Loading...
HomeMy WebLinkAbout180243 BRC Castle Hayne TIA Final 11292018This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. TRANSPORTATION IMPACT ANALYSIS November 28, 2018 BRC Castle Hayne Development New Hanover County, NC Prepared for Blue Ridge Companies Project #: 180243 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 1 BRC Castle Hayne – Transportation Impact Analysis Prepared for Blue Ridge Companies New Hanover County, NC November 28, 2018 Table of Contents 1.0 Introduction ............................................................................................................. 2 Figure 1 – Site Plan ..................................................................................................... 3 Figure 2 – Vicinity Map ................................................................................................ 4 2.0 Existing Conditions ................................................................................................ 5 2.1 Inventory ................................................................................................................ 5 2.2 Existing Traffic Volumes ........................................................................................ 5 Figure 3 – Existing Lane Geometry ............................................................................. 6 Figure 4 – 2018 Existing Traffic Volumes .................................................................... 7 3.0 Approved Developments and Committed Improvements ................................... 8 3.1 Approved Developments ........................................................................................ 8 3.2 Committed Improvements ...................................................................................... 8 4.0 Methodology ........................................................................................................... 9 4.1 Base Assumptions and Standards ......................................................................... 9 5.0 Capacity Analysis ................................................................................................. 10 5.1 Level of Service Evaluation Criteria ..................................................................... 10 6.0 2021 Phase 1 Build Conditions ........................................................................... 11 6.1 Trip Generation .................................................................................................... 11 6.2 Trip Distribution .................................................................................................... 11 6.3 2021 Future No Build Traffic ................................................................................ 11 6.4 2021 Phase 1 Build Total Traffic .......................................................................... 11 Figure 5 – Phase 1 Trip Distribution .......................................................................... 12 Figure 6 – 2021 Future No Build Volumes ................................................................. 13 Figure 7 – Phase 1 Site Trips .................................................................................... 14 Figure 8 – 2021 Phase 1 Build Volumes .................................................................... 15 6.5 Phase 1 Discussion of Results ............................................................................ 16 Figure 9 – Phase 1 Recommended Improvements.................................................... 18 7.0 2023 Full Build Conditions ................................................................................... 19 7.1 Trip Generation .................................................................................................... 19 7.2 Trip Distribution .................................................................................................... 19 7.3 2023 Future No Build Traffic ................................................................................ 19 7.4 2023 Full Build Total Traffic ................................................................................. 19 Figure 10 – Full Build Trip Distribution ....................................................................... 20 Figure 11 – 2023 Future No Build Volumes ............................................................... 21 Figure 12 – Full Build Site Trips ................................................................................. 22 Figure 13 – 2023 Full Build Volumes ......................................................................... 23 7.5 Full Build Discussion of Results ........................................................................... 24 8.0 Queueing Results ................................................................................................. 26 Figure 14 – Full Build Recommended Improvements ................................................ 28 9.0 Summary and Conclusion ................................................................................... 29 Appendix ...................................................................................................................... 30 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 2 BRC Castle Hayne – Transportation Impact Analysis Prepared for Blue Ridge Companies New Hanover County, NC November 28, 2018 1.0 Introduction The proposed BRC Castle Hayne development is to be located west of Castle Hayne Road on both the north and south sides of the planned Riverside Drive in New Hanover County, North Carolina. The development is planned to consist of 360 apartments in full build. The development will utilize four (4) access points on Riverside Drive, and one existing access on Castle Hayne Road. Figure 1 shows the site plan and Figure 2 shows the vicinity map. The BRC Castle Hayne development will be analyzed for two (2) phases: • Phase 1 will consist of the south side of the development, which is 216 apartment units. The build year for Phase 1 is assumed to be 2021. • Full Build, including Phase 1, will add 144 apartments to the north side of the development and will consist of 360 total apartment units. The build year for Full Build is assumed to be 2023. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • NC 133 (Castle Hayne Road) at North Kerr Avenue (west side of intersection is planned to be named Riverside Drive) • NC 133 (Castle Hayne Road) at Existing Site Access The above-mentioned intersections were analyzed for the following scenarios: • 2018 Existing Conditions • 2021 Future No Build Conditions • 2021 Phase 1 Build Conditions • 2021 Phase 1 Build Conditions with Improvements (as necessary) • 2023 Future No Build Conditions • 2023 Full Build Conditions • 2023 Full Build Conditions with Improvements (as necessary) The WMPO was contacted to obtain background information and to ascertain the elements to be covered in this Transportation Impact Analysis (TIA). The approved scope for this TIA is included in the appendix. Information regarding the property was provided by Blue Ridge Companies and CPT Engineering and Surveying, Inc. FIGURE 1 SITE PLAN FIGURE 2 VICINITY MAP STUDY INTERSECTIONS BACKGROUND PROPOSED SITE SITE 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 5 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 presents a summary of this review. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Castle Hayne Road NC 133 Varies between 2-lane undivided and 2-lane with TWLTL Approx. 22’-36’ 45 MPH NCDOT North Kerr Avenue SR 1322 2-lane undivided Approx. 22’ 45 MPH NCDOT Existing Site Access N/A 2-lane undivided Approx. 22’ Not Posted Local 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT. Table 2.2 below contains the date the count was conducted. Schools were in session at the time of traffic counts. Figure 4 shows existing AM and PM peak hour volumes. The full reports for these volumes can be found in the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: NC 133 (Castle Hayne Road) at North Kerr Avenue 10/18/18 NC 133 (Castle Hayne Road) at Existing Site Access 10/18/18 *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE3EXISTING LANE GEOMETRY BLACK = EXISTING AADT 2017 VOLUME#### 15 0 ' 16 , 0 0 0 SPEED LIMIT45 North Kerr Avenue ~4 5 0 ' SPEEDLIMIT 458,500 16 , 0 0 0 Site Access Ca s t l e H a y n e Ro a d FU L L TW L T L TW L T L 47 5 ' FULL 27 5 ' FULL FULL Riverside Drive 200' 250' 275' internal stem SPEEDLIMIT 25 *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 4 2018 EXISTING TRAFFIC VOLUMES 27 / 13 76 4 / 5 0 8 12 / 1 2 14 / 1 0 10 9 3 / 6 7 3 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 20 6 / 2 1 1 195 / 288 35 / 99 34 / 49 60 / 60 251 / 198 13 / 5 9 41 0 / 6 8 3 87 / 9 0 4 / 6 55 4 / 8 7 8 2 / 3 5 / 2 Riverside Drive 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 8 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per NCDOT staff, there is one (1) approved development in the vicinity of this project. This development is the Riverside development. Full Build of the development consists of 165 single family homes and 72 apartments. However, the 72 apartments are now a part of this BRC Castle Hayne development. Therefore, the full build of the Riverside development consists of 165 single family homes, with a build year of 2019. Trips due to this approved development have been incorporated in the analysis for both Phase 1 and Full Build. The trip distribution and trip generation for the Riverside development can be found in the appendix, along with Figure A Approved Development Trips. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a developer in the area, but not yet constructed. Per WMPO and NCDOT staff, there is one (1) committed improvement in the vicinity of this project. This committed improvement is due to the Riverside approved development. Part of the improvements were to construct eastbound and westbound right turn lanes for the Castle Hayne Road at North Kerr Avenue/Riverside Drive intersection, which have been completed. Additionally, the signal was to be modified to reflect the roadway changes. This signal modification has not been installed but is expected to be done prior to our Phase 1 build year. However, the signal plan has been completed and approved and was provided to us to use in analysis. The completed roadway plans and new signal plan can both be found in the appendix. 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 9 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 1% per year for all roadways Analysis Software Synchro/SimTraffic Version 9.0 Signal Plans/Timings Provided by NCDOT/WMPO Lane widths 12-feet Truck percentages 2% A 2016 signal plan, which is currently in use, was used for existing analysis. The already constructed westbound and eastbound right turn lanes were also included in the analysis, even though the 2016 signal plan does not reflect these additional lanes. For all future analysis, the provided newly approved 2018 signal plan was used since it is expected to be utilized prior to this project’s Phase 1 build year. Both signal plans can be found in the appendix. 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 10 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents the best conditions and Level of Service “F” represents the worst. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A  10 A  10 B  10 and  20 B  10 and  15 C  20 and  35 C  15 and  25 D  35 and  55 D  25 and  35 E  55 and  80 E  35 and  50 F  80 F  50 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 11 6.0 2021 Phase 1 Build Conditions Phase 1 consists of 216 apartment units in 2021. 6.1 Trip Generation Trips for this development were projected based on the 10th Edition of ITE Trip Generation Manual. Table 6.1 contains the results. Table 6.1 - ITE Trip Generation BRC Castle Hayne (Phase 1) Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Apartments 220 216 Dwelling Units Adjacent /Equation 1,592 23 76 74 43 Total Trips 1,592 23 76 74 43 6.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. These distributions were reviewed and approved by WMPO. The directional distributions for Phase 1 site trips are as follows: • 40% to and from the north on Castle Hayne Road • 40% to and from the south on Castle Hayne Road • 20% to and from the east on North Kerr Avenue The site trip distributions for Phase 1 are shown in Figure 5. 6.3 2021 Future No Build Traffic The 2021 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2018 existing traffic volumes and adding approved development traffic. Figure 6 shows the 2021 future no build traffic volumes for AM and PM peaks. 6.4 2021 Phase 1 Build Total Traffic The 2021 build-out traffic volumes were obtained by summing 2021 future no build volumes and Phase 1 site trips due to the proposed project. Phase 1 site trips are shown in Figure 7. The resulting Phase 1 build volume totals for AM and PM peaks are shown in Figure 8. More information can be found in the Traffic Volume Data section of the appendix. *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,is intendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. BLACK = EXISTING 1% DESTINATION NODE% FIGURE5PHASE 1TRIP DISTRIBUTION North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d Riverside Drive 40% 20% 40% 30 % I N 30 % I N 20% IN 30% OUT 40% OUT 20% OUT 10 % I N 10 % O U T 10 % I N 10% OUT 10 % I N 10 % I N *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 6 2021 FUTURE NO BUILD VOLUMES 66 / 37 78 7 / 5 2 3 21 / 4 3 14 / 1 0 11 6 4 / 7 1 7 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 2 / 2 1 7 201 / 297 64 / 120 63 / 68 71 / 93 259 / 204 25 / 1 0 3 42 2 / 7 0 4 90 / 9 3 4 / 6 58 3 / 9 4 7 2 / 3 5 / 2 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 7 PHASE 1 SITE TRIPS 8 / 4 2 / 7 7 / 2 2 2 / 7 8 / 4 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 0 / 0 0 / 0 30 / 17 15 / 9 5 / 