Loading...
HomeMy WebLinkAbout2018-02-14 Meeting Agenda Agenda 14 February 2018, 4:00 PM New Hanover County, Government Center Finance Conference Room, 500 4:00 Call to Order Welcome/Introductions Request approval of the January meeting minutes (emailed 12Jan2018). Current Efforts: Wrightsville Beach (WB) FY18 Coastal Storm Damage Reduction (CSDR) Project  Weeks’ Marine has proposed their hydraulic cutterhead dredge McCaskill.  A pre-construction regulatory walkabout occurred on 11Jan2018.  Week’s tentative start is mid-February.  The Validation Study (CSDR post authorization change report) development is underway. Carolina Beach (CB) CSDR Project, Beach Renourishment Evaluation Report (BRER)  A USACE teleconference was held on February 9th.  NHC, CB and Corps' reps from Wilmington, Atlanta and Washington DC participated.  The Wilmington District presented the BRER assumptions and process deliverables. Kure Beach (KB) CSDR Project  Offshore Borrow Area B, USACE Geotechnical Assessment Geophysical work is due this month (Contract work is ~78% complete). o Vibracore work due in March (coring, lab work, and report). o The assessment results are intended to be used in KB’s FY19 CSDR plans and specifications. o Mason Inlet Relocation Project (MIRP)  The MIRP’s 2018 project surveys began this month.  Sensitive habitat area surveys are complete.  The 1Mar2018 waterbird monitoring kickoff is on schedule. Carolina Beach Inlet (CBI)  The next maintenance event is scheduled for early March.  A special purpose hopper dredge is anticipated.  USACE surveys can be found at; http://www.saw.usace.army.mil/Missions/Navigation/Hydrographic-Surveys/Inlets-Crossings/. Shoreline Mapping Program  The 2018 contracting is underway and schedules are being coordinated. Refined Coastal Modeling  The WB modeling report is being finalized.  The CB DRAFT final modeling runs are in progress.  The KB modeling runs are also in progress. Legislative Updates: Raleigh and DC Public Comment: Adjourn