 52 159 0 0 211 87 0 11 0 98 0 184 19 0 203 0 512 512 Total 0 0 0 0 0 266 702 0 0 968 374 0 36 0 410 0 798 117 1 915 1 2293 2294 Grand Total 0 0 0 1 0 932 3118 0 6 4050 1018 5 94 0 1117 0 2851 381 1 3232 8 8399 8407 Apprch %0 0 0 23 77 0 91.1 0.4 8.4 0 88.2 11.8 Total %0 0 0 0 11.1 37.1 0 48.2 12.1 0.1 1.1 13.3 0 33.9 4.5 38.5 0.1 99.9 Cars 0 0 0 1 921 3056 0 3981 1002 5 91 1098 0 2796 369 3165 0 0 8245 % Cars 0 0 0 100 100 98.8 98 0 66.7 98.2 98.4 100 96.8 0 98.3 0 98.1 96.9 0 97.9 0 0 98.1 Buses and Trucks 0 0 0 0 11 61 0 74 15 0 1 16 0 55 12 67 0 0 157 % Buses and Trucks 0 0 0 0 0 1.2 2 0 33.3 1.8 1.5 0 1.1 0 1.4 0 1.9 3.1 0 2.1 0 0 1.9 Bikes on Road 0 0 0 0 0 1 0 1 1 0 2 3 0 0 0 1 0 0 5 % Bikes on Road 0 0 0 0 0 0 0 0 0 0 0.1 0 2.1 0 0.3 0 0 0 100 0 0 0 0.1 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : 2. Gordon Road and I40 WB Ramps Site Code : 00170224 Start Date : 5/18/2017 Page No : 2 I-40 West On Ramp G o r d o n R o a d G o r d o n R o a d I-40 West Off Ramp Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 1295 0 1295 23 0 23 0 0 0 1318 1318 0 Ri g h t 92 1 11 0 93 2 Th r u 30 5 6 61 1 31 1 8 Le f t 0 0 0 0 Ou t To t a l In 37 9 8 39 7 7 77 7 5 70 72 14 2 1 1 2 38 6 9 79 1 9 40 5 0 Left 91 1 2 94 Thru 5 0 0 5 Right 1002 15 1 1018 Out TotalIn 0 1098 1098 0 16 16 0 3 3 0 1117 1117 Le f t 36 9 12 0 38 1 Th r u 27 9 6 55 0 28 5 1 Rig h t 0 0 0 0 To t a l Ou t In 31 4 7 31 6 5 63 1 2 62 67 12 9 3 0 3 32 1 2 64 4 4 32 3 2 5/18/2017 07:00 5/18/2017 17:45 Cars Buses and Trucks Bikes on Road North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : 2. Gordon Road and I40 WB Ramps Site Code : 00170224 Start Date : 5/18/2017 Page No : 3 I-40 West On Ramp Southbound Gordon Road Westbound I-40 West Off Ramp Northbound Gordon Road Eastbound Start Time App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 11:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 0 0 0 0 44 242 0 286 29 0 4 33 0 202 23 225 544 07:30 0 0 0 0 82 274 0 356 31 0 3 34 0 155 22 177 567 07:45 0 0 0 0 61 244 0 305 39 1 3 43 0 195 21 216 564 08:00 0 0 0 0 53 264 0 317 41 0 4 45 0 184 21 205 567 Total Volume 0 0 0 0 240 1024 0 1264 140 1 14 155 0 736 87 823 2242 % App. Total 0 0 0 19 81 0 90.3 0.6 9 0 89.4 10.6 PHF .000 .000 .000 .000 .732 .934 .000 .888 .854 .250 .875 .861 .000 .911 .946 .914 .989 Cars 0 0 0 0 239 1012 0 1251 136 1 12 149 0 718 81 799 2199 % Cars 0 0 0 0 99.6 98.8 0 99.0 97.1 100 85.7 96.1 0 97.6 93.1 97.1 98.1 Buses and Trucks 0 0 0 0 1 11 0 12 4 0 1 5 0 18 6 24 41 % Buses and Trucks 0 0 0 0 0.4 1.1 0 0.9 2.9 0 7.1 3.2 0 2.4 6.9 2.9 1.8 Bikes on Road 0 0 0 0 0 1 0 1 0 0 1 1 0 0 0 0 2 % Bikes on Road 0 0 0 0 0 0.1 0 0.1 0 0 7.1 0.6 0 0 0 0 0.1 I-40 West On Ramp G o r d o n R o a d G o r d o n R o a d I-40 West Off Ramp Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 321 0 321 7 0 7 0 0 0 328 328 0 Ri g h t 23 9 1 0 24 0 Th r u 10 1 2 11 1 10 2 4 Le f t 0 0 0 0 Ou t To t a l In 85 4 12 5 1 21 0 5 22 12 34 0 1 1 87 6 21 4 0 12 6 4 Left 12 1 1 14 Thru 1 0 0 1 Right 136 4 0 140 Out TotalIn 0 149 149 0 5 5 0 1 1 0 155 155 Le f t 81 6 0 87 Th r u 71 8 18 0 73 6 Rig h t 0 0 0 0 To t a l Ou t In 10 2 4 79 9 18 2 3 12 24 36 2 0 2 10 3 8 18 6 1 82 3 Peak Hour Begins at 07:15 Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : 2. Gordon Road and I40 WB Ramps Site Code : 00170224 Start Date : 5/18/2017 Page No : 4 I-40 West On Ramp Southbound Gordon Road Westbound I-40 West Off Ramp Northbound Gordon Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 0 0 0 0 70 155 0 225 76 0 8 84 0 191 28 219 528 17:00 0 0 0 0 85 174 0 259 94 0 7 101 0 216 41 257 617 17:15 0 0 0 0 72 197 0 269 104 0 8 112 0 211 25 236 617 17:30 0 0 0 0 57 172 0 229 89 0 10 99 0 187 32 219 547 Total Volume 0 0 0 0 284 698 0 982 363 0 33 396 0 805 126 931 2309 % App. Total 0 0 0 28.9 71.1 0 91.7 0 8.3 0 86.5 13.5 PHF .000 .000 .000 .000 .835 .886 .000 .913 .873 .000 .825 .884 .000 .932 .768 .906 .936 Cars 0 0 0 0 282 684 0 966 362 0 33 395 0 800 124 924 2285 % Cars 0 0 0 0 99.3 98.0 0 98.4 99.7 0 100 99.7 0 99.4 98.4 99.2 99.0 Buses and Trucks 0 0 0 0 2 14 0 16 0 0 0 0 0 5 2 7 23 % Buses and Trucks 0 0 0 0 0.7 2.0 0 1.6 0 0 0 0 0 0.6 1.6 0.8 1.0 Bikes on Road 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 1 % Bikes on Road 0 0 0 0 0 0 0 0 0.3 0 0 0.3 0 0 0 0 0.0 I-40 West On Ramp G o r d o n R o a d G o r d o n R o a d I-40 West Off Ramp Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 406 0 406 4 0 4 0 0 0 410 410 0 Ri g h t 28 2 2 0 28 4 Th r u 68 4 14 0 69 8 Le f t 0 0 0 0 Ou t To t a l In 11 6 2 96 6 21 2 8 5 16 21 1 0 1 11 6 8 21 5 0 98 2 Left 33 0 0 33 Thru 0 0 0 0 Right 362 0 1 363 Out TotalIn 0 395 395 0 0 0 0 1 1 0 396 396 Le f t 12 4 2 0 12 6 Th r u80 0 5 0 80 5 Rig h t 0 0 0 0 To t a l Ou t In 71 7 92 4 16 4 1 14 7 21 0 0 0 73 1 16 6 2 93 1 Peak Hour Begins at 16:45 Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : 3. Gordan Road and Blount Drive Site Code : 00170224 Start Date : 5/18/2017 Page No : 1 Counted by: E. Stuart *Note: Peds Column under bikes group contains