15 0 / 0 2 / 7 0 / 0 0 / 0 7 / 2 2 2 / 7 0 / 0 23 / 13 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 8 2021 PHASE 1 BUILD VOLUMES 73 / 42 78 9 / 5 3 0 28 / 6 5 16 / 1 7 11 7 1 / 7 2 2 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 2 / 2 1 7 201 / 297 95 / 138 78 / 77 76 / 108 259 / 204 28 / 1 1 0 42 2 / 7 0 4 90 / 9 3 11 / 2 8 58 6 / 9 5 4 2 / 3 28 / 15 Riverside Drive 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 16 6.5 Phase 1 Discussion of Results The following section discusses 2021 Phase 1 level of service for each intersection. NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2021 future no build conditions, it is expected to operate at LOS D during the AM peak and LOS E during the PM peak. In 2021 Phase 1 build conditions, it is expected to operate at LOS E during the AM and PM peaks. It is recommended to re-stripe the northbound left turn lane to extend the storage from 150 feet to 250 feet with appropriate taper. Additionally, it is recommended to provide “time of day” timings for both the AM and PM peaks. With this recommendation in place, this intersection is expected to operate at LOS D during the AM peak and LOS E during the PM peak. Table 6.2 - NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2018 Existing C (26.7) L T R L T R L T R L T R C (27.7) C (27.0) C (27.2) D (45.8) C (27.4) B (18.0) A (9.1) C (27.2) C (27.2) B (13.2) C (26.3) B (13.2) C (27.3) C (32.9) C (26.8) C (23.4) 2021 Future No Build D (50.7) L T R L T R L T R L T R E (63.7) E (59.5) D (44.4) F (123.1) D (54.8) D (39.1) E (62.5) C (28.2) C (28.2) F (94.4) C (31.7) A (6.5) E (55.7) F (82.2) C (29.8) D (44.3) 2021 Phase 1 Build E (60.3) L T R L T R L T R L T R E (68.8) E (61.7) D (44.1) F (157.8) E (57.4) D (42.1) E (64.6) C (29.1) C (29.1) F (118.4) D (39.8) A (6.4) E (59.3) F (100.3) C (30.9) E (55.1) 2021 Phase 1 Build with Improvements D (47.0) L T R L T R L T R L T R E (61.7) E (72.9) D (46.1) E (66.8) D (48.4) C (30.0) E (60.2) D (39.6) D (39.6) E (70.3) D (39.9) A (6.3) E (60.7) D (50.4) D (40.7) D (45.3) PM Peak Hour 2018 Existing C (32.6) L T R L T R L T R L T R D (40.0) C (34.2) C (32.6) E (58.9) C (34.7) C (28.6) A (7.7) D (37.2) D (37.2) D (38.7) B (16.7) B (12.3) D (37.7) D (40.2) D (35.1) C (23.0) 2021 Future No Build E (66.8) L T R L T R L T R L T R F (84.8) E (66.3) D (43.8) F (136.4) E (68.4) E (64.0) F (80.5) D (46.6) D (46.6) F (180.2) C (24.3) A (7.8) E (72.5) F (89.6) D (50.5) E (66.6) 2021 Phase 1 Build E (68.9) L T R L T R L T R L T R F (90.9) E (65.9) D (43.5) F (142.2) E (71.0) E (64.6) F (84.1) D (48.2) D (48.2) F (188.8) C (25.5) A (8.4) E (75.6) F (91.8) D (52.6) E (67.8) 2021 Phase 1 Build with Improvements E (57.6) L T R L T R L T R L T R F (93.4) F (81.7) D (37.6) F (98.6) E (73.1) D (51.1) E (64.1) E (55.3) E (55.3) F (96.7) C (23.2) A (7.5) F (80.7) E (70.9) E (56.4) D (41.6) 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 17 NC 133 (Castle Hayne Road) at Existing Site Access This unsignalized intersection currently operates at LOS C during the AM and PM peaks. In 2021 future no build conditions, it is expected to remain the same. In 2021 Phase 1 build conditions, it is expected to operate at LOS D during the AM peak and LOS C during the PM peak. While the LOS in the AM peak does increase by a letter, it is only due to a 3 second increase in delay that is not expected to cause issues. Therefore, no improvements are recommended to accommodate Phase 1 traffic. Based on NCDOT turn lane warrant charts, no turn lanes are warranted. Table 6.3 - NC 133 (Castle Hayne Road) at Site Access Scenario LOS of Worst Approach Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2018 Existing C (22.4) EB Approach L T R L T R L T R L T R C (22.4) C (22.4) B (11.3) A (0.0) A (0.0) A (0.0) C (22.4) A (0.1) A (0.0) 2021 Future No Build C (24.3) EB Approach L T R L T R L T R L T R C (24.3) C (24.3) B (11.8) A (0.0) A (0.0) A (0.0) C (24.3) A (0.1) A (0.0) 2021 Phase 1 Build D (27.1) EB Approach L T R L T R L T R L T R D (27.1) D (27.1) B (11.9) A (0.0) A (0.0) A (0.0) D (27.1) A (0.2) A (0.0) PM Peak Hour 2018 Existing C (18.3) EB Approach L T R L T R L T R L T R C (18.3) C (18.3) A (9.2) A (0.0) A (0.0) A (0.0) C (18.3) A (0.1) A (0.0) 2021 Future No Build C (19.6) EB Approach L T R L T R L T R L T R C (19.6) C (19.6) A (9.4) A (0.0) A (0.0) A (0.0) C (19.6) A (0.1) A (0.0) 2021 Phase 1 Build C (16.8) EB Approach L T R L T R L T R L T R C (16.8) C (16.8) A (9.6) A (0.0) A (0.0) A (0.0) C (16.8) A (0.3) A (0.0) *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE9PHASE 1 RECOMMENDED IMPROVEMENTS 25 0 ' r e - s t r i p e SPEED LIMIT45 North Kerr Avenue SPEEDLIMIT 45 Site Access Ca s t l e H a y n e Ro a d FU L L TW L T L TW L T L 47 5 ' FULL 27 5 ' FULL FULL Riverside Drive 200' 250' SPEEDLIMIT 25 BLACK = EXISTING GREEN = COMMITTED BLUE = PROPOSEDIN PHASE 1 New signal plan to be installed prior to Phase 1 ProvideAM/PM peak "time of day" timings 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 19 7.0 2023 Full Build Conditions Full Build consists of 360 apartment units in 2023. 7.1 Trip Generation Trips for this development were projected based on the 10th Edition of ITE Trip Generation Manual. Table 7.1 contains the results. Table 7.1 - ITE Trip Generation BRC Castle Hayne (Full Build) Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Apartments 220 360 Dwelling Units Adjacent /Equation 2,681 37 124 116 68 Total Trips 2,681 37 124 116 68 7.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. These distributions were reviewed and approved by WMPO. The directional distributions for Full Build site trips are as follows: • 40% to and from the north on Castle Hayne Road • 40% to and from the south on Castle Hayne Road • 20% to and from the east on North Kerr Avenue The site trip distributions for Full Build are shown in Figure 10. 7.3 2023 Future No Build Traffic The 2023 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2018 existing traffic volumes and adding the approved development trips. Figure 11 shows the 2023 future no build traffic volumes for AM and PM peaks. 