Loading...
HomeMy WebLinkAboutZ17-11 Application 1.17.2018 January 16, 2018 Todd Simmons, PE Freeland & Kauffman, Inc. 209 West Stone Avenue Greenville, SC 29609 E: TSimmons@fk-inc.com Subject: Trip Generation Letter AAA Car Wash - Ogden, North Carolina Dear Mr. Simmons: This letter provides trip generation information for the proposed AAA Car Wash site proposed along Market Street in Ogden, North Carolina. The proposed development is anticipated to consist of an automated car wash and car care facility. Average weekday daily, AM peak hour, PM peak hour, Saturday daily, and Saturday peak hour trips for the proposed development were determined by the NCDOT based on methodology contained within the ITE Trip Generation Manual, 9th Edition. Table 1 provides a summary of the trip generation potential for the proposed development. It should be noted that Table 1 provides two alternatives for the automobile care/service portion of the development. As shown in Table 1, the alternative using land use code 943 results in a total Saturday peak hour trip generation of 105 trips. The weekday AM and PM peak hour trip generation is less than 100 peak hour trips. The trip calculations in Table 1 do not account for the reduction in trips that occur for the current use. The property is currently occupied as a landscaping nursery. Since these trips will be removed when the new AAA car wash is constructed, the existing trips were calculated and subtracted from the new trip generation to determine the net trip increase on the roadway network. Trips for the existing nursery use were calculated based on methodology contained within the ITE Trip Generation Manual, 9th Edition. The total number of acres of the nursery property were estimated based on New Hanover County GIS property data. As shown in Table 2, it is estimated the nursery site currently generates a total of 58 peak hour trips on a Saturday. Weekday AM and PM peak hour trips are much less. Also shown in Table 2 is the net new trips that would be added to the roadway network. The net new trips were calculated by subtracting the existing trips (nursery) from the proposed trips (AAA car wash). As shown in Table 2, the net new trips are well below the City’s threshold for requiring a Traffic Impact Analysis (TIA), which is 100 peak hour trips. AAA Car Wash – Trip Generation Letter Page 2 of 2 If you should have any questions, please feel free to contact me at (919) 872-5115. Sincerely, Ramey Kemp & Associates, Inc. Rynal G. Stephenson, P.E. Regional Manager NC Corporate License # C-0910 Table 1: ITE Trip Generation: Proposed Future Use Table 2: ITE Trip Generation: Existing Use and Difference Land Use ITE Code Size Type Weekday 24-hour Two-Way AM Peak Hour PM Peak Hour Saturday 24-Hour Two-Way Saturday Peak Hour Enter Exit Enter Exit Enter Exit Nursery (Garden Center) 817 2.5 Acres Generator 270 12 11 13 13 387 29 29 DIFFERENCE (Net New Trips) N/A N/A N/A 28 27 N/A 21 26