U-turns Weather: Clear Groups Printed- Cars - Buses and Trucks - Bikes on Road Blount Drive Southbound Gordon Rd Westbound T-Intx Northbound Gordon Rd Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total06:00 AM 2 0 0 0 2 0 140 0 0 140 0 0 0 0 0 0 66 0 0 66 0 208 208 06:15 AM 0 0 0 0 0 0 216 0 0 216 0 0 0 0 0 0 120 0 0 120 0 336 336 06:30 AM 4 0 0 0 4 0 295 0 0 295 0 0 0 0 0 0 196 0 0 196 0 495 495 06:45 AM 0 0 0 0 0 0 282 0 0 282 0 0 0 0 0 0 210 2 0 212 0 494 494 Total 6 0 0 0 6 0 933 0 0 933 0 0 0 0 0 0 592 2 0 594 0 1533 1533 07:00 AM 2 0 0 0 2 1 237 0 0 238 0 0 0 0 0 0 154 1 0 155 0 395 395 07:15 AM 2 0 0 0 2 0 274 0 0 274 0 0 0 0 0 0 207 0 0 207 0 483 483 07:30 AM 0 0 0 0 0 0 353 0 0 353 0 0 0 0 0 0 204 1 0 205 0 558 558 07:45 AM 0 0 0 1 0 0 320 0 0 320 0 0 0 0 0 0 223 1 0 224 1 544 545 Total 4 0 0 1 4 1 1184 0 0 1185 0 0 0 0 0 0 788 3 0 791 1 1980 1981 08:00 AM 1 0 0 0 1 0 315 0 0 315 0 0 0 0 0 0 187 1 0 188 0 504 504 08:15 AM 1 0 0 0 1 0 297 0 0 297 0 0 0 0 0 0 262 1 0 263 0 561 561 08:30 AM 0 0 0 0 0 0 178 0 0 178 0 0 0 0 0 0 154 1 0 155 0 333 333 08:45 AM 1 0 0 0 1 0 176 0 0 176 0 0 0 0 0 0 197 0 0 197 0 374 374 Total 3 0 0 0 3 0 966 0 0 966 0 0 0 0 0 0 800 3 0 803 0 1772 1772 09:00 AM 0 0 0 0 0 0 151 0 0 151 0 0 0 0 0 0 135 0 0 135 0 286 286 09:15 AM 1 0 0 0 1 0 160 0 0 160 0 0 0 0 0 0 141 0 0 141 0 302 302 09:30 AM 1 0 1 0 2 0 151 0 0 151 0 0 0 0 0 0 138 1 0 139 0 292 292 09:45 AM 0 0 0 0 0 0 146 0 0 146 0 0 0 0 0 0 109 1 0 110 0 256 256 Total 2 0 1 0 3 0 608 0 0 608 0 0 0 0 0 0 523 2 0 525 0 1136 1136 10:00 AM 0 0 0 0 0 0 137 0 0 137 0 0 0 0 0 0 111 2 0 113 0 250 250 10:15 AM 1 0 0 0 1 0 115 0 0 115 0 0 0 0 0 0 124 0 0 124 0 240 240 10:30 AM 0 0 0 0 0 0 112 0 0 112 0 0 0 0 0 0 114 0 0 114 0 226 226 10:45 AM 0 0 0 0 0 0 127 0 0 127 0 0 0 0 0 0 120 1 0 121 0 248 248 Total 1 0 0 0 1 0 491 0 0 491 0 0 0 0 0 0 469 3 0 472 0 964 964 11:00 AM 2 0 0 0 2 0 123 0 0 123 0 0 0 0 0 0 141 1 0 142 0 267 267 11:15 AM 2 0 0 0 2 0 136 0 0 136 0 0 0 0 0 0 121 0 0 121 0 259 259 11:30 AM 2 0 0 0 2 1 142 0 0 143 0 0 0 0 0 0 149 0 0 149 0 294 294 11:45 AM 0 0 0 0 0 0 139 0 0 139 0 0 0 0 0 0 147 0 0 147 0 286 286 Total 6 0 0 0 6 1 540 0 0 541 0 0 0 0 0 0 558 1 0 559 0 1106 1106 12:00 PM 2 0 0 0 2 0 196 0 0 196 0 0 0 0 0 0 218 2 0 220 0 418 418 12:15 PM 1 0 0 0 1 0 115 0 0 115 0 0 0 0 0 0 112 2 0 114 0 230 230 12:30 PM 2 0 1 0 3 0 168 0 0 168 0 0 0 0 0 0 143 3 0 146 0 317 317 12:45 PM 0 0 0 0 0 1 147 0 0 148 0 0 0 0 0 0 136 2 0 138 0 286 286 Total 5 0 1 0 6 1 626 0 0 627 0 0 0 0 0 0 609 9 0 618 0 1251 1251 01:00 PM 4 0 0 0 4 0 163 0 0 163 0 0 0 0 0 0 173 0 0 173 0 340 340 01:15 PM 2 0 0 0 2 0 149 0 0 149 0 0 0 0 0 0 161 0 0 161 0 312 312 01:30 PM 1 0 0 1 1 0 163 0 0 163 0 0 0 0 0 0 156 0 0 156 1 320 321 01:45 PM 0 0 0 0 0 0 166 0 0 166 0 0 0 0 0 0 147 0 0 147 0 313 313 Total 7 0 0 1 7 0 641 0 0 641 0 0 0 0 0 0 637 0 0 637 1 1285 1286 02:00 PM 1 0 0 0 1 0 156 0 0 156 0 0 0 0 0 0 171 0 0 171 0 328 328 02:15 PM 0 0 1 0 1 0 180 0 0 180 0 0 0 0 0 0 169 0 0 169 0 350 350 02:30 PM 1 0 0 0 1 1 175 0 0 176 0 0 0 0 0 0 148 2 0 150 0 327 327 02:45 PM 0 0 2 0 2 0 198 0 0 198 0 0 0 0 0 0 168 2 0 170 0 370 370 Total 2 0 3 0 5 1 709 0 0 710 0 0 0 0 0 0 656 4 0 660 0 1375 1375 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 3. Gordan Road and Blount Drive Site Code : 00170224 Start Date : 5/18/2017 Page No : 2 Groups Printed- Cars - Buses and Trucks - Bikes on Road Blount Drive Southbound Gordon Rd Westbound T-Intx Northbound Gordon Rd Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total03:00 PM 0 0 0 0 0 0 201 0 0 201 0 0 0 0 0 0 178 2 0 180 0 381 381 03:15 PM 0 0 0 0 0 0 183 0 0 183 0 0 0 0 0 0 191 4 0 195 0 378 378 03:30 PM 2 0 0 0 2 0 156 0 0 156 0 0 0 0 0 0 193 1 0 194 0 352 352 03:45 PM 3 0 0 0 3 0 114 0 0 114 0 0 0 0 0 0 130 1 0 131 0 248 248 Total 5 0 0 0 5 0 654 0 0 654 0 0 0 0 0 0 692 8 0 700 0 1359 1359 04:00 PM 2 0 0 0 2 0 197 0 0 197 0 0 0 0 0 0 258 3 0 261 0 460 460 04:15 PM 2 0 1 0 3 0 203 0 0 203 0 0 0 0 0 0 226 1 0 227 0 433 433 04:30 PM 2 0 1 0 3 0 204 0 0 204 0 0 0 0 0 0 209 1 0 210 0 417 417 04:45 PM 1 0 0 0 1 0 185 0 0 185 0 0 0 0 0 0 192 0 0 192 0 378 378 Total 7 0 2 0 9 0 789 0 0 789 0 0 0 0 0 0 885 5 0 890 0 1688 1688 05:00 PM 1 0 0 0 1 1 225 0 0 226 0 0 0 0 0 0 261 2 0 263 0 490 490 05:15 PM 3 0 0 0 3 0 206 0 0 206 0 0 0 0 0 0 256 0 0 256 0 465 465 05:30 PM 1 0 0 0 1 0 225 0 0 225 0 0 0 0 0 0 246 3 0 249 0 475 475 05:45 PM 1 0 0 0 1 1 192 0 0 193 0 0 0 0 0 0 216 0 0 216 0 410 410 Total 6 0 0 0 6 2 848 0 0 850 0 0 0 0 0 0 979 5 0 984 0 1840 1840 06:00 PM 2 0 0 0 2 0 208 0 0 208 0 0 0 0 0 0 177 5 0 182 0 392 392 06:15 PM 4 0 0 0 4 1 153 0 0 154 0 0 0 0 0 0 164 0 0 164 0 322 322 06:30 PM 0 0 0 0 0 0 152 0 0 152 0 0 0 0 0 0 228 0 0 228 0 380 380 06:45 PM 1 0 0 0 1 2 163 0 0 165 0 0 0 0 0 0 191 2 0 193 0 359 359 Total 7 0 0 0 7 3 676 0 0 679 0 0 0 0 0 0 760 7 0 767 0 1453 1453 Grand Total 61 0 7 2 68 9 9665 0 0 9674 0 0 0 0 0 0 8948 52 0 9000 2 18742 18744 Apprch %89.7 0 10.3 0.1 99.9 0 0 0 0 0 99.4 0.6 Total %0.3 0 0 0.4 0 51.6 0 51.6 0 0 0 0 0 47.7 0.3 48 