7.4 2023 Full Build Total Traffic The 2023 Full Build traffic volumes were obtained by summing 2023 future no build volumes and Full Build site trips due to the proposed development. Full Build site trips are shown in Figure 12. The resulting Full build volume totals for AM and PM peaks are shown in Figure 13. More information can be found in the Traffic Volume Data section of the appendix. *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,is intendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. BLACK = EXISTING 1% DESTINATION NODE% FIGURE10FULL BUILDTRIP DISTRIBUTION North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d Riverside Drive 40% 20% 40% 20 % I N 30 % I N 20% IN 20% OUT 40% OUT 20% OUT 20 % I N 20 % I N 20% OUT 20 % O U T 10 % I N 10 % I N *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 11 2023 FUTURE NO BUILD VOLUMES 66 / 38 80 3 / 5 3 4 22 / 4 4 15 / 1 1 11 8 7 / 7 3 1 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 7 / 2 2 2 205 / 303 65 / 122 64 / 69 72 / 94 264 / 208 26 / 1 0 4 43 1 / 7 1 8 91 / 9 5 4 / 6 59 4 / 9 6 5 2 / 3 5 / 2 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 12 FULL BUILD SITE TRIPS 25 / 14 4 / 1 2 11 / 3 5 4 / 1 2 25 / 1 4 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 0 / 0 0 / 0 50 / 27 25 / 14 7 / 23 0 / 0 7 / 2 3 0 / 0 0 / 0 7 / 2 3 7 / 2 3 0 / 0 25 / 14 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 13 2023 FULL BUILD VOLUMES 90 / 52 80 7 / 5 4 6 33 / 7 9 19 / 2 3 12 1 1 / 7 4 5 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 7 / 2 2 2 205 / 303 115 / 150 89 / 83 80 / 117 264 / 208 34 / 1 2 7 43 1 / 7 1 8 91 / 9 5 11 / 2 9 60 2 / 9 8 8 2 / 3 30 / 16 Riverside Drive 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 24 7.5 Full Build Discussion of Results The following section discusses 2023 Full Build level of service for each intersection. NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive In 2023 future no build conditions, this intersection is expected to operate at LOS D in the AM peak and LOS E during the PM peak. In 2023 full build conditions, it is expected to remain unchanged. Therefore, no improvements are recommended to accommodate full build traffic. Table 7.2 - NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2023 Future No Build D (53.4) L T R L T R L T R L T R E (65.4) E (60.9) D (45.5) F (136.4) E (56.3) D (40.7) E (63.8) C (27.9) C (27.9) F (104.6) C (32.0) A (6.4) E (57.2) F (89.4) C (29.6) D (46.6) 2023 Full Build D (50.7) L T R L T R L T R L T R D (54.7) F (85.9) D (47.9) E (71.2) D (52.3) D (35.1) E (63.6) D (38.2) D (38.2) E (75.1) D (46.5) A (6.2) E (62.1) D (54.9) D (39.8) D (51.1) PM Peak Hour 2023 Future No Build E (71.1) L T R L T R L T R L T R F (87.7) E (67.3) D (44.5) F (150.9) E (70.2) E (68.9) F (83.2) D (47.1) D (47.1) F (203.5) C (24.3) A (7.8) E (74.4) F (97.3) D (51.2) E (73.2) 2023 Full Build E (61.4) L T R L T R L T R L T R F (108.4) F (88.2) D (37.8) F (105.7) F (81.2) D (53.6) E (67.9) E (57.6) E (57.6) F (105.8) C (24.0) A (7.7) F (89.6) E (76.0) E (59.0) D (43.9) 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 25 NC 133 (Castle Hayne Road) at Existing Site Access In 2023 future no build conditions, this intersection is expected to operate at LOS D in the AM peak and LOS C in the PM peak. In 2023 full build conditions, it is expected to remain the same. Therefore, no improvements are recommended to accommodate full build traffic. Based on NCDOT turn lane warrant charts, no turn lanes are warranted. Table 7.3 - NC 133 (Castle Hayne Road) at Site Access Scenario LOS of Worst Approach Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2023 Future No Build D (25.0) EB Approach L T R L T R L T R L T R D (25.0) D (25.0) B (11.9) A (0.0) A (0.0) A (0.0) D (25.0) A (0.1) A (0.0) 2023 Full Build D (29.2) EB Approach L T R L T R L T R L T R D (29.2) D (29.2) B (12.2) A (0.0) A (0.0) A (0.0) D (29.2) A (0.2) A (0.0) PM Peak Hour 2023 Future No Build C (19.9) EB Approach L T R L T R L T R L T R C (19.9) C (19.9) A (9.5) A (0.0) A (0.0) A (0.0) C (19.9) A (0.1) A (0.0) 2023 Full Build C (17.2) EB Approach L T R L T R L T R L T R C (17.2) C (17.2) A (9.7) A (0.0) A (0.0) A (0.0) C (17.2) A (0.3) A (0.0) 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 26 8.0 Queueing Results Below in Table 8.1 are the queue results for all exclusive turn lanes. Full Build recommended improvements are illustrated in Figure 14. Table 8.1 - Queue Results AM Peak Hour Queues Scenario NC 133 (Castle Hayne Road) at North Kerr Avenue NC 133 (Castle Hayne Road) at Site Access 2018 Existing EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 74 52 205 184 174 299 15 0 95th Percentile Queue (ft) 47 38 276 146 12 111 15 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 118 96 448 174 175 300 41 0 95th Percentile Queue (ft) 118 105 573 280 60 469 15 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 180 96 395 208 175 300 42 0 95th Percentile Queue (ft) 167 115 581 134 65 474 19 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build + Imps EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 136 135 267 236 250 300 61 95th Percentile Queue (ft) 137 105 367 208 57 305 16 Storage Bay (ft) FULL FULL FULL 200 250 275 475 2023 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 96 137 326 245 175 299 15 0 95th Percentile Queue (ft) 121 105 587 288 62 481 16 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2023 Full Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 131 156 381 220 249 299 40 0 95th Percentile Queue (ft) 161 125 375 213 66 315 19 0 Storage Bay (ft) FULL FULL FULL 200 250 275 475 FULL 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 27 PM Peak Hour Queues Scenario NC 133 (Castle Hayne Road) at North Kerr Avenue NC 133 (Castle Hayne Road) at Site Access 2018 Existing EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 336 52 203 250 174 189 39 0 95th Percentile Queue (ft) 118 24 230 246 35 222 15 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 286 118 584 250 175 300 42 0 95th Percentile Queue (ft) 244 66 461 467 196 509 30 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 222 93 549 250 175 300 41 0 95th Percentile Queue (ft) 299 73 470 444 220 516 43 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build + Imps EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 242 118 351 250 250 299 42 95th Percentile Queue (ft) 241 62 337 366 153 351 36 Storage Bay (ft) FULL FULL FULL 200 250 275 475 2023 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 286 118 699 250 175 300 700 0 95th Percentile Queue (ft) 251 67 472 481 201 524 31 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2023 Full Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 304 115 608 245 250 300 61 0 95th Percentile Queue (ft) 268 73 343 378 174 362 43 0 Storage Bay (ft) FULL FULL FULL 200 250 275 475 FULL *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE14FULL BUILD RECOMMENDED IMPROVEMENTS 25 0 ' r e - s t r i p e SPEED LIMIT45 North Kerr Avenue SPEEDLIMIT 45 Site Access Ca s t l e H a y n e Ro a d FU L L TW L T L TW L T L 47 5 ' FULL 27 5 ' FULL FULL Riverside Drive 200' 250' SPEEDLIMIT 25 BLACK = EXISTING GREEN = COMMITTED BLUE = PROPOSEDIN PHASE 1 PURPLE = PROPOSEDIN FULLBUILD New signal plan to be installed prior to Phase 1 No additional improvements recommended for FullBuild ProvideAM/PM peak "time of day" timings 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 29 9.0 Summary and Conclusion The proposed BRC Castle Hayne development is to be located west of Castle Hayne Road on both the north and south sides of the planned Riverside Drive in New Hanover County, North Carolina. The development is planned to consist of 360 apartments in full build. The development will utilize four (4) access points on Riverside Drive, and one existing access on Castle Hayne Road. The trip generation indicates that the proposed development is expected to generate 1,592 daily trips, 99 trips in the AM peak, and 117 trips in the PM peak for Phase 1 Build. The trip generation indicates that the proposed development is expected to generate 2,681 daily trips, 161 trips in the AM peak, and 184 trips in the PM peak for Full Build. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. It is recommended in Phase 1 to re-stripe the northbound left turn lane for the Castle Hayne Road at North Kerr Avenue/Riverside Drive intersection from 150 feet to 250 feet of storage with appropriate taper. Additionally, it is recommended to implement “time of day” timings for both the AM and PM peaks. There are no additional recommended improvements to accommodate the full build. In conclusion, this study has reviewed the impacts of both background traffic and proposed development traffic and has provided recommendations to accommodate future traffic. Please note the proposed site accesses should be designed according to NCDOT standards. 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 30 Appendix 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Level of Service Analysis 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis NC 133 (Castle Hayne Road) at North Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM Exist C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)35342725160195134108720676412 Future Volume (vph)35342725160195134108720676412 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9740.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018140177018631583 Flt Permitted0.7130.7320.1380.243 Satd. Flow (perm)1328186315831364186315832571814045318631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)39383027967217144569722984913 Shared Lane Traffic (%) Lane Group Flow (vph)3938302796721714553022984913 Turn TypePermNAPermPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases4488266 Detector Phase 44488152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.012.07.012.012.0 Minimum Split (s)12.412.412.412.512.511.913.218.211.918.218.2 Total Split (s)30.030.030.040.040.020.020.060.020.060.060.0 Total Split (%)25.0%25.0%25.0%33.3%33.3%16.7%16.7%50.0%16.7%50.0%50.0% Maximum Green (s)24.624.624.634.534.515.113.853.815.153.853.8 Yellow Time (s)3.23.23.24.54.53.03.04.53.04.54.5 All-Red Time (s)2.22.22.21.01.01.93.21.71.91.71.7 Lost Time Adjust (s)-0.4-0.4-0.4-0.5-0.50.1-1.2-1.20.1-1.2-1.2 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.0 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.03.02.03.03.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.015.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.040.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinMin Act Effct Green (s)23.723.723.723.723.739.246.938.253.649.649.6 Actuated g/C Ratio0.270.270.270.270.270.450.530.430.610.560.56 v/c Ratio0.110.080.070.760.130.310.050.700.530.810.01 Control Delay27.727.027.245.827.418.09.127.213.226.313.2 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay27.727.027.245.827.418.09.127.213.226.313.2 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM Exist C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSCCCDCBACBCB Approach Delay27.332.926.823.4 Approach LOS CCCC Queue Length 50th (ft)15151213226693228482862 Queue Length 95th (ft)4745382767014612460111#84215 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)556780662571780804425119351312261042 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.070.050.050.490.090.270.030.460.450.690.01 Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 88 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 26.7Intersection LOS: C Intersection Capacity Utilization 79.1%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 FNB C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)64636625971201254229021278721 Future Volume (vph)64636625971201254229021278721 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9740.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018140177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018140177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)717073288792232846910023687423 Shared Lane Traffic (%) Lane Group Flow (vph)7170732887922328569023687423 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.030.020.020.030.020.020.090.020.090.020.0 Total Split (%)12.5%18.8%12.5%12.5%18.8%12.5%12.5%56.3%12.5%56.3%12.5% Maximum Green (s)14.222.913.814.922.914.913.883.814.983.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)10.611.821.317.116.938.38.251.216.162.778.6 Actuated g/C Ratio0.090.100.190.150.150.340.070.460.140.560.70 v/c Ratio0.430.360.241.070.280.410.220.690.940.840.02 Control Delay63.759.544.4123.154.839.162.528.294.431.76.5 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay63.759.544.4123.154.839.162.528.294.431.76.5 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 FNB C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSEEDFDDECFCA Approach Delay55.782.229.844.3 Approach LOSEFCD Queue Length 50th (ft)504945~2535313120320~1855525 Queue Length 95th (ft)118115105#57312728060469#46985615 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)252443409269443539252138425214211207 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.280.160.181.070.180.410.110.410.940.620.02 Intersection Summary Area Type:Other Cycle Length: 160 Actuated Cycle Length: 112.4 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.07 Intersection Signal Delay: 50.7Intersection LOS: D Intersection Capacity Utilization 79.1%ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)95787325976201284229021278928 Future Volume (vph)95787325976201284229021278928 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9740.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018140177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018140177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)1068781288842233146910023687731 Shared Lane Traffic (%) Lane Group Flow (vph)10687812888422331569023687731 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.030.020.020.030.020.020.090.020.090.020.0 Total Split (%)12.5%18.8%12.5%12.5%18.8%12.5%12.5%56.3%12.5%56.3%12.5% Maximum Green (s)14.222.913.814.922.914.913.883.814.983.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)12.312.726.216.515.936.68.354.615.561.879.3 Actuated g/C Ratio0.100.110.220.140.130.310.070.460.130.520.67 v/c Ratio0.580.440.231.170.340.460.250.681.030.910.03 Control Delay68.861.744.1157.857.442.164.629.1118.439.86.4 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay68.861.744.1157.857.442.164.629.1118.439.86.4 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSEEDFEDECFDA Approach Delay59.3100.330.955.1 Approach LOSEFCE Queue Length 50th (ft)776351~2676014023327~1975757 Queue Length 95th (ft)167138115#58113428265474#47487919 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)230404443246404486230133923013751097 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.460.220.181.170.210.460.130.421.030.640.03 Intersection Summary Area Type:Other Cycle Length: 160 Actuated Cycle Length: 119 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.17 Intersection Signal Delay: 60.3Intersection LOS: E Intersection Capacity Utilization 79.2%ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle HayneAM 2021 Ph1 Build + Imps C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)95787325976201284229021278928 Future Volume (vph)95787325976201284229021278928 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002002500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9740.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018140177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018140177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)1068781288842233146910023687731 Shared Lane Traffic (%) Lane Group Flow (vph)10687812888422331569023687731 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.013.012.027.020.025.012.055.025.068.020.0 Total Split (%)16.7%10.8%10.0%22.5%16.7%20.8%10.0%45.8%20.8%56.7%16.7% Maximum Green (s)14.25.95.821.912.919.95.848.819.961.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)11.58.320.421.020.142.86.942.317.556.172.7 Actuated g/C Ratio0.110.080.190.190.180.390.060.390.160.520.67 v/c Ratio0.570.620.270.840.240.360.270.810.830.910.03 Control Delay61.772.946.166.848.430.060.239.670.339.96.3 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay61.772.946.166.848.430.060.239.670.339.96.3 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle HayneAM 2021 Ph1 Build + Imps C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSEEDEDCEDEDA Approach Delay60.750.440.745.3 Approach LOSEDDD Queue Length 50th (ft)80675621759129243681785877 Queue Length 95th (ft)137#148105#36711220857514#305#87216 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200250275475 Base Capacity (vph)25214130038634466811786133611141117 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.420.620.270.750.240.330.260.660.700.790.03 Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 108.7 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 47.0Intersection LOS: D Intersection Capacity Utilization 79.2%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2023 FNB C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)65646626472205264319121780322 Future Volume (vph)65646626472205264319121780322 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9740.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018140177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018140177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)727173293802282947910124189224 Shared Lane Traffic (%) Lane Group Flow (vph)7271732938022829580024189224 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.030.020.020.030.020.020.090.020.090.020.0 Total Split (%)12.5%18.8%12.5%12.5%18.8%12.5%12.5%56.3%12.5%56.3%12.5% Maximum Green (s)14.222.913.814.922.914.913.883.814.983.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)10.711.921.417.116.938.38.353.616.165.081.1 Actuated g/C Ratio0.090.100.190.150.150.330.070.470.140.570.71 v/c Ratio0.440.370.251.110.290.430.230.690.980.850.02 Control Delay65.460.945.5136.456.340.763.827.9104.632.06.4 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay65.460.945.5136.456.340.763.827.9104.632.06.4 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2023 FNB C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSEEDFEDECFCA Approach Delay57.289.429.646.6 Approach LOSEFCD Queue Length 50th (ft)535247~2755614121330~2055796 Queue Length 95th (ft)121116105#58712928862482#48189416 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)247433401263433528247135624713931213 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.290.160.181.110.180.430.120.430.980.640.02 Intersection Summary Area Type:Other Cycle Length: 160 Actuated Cycle Length: 114.9 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 53.4Intersection LOS: D Intersection Capacity Utilization 80.2%ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne AM 2023 Build C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)115899026480205344319121780733 Future Volume (vph)115899026480205344319121780733 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002002500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9740.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018140177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018140177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)12899100293892283847910124189737 Shared Lane Traffic (%) Lane Group Flow (vph)128991002938922838580024189737 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.013.012.027.020.025.012.055.025.068.020.0 Total Split (%)16.7%10.8%10.0%22.5%16.7%20.8%10.0%45.8%20.8%56.7%16.7% Maximum Green (s)14.25.95.821.912.919.95.848.819.961.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)17.58.120.021.614.234.16.946.318.057.480.0 Actuated g/C Ratio0.150.070.180.190.130.300.060.410.160.510.71 v/c Ratio0.470.740.360.870.380.480.360.780.860.950.03 Control Delay54.785.947.971.252.335.163.638.275.146.56.2 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay54.785.947.971.252.335.163.638.275.146.56.2 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne AM 2023 Build C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSDFDEDDEDEDA Approach Delay62.154.939.851.1 Approach LOSEDDD Queue Length 50th (ft)96777022264135293791826138 Queue Length 95th (ft)161#174125#37511821366527#315#90419 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200250275475 Base Capacity (vph)28913328236426450911081031610491131 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.440.740.350.800.340.450.350.720.760.860.03 Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 113.1 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.95 Intersection Signal Delay: 50.7Intersection LOS: D Intersection Capacity Utilization 80.4%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM Exist C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)99491319860288596839021150812 Future Volume (vph)99491319860288596839021150812 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9830.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018310177018631583 Flt Permitted0.7130.7220.3790.087 Satd. Flow (perm)1328186315831345186315837061831016218631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)1105414220673206675910023456413 Shared Lane Traffic (%) Lane Group Flow (vph)11054142206732066859023456413 Turn TypePermNAPermPermNApm+ovpm+ptNApm+ptNAPerm Protected Phases4 815216 Permitted Phases4488266 Detector Phase 44488152166 Switch Phase Minimum Initial (s)7.07.07.07.07.07.07.012.07.012.012.0 Minimum Split (s)12.412.412.412.512.511.913.218.211.918.218.2 Total Split (s)30.030.030.040.040.020.020.060.020.060.060.0 Total Split (%)25.0%25.0%25.0%33.3%33.3%16.7%16.7%50.0%16.7%50.0%50.0% Maximum Green (s)24.624.624.634.534.515.113.853.815.153.853.8 Yellow Time (s)3.23.23.24.54.53.03.04.53.04.54.5 All-Red Time (s)2.22.22.21.01.01.93.21.71.91.71.7 Lost Time Adjust (s)-0.4-0.4-0.4-0.5-0.50.1-1.2-1.20.1-1.2-1.2 Total Lost Time (s)5.05.05.05.05.05.05.05.05.05.05.0 Lead/LagLeadLeadLagLeadLagLag Lead-Lag Optimize?YesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.03.02.03.03.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.015.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.040.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinMin Act Effct Green (s)22.022.022.022.022.039.563.955.572.662.662.6 Actuated g/C Ratio0.210.210.210.210.210.380.610.530.690.600.60 v/c Ratio0.400.140.040.780.170.540.130.890.770.510.01 Control Delay40.034.232.658.934.728.67.737.238.716.712.3 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay40.034.232.658.934.728.67.737.238.716.712.3 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM Exist C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSDCCECCADDBB Approach Delay37.740.235.123.0 Approach LOS DDDC Queue Length 50th (ft)653081433816413514842214 Queue Length 95th (ft)11863242307524635#927#22239915 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)4466255314516256356239663431110943 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.250.090.030.490.110.500.110.890.680.510.01 Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 105.1 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 32.6Intersection LOS: C Intersection Capacity Utilization 83.2%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 FNB C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)1206837204932971037049321752343 Future Volume (vph)1206837204932971037049321752343 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9830.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018310177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018310177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)133764122710333011478210324158148 Shared Lane Traffic (%) Lane Group Flow (vph)1337641227103330114885024158148 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.030.020.020.030.020.020.090.020.090.020.0 Total Split (%)12.5%18.8%12.5%12.5%18.8%12.5%12.5%56.3%12.5%56.3%12.5% Maximum Green (s)14.222.913.814.922.914.913.883.814.983.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)14.013.932.316.315.235.613.370.415.372.491.5 Actuated g/C Ratio0.100.100.240.120.110.260.100.520.110.540.68 v/c Ratio0.730.400.111.070.490.790.660.931.210.580.04 Control Delay84.866.343.8136.468.464.080.546.6180.224.37.8 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay84.866.343.8136.468.464.080.546.6180.224.37.8 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 FNB C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSFEDFEEFDFCA Approach Delay72.589.650.566.6 Approach LOSEFDE Queue Length 50th (ft)1186529~23690286100698~27434413 Queue Length 95th (ft)#24412666#461162#467#196#1014#50949430 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)200351400213351416200117320011931086 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.670.220.101.070.290.790.570.751.210.490.04 Intersection Summary Area Type:Other Cycle Length: 160 Actuated Cycle Length: 135.3 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.21 Intersection Signal Delay: 66.8Intersection LOS: E Intersection Capacity Utilization 85.2%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)13877422041082971107049321753065 Future Volume (vph)13877422041082971107049321753065 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9830.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018310177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018310177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)153864722712033012278210324158972 Shared Lane Traffic (%) Lane Group Flow (vph)1538647227120330122885024158972 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.030.020.020.030.020.020.090.020.090.020.0 Total Split (%)12.5%18.8%12.5%12.5%18.8%12.5%12.5%56.3%12.5%56.3%12.5% Maximum Green (s)14.222.913.814.922.914.913.883.814.983.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)14.915.434.116.315.736.113.671.315.372.992.9 Actuated g/C Ratio0.110.110.250.120.110.260.100.520.110.530.68 v/c Ratio0.800.420.121.080.570.800.700.931.230.600.07 Control Delay90.965.943.5142.271.064.684.148.2188.825.58.4 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay90.965.943.5142.271.064.684.148.2188.825.58.4 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSFEDFEEFDFCA Approach Delay75.691.852.667.8 Approach LOSEFDE Queue Length 50th (ft)1417534~245107290110715~28436021 Queue Length 95th (ft)#29913973#470184#444#220#1088#51651743 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)196345411210345415196115319611731073 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.780.250.111.080.350.800.620.771.230.500.07 Intersection Summary Area Type:Other Cycle Length: 160 Actuated Cycle Length: 137.6 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.23 Intersection Signal Delay: 68.9Intersection LOS: E Intersection Capacity Utilization 85.2%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle HaynePM 2021 Ph1 Build + Imps C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)13877422041082971107049321753065 Future Volume (vph)13877422041082971107049321753065 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002002500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9830.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018310177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018310177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)153864722712033012278210324158972 Shared Lane Traffic (%) Lane Group Flow (vph)1538647227120330122885024158972 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)17.013.021.020.016.022.021.065.022.066.017.0 Total Split (%)14.2%10.8%17.5%16.7%13.3%18.3%17.5%54.2%18.3%55.0%14.2% Maximum Green (s)11.25.914.814.98.916.914.858.816.959.811.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)11.88.026.216.011.233.213.258.617.062.479.2 Actuated g/C Ratio0.100.070.220.130.090.280.110.490.140.530.67 v/c Ratio0.860.690.130.950.690.740.620.980.950.600.07 Control Delay93.481.737.698.673.151.164.155.396.723.27.5 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay93.481.737.698.673.151.164.155.396.723.27.5 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle HaynePM 2021 Ph1 Build + Imps C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSFFDFEDEEFCA Approach Delay80.770.956.441.6 Approach LOSFEED Queue Length 50th (ft)1196629177922359164318830518 Queue Length 95th (ft)#241#14762#337#180#366153#935#35143936 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200250275475 Base Capacity (vph)1791253872391754432399262539801059 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.850.690.120.950.690.740.510.960.950.600.07 Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 118.6 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 57.6Intersection LOS: E Intersection Capacity Utilization 85.2%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2023 FNB C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)1226938208943031047189522253444 Future Volume (vph)1226938208943031047189522253444 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002001500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9820.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018290177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018290177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)136774223110433711679810624759349 Shared Lane Traffic (%) Lane Group Flow (vph)1367742231104337116904024759349 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)20.030.020.020.030.020.020.090.020.090.020.0 Total Split (%)12.5%18.8%12.5%12.5%18.8%12.5%12.5%56.3%12.5%56.3%12.5% Maximum Green (s)14.222.913.814.922.914.913.883.814.983.814.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)14.214.232.716.315.235.613.473.415.275.294.5 Actuated g/C Ratio0.100.100.240.120.110.260.100.530.110.540.68 v/c Ratio0.750.400.111.110.510.830.680.931.270.590.05 Control Delay87.767.344.5150.970.268.983.247.1203.524.37.8 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay87.767.344.5150.970.268.983.247.1203.524.37.8 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2023 FNB C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSFEDFEEFDFCA Approach Delay74.497.351.273.2 Approach LOSEFDE Queue Length 50th (ft)1276931~26195310107730~30535514 Queue Length 95th (ft)#25112767#472164#481#201#1107#52450831 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200150275475 Base Capacity (vph)195342394208342406195114219511631092 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.700.230.111.110.300.830.590.791.270.510.04 Intersection Summary Area Type:Other Cycle Length: 160 Actuated Cycle Length: 138.4 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.27 Intersection Signal Delay: 71.1Intersection LOS: E Intersection Capacity Utilization 86.5%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne PM 2023 Full Build C. Steiss Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Traffic Volume (vph)15083522081173031277189522254679 Future Volume (vph)15083522081173031277189522254679 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0002002500275475 Storage Lanes11121011 Taper Length (ft)25252525 Lane Util. Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Frt0.8500.8500.9820.850 Flt Protected0.9500.9500.9500.950 Satd. Flow (prot)177018631583177018631583177018290177018631583 Flt Permitted0.9500.9500.9500.950 Satd. Flow (perm)177018631583177018631583177018290177018631583 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)25454545 Link Distance (ft)4091017454884 Travel Time (s)11.215.46.913.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Adj. Flow (vph)167925823113033714179810624760788 Shared Lane Traffic (%) Lane Group Flow (vph)1679258231130337141904024760788 Turn TypeProtNApm+ovProtNApm+ovProtNAProtNApm+ov Protected Phases 74538152167 Permitted Phases486 Detector Phase 74538152167 Switch Phase Minimum Initial (s)5.05.05.05.05.05.05.012.05.012.05.0 Minimum Split (s)10.812.111.210.112.110.111.218.210.118.210.8 Total Split (s)17.013.021.020.016.022.021.065.022.066.017.0 Total Split (%)14.2%10.8%17.5%16.7%13.3%18.3%17.5%54.2%18.3%55.0%14.2% Maximum Green (s)11.25.914.814.98.916.914.858.816.959.811.2 Yellow Time (s)3.04.53.03.04.53.03.04.53.04.53.0 All-Red Time (s)2.82.63.22.12.62.13.21.72.11.72.8 Lost Time Adjust (s)-0.8-2.1-1.2-1.1-2.1-0.1-1.2-1.2-0.1-1.2-0.8 Total Lost Time (s)5.05.05.04.05.05.05.05.05.05.05.0 Lead/LagLeadLagLeadLeadLagLeadLeadLagLeadLagLead Lead-Lag Optimize?YesYesYesYesYesYesYesYesYesYesYes Vehicle Extension (s)2.02.02.02.02.02.02.06.02.05.52.0 Minimum Gap (s)3.03.03.03.03.03.03.03.03.03.03.0 Time Before Reduce (s)0.00.00.00.00.00.00.015.00.015.00.0 Time To Reduce (s)0.00.00.00.00.00.00.040.00.040.00.0 Recall ModeNoneNoneNoneNoneNoneNoneNoneMinNoneMinNone Act Effct Green (s)12.08.026.916.011.033.013.960.017.063.180.1 Actuated g/C Ratio0.100.070.220.130.090.280.120.500.140.530.67 v/c Ratio0.940.740.160.980.760.770.690.990.990.620.08 Control Delay108.488.237.8105.781.253.667.957.6105.824.07.7 Queue Delay0.00.00.00.00.00.00.00.00.00.00.0 Total Delay108.488.237.8105.781.253.667.957.6105.824.07.7 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne PM 2023 Full Build C. Steiss Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR LOSFFDFFDEEFCA Approach Delay89.676.059.043.9 Approach LOSFEED Queue Length 50th (ft)131713618110024110567119332623 Queue Length 95th (ft)#268#15873#343#201#378174#968#36245843 Internal Link Dist (ft)329937374804 Turn Bay Length (ft)200250275475 Base Capacity (vph)1771243822361704352369142509791055 Starvation Cap Reductn 00000000000 Spillback Cap Reductn 00000000000 Storage Cap Reductn 00000000000 Reduced v/c Ratio0.940.740.150.980.760.770.600.990.990.620.08 Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 120 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.99 Intersection Signal Delay: 61.4Intersection LOS: E Intersection Capacity Utilization 86.5%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis NC 133 (Castle Hayne Road) at Existing Site Access HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM Exist C. Steiss Page 4 Intersection Int Delay, s/veh0.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h254554109314 Future Vol, veh/h254554109314 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow264616121416 Major/MinorMinor2Major1Major2 Conflicting Flow All1838121412140-0 Stage 11214 ----- Stage 2624 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver83221575--- Stage 1281 ----- Stage 2534 ----- Platoon blocked, %--- Mov Cap-1 Maneuver82221575--- Mov Cap-2 Maneuver200 ----- Stage 1281 ----- Stage 2528 ----- ApproachEBNBSB HCM Control Delay, s22.40.10 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)575-215-- HCM Lane V/C Ratio0.008-0.036-- HCM Control Delay (s)11.3022.4-- HCM Lane LOSBAC-- HCM 95th %tile Q(veh)0-0.1-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM 2021 FNB C. Steiss Page 4 Intersection Int Delay, s/veh0.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h254583116414 Future Vol, veh/h254583116414 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow264648129316 Major/MinorMinor2Major1Major2 Conflicting Flow All1950129312930-0 Stage 11293 ----- Stage 2657 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver71199536--- Stage 1257 ----- Stage 2516 ----- Platoon blocked, %--- Mov Cap-1 Maneuver70199536--- Mov Cap-2 Maneuver184 ----- Stage 1257 ----- Stage 2510 ----- ApproachEBNBSB HCM Control Delay, s24.30.10 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)536-194-- HCM Lane V/C Ratio0.008-0.04-- HCM Control Delay (s)11.8024.3-- HCM Lane LOSBAC-- HCM 95th %tