Loading...
HomeMy WebLinkAboutTIA18-01 Feb 2018This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. TRANSPORTATION IMPACT ANALYSIS February 1, 2018 Bailey Shoppes on Market Development New Hanover County, NC Prepared for Bailey and Associates, Inc. Project #: 180202 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 1 Bailey Shoppes on Market Development – Transportation Impact Analysis New Hanover County, NC Prepared for Bailey and Associates, Inc. Original: January 6, 2017 Revised: February 1, 2018 Table of Contents 1.0 Introduction ............................................................................................................. 3 Figure 1 – Site Plan ..................................................................................................... 4 Figure 2A – Site Location Map .................................................................................... 6 Figure 2B – Vicinity Map .............................................................................................. 7 2.0 Existing Conditions ................................................................................................ 8 2.1 Inventory ................................................................................................................ 8 2.2 Existing Traffic Volumes ........................................................................................ 8 Figure 3 – Existing Lane Geometry ............................................................................. 9 Figure 4 – 2016 Existing Traffic Volumes .................................................................. 10 3.0 Approved Developments and Committed Improvements ................................. 11 3.1 Approved Developments ...................................................................................... 11 3.2 Committed Improvements .................................................................................... 11 4.0 Methodology ......................................................................................................... 12 4.1 Base Assumptions and Standards ....................................................................... 12 4.2 Trip Generation .................................................................................................... 12 4.3 Trip Distribution .................................................................................................... 13 4.4 2018 Future No Build Traffic ................................................................................ 13 4.5 2018 Future Build Total Traffic ............................................................................. 13 Figure 5A – Alternative 1 – Primary Trip Distribution ................................................. 14 Figure 5B – Alternative 1 – Pass-by Trip Distribution ................................................ 15 Figure 6A – Alternative 2 – Primary Trip Distribution ................................................. 16 Figure 6B – Alternative 2 – Pass-by Trip Distribution ................................................ 17 Figure 7 – 2018 Future No Build Volumes ................................................................. 18 Figure 8A – Alternative 1 – Primary Site Trips ........................................................... 19 Figure 8B – Alternative 1 – Pass-by Site Trips .......................................................... 20 Figure 9A – Alternative 2 – Primary Site Trips ........................................................... 21 Figure 9B – Alternative 2 – Pass-by Site Trips .......................................................... 22 Figure 10 – Alternative 1 – 2018 Future Build Volumes ............................................. 23 Figure 11 – Alternative 2 – 2018 Future Build Volumes ............................................. 24 5.0 Capacity Analysis ................................................................................................. 25 5.1 Level of Service Evaluation Criteria ..................................................................... 25 6.0 Alternative 1 (Connection to Raintree Road) ..................................................... 26 6.1 Level of Service Results ...................................................................................... 26 6.2 Level of Service Summary ................................................................................... 28 Figure 12 – Alternative 1 – Recommended Improvements ........................................ 32 7.0 Alternative 2 (Without Connection to Raintree Road) ....................................... 33 7.1 Level of Service Results ...................................................................................... 33 7.2 Level of Service Summary ................................................................................... 33 Figure 13 – Alternative 2 – Recommended Improvements ........................................ 35 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 2 8.0 Queue Summary ................................................................................................... 36 9.0 Summary and Conclusion ................................................................................... 38 Appendix ...................................................................................................................... 39 Trip Generation .......................................................................................................... 40 Level of Service Analysis ........................................................................................... 41 Traffic Volume Data ................................................................................................... 48 Queueing and Blocking Reports ................................................................................ 49 Supporting Documentation ........................................................................................ 50 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary i Bailey Shoppes on Market Development – Transportation Impact Analysis New Hanover County, NC Prepared for Bailey and Associates, Inc. Original: January 6, 2017 Revised: February 1, 2018 Executive Summary The proposed Bailey Shoppes on Market Development (formerly Buy Quick Convenience Mart) is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. Since the submittal of the Transportation Impact Analysis (TIA) in February 2017 there have been changes to the land uses of the development. The proposed development will include 4,800 square feet of office, 6,600 square feet of shopping center, 1,200 square feet of fast food restaurant with drive-thru and 2,400 square feet of high-turnover restaurant. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study:  US 17 Business (Market Street) at SR 2734 (Marsh Oaks Drive)/ SR 2290 (Mendenhall Drive)  US 17 Business (Market Street) at Bump Along Road  US 17 Business (Market Street) U-turn Break (approx. 800 feet south from Alexander Road)  Bump Along Road at Site Access 1  Bump Along Road at Site Access 2  SR 2146 (Raintree Road) at Site Access 3 As part of the analysis, the Wilmington Metropolitan Planning Organization (WMPO) has requested that the study include two (2) alternatives: Alternative 1 includes connection to Raintree Road and Alternative 2 excludes the connection to Raintree Road. The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions:  2016 Existing Conditions  2018 Future No Build Conditions  2018 Alternative 1 - Future Build Conditions (With Site Access 3)  2018 Alternative 1 - Future Build Condition with Mitigation (if necessary)  2018 Alternative 2 - Future Build Conditions (Without Site Access 3)  2018 Alternative 2 - Future Build Condition with Mitigation (if necessary) The build-out analysis year for this project was assumed to be 2018. The AM (7-9 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary ii am) and PM (4-6 pm) peaks were studied. The WMPO, County and the North Carolina Department of Transportation (NCDOT) were contacted to obtain background information and to ascertain the elements to be covered in this TIA. Information regarding the property was provided by Design Solutions. Alternative 1 (Connection to Raintree Road) Level of Service Results The following section discusses level of service for each intersection. Market Street at Marsh Oaks Drive This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2018 future no build conditions, LOS C is expected in the AM peak and LOS D in the PM peak. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS D in the PM peak. No improvements are recommended. Market Street at Bump Along Road This unsignalized intersection currently operates at LOS C during the AM and PM peaks. In 2018 future no build condition, LOS C is expected in the AM and PM peaks With the addition of proposed site traffic, LOS D is expected in the AM peak and LOS F in the PM peak. Since Bump Along Road is the main entry into the development and based on the NCDOT Driveway Manual, it is recommended to provide a southbound right turn lane extending from Bump Along Road to Mendenhall Drive with the turn lane tying into the U-turn bumpout designed for the U-4902D project. We understand that this improvement will require coordination with NCDOT for execution of a developer/NCDOT agreement whereas NCDOT would design/construct the roadway improvement as part of the U-4902D project with the developer responsible for the associated costs. With this improvement, LOS C is expected in the AM peak and LOS E in the PM peak. Bump Along Road at Site Access 1 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Bump Along Road at Site Access 2 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary iii determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Raintree Road at Site Access 3 In 2018 future build condition, LOS A is expected in the AM and PM peaks. Based on the Alternative 1 scenario which considers connection to Raintree Road, it is recommended to provide interconnectivity of the development site to Raintree Road by providing a two-way, two lane road connection matching the pavement width and typical section at the property line. Market Street at Future U-turn Break A U-turn break will be built as part of TIP Project U-4902, approximately 800 feet south from Alexander Road, in order to accommodate southbound U-turns on Market Street. In 2018 future no build conditions, LOS B is expected in the AM peak and LOS C in the PM peak. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS E in the PM peak. Based on NCDOT guidance charts, methods for determining signalization in channelized directional intersections, and synchro/SimTraffic queue results, a traffic signal is warranted for the southbound U-turn movement in the PM peak future build conditions. The committed turn lane storage and taper roadway improvements are expected to accommodate the future volumes at this intersection in the signalized condition. If the signalization improvement is provided, this intersection is expected to operate at LOS A in the AM peak and LOS B in the PM peak. We understand that this improvement will require coordination with NCDOT for execution of a developer/NCDOT agreement whereas NCDOT would design/construct the signalization improvement as part of the U-4902D project with the developer responsible for the associated costs. The recommended improvements are illustrated in Figure 12 in the report. 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary iv Level of Service Summary Tables A- F summarizes the level of service analysis at the study intersections: Table A -Market Street at Marsh Oaks Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour Existing C (20.6) D (54.7) D (41.9) F (85) D (47.8) A (7.8) B (14.4) B (10.1) A (7.1) B (17.9) D (48.6) E (68.8) B (14.1) B (17.5) 2018 Future No Build C (31.2) D (50.6) C (33.6) F (83.7) D (39) F (82.7) C (21.8) B (14.3) E (77.6) C (27.9) D (42.5) E (66.3) C (24.9) C (30) 2018 Future Build - Alternative 1 C (34) D (49.9) C (32) F (83.6) D (38.4) F (87.2) C (22.6) B (14.6) E (77.6) C (31.9) D (41.3) E (66.4) C (27.3) C (33.8) PM Peak Hour Existing C (20.5) E (64.4) D (47.7) F (87) D (44.3) A (7.5) C (21.7) B (10.5) D (40.4) B (13.6) E (58.8) E (67.4) C (20.9) B (15.7) 2018 Future No Build D (37.9) E (59.1) D (39.5) F (96.6) D (36.7) F (80.8) D (40.4) B (15.4) F (100.3) C (21.5) D (52.5) E (70.6) D (40.5) C (30.9) 2018 Future Build - Alternative 1 D (43.6) E (59) D (36.7) F (99.5) D (36.4) F (84.8) D (46.8) B (15.7) F (100.3) C (27.4) D (51.5) E (72.9) D (47.1) D (36) 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary v Table B-Market Street at Bump Along Road Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour Existing C (18.8) C (18.8) C (16.6) C (18.8) #N/A A (0) A (0) 2018 Future No Build C (20.1) C (20.1) C (20.1) #N/A A (0) A (0) 2018 Future Build - Alternative 1 D (25.8) D (25.8) D (25.8) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 1 C (24.2) C (24.2) C (24.2) #N/A A (0) A (0) PM Peak Hour Existing C (19) C (19) C (16.8) C (19) #N/A A (0) A (0) 2018 Future No Build C (20.4) C (20.4) C (20.4) #N/A A (0) A (0) 2018 Future Build - Alternative 1 F (51) F (51) F (51) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 1 E (44) E (44) E (44) #N/A A (0) A (0) 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary vi Table C -Bump Along Road at Site Access 1 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 1 A (8.5) A (7.3) A (0) A (8.5) A (0) A (6.6) A (8.5) PM Peak Hour 2018 Future Build - Alternative 1 A (8.9) A (7.4) A (0) A (8.9) A (0) A (6.5) A (8.9) Table D -Bump Along Road at Site Access 2 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 1 A (8.3) A (7.2) A (0) A (8.3) A (0) A (6.2) A (8.3) PM Peak Hour 2018 Future Build - Alternative 1 A (8.4) #N/A A (7.2) A (0) A (8.4) A (0) A (4.6) A (8.4) #N/A Table E-Raintree Road at Site Access 3 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 1 A (0) A (0) A (0) #N/A A (0) A (0) A (0) PM Peak Hour 2018 Future Build - Alternative 1 A (0) A (0) A (0) #N/A A (0) A (0) A (0) 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary vii Table F-Market Street at U-turn Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future No Build B (14.4) B (14.4) B (14.4) #N/A A (0) #N/A 2018 Future Build - Alternative 1 C (15.5) C (15.5) C (15.5) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 1 A (4.9) Signalized C (32.5) A (3.8) C (32.5) () A (3.8) () PM Peak Hour 2018 Future No Build C (23.7) C (23.7) C (23.7) #N/A A (0) #N/A 2018 Future Build - Alternative 1 E (40.8) E (40.8) E (40.8) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 1 B (13.7) Signalized C (31.1) B (12.9) C (31.1) () B (12.9) () Alternative 2 (Without Connection to Raintree Road) Level of Service Results Alternative 2 illustrates the development without the access to Raintree Road. All intersections retained the same level of service and are expected to function with the same recommended improvements as Alternative 1. Figure 13, in the report, illustrates the recommended improvements for this alternative. Level of Service Summary Tables G- K presents the summary of the level of service analysis. Table G -Market Street at Marsh Oaks Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 C (34.2) D (49.9) C (31.7) F (83.6) C (38.4) F (86.7) C (22.6) B (14.6) E (77.6) C (32.4) D (41.2) E (66.4) C (27.4) C (34.3) PM Peak Hour 2018 Future Build - Alternative 2 D (43.7) E (59) D (36.6) F (99.5) D (36.4) F (84.6) D (46.8) B (15.7) F (100.3) C (27.7) D (51.5) E (72.9) D (47.2) D (36.3) 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary viii Table H -Market Street at Bump Along Road Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 D (26.9) D (26.9) D (26.9) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 2 D (25.1) D (25.1) D (25.1) #N/A A (0) A (0) PM Peak Hour 2018 Future Build - Alternative 2 F (67.4) F (67.4) F (67.4) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 2 F (53.3) #N/A F (53.3) F (53.3) #N/A A (0) A (0) Table I -Bump Along Road at Site Access 1 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 A (8.5) A (7.3) A (0) A (8.5) A (0) A (6.7) A (8.5) #N/A PM Peak Hour 2018 Future Build - Alternative 2 A (9) A (7.4) A (0) A (9) A (0) A (6.7) A (9) #N/A Table J -Bump Along Road at Site Access 2 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 A (8.3) A (7.2) A (0) A (8.3) A (0) A (6.2) A (8.3) #N/A PM Peak Hour 2018 Future Build - Alternative 2 A (8.4) A (7.2) A (0) A (8.4) A (0) A (4.6) A (8.4) #N/A 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary ix Table K -Market Street at U-turn Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 C (15.5) C (15.5) C (15.5) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 2 A (4.8) Signalized C (30.6) A (3.8) C (30.6) () A (3.8) () PM Peak Hour 2018 Future Build - Alternative 2 E (40.8) E (40.8) E (40.8) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 2 B (13.7) Signalized C (31) B (12.9) C (31) () B (12.9) () 2/1/18 180202 Bailey Shoppes on Market Development – Executive Summary x Summary and Conclusion The proposed Bailey Shoppes on Market Development (formerly Buy Quick Convenience Mart) is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. Since the submittal of the Transportation Impact Analysis (TIA) in February 2017 there have been changes to the land uses of the development. The proposed development will include 4,800 square feet of office, 6,600 square feet of shopping center, 1,200 square feet of fast food restaurant with drive-thru and 2,400 square feet of high-turnover restaurant. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 9th Edition), this development has a trip generation potential of 107 trips in the AM peak and 192 trips in the PM peak. Based on the analysis, it is expected that each study intersection is to operate at LOS E or better in the AM and PM peaks with recommended improvements for Alternative 1 and Alternative 2. For both alternatives, it is recommended to provide a southbound right turn lane extending from Bump Along Road to Mendenhall Drive with the turn lane tying into the U-turn bumpout designed for the U-4902D project. It is also recommended to provide signalization to the future U-turn at Market Street intersection. We understand that the improvements will require coordination with NCDOT for execution of a developer/NCDOT agreement whereas NCDOT would design/construct the roadway and signalization improvements as part of the U-4902D project with the developer responsible for the associated costs. The turn lane warrant analysis indicates the site accesses on Bump Along Road are not expected to warrant turn lanes due to the low traffic volumes. In conclusion, this study has reviewed the impacts of both background traffic and this development traffic, and has determined that with the recommended improvements in place, there will be adequate capacity to accommodate future traffic. The final design of these improvements will need to be coordinated during the site plan approval process. Please note that all accesses to the site are required to be constructed to NCDOT standards. 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 3 Bailey Shoppes on Market Development – Transportation Impact Analysis New Hanover County, NC Prepared for Bailey and Associates, Inc. Original: January 6, 2017 Revised: February 1, 2018 1.0 Introduction The proposed Bailey Shoppes on Market Development (formerly Buy Quick Convenience Mart) is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. Since the submittal of the Transportation Impact Analysis (TIA) in February 2017 there have been changes to the land uses of the development. The proposed development will include 4,800 square feet of office, 6,600 square feet of shopping center, 1,200 square feet of fast food restaurant with drive-thru and 2,400 square feet of high-turnover restaurant. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. Figure 1 shows the site plan. The site location and vicinity map are illustrated in Figures 2A and 2B, respectively. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study:  US 17 Business (Market Street) at SR 2734 (Marsh Oaks Drive)/ SR 2290 (Mendenhall Drive)  US 17 Business (Market Street) at Bump Along Road  US 17 Business (Market Street) U-turn Break (approx. 800 feet south from Alexander Road)  Bump Along Road at Site Access 1  Bump Along Road at Site Access 2  SR 2146 (Raintree Road) at Site Access 3 As part of the analysis, the Wilmington Metropolitan Planning Organization (WMPO) has requested that the study include two (2) alternatives: Alternative 1 includes connection to Raintree Road and Alternative 2 excludes the connection to Raintree Road. The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions:  2016 Existing Conditions  2018 Future No Build Conditions  2018 Alternative 1 - Future Build Conditions (With Site Access 3)  2018 Alternative 1 - Future Build Condition with Mitigation (if necessary)  2018 Alternative 2 - Future Build Conditions (Without Site Access 3)  2018 Alternative 2 - Future Build Condition with Mitigation (if necessary) 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 4 The build-out analysis year for this project was assumed to be 2018. The AM (7-9 am) and PM (4-6 pm) peaks were studied. The WMPO, County and the North Carolina Department of Transportation (NCDOT) were contacted to obtain background information and to ascertain the elements to be covered in this TIA. Information regarding the property was provided by Design Solutions. US 17 Business (Market Street) at Bump Along Road Facing East     FI G U R E 1 SI T E P L A N    FIGURE 2A SITE LOCATION MAP SITE INDICATOR FIGURE 2B VICINITY MAP STUDY INTERSECTIONS EXISTING PROPOSED 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 8 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 contains the results of this effort. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Market Street US 17 BUS 5 lane undivided Approx. 63’ 45 MPH NCDOT Marsh Oaks Drive SR 2734 2 lane undivided Approx. 34’ 35 MPH NCDOT Mendenhall Road SR 2290 2 lane undivided Approx. 27’ 55 MPH* NCDOT Bump Along Road N/A 1 lane undivided Approx. 12’ Not Posted City of Wilmington Raintree Road SR 2146 2 lane undivided Approx. 22’ 55 MPH* NCDOT *According to NCDOT Speed Limit Maps 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT staff. Table 2.2 contains the dates these counts were conducted. Traffic volumes were balanced between the study intersections by using the greater of adjacent volumes. School was in session at the time of traffic counts. Figure 4 shows existing AM and PM peak hour volumes. More information can be found in the Traffic Volume Data section of the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: By: US 17 BUS (Market Street) at Marsh Oaks Drive 3/9/2016 1/4/2017 DAVENPORT US 17 BUS (Market Street) at Bump Along Road 12/13/2016 DAVENPORT *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND FIGURE3 EXISTINGLANE GEOMETRY SPEEDLIMIT45 20 0 ' 125' Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive SPEED LIMIT 35 15 0 ' FU L L TW L T L SPEEDLIMIT45 2013 AADT VOLUME10,000 32,000 125' Bump Along  Road ~4 6 5 ' *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 4 EXISTING TRAFFIC VOLUMES 106 / 66 131 / 6915 5 3 / 1 6 3 9 11 3 3 / 1 6 8 1 20 / 20 21 / 11 9 / 1 1 30 / 3 8 6 / 7 3 / 2 32 / 1 1 8 38 / 8 9 0 / 0 26 / 2 8 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 17 0 5 / 1 7 1 6 12 0 1 / 1 8 0 8 0 / 0 1 / 2 0 / 3 1 / 1 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 11 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per WMPO staff, there are two (2) approved developments to be considered in this analysis, the ALDI at Marsh Oaks and Amberleigh Shores Phase 2. The ALDI at Marsh Oaks’ TIA was conducted by DAVENPORT in June 2016. This development is planned to consist of 18,900 square feet of discount supermarket and will be located at the southeast corner of US 17 Business (Market Street) and Marsh Oaks Road. The Amberleigh Shores development TIA was conducted by Ramey Kemp & Associates in April 2016 and it is partially constructed. The portion remaining to be built is Phase 2, which will consist of 288 apartment units and is located east of Market Street at its intersection with Alexander Road and south of Marsh Oaks Drive. Site trips for these developments were incorporated in the analysis based on the TIA for each development, and Figure A in the Appendix illustrates these traffic volumes. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a developer in the area, but not yet constructed. Per WMPO, there is one (1) committed improvement in the study area. NCDOT TIP U-4902 A/B/C/D is a roadway improvement project that consists of four parts. U-4902 D is adjacent to the proposed development, which will consist of median installation on US 17 Business (Market Street) from Lendire Road to Marsh Oaks Drive. The NCDOT construction project is anticipated to begin in early 2019. Improvements identified in the TIA for the Amberleigh Shores approved development were also included in the analysis. As directed by the WMPO/ NCDOT, both improvement projects were incorporated in the analysis. More information on the above mentioned projects can be found in the Supporting Documentation in the Appendix. 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 12 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 1.0% per year for all roadways Analysis Software Synchro/SimTraffic Version 9.0 Base Signal Timing/Phasing City of Wilmington/ NCDOT Lane widths 12-feet Truck percentages 2% 4.2 Trip Generation Trips for this development were projected using TripGen 2013 software, based on the 9th edition of ITE Trip Generation Manual. Table 4.2 presents the results. Table 4.2 - ITE Trip Generation Bailey Shoppes on Market Development Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Method - Type Volume Enter Exit Enter Exit Office 710 4.8 Th.Sq.Ft. GFA Equation - Adjacent 131 15 2 14 70 Shopping Center 820 6.6 Th.Sq.Ft. GFA Equation - Adjacent 1,160 19 11 47 50 Fast Food Restaurant with Drive-Thru 934 1.2 Th.Sq.Ft. GFA Rates - Adjacent 595 28 27 20 19 High-Turnover Restaurant 932 2.4 Th.Sq.Ft. GFA Rates - Adjacent 305 17 15 24 20 Unadjusted Total Trips 2,191 79 55 105 159 Shopping Center Pass-by Reduction (34% PM) 0 0 -16 -17 Fast Food Restaurant with Drive-Thru Pass-by Reduction (49% AM, 50% PM) -14 -13 -10 -10 High-Turnover Restaurant Pass-by Reduction (43% PM) 0 0 -10 -9 Total Pass-by Reduction -14 -13 -36 -36 Adjusted Total Trips 65 42 69 123 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 13 Developments of this type also generate what are called “pass-by” trips. The ITE Trip Generation Manual defines “pass-by” trips as trips that are generated by the development, but are already on the adjacent roadway. These trips are not new trips, but are a part of the existing background traffic on Market Street. A “pass-by” reduction of 49% was applied in the AM peak hour and 50% in the PM peak hour for fast food restaurant with drive-thru. A reduction of 43% in the PM peak hour for high-turnover restaurant and 34% in the PM peak hour for shopping center. The rear lot is currently zoned as O&I and could be up to a 10,000 square foot office building space. There are no plans for development of this lot at this time; however, there is still a reduction of trips compared to the original TIA. More information can be found in the Appendix. 4.3 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The trip distribution model is shown in Figure 5A and Figure 6A for the two alternatives, and the directional distributions for site trips are as follows:  45% to and from the north on Market Street  40% to and from the south on Market Street (45% for Alternative 2)  10% to and from the east on Marsh Oaks Drive  5% to and from south Raintree Road (for Alternative 1 only) 60% of pass-by trips were assumed to originate from the north on Market Street, 40% from the south on Market Street. Figures 5B and 6B illustrate the pass-by distribution for the two alternatives. 4.4 2018 Future No Build Traffic The 2018 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2016 existing traffic volumes and adding approved development trips. During the future year 2018, NCDOT TIP U-4902 was assumed to be in place. With this committed improvement, it is assumed there will be rerouted trips due to the limited access on Market Street. Therefore, rerouted volumes is illustrated in Figure B in the Appendix. Figure 7 shows 2018 future no build traffic volumes for AM and PM peaks. 4.5 2018 Future Build Total Traffic The 2018 build-out traffic volume was obtained by summing the 2018 future no build volumes and site trips due to the proposed development. Primary site trips for the two alternatives are shown in Figures 8A and 9A, respectively and pass-by site trips for the two alternatives are shown in Figures 8B and 9B, respectively. The 2018 future build volumes are shown for AM and PM peaks in Figures 10 and 11 for the two alternatives. More information can be found in the Traffic Volume Data section of the Appendix. *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND Mendenhall Drive Marsh Oaks Drive DESTINATION NODE% 40% 45% 10% 10% IN 10 % O U T 95% OUT 95 % I N 45 % I N FIGURE5A ALTERNATIVE 1 PRIMARY TRIP DISTRIBUTION US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road Alexander Road Si t e Ac c e s s 3 Ra i n t r e e Ro a d 95 % O U T 40 % I N + 55 % O U T 55 % O U T 40 % O U T 40 % I N 45 % O U T 85% IN10% IN 40 % I N 85 % O U T 10 % O U T RIGHTIN / RIGHTOUT DIRECTIONAL CROSSOVER 10% OUT 10% IN 40 % I N + 55 % O U T 5% O U T 5% I N 5% *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND Mendenhall Drive Marsh Oaks Drive DESTINATION NODE% 40% 60% 50% OUT 50 % I N FIGURE5B ALTERNATIVE 1 PASS-BY TRIP DISTRIBUTION US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road Alexander Road Si t e Ac c e s s 3 Ra i n t r e e Ro a d -1 0 % I N 50% OUT 50 % I N -5 0 % I N 40 % O U T 40 % O U T 40 % I N 40 % O U T 50% IN 50 % O U T 50 % I N 50 % O U T RIGHTIN / RIGHTOUT DIRECTIONAL CROSSOVER -4 0 % I N + 40 % O U T *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND Mendenhall Drive Marsh Oaks Drive DESTINATION NODE% 45% 45% 10% 10% IN 10 % O U T 100% OUT 10 0 % I N 45 % I N FIGURE6A ALTERNATIVE 2 PRIMARY TRIP DISTRIBUTION US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road Alexander Road Ra i n t r e e Ro a d 10 0 % O U T 45 % I N + 55 % O U T 55 % O U T 45 % O U T 45 % I N 45 % O U T 90% IN10% IN 45 % I N 90 % O U T 10 % O U T RIGHTIN / RIGHTOUT DIRECTIONAL CROSSOVER 45 % I N + 55 % O U T 10% OUT 10% IN *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND Mendenhall Drive Marsh Oaks Drive DESTINATION NODE% 40% 60% 100% OUT 10 0 % I N FIGURE6B ALTERNATIVE 2 PASS-BY TRIP DISTRIBUTION US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road Alexander Road Ra i n t r e e Ro a d -6 0 % I N 40 % O U T 40 % O U T 40 % I N 40 % O U T 100% IN 10 0 % O U T RIGHTIN / RIGHTOUT DIRECTIONAL CROSSOVER -4 0 % I N + 40 % O U T *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 7 2018 FUTURE NO BUILD VOLUMES 108 / 104 163 / 12815 8 4 / 1 6 6 6 12 2 0 / 1 7 4 1 20 / 20 21 / 11 9 / 1 1 31 / 3 9 6 / 7 3 / 2 45 / 2 0 0 39 / 9 1 42 / 2 2 27 / 2 9 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 18 0 9 / 1 8 2 3 13 3 1 / 1 9 3 7 1 / 2 1 / 4 19 1 1 / 1 7 3 8 11 6 1 / 1 9 9 5 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 18 / 1 0 *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 8A ALTERNATIVE 1 - PRIMARY SITE TRIPS 0 / 0 7 / 729 / 3 1 19 / 5 5 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 4 / 1 2 26 / 2 8 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 0 / 0 49 / 9 5 40 / 117 62 / 6 6 19 / 5 5 29 / 3 1 55 / 59 0 / 0 0 / 0 7 / 7 4 / 12 36 / 1 0 5 7 / 7 0 / 0 0 / 0 0 / 0 0 / 0 4 / 1 2 Si t e Ac c e s s 3 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 2 / 6 3 / 3 23 / 6 8 *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 8B ALTERNATIVE 1 - PASS-BY SITE TRIPS 0 / 0 0 / 00 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 6 / 1 4 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road RIGHTIN / RIGHTOUT Alexander Road -1 / - 4 5 / 1 4 7 / 18 7 / 1 8 0 / 0 0 / 0 7 / 18 0 / 0 0 / 0 0 / 0 0 / 0 7 / 1 8 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 Si t e Ac c e s s 3 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 7 / 1 8 7 / 1 8 5 / 1 4 *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 9A ALTERNATIVE 2 - PRIMARY SITE TRIPS 0 / 0 7 / 729 / 3 1 19 / 5 5 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 4 / 1 2 29 / 3 1 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 0 / 0 52 / 9 9 42 / 123 65 / 6 9 19 / 5 5 29 / 3 1 59 / 62 0 / 0 0 / 0 7 / 7 4 / 12 38 / 1 1 1 7 / 7 0 / 0 0 / 0 0 / 0 0 / 0 4 / 1 2 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 23 / 6 8 *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 9B ALTERNATIVE 2 - PASS-BY SITE TRIPS 0 / 0 0 / 00 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 6 / 1 4 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road RIGHTIN / RIGHTOUT Alexander Road -8 / - 2 2 5 / 1 4 13 / 36 14 / 3 6 0 / 0 0 / 0 14 / 36 0 / 0 0 / 0 0 / 0 0 / 0 13 / 3 6 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 5 / 1 4 *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 10 ALTERNATIVE 1 - 2018 FUTURE BUILD 108 / 104 170 / 13516 1 3 / 1 6 9 7 12 3 9 / 1 7 9 6 20 / 20 21 / 11 9 / 1 1 31 / 3 9 6 / 7 3 / 2 45 / 2 0 0 43 / 1 0 3 74 / 6 4 27 / 2 9 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 18 0 8 / 1 8 1 9 13 8 5 / 2 0 4 6 48 / 137 70 / 8 8 19 3 0 / 1 7 9 3 11 9 0 / 2 0 2 6 62 / 77 0 / 0 0 / 0 8 / 11 5 / 14 43 / 1 2 3 7 / 7 0 / 0 0 / 0 1 / 4 1 / 2 4 / 1 2 Si t e Ac c e s s 3 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 9 / 2 4 10 / 2 1 46 / 9 2 *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE 11 ALTERNATIVE 2 - 2018 FUTURE BUILD 108 / 104 170 / 13516 1 3 / 1 6 9 7 12 3 9 / 1 7 9 6 20 / 20 21 / 11 9 / 1 1 31 / 3 9 6 / 7 3 / 2 45 / 2 0 0 43 / 1 0 3 77 / 6 7 27 / 2 9 0 / 0 AM / PM PEAKS 0 / 1 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Si t e Ac c e s s 1 Si t e Ac c e s s 2 Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 18 0 1 / 1 8 0 1 13 8 8 / 2 0 5 0 56 / 161 80 / 1 0 9 19 3 0 / 1 7 9 3 11 9 0 / 2 0 2 6 73 / 98 0 / 0 0 / 0 8 / 11 5 / 14 51 / 1 4 7 7 / 7 0 / 0 0 / 0 1 / 4 1 / 2 4 / 1 2 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 46 / 9 2 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 25 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents the best conditions and Level of Service “F” represents the worst. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A  10 A  10 B  10 and  20 B  10 and  15 C  20 and  35 C  15 and  25 D  35 and  55 D  25 and  35 E  55 and  80 E  35 and  50 F  80 F  50 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 26 6.0 Alternative 1 (Connection to Raintree Road) 6.1 Level of Service Results The following section discusses level of service for each intersection. Market Street at Marsh Oaks Drive This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2018 future no build conditions, LOS C is expected in the AM peak and LOS D in the PM peak. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS D in the PM peak. No improvements are recommended. Market Street at Bump Along Road This unsignalized intersection currently operates at LOS C during the AM and PM peaks. In 2018 future no build condition, LOS C is expected in the AM and PM peaks With the addition of proposed site traffic, LOS D is expected in the AM peak and LOS F in the PM peak. Since Bump Along Road is the main entry into the development and based on the NCDOT Driveway Manual, it is recommended to provide a southbound right turn lane extending from Bump Along Road to Mendenhall Drive with the turn lane tying into the U-turn bumpout designed for the U-4902D project. We understand that this improvement will require coordination with NCDOT for execution of a developer/NCDOT agreement whereas NCDOT would design/construct the roadway improvement as part of the U-4902D project with the developer responsible for the associated costs. With this improvement, LOS C is expected in the AM peak and LOS E in the PM peak. Bump Along Road at Site Access 1 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Bump Along Road at Site Access 2 In 2018 future build condition, LOS A is expected in the AM and PM peaks. This site access was assessed for the need of turn lanes using NCDOT Driveway Manual. It was determined based on projected volumes, that an auxiliary turn lane would not be warranted. Therefore, no improvements are recommended. Raintree Road at Site Access 3 In 2018 future build condition, LOS A is expected in the AM and PM peaks. Based on the Alternative 1 scenario which considers connection to Raintree Road, it is 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 27 recommended to provide interconnectivity of the development site to Raintree Road by providing a two-way, two lane road connection matching the pavement width and typical section at the property line. Market Street at Future U-turn Break A U-turn break will be built as part of TIP Project U-4902, approximately 800 feet south from Alexander Road, in order to accommodate southbound U-turns on Market Street. In 2018 future no build conditions, LOS B is expected in the AM peak and LOS C in the PM peak. With the addition of proposed site traffic, LOS C is expected in the AM peak and LOS E in the PM peak. Based on NCDOT guidance charts, methods for determining signalization in channelized directional intersections, and synchro/SimTraffic queue results, a traffic signal is warranted for the southbound U-turn movement in the PM peak future build conditions. The committed turn lane storage and taper roadway improvements are expected to accommodate the future volumes at this intersection in the signalized condition. If the signalization improvement is provided, this intersection is expected to operate at LOS A in the AM peak and LOS B in the PM peak. We understand that this improvement will require coordination with NCDOT for execution of a developer/NCDOT agreement whereas NCDOT would design/construct the signalization improvement as part of the U-4902D project with the developer responsible for the associated costs. The recommended improvements are illustrated in Figure 12. 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 28 6.2 Level of Service Summary Tables 6.1 – 6.6 summarizes the level of service analysis at the study intersections: Table 6.1-Market Street at Marsh Oaks Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour Existing C (20.6) D (54.7) D (41.9) F (85) D (47.8) A (7.8) B (14.4) B (10.1) A (7.1) B (17.9) D (48.6) E (68.8) B (14.1) B (17.5) 2018 Future No Build C (31.2) D (50.6) C (33.6) F (83.7) D (39) F (82.7) C (21.8) B (14.3) E (77.6) C (27.9) D (42.5) E (66.3) C (24.9) C (30) 2018 Future Build - Alternative 1 C (34) D (49.9) C (32) F (83.6) D (38.4) F (87.2) C (22.6) B (14.6) E (77.6) C (31.9) D (41.3) E (66.4) C (27.3) C (33.8) PM Peak Hour Existing C (20.5) E (64.4) D (47.7) F (87) D (44.3) A (7.5) C (21.7) B (10.5) D (40.4) B (13.6) E (58.8) E (67.4) C (20.9) B (15.7) 2018 Future No Build D (37.9) E (59.1) D (39.5) F (96.6) D (36.7) F (80.8) D (40.4) B (15.4) F (100.3) C (21.5) D (52.5) E (70.6) D (40.5) C (30.9) 2018 Future Build - Alternative 1 D (43.6) E (59) D (36.7) F (99.5) D (36.4) F (84.8) D (46.8) B (15.7) F (100.3) C (27.4) D (51.5) E (72.9) D (47.1) D (36) 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 29 Table 6.2-Market Street at Bump Along Road Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour Existing C (18.8) C (18.8) C (16.6) C (18.8) #N/A A (0) A (0) 2018 Future No Build C (20.1) C (20.1) C (20.1) #N/A A (0) A (0) 2018 Future Build - Alternative 1 D (25.8) D (25.8) D (25.8) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 1 C (24.2) C (24.2) C (24.2) #N/A A (0) A (0) PM Peak Hour Existing C (19) C (19) C (16.8) C (19) #N/A A (0) A (0) 2018 Future No Build C (20.4) C (20.4) C (20.4) #N/A A (0) A (0) 2018 Future Build - Alternative 1 F (51) F (51) F (51) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 1 E (44) E (44) E (44) #N/A A (0) A (0) 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 30 Table 6.3-Bump Along Road at Site Access 1 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 1 A (8.5) A (7.3) A (0) A (8.5) A (0) A (6.6) A (8.5) PM Peak Hour 2018 Future Build - Alternative 1 A (8.9) A (7.4) A (0) A (8.9) A (0) A (6.5) A (8.9) Table 6.4-Bump Along Road at Site Access 2 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 1 A (8.3) A (7.2) A (0) A (8.3) A (0) A (6.2) A (8.3) PM Peak Hour 2018 Future Build - Alternative 1 A (8.4) #N/A A (7.2) A (0) A (8.4) A (0) A (4.6) A (8.4) #N/A Table 6.5-Raintree Road at Site Access 3 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AMPeak Hour 2018 Future Build - Alternative 1 A (0) A (0) A (0) #N/A A (0) A (0) A (0) PM Peak Hour 2018 Future Build - Alternative 1 A (0) A (0) A (0) #N/A A (0) A (0) A (0) 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 31 Table 6.6-Market Street at U-turn Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future No Build B (14.4) B (14.4) B (14.4) #N/A A (0) #N/A 2018 Future Build - Alternative 1 C (15.5) C (15.5) C (15.5) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 1 A (4.9) Signalized C (32.5) A (3.8) C (32.5) () A (3.8) () PM Peak Hour 2018 Future No Build C (23.7) C (23.7) C (23.7) #N/A A (0) #N/A 2018 Future Build - Alternative 1 E (40.8) E (40.8) E (40.8) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 1 B (13.7) Signalized C (31.1) B (12.9) C (31.1) () B (12.9) () *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE12 ALTERNATIVE 1 - RECOMMENDED IMPROVEMENTS 40 0 ' 125' Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive 50 0 ' FU L L 125' Bump Along  Road Si t e Ac c e s s 2 Alexander Road Si t e Ac c e s s 3 Ra i n t r e e Ro a d 30 0 ' 30 0 ' FU L L Si t e Ac c e s s 1 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 33 7.0 Alternative 2 (Without Connection to Raintree Road) 7.1 Level of Service Results Alternative 2 illustrates the development without the access to Raintree Road. All intersections retained the same level of service and are expected to function with the same recommended improvements as Alternative 1. Figure 13 illustrates the recommended improvements for this alternative. 7.2 Level of Service Summary Tables 7.1 – 7.5 presents the summary of the level of service analysis. Table 7.1-Market Street at Marsh Oaks Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 C (34.2) D (49.9) C (31.7) F (83.6) C (38.4) F (86.7) C (22.6) B (14.6) E (77.6) C (32.4) D (41.2) E (66.4) C (27.4) C (34.3) PM Peak Hour 2018 Future Build - Alternative 2 D (43.7) E (59) D (36.6) F (99.5) D (36.4) F (84.6) D (46.8) B (15.7) F (100.3) C (27.7) D (51.5) E (72.9) D (47.2) D (36.3) Table 7.2-Market Street at Bump Along Road Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 D (26.9) D (26.9) D (26.9) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 2 D (25.1) D (25.1) D (25.1) #N/A A (0) A (0) PM Peak Hour 2018 Future Build - Alternative 2 F (67.4) F (67.4) F (67.4) #N/A A (0) A (0) 2018 Build + Improvements - Alternative 2 F (53.3) #N/A F (53.3) F (53.3) #N/A A (0) A (0) 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 34 Table 7.3-Bump Along Road at Site Access 1 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 A (8.5) A (7.3) A (0) A (8.5) A (0) A (6.7) A (8.5) #N/A PM Peak Hour 2018 Future Build - Alternative 2 A (9) A (7.4) A (0) A (9) A (0) A (6.7) A (9) #N/A Table 7.4-Bump Along Road at Site Access 2 Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 A (8.3) A (7.2) A (0) A (8.3) A (0) A (6.2) A (8.3) #N/A PM Peak Hour 2018 Future Build - Alternative 2 A (8.4) A (7.2) A (0) A (8.4) A (0) A (4.6) A (8.4) #N/A Table 7.5-Market Street at U-turn Scenario Worst Movement LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound L T R L T R L T R L T R AM Peak Hour 2018 Future Build - Alternative 2 C (15.5) C (15.5) C (15.5) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 2 A (4.8) Signalized C (30.6) A (3.8) C (30.6) () A (3.8) () PM Peak Hour 2018 Future Build - Alternative 2 E (40.8) E (40.8) E (40.8) #N/A A (0) #N/A 2018 Build + Improvements - Alternative 2 B (13.7) Signalized C (31) B (12.9) C (31) () B (12.9) () *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE13 ALTERNATIVE 2 - RECOMMENDED IMPROVEMENTS 40 0 ' 125' Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive 50 0 ' FU L L 125' Bump Along  Road Si t e Ac c e s s 2 Alexander Road Ra i n t r e e Ro a d 30 0 ' 30 0 ' FU L L Si t e Ac c e s s 1 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 36 8.0 Queue Summary Below in Table 8.1 are the queue results for all exclusive turn lanes. Table 8.1 - Queue Results Weekday AM Peak Hour Queues Scenario Market Street at Mendenhall Drive/ Marsh Oaks Drive Market Street at Bump Along Road Market Street at U-turn* Existing EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 71 158 69 63 48 95th Percentile Queue (ft) 56 130 52 24 48 Storage Bay (ft) 125 125 150 FULL 200 2018 No Build EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 48 225 138 64 178 29 30 95th Percentile Queue (ft) 44 172 119 41 170 13 36 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build – Alternative 1 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 50 225 180 42 393 93 82 95th Percentile Queue (ft) 37 188 157 33 458 70 61 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build + Improvements – Alternative 1 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 50 225 153 127 127 67 134 95th Percentile Queue (ft) 42 171 129 67 104 51 102 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build – Alternative 2 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 50 225 180 43 227 94 81 95th Percentile Queue (ft) 31 194 153 27 201 71 60 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build + Improvements – Alternative 2 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 72 133 131 103 500 87 51 95th Percentile Queue (ft) 54 100 117 48 444 71 62 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 *Note: Synchro modeled with two nodes to create the superstreet; therefore, the queues are the result of the two nodes. 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 37 Table 8.1 - Queue Results Weekday PM Peak Hour Queues Scenario Market Street at Mendenhall Drive/ Marsh Oaks Drive Market Street at Bump Along Road Market Street at U-turn* Existing EBR WBR NBL NBR SBL EBLR NBL EBL Max Queue (ft) 68 118 248 60 167 31 95th Percentile Queue (ft) 43 96 105 40 146 10 Storage Bay (ft) 125 125 150 FULL 200 50 2018 No Build EBR WBR NBL NBR SBL EBR EBR EBL Max Queue (ft) 30 189 169 64 500 29 70 95th Percentile Queue (ft) 25 130 125 60 591 14 45 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build – Alternative 1 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 30 225 125 84 500 104 467 95th Percentile Queue (ft) 26 206 152 67 574 113 553 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build + Improvements – Alternative 1 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 50 222 215 83 500 100 128 95th Percentile Queue (ft) 39 128 186 71 514 101 127 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build – Alternative 2 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 50 224 218 106 499 96 467 95th Percentile Queue (ft) 32 191 185 66 475 105 497 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 2018 Build + Improvements – Alternative 2 EBR WBR NBL NBR SBL EBR EBL Max Queue (ft) 50 221 197 126 499 73 170 95th Percentile Queue (ft) 37 164 166 74 484 84 144 Storage Bay (ft) 125 125 500 FULL 400 FULL 300 300 *Note: Synchro modeled with two nodes to create the superstreet; therefore, the queues are the result of the two nodes. 