0 100 Cars 58 0 6 66 8 9425 0 9433 0 0 0 0 0 8836 51 8887 0 0 18386 % Cars 95.1 0 85.7 100 94.3 88.9 97.5 0 0 97.5 0 0 0 0 0 0 98.7 98.1 0 98.7 0 0 98.1 Buses and Trucks 3 0 1 4 1 238 0 239 0 0 0 0 0 110 1 111 0 0 354 % Buses and Trucks 4.9 0 14.3 0 5.7 11.1 2.5 0 0 2.5 0 0 0 0 0 0 1.2 1.9 0 1.2 0 0 1.9 Bikes on Road 0 0 0 0 0 2 0 2 0 0 0 0 0 2 0 2 0 0 4 % Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 3. Gordan Road and Blount Drive Site Code : 00170224 Start Date : 5/18/2017 Page No : 3 Blount Drive G o r d o n R d G o r d o n R d T-Intx Right 58 3 0 61 Thru 0 0 0 0 Left 6 1 0 7 InOut Total 59 64 123 2 4 6 0 0 0 61 129 68 Rig h t 8 1 0 9 Th r u 94 2 5 23 8 2 96 6 5 Le f t 0 0 0 0 Ou t To t a l In 88 4 2 94 3 3 18 2 7 5 11 1 23 9 35 0 2 2 4 89 5 5 18 6 2 9 96 7 4 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 0 0 0 0 0 0 0 0 0 0 0 0 Le f t 51 1 0 52 Th r u 88 3 6 11 0 2 89 4 8 Ri g h t 0 0 0 0 To t a l Ou t In 94 8 3 88 8 7 18 3 7 0 24 1 11 1 35 2 2 2 4 97 2 6 18 7 2 6 90 0 0 5/18/2017 06:00 AM 5/18/2017 06:45 PM Cars Buses and Trucks Bikes on Road North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 3. Gordan Road and Blount Drive Site Code : 00170224 Start Date : 5/18/2017 Page No : 4 Blount Drive Southbound Gordon Rd Westbound T-Intx Northbound Gordon Rd Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 06:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 0 0 0 0 0 353 0 353 0 0 0 0 0 204 1 205 558 07:45 AM 0 0 0 0 0 320 0 320 0 0 0 0 0 223 1 224 544 08:00 AM 1 0 0 1 0 315 0 315 0 0 0 0 0 187 1 188 504 08:15 AM 1 0 0 1 0 297 0 297 0 0 0 0 0 262 1 263 561 Total Volume 2 0 0 2 0 1285 0 1285 0 0 0 0 0 876 4 880 2167 % App. Total 100 0 0 0 100 0 0 0 0 0 99.5 0.5 PHF .500 .000 .000 .500 .000 .910 .000 .910 .000 .000 .000 .000 .000 .836 1.00 .837 .966 Cars 2 0 0 2 0 1271 0 1271 0 0 0 0 0 865 4 869 2142 % Cars 100 0 0 100 0 98.9 0 98.9 0 0 0 0 0 98.7 100 98.8 98.8 Buses and Trucks 0 0 0 0 0 14 0 14 0 0 0 0 0 11 0 11 25 % Buses and Trucks 0 0 0 0 0 1.1 0 1.1 0 0 0 0 0 1.3 0 1.3 1.2 Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Blount Drive G o r d o n R d G o r d o n R d T-Intx Right 2 0 0 2 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 4 2 6 0 0 0 0 0 0 4 6 2 Rig h t 0 0 0 0 Th r u 12 7 1 14 0 12 8 5 Le f t 0 0 0 0 Ou t To t a l In 86 5 12 7 1 21 3 6 11 14 25 0 0 0 87 6 21 6 1 12 8 5 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 0 0 0 0 0 0 0 0 0 0 0 0 Le f t 4 0 0 4 Th r u86 5 11 0 87 6 Rig h t 0 0 0 0 To t a l Ou t In 12 7 3 86 9 21 4 2 14 11 25 0 0 0 12 8 7 21 6 7 88 0 Peak Hour Begins at 07:30 AM Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 3. Gordan Road and Blount Drive Site Code : 00170224 Start Date : 5/18/2017 Page No : 5 Blount Drive Southbound Gordon Rd Westbound T-Intx Northbound Gordon Rd Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 1 0 0 1 1 225 0 226 0 0 0 0 0 261 2 263 490 05:15 PM 3 0 0 3 0 206 0 206 0 0 0 0 0 256 0 256 465 05:30 PM 1 0 0 1 0 225 0 225 0 0 0 0 0 246 3 249 475 05:45 PM 1 0 0 1 1 192 0 193 0 0 0 0 0 216 0 216 410 Total Volume 6 0 0 6 2 848 0 850 0 0 0 0 0 979 5 984 1840 % App. Total 100 0 0 0.2 99.8 0 0 0 0 0 99.5 0.5 PHF .500 .000 .000 .500 .500 .942 .000 .940 .000 .000 .000 .000 .000 .938 .417 .935 .939 Cars 6 0 0 6 2 837 0 839 0 0 0 0 0 977 5 982 1827 % Cars 100 0 0 100 100 98.7 0 98.7 0 0 0 0 0 99.8 100 99.8 99.3 Buses and Trucks 0 0 0 0 0 11 0 11 0 0 0 0 0 2 0 2 13 % Buses and Trucks 0 0 0 0 0 1.3 0 1.3 0 0 0 0 0 0.2 0 0.2 0.7 Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Blount Drive G o r d o n R d G o r d o n R d T-Intx Right 6 0 0 6 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 7 6 13 0 0 0 0 0 0 7 13 6 Ri g h t 2 0 0 2 Th r u 83 7 11 0 84 8 Le f t 0 0 0 0 Ou t To t a l In 97 7 83 9 18 1 6 2 11 13 0 0 0 97 9 18 2 9 85 0 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 0 0 0 0 0 0 0 0 0 0 0 0 Le f t 5 0 0 5 Th r u97 7 2 0 97 9 Rig h t 0 0 0 0 To t a l Ou t In 84 3 98 2 18 2 5 11 2 13 0 0 0 85 4 18 3 8 98 4 Peak Hour Begins at 05:00 PM Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 10 0 10 0 AM P e a k 20 1 7 T M C B a l a n c i n g 2 0 1 7 B a s e 20 2 1 Pr o j e c t e d Ap p d D e v 2 0 2 1 F N B Pr i m a r y Si t e T r i p s 20 2 1 B u i l d PM P e a k 20 1 7 T M C B a l a n c i n g 2 0 1 7 B a s e 20 2 1 Pr o j e c t e d Ap p d D e v 2 0 2 1 F N B Primary Site Trips2021 Build EB L 3 6 3 6 3 7 3 7 3 7 E B L 5 3 5 3 5 4 5 4 5 4 EB T 1 4 3 1 4 3 1 4 6 7 1 5 3 1 3 1 6 6 E B T 3 1 3 3 1 3 3 1 9 9 3 2 8 4 6 3 7 4 EB R 3 5 3 5 3 6 3 6 3 6 E B R 1 9 1 9 1 9 1 9 1 9 WB L 3 0 2 3 0 2 3 0 8 1 4 3 2 2 5 3 3 7 5 W B L 1 5 2 1 5 2 1 5 5 1 7 1 7 2 3 3 2 0 5 WB T 3 6 6 3 6 6 3 7 3 1 4 3 8 7 4 2 4 3 0 W B T 1 5 9 1 5 9 1 6 2 1 7 1 7 9 2 6 2 0 5 WB R 4 7 9 4 7 9 4 8 9 2 1 5 1 0 4 2 5 5 2 W B R 3 1 0 3 1 0 3 1 6 2 6 3 4 2 2 6 3 6 8 NB L 8 0 8 0 8 2 8 2 8 2 N B L 2 3 2 3 2 3 2 3 2 3 NB T 1 7 4 1 7 4 1 7 8 1 7 8 1 7 8 N B T 8 6 8 6 8 8 8 8 8 8 NB R 2 0 6 2 0 6 2 1 0 7 2 1 7 6 2 2 4 N B R 1 7 1 1 7 1 1 7 4 9 1 8 3 2 3 2 0 6 SB L 4 2 6 4 2 6 4 3 5 7 4 4 2 1 6 4 5 8 S B L 4 0 1 4 0 1 4 0 9 9 4 1 8 5 7 4 7 5 SB T 5 7 0 5 7 0 5 8 1 5 8 1 5 8 1 S B T 5 7 2 5 7 2 5 8 4 5 8 4 5 8 4 SB R 5 6 5 6 5 7 5 7 5 7 S B R 5 7 5 7 5 8 5 8 5 8 To t a l 2 8 7 3 0 2 8 7 3 2 9 3 1 7 0 3 0 0 1 1 7 2 3 1 7 3 T o t a l 2 3 1 6 0 2 3 1 6 2 3 6 3 8 7 2 4 5 0 2 1 0 2 6 6 0 20 0 20 0 AM P e a k 20 1 7 T M C B a l a n c i n g 2 0 1 7 B a s e 20 2 1 Pr o j e c t e d Ap p d D e v 2 0 2 1 F N B Pr i m a r y Si t e T r i p s 20 2 1 B u i l d PM P e a k 20 1 7 T M C B a l a n c i n g 2 0 1 7 B a s e 20 2 1 Pr o j e c t e d Ap p d D e v 2 0 2 1 F N B Primary Site Trips2021 Build EB L 8 7 8 7 8 9 8 9 8 9 E B L 1 2 6 1 2 6 1 2 9 1 2 9 1 2 9 EB T 7 3 6 7 3 6 7 5 1 2 9 7 8 0 3 5 8 1 5 E B T 8 0 5 8 0 5 8 2 1 3 5 8 5 6 1 2 6 9 8 2 EBR0 0 0 0 0 E B R 0 0 0 0 0 WBL0 0 0 0 0 W B L 0 0 0 0 0 WB T 1 0 2 4 1 0 2 4 1 0 4 5 5 6 1 1 0 1 1 3 7 1 2 3 8 W B T 6 9 8 6 9 8 7 1 2 6 8 7 8 0 8 5 8 6 5 WB R 2 4 0 2 4 0 2 4 5 1 4 2 5 9 2 1 2 8 0 W B R 2 8 4 2 8 4 2 9 0 1 7 3 0 7 1 3 3 2 0 NB L 1 4 1 4 1 4 1 4 1 4 N B L 3 3 3 3 3 4 3 4 3 4 NBT1 1 1 1 1 N B T 0 0 0 0 0 NB R 1 4 0 1 4 0 1 4 3 7 1 5 0 1 3 1 6 3 N B R 3 6 3 3 6 3 3 7 0 9 3 7 9 4 6 4 2 5 SBL0 0 0 0 0 S B L 0 0 0 0 0 SBT0 0 0 0 0 S B T 0 0 0 0 0 SBR0 0 0 0 0 S B R 0 0 0 0 0 To t a l 2 2 4 2 0 2 2 4 2 2 2 8 7 1 0 6 2 3 9 3 2 0 6 2 5 9 9 T o t a l 2 3 0 9 0 2 3 0 9 2 3 5 6 1 2 9 2 4 8 5 2 6 9 2 7 5 4 30 0 30 0 AM P e a k 20 1 7 T M C B a l a n c i n g 2 0 1 7 B a s e 20 2 1 Pr o j e c t e d Ap p d D e v 2 0 2 1 F N B Pr i m a r y Si t e T r i p s 20 2 1 B u i l d PM P e a k 20 1 7 T M C B a l a n c i n g 2 0 1 7 B a s e 20 2 1 Pr o j e c t e d Ap p d D e v 2 0 2 1 F N B Primary Site Trips2021 Build EBL4 4 4 4 4 E B L 5 5 5 5 5 EB T 8 7 6 8 7 6 8 9 4 7 9 0 1 9 0 1 E B T 9 7 9 9 7 9 9 9 9 8 1 0 0 7 1 0 0 7 EB R 0 0 0 0 4 8 4 8 E B R 0 0 0 0 1 7 2 1 7 2 WB L 0 0 0 0 1 6 1 6 W B L 0 0 0 0 5 7 5 7 WB T 1 2 8 5 1 2 8 5 1 3 1 1 4 4 1 3 5 5 1 3 5 5 W B T 8 4 8 8 4 8 8 6 5 5 1 9 1 6 9 1 6 WBR0 0 0 0 0 W B R 2 2 2 2 2 NB L 0 0 0 0 1 5 8 1 5 8 N B L 0 0 0 0 9 8 9 8 NBT0 0 0 0 0 N B T 0 0 0 0 0 NB R 0 0 0 0 5 3 5 3 N B R 0 0 0 0 3 3 3 3 SBL0 0 0 0 0 S B L 0 0 0 0 0 SBT0 0 0 0 0 S B T 0 0 0 0 0 SBR2 2 2 2 2 S B R 6 6 6 6 6 To t a l 2 1 6 7 0 2 1 6 7 2 2 1 1 5 1 2 2 6 2 2 7 5 2 5 3 7 T o t a l 1 8 4 0 0 1 8 4 0 1 8 7 7 5 9 1 9 3 6 3 5 9 2 2 9 5 Go r d o n R o a d a n d N C 1 3 2 ( N . C o l l e g e R o a d ) / I - 4 0 E a s t b o u n d R a m p s Go r d o n R o a d a n d I - 4 0 W B R a m p s Go r d o n R o a d a n d B l o u n t D r i v e / S i t e A c c e s s Go r d o n R o a d a n d N C 1 3 2 ( N . C o l l e g e R o a d ) / I - 4 0 E a s t b o u n d R a m p s Go r d o n R o a d a n d I - 4 0 W B R a m p s Go r d o n R o a d a n d B l o u n t D r i v e / S i t e A c c e s s 07/28/2017 170224 The Landing at Lewis Creek Estates – Transportation Impact Analysis 30 Supporting Documentation DAVENPORT Signal Warrant Analysis Page No. : 1Signal Warrants - Summary Major Street Approaches Minor Street Approaches Eastbound: Gordon Rd Number of Lanes: 1 85% Speed > 40 MPH. Total Approach Volume: 10,236 Northbound: Site Access Number of Lanes: 1 Total Approach Volume: 1,436 Westbound: Gordon Rd Number of Lanes: 1 85% Speed > 40 MPH. Total Approach Volume: 10,193 Southbound: Blount Dr Number of Lanes: 1 Total Approach Volume: 68 Warrant Summary (Rural values apply.) Warrant 1 - Eight Hour Vehicular Volumes ...........................................................................................................................Satisfied Warrant 1A - Minimum Vehicular Volume .........................................................................................Not Satisfied Required volumes reached for 6 hours, 8 are needed Warrant 1B - Interruption of Continuous Traffic ..............................................................................Satisfied Required volumes reached for 13 hours, 8 are needed Warrant 1 A&B - Combination of Warrants ......................................................................................Satisfied Required volumes reached for 10 hours, 8 are needed Warrant 2 - Four Hour Volumes .............................................................................................................................................Satisfied Number of hours (13) volumes exceed minimum >= minimum required (4). Warrant 3 - Peak Hour ............................................................................................................................................................Satisfied Warrant 3A - Peak Hour Delay ...........................................................................................................Satisfied Number of hours (27) volumes exceed minimum >= required (1). Delay data not evaluated. Warrant 3B - Peak Hour Volumes ......................................................................................................Satisfied Volumes exceed minimums for at least one hour. Warrant 4 - Pedestrian Volumes ............................................................................................................................................Not Evaluated Warrant 5 - School Crossing ..................................................................................................................................................Not Evaluated Warrant 6 - Coordinated Signal System ...............................................................................................................................Not Evaluated Warrant 7 - Crash Experience ................................................................................................................................................Not Evaluated Warrant 8 - Roadway Network ...............................................................................................................................................Not Evaluated Warrant 9 - Intersection Near a Grade Crossing ..................................................................................................................Not Evaluated DAVENPORT Signal Warrant Analysis Page No. : 2Signal Warrants - Summary 200 400 600 800 1000 1200 1400 1600 1800 0 100 200 300 400 500 600 700 Major Street - Total of Both Directions (VPH) Mi n o r S t r e e t - H i g h e r V o l u m e A p p r o a c h ( V P H ) Warrant Curves Peak Hour Warrant Four Hour Warrant [Rural, 1 major lane and 1 minor lane curves used] 07:15 17:1516:1506:15 08:15 09:15 16:0015:4515:3014:4515:1514:3014:15 06:00 15:0014:0013:4513:3013:00 Analysis of 8-Hour Volume Warrants: War 1A-Minimum Volume War 1B-Interruption of Traffic War 1C-Combination of Warrants Hour Major Minor Maj Min Hour Major Minor Maj Min Hour Major Minor Maj Min Begin Total Vol Dir 350 105 Begin Total Vol Dir 525 53 Begin Total Vol Dir 420 84 07:15 2,187 199 NB Yes Yes 16:45 2,057 121 NB Yes Yes 07:00 2,071 186 NB Yes Yes 17:15 1,988 121 NB Yes Yes 07:45 2,038 199 NB Yes Yes 16:30 1,985 114 NB Yes Yes 16:15 1,943 107 NB Yes Yes 06:45 2,012 158 NB Yes Yes 08:00 1,861 186 NB Yes Yes 06:15 1,781 115 NB Yes Yes 15:45 1,759 94 NB Yes Yes 17:30 1,831 114 NB Yes Yes 08:15 1,637 166 NB Yes Yes 17:45 1,725 107 NB Yes Yes 15:30 1,687 88 NB Yes Yes 09:15 1,171 124 NB Yes Yes 14:45 1,658 76 NB Yes Yes 06:00 1,585 100 NB Yes Yes 16:00 1,901 100 NB Yes No 13:45 1,459 76 NB Yes Yes 12:30 1,370 88 NB Yes Yes 15:45 1,759 94 NB Yes No 12:45 1,375 82 NB Yes Yes 11:30 1,323 88 NB Yes Yes 15:30 1,687 88 NB Yes No 11:45 1,357 94 NB Yes Yes 09:00 1,208 132 NB Yes Yes 14:45 1,658 76 NB Yes No 08:45 1,327 139 NB Yes Yes 10:00 1,033 100 NB Yes Yes 15:15 1,627 82 NB Yes No 10:45 1,135 82 NB Yes Yes 14:45 1,658 76 NB Yes No 14:30 1,625 76 NB Yes No 05:45 1,074 75 NB Yes Yes 15:15 1,627 82 NB Yes No 14:15 1,586 76 NB Yes No 09:45 1,041 108 NB Yes Yes 14:30 1,625 76 NB Yes No 06:00 1,585 100 NB Yes No 05:30 566 50 NB Yes No 14:15 1,586 76 NB Yes No 15:00 1,542 76 NB Yes No 18:45 412 25 NB No No 15:00 1,542 76 NB Yes No 14:00 1,521 76 NB Yes No 05:15 217 25 NB No No 14:00 1,521 76 NB Yes No 13:45 1,459 76 NB Yes No 22:45 0 0 SB No No 13:45 1,459 76 NB Yes No 13:30 1,445 76 NB Yes No 22:30 0 0 SB No No 13:30 1,445 76 NB Yes No 13:00 1,402 76 NB Yes No 22:15 0 0 SB No No 11:15 1,340 82 NB Yes No 13:15 1,399 76 NB Yes No 22:00 0 0 SB No No 11:00 1,174 76 NB Yes No 12:45 1,375 82 NB Yes No 21:45 0 0 SB No No 05:45 1,074 75 NB Yes No 12:30 1,370 88 NB Yes No 21:30 0 0 SB No No 18:30 847 50 NB Yes No 12:00 1,369 100 NB Yes No 21:15 0 0 SB No No 05:30 566 50 NB Yes No 11:45 1,357 94 NB Yes No 21:00 0 0 SB No No 18:45 412 25 NB No No DAVENPORT Signal Warrant Analysis with 50 percent right turns on minor street removed Page No. : 1Signal Warrants - Summary Major Street Approaches Minor Street Approaches Eastbound: Gordon Rd Number of Lanes: 1 85% Speed > 40 MPH. Total Approach Volume: 10,236 Northbound: Site Access Number of Lanes: 1 Total Approach Volume: 1,288 Westbound: Gordon Rd Number of Lanes: 1 85% Speed > 40 MPH. Total Approach Volume: 10,193 Southbound: Blount Dr Number of Lanes: 1 Total Approach Volume: 46 Warrant Summary (Rural values apply.) Warrant 1 - Eight Hour Vehicular Volumes ...........................................................................................................................Satisfied Warrant 1A - Minimum Vehicular Volume .........................................................................................Not Satisfied Required volumes reached for 4 hours, 8 are needed Warrant 1B - Interruption of Continuous Traffic ..............................................................................Satisfied Required volumes reached for 13 hours, 8 are needed Warrant 1 A&B - Combination of Warrants ......................................................................................Satisfied Required volumes reached for 9 hours, 8 are needed Warrant 2 - Four Hour Volumes .............................................................................................................................................Satisfied Number of hours (13) volumes exceed minimum >= minimum required (4). Warrant 3 - Peak Hour ............................................................................................................................................................Satisfied Warrant 3A - Peak Hour Delay ...........................................................................................................Satisfied Number of hours (19) volumes exceed minimum >= required (1). Delay data not evaluated. Warrant 3B - Peak Hour Volumes ......................................................................................................Satisfied Volumes exceed minimums for at least one hour. Warrant 4 - Pedestrian Volumes ............................................................................................................................................Not Evaluated Warrant 5 - School Crossing ..................................................................................................................................................Not Evaluated Warrant 6 - Coordinated Signal System ...............................................................................................................................Not Evaluated Warrant 7 - Crash Experience ................................................................................................................................................Not Evaluated Warrant 8 - Roadway Network ...............................................................................................................................................Not Evaluated Warrant 9 - Intersection Near a Grade Crossing ..................................................................................................................Not Evaluated DAVENPORT Signal Warrant Analysis with 50 percent right turns on minor street removed Page No. : 2Signal Warrants - Summary 200 400 600 800 1000 1200 1400 1600 1800 0 100 200 300 400 500 600 700 Major Street - Total of Both Directions (VPH) Mi n o r S t r e e t - H i g h e r V o l u m e A p p r o a c h ( V P H ) Warrant Curves Peak Hour Warrant Four Hour Warrant [Rural, 1 major lane and 1 minor lane curves used] 07:30 16:4506:3008:30 16:3016:1516:0006:1515:4517:4515:3018:00 14:4515:1514:3014:15 06:00 15:0014:00 Analysis of 8-Hour Volume Warrants: War 1A-Minimum Volume War 1B-Interruption of Traffic War 1C-Combination of Warrants Hour Major Minor Maj Min Hour Major Minor Maj Min Hour Major Minor Maj Min Begin Total Vol Dir 350 105 Begin Total Vol Dir 525 53 Begin Total Vol Dir 420 84 07:30 2,271 188 NB Yes Yes 16:45 2,057 107 NB Yes Yes 07:00 2,071 164 NB Yes Yes 16:45 2,057 107 NB Yes Yes 07:45 2,038 176 NB Yes Yes 16:45 2,057 107 NB Yes Yes 06:30 1,935 116 NB Yes Yes 06:45 2,012 140 NB Yes Yes 08:00 1,861 164 NB Yes Yes 08:30 1,370 128 NB Yes Yes 15:45 1,759 86 NB Yes Yes 15:45 1,759 86 NB Yes Yes 16:30 1,985 102 NB Yes No 17:45 1,725 97 NB Yes Yes 17:45 1,725 97 NB Yes Yes 16:15 1,943 97 NB Yes No 14:45 1,658 68 NB Yes Yes 06:00 1,585 92 NB Yes Yes 16:00 1,901 92 NB Yes No 13:45 1,459 68 NB Yes Yes 11:45 1,357 86 NB Yes Yes 06:15 1,781 104 NB Yes No 12:45 1,375 74 NB Yes Yes 09:00 1,208 116 NB Yes Yes 15:45 1,759 86 NB Yes No 11:45 1,357 86 NB Yes Yes 10:00 1,033 92 NB Yes Yes 17:45 1,725 97 NB Yes No 08:45 1,327 122 NB Yes Yes 15:30 1,687 80 NB Yes No 15:30 1,687 80 NB Yes No 10:45 1,135 74 NB Yes Yes 14:45 1,658 68 NB Yes No 18:00 1,663 92 NB Yes No 05:45 1,074 69 NB Yes Yes 15:15 1,627 74 NB Yes No 14:45 1,658 68 NB Yes No 09:45 1,041 98 NB Yes Yes 14:30 1,625 68 NB Yes No 15:15 1,627 74 NB Yes No 05:30 566 46 NB Yes No 14:15 1,586 68 NB Yes No 14:30 1,625 68 NB Yes No 18:45 412 23 NB No No 15:00 1,542 68 NB Yes No 14:15 1,586 68 NB Yes No 05:15 217 23 NB No No 14:00 1,521 68 NB Yes No 06:00 1,585 92 NB Yes No 22:45 0 0 SB No No 13:45 1,459 68 NB Yes No 15:00 1,542 68 NB Yes No 22:30 0 0 SB No No 13:30 1,445 68 NB Yes No 14:00 1,521 68 NB Yes No 22:15 0 0 SB No No 13:00 1,402 68 NB Yes No 13:45 1,459 68 NB Yes No 22:00 0 0 SB No No 13:15 1,399 68 NB Yes No 13:30 1,445 68 NB Yes No 21:45 0 0 SB No No 12:45 1,375 74 NB Yes No 13:00 1,402 68 NB Yes No 21:30 0 0 SB No No 11:15 1,340 74 NB Yes No 13:15 1,399 68 NB Yes No 21:15 0 0 SB No No 11:30 1,323 80 NB Yes No 12:45 1,375 74 NB Yes No 21:00 0 0 SB No No 11:00 1,174 68 NB Yes No DAVENPORT Signal Warrant Analysis with 100 percent right turns on minor street removed Page No. : 1Signal Warrants - Summary Major Street Approaches Minor Street Approaches Eastbound: Gordon Rd Number of Lanes: 1 85% Speed > 40 MPH. Total Approach Volume: 10,236 Northbound: Site Access Number of Lanes: 1 Total Approach Volume: 1,116 Westbound: Gordon Rd Number of Lanes: 1 85% Speed > 40 MPH. Total Approach Volume: 10,193 Southbound: Blount Dr Number of Lanes: 1 Total Approach Volume: 7 Warrant Summary (Rural values apply.) Warrant 1 - Eight Hour Vehicular Volumes ...........................................................................................................................Satisfied Warrant 1A - Minimum Vehicular Volume .........................................................................................Not Satisfied Required volumes reached for 3 hours, 8 are needed Warrant 1B - Interruption of Continuous Traffic ..............................................................................Satisfied Required volumes reached for 13 hours, 8 are needed Warrant 1 A&B - Combination of Warrants ......................................................................................Not Satisfied Required volumes reached for 6 hours, 8 are needed Warrant 2 - Four Hour Volumes .............................................................................................................................................Satisfied Number of hours (13) volumes exceed minimum >= minimum required (4). Warrant 3 - Peak Hour ............................................................................................................................................................Satisfied Warrant 3A - Peak Hour Delay ...........................................................................................................Satisfied Number of hours (11) volumes exceed minimum >= required (1). Delay data not evaluated. Warrant 3B - Peak Hour Volumes ......................................................................................................Satisfied Volumes exceed minimums for at least one hour. Warrant 4 - Pedestrian Volumes ............................................................................................................................................Not Evaluated Warrant 5 - School Crossing ..................................................................................................................................................Not Evaluated Warrant 6 - Coordinated Signal System ...............................................................................................................................Not Evaluated Warrant 7 - Crash Experience ................................................................................................................................................Not Evaluated Warrant 8 - Roadway Network ...............................................................................................................................................Not Evaluated Warrant 9 - Intersection Near a Grade Crossing ..................................................................................................................Not Evaluated DAVENPORT Signal Warrant Analysis with 100 percent right turns on minor street removed Page No. : 2Signal Warrants - Summary 200 400 600 800 1000 1200 1400 1600 1800 0 100 200 300 400 500 600 700 Major Street - Total of Both Directions (VPH) Mi n o r S t r e e t - H i g h e r V o l u m e A p p r o a c h ( V P H ) Warrant Curves Peak Hour Warrant Four Hour Warrant [Rural, 1 major lane and 1 minor lane curves used] 07:45 06:4508:45 17:0016:4517:1516:3016:1506:30 16:0017:3006:1515:4517:4515:3018:00 14:4515:1514:30 Analysis of 8-Hour Volume Warrants: War 1A-Minimum Volume War 1B-Interruption of Traffic War 1C-Combination of Warrants Hour Major Minor Maj Min Hour Major Minor Maj Min Hour Major Minor Maj Min Begin Total Vol Dir 350 105 Begin Total Vol Dir 525 53 Begin Total Vol Dir 420 84 07:45 2,038 150 NB Yes Yes 16:45 2,057 92 NB Yes Yes 07:15 2,187 150 NB Yes Yes 06:45 2,012 120 NB Yes Yes 07:45 2,038 150 NB Yes Yes 17:15 1,988 92 NB Yes Yes 08:45 1,327 105 NB Yes Yes 06:45 2,012 120 NB Yes Yes 16:15 1,943 84 NB Yes Yes 17:00 2,099 96 NB Yes No 15:45 1,759 75 NB Yes Yes 06:15 1,781 90 NB Yes Yes 16:45 2,057 92 NB Yes No 17:45 1,725 84 NB Yes Yes 08:15 1,637 125 NB Yes Yes 17:15 1,988 92 NB Yes No 14:45 1,658 60 NB Yes Yes 09:15 1,171 95 NB Yes Yes 16:30 1,985 88 NB Yes No 13:45 1,459 60 NB Yes Yes 16:00 1,901 80 NB Yes No 16:15 1,943 84 NB Yes No 12:45 1,375 65 NB Yes Yes 15:45 1,759 75 NB Yes No 06:30 1,935 100 NB Yes No 11:45 1,357 75 NB Yes Yes 15:30 1,687 70 NB Yes No 16:00 1,901 80 NB Yes No 08:45 1,327 105 NB Yes Yes 14:45 1,658 60 NB Yes No 17:30 1,831 88 NB Yes No 10:45 1,135 65 NB Yes Yes 15:15 1,627 65 NB Yes No 06:15 1,781 90 NB Yes No 05:45 1,074 60 NB Yes Yes 14:30 1,625 60 NB Yes No 15:45 1,759 75 NB Yes No 09:45 1,041 85 NB Yes Yes 14:15 1,586 60 NB Yes No 17:45 1,725 84 NB Yes No 05:30 566 40 NB Yes No 06:00 1,585 80 NB Yes No 15:30 1,687 70 NB Yes No 18:45 412 20 NB No No 15:00 1,542 60 NB Yes No 18:00 1,663 80 NB Yes No 05:15 217 20 NB No No 14:00 1,521 60 NB Yes No 14:45 1,658 60 NB Yes No 22:45 0 0 SB No No 13:45 1,459 60 NB Yes No 15:15 1,627 65 NB Yes No 22:30 0 0 SB No No 13:30 1,445 60 NB Yes No 14:30 1,625 60 NB Yes No 22:15 0 0 SB No No 13:00 1,402 60 NB Yes No 14:15 1,586 60 NB Yes No 22:00 0 0 SB No No 13:15 1,399 60 NB Yes No 06:00 1,585 80 NB Yes No 21:45 0 0 SB No No 12:45 1,375 65 NB Yes No 15:00 1,542 60 NB Yes No 21:30 0 0 SB No No 12:30 1,370 70 NB Yes No 14:00 1,521 60 NB Yes No 21:15 0 0 SB No No 12:00 1,369 80 NB Yes No 13:45 1,459 60 NB Yes No 21:00 0 0 SB No No 11:45 1,357 75 NB Yes No Gordon Road Buy and Go Development Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes January 10, 2011 ____________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way Land Use Size Volume Enter Exit Enter Exit ____________________________________________________________________ Service Sta. with Conv. Market and Car Wash 12 Vehicle Fueling Positions 1834 73 70 85 82 Mini-Warehouse 24.8 Th.Sq.Ft. GFA 58 0 0 3 3 ____________________________________________________________________ Total Driveway Volume 1892 73 70 88 85 Total Peak Hour Pass-By Trips 0 0 0 0 Total Peak Hour Vol. Added to Adjacent Streets 73 70 88 85 ____________________________________________________________________ Note: A zero indicates no data available. TRIP GENERATION BY MICROTRANS Home Office: 305 West Fourth Street, Suite 2A (27101) NORTH CAROLINA P.O. Box 4131, Winston-Salem, NC 27115-4131 SOUTH CAROLINA Main: 336.744.1636 Fax: 336.458.9377 VIRGINIA AM Peak 2011 TMC Balancing Balanced Existing Site TripsTotal PM Peak 2011 TMC Balancing Balanced Existing Site TripsTotal EBL999EBL393939 EBT10251077114EBT284203049313 EBR393939EBR383838 WBU0077WBU0099 WBL4652048514499WBL2382025817275 WBT3062032614340WBT1981921717234 WBR2522527721298WBR2932031326339 NBL181818NBL151515 NBT424242NBT474747 NBR15951647171NBR161211829191 SBL282162987305SBL338303689377 SBT560560560SBT621621621 SBR222222SBR454545 Total2256912347782425Total23171302447942541 Gordon @ N. College Road Gordon @ N. College Road AM Peak 2011 TMC Balancing Balanced Existing Site TripsTotal PM Peak 2011 TMC Balancing Balanced Existing Site TripsTotal EBL595959EBL747474 EBT51051029539EBT78078035815 EBR000EBR000 WBL000WBL000 WBT10641064561120WBT73773768805 WBR18318314197WBR17617617193 NBL242424NBL515151 NBT333NBT111 NBR1581587165NBR4364369445 SBL000SBL000 SBT000SBT000 SBR000SBR000 Total2001020011062107Total2255022551292384 Gordon @ I-40 Westbound Ramps Gordon @ I-40 Westbound Ramps NCDOT Division 3, District 3 KLS Preliminary TIA Review TIA Name: The Landing at Lewis Creek Estates Date Reviewed: 7/11/17 Check parameters of study against the approved TIA Scope and Congestion Management guidelines. Use Blue ink for items that check off and Red ink for items that potentially need correction/revision or determine the TIA to be invalid and a resubmittal necessary. General  Study Intersections OK  Accesses, Access Types, and Access Scenarios No new accesses, changes in type of access, or new scenarios added? No, matches approved scope 5/10/17  Traffic Counts Correct peak hours? Yes Counts taken while school in session? (when applicable) Yes – Thurs. 5/18/17, & Tues. 5/23/17  Required Approved Developments included? Yes, Gordon Road Buy and Go  Required Committed Improvements included? (TIP, etc.) Yes, Gordon Road Buy and Go roadway improvements  Approved Annual Growth Rate applied correctly? 0.5%, but there is an error in Future No Build Volumes for the thru volumes at Gordon Rd. & Blount Dr. with applying approved development traffic – adj. dev. volumes should be derived from adj. dev. volumes at the I-40 ramps OR balance the Future No Build thru volumes using the ramp intersection volumes  Does Trip Generation match approved scope? No – approved scope shows 224 single family homes, but TIA report has 236; however trip gen. calculations are correct  Trip distributions Were trip distributions submitted for approval and approved prior to use in the TIA? Yes, approved 6/6/17  Is the proper Horizon Year analyzed? Yes, 2021 Synchro Analysis  Check detector settings for signals. Do the size and distance from the stop bar match the included signal plans? If a proposed signal, must be designed according to the NCDOT Signal Design Manual. Existing signal at Gordon Rd. & N. College – detector settings correct Proposed signal at Gordon Rd. & Blount Dr./Site access – detector settings incorrect – Use a design speed of 50 mph, and standards 4.1.1, 4.1.2, and 4.1.5 from the Signal Design Manual.  Check if Right Turn on Red (RTOR) is used. Eliminate all RTOR phasing (existing and future). Congestion Management guidelines state “do not analyze right turn on red at any proposed intersection approaches to ensure that adequate storage is provided.” RTOR was not used. NCDOT Division 3, District 3 KLS  Check Left-Turn Phasing. Eliminate all PT+PM left-turn phasing. Congestion Management guidelines state that analysis of Protected-only phasing in future conditions will identify required storage in the event that Protected-only phasing is necessary. Existing Permissive left- turn phasing should remain Permissive in future conditions, except where Protected-only phasing is being analyzed as an improvement to the intersection in Future + Improvement condition. Gordon Rd. & N. College – PT+PM left-turn phasing used in analysis of future conditions  For left-turn movements, check cross product of left-turn hourly volumes and opposing volumes (thru + rights), for potential signalization or phasing change. For left-turn and right-turn movements, check total peak-hour volumes for potential dual turn lanes.