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 38 9.0 Summary and Conclusion The proposed Bailey Shoppes on Market Development (formerly Buy Quick Convenience Mart) is located along the west side of US 17 Business (Market Street) on the southwest quadrant of Market Street and Bump Along Road in New Hanover County, North Carolina. Since the submittal of the Transportation Impact Analysis (TIA) in February 2017 there have been changes to the land uses of the development. The proposed development will include 4,800 square feet of office, 6,600 square feet of shopping center, 1,200 square feet of fast food restaurant with drive-thru and 2,400 square feet of high-turnover restaurant. The site plan currently shows three (3) accesses: two (2) on Bump Along Road and one (1) connecting to Raintree Road. Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 9th Edition), this development has a trip generation potential of 107 trips in the AM peak and 192 trips in the PM peak. Based on the analysis, it is expected that each study intersection is to operate at LOS E or better in the AM and PM peaks with recommended improvements for Alternative 1 and Alternative 2. For both alternatives, it is recommended to provide a southbound right turn lane extending from Bump Along Road to Mendenhall Drive with the turn lane tying into the U-turn bumpout designed for the U-4902D project. It is also recommended to provide signalization to the future U-turn at Market Street intersection. We understand that the improvements will require coordination with NCDOT for execution of a developer/NCDOT agreement whereas NCDOT would design/construct the roadway and signalization improvements as part of the U-4902D project with the developer responsible for the associated costs. The turn lane warrant analysis indicates the site accesses on Bump Along Road are not expected to warrant turn lanes due to the low traffic volumes. In conclusion, this study has reviewed the impacts of both background traffic and this development traffic, and has determined that with the recommended improvements in place, there will be adequate capacity to accommodate future traffic. The final design of these improvements will need to be coordinated during the site plan approval process. Please note that all accesses to the site are required to be constructed to NCDOT standards. 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 39 Appendix 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 40 Trip Generation Trip Generation Summary - Alternative 1 Project: Alternative: Open Date: Analysis Date: The Range on Oleander Alternative 1 1/2/2018 1/2/2018 ITE Land Use Enter Exit Enter Exit Average Daily Trips Enter Exit TotalTotalTotal AM Peak Hour of Adjacent Street Traffic PM Peak Hour of Adjacent Street Traffic 710OFFICEGENERAL 1 4.8Gross Floor Area 1000 SF 847014172151316566 820CENTERSHOPPING 1 6.6Gross Leasable Area 1000 SF 9750473011191160580580 932RESTAURANTHT 1 2.4Gross Floor Area 1000 SF 305152153 934FASTFOODDT 1 1.2Gross Floor Area 1000 SF 391920552728595297298 Unadjusted Volume 109710942191624010281139220 Internal Capture Trips0008816202040 000131124192039 1097109421914121624299141 Pass-By Trips Volume Added to Adjacent Streets Total AM Peak Hour Internal Capture = 16 Percent Total PM Peak Hour Internal Capture = 18 Percent 1TRIP GENERATION 2014, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012       AM peak PM peak   ADT enter exit total enter exit total  Original 2017 TIA  convenience store/8k office 2638 118 96 214 128 182 310      10,000 SF office on rear tract    AM peak PM peak  SF Use ADT enterexit total enter exittotal  6600 retail 1160 19 11 30 47 50 97  14800 office 307 37 5 42 16 79 95  1200 fast food with drive 595 28 27 55 20 19 39  2400 High turnover sit down restaurant 305 17 15 32 24 20 44  25000 total 2367 101 58 159 107 168275    change from original ‐10% ‐14% ‐40%‐26% ‐16% ‐8%‐11%   decrease        2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 41 Level of Service Analysis 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 42 US 17 BUS (Market Street) at Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBUSBLSBT Lane Configurations Traffic Volume (vph)2032113161063011333826321553 Future Volume (vph)2032113161063011333826321553 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)012501251500200 Storage Lanes0101111 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.8500.999 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583177035391583017703536 Flt Permitted0.6430.7180.0820.170 Satd. Flow (perm)0119815830133715831533539158303173536 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)55354545 Link Distance (ft)6857344291243 Travel Time (s)8.514.36.518.8 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)2232314671183312594229361726 Shared Lane Traffic (%) Lane Group Flow (vph)025230153118331259420651736 Turn TypePermNApm+ovPermNApm+ovpm+ptNAPermpm+ptpm+ptNA Protected Phases4581!521!16 Permitted Phases4488226!6 Detector Phase 445881522116 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.012.012.07.07.012.0 Minimum Split (s)24.624.613.324.624.613.313.324.524.513.313.324.5 Total Split (s)45.045.020.045.045.020.020.087.087.020.020.087.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%57.2%57.2%13.2%13.2%57.2% Maximum Green (s)38.438.413.738.438.413.713.780.580.513.713.780.5 Yellow Time (s)3.83.83.03.83.83.03.04.54.53.03.04.5 All-Red Time (s)2.82.83.32.82.83.33.32.02.03.33.32.0 Lost Time Adjust (s)0.00.00.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.56.36.5 Lead/LagLeadLeadLeadLagLagLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNoneNoneC-Max Act Effct Green (s)22.736.422.736.7109.7102.5102.5111.7105.5 Actuated g/C Ratio0.150.240.150.240.720.670.670.730.69 v/c Ratio0.140.060.770.310.180.530.040.210.71 Control Delay54.741.985.047.87.814.410.17.117.9 Queue Delay0.00.00.00.00.00.00.00.00.0 Total Delay54.741.985.047.87.814.410.17.117.9 LOSDDFDABBAB Approach Delay48.668.814.117.5 Approach LOSDEBB Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Existing Dionne C. Brown, PE Page 2 Lane GroupSBR Lane Configurations Traffic Volume (vph)9 Future Volume (vph)9 Ideal Flow (vphpl)1900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.95 Frt Flt Protected Satd. Flow (prot)0 Flt Permitted Satd. Flow (perm)0 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor0.90 Adj. Flow (vph)10 Shared Lane Traffic (%) Lane Group Flow (vph)0 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Existing Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBUSBLSBT Queue Length 50th (ft)22181489773081314538 Queue Length 95th (ft)4940218145204453333750 Internal Link Dist (ft)6056543491163 Turn Bay Length (ft)125125150200 Base Capacity (vph)302448337448262238510673732453 Starvation Cap Reductn00 0000000 Spillback Cap Reductn00 0000000 Storage Cap Reductn00 0000000 Reduced v/c Ratio0.080.050.450.260.130.530.040.170.71 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 20.6Intersection LOS: C Intersection Capacity Utilization 73.4%ICU Level of Service D Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Existing Dionne C. Brown, PE Page 4 Lane GroupSBR Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)20321163610842311220392745 Future Volume (vph)20321163610842311220392745 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500400 Storage Lanes01 01111 Taper Length (ft)25250100 Lane Util. Factor1.001.001.001.001.001.000.951.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583017703539158301770 Flt Permitted0.6310.7160.9500.950 Satd. Flow (perm)011751583013341583017703539158301770 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22323181712047341356433050 Shared Lane Traffic (%) Lane Group Flow (vph)025230188120081135643080 Turn TypePermNApm+ovPermNApm+ovProtProtNAPermProtProt Protected Phases45!81!5!521!1 Permitted Phases44882 Detector Phase 445881552211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.615.324.624.615.315.315.324.524.515.315.3 Total Split (s)45.045.020.045.045.020.020.020.087.087.020.020.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%13.2%57.2%57.2%13.2%13.2% Maximum Green (s)38.438.413.738.438.413.713.713.780.580.513.713.7 Yellow Time (s)3.83.83.03.83.83.03.03.04.54.53.03.0 All-Red Time (s)2.82.83.32.82.83.33.33.32.02.03.33.3 Lost Time Adjust (s)0.00.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.56.3 Lead/LagLeadLagLeadLeadLeadLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNoneNone Act Effct Green (s)26.745.426.747.012.192.292.213.7 Actuated g/C Ratio0.180.300.180.310.080.610.610.09 v/c Ratio0.120.050.800.250.570.630.040.50 Control Delay50.633.683.739.082.721.814.377.6 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay50.633.683.739.082.721.814.377.6 LOSDCFDFCBE Approach Delay42.566.324.9 Approach LOSDEC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM No Build Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)15849 Future Volume (vph)15849 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)176010 Shared Lane Traffic (%) Lane Group Flow (vph)17700 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)87.0 Total Split (%)57.2% Maximum Green (s)80.5 Yellow Time (s)4.5 All-Red Time (s)2.0 Lost Time Adjust (s)0.0 Total Lost Time (s)6.5 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Max Act Effct Green (s)93.8 Actuated g/C Ratio0.62 v/c Ratio0.81 Control Delay27.9 Queue Delay0.0 Total Delay27.9 LOSC Approach Delay30.0 Approach LOSC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM No Build Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Queue Length 50th (ft)211618189794331777 Queue Length 95th (ft)473525613213559240136 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125400 Base Capacity (vph)2964953374891662146960159 Starvation Cap Reductn00000000 Spillback Cap Reductn00000000 Storage Cap Reductn00000000 Reduced v/c Ratio0.080.050.560.250.490.630.040.50 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 31.2Intersection LOS: C Intersection Capacity Utilization 86.5%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM No Build Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)682 Queue Length 95th (ft)#1005 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2181 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.81 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)20321169610874311239432745 Future Volume (vph)20321169610874311239432745 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500400 Storage Lanes01 01111 Taper Length (ft)25250100 Lane Util. Factor1.001.001.001.001.001.000.951.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583017703539158301770 Flt Permitted0.6290.7150.9500.950 Satd. Flow (perm)011721583013321583017703539158301770 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22323188712082341377483050 Shared Lane Traffic (%) Lane Group Flow (vph)0252301951200116137748080 Turn TypePermNApm+ovPermNApm+ovProtProtNAPermProtProt Protected Phases45!81!5!521!1 Permitted Phases44882 Detector Phase 445881552211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.615.324.624.615.315.315.324.524.515.315.3 Total Split (s)45.045.020.045.045.020.020.020.087.087.020.020.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%13.2%57.2%57.2%13.2%13.2% Maximum Green (s)38.438.413.738.438.413.713.713.780.580.513.713.7 Yellow Time (s)3.83.83.03.83.83.03.03.04.54.53.03.0 All-Red Time (s)2.82.83.32.82.83.33.33.32.02.03.33.3 Lost Time Adjust (s)0.00.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.56.3 Lead/LagLeadLagLeadLeadLeadLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNoneNone Act Effct Green (s)27.548.627.547.814.591.491.413.7 Actuated g/C Ratio0.180.320.180.310.100.600.600.09 v/c Ratio0.120.050.810.240.690.650.050.50 Control Delay49.932.083.638.487.222.614.677.6 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay49.932.083.638.487.222.614.677.6 LOSDCFDFCBE Approach Delay41.366.427.3 Approach LOSDEC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)16139 Future Volume (vph)16139 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)179210 Shared Lane Traffic (%) Lane Group Flow (vph)18020 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)87.0 Total Split (%)57.2% Maximum Green (s)80.5 Yellow Time (s)4.5 All-Red Time (s)2.0 Lost Time Adjust (s)0.0 Total Lost Time (s)6.5 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Max Act Effct Green (s)90.6 Actuated g/C Ratio0.60 v/c Ratio0.85 Control Delay31.9 Queue Delay0.0 Total Delay31.9 LOSC Approach Delay33.8 Approach LOSC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Queue Length 50th (ft)2116188881124501977 Queue Length 95th (ft)4735263130#19561644136 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125400 Base Capacity (vph)2965133364971772128951159 Starvation Cap Reductn00000000 Spillback Cap Reductn00000000 Storage Cap Reductn00000000 Reduced v/c Ratio0.080.040.580.240.660.650.050.50 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 34.0Intersection LOS: C Intersection Capacity Utilization 87.6%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)761 Queue Length 95th (ft)#1073 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2108 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.85 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)20321169610877311239432745 Future Volume (vph)20321169610877311239432745 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500400 Storage Lanes01 01111 Taper Length (ft)25250100 Lane Util. Factor1.001.001.001.001.001.000.951.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9580.9540.9500.950 Satd. Flow (prot)017851583017771583017703539158301770 Flt Permitted0.6290.7150.9500.950 Satd. Flow (perm)011721583013321583017703539158301770 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22323188712086341377483050 Shared Lane Traffic (%) Lane Group Flow (vph)0252301951200120137748080 Turn TypePermNApm+ovPermNApm+ovProtProtNAPermProtProt Protected Phases45!81!5!521!1 Permitted Phases44882 Detector Phase 445881552211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.615.324.624.615.315.315.324.524.515.315.3 Total Split (s)45.045.020.045.045.020.020.020.087.087.020.020.0 Total Split (%)29.6%29.6%13.2%29.6%29.6%13.2%13.2%13.2%57.2%57.2%13.2%13.2% Maximum Green (s)38.438.413.738.438.413.713.713.780.580.513.713.7 Yellow Time (s)3.83.83.03.83.83.03.03.04.54.53.03.0 All-Red Time (s)2.82.83.32.82.83.33.33.32.02.03.33.3 Lost Time Adjust (s)0.00.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.56.3 Lead/LagLeadLagLeadLeadLeadLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNoneNone Act Effct Green (s)27.549.027.547.814.991.491.413.7 Actuated g/C Ratio0.180.320.180.310.100.600.600.09 v/c Ratio0.120.050.810.240.690.650.050.50 Control Delay49.931.783.638.486.722.614.677.6 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay49.931.783.638.486.722.614.677.6 LOSDCFDFCBE Approach Delay41.266.427.4 Approach LOSDEC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)16139 Future Volume (vph)16139 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)179210 Shared Lane Traffic (%) Lane Group Flow (vph)18020 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)87.0 Total Split (%)57.2% Maximum Green (s)80.5 Yellow Time (s)4.5 All-Red Time (s)2.0 Lost Time Adjust (s)0.0 Total Lost Time (s)6.5 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Max Act Effct Green (s)90.2 Actuated g/C Ratio0.59 v/c Ratio0.86 Control Delay32.4 Queue Delay0.0 Total Delay32.4 LOSC Approach Delay34.3 Approach LOSC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBUNBLNBTNBRSBUSBL Queue Length 50th (ft)2116188881164501977 Queue Length 95th (ft)4735263130#20561644136 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125400 Base Capacity (vph)2965163364971802128951159 Starvation Cap Reductn00000000 Spillback Cap Reductn00000000 Storage Cap Reductn00000000 Reduced v/c Ratio0.080.040.580.240.670.650.050.50 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 140 (92%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 34.2Intersection LOS: C Intersection Capacity Utilization 87.8%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)769 Queue Length 95th (ft)#1073 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2098 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.86 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Existing Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBLNBTNBRSBUSBL Lane Configurations Traffic Volume (vph)202111697663816818928118 Future Volume (vph)202111697663816818928118 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)012501251500200 Storage Lanes 0101111 Taper Length (ft)2525100100 Lane Util. Factor1.001.001.001.001.001.001.001.000.951.000.951.00 Frt0.8500.8500.850 Flt Protected0.9560.9570.9500.950 Satd. Flow (prot)017811583001783158317703539158301770 Flt Permitted0.6700.7280.0870.054 Satd. Flow (perm)0124815830013561583162353915830101 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)222121778734218689931131 Shared Lane Traffic (%) Lane Group Flow (vph)02412008673421868990162 Turn TypePermNApm+ovPermPermNApm+ovpm+ptNAPermpm+ptpm+pt Protected Phases4581!521!1 Permitted Phases44888226!6 Detector Phase 445888152211 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.012.012.07.07.0 Minimum Split (s)24.624.613.324.624.624.613.313.324.524.513.313.3 Total Split (s)30.030.025.030.030.030.030.025.092.092.030.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%60.5%60.5%19.7%19.7% Maximum Green (s)23.423.418.723.423.423.423.718.785.585.523.723.7 Yellow Time (s)3.83.83.03.83.83.83.03.04.54.53.03.0 All-Red Time (s)2.82.83.32.82.82.83.33.32.02.03.33.3 Lost Time Adjust (s)0.00.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.56.3 Lead/LagLeadLeadLeadLagLagLeadLead Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNoneNone Act Effct Green (s)14.928.714.936.5110.1102.7102.7124.0 Actuated g/C Ratio0.100.190.100.240.720.680.680.82 v/c Ratio0.200.040.650.190.220.780.090.66 Control Delay64.447.787.044.37.521.710.540.4 Queue Delay0.00.00.00.00.00.00.00.0 Total Delay64.447.787.044.37.521.710.540.4 LOSEDFDACBD Approach Delay58.867.420.9 Approach LOSEEC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Existing Dionne C. Brown, PE Page 2 Lane GroupSBTSBR Lane Configurations Traffic Volume (vph)163911 Future Volume (vph)163911 Ideal Flow (vphpl)19001900 Storage Length (ft)0 Storage Lanes0 Taper Length (ft) Lane Util. Factor0.950.95 Frt0.999 Flt Protected Satd. Flow (prot)35360 Flt Permitted Satd. Flow (perm)35360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.90 Adj. Flow (vph)182112 Shared Lane Traffic (%) Lane Group Flow (vph)18330 Turn TypeNA Protected Phases6 Permitted Phases Detector Phase6 Switch Phase Minimum Initial (s)12.0 Minimum Split (s)24.5 Total Split (s)97.0 Total Split (%)63.8% Maximum Green (s)90.5 Yellow Time (s)4.5 All-Red Time (s)2.0 Lost Time Adjust (s)0.0 Total Lost Time (s)6.5 Lead/LagLag Lead-Lag Optimize?Yes Vehicle Extension (s)3.0 Recall ModeC-Max Act Effct Green (s)113.1 Actuated g/C Ratio0.74 v/c Ratio0.70 Control Delay13.6 Queue Delay0.0 Total Delay13.6 LOSB Approach Delay15.7 Approach LOSB Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Existing Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBLNBTNBRSBUSBL Queue Length 50th (ft)2210845876263278 Queue Length 95th (ft)5228140931893970160 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125150200 Base Capacity (vph)19241820847032623911069342 Starvation Cap Reductn00 000000 Spillback Cap Reductn00 000000 Storage Cap Reductn00 000000 Reduced v/c Ratio0.130.030.410.160.130.780.090.47 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 20.5Intersection LOS: C Intersection Capacity Utilization 87.6%ICU Level of Service E Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Existing Dionne C. Brown, PE Page 4 Lane GroupSBTSBR Queue Length 50th (ft)491 Queue Length 95th (ft)685 Internal Link Dist (ft)1163 Turn Bay Length (ft) Base Capacity (vph)2632 Starvation Cap Reductn0 Spillback Cap Reductn0 Storage Cap Reductn0 Reduced v/c Ratio0.70 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM No Build Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Lane Configurations Traffic Volume (vph)2021111287104223917419129 Future Volume (vph)2021111287104223917419129 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500 Storage Lanes 010111 Taper Length (ft)25250 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.850 Flt Protected0.9560.9550.950 Satd. Flow (prot)017811583001779158301770353915830 Flt Permitted0.5930.7200.950 Satd. Flow (perm)011051583001341158301770353915830 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22212114281162443193410132 Shared Lane Traffic (%) Lane Group Flow (vph)024120015111606719341010 Turn TypePermNApm+ovPermPermNApm+ovProtProtNAPermProt Protected Phases45!81!5!521! Permitted Phases448882 Detector Phase 445888155221 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.07.012.012.07.0 Minimum Split (s)24.624.615.324.624.624.615.315.315.324.524.515.3 Total Split (s)30.030.025.030.030.030.030.025.025.092.092.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%16.4%60.5%60.5%19.7% Maximum Green (s)23.423.418.723.423.423.423.718.718.785.585.523.7 Yellow Time (s)3.83.83.03.83.83.83.03.03.04.54.53.0 All-Red Time (s)2.82.83.32.82.82.83.33.33.32.02.03.3 Lost Time Adjust (s)0.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.5 Lead/LagLeadLagLeadLeadLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNone Act Effct Green (s)20.738.520.751.011.288.288.2 Actuated g/C Ratio0.140.250.140.340.070.580.58 v/c Ratio0.160.030.830.220.520.940.11 Control Delay59.139.596.636.780.840.415.4 Queue Delay0.00.00.00.00.00.00.0 Total Delay59.139.596.636.780.840.415.4 LOSEDFDFDB Approach Delay52.570.640.5 Approach LOSDED Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM No Build Dionne C. Brown, PE Page 2 Lane GroupSBLSBTSBR Lane Configurations Traffic Volume (vph)200166611 Future Volume (vph)200166611 Ideal Flow (vphpl)190019001900 Storage Length (ft)4000 Storage Lanes10 Taper Length (ft)100 Lane Util. Factor1.000.950.95 Frt0.999 Flt Protected0.950 Satd. Flow (prot)177035360 Flt Permitted0.950 Satd. Flow (perm)177035360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.900.90 Adj. Flow (vph)222185112 Shared Lane Traffic (%) Lane Group Flow (vph)25418630 Turn TypeProtNA Protected Phases16 Permitted Phases Detector Phase16 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)15.324.5 Total Split (s)30.097.0 Total Split (%)19.7%63.8% Maximum Green (s)23.790.5 Yellow Time (s)3.04.5 All-Red Time (s)3.32.0 Lost Time Adjust (s)0.00.0 Total Lost Time (s)6.36.5 Lead/LagLagLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.0 Recall ModeNoneC-Max Act Effct Green (s)23.7103.3 Actuated g/C Ratio0.160.68 v/c Ratio0.920.78 Control Delay100.321.5 Queue Delay0.00.0 Total Delay100.321.5 LOSFC Approach Delay30.9 Approach LOSC Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM No Build Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Queue Length 50th (ft)219146816593545 Queue Length 95th (ft)5126#248132117#114876 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125 Base Capacity (vph)1704792065312172053918 Starvation Cap Reductn0000000 Spillback Cap Reductn0000000 Storage Cap Reductn0000000 Reduced v/c Ratio0.140.030.730.220.310.940.11 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 37.9Intersection LOS: D Intersection Capacity Utilization 94.5%ICU Level of Service F Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM No Build Dionne C. Brown, PE Page 4 Lane GroupSBLSBTSBR Queue Length 50th (ft)252684 Queue Length 95th (ft)#424868 Internal Link Dist (ft)1163 Turn Bay Length (ft)400 Base Capacity (vph)2752403 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.920.78 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Lane Configurations Traffic Volume (vph)20211113571046439179610329 Future Volume (vph)20211113571046439179610329 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500 Storage Lanes 010111 Taper Length (ft)25250 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.850 Flt Protected0.9560.9550.950 Satd. Flow (prot)017811583001779158301770353915830 Flt Permitted0.5820.7190.950 Satd. Flow (perm)010841583001339158301770353915830 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22212115081167143199611432 Shared Lane Traffic (%) Lane Group Flow (vph)0241200159116011419961140 Turn TypePermNApm+ovPermPermNApm+ovProtProtNAPermProt Protected Phases45!81!5!521! Permitted Phases448882 Detector Phase 445888155221 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.07.012.012.07.0 Minimum Split (s)24.624.615.324.624.624.615.315.315.324.524.515.3 Total Split (s)30.030.025.030.030.030.030.025.025.092.092.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%16.4%60.5%60.5%19.7% Maximum Green (s)23.423.418.723.423.423.423.718.718.785.585.523.7 Yellow Time (s)3.83.83.03.83.83.83.03.03.04.54.53.0 All-Red Time (s)2.82.83.32.82.82.83.33.33.32.02.03.3 Lost Time Adjust (s)0.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.5 Lead/LagLeadLagLeadLeadLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNone Act Effct Green (s)21.242.521.251.514.787.787.7 Actuated g/C Ratio0.140.280.140.340.100.580.58 v/c Ratio0.160.030.850.220.670.980.12 Control Delay59.036.799.536.484.846.815.7 Queue Delay0.00.00.00.00.00.00.0 Total Delay59.036.799.536.484.846.815.7 LOSEDFDFDB Approach Delay51.572.947.1 Approach LOSDED Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupSBLSBTSBR Lane Configurations Traffic Volume (vph)200169711 Future Volume (vph)200169711 Ideal Flow (vphpl)190019001900 Storage Length (ft)4000 Storage Lanes10 Taper Length (ft)100 Lane Util. Factor1.000.950.95 Frt0.999 Flt Protected0.950 Satd. Flow (prot)177035360 Flt Permitted0.950 Satd. Flow (perm)177035360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.900.90 Adj. Flow (vph)222188612 Shared Lane Traffic (%) Lane Group Flow (vph)25418980 Turn TypeProtNA Protected Phases16 Permitted Phases Detector Phase16 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)15.324.5 Total Split (s)30.097.0 Total Split (%)19.7%63.8% Maximum Green (s)23.790.5 Yellow Time (s)3.04.5 All-Red Time (s)3.32.0 Lost Time Adjust (s)0.00.0 Total Lost Time (s)6.36.5 Lead/LagLagLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.0 Recall ModeNoneC-Max Act Effct Green (s)23.796.7 Actuated g/C Ratio0.160.64 v/c Ratio0.920.84 Control Delay100.327.4 Queue Delay0.00.0 Total Delay100.327.4 LOSFC Approach Delay36.0 Approach LOSD Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Queue Length 50th (ft)21815480111~101952 Queue Length 95th (ft)5125#269132176#121685 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125 Base Capacity (vph)1664842065362172041913 Starvation Cap Reductn0000000 Spillback Cap Reductn0000000 Storage Cap Reductn0000000 Reduced v/c Ratio0.140.020.770.220.530.980.12 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 130 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 43.6Intersection LOS: D Intersection Capacity Utilization 96.0%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 4 Lane GroupSBLSBTSBR Queue Length 50th (ft)252777 Queue Length 95th (ft)#424958 Internal Link Dist (ft)1163 Turn Bay Length (ft)400 Base Capacity (vph)2752250 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.920.84 Intersection Summary Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Lane Configurations Traffic Volume (vph)20211113571046739179610329 Future Volume (vph)20211113571046739179610329 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0125012500 Storage Lanes 010111 Taper Length (ft)25250 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.951.000.95 Frt0.8500.8500.850 Flt Protected0.9560.9550.950 Satd. Flow (prot)017811583001779158301770353915830 Flt Permitted0.5820.7190.950 Satd. Flow (perm)010841583001339158301770353915830 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)553545 Link Distance (ft)685734429 Travel Time (s)8.514.36.5 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)22212115081167443199611432 Shared Lane Traffic (%) Lane Group Flow (vph)0241200159116011719961140 Turn TypePermNApm+ovPermPermNApm+ovProtProtNAPermProt Protected Phases45!81!5!521! Permitted Phases448882 Detector Phase 445888155221 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.07.07.012.012.07.0 Minimum Split (s)24.624.615.324.624.624.615.315.315.324.524.515.3 Total Split (s)30.030.025.030.030.030.030.025.025.092.092.030.0 Total Split (%)19.7%19.7%16.4%19.7%19.7%19.7%19.7%16.4%16.4%60.5%60.5%19.7% Maximum Green (s)23.423.418.723.423.423.423.718.718.785.585.523.7 Yellow Time (s)3.83.83.03.83.83.83.03.03.04.54.53.0 All-Red Time (s)2.82.83.32.82.82.83.33.33.32.02.03.3 Lost Time Adjust (s)0.00.00.00.00.00.00.0 Total Lost Time (s)6.66.36.66.36.36.56.5 Lead/LagLeadLagLeadLeadLeadLeadLag Lead-Lag Optimize?YesYesYesYesYesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneNoneNoneC-MaxC-MaxNone Act Effct Green (s)21.242.821.251.515.087.787.7 Actuated g/C Ratio0.140.280.140.340.100.580.58 v/c Ratio0.160.030.850.220.670.980.12 Control Delay59.036.699.536.484.646.815.7 Queue Delay0.00.00.00.00.00.00.0 Total Delay59.036.699.536.484.646.815.7 LOSEDFDFDB Approach Delay51.572.947.2 Approach LOSDED Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupSBLSBTSBR Lane Configurations Traffic Volume (vph)200169711 Future Volume (vph)200169711 Ideal Flow (vphpl)190019001900 Storage Length (ft)4000 Storage Lanes10 Taper Length (ft)100 Lane Util. Factor1.000.950.95 Frt0.999 Flt Protected0.950 Satd. Flow (prot)177035360 Flt Permitted0.950 Satd. Flow (perm)177035360 Right Turn on RedNo Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)1243 Travel Time (s)18.8 Peak Hour Factor0.900.900.90 Adj. Flow (vph)222188612 Shared Lane Traffic (%) Lane Group Flow (vph)25418980 Turn TypeProtNA Protected Phases16 Permitted Phases Detector Phase16 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)15.324.5 Total Split (s)30.097.0 Total Split (%)19.7%63.8% Maximum Green (s)23.790.5 Yellow Time (s)3.04.5 All-Red Time (s)3.32.0 Lost Time Adjust (s)0.00.0 Total Lost Time (s)6.36.5 Lead/LagLagLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.0 Recall ModeNoneC-Max Act Effct Green (s)23.796.4 Actuated g/C Ratio0.160.63 v/c Ratio0.920.85 Control Delay100.327.7 Queue Delay0.00.0 Total Delay100.327.7 LOSFC Approach Delay36.3 Approach LOSD Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 3 Lane GroupEBLEBTEBRWBUWBLWBTWBRNBUNBLNBTNBRSBU Queue Length 50th (ft)21815480114~101952 Queue Length 95th (ft)5125#269132182#121685 Internal Link Dist (ft)605654349 Turn Bay Length (ft)125125 Base Capacity (vph)1664842065362172041913 Starvation Cap Reductn0000000 Spillback Cap Reductn0000000 Storage Cap Reductn0000000 Reduced v/c Ratio0.140.020.770.220.540.980.12 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 30 (20%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 130 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 43.7Intersection LOS: D Intersection Capacity Utilization 96.0%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive Lanes, Volumes, Timings 100: Market Street & Mendenhall Drive/Marsh Oaks Drive 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 4 Lane GroupSBLSBTSBR Queue Length 50th (ft)252782 Queue Length 95th (ft)#424958 Internal Link Dist (ft)1163 Turn Bay Length (ft)400 Base Capacity (vph)2752243 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.920.85 Intersection Summary 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 43 US 17 BUS (Market Street) at Bump Along Road HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Existing Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h011120117050 Future Vol, veh/h011120117050 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0-50--- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow011133418940 Major/MinorMinor2Major1Major2 Conflicting Flow All256394718940-0 Stage 11894 ----- Stage 2669 ----- Critical Hdwy6.846.944.14--- Critical Hdwy Stg 15.84 ----- Critical Hdwy Stg 25.84 ----- Follow-up Hdwy3.523.322.22--- Pot Cap-1 Maneuver21262311--- Stage 1104 ----- Stage 2471 ----- Platoon blocked, %--- Mov Cap-1 Maneuver21262311--- Mov Cap-2 Maneuver83 ----- Stage 1104 ----- Stage 2469 ----- ApproachEBNBSB HCM Control Delay, s18.800 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)311-262-- HCM Lane V/C Ratio0.004-0.004-- HCM Control Delay (s)16.6-18.8-- HCM Lane LOSC-C-- HCM 95th %tile Q(veh)0-0-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM No Build Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h010133118091 Future Vol, veh/h010133118091 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0 ---- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow010147920101 Major/MinorMinor2Major1Major2 Conflicting Flow All-1006-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02390--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-239 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s20.100 HCM LOSC Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-239-- HCM Lane V/C Ratio-0.005-- HCM Control Delay (s)-20.1-- HCM Lane LOS-C-- HCM 95th %tile Q(veh)-0-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.4 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h04801385180869 Future Vol, veh/h04801385180869 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0 ---- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow05301539200977 Major/MinorMinor2Major1Major2 Conflicting Flow All-1043-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02260--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-226 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s25.800 HCM LOSD Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-226-- HCM Lane V/C Ratio-0.236-- HCM Control Delay (s)-25.8-- HCM Lane LOS-D-- HCM 95th %tile Q(veh)-0.9-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.4 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h04801385180869 Future Vol, veh/h04801385180869 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0---0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow05301539200977 Major/MinorMinor2Major1Major2 Conflicting Flow All-1004-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02400--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-240 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s24.200 HCM LOSC Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-240-- HCM Lane V/C Ratio-0.222-- HCM Control Delay (s)-24.2-- HCM Lane LOS-C-- HCM 95th %tile Q(veh)-0.8-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.5 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h05601388180179 Future Vol, veh/h05601388180179 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0 ---- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow06201542200188 Major/MinorMinor2Major1Major2 Conflicting Flow All-1044-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02260--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-226 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s26.900 HCM LOSD Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-226-- HCM Lane V/C Ratio-0.275-- HCM Control Delay (s)-26.9-- HCM Lane LOS-D-- HCM 95th %tile Q(veh)-1.1-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.4 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h05601388180179 Future Vol, veh/h05601388180179 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0---0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow06201542200188 Major/MinorMinor2Major1Major2 Conflicting Flow All-1001-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02410--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-241 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s25.100 HCM LOSD Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-241-- HCM Lane V/C Ratio-0.258-- HCM Control Delay (s)-25.1-- HCM Lane LOS-D-- HCM 95th %tile Q(veh)-1-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Existing Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h021180817163 Future Vol, veh/h021180817163 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0-50--- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow021200919073 Major/MinorMinor2Major1Major2 Conflicting Flow All291595519100-0 Stage 11908 ----- Stage 21007 ----- Critical Hdwy6.846.944.14--- Critical Hdwy Stg 15.84 ----- Critical Hdwy Stg 25.84 ----- Follow-up Hdwy3.523.322.22--- Pot Cap-1 Maneuver12259307--- Stage 1102 ----- Stage 2314 ----- Platoon blocked, %--- Mov Cap-1 Maneuver12259307--- Mov Cap-2 Maneuver74 ----- Stage 1102 ----- Stage 2313 ----- ApproachEBNBSB HCM Control Delay, s1900 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)307-259-- HCM Lane V/C Ratio0.004-0.009-- HCM Control Delay (s)16.8-19-- HCM Lane LOSC-C-- HCM 95th %tile Q(veh)0-0-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM No Build Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h020193718234 Future Vol, veh/h020193718234 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0 ---- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow020215220264 Major/MinorMinor2Major1Major2 Conflicting Flow All-1015-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02360--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-236 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s20.400 HCM LOSC Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-236-- HCM Lane V/C Ratio-0.009-- HCM Control Delay (s)-20.4-- HCM Lane LOS-C-- HCM 95th %tile Q(veh)-0-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh1.7 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h013702046181988 Future Vol, veh/h013702046181988 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0 ---- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow015202273202198 Major/MinorMinor2Major1Major2 Conflicting Flow All-1059-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02210--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-221 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s5100 HCM LOSF Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-221-- HCM Lane V/C Ratio-0.689-- HCM Control Delay (s)-51-- HCM Lane LOS-F-- HCM 95th %tile Q(veh)-4.4-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh1.5 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h013702046181988 Future Vol, veh/h013702046181988 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0---0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow015202273202198 Major/MinorMinor2Major1Major2 Conflicting Flow All-1011-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02370--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-237 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s4400 HCM LOSE Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-237-- HCM Lane V/C Ratio-0.642-- HCM Control Delay (s)-44-- HCM Lane LOS-E-- HCM 95th %tile Q(veh)-3.9-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh2.6 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h0161020501801109 Future Vol, veh/h0161020501801109 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0 ---- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow0179022782001121 Major/MinorMinor2Major1Major2 Conflicting Flow All-1061-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02200--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-220 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s67.400 HCM LOSF Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-220-- HCM Lane V/C Ratio-0.813-- HCM Control Delay (s)-67.4-- HCM Lane LOS-F-- HCM 95th %tile Q(veh)-6-- HCM 2010 TWSC 200: Market Street & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh2.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h0161020501801109 Future Vol, veh/h0161020501801109 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length-0---0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow0179022782001121 Major/MinorMinor2Major1Major2 Conflicting Flow All-1001-0-0 Stage 1------ Stage 2------ Critical Hdwy-6.94 ---- Critical Hdwy Stg 1------ Critical Hdwy Stg 2------ Follow-up Hdwy-3.32 ---- Pot Cap-1 Maneuver02410--- Stage 10-0--- Stage 20-0--- Platoon blocked, %--- Mov Cap-1 Maneuver-241 ---- Mov Cap-2 Maneuver------ Stage 1------ Stage 2------ ApproachEBNBSB HCM Control Delay, s53.300 HCM LOSF Minor Lane/Major MvmtNBTEBLn1SBTSBR Capacity (veh/h)-241-- HCM Lane V/C Ratio-0.742-- HCM Control Delay (s)-53.3-- HCM Lane LOS-F-- HCM 95th %tile Q(veh)-5.2-- 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 44 US 17 BUS (Market Street) U-Turn HCM 2010 TWSC 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM No Build Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.2 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h1800116100 Future Vol, veh/h1800116100 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0--0-- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow2000129000 Major/MinorMinor2Major1 Conflicting Flow All645--0 Stage 10--- Stage 2645--- Critical Hdwy6.84--- Critical Hdwy Stg 1---- Critical Hdwy Stg 25.84--- Follow-up Hdwy3.52--- Pot Cap-1 Maneuver40500- Stage 1-00- Stage 248400- Platoon blocked, %- Mov Cap-1 Maneuver405--- Mov Cap-2 Maneuver405--- Stage 1---- Stage 2484--- ApproachEBNB HCM Control Delay, s14.40 HCM LOSB Minor Lane/Major MvmtNBTEBLn1 Capacity (veh/h)-405 HCM Lane V/C Ratio-0.049 HCM Control Delay (s)-14.4 HCM Lane LOS-B HCM 95th %tile Q(veh)-0.2 HCM 2010 TWSC 11: 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.6 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h4600119000 Future Vol, veh/h4600119000 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0--0-- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow5100132200 Major/MinorMinor2Major1 Conflicting Flow All661--0 Stage 10--- Stage 2661--- Critical Hdwy6.84--- Critical Hdwy Stg 1---- Critical Hdwy Stg 25.84--- Follow-up Hdwy3.52--- Pot Cap-1 Maneuver39500- Stage 1-00- Stage 247500- Platoon blocked, %- Mov Cap-1 Maneuver395--- Mov Cap-2 Maneuver395--- Stage 1---- Stage 2475--- ApproachEBNB HCM Control Delay, s15.50 HCM LOSC Minor Lane/Major MvmtNBTEBLn1 Capacity (veh/h)-395 HCM Lane V/C Ratio-0.129 HCM Control Delay (s)-15.5 HCM Lane LOS-C HCM 95th %tile Q(veh)-0.4 Lanes, Volumes, Timings 11: 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)4600119000 Future Volume (vph)4600119000 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)303030 Link Distance (ft)609162510 Travel Time (s)1.420.857.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)5100132200 Shared Lane Traffic (%) Lane Group Flow (vph)5100132200 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)22.522.5 Total Split (s)24.052.0 Total Split (%)31.6%68.4% Maximum Green (s)17.045.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Max Act Effct Green (s)10.163.5 Actuated g/C Ratio0.130.84 v/c Ratio0.220.45 Control Delay32.53.8 Queue Delay0.00.0 Total Delay32.53.8 LOSCA Approach Delay32.53.8 Approach LOSCA Queue Length 50th (ft)35105 Queue Length 95th (ft)m43165 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)4422958 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.120.45 Intersection Summary Area Type:Other Cycle Length: 76 Actuated Cycle Length: 76 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 4.9Intersection LOS: A Intersection Capacity Utilization 68.3%ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: HCM 2010 TWSC 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.6 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h4600119000 Future Vol, veh/h4600119000 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0--0-- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow5100132200 Major/MinorMinor2Major1 Conflicting Flow All661--0 Stage 10--- Stage 2661--- Critical Hdwy6.84--- Critical Hdwy Stg 1---- Critical Hdwy Stg 25.84--- Follow-up Hdwy3.52--- Pot Cap-1 Maneuver39500- Stage 1-00- Stage 247500- Platoon blocked, %- Mov Cap-1 Maneuver395--- Mov Cap-2 Maneuver395--- Stage 1---- Stage 2475--- ApproachEBNB HCM Control Delay, s15.50 HCM LOSC Minor Lane/Major MvmtNBTEBLn1 Capacity (veh/h)-395 HCM Lane V/C Ratio-0.129 HCM Control Delay (s)-15.5 HCM Lane LOS-C HCM 95th %tile Q(veh)-0.4 Lanes, Volumes, Timings 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)4600119000 Future Volume (vph)4600119000 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)304545 Link Distance (ft)609162510 Travel Time (s)1.413.938.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)5100132200 Shared Lane Traffic (%) Lane Group Flow (vph)5100132200 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)25.025.0 Total Split (s)25.051.0 Total Split (%)32.9%67.1% Maximum Green (s)18.044.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Max Act Effct Green (s)10.163.5 Actuated g/C Ratio0.130.84 v/c Ratio0.220.45 Control Delay30.63.8 Queue Delay0.00.0 Total Delay30.63.8 LOSCA Approach Delay30.63.8 Approach LOSCA Queue Length 50th (ft)31105 Queue Length 95th (ft)m44165 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)4652958 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.110.45 Intersection Summary Area Type:Other Cycle Length: 76 Actuated Cycle Length: 76 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 4.8Intersection LOS: A Intersection Capacity Utilization 68.3%ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: Market Street & U-turn HCM 2010 TWSC 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM No Build Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h1000199500 Future Vol, veh/h1000199500 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0--0-- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow1100221700 Major/MinorMinor2Major1 Conflicting Flow All1108--0 Stage 10--- Stage 21108--- Critical Hdwy6.84--- Critical Hdwy Stg 1---- Critical Hdwy Stg 25.84--- Follow-up Hdwy3.52--- Pot Cap-1 Maneuver20400- Stage 1-00- Stage 227800- Platoon blocked, %- Mov Cap-1 Maneuver204--- Mov Cap-2 Maneuver204--- Stage 1---- Stage 2278--- ApproachEBNB HCM Control Delay, s23.70 HCM LOSC Minor Lane/Major MvmtNBTEBLn1 Capacity (veh/h)-204 HCM Lane V/C Ratio-0.054 HCM Control Delay (s)-23.7 HCM Lane LOS-C HCM 95th %tile Q(veh)-0.2 HCM 2010 TWSC 11: 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh1.8 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h9200202600 Future Vol, veh/h9200202600 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0--0-- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow10200225100 Major/MinorMinor2Major1 Conflicting Flow All1126--0 Stage 10--- Stage 21126--- Critical Hdwy6.84--- Critical Hdwy Stg 1---- Critical Hdwy Stg 25.84--- Follow-up Hdwy3.52--- Pot Cap-1 Maneuver19900- Stage 1-00- Stage 227200- Platoon blocked, %- Mov Cap-1 Maneuver199--- Mov Cap-2 Maneuver199--- Stage 1---- Stage 2272--- ApproachEBNB HCM Control Delay, s40.80 HCM LOSE Minor Lane/Major MvmtNBTEBLn1 Capacity (veh/h)-199 HCM Lane V/C Ratio-0.514 HCM Control Delay (s)-40.8 HCM Lane LOS-E HCM 95th %tile Q(veh)-2.6 Lanes, Volumes, Timings 11: 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)9200202600 Future Volume (vph)9200202600 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)304545 Link Distance (ft)609162510 Travel Time (s)1.413.938.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)10200225100 Shared Lane Traffic (%) Lane Group Flow (vph)10200225100 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)25.025.0 Total Split (s)25.051.0 Total Split (%)32.9%67.1% Maximum Green (s)18.044.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Max Act Effct Green (s)11.957.9 Actuated g/C Ratio0.160.76 v/c Ratio0.370.83 Control Delay31.112.9 Queue Delay0.00.0 Total Delay31.112.9 LOSCB Approach Delay31.112.9 Approach LOSCB Queue Length 50th (ft)53356 Queue Length 95th (ft)m54#701 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build + Improvements - Alternative 1 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)4652696 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.220.83 Intersection Summary Area Type:Other Cycle Length: 76 Actuated Cycle Length: 76 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 13.7Intersection LOS: B Intersection Capacity Utilization 71.8%ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: HCM 2010 TWSC 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh1.8 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h9200202600 Future Vol, veh/h9200202600 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0--0-- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow10200225100 Major/MinorMinor2Major1 Conflicting Flow All1126--0 Stage 10--- Stage 21126--- Critical Hdwy6.84--- Critical Hdwy Stg 1---- Critical Hdwy Stg 25.84--- Follow-up Hdwy3.52--- Pot Cap-1 Maneuver19900- Stage 1-00- Stage 227200- Platoon blocked, %- Mov Cap-1 Maneuver199--- Mov Cap-2 Maneuver199--- Stage 1---- Stage 2272--- ApproachEBNB HCM Control Delay, s40.80 HCM LOSE Minor Lane/Major MvmtNBTEBLn1 Capacity (veh/h)-199 HCM Lane V/C Ratio-0.514 HCM Control Delay (s)-40.8 HCM Lane LOS-E HCM 95th %tile Q(veh)-2.6 Lanes, Volumes, Timings 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 1 Lane GroupEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Volume (vph)9200202600 Future Volume (vph)9200202600 Ideal Flow (vphpl)190019001900190019001900 Lane Util. Factor1.001.001.000.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)177000353900 Flt Permitted0.950 Satd. Flow (perm)177000353900 Right Turn on RedNoNoNo Satd. Flow (RTOR) Link Speed (mph)304545 Link Distance (ft)609162510 Travel Time (s)1.413.938.0 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)10200225100 Shared Lane Traffic (%) Lane Group Flow (vph)10200225100 Turn TypeProtNA Protected Phases42 Permitted Phases Detector Phase42 Switch Phase Minimum Initial (s)7.012.0 Minimum Split (s)25.025.0 Total Split (s)25.051.0 Total Split (%)32.9%67.1% Maximum Green (s)18.044.0 Yellow Time (s)5.05.0 All-Red Time (s)2.02.0 Lost Time Adjust (s)-2.0-2.0 Total Lost Time (s)5.05.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s)3.03.0 Recall ModeNoneC-Min Act Effct Green (s)11.957.9 Actuated g/C Ratio0.160.76 v/c Ratio0.370.83 Control Delay31.012.9 Queue Delay0.00.0 Total Delay31.012.9 LOSCB Approach Delay31.012.9 Approach LOSCB Queue Length 50th (ft)53356 Queue Length 95th (ft)m55#701 Internal Link Dist (ft)18362430 Lanes, Volumes, Timings 11: Market Street & U-turn 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build + Improvements - Alternative 2 Dionne C. Brown, PE Page 2 Lane GroupEBLEBRNBLNBTSBTSBR Turn Bay Length (ft) Base Capacity (vph)4652696 Starvation Cap Reductn00 Spillback Cap Reductn00 Storage Cap Reductn00 Reduced v/c Ratio0.220.83 Intersection Summary Area Type:Other Cycle Length: 76 Actuated Cycle Length: 76 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 13.7Intersection LOS: B Intersection Capacity Utilization 72.0%ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 11: Market Street & U-turn 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 45 Bump Along Road at Site Access 1 HCM 2010 TWSC 300: Site Access 1 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh7 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h50617043 Future Vol, veh/h50617043 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow60688048 Major/MinorMajor1Major2Minor1 Conflicting Flow All00601496 Stage 1----6- Stage 2----143- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1615-8431077 Stage 1----1017- Stage 2----884- Platoon blocked, %--- Mov Cap-1 Maneuver--1615-8081077 Mov Cap-2 Maneuver----808- Stage 1----1017- Stage 2----847- ApproachEBWBNB HCM Control Delay, s06.68.5 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1077--1615- HCM Lane V/C Ratio0.044--0.042- HCM Control Delay (s)8.5--7.30 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0.1--0.1- HCM 2010 TWSC 300: Site Access 1 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh7.1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h50727051 Future Vol, veh/h50727051 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow60808057 Major/MinorMajor1Major2Minor1 Conflicting Flow All00601746 Stage 1----6- Stage 2----168- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1615-8161077 Stage 1----1017- Stage 2----862- Platoon blocked, %--- Mov Cap-1 Maneuver--1615-7751077 Mov Cap-2 Maneuver----775- Stage 1----1017- Stage 2----819- ApproachEBWBNB HCM Control Delay, s06.78.5 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1077--1615- HCM Lane V/C Ratio0.053--0.05- HCM Control Delay (s)8.5--7.30 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0.2--0.2- HCM 2010 TWSC 300: Site Access 1 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh7.4 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h14077110123 Future Vol, veh/h14077110123 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow16086120137 Major/MinorMajor1Major2Minor1 Conflicting Flow All0016019916 Stage 1----16- Stage 2----183- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1602-7901063 Stage 1----1007- Stage 2----848- Platoon blocked, %--- Mov Cap-1 Maneuver--1602-7471063 Mov Cap-2 Maneuver----747- Stage 1----1007- Stage 2----802- ApproachEBWBNB HCM Control Delay, s06.58.9 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1063--1602- HCM Lane V/C Ratio0.129--0.053- HCM Control Delay (s)8.9--7.40 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0.4--0.2- HCM 2010 TWSC 300: Site Access 1 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh7.6 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h14098110147 Future Vol, veh/h14098110147 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow160109120163 Major/MinorMajor1Major2Minor1 Conflicting Flow All0016024616 Stage 1----16- Stage 2----230- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1602-7421063 Stage 1----1007- Stage 2----808- Platoon blocked, %--- Mov Cap-1 Maneuver--1602-6911063 Mov Cap-2 Maneuver----691- Stage 1----1007- Stage 2----752- ApproachEBWBNB HCM Control Delay, s06.79 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1063--1602- HCM Lane V/C Ratio0.154--0.068- HCM Control Delay (s)9--7.40 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0.5--0.2- 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 46 Bump Along Road at Site Access 2 HCM 2010 TWSC 400: Site Access 2 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh6.4 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h1 06104 Future Vol, veh/h1 06104 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow1 07104 Major/MinorMajor1Major2Minor1 Conflicting Flow All0010151 Stage 1----1- Stage 2----14- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1622-10041084 Stage 1----1022- Stage 2----1009- Platoon blocked, %--- Mov Cap-1 Maneuver--1622-10001084 Mov Cap-2 Maneuver----1000- Stage 1----1022- Stage 2----1005- ApproachEBWBNB HCM Control Delay, s06.28.3 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1084--1622- HCM Lane V/C Ratio0.004--0.004- HCM Control Delay (s)8.3--7.20 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0--0- HCM 2010 TWSC 400: Site Access 2 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh6.4 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h1 06104 Future Vol, veh/h1 06104 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow1 07104 Major/MinorMajor1Major2Minor1 Conflicting Flow All0010151 Stage 1----1- Stage 2----14- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1622-10041084 Stage 1----1022- Stage 2----1009- Platoon blocked, %--- Mov Cap-1 Maneuver--1622-10001084 Mov Cap-2 Maneuver----1000- Stage 1----1022- Stage 2----1005- ApproachEBWBNB HCM Control Delay, s06.28.3 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1084--1622- HCM Lane V/C Ratio0.004--0.004- HCM Control Delay (s)8.3--7.20 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0--0- HCM 2010 TWSC 400: Site Access 2 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh6.1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h2 074012 Future Vol, veh/h2 074012 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow2 084013 Major/MinorMajor1Major2Minor1 Conflicting Flow All0020222 Stage 1----2- Stage 2----20- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1620-9951082 Stage 1----1021- Stage 2----1003- Platoon blocked, %--- Mov Cap-1 Maneuver--1620-9901082 Mov Cap-2 Maneuver----990- Stage 1----1021- Stage 2----998- ApproachEBWBNB HCM Control Delay, s04.68.4 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1082--1620- HCM Lane V/C Ratio0.012--0.005- HCM Control Delay (s)8.4--7.20 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0--0- HCM 2010 TWSC 400: Site Access 2 & Bump Along Road 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 2 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh6.1 MovementEBTEBRWBLWBTNBLNBR Lane Configurations Traffic Vol, veh/h2 074012 Future Vol, veh/h2 074012 Conflicting Peds, #/hr0 00000 Sign Control FreeFreeFreeFreeStopStop RT Channelized-None-None-None Storage Length----0- Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow2 084013 Major/MinorMajor1Major2Minor1 Conflicting Flow All0020222 Stage 1----2- Stage 2----20- Critical Hdwy--4.12-6.426.22 Critical Hdwy Stg 1----5.42- Critical Hdwy Stg 2----5.42- Follow-up Hdwy--2.218-3.5183.318 Pot Cap-1 Maneuver--1620-9951082 Stage 1----1021- Stage 2----1003- Platoon blocked, %--- Mov Cap-1 Maneuver--1620-9901082 Mov Cap-2 Maneuver----990- Stage 1----1021- Stage 2----998- ApproachEBWBNB HCM Control Delay, s04.68.4 HCM LOSA Minor Lane/Major MvmtNBLn1EBTEBRWBLWBT Capacity (veh/h)1082--1620- HCM Lane V/C Ratio0.012--0.005- HCM Control Delay (s)8.4--7.20 HCM Lane LOSA--AA HCM 95th %tile Q(veh)0--0- 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 47 Raintree Road at Site Access 3 HCM 2010 TWSC 500: Site Access 3/Site Access 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentAM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0 MovementWBLWBRNBTNBRSBLSBT Lane Configurations Traffic Vol, veh/h0010009 Future Vol, veh/h0010009 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0-0--0 Grade, %0-0--0 Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow00110010 Major/MinorMinor1Major1Major2 Conflicting Flow All211100110 Stage 111 ----- Stage 210 ----- Critical Hdwy6.426.22--4.12- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.318--2.218- Pot Cap-1 Maneuver9961070--1608- Stage 11012 ----- Stage 21013 ----- Platoon blocked, %--- Mov Cap-1 Maneuver9961070--1608- Mov Cap-2 Maneuver996 ----- Stage 11012 ----- Stage 21013 ----- ApproachWBNBSB HCM Control Delay, s000 HCM LOSA Minor Lane/Major MvmtNBTNBRWBLn1SBLSBT Capacity (veh/h)---1608- HCM Lane V/C Ratio ----- HCM Control Delay (s)--00- HCM Lane LOS--AA- HCM 95th %tile Q(veh)---0- HCM 2010 TWSC 500: Site Access 3/Site Access 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentPM Build - Alternative 1 Dionne C. Brown, PE Page 1 Intersection Int Delay, s/veh0 MovementWBLWBRNBTNBRSBLSBT Lane Configurations Traffic Vol, veh/h00210024 Future Vol, veh/h00210024 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----- Veh in Median Storage, #0-0--0 Grade, %0-0--0 Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow00230027 Major/MinorMinor1Major1Major2 Conflicting Flow All502300230 Stage 123 ----- Stage 227 ----- Critical Hdwy6.426.22--4.12- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.318--2.218- Pot Cap-1 Maneuver9591054--1592- Stage 11000 ----- Stage 2996 ----- Platoon blocked, %--- Mov Cap-1 Maneuver9591054--1592- Mov Cap-2 Maneuver959 ----- Stage 11000 ----- Stage 2996 ----- ApproachWBNBSB HCM Control Delay, s000 HCM LOSA Minor Lane/Major MvmtNBTNBRWBLn1SBLSBT Capacity (veh/h)---1592- HCM Lane V/C Ratio ----- HCM Control Delay (s)--00- HCM Lane LOS--AA- HCM 95th %tile Q(veh)---0- 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 48 Traffic Volume Data File Name : 16-0257 Marsh Oaks and Mendenhall at Market Street 7-9am Site Code : 00160257 Start Date : 1/4/2017 Page No : 1 Counted By: James Huntley *Note: Peds Column under Bikes group contains U-turns Weather: Clear Groups Printed- Cars - Buses and Trucks - Bikes on Road Market Street Southbound Marsh Oaks Drive Westbound Market Street Northbound Mendenhall Drive Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total07:00 AM 3 309 3 8 323 20 1 29 0 50 1 183 2 0 186 6 0 3 0 9 568 07:15 AM 5 425 5 7 442 18 0 35 0 53 6 240 5 0 251 8 0 7 0 15 761 07:30 AM 2 380 5 7 394 34 2 35 0 71 17 268 5 0 290 7 2 4 0 13 768 07:45 AM 1 322 11 7 341 31 4 30 0 65 6 332 9 0 347 1 0 6 0 7 760 Total 11 1436 24 29 1500 103 7 129 0 239 30 1023 21 0 1074 22 2 20 0 44 2857 08:00 AM 1 368 11 5 385 23 0 31 0 54 9 293 11 0 313 5 1 3 0 9 761 08:15 AM 2 318 12 5 337 22 1 36 0 59 10 291 7 0 308 5 0 5 0 10 714 08:30 AM 3 360 9 9 381 18 0 25 0 43 10 286 7 0 303 2 0 3 0 5 732 08:45 AM 5 319 10 4 338 17 0 29 0 46 5 300 11 0 316 7 1 2 0 10 710 Total 11 1365 42 23 1441 80 1 121 0 202 34 1170 36 0 1240 19 2 13 0 34 2917 Grand Total 22 2801 66 52 2941 183 8 250 0 441 64 2193 57 0 2314 41 4 33 0 78 5774 Apprch %0.7 95.2 2.2 1.8 41.5 1.8 56.7 0 2.8 94.8 2.5 0 52.6 5.1 42.3 0 Total %0.4 48.5 1.1 0.9 50.9 3.2 0.1 4.3 0 7.6 1.1 38 1 0 40.1 0.7 0.1 0.6 0 1.4 Cars 20 2766 63 12 2861 179 7 249 0 435 63 2158 57 0 2278 41 4 33 0 78 5652 % Cars 90.9 98.8 95.5 23.1 97.3 97.8 87.5 99.6 0 98.6 98.4 98.4 100 0 98.4 100 100 100 0 100 97.9 Buses and Trucks 2 35 3 0 40 4 1 1 0 6 1 35 0 0 36 0 0 0 0 0 82 % Buses and Trucks 9.1 1.2 4.5 0 1.4 2.2 12.5 0.4 0 1.4 1.6 1.6 0 0 1.6 0 0 0 0 0 1.4 Bikes on Road 0 0 0 40 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40 % Bikes on Road 0 0 0 76.9 1.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 16-0257 Marsh Oaks and Mendenhall at Market Street 7-9am Site Code : 00160257 Start Date : 1/4/2017 Page No : 2 Counted By: James Huntley *Note: Peds Column under Bikes group contains U-turns Weather: Clear Market Street M e n d e n h a l l D r i v e M a r s h O a k s D r i v e Market Street Right 20 2 0 22 Thru 2766 35 0 2801 Left 63 3 0 66 Peds 12 0 40 52 InOut Total 2370 2861 5231 39 40 79 0 40 40 2409 5350 2941 Rig h t 17 9 4 0 18 3 Th r u 7 1 0 8 Le f t 24 9 1 0 25 0 Pe d s 0 0 0 0 Ou t To t a l In 13 0 43 5 56 5 4 6 10 0 0 0 13 4 57 5 44 1 Left 57 0 0 57 Thru 2158 35 0 2193 Right 63 1 0 64 Peds 0 0 0 0 Out TotalIn 3056 2278 5334 36 36 72 0 0 0 3092 5406 2314 Le f t 33 0 0 33 Th r u 4 0 0 4 Ri g h t 41 0 0 41 Pe d s 0 0 0 0 To t a l Ou t In 84 78 16 2 3 0 3 0 0 0 87 16 5 78 1/4/2017 07:00 AM 1/4/2017 08:45 AM Cars Buses and Trucks Bikes on Road North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 16-0257 Marsh Oaks and Mendenhall at Market Street 7-9am Site Code : 00160257 Start Date : 1/4/2017 Page No : 3 Counted By: James Huntley *Note: Peds Column under Bikes group contains U-turns Weather: Clear Market Street Southbound Marsh Oaks Drive Westbound Market Street Northbound Mendenhall Drive Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. TotalPeak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 5 425 5 7 442 18 0 35 0 53 6 240 5 0 251 8 0 7 0 15 761 07:30 AM 2 380 5 7 394 34 2 35 0 71 17 268 5 0 290 7 2 4 0 13 768 07:45 AM 1 322 11 7 341 31 4 30 0 65 6 332 9 0 347 1 0 6 0 7 760 08:00 AM 1 368 11 5 385 23 0 31 0 54 9 293 11 0 313 5 1 3 0 9 761 Total Volume 9 1495 32 26 1562 106 6 131 0 243 38 1133 30 0 1201 21 3 20 0 44 3050 % App. Total 0.6 95.7 2 1.7 43.6 2.5 53.9 0 3.2 94.3 2.5 0 47.7 6.8 45.5 0 PHF .450 .879 .727 .929 .883 .779 .375 .936 .000 .856 .559 .853 .682 .000 .865 .656 .375 .714 .000 .733 .993 Cars 8 1476 31 5 1520 103 5 131 0 239 37 1113 30 0 1180 21 3 20 0 44 2983 % Cars 88.9 98.7 96.9 19.2 97.3 97.2 83.3 100 0 98.4 97.4 98.2 100 0 98.3 100 100 100 0 100 97.8 Buses and Trucks 1 19 1 0 21 3 1 0 0 4 1 20 0 0 21 0 0 0 0 0 46 % Buses and Trucks 11.1 1.3 3.1 0 1.3 2.8 16.7 0 0 1.6 2.6 1.8 0 0 1.7 0 0 0 0 0 1.5 Bikes on Road 0 0 0 21 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 % Bikes on Road 0 0 0 80.8 1.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7 Market Street M e n d e n h a l l D r i v e M a r s h O a k s D r i v e Market Street Right 8 1 0 9 Thru 1476 19 0 1495 Left 31 1 0 32 Peds 5 0 21 26 InOut Total 1236 1520 2756 23 21 44 0 21 21 1259 2821 1562 Ri g h t 10 3 3 0 10 6 Th r u 5 1 0 6 Le f t 13 1 0 0 13 1 Pe d s 0 0 0 0 Ou t To t a l In 71 23 9 31 0 2 4 6 0 0 0 73 31 6 24 3 Left 30 0 0 30 Thru 1113 20 0 1133 Right 37 1 0 38 Peds 0 0 0 0 Out TotalIn 1628 1180 2808 19 21 40 0 0 0 1647 2848 1201 Le f t 20 0 0 20 Th r u 3 0 0 3 Rig h t 21 0 0 21 Pe d s 0 0 0 0 To t a l Ou t In 43 44 87 2 0 2 0 0 0 45 89 44 Peak Hour Begins at 07:15 AM Cars Buses and Trucks Bikes on Road Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US 17 at Marsh Oaks Drive 03.09.2016 Site Code : 00160210 Start Date : 3/9/2016 Page No : 1 Counted By: A. Ayuninjam *Bank 2 + Peds = U-Turns Weather: Clear, Sunny Groups Printed- Cars - Trucks and Buses - Bicycles US 17 (Market Street) Southbound Marsh Oaks Drive Westbound US 17 (Market Street) Northbound Mendenhall Drive Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total04:00 PM 1 371 26 7 398 17 2 20 0 39 17 392 8 4 417 6 1 4 0 11 11 865 876 04:15 PM 3 399 28 6 430 20 1 14 0 35 27 410 7 0 444 1 1 0 0 2 6 911 917 04:30 PM 4 416 31 10 451 15 2 13 1 30 22 421 10 0 453 0 0 6 0 6 11 940 951 04:45 PM 1 422 24 5 447 18 3 13 0 34 15 414 7 0 436 2 1 5 0 8 5 925 930 Total 9 1608 109 28 1726 70 8 60 1 138 81 1637 32 4 1750 9 3 15 0 27 33 3641 3674 05:00 PM 3 402 35 7 440 13 1 29 0 43 25 436 14 0 475 8 0 9 0 17 7 975 982 05:15 PM 1 429 39 2 469 15 1 29 0 45 20 342 9 0 371 2 1 3 0 6 2 891 893 05:30 PM 0 413 33 5 446 13 2 23 1 38 26 303 4 0 333 6 1 3 0 10 6 827 833 05:45 PM 3 378 33 7 414 28 0 26 0 54 29 507 23 0 559 3 0 4 0 7 7 1034 1041 Total 7 1622 140 21 1769 69 4 107 1 180 100 1588 50 0 1738 19 2 19 0 40 22 3727 3749 Grand Total 16 3230 249 49 3495 139 12 167 2 318 181 3225 82 4 3488 28 5 34 0 67 55 7368 7423 Apprch %0.5 92.4 7.1 43.7 3.8 52.5 5.2 92.5 2.4 41.8 7.5 50.7 Total %0.2 43.8 3.4 47.4 1.9 0.2 2.3 4.3 2.5 43.8 1.1 47.3 0.4 0.1 0.5 0.9 0.7 99.3 Cars 15 3188 247 3450 136 11 165 312 181 3188 82 3455 27 5 32 64 0 0 7281 % Cars 93.8 98.7 99.2 0 97.3 97.8 91.7 98.8 0 97.5 100 98.9 100 100 98.9 96.4 100 94.1 0 95.5 0 0 98.1 Trucks and Buses 1 42 2 45 3 1 2 6 0 37 0 37 1 0 2 3 0 0 91 % Trucks and Buses 6.2 1.3 0.8 0 1.3 2.2 8.3 1.2 0 1.9 0 1.1 0 0 1.1 3.6 0 5.9 0 4.5 0 0 1.2 Bicycles 0 0 0 49 0 0 0 2 0 0 0 0 0 0 0 0 0 0 51 % Bicycles 0 0 0 100 1.4 0 0 0 100 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0.7 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US 17 at Marsh Oaks Drive 03.09.2016 Site Code : 00160210 Start Date : 3/9/2016 Page No : 2 US 17 (Market Street) M e n d e n h a l l D r i v e M a r s h O a k s D r i v e US 17 (Market Street) Right 15 1 0 16 Thru 3188 42 0 3230 Left 247 2 0 249 InOut Total 3356 3450 6806 42 45 87 0 0 0 3398 6893 3495 Ri g h t 13 6 3 0 13 9 Th r u 11 1 0 12 Le f t 16 5 2 0 16 7 Ou t To t a l In 43 3 31 2 74 5 2 6 8 0 0 0 43 5 75 3 31 8 Left 82 0 0 82 Thru 3188 37 0 3225 Right 181 0 0 181 Out TotalIn 3380 3451 6831 45 37 82 0 0 0 3425 6913 3488 Le f t 32 2 0 34 Th r u 5 0 0 5 Ri g h t 27 1 0 28 To t a l Ou t In 10 8 64 17 2 2 3 5 0 0 0 11 0 17 7 67 3/9/2016 04:00 PM 3/9/2016 05:45 PM Cars Trucks and Buses Bicycles North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US 17 at Marsh Oaks Drive 03.09.2016 Site Code : 00160210 Start Date : 3/9/2016 Page No : 3 US 17 (Market Street) Southbound Marsh Oaks Drive Westbound US 17 (Market Street) Northbound Mendenhall Drive Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM 3 399 28 430 20 1 14 35 27 410 7 444 1 1 0 2 911 04:30 PM 4 416 31 451 15 2 13 30 22 421 10 453 0 0 6 6 940 04:45 PM 1 422 24 447 18 3 13 34 15 414 7 436 2 1 5 8 925 05:00 PM 3 402 35 440 13 1 29 43 25 436 14 475 8 0 9 17 975 Total Volume 11 1639 118 1768 66 7 69 142 89 1681 38 1808 11 2 20 33 3751 % App. Total 0.6 92.7 6.7 46.5 4.9 48.6 4.9 93 2.1 33.3 6.1 60.6 PHF .688 .971 .843 .980 .825 .583 .595 .826 .824 .964 .679 .952 .344 .500 .556 .485 .962 Cars 10 1615 117 1742 65 7 68 140 89 1658 38 1785 11 2 19 32 3699 % Cars 90.9 98.5 99.2 98.5 98.5 100 98.6 98.6 100 98.6 100 98.7 100 100 95.0 97.0 98.6 Trucks and Buses 1 24 1 26 1 0 1 2 0 23 0 23 0 0 1 1 52 % Trucks and Buses 9.1 1.5 0.8 1.5 1.5 0 1.4 1.4 0 1.4 0 1.3 0 0 5.0 3.0 1.4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 US 17 (Market Street) M e n d e n h a l l D r i v e M a r s h O a k s D r i v e US 17 (Market Street) Right 10 1 0 11 Thru 1615 24 0 1639 Left 117 1 0 118 InOut Total 1742 1742 3484 25 26 51 0 0 0 1767 3535 1768 Rig h t 65 1 0 66 Th r u 7 0 0 7 Le f t 68 1 0 69 Ou t To t a l In 20 8 14 0 34 8 1 2 3 0 0 0 20 9 35 1 14 2 Left 38 0 0 38 Thru 1658 23 0 1681 Right 89 0 0 89 Out TotalIn 1694 1785 3479 25 23 48 0 0 0 1719 3527 1808 Le f t 19 1 0 20 Th r u 2 0 0 2 Rig h t 11 0 0 11 To t a l Ou t In 55 32 87 1 1 2 0 0 0 56 89 33 Peak Hour Begins at 04:15 PM Cars Trucks and Buses Bicycles Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 1 Groups Printed- Lights - Other Vehicles - Pedestrians US 17 Southbound Bump Along Road Westbound US 17 Northbound Bump Along Road Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Exclu. Total Inclu. Total Int. Total07:00 0 447 0 0 447 0 0 0 0 0 0 224 0 0 224 0 0 0 0 0 0 671 671 07:15 0 521 0 0 521 0 0 0 0 0 0 269 0 1 269 1 0 0 0 1 1 791 792 07:30 0 397 1 0 398 0 0 0 0 0 1 314 1 0 316 0 0 0 0 0 0 714 714 07:45 0 340 1 0 341 1 0 0 0 1 0 332 0 0 332 0 0 0 0 0 0 674 674 Total 0 1705 2 0 1707 1 0 0 0 1 1 1139 1 1 1141 1 0 0 0 1 1 2850 2851 08:00 0 343 1 0 344 0 0 2 0 2 2 267 0 0 269 0 0 1 0 1 0 616 616 08:15 0 333 1 0 334 0 0 0 0 0 2 304 1 0 307 1 0 0 0 1 0 642 642 08:30 0 376 0 0 376 0 0 1 0 1 1 299 0 0 300 0 0 0 0 0 0 677 677 08:45 0 386 6 0 392 2 0 0 0 2 1 288 0 0 289 0 0 0 0 0 0 683 683 Total 0 1438 8 0 1446 2 0 3 0 5 6 1158 1 0 1165 1 0 1 0 2 0 2618 2618 16:00 1 381 1 0 383 2 0 0 0 2 0 407 0 0 407 0 0 0 0 0 0 792 792 16:15 0 392 1 0 393 1 0 0 0 1 2 417 0 0 419 0 0 0 0 0 0 813 813 16:30 1 374 1 0 376 2 0 2 0 4 1 430 1 0 432 0 0 1 0 1 0 813 813 16:45 1 415 1 0 417 2 0 0 0 2 2 448 1 0 451 1 0 0 0 1 0 871 871 Total 3 1562 4 0 1569 7 0 2 0 9 5 1702 2 0 1709 1 0 1 0 2 0 3289 3289 17:00 0 426 0 1 426 2 0 0 0 2 1 443 0 0 444 0 0 0 0 0 1 872 873 17:15 0 412 1 0 413 3 0 0 0 3 2 447 0 0 449 0 0 0 0 0 0 865 865 17:30 2 399 1 0 402 1 0 0 0 1 3 432 0 0 435 1 0 0 0 1 0 839 839 17:45 1 352 0 0 353 0 0 0 0 0 5 418 1 0 424 0 0 1 0 1 0 778 778 Total 3 1589 2 1 1594 6 0 0 0 6 11 1740 1 0 1752 1 0 1 0 2 1 3354 3355 Grand Total 6 6294 16 1 6316 16 0 5 0 21 23 5739 5 1 5767 4 0 3 0 7 2 12111 12113 Apprch %0.1 99.7 0.3 76.2 0 23.8 0.4 99.5 0.1 57.1 0 42.9 Total %0 52 0.1 52.2 0.1 0 0 0.2 0.2 47.4 0 47.6 0 0 0 0.1 0 100 Lights 6 6192 16 6215 16 0 5 21 23 5634 4 5662 3 0 3 6 0 0 11904 % Lights 100 98.4 100 100 98.4 100 0 100 0 100 100 98.2 80 100 98.2 75 0 100 0 85.7 0 0 98.3 Other Vehicles 0 102 0 102 0 0 0 0 0 105 1 106 1 0 0 1 0 0 209 % Other Vehicles 0 1.6 0 0 1.6 0 0 0 0 0 0 1.8 20 0 1.8 25 0 0 0 14.3 0 0 1.7 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 2 US 17 B u m p A l o n g R o a d B u m p A l o n g R o a d US 17 Right 6 0 0 6 Thru 6192 102 0 6294 Left 16 0 0 16 InOut Total 5653 6214 11867 105 102 207 0 0 0 5758 12074 6316 Ri g h t 16 0 0 16 Th r u 0 0 0 0 Le f t 5 0 0 5 Ou t To t a l In 39 21 60 0 0 0 0 0 0 39 60 21 Left 4 1 0 5 Thru 5634 105 0 5739 Right 23 0 0 23 Out TotalIn 6200 5661 11861 103 106 209 0 0 0 6303 12070 5767 Le f t 3 0 0 3 Th r u 0 0 0 0 Rig h t 3 1 0 4 To t a l Ou t In 10 6 16 1 1 2 0 0 0 11 18 7 12/13/2016 07:00 12/13/2016 18:00 Lights Other Vehicles Pedestrians North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 3 US 17 Southbound Bump Along Road Westbound US 17 Northbound Bump Along Road Eastbound Start Time App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 11:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 07:00 0 447 0 447 0 0 0 0 0 224 0 224 0 0 0 0 671 07:15 0 521 0 521 0 0 0 0 0 269 0 269 1 0 0 1 791 07:30 0 397 1 398 0 0 0 0 1 314 1 316 0 0 0 0 714 07:45 0 340 1 341 1 0 0 1 0 332 0 332 0 0 0 0 674 Total Volume 0 1705 2 1707 1 0 0 1 1 1139 1 1141 1 0 0 1 2850 % App. Total 0 99.9 0.1 100 0 0 0.1 99.8 0.1 100 0 0 PHF .000 .818 .500 .819 .250 .000 .000 .250 .250 .858 .250 .859 .250 .000 .000 .250 .901 Lights 0 1661 2 1663 1 0 0 1 1 1108 1 1110 1 0 0 1 2775 % Lights 0 97.4 100 97.4 100 0 0 100 100 97.3 100 97.3 100 0 0 100 97.4 Other Vehicles 0 44 0 44 0 0 0 0 0 31 0 31 0 0 0 0 75 % Other Vehicles 0 2.6 0 2.6 0 0 0 0 0 2.7 0 2.7 0 0 0 0 2.6 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 US 17 B u m p A l o n g R o a d B u m p A l o n g R o a d US 17 Right 0 0 0 0 Thru 1661 44 0 1705 Left 2 0 0 2 InOut Total 1109 1663 2772 31 44 75 0 0 0 1140 2847 1707 Rig h t 1 0 0 1 Th r u 0 0 0 0 Le f t 0 0 0 0 Ou t To t a l In 3 1 4 0 0 0 0 0 0 3 4 1 Left 1 0 0 1 Thru 1108 31 0 1139 Right 1 0 0 1 Out TotalIn 1662 1110 2772 44 31 75 0 0 0 1706 2847 1141 Le f t 0 0 0 0 Th r u 0 0 0 0 Ri g h t 1 0 0 1 To t a l Ou t In 1 1 2 0 0 0 0 0 0 1 2 1 Peak Hour Begins at 07:00 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : US-17 at Bump Along Road Site Code : 160257 Start Date : 12/13/2016 Page No : 4 US 17 Southbound Bump Along Road Westbound US 17 Northbound Bump Along Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 to 18:00 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 1 415 1 417 2 0 0 2 2 448 1 451 1 0 0 1 871 17:00 0 426 0 426 2 0 0 2 1 443 0 444 0 0 0 0 872 17:15 0 412 1 413 3 0 0 3 2 447 0 449 0 0 0 0 865 17:30 2 399 1 402 1 0 0 1 3 432 0 435 1 0 0 1 839 Total Volume 3 1652 3 1658 8 0 0 8 8 1770 1 1779 2 0 0 2 3447 % App. Total 0.2 99.6 0.2 100 0 0 0.4 99.5 0.1 100 0 0 PHF .375 .969 .750 .973 .667 .000 .000 .667 .667 .988 .250 .986 .500 .000 .000 .500 .988 Lights 3 1636 3 1642 8 0 0 8 8 1752 1 1761 2 0 0 2 3413 % Lights 100 99.0 100 99.0 100 0 0 100 100 99.0 100 99.0 100 0 0 100 99.0 Other Vehicles 0 16 0 16 0 0 0 0 0 18 0 18 0 0 0 0 34 % Other Vehicles 0 1.0 0 1.0 0 0 0 0 0 1.0 0 1.0 0 0 0 0 1.0 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 US 17 B u m p A l o n g R o a d B u m p A l o n g R o a d US 17 Right 3 0 0 3 Thru 1636 16 0 1652 Left 3 0 0 3 InOut Total 1760 1642 3402 18 16 34 0 0 0 1778 3436 1658 Rig h t 8 0 0 8 Th r u 0 0 0 0 Le f t 0 0 0 0 Ou t To t a l In 11 8 19 0 0 0 0 0 0 11 19 8 Left 1 0 0 1 Thru 1752 18 0 1770 Right 8 0 0 8 Out TotalIn 1638 1761 3399 16 18 34 0 0 0 1654 3433 1779 Le f t 0 0 0 0 Th r u 0 0 0 0 Ri g h t 2 0 0 2 To t a l Ou t In 4 2 6 0 0 0 0 0 0 4 6 2 Peak Hour Begins at 16:45 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 1 Groups Printed- Lights - Other Vehicles - Pedestrians T-intersection Southbound Bump Along Road Westbound Raintree Road Northbound Bump Along Road Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Exclu. Total Inclu. Total Int. Total07:00 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 07:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 1 1 07:30 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 Total 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 1 0 0 1 0 3 3 08:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 1 1 08:15 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 Total 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 2 2 16:00 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 16:30 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 2 2 16:45 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 1 0 0 1 0 3 3 Total 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 0 2 0 0 2 0 6 6 17:30 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 0 2 2 17:45 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 2 0 0 2 0 4 4 Total 0 0 0 0 0 0 2 2 0 4 0 0 0 0 0 0 2 0 0 2 0 6 6 Grand Total 0 0 0 0 0 0 7 4 0 11 0 0 0 0 0 0 6 0 0 6 0 17 17 Apprch %0 0 0 0 63.6 36.4 0 0 0 0 100 0 Total %0 0 0 0 0 41.2 23.5 64.7 0 0 0 0 0 35.3 0 35.3 0 100 Lights 0 0 0 0 0 6 4 10 0 0 0 0 0 6 0 6 0 0 16 % Lights 0 0 0 0 0 0 85.7 100 0 90.9 0 0 0 0 0 0 100 0 0 100 0 0 94.1 Other Vehicles 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 % Other Vehicles 0 0 0 0 0 0 14.3 0 0 9.1 0 0 0 0 0 0 0 0 0 0 0 0 5.9 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 2 T-intersection B u m p A l o n g R o a d B u m p A l o n g R o a d Raintree Road Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Ri g h t 0 0 0 0 Th r u 6 1 0 7 Le f t 4 0 0 4 Ou t To t a l In 6 10 16 0 1 1 0 0 0 6 17 11 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 4 0 4 0 0 0 0 0 0 4 4 0 Le f t 0 0 0 0 Th r u 6 0 0 6 Rig h t 0 0 0 0 To t a l Ou t In 6 6 12 1 0 1 0 0 0 7 13 6 12/13/2016 07:00 12/13/2016 17:45 Lights Other Vehicles Pedestrians North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 3 T-intersection Southbound Bump Along Road Westbound Raintree Road Northbound Bump Along Road Eastbound Start Time App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 11:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 07:00 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 1 07:15 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 1 07:30 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 07:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Volume 0 0 0 0 0 1 1 2 0 0 0 0 0 1 0 1 3 % App. Total 0 0 0 0 50 50 0 0 0 0 100 0 PHF .000 .000 .000 .000 .000 .250 .250 .500 .000 .000 .000 .000 .000 .250 .000 .250 .750 Lights 0 0 0 0 0 1 1 2 0 0 0 0 0 1 0 1 3 % Lights 0 0 0 0 0 100 100 100 0 0 0 0 0 100 0 100 100 Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T-intersection B u m p A l o n g R o a d B u m p A l o n g R o a d Raintree Road Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Rig h t 0 0 0 0 Th r u 1 0 0 1 Le f t 1 0 0 1 Ou t To t a l In 1 2 3 0 0 0 0 0 0 1 3 2 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 1 0 1 0 0 0 0 0 0 1 1 0 Le f t 0 0 0 0 Th r u 1 0 0 1 Ri g h t 0 0 0 0 To t a l Ou t In 1 1 2 0 0 0 0 0 0 1 2 1 Peak Hour Begins at 07:00 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 File Name : Bump_Along_Rd_and_Raintree_Rd_373474_12-13-2016 Site Code : 160257 Start Date : 12/13/2016 Page No : 4 T-intersection Southbound Bump Along Road Westbound Raintree Road Northbound Bump Along Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:00 16:00 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 16:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16:30 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 2 16:45 0 0 0 0 0 2 0 2 0 0 0 0 0 1 0 1 3 Total Volume 0 0 0 0 0 3 1 4 0 0 0 0 0 2 0 2 6 % App. Total 0 0 0 0 75 25 0 0 0 0 100 0 PHF .000 .000 .000 .000 .000 .375 .250 .500 .000 .000 .000 .000 .000 .500 .000 .500 .500 Lights 0 0 0 0 0 3 1 4 0 0 0 0 0 2 0 2 6 % Lights 0 0 0 0 0 100 100 100 0 0 0 0 0 100 0 100 100 Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Other Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Pedestrians 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T-intersection B u m p A l o n g R o a d B u m p A l o n g R o a d Raintree Road Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Rig h t 0 0 0 0 Th r u 3 0 0 3 Le f t 1 0 0 1 Ou t To t a l In 2 4 6 0 0 0 0 0 0 2 6 4 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Out TotalIn 1 0 1 0 0 0 0 0 0 1 1 0 Le f t 0 0 0 0 Th r u 2 0 0 2 Ri g h t 0 0 0 0 To t a l Ou t In 3 2 5 0 0 0 0 0 0 3 5 2 Peak Hour Begins at 16:00 Lights Other Vehicles Pedestrians Peak Hour Data North DAVENPORT 305 West 4th Street, Winston Salem NC, 27101 Ph: (336) 744-1636 10 0 10 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i p s AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i p s ALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 2 0 2 0 2 0 2 0 2 0 2 0 E B L 2 0 2 0 2 0 2 0 2 0 2 0 EB T 3 3 3 3 3 3 E B T 2 2 2 2 2 2 EB R 2 1 2 1 2 1 2 1 2 1 2 1 E B R 1 1 1 1 1 1 1 1 1 1 1 1 WB L 1 3 1 1 3 1 1 3 4 2 9 1 6 3 7 1 7 0 7 1 7 0 W B L 6 9 6 9 7 0 5 8 1 2 8 7 1 3 5 7 1 3 5 WB T 6 6 6 6 6 6 W B T 7 7 7 7 7 7 WB R 10 6 1 0 6 1 0 8 1 0 8 1 0 8 1 0 8 W B R 66 6 6 6 7 3 7 1 0 4 1 0 4 1 0 4 NB L 3 0 3 0 3 1 3 1 3 1 3 1 N B L 3 8 3 8 3 9 3 9 3 9 3 9 NB T 1 1 3 3 1 1 3 3 1 1 5 6 4 6 1 8 1 2 2 0 1 9 0 1 2 3 9 1 9 0 1 2 3 9 N B T 1 6 8 1 1 6 8 1 1 7 1 5 1 6 1 0 1 7 4 1 5 5 0 1 7 9 6 5 5 0 1 7 9 6 NB R 3 8 3 8 3 9 3 9 4 4 3 4 4 3 N B R 8 9 8 9 9 1 9 1 1 2 1 0 3 1 2 1 0 3 SB L 3 2 3 2 3 3 1 2 4 5 4 5 4 5 S B L 1 1 8 1 1 8 1 2 0 8 0 2 0 0 2 0 0 2 0 0 SB T 1 4 9 5 5 8 1 5 5 3 1 5 8 4 1 5 8 4 2 9 1 6 1 3 2 9 1 6 1 3 S B T 1 6 3 9 1 6 3 9 1 6 7 2 - 6 1 6 6 6 3 1 1 6 9 7 3 1 1 6 9 7 SB R 9 9 9 9 9 9 S B R 1 1 1 1 1 1 1 1 1 1 1 1 EB U 00 0 0 0 0 E B U 00 0 0 0 0 WB U 0 0 0 0 0 0 W B U 1 1 1 1 1 1 NB U 0 0 0 4 1 1 4 2 2 6 6 7 4 2 9 6 7 7 N B U 0 0 0 2 1 1 2 2 2 8 1 4 6 4 3 1 1 4 6 7 SB U 2 6 2 6 2 7 2 7 2 7 2 7 S B U 2 8 2 8 2 9 2 9 2 9 2 9 To t a l 3 0 5 0 5 8 3 0 8 2 3 1 4 4 8 7 3 2 4 9 5 9 0 3 3 0 8 5 9 0 3 3 0 8 T o t a l 3 7 8 0 0 3 7 5 1 3 8 2 6 1 8 5 4 0 2 1 1 0 6 0 4 1 2 5 1 0 6 0 4 1 2 5 20 0 20 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 0 E B L 00 0 0 0 0 EB T 0 0 0 0 0 0 E B T 0 0 0 0 0 0 EB R 1 1 1 1 4 0 7 4 8 4 2 1 3 5 6 E B R 2 2 2 2 1 1 7 1 8 1 3 7 1 2 3 3 6 1 6 1 WB L 00 0 0 0 0 W B L 00 0 0 0 0 WB T 0 0 0 0 0 0 W B T 0 0 0 0 0 0 WB R 11 1 1 1 1 W B R 88 8 8 8 8 NB L 11 1 - 1 0 0 0 N B L 11 1 - 1 0 0 0 NB T 1 1 3 9 6 2 1 2 0 1 1 2 2 5 8 7 1 9 1 3 3 1 4 9 5 1 3 8 5 5 2 5 1 3 8 8 N B T 1 7 7 0 3 8 1 8 0 8 1 8 4 4 8 2 1 1 1 9 3 7 9 5 1 4 2 0 4 6 9 9 1 4 2 0 5 0 NB R 11 1 1 1 1 N B R 88 8 8 8 8 SB L 2 2 2 2 2 2 S B L 3 3 3 3 3 3 SB T 1 7 0 5 1 7 0 5 1 7 3 9 7 0 1 8 0 9 - 1 1 8 0 8 - 8 1 8 0 1 S B T 1 6 5 2 6 4 1 7 1 6 1 7 5 0 7 3 1 8 2 3 - 4 1 8 1 9 - 2 2 1 8 0 1 SB R 0 0 0 1 1 6 2 7 7 0 6 5 1 4 8 0 S B R 3 3 3 1 4 6 6 1 8 8 8 6 9 3 6 1 0 9 To t a l 2 8 5 0 6 2 2 9 1 2 2 9 7 1 1 5 7 3 1 4 7 1 5 1 1 7 3 3 1 5 1 5 9 2 4 3 3 2 9 T o t a l 3 4 4 7 1 0 2 3 5 4 9 3 6 2 0 1 5 5 3 7 8 6 2 7 8 4 7 4 1 0 9 2 9 1 6 5 4 1 4 0 30 0 30 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 1 0 1 1 1 4 5 4 5 E B T 2 0 2 2 2 1 2 1 4 1 2 1 4 EB R 00 0 0 0 E B R 00 0 0 0 WB L 0 0 0 5 5 7 6 2 5 9 1 4 7 3 W B L 00 0 5 9 1 8 7 7 6 2 3 6 9 8 WB T 1 0 1 1 1 7 8 7 8 W B T 4 0 4 4 4 7 1 1 7 1 1 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 0 0 0 0 0 N B T 0 0 0 0 0 NB R 0 0 0 3 6 7 4 3 3 8 1 3 5 1 N B R 0 0 0 1 0 5 1 8 1 2 3 1 1 1 3 6 1 4 7 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 0 0 0 0 0 S B T 0 0 0 0 0 SB R 0 0 0 0 0 S B R 0 0 0 0 0 To t a l 2 0 2 2 0 2 1 0 2 1 4 1 1 8 1 0 7 2 7 1 3 7 T o t a l 6 0 6 6 0 6 1 8 2 3 6 2 2 5 1 9 2 7 2 2 7 0 US 1 7 B U S a t M a r s h O a k s R o a d US 1 7 B U S a t B u m p A l o n g R o a d Bu m p A l o n g R o a d a t S i t e A c c e s s 1 Bu m p A l o n g R o a d a t S i t e A c c e s s 1 US 1 7 B U S a t B u m p A l o n g R o a d US 1 7 B U S a t M a r s h O a k s R o a d 40 0 40 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 1 0 1 1 1 1 1 E B T 2 0 2 2 2 2 2 EB R 00 0 0 0 E B R 00 0 0 0 WB L 00 0 7 7 7 7 W B L 00 0 7 7 7 7 WB T 1 0 1 1 1 1 1 W B T 4 0 4 4 4 4 4 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 0 0 0 0 0 N B T 0 0 0 0 0 NB R 00 0 4 4 4 4 N B R 00 0 1 2 1 2 1 2 1 2 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 0 0 0 0 0 S B T 0 0 0 0 0 SB R 0 0 0 0 0 S B R 0 0 0 0 0 To t a l 2 0 2 2 0 2 1 1 0 1 3 1 1 0 1 3 T o t a l 6 0 6 6 0 6 1 9 0 2 5 1 9 0 2 5 50 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 0 0 0 0 0 E B T 0 0 0 0 0 EB R 00 0 0 0 E B R 00 0 0 0 WB L 00 0 0 0 W B L 00 0 0 0 WB T 0 0 0 0 0 W B T 0 0 0 0 0 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 0 0 0 3 7 1 0 0 N B T 0 0 0 3 1 8 2 1 0 NB R 00 0 0 0 N B R 00 0 0 0 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 0 0 0 2 7 9 0 S B T 0 0 0 6 1 8 2 4 0 SB R 0 0 0 0 0 S B R 0 0 0 0 0 To t a l 0 0 0 0 0 0 5 1 4 1 9 0 0 0 T o t a l 0 0 0 0 0 0 1 0 3 6 4 5 0 0 0 60 0 AM Pe a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l T r i p s AL T 1 P a s s - by T r i p s AL T 1 20 1 8 Fu t u r e Bu i l d AL T 2 Pr i m a r y Re t a i l Tr i ps AL T 2 P a s s - by T r i p s AL T 2 20 1 8 Fu t u r e Bu i l d PM P e a k 20 1 6 TM C Ba l a n c i n g 20 1 6 Ba s e 20 1 8 Pr o j e c t e d Ap p d De v Re r o u t e 20 1 8 Fu t u r e N o Bu i l d AL T 1 Pr i m a r y Re t a i l Tr i psALT 1 Pass-by TripsALT 1 2018 Future BuildALT 2 Primary Retail TripsALT 2 Pass-by TripsALT 2 2018 Future Build EB L 00 0 0 0 E B L 00 0 0 0 EB T 0 0 0 0 0 E B T 0 0 0 0 0 EB R 00 0 0 0 E B R 00 0 0 0 WB L 00 0 0 0 W B L 00 0 0 0 WB T 0 0 0 0 0 W B T 0 0 0 0 0 WB R 00 0 0 0 W B R 00 0 0 0 NB L 00 0 0 0 N B L 00 0 0 0 NB T 1 1 2 1 1 1 2 1 1 1 4 4 1 7 1 1 6 1 2 9 1 1 9 0 2 9 1 1 9 0 N B T 1 8 5 4 1 8 5 4 1 8 9 1 1 0 4 1 9 9 5 3 1 2 0 2 6 3 1 2 0 2 6 NB R 00 0 0 0 N B R 00 0 0 0 SB L 0 0 0 0 0 S B L 0 0 0 0 0 SB T 1 8 0 5 1 8 0 5 1 8 4 1 7 0 1 9 1 1 1 9 1 9 3 0 1 9 1 9 3 0 S B T 1 6 3 2 1 6 3 2 1 6 6 5 7 3 1 7 3 8 5 5 1 7 9 3 5 5 1 7 9 3 SB R 0 0 0 0 0 S B R 0 0 0 0 0 NB U 0 0 0 0 0 N B U 0 0 0 0 0 SB U 0 0 1 8 1 8 2 3 5 4 6 2 3 5 4 6 S B U 0 0 1 0 1 0 6 8 1 4 9 2 6 8 1 4 9 2 To t a l 2 9 2 6 0 2 9 2 6 2 9 8 5 8 7 3 0 7 2 4 8 0 3 1 2 0 4 8 0 3 1 2 0 T o t a l 3 4 8 6 0 3 4 8 6 3 5 5 6 1 7 7 3 7 3 3 8 6 0 3 8 1 9 8 6 0 3 8 1 9 US 1 7 B U S U - t u r n US 1 7 B U S U - t u r n Ra i n t r e e R o a d a t S i t e A c c e s s 3 Ra i n t r e e R o a d a t S i t e A c c e s s 3 Bu m p A l o n g R o a d a t S i t e A c c e s s 2 Bu m p A l o n g R o a d a t S i t e A c c e s s 2 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 49 Queueing and Blocking Reports Queuing and Blocking Report AM Existing 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRLTRLTTRULTTR Maximum Queue (ft)9171235158692592376348240248 Average Queue (ft)211911970178588422130109 95th Queue (ft)6056190130521841822448228211 Link Distance (ft)63267735435435411971197 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)125125150200 Storage Blk Time (%)8211 Queuing Penalty (veh)8301 Intersection: 200: Market Street & Bump Along Road MovementEB Directions ServedLR Maximum Queue (ft)29 Average Queue (ft)2 95th Queue (ft)14 Link Distance (ft)1267 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 13 Queuing and Blocking Report AM No Build 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 10: U-turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: Market Street & U-turn MovementEB Directions ServedL Maximum Queue (ft)30 Average Queue (ft)13 95th Queue (ft)36 Link Distance (ft)31 Upstream Blk Time (%)4 Queuing Penalty (veh)1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: Market Street Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM No Build 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRLTRULTTRULTTR Maximum Queue (ft)504827022513835835164178414422 Average Queue (ft)141714171651942111180224215 95th Queue (ft)414423517211931131141170352365 Link Distance (ft)63367736036036036011971197 Upstream Blk Time (%)00 Queuing Penalty (veh)00 Storage Bay Dist (ft)125125400 Storage Blk Time (%)1510 Queuing Penalty (veh)1610 Intersection: 200: Market Street & Bump Along Road MovementEB Directions ServedR Maximum Queue (ft)29 Average Queue (ft)2 95th Queue (ft)13 Link Distance (ft)1275 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 18 Queuing and Blocking Report AM Build - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: MovementEB Directions ServedL Maximum Queue (ft)64 Average Queue (ft)28 95th Queue (ft)55 Link Distance (ft)13 Upstream Blk Time (%)15 Queuing Penalty (veh)7 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: MovementSB Directions ServedR Maximum Queue (ft)22 Average Queue (ft)1 95th Queue (ft)7 Link Distance (ft)417 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: MovementSB Directions ServedL Maximum Queue (ft)18 Average Queue (ft)1 95th Queue (ft)6 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)300 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRLTRULTTRULTTR Maximum Queue (ft)925041722518031033942393451429 Average Queue (ft)1311189988716118310233279243 95th Queue (ft)443731818815728028833458435384 Link Distance (ft)63367735935935935911971197 Upstream Blk Time (%)0 Queuing Penalty (veh)0 Storage Bay Dist (ft)125125400 Storage Blk Time (%)27231 Queuing Penalty (veh)294280 Intersection: 200: Market Street & Bump Along Road MovementEB Directions ServedR Maximum Queue (ft)93 Average Queue (ft)27 95th Queue (ft)70 Link Distance (ft)81 Upstream Blk Time (%)1 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)65 Average Queue (ft)18 95th Queue (ft)49 Link Distance (ft)188 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)23 Average Queue (ft)1 95th Queue (ft)11 Link Distance (ft)215 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 500: Site Access 3/Site Access 2 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 68 Queuing and Blocking Report AM Build + Improvements - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: MovementEBNBNB Directions ServedLTT Maximum Queue (ft)90141138 Average Queue (ft)385461 95th Queue (ft)77122126 Link Distance (ft)13891891 Upstream Blk Time (%)29 Queuing Penalty (veh)13 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: MovementB3 Directions ServedT Maximum Queue (ft)32 Average Queue (ft)1 95th Queue (ft)11 Link Distance (ft)123 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: MovementSB Directions ServedL Maximum Queue (ft)44 Average Queue (ft)6 95th Queue (ft)25 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)300 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build + Improvements - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRLTRULTTRULTTR Maximum Queue (ft)4950280225153427426127132463456 Average Queue (ft)161513569802622792150268252 95th Queue (ft)434221217112943644767104412394 Link Distance (ft)62167735935935935911971197 Upstream Blk Time (%)46 Queuing Penalty (veh)1420 Storage Bay Dist (ft)125125400 Storage Blk Time (%)1911 Queuing Penalty (veh)2010 Intersection: 200: Market Street & Bump Along Road MovementEBNBNB Directions ServedRTT Maximum Queue (ft)676482 Average Queue (ft)2269 95th Queue (ft)513446 Link Distance (ft)73123123 Upstream Blk Time (%)0 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)53 Average Queue (ft)21 95th Queue (ft)46 Link Distance (ft)188 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build + Improvements - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)23 Average Queue (ft)1 95th Queue (ft)8 Link Distance (ft)215 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 500: Site Access 3/Site Access 2 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 69 Queuing and Blocking Report AM Build - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: Market Street & U-turn MovementEB Directions ServedL Maximum Queue (ft)64 Average Queue (ft)27 95th Queue (ft)54 Link Distance (ft)13 Upstream Blk Time (%)15 Queuing Penalty (veh)7 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: Market Street MovementB3 Directions ServedT Maximum Queue (ft)56 Average Queue (ft)2 95th Queue (ft)18 Link Distance (ft)123 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: U-turn & Market Street MovementSB Directions ServedL Maximum Queue (ft)17 Average Queue (ft)1 95th Queue (ft)6 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)300 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRLTRULTTRULTTR Maximum Queue (ft)725035022518031232743227430466 Average Queue (ft)1891728691173190895286267 95th Queue (ft)483130319415330431527201455457 Link Distance (ft)63367735935935935911971197 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)125125400 Storage Blk Time (%)2211 Queuing Penalty (veh)2411 Intersection: 200: Market Street & Bump Along Road MovementEB Directions ServedR Maximum Queue (ft)94 Average Queue (ft)35 95th Queue (ft)71 Link Distance (ft)81 Upstream Blk Time (%)1 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementWBNB Directions ServedLTLR Maximum Queue (ft)3156 Average Queue (ft)123 95th Queue (ft)1047 Link Distance (ft)81191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)24 Average Queue (ft)4 95th Queue (ft)18 Link Distance (ft)201 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 33 Queuing and Blocking Report AM Build + Improvements - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: Market Street & U-turn MovementEBNBNB Directions ServedLTT Maximum Queue (ft)51116160 Average Queue (ft)305355 95th Queue (ft)62120132 Link Distance (ft)13891891 Upstream Blk Time (%)29 Queuing Penalty (veh)13 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: Market Street MovementSB Directions ServedR Maximum Queue (ft)78 Average Queue (ft)6 95th Queue (ft)34 Link Distance (ft)417 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: U-turn & Market Street Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build + Improvements - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRLTRULTTRULTTR Maximum Queue (ft)4972221133131363390103500980862 Average Queue (ft)1318111457320522413154429392 95th Queue (ft)405419710011737237748444793721 Link Distance (ft)62167735935935935911971197 Upstream Blk Time (%)00 Queuing Penalty (veh)12 Storage Bay Dist (ft)125125400 Storage Blk Time (%)9016 Queuing Penalty (veh)9012 Intersection: 200: Market Street & Bump Along Road MovementEB Directions ServedR Maximum Queue (ft)87 Average Queue (ft)39 95th Queue (ft)71 Link Distance (ft)73 Upstream Blk Time (%)4 Queuing Penalty (veh)2 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementEBNB Directions ServedTRLR Maximum Queue (ft)3156 Average Queue (ft)132 95th Queue (ft)1049 Link Distance (ft)156191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM Build + Improvements - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)23 Average Queue (ft)2 95th Queue (ft)14 Link Distance (ft)201 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 39 Queuing and Blocking Report PM Existing 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRULTRLTTRULTTR Maximum Queue (ft)706813811824835736960167229225 Average Queue (ft)2013804934181193118011588 95th Queue (ft)53431299610534334940146213188 Link Distance (ft)63267735435435411971197 Upstream Blk Time (%)01 Queuing Penalty (veh)13 Storage Bay Dist (ft)125125150200 Storage Blk Time (%)3091 Queuing Penalty (veh)2031 Intersection: 200: Market Street & Bump Along Road MovementEBNBNBNB Directions ServedLRLTT Maximum Queue (ft)28315276 Average Queue (ft)1123 95th Queue (ft)9101727 Link Distance (ft)126750925092 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)50 Storage Blk Time (%)00 Queuing Penalty (veh)00 Network Summary Network wide Queuing Penalty: 11 Queuing and Blocking Report PM No Build 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 10: U-turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: Market Street & U-turn MovementEBNBNB Directions ServedLTT Maximum Queue (ft)70728729 Average Queue (ft)134955 95th Queue (ft)45311336 Link Distance (ft)31714714 Upstream Blk Time (%)2000 Queuing Penalty (veh)200 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: Market Street MovementNBNBSB Directions ServedTTR Maximum Queue (ft)2417239982 Average Queue (ft)150415333 95th Queue (ft)2431242527 Link Distance (ft)23182318549 Upstream Blk Time (%)810 Queuing Penalty (veh)8399 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM No Build 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRULTRULTTRULTTR Maximum Queue (ft)50302021891694184076450012361212 Average Queue (ft)138119715830032522342568544 95th Queue (ft)35251851301254194266059111951132 Link Distance (ft)63367736036036036011971197 Upstream Blk Time (%)2431 Queuing Penalty (veh)81900 Storage Bay Dist (ft)125125400 Storage Blk Time (%)110400 Queuing Penalty (veh)1113290 Intersection: 200: Market Street & Bump Along Road MovementEBNBB3B3 Directions ServedRTTT Maximum Queue (ft)2935609646 Average Queue (ft)21361614 95th Queue (ft)1412756632 Link Distance (ft)1275122549549 Upstream Blk Time (%)134 Queuing Penalty (veh)6331 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 890 Queuing and Blocking Report PM Build - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: MovementEB Directions ServedL Maximum Queue (ft)67 Average Queue (ft)64 95th Queue (ft)71 Link Distance (ft)13 Upstream Blk Time (%)98 Queuing Penalty (veh)90 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: MovementNBNBSBSBB3B3 Directions ServedTTRRTT Maximum Queue (ft)17101749537537242215 Average Queue (ft)8709481781765657 95th Queue (ft)18421848557552199201 Link Distance (ft)24722472417417123123 Upstream Blk Time (%)28281518 Queuing Penalty (veh)272278145173 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: MovementSBSBSB Directions ServedLTT Maximum Queue (ft)40025842583 Average Queue (ft)36516211581 95th Queue (ft)48233403383 Link Distance (ft)24772477 Upstream Blk Time (%)4142 Queuing Penalty (veh)402410 Storage Bay Dist (ft)300 Storage Blk Time (%)830 Queuing Penalty (veh)7420 Queuing and Blocking Report PM Build - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRULTRULTTRULTTR Maximum Queue (ft)50303522251523964288450012121249 Average Queue (ft)2281501018632732826369564522 95th Queue (ft)50262672061524114066757412161182 Link Distance (ft)63367735935935935911971197 Upstream Blk Time (%)221411 Queuing Penalty (veh)111200 Storage Bay Dist (ft)125125400 Storage Blk Time (%)173371 Queuing Penalty (veh)1843172 Intersection: 200: Market Street & Bump Along Road MovementEBNBNBB3B3SBSB Directions ServedR TTTTTTR Maximum Queue (ft)1043422463515179160 Average Queue (ft)7811693212330 95th Queue (ft)113117325695105122 Link Distance (ft)81123123417417359359 Upstream Blk Time (%)38012 Queuing Penalty (veh)522118 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementEBWBNB Directions ServedTRLTLR Maximum Queue (ft)3131222 Average Queue (ft)1186 95th Queue (ft)1010202 Link Distance (ft)15581188 Upstream Blk Time (%)18 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM Build - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)24 Average Queue (ft)6 95th Queue (ft)22 Link Distance (ft)215 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 500: Site Access 3/Site Access 2 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 3049 Queuing and Blocking Report PM Build + Improvements - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: MovementEBNBNB Directions ServedLTT Maximum Queue (ft)66925925 Average Queue (ft)51305317 95th Queue (ft)79806806 Link Distance (ft)13891891 Upstream Blk Time (%)521011 Queuing Penalty (veh)4800 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: MovementNBNBB3 Directions ServedTTT Maximum Queue (ft)2553257145 Average Queue (ft)172917812 95th Queue (ft)3094307715 Link Distance (ft)24722472123 Upstream Blk Time (%)1114 Queuing Penalty (veh)112147 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: MovementSB Directions ServedL Maximum Queue (ft)62 Average Queue (ft)15 95th Queue (ft)48 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)300 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM Build + Improvements - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRULTRULTTRULTTR Maximum Queue (ft)1045069222221539240283500741688 Average Queue (ft)2412206529232534429328343295 95th Queue (ft)653953612818640341171514609527 Link Distance (ft)62167735935935935911971197 Upstream Blk Time (%)1023 Queuing Penalty (veh)01017 Storage Bay Dist (ft)125125400 Storage Blk Time (%)300111 Queuing Penalty (veh)311913 Intersection: 200: Market Street & Bump Along Road MovementEBB3B3 Directions ServedRTT Maximum Queue (ft)100472502 Average Queue (ft)63109369 95th Queue (ft)101409702 Link Distance (ft)73417417 Upstream Blk Time (%)27015 Queuing Penalty (veh)374152 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementEBWBNB Directions ServedTRLTLR Maximum Queue (ft)3131202 Average Queue (ft)3156 95th Queue (ft)1810136 Link Distance (ft)15573188 Upstream Blk Time (%)1 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM Build + Improvements - Alternative 1 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementWBNB Directions ServedLTLR Maximum Queue (ft)3124 Average Queue (ft)15 95th Queue (ft)1021 Link Distance (ft)155215 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 500: Site Access 3/Site Access 2 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 651 Queuing and Blocking Report PM Build - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: Market Street & U-turn MovementEBNBNB Directions ServedLTT Maximum Queue (ft)67272265 Average Queue (ft)624047 95th Queue (ft)68174188 Link Distance (ft)13891891 Upstream Blk Time (%)99 Queuing Penalty (veh)91 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: Market Street MovementNBNBSBSBB3B3 Directions ServedTTRRTT Maximum Queue (ft)25582554508526214232 Average Queue (ft)202520601972066263 95th Queue (ft)28902880575584213215 Link Distance (ft)24722472417417123123 Upstream Blk Time (%)162031332727 Queuing Penalty (veh)171215307319269269 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: U-turn & Market Street MovementSBSBSB Directions ServedLTT Maximum Queue (ft)40025602572 Average Queue (ft)37516611639 95th Queue (ft)42932603298 Link Distance (ft)24772477 Upstream Blk Time (%)4444 Queuing Penalty (veh)429430 Storage Bay Dist (ft)300 Storage Blk Time (%)910 Queuing Penalty (veh)8160 Queuing and Blocking Report PM Build - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRULTRULTTRULTTR Maximum Queue (ft)505024122421839439710649912121212 Average Queue (ft)17101308810330531523294361353 95th Queue (ft)443222619118539139866475832823 Link Distance (ft)63367735935935935911971197 Upstream Blk Time (%)1221 Queuing Penalty (veh)81200 Storage Bay Dist (ft)125125400 Storage Blk Time (%)15168 Queuing Penalty (veh)1625419 Intersection: 200: Market Street & Bump Along Road MovementEBB3B3SBSB Directions ServedRTTTTR Maximum Queue (ft)96458502352370 Average Queue (ft)70823339096 95th Queue (ft)105353693326343 Link Distance (ft)81417417359359 Upstream Blk Time (%)3501301 Queuing Penalty (veh)56313317 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementEBWBNB Directions ServedTRLTLR Maximum Queue (ft)16132204 Average Queue (ft)30384 95th Queue (ft)10818193 Link Distance (ft)15681191 Upstream Blk Time (%)423 Queuing Penalty (veh)10 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM Build - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)24 Average Queue (ft)8 95th Queue (ft)26 Link Distance (ft)201 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 3627 Queuing and Blocking Report PM Build + Improvements - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 1 Intersection: 11: Market Street & U-turn MovementEBNBNB Directions ServedLTT Maximum Queue (ft)68906906 Average Queue (ft)52286301 95th Queue (ft)79712713 Link Distance (ft)13891891 Upstream Blk Time (%)5200 Queuing Penalty (veh)4800 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 12: Market Street MovementNBNBSBSB Directions ServedTTRR Maximum Queue (ft)2553257218103 Average Queue (ft)2054208513 95th Queue (ft)27952789634 Link Distance (ft)24722472417417 Upstream Blk Time (%)813 Queuing Penalty (veh)88137 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 15: U-turn & Market Street MovementSB Directions ServedL Maximum Queue (ft)102 Average Queue (ft)18 95th Queue (ft)65 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)300 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM Build + Improvements - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 2 Intersection: 100: Market Street & Mendenhall Drive/Marsh Oaks Drive MovementEBEBWBWBNBNBNBNBSBSBSB Directions ServedLTRULTRULTTRULTTR Maximum Queue (ft)5050329221197427406126499624406 Average Queue (ft)1812141819432032724301341292 95th Queue (ft)453723216416639639574484506404 Link Distance (ft)62167735935935935911971197 Upstream Blk Time (%)12 Queuing Penalty (veh)711 Storage Bay Dist (ft)125125400 Storage Blk Time (%)16471 Queuing Penalty (veh)176592 Intersection: 200: Market Street & Bump Along Road MovementEBNBB3B3 Directions ServedRTTT Maximum Queue (ft)7326469497 Average Queue (ft)681112385 95th Queue (ft)849418698 Link Distance (ft)73123417417 Upstream Blk Time (%)26014 Queuing Penalty (veh)425145 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: Site Access 1 & Bump Along Road MovementEBNB Directions ServedTRLR Maximum Queue (ft)31118 Average Queue (ft)559 95th Queue (ft)22110 Link Distance (ft)156191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM Build + Improvements - Alternative 2 01/30/2018 180202 Bailey Shoppes at Market DevelopmentSimTraffic Report Dionne C. Brown, PE Page 3 Intersection: 400: Site Access 2 & Bump Along Road MovementNB Directions ServedLR Maximum Queue (ft)24 Average Queue (ft)5 95th Queue (ft)20 Link Distance (ft)201 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 567 2/1/18 180202 Bailey Shoppes on Market Development – Transportation Impact Analysis 50 Supporting Documentation *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE A APPROVED DEVELOPMENTS 0 / 37 29 / 580 / - 6 46 / 1 6 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 12 / 8 0 0 / 0 41 / 2 1 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 70 / 7 3 87 / 8 2 0 / 0 0 / 0 70 / 7 3 17 / 1 0 4 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 0 / 0 *** NOT TO SCALE *** PROJECT NUMBER 180202 BAILEY SHOPPESON MARKET DEVELOPMENT WILMINGTON, NC Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = COMMITTED BLUE = PROPOSED ROADWAY LEGEND FIGURE B REROUTED VOLUMES 0 / 0 0 / 00 / 0 18 / 1 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 1 / 1 0 / 0 0 / 0 AM / PM PEAKS 0 / 0 Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Bump Along Road RIGHTIN / RIGHTOUT Alexander Road 0 / 0 19 / 1 1 0 / 0 1 / 1 0 / 0 0 / 0 Ra i n t r e e Ro a d DIRECTIONAL CROSSOVER 18 / 1 0 LE G E N D A M P E A K H O U R , V U PM P E A K H O U R , V U SU P E R S T R E E T S I G N A L W A R R A N T S U M M A R Y November 2017 Pe a k H o u r Volumes Opposing U-Turns AM 1 1 9 0 4 6 PM 2 0 2 6 9 2 T BRICK WALL 28"X39" BRICK WALL 28"X39" CB DI DI DIT BRICK WALL 28"X39" BRICK WALL 28"X39" CB DI DI DI 51 21 22 61 62 41 42 8182 MP#2 NOTES PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND TABLE OF OPERATION FACE SIGNAL PHASE SIGNAL FACE I.D. FLASH 0 1 + 6 0 1 + 5 02+502+604+8 SHEET NO.PROJECT REFERENCE NO. PREPARED BY: SIG. INVENTORY NO. SCALEREVISIONS REVIEWED BY: INIT.DATE REVIEWED BY:PLAN DATE: 0 Division 3 New Hanover County Wilmington Sterling 1"=40’ 40 03-1027 40238.1.1 Sig. 1 N k g p e e d i n S : \ I T S & S U \ I T S S i g n a l s \ S i g n a l D e s i g n S e c t i o n \ E a s t e r n R e g i o n \ D i v - 0 3 \ P O R \ 0 3 - 1 0 2 7 \ 0 3 1 0 2 7 _ s i g _ P O R _ 2 0 1 5 m m d d . d g n 1 6 - S E P - 2 0 1 5 1 6 : 2 7 FEATURE PHASE 124568 MIN RECALLMIN RECALL YELLOWYELLOW ONON 159020159020 ---- ------ ---- -- ---- ----1515 3434 3.03.0 4.54.5 --ON--ON ---- ---- ONONONON is shown. Min Green for all other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what Simultaneous Gap Dual Entry Vehicle Call Memory Recall Mode Minimum Gap Time To Reduce * Time Before Reduction * Max Variable Initial * Seconds Per Actuation * Don’t Walk 1 Walk 1 * Red Clearance Yellow Clearance Max Green 1 * Extension 1 * Min Green 1 * 2.02.02.02.0 6.06.0 71277127 ---- ---- 3030 Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSEDEXISTING Sign Modified Signal HeadN/A Junction Box N/ARight of Way TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH NE W C A R D N E W L O O P FU L L T I M E D E L A Y EX T E N S I O N CA L L I N G SY S T E M L O O P 1A 1B 2A 2B 4A 5A 5B 6A 6B 8A 6X40 6X40 6X40 6X40 6X40 6X40 +5 0 0 +5 0 0 6X6 6X6 6X6 6X6 300 300 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 5 5 5 5 Y Y Y Y Y Y Y Y Y Y Y YY Y Y Y Y Y Y Y Y Y Y Y - - - - Y - - - - - - - - - - - - - - - - - Y -10 10 15 15 1 1 6 2 2 4 5 2 5 6 6 8 0% Grade 45 MPH 0% Grade 45 MPH = FLASHING YELLOW ARROW 51 1 1 81 61, 62 41 21, 22 82 42 1 1 21, 22 41 42 51 61, 62 81 82 R RR R R R G GG G G G G G Y Y RRR R R R R R RRR RRR R R R R R RRR 3.0 1.5 3.0 1.5 SR 2290 (Mendenhall Drive) SR 2734 (Marsh Oaks Drive)/ at US 17 Business (Market Street) Metal Pole with Mastarmexisting existing existing existing October 2008 PHASING DIAGRAM 01+5 04+8 02+6 02+5 01+6 300 300 3 3 - - - - - - - - - - - -- - - - - - All Heads L.E.D. R Y FY 12" R Y G 12" R YY G 12" existing existing existing existing SIGN 32"X68" MP#1 ex ex ex ex ex ex exe x ex ex US 17 Business (Market Street) US 17 Business (Market Street) S R 2 7 3 4 ( M a r s h O a k s D r i v e ) S R 2 2 9 0 ( Me n d e n h a l l D r i v e ) 1 SIGN clearance timing Relocate Market Street stopbars and adjust exex ex ex ex ex Plan of Record - - - - - - - - - - - - - - - - - - - - - - - - Pla1/27/10 PREPARED BY:DATE: DATE:REVIEWED BY: COMMENTS Plan of Record its original state. by field personnel. This plan may have been modified from This plan of record reflects existing field conditions as submitted DATE: SIGNATURE: K.G. Peedin, Jr June 2015 P.L. Alexander June 2015 Wilmington Signal System Fully Actuated 5 Phase 1. Refer to "Roadway Standard Drawings NCDOT" dated January 2012 and "Standard Specifications for Roads and Structures" dated January 2012. 2. Do not program signal for late night flashing operation unless otherwise directed by the Engineer. 3. Phase 1 and/or phase 5 may be lagged. 4. Set all detector units to presence mode. 5. Maximum times shown in timing chart are for free-run operation only. Coordinated signal system timing values supersede these values. 6. Signal system data: Controller Asset #: 1027. OASIS 2070 TIMING CHART 2 2 3.3 2.0 3.32.02.8 DATE NORTH CAR OLI N A ENGINEER PROFESSIO NAL P A MEL A L . ALEXAN DER 023489 SEAL REVISION SEAL 2 as to the revisions. This document is only certified on 10/09/2008 Robert J. Ziemba, PE-026486 issued and sealed by This document originally Only as to the Revisions - to the Original Document but Not a certified document as AA "U-TURN YIELD TO RIGHT TURN" Sign (R10-16) 3.8 + 1 % G r a d e 2 5 M P H F Y F Y F Y F Y Y Y Adjust clearance timing OASIS 2070 LOOP & DETECTOR INSTALLATION CHART ( D e s i g n S p e e d 3 5 MP H ) 0 % G r a d e 5 5 MP H 3.8 2.8 11 speed limits. ciled stop bar locations, added sign, revised Added to city system, revised loop delay, recon- 5A 8A1B 1A 4A 5B 6B 6A 2A 2B TN T T I N D E P A R T ME N OF TRASPORT A IO N STA E OFNORTH C AROL A noisi v i D ytefaS dna ytiliboM noit atrop sn a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared in the Offices of: A 9/17/2015 9/17/2015 9/17/2015 Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 6 Site Trip Distribution X% (Y%) XX% Entering Trip Distribution Exiting Trip Distribution Regional Trip Distribution N LEGEND SignalizedIntersection Unsignalized Intersection Site Right-In/Right-Out Intersection 13 60% 40% (5%) (7 0 % ) 5% (6 0 % ) (25%) (3 5 % ) 40 % 5% 55 % (6 0 % ) (2 5 % ) 40% (70%) (4 0 % ) Left-Over Intersection Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 7 Primary Site Trip Assignment N LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Traffic Right-In/Right-Out Intersection 14 Site 6/3 81 / 4 3 1/ 6 70 / 3 7 29/16 12 / 4 6 1/ 6 16 / 6 2 70 / 3 7 29 / 1 6 12/46 81/43 41 / 2 1 46 / 2 5 Left-Over Intersection DAVEN>ORT Transportation Impact Analysis ALDI Marsh Oaks Drive Site Wilmington, NC Prepared for ALDI, Inc. March 31, 2016 Analysis by: Monisha Badarinath SE.\L Mary Morgan, P.E. Drafting/Graphics by: Monisha Badarinath Reviewed by: Mary Morgan, P.E. Dan Cumbo, P.E. Sealed by: Mary Morgan, P.E. This report is printed on recycled paper with 30% post-consumer content. ~MAll paper is FSC Certified. The entire document, including binding, is 100% recyclable. ~ This document , together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Home Office: ."(J~ \\ ',"" !'" un h :'!t'lT'. :'Uilc 2.\ \\ i";,,," :'ak lll. -«: :r' I(J I vluin: .'>36.~· 1 · 1. 1 (, %; !','X: .".\(..·1:'0' ) "--;­ *** NOT TO SCALE *** PROJECT NUMBER 160210 ALDI -MARSH OAKS DRIVE SITE WILMINGTON, NC This document,together with the concepts and designs presented herein,is intended only for the specific purpose and client for which it was prepared. Reuse of,or improper reliance on,this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORTand the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND FIGURE 7A SITE TRIP DISTRIBUTIONS 32 / 28 41 / 360 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 32 / 2 8 0 / 0 0 / 0 0 / 0 0 / 0 SAT MIDDAY PEAK/ WEEKDAY PM 0 / 0Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Am b e r l e i g h Sh o r e s A c c e s s 18 / 16 0 / 0 73 / 6 3 18 / 1 6 0 / 0 0 / 0 Site Access 1 Si t e Ac c e s s 2 73 / 63 32 / 28 0 / 0 0 / 0 41 / 3 6 41 / 3 6 Site Access 3 91 / 79 0 / 0 0 / 0 0 / 0 0 / 0 18 / 1 6 *** NOT TO SCALE *** PROJECT NUMBER 160210 ALDI -MARSH OAKS DRIVE SITE WILMINGTON, NC This document,together with the concepts and designs presented herein,is intended only for the specific purpose and client for which it was prepared. Reuse of,or improper reliance on,this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORTand the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED BLUE = PROPOSED ROADWAY LEGEND FIGURE 7B SITE PASS-BY TRIPS 0 / 9 0 / 60 / -6 0 / -90 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 6 0 / 0 0 / 0 0 / 0 0 / 0 SAT MIDDAY PEAK/ WEEKDAY PM 0 / 0Mendenhall Drive US 1 7 B u s i n e s s (M a r k e t S t r e e t ) Marsh Oaks Drive Am b e r l e i g h Sh o r e s A c c e s s 0 / 2 0 / -2 0 / 1 7 0 / 0 0 / 0 0 / 0 Site Access 1 Si t e Ac c e s s 2 0 / 15 0 / 6 0 / 0 0 / -9 0 / 9 0 / 0 Site Access 3 0 / 17 0 / 0 0 / 0 0 / 0 0 / 0 0 / 2 BM14 1 5 " R C P - I V 1 5 " R C P - I V 15 " R C P - I V 15 " R C P - I V 2 4 " R C P - I V 18" RCP-III RCP-III15" 42" RCP-III 1 5 " R C P - I I I 2 4 " R C P - I I I 15 " R C P - I V 15 " R C P - I I I 1 5 " R C P - I I I R C P - I I I 1 8 " G eotextile Sl o p e F i l l RE T A I N 15" RCP-IV R C P - I V 1 5 " R E M O V E R E M O V E R E M O V E R E M O V E R E M O V E ES T . 1 2 S Y G F E S T . 4 T O N S C L A S S ' I ' R I P - R A P RE M O V E R E M O V E R E M O V E REMOVE REMOVE R E M O V E RE M O V E RE M O V E RE M O V E R E M O V E R E M O V E R E M O V E R E M O V E RE M O V E RE M O V E RE M O V E RE M O V E RE M O V E RE M O V E REMOVE REMOVEREMOVEREMOVEREMOVEREMOVE SE E D E T A I L C SP E C I A L L A T . ' V ' D I T C H EST. 200 SYGFEST. 90 TONSDDE = 340 CYS=6.4114%SEE DETAIL D VAR. WIDTH BASE DITCH RETAINRETAIN M B 9 P G 1 6 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 1 3 6 9 P G 5 6 4 LOST TREE LLCBROWN JOHNNY E B R O W N G E O R G E E D W A R D E T A L D B 1 2 0 0 P G 4 7 1 D B 7 8 8 P G 1 4 6 D B 5 3 1 3 P G 1 8 9 9 M B 3 1 1 P G 3 1 2 D B 6 8 1 P G 1 0 8 D B 1 2 0 0 P G 4 7 1 P R I D G E N D A R L E N E R M B 3 1 1 P G 3 1 2 D B 1 2 0 0 P G 4 7 1 D B 5 1 9 9 P G 1 6 5 B A Y S H O R E E S T A T E S I N C D B 6 8 1 P G 1 0 7 D B 3 2 6 5 P G 2 1 9 D B 2 8 3 0 P G 5 4 D B 1 2 0 5 P G 1 3 2 1 D B 1 4 0 3 P G 1 2 5 6 D B 1 6 4 9 P G 1 2 2 D B 3 2 6 5 P G 2 1 9 D B 2 8 3 0 P G 6 9 D B 1 2 1 0 P G 1 5 4 D B 1 2 1 4 P G 4 4 7 D B 1 6 4 9 P G 1 2 4 D O W N I N G A N N S DOWNING ANN S DB 841 PG 602DB 1210 PG 154DB 1646 PG 1384 DB 2889 PG 1354MINI STORAGE INCOCEAN HIGHWAY MB 21 PG 31DB 1326 PG 1144DB 1878 PG 308HOWELL ROBERT RHRSMOORE THERESA DB 1389 PG 1122DB 1397 PG 656DB 97GS PG 1442DB 862 PG 475 DB 1389 PG 1122DB 1397 PG 656DB 97GS PG 1442DB 1637 PG 1536DB 474 PG 621 C N S P R O P E R T I E S L L C D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 2 7 4 5 P G 8 7 9 D B 3 0 6 7 P G 2 6 D B 3 2 3 2 P G 5 2 5 D B 1 3 0 5 P G 1 2 8 9 D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 1 9 9 8 P G 2 2 5 D B 3 3 0 0 P G 9 1 9 P I E R P A N H E N R Y J M O N I C A M 7 6 4 3 M A R K E T S T R E E T L L C D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 5 6 1 7 P G 2 5 9 0 D B 5 7 4 5 P G 2 0 4 4 D B 5 7 9 9 P G 1 4 4 7 C H R I S T S S A N C T I F I E D H O L Y C H U R C H M B 3 1 P G 2 6 4 D B 1 5 6 9 P G 5 3 5 D B 1 6 4 9 P G 1 1 9 M B 5 0 P G 3 3 6 D B 5 1 6 6 P G 2 5 6 1 DB 5687 PG 2119DB 2889 PG 135420' ACCESS EASEMENT DB 2830 PG 69 30' SEWER EASEMENT DB 3067 PG 2610' WATER EASEMENT D B 3 3 0 0 P G 9 1 9 3 0 ' S E W E R E A S E M E N T MB 50 PG 33610' UTILITY EASEMENT (PRIVATE) M B 5 0 P G 3 3 6 2 6 ' S E W E R E A S E M E N T MB 50 PG 33626' SEWER EASEMENT DB 5799 PG 1447 10' ACCESS EASEMENT DB 5799 PG 144710' ACCESS EASEMENT E I P EI P B E N T E I P M B A R E A LA N D S C A P E EI P P I N C H E I P P I N C H GRAVEL GRAVEL E I P C URB ASPHALT FLUME S 6 " C O N C C U R B 6 "CO NC C URB CONC CONC ASPHALT EI P P I N C H 6 " C U R B 6 "C O NC CU RB CONC GRAVEL GRAVELGRAVELGRAVELCONC36"SRFS36"SRFEIPDIST CONC70"WPF6"CONC CURB CONC6"CURB6"CURB SS ASPHALT6"ASPHALT CURBSOIL8"ASPHALT CURBASPHALTSHOUSEPUMPS60"CHL60"CHL60'CHL60'CHLEIPPINCH CANBUS1SMTLBUS1SBLKBUS1SMTL B U S 1S M T L B U S 1S W D 1S F D B U S 1S W D MONNCGSMKRTELSGRAVELS 2 4 "BL KWA L L ASPHALT S S S E I P E I P S E I R B E N T EIREIR S OIL GRAVEL BUS1SBLK 3 6 " R C P 3 0 " RC P 15 " R C P 18 " R C P 30 " R C P 2 4 " R C P 24" RCP 15 " R C P 18" CMP 18 " RCP 18" RCP 18" RCP 8 " P VC 8" PVC 8" PVC 8 " P V C 60" CMP 36" RCP 18" RCP 12 " R C P 12 " R C P 12" RCP JB NOT FOUND.UNDER GROUND S EXISTING R/W EXISTING R/W 6 0. 0 0' 100.00'60.00' E X I S T I N G R / W EX I S T I N G R / W EXISTING R/W GRAVEL ASPHALT GRAVEL60' BST M A R K E T S T R E E T U S H W Y 1 7 ALEXANDER ROAD 19' BSTSR 1345 C B C B C B C B C B C B C B CBCBCB GR A V E L D I D I D I DI DI WOOD ASPHALT HEADWALL HEADWALL HEADWALL HE A D W A L L HEADWALLDB 1637 PG 153615' DRAINAGE EASEMENT 3 0 " R C P SOIL/GRAVELDB 1637 PG 153635' DRAINAGE EASEMENT 60" CMP18" RCP S S S S SSMB S 12" HDPE12" HDPE DI DI30" RCP BST VARIES GREENVIEW DRSR 2082 60 . 5 ' B S T M A R K E T S T R E E T U S H W Y 1 7 JR D O R O T H Y B A L K C U M J A M E S T R/WEXISTING P R O P E R T I E S I N C S H E L L I N G T O N B A R B A R A A N N J O R D A N 60" CM P 24" RCP HOWELL ROBERT R I IIIIH lcb bIIII b HHIHHl bbHH|b|b b | E O R I C EORI T T 16 SEE SHEET 15 MATCH LINE -L- 244+00.00 SEE SHEET 17 MATCH LINE -L- 258+00.00 1 . A L L D R I V E W A Y R A D I I A R E 2 0 ' U N L E S S N O T E D O N P L A N S . N O T E : R E M O V E D P E R D A V I D L E O N A R D E M A I L 3 0 . 0 0 ' R T + 2 5 . 0 0 - Y 3 1 - 6 2 . 0 0 ' L T + 2 0 . 0 0 - L - 1 5 5 C J R E T A L B R I N K L E Y L L O Y D SEE SHEET 2B-4FOR INTERSECTION DETAIL OF -Y32-, FOR -Y32- PROFILE, SEE SHEET 33FOR -Y31- PROFILE, SEE SHEET 33FOR -L- PROFILE, SEE SHEET 27 7 5 . 0 0 ' L T + 2 1 . 6 3 - L - CAT-1 F F F F F F F FFFFCCFCFFFF F F F F F F FF F F F F F F F F C - B L - 1 3 -BL- 14 - B L - ? 6 2 . 0 0 ' R T 7 2 . 0 0 ' R T 8 0 . 0 0 ' R T + 8 3 . 0 0 - L - 7 5 . 0 0 ' R T + 9 3 . 8 6 - L - 1 0 6 . 0 0 ' R T + 4 6 . 0 0 - L - 1 0 6 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T + 3 9 . 0 9 - L - 6 2 . 0 0 ' R T 7 2 . 0 0 ' R T 8 0 . 0 0 ' R T + 0 3 . 0 0 - L - 72.00' RT+72.32 -L-283.00' RT+88.00 -L-62.00' RT+73.00 -L-281.00' RT+58.00 -L-72.00' RT+02.32 -L-62.00' RT+03.00 -L-62.00' RT+33.00 -L-75.00' RT+42.00 -L-62.00' RT+82.00 -L-75.00' RT+91.00 -L- 3 0 . 0 0 ' L T + 2 5 . 0 0 - Y 3 1 - 6 2 . 0 0 ' L T + 1 6 . 0 0 - L - 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 0 0 . 0 0 - L - 81.00' LT+34.00 -L-62.00' LT+70.00 -L-76.00' LT96.00' LT+09.00 -L-62.00' LT76.00' LT+27.00 -L-62.00' LT135.00' LT+40.00 -L-62.00' LT135.00' LT+10.00 -L- 1 5 7 1 5 8 1 5 9 1 6 3 1 6 4 166167170172169 1 6 0 1 6 1 1 6 2 1 6 5 1 6 8 171171 30.00' LT+50.00 -Y32-30.00' RT+50.00 -Y32- 62 . 0 0 ' L T 75 . 0 0 ' L T 8 1 . 0 0 ' L T + 8 9 . 0 0 - L - 81.00' LT96.00' LT+87.00 -L- 6 2 . 0 0 ' R T + 7 2 . 0 0 - L - B E G I N C / A 6 2 . 0 0 ' R T + 8 0 . 0 0 - L - E N D C / A 3 0 . 0 0 ' L T + 2 5 . 0 0 - Y 3 1 - 43.71' RT+39.00 -Y32-72.00' RT+39.92 -L- 8 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T + 5 5 . 0 0 - L - 6 2 . 0 0 ' L T + 0 0 . 0 0 - L - 45.00' RT+09.00 -Y32-81.00' LT+63.38 -L- REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:48 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_16.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED G T D G T D G TD G TD 1 5 " R C P - I V 1 6 0 5 1 6 0 6 15 " R C P - I V C B - F 15" RC P-IV 1 5 " R C P- I V 1 6 0 9 1 6 1 5 1 6 1 8 1 6 1 7 1 6 1 9 1 6 2 0 REM O VE 1 6 2 1 1 6 2 2 1 5 " R C P - I V REMO VE 1 6 2 5 1 6 2 6 1 5 " R C P - I V 24 " R C P - I V 24 " R C P - I V 1 6 2 7 1631RCP-IV15"1632 1633163515" RCP-IV15" RCP-IV1637 REMOVE 1 6 0 3 1 6 0 4 C B - G REMO VE 1 6 0 8 C B - G 1 6 0 7 D I 1 6 1 1 C B - G 1 6 1 0 D I 1 6 1 2 C B - G 16 1 3 D I REM O VE 16 1 4 C B - G REM O VE 1 6 2 3 1 6 2 4 C B - G D I 1 6 2 8 C B - G REMOVE42" RCP-IVCB-G 1634CB-G1636 42" RCP-IV 164016301629DI1638CB-G1639CB-EREMOVE C B - E C B - E 1 6 4 1 1 6 4 2 18" RCP-III36" RCP-III 36 " RC P-III 3 6 " RCP- III 3 6 " R C P - I I I 3 0 " R C P - I I I 3 0 " R C P - I I I 3 0 " R C P - I I I 15 " R C P - I V 2:12:1D( Not to Scale)STANDARD BASE DITCH Bd FRO M - L- STA. 256+58 TO -L- STA. 256+96DETAIL D G ro und N atural GroundNatural Typ e o f Lin er= Class 'I' Rip-Rap GTD ( N o t t o S c a l e ) SP E C I A L L A T E R A L ' V ' D I T C H 3:1 D F R O M - Y 3 1 - S T A . 1 1 + 3 0 T O S T A . 1 1 + 9 5 L T . M i n . D = 1 . 0 F t . D E T A I L C G r o u n d N a t u r a l Flatter 4:1 or C B - F C B - F 3 0 " RC P - I I I C B - F C B - F D I D I D I C B - F C B - F D I C B - F CB-FGTDDIDI CB-FCB-FCB-FCB-ERETAINRCP-IV15" B= VAR. Ft.Max. d= 5.0 Ft.Min. D= 2.0 Ft.1643 DI-SD 1 @ 96" RCP-III1 @ 96" RCP-IIIDI15" RCP-III E XI S T. 0 2 + 3 5. 5 0 INC21' 0 2 0 2 0 1 0 0 0 20 1 + 0 3. 4 9 025 CR CR CR CR C R CR CR 025 CR 24'24' 24' +97.80 5 0 ' R 1 5' 1 5' 50' R +29.98 50' +16.00 4 5 ' 24' 3.5' 3 5 ' R 3.5' 8.75' 8.75' +56.00 1 5 0 ' M E D I A N B A Y T A P E R 24'+51.00 41.5'30.17' 3 0 . 0 ' R 6 2 . 7 5 ' L T + 1 5 . 7 7 - L - 30' M O U N TED ) (SURFAC E C O N C . ISLAN D M O N O LITH IC PRO P. 5 " PR O P . 1 0 ' M U L T I - U S E P A T H PR O P . 5 ' S I D E W A L K 29.50' 1 0 . 0 ' R 5 2 . 9 2 ' R T + 0 9 . 2 2 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 1 0 . 0 3 - L - C O N C . C U R B P R O P . 8 " X 1 8 " PA T H M U L T I - U S E P R O P . 1 0 ' PA T H M U L T I - U S E P R O P . 1 0 ' P R O P . 5 ' S I D E W A L K 5 0 . 0 ' R 2 3 . 5 0 ' R T + 7 6 . 0 0 - L - 1 5 . 0 ' R 4 7 . 7 5 ' R T + 1 6 . 8 7 - L - + 7 7. 9 0 - Y3 1 - 7 5 . 0 ' R 1 1 3 . 2 5 ' R T + 8 3 . 9 5 - L - 2 . 0 ' R 8 . 7 5 ' L T + 6 6 . 0 0 - L - 17.5' 2 . 0 ' R 7 . 0 ' R T + 7 6 . 0 0 - L - 24' 17.5'24' 3 0 . 0 ' R 7 4 . 7 5 ' L T + 9 5 . 9 3 - L - M O U N T E D ) (S U R F A C E C O N C . I S L A N D M O N O L I T H I C P R O P . 5 " 2 . 0 ' R 7 . 0 ' L T + 2 5 . 0 0 - L - 245 250 255-Y32- POT Sta. 10+00.00 -Y31- - Y 3 1 - P O T S T A 1 2 + 5 0 . 0 9 - L - P O T S T A 2 4 4 + 7 9 . 1 0 = - Y 3 2 - P O T S T A 1 3 + 0 2 . 1 0 - L - P O T S T A 2 5 4 + 2 5 . 7 0 = 1 0 - Y 3 1- P O T S t a . 10 + 0 0 . 0 0 - Y 3 1 - P O T S T A 1 1 + 2 5 . 0 0 B E G I N C O N S T R U C T I O N -Y32- POT STA 11+50.00BEGIN CONSTRUCTION - L - -Y32- 106' 62' 62' 62'62'NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C. T TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT 15" RCP-IV15" RCP-IV15" RCP-IV15" RCP-IV 15" RCP-III 15" RCP-IV15" RCP-IV 15 " R C P - I I I RETAINRETAIN FOR 2:1 SLOPESROCK PLATING R E M O V E R E M O V E R E M O V E RE M O V E RE M O V E RE M O V E RE M O V E REMOVEREMOVEREMOVEREMOVEREMOVE REMOVEREMOVEREMOVEREMOVE SEE DETAIL E (DO W N STREAM ) IM PRO VEMEN TS C U LVERT C H AN N EL E S T . 2 0 0 S Y G F E S T . 9 0 T O N S D D E = 3 4 0 C Y S = 6 . 4 1 1 4 % S E E D E T A I L D VA R . W I D T H B A S E D I T C H MB 57 PG 207 & 208MB 39 PG 178MB 37 PG 101DB 2304 PG 351DB 2519 PG 813DB 5075 PG 464DB 5524 PG 734DB 5691 PG 1629 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 1 6 3 7 P G 1 5 3 6 D B 4 7 4 P G 6 2 1 W I L S O N S H I R L E Y C A P E F E A R M A R I N E G R O U P L L C D B 2 4 7 2 P G 3 2 3 D B 4 8 8 8 P G 9 1 O G D E N 1 2 P R O P E R T I E S L L C D B 2 4 9 1 P G 8 2 8 D B 2 4 9 1 P G 8 3 1 D B 5 3 9 6 P G 1 6 2 1 D B 5 2 8 0 P G 1 0 7 6 D B 2 4 9 1 P G 8 3 4 D B 5 3 9 6 P G 1 6 2 1 D B 5 2 8 0 P G 1 0 7 6 L E E E S T H E R F LEE ESTHER FDB 1173 PG 1613DB 1389 PG 1122DB 1397 PG 656DB 1630 PG 1534POTTER WALTER LARRY VIRGINIA SDB 875 PG 194DB 1389 PG 1122DB 1397 PG 656DB 97GS PG 1442DB 2745 PG 886DB 5195 PG 1317 M B 2 5 P G 1 7 4 D B 1 3 2 2 P G 3 9 8 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 4 3 3 5 P G 3 3 1 D B 5 1 3 5 P G 1 2 2 4 P O R T E R S N E C K B U S I N E S S P K C O A I N C K R U E G E R J E A N A F A M I L Y T R U S T M B 2 5 P G 1 7 4 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 8 8 5 P G 1 6 M B 2 5 P G 1 7 4 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 4 5 4 P G 9 1 5 D B 2 7 0 6 P G 5 7 5 P O N D S E D G E O F F I C E H O A I N C D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 4 6 7 4 P G 5 4 8 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 1 2 9 1 P G 1 9 0 8 H R S M O O R E T H E R E S A D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 8 6 2 P G 4 7 5 M B 4 7 P G 4 2 D B 4 6 3 8 P G 3 0 5 D B 3 9 5 2 P G 3 3 3 M B 4 7 P G 4 2 D B 4 6 3 8 P G 3 0 9 D B 4 6 9 6 P G 1 6 0 D B 5 0 6 5 P G 2 2 0 4 D B 5 2 8 9 P G 1 7 8 5 D B 3 9 5 2 P G 3 3 3 D B 4 5 7 2 P G 2 6 9 M B 5 4 P G 7 9 D B 1 3 2 0 P G 4 2 D B 5 2 8 2 P G 2 6 7 8 MB 54 PG 79DB 5410 PG 2110DB 5799 PG 2954 M B 4 7 P G 4 2 10 ' U T I L I T Y E A S E M E N T M B 5 4 P G 7 9 30 ' S E W E R & U T I L I T Y E A S E M E N T MB 54 PG 7910' UTILITY EASEMENT MB 57 PG 20715' ACCESS EASEMENT (PRIVATE)DB 2745 PG 886SEWER EASEMENT30' WATER & 60'CHL EI P P I N C H ASPHALT 8 "C O NC C UR B S FL A G CONC ASPHALT E I P E I P E I P S 24"C&G 24"C&G EI R E I P O L D GUY BOXALPHAMKRFO SOILGRAVELROPEFENCESCONCROPEFENCECONCASPHALTEIRGATESGRAVELRIPRAPS V A U L T E I P P I N C H EI R S P I E R BR K P I E R B R K E I P 6"C UR B 6"CURB 6 " C U R B SOIL E I R WDSHED GRAVELSOIL15" RCP 15" RCP 15 " R CP 15" RCP 18" RCP15" HDPE 3 0 " R C P 18" RCP 15" RCP 18" RCP24" RCP15" RCP24" RCPSSS 100.00' 60.00'100.00'EXISTING R/WEXISTING R/W E X I S T I N G R / W E X I S T I N G R / W A S P H A L T GRASS ISL 84" SWALEXANDER ROAD 20' BSTSR 1345 C B C B CB C B CBCBCBMARKET STREET BST VARIESUS HWY 17 D I DISSSSSS 60" CM P C U R B 8 "C ON C II I E T A L G E O R G E E S A U N D E R S P R O P E R T Y L L C T H R E E O A K CATHLEEN ETALPADGETT G O R D O N E T A L E V E R E T T II I E T A L G E O R G E E S A U N D E R S H O W E L L R O B E R T R D B 5 6 8 7 P G 2 1 1 9 | | |b IIIH II I b aIlI|b | lHcaI l H bb b 12" D.I. LINE IN 24" STL. CASING12 ", D.I., CFPU IPIV V A L V E F S S VALVEFSS VALVEFSSC EOI EOI HH T T17SEE SHEET 18 MATCH LINE -L- STA 272+00.00 SEE SHEET 16 MATCH LINE -L- STA 258+00.00 1 . A L L D R I V E W A Y R A D I I A R E 2 0 ' U N L E S S N O T E D O N P L A N S . N O T E : R E M O V E D P E R D A V I D L E O N A R D E M A I L D A T E D 7 / 1 7 / 1 5 AMBERLEIGH SHORES LLC FOR INTERSECTION DETAIL FOR -Y33-, SEE SHEET 2B-4FOR -Y33- PROFILE, SEE SHEET 33FOR -L- PROFILE, SEE SHEET 28 1 7 1 B R O W N J O H N N Y E ST E E L B E A M G U A R D R A I L GROUNDORIGINAL 2 ' 1' C L E A R A N C E M I N . 18 " C L A S S I V S E L E C T M A T E R I A L ( A B C ) 10' MAX. 3' M I N . NECESSARY M IN. IF 5' O VERLAP (S E E N O T E 3 ) 2 ' T H I C K R I P R A P RO C K P L A N T I N G GE O T E X T I L E F O R OVERLAP DETAILSEE GEOTEXTILE (TOE OF SLOPE)CONSTRUCTION LIMITSLOPE STAKE POINT ANDFLATTER FILL SLOPE1.5:1(H:V) ORBREAK POINT (TOP SLOPE)SHOULDER OR BERM R O C K P L A T I N G D E T A I L - T Y P I C A L S E C T I O N FI N I S H E D G R A D E D E T A I L S SE E R O A D W A Y T Y P I C A L S F O R - L - S T A . 2 7 1 + 0 0 T O S T A . 2 7 8 + 5 0 R T 21 0 . 0 0 ' R T + 3 7 . 0 0 - L - G R A U - 3 5 0 GRAU 350 F F F F F F F F F FFFF F F F F F F F FF F - B L - 1 5 16-BL- 6 7 . 0 0 ' R T + 0 0 . 0 0 - L - 78.00' RT+62.00 -L-85.00' RT+00.00 -L- 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 4 0 . 0 0 - L - 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 0 0 . 0 0 - L - 6 2 . 0 0 ' L T 7 5 . 0 0 ' L T + 3 3 . 0 0 - L - 26.37' RT+65.00 -Y33-33.63' LT+65.00 -Y33-62.00' LT+56.00 -L- 1 7 3 1 7 4 1 7 5 1 7 7 1 8 2 1 8 3 187 1 7 6 1 7 9 1 8 0 1 8 4 185189 1 7 2 1 8 1 7 5 . 0 0 ' R T 9 5 . 0 0 ' R T + 7 9 . 0 0 - L - 7 5 . 0 0 ' R T 9 5 . 0 0 ' R T + 4 4 . 0 0 - L - 10 ' AT&T EASEM EN T 8 5 . 0 0 ' L T + 0 8 . 0 0 - L - 62.00' LT+55.00 -L- 6 7 . 0 0 ' R T + 9 5 . 0 0 - L - 1 0 5 . 0 0 ' R T + 8 9 . 0 0 - L - 78.00' RT+94.00 -L-78.00' RT+94.00 -L- 7 5 . 0 0 ' R T + 9 2 . 0 0 - L - 1 0 5 . 0 0 ' R T + 0 2 . 0 0 - L - 1 7 8 186 2 4 8 . 0 0 ' R T + 0 0 . 0 0 - L - 2 3 0 . 0 0 ' R T + 0 0 . 0 0 - L - 2 5 4 . 0 0 ' R T + 3 7 . 0 0 - L - 6 2 . 0 0 ' R T 8 8 . 0 0 ' R T 11 3 . 0 0 ' R T + 7 1 . 0 0 - L - 62.00' RT89.00' RT113.00' RT+36.00 -L-26.65' RT+15.00 -Y33-62.00' LT+10.00 -L-75.00' LT+21.14 -L-HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:49 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_17.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED G TD G T D GTDGTD 1 7 0 2 15 " RC P- IV 1 7 0 3 1 7 0 8 1 7 0 1 C B - F 1 7 0 4 1 7 0 5 C B - F D I 1 7 0 6 1 7 0 7 C B - G D I 1 7 0 9 C B - G 15 " RC P- IV 15 " RC P- IV REM O VE 1 7 1 0 C B - E 15 " RC P- IV RCP-IV 15" 1 7 1 3 1 7 1 4 CB-G D I 15 " RC P- IV 1716 15" RCP-IV17191720CB-G CB-G172117221723DICB-GCB-F 24" RCP-IVCB-G1728 24" RCP-IV17301731CB-GDI 24" RCP-IV C B - E 1 7 1 5 REMOVEREMOVE1732 CB-F 1729CB-F 1724CB-FDIDIDI172717261725RCP-IV15" 1718171715" RCP-IV CB-FCB-F 15 " R C P - I V 15" RCP-IV C B - G 15 " R C P - I V 1 7 1 1 1 7 1 2 RCP-III 15" 15 " RC P- III 15 " RC P- III 15 " RC P- III 15 " RCP- III d ( N o t t o S c a l e ) D E T A I L E (V a r i a b l e ) Ch a n n e l B e d N a t u r a l G r o u n d VA R. 1 . 5 ' M i n . D V A R. N a t u r a l G r o u n d C l a s s I R i p r a p M a x . d = 7 . 0 F t . ( T o T o p o f B a n k ) D = V a r i e s (D O W N S T R E A M ) CU L V E R T C H A N N E L I M P R O V E M E N T S ES T . 4 5 S Y G E O T E X T I L E F A B R I C ES T . 2 5 T O N S C L A S S I R I P R A P ES T . 5 C Y E X C A V A T I O N C B - G C B - G C B - G C B - F PLUG PL U G C B - E PLUG PLUG RCP-IV24"RETAINRETAIN 1 @ 96" RCP-III 1 @ 96" RCP-III 24" RCP-IV 025 025 CR CR CR CR CR CR CR CR CR CR 24' 36'24' 24'24' 2 0 . 0 ' R 6 7 . 0 0 ' R T + 1 3 . 8 5 - L - 2 0 0 ' B A Y T A P E R R T 36' +72.08 50' R C U R B EX I S T I N G TI E T O 5 0 ' R C U R B EX I S T I N G T I E T O +19.08 10 0 ' B A Y T A P E R R T 36' 17.5'24'32.75' 2 5 . 0 ' R 5 7 . 7 5 ' L T + 0 1 . 2 6 - L - +20.00 +86.00 P R O P . 5 ' S I D E W A L K P R O P . 1 0 ' M U L T I - U S E P A T H 5 . 0 ' R 5 7 . 9 2 ' R T + 6 8 . 9 3 - L - 5 . 0 ' R 5 7 . 9 2 ' R T + 3 2 . 9 3 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 7 9 . 8 5 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 7 3 . 7 2 - L - 1 0 . 0 ' R 5 2 . 9 2 ' R T + 1 3 . 7 2 - L - C U R B EX I S T I N G T I E T O P R O P . 1 0 ' M U L T I - U S E P A T H PA T H M U L T I - U S E P R O P . 1 0 ' P R O P . 1 0 ' M U L T I - U S E P A T H PROP. 10' MULTI-USE PATH +13.00 41.5' 24'+35.00 20 0 ' M E D I A N B A Y T A P E R 5 . 5 ' R 6 1 . 5 ' R T + 3 9 . 5 8 - L - +20.73 W I D T H 1 1 . 5 ' M E D . M O U N T E D ) (S U R F A C E C O N C . I S L A N D M O N O L I T H I C P R O P . 5 " C O N C . C U R B P R O P . 8 " X 1 8 " C O N C . C U R B P R O P . 8 " X 1 8 " 17.5' 2 5 . 0 ' R 5 7 . 7 5 ' L T + 1 9 . 8 7 - L - 17.5' 17.5' 24'32.75' 24' 20' -Y33- 260 265 27010-Y33- POT Sta. 10+00.00 -Y33- POT STA 12+50.70-L- POT STA 269+08.94 =-L- - L - -Y33- POT STA 11+65.00BEGIN CONSTRUCTION 62'62' 62'62'NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C. 5 4 " R C P - I I I 5 4 " R C P - I I I F O R 2 : 1 S L O P E S R O C K P L A T I N G F O R 2 : 1 S L O P E S R O C K P L A T I N G RE M O V E RE M O V E RE M O V E R E M O V E R E M O V E R E M O V E REMOVE R E M O V E REMOVE REMOVEREMOVE REMOVE REMOVEREMOVEREMOVEREMOVEREMOVE RE M O V E REMOVE RE M O V E RE M O V E RE M O V E R E M O V E R E M O V E E S T . 6 2 S Y G F E S T . 3 3 T O N S C L A S S ' I ' R I P - R A P D B 1 1 7 3 P G 1 6 1 3 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 1 6 3 0 P G 1 5 3 4 A M B E R L E I G H S H O R E S L L C D B 1 3 0 8 P G 1 2 6 0 D B 5 5 8 0 P G 1 6 4 4 BARBARA WFURR JAMES S DB 1223 PG 198DB 3013 PG 435DASJA INCORPORATED DB 1393 PG 1096DB 1915 PG 690DB 5399 PG 2823BAYSHORE ESTATES INCEAST CAROLINA BANKLIBERTY BAPTIST CHURCH OF WILM INC MB 16 PG 32DB 97GS PG 1442DB 1389 PG 1122DB 5690 PG 2878DB 5777 PG 2392 Y O S E F I N C M B 1 6 P G 3 2 M B 1 6 P G 3 1 D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 5 7 7 7 P G 2 3 9 2 D B 5 7 7 7 P G 2 3 9 6 M B 1 6 P G 3 1 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 1 0 5 0 P G 3 2 0 D B 1 7 6 2 P G 1 2 5 1 C A P E F E A R P U B L I C U T I L I T Y A U T H O R I T Y M B 1 6 P G 3 1 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 5 7 9 0 P G 9 6 1 G R A T H W O L P R O P E R T Y H O L D I N G S L L C E T A L M B 1 6 P G 3 1 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 5 4 7 0 P G 1 6 6 8 G E O R G E R O N A L D E M B 1 6 P G 3 1 D B 9 7 G S P G 1 4 4 2 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 5 1 7 5 P G 1 8 1 2 D B 5 1 7 5 P G 1 8 0 3 S H I N B O O M I N MB 50 PG 225DB 5109 PG 2229DB 5361 PG 2881DB 5452 PG 1468DB 5492 PG 772 M B 5 7 P G 2 0 7 & 2 0 8 M B 3 9 P G 1 7 8 M B 3 7 P G 1 0 1 D B 2 3 0 4 P G 3 5 1 D B 2 5 1 9 P G 8 1 3 D B 5 0 7 5 P G 4 6 4 D B 5 5 2 4 P G 7 3 4 D B 5 6 9 1 P G 1 6 2 9 M B 5 7 P G 2 0 7 10 ' U T I L I T Y E A S E M E N T M B 5 7 P G 2 0 7 10 ' U T I L I T Y E A S E M E N T M B 5 7 P G 2 0 7 EA S E M E N T 30 ' N C D O T D R A I N A G E MB 57 PG 20730' ACCESS EASEMENTMB 57 PG 207 & 208DB 681 PG 109DB 5691 PG 1638 MB 57 PG 20820' UTILITY EASEMENTMB 50 PG 22530' SEWER EASEMENTMB 50 PG 22510' AT&T EASEMENT DB 5690 PG 287835' PUBLIC UTILITY EASEMENT EI R S 1 . 5 S F B U S CONCS CANNAILMAGASPHALT2SFBUSRRTIESSHOUSEPUMPEIRFLAGSASPHALTWDWDEIPEIPEIREIPS E I P E I P E I P 24"BRKWALL 24"BRKWALLEIRCAPEIPDISTEIR6"CONC CURB36"BLKW ALL 8" PVC 2 4 " R C P 15" RCP 24" RCP24" RCP24" RCP24" RCP 12" RCP12" RCP 2 4 " R C P 36" RCP 3 0 " R C P 15" RCP 30" RCP 36 " RCP 30" RCP 3 0 " R C P S 12" RCP 12 " R C P S S S 100.00'EXISTING R/W E X I S T I N G R / W E X I S T I N G R / W 8 4" S W C O N C I S L GRASS ISLASPHALT 8 4 " S W ASPHALT M A R K E T S T R E E T 6 0 ' B S T U S H W Y 1 7 72' BSTMARKET STREETUS HWY 17 MARSH OAKS DRIVE 24.5' BSTSR 2734 C B C B C B C B C B C B CBCBCBCBDIDIDIMENDENHALL LANE BST VARIES S S S S S S SS S S P R O P E R T I E S L L C W Q G O O D M A N ISL CONC 24" RCP HHdIHc l | | HH IH ARV EOI VALVEFSS V A L V E F S S T 18 SEE SHEET 17 MATCH LINE -L- STA 272+00.00 SEE SHEET 19 MATCH LINE -L- STA 286+00.00 FOR -L- PROFILE, SEE SHEET 28 1 . A L L D R I V E W A Y R A D I I A R E 2 0 ' U N L E S S N O T E D O N P L A N S . N O T E : BM 1 7 1 8 7 V I R G I N I A S P O T T E R W A L T E R L A R R Y ( - L - S T A . 2 7 9 + 0 0 . 0 0 I S L A N D ) D E T A I L 1 8 - A 1 4' 18' 2 . 0 ' R 6 0 . 4 1 ' R T + 0 3 . 5 8 2 . 0 ' R 4 8 . 2 5 ' R T + 9 6 . 5 0 2 . 0 ' R 4 0 . 7 5 ' R T + 8 9 . 2 5 2 . 0 ' R 4 0 . 7 5 ' R T + 1 6 . 2 9 2 . 0 ' R 4 8 . 2 5 ' R T + 0 9 . 9 8 2 . 0 ' R 5 7 . 2 5 ' R T + 0 2 . 1 6 2 . 0 ' R 5 7 . 2 5 ' R T + 0 4 . 8 8 IS L A N D ( S U R F A C E M O U N T ) P R O P . 5 " M O N O L I T H I C C O N C . STEEL BEAM GUARDRAIL GROUNDORIGINAL2'1' CLEARANCE MIN.18" CLASS IV SELECT MATERIAL(ABC)10' MAX.3' MIN.NECESSARYMIN. IF5' OVERLAP (SEE NOTE 3)2' THICK RIP RAPROCK PLANTINGGEOTEXTILE FOROVERLAP DETAILSEE GEOTEXTILE (TOE OF SLOPE)CONSTRUCTION LIMITSLOPE STAKE POINT ANDFLATTER FILL SLOPE1.5:1(H:V) ORBREAK POINT (TOP SLOPE)SHOULDER OR BERM ROCK PLATING DETAIL- TYPICAL SECTION F I N I S H E D G R A D E D E T A I L S S E E R O A D W A Y T Y P I C A L S F O R -L- STA. 271+00 TO STA. 278+50 RT A T - 1 F F F FFFCF FF FFF F 1 7 - B L - 8 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 5 . 0 0 ' R T + 0 0 . 0 0 - L - 6 2 . 0 0 ' R T 7 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T 8 5 . 0 0 ' R T + 0 0 . 0 0 - L - 7 2 . 0 0 ' R T 8 5 . 0 0 ' R T 10 1 . 0 0 ' R T + 0 8 . 0 0 - L - 7 2 . 0 0 ' R T 8 5 . 0 0 ' R T 1 0 1 . 0 0 ' R T + 3 3 . 0 0 - L - 8 5 . 0 0 ' R T + 4 7 . 0 0 - L - 1 0 5 . 0 0 ' R T + 9 0 . 0 0 - L - 1 0 5 . 0 0 ' R T + 3 7 . 0 0 - L - 8 5 . 0 0 ' R T + 5 7 . 0 0 - L - 72.00' RT85.00' RT+00.00 -L-72.00' RT+75.00 -L- 7 2 . 0 0 ' L T + 0 0 . 0 0 - L - 7 2 . 0 0 ' L T + 5 0 . 0 0 - L - 6 2 . 0 0 ' L T + 0 5 . 0 0 - L - 62.00' LT75.00' LT+70.00 -L-62.00' LT75.00' LT+50.00 -L-62.00' LT84.00' LT+67.00 -L-88.00' LT+93.00 -L- 1 8 8 1 9 0 1 8 9 1 9 1 1 9 2 1 9 3 197 198 196194195 6 2 . 0 0 ' L T + 3 5 . 0 0 - L - 50.52' RT+18.98 -Y35- REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:49 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_18.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 2 4 " RC P- IV 2 4 " RC P- IV 1 8 0 1 C B - E 2 4 " RC P- IV C B - F 1 8 0 3 2 4 " RC P- III 1 8 0 5 C B - G 2 4 " RC P- III 1 8 0 7 C B - E 1 8 0 9 C B - F 1 8 1 9 REMOVE 3 0 " RC P- III 1 8 1 0 C B - G RE M O V E R E M O V E 1 8 1 1 15 " RC P- III C B - F 15" RCP-IV1814 1816CB-FCB-F RCP-IV 15" 1815DI REMOVEREMOVE REMOVE1818CB-G15" RCP-IV 1813CB-G15" RCP-IV1817CB-GRCP-IV 15" C B - G 1 8 1 2 18 " RC P- IV 18 " R C P - I I I RE M O V E 1 8 0 8 C B - E 1 8 0 6 C B - F 2 4 " RC P- III 24 " RC P-III 2 4 " R C P - I V 1 8 0 4 C B - G 1 8 0 2 C B - E C B - F 2 4 " R C P - I V 2 4 " R C P - I V PL U G PL U G 5 4 " R C P - I I I RE T A I N HW 025 025 025025 CR CR CRCR 10 0 ' B A Y T A P E R R T +07.0024' 36' 2.0' R6.0' LT+86.00 C U R B EX I S T I N G T I E T O C U R B EX I S T I N G TI E T O 2 0 0 ' M E D I A N B A Y T A P E R +86.00 24' 5.5'24' 3 5 ' R 24'8.75'44.75'5.5'30'500' FULL STORAGE LANE 35' R35' R 15 0 ' F U L L L A N E S T O R A G E PROP. 10' MULTI-USE PATHPROP. 5' SIDEWALK +86.03 24' 3 5 ' R M U L T I - U S E P A T H P R O P . 1 0 ' PA T H M U L T I - U S E P R O P . 1 0 ' SI D E W A L K P R O P . 5 ' +10.00 W I D T H 1 1 . 5 ' M E D . M O U N T E D ) (S U R F A C E C O N C . I S L A N D M O N O L I T H I C P R O P . 5 " 17.5'24'24' 48'48' 1 8 - A SE E D E T A I L 275 280 285 - L - 62' 72'62' 62' NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C. T TT T T T T T T T T T T T T T T T T T T T TT TT T T T T T T T T T T T T T T T T T T T T T BMU49029 M B 5 7 P G 2 0 7 & 2 0 8 D B 6 8 1 P G 1 0 9 D B 5 6 9 1 P G 1 6 3 8 O C E A N S 1 0 L L C C L A R K J U D I T H J B A Y S H O R E E S T A T E S I N C M B 7 P G 6 9 D B 1 6 4 9 P G 1 2 8 D B 2 1 2 8 P G 3 1 3 D B 2 3 0 4 P G 3 5 1 D B 2 5 1 9 P G 8 1 3 D B 3 3 6 0 P G 2 7 D B 5 0 7 5 P G 4 6 4 D B 5 5 2 4 P G 7 3 4 D B 6 8 1 P G 1 0 9 D B 5 7 7 6 P G 1 7 6 1 D B 5 2 3 6 P G 7 6 3 B L U E G E M I N C M B 1 6 P G 3 2 M B 4 0 P G 4 9 M B 2 6 P G 1 0 3 D B 1 2 4 4 P G 1 6 5 6 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 7 4 9 P G 1 0 3 D B 2 8 5 5 P G 8 9 D B 5 7 1 7 P G 1 6 1 3 D B 5 7 9 5 P G 1 6 8 9 M B 4 4 P G 1 2 1 M B 3 9 P G 2 0 0 D B 1 3 8 9 P G 1 1 2 2 D B 1 3 9 7 P G 6 5 6 D B 9 7 G S P G 1 4 4 2 D B 2 7 5 6 P G 6 9 2 D B 2 7 7 8 P G 8 6 8 D B 3 1 1 7 P G 9 6 8 D B 4 0 6 8 P G 3 3 D B 5 3 5 2 P G 1 7 7 D B 5 3 6 1 P G 2 8 8 1 MB 57 PG 208 20' UTILITY EASEMENT MB 44 PG 121UTILITY EASEMENT42' ACCESS & MB 4 4 P G 12 1 2 0' L A N D S C A P E B U F F E R M B 4 4 P G 1 2 1 30 ' S E W E R E A S E M E N T E I R C A P S S S 2 4 " B R K W A L L 6 "C O NC CURB A S P H A L T S ASPHALT 6" C O N C C U R B M B ASPHALT ASPH ALT 6" C O N C C U R B SOIL S 2 4 " C & G S E I P 2 4 " C & G S IC V S S E I R E I P P I N C H E I R E I P D I S T B O X T R A F E I P CONC 12 " R C P 15" RCP 8 " P V C 5 0. 0 0' EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W E X I S T I N G R / W EX I S T I N G R / W ASPHALT ASPHALT A S P H A L T 6 0 ' B S T M A R K E T S T R E E T U S H W Y 1 7 MARSH OAKS DRIVE 24.5' BST SR 2734 MARSH OAKS DRIVE 24.5' BSTSR 2734 MENDENHALL LANE BST VARIES D I D I S S S S S S S S S S S D E V E L O P M E N T L L C L I V E O A K p HH HH HH b I b a I a | l a c | IH I Q c V A L V E F S S PI P I N G F O U N D N O A S S O C I A T E D WM HH H H HH HH T 19 SEE SHEET 18 MATCH LINE -L- STA 286+00.00 3 7 1 7 7 3 7 6 2 3 2 0 3 6 2 0 1 6 3 8 8 2 9 3 8 2 3 7 2 9 4 0 2 1 2 5 2 5 2 9 1 9 3 7 - L - 6 0 9 2 4 2 4 0 1 8 5 9 6 7 4 6 1 8 2 4 8 M A R S H O A K S D R I V E - S R 2 7 3 4 ( - Y 3 5 - ) M E N D E N H A L L D R I V E ( - Y 3 4 - ) A N D I N T E R S E C T I O N O F U S 1 7 B U S I N E S S ( - L - ) , 3 1 0 0 1 1 0 0 FOR -L- PROFILE, SEE SHEET 29 E N D C O N S T R U C T I O N - L - P O T S T A . 2 8 9 + 5 0 . 7 5 E N D T I P P R O J E C T U - 4 9 0 2 C / D -Y34--Y35- E X I S T I N G S I G N A L 2 5 . 0 0 ' R T + 1 3 . 0 0 - Y 3 4 - 8 7 . 0 0 ' L T + 0 9 . 7 3 - L - 5 0 . 5 2 ' R T + 1 8 . 9 8 - Y 3 5 - 1 9 6 B A Y S H O R E E S T A T E S I N C FF 5 0 . 0 0 ' L T 7 3 . 0 0 ' L T + 2 6 . 0 0 - L - 1 9 9 2 0 1 2 0 2 2 0 0 2 5 . 0 0 ' L T + 4 2 . 0 0 - Y 3 4 - 5 0 . 0 0 ' R T 8 3 . 0 0 ' R T + 2 7 . 0 0 - L - 5 0 . 0 0 ' R T 8 3 . 0 0 ' R T + 5 1 . 0 0 - L - REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. U-4902C/D 09-SEP-2016 11:49 \\ralw00\projects\58177 NCDOT Division On-Call\Market Street - DDC\Roadway\Proj\U4902C_rdy_psh_19.dgn $$$$USERNAME$$$$8/17/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CR CR 4 0 . 0 ' R 8 4 . 8 0 ' L T + 9 9 . 1 1 4 0 . 0 ' R 8 4 . 7 5 ' R T + 9 6 . 8 6 C U R B EX I S T I N G T I E T O C U R B EX I S T I N G T I E T O E N D P R O P . 5 ' S I D E W A L K M U L T I - U S E P A T H E N D P R O P . 1 0 ' -Y34- 290 295 10 - Y3 4 - P O T S t a . 10 + 0 0 . 0 0 - Y3 5 - P OT S ta . 12 + 5 3 .6 9 - Y 3 4 - P O T S T A 1 3 + 2 2 . 8 0 - L - P O T S T A 2 8 6 + 8 1 . 5 1 = - Y 3 5 - P O T S T A 1 0 + 0 0 . 0 0 - L - P O T S T A 2 8 6 + 8 3 . 6 1 = -Y35- - L - NAD 83/ NSRS 2007NC License No: C-1554Raleigh, North Carolina 27609343 E. Six Forks Road, Suite 200HNTB NORTH CAROLINA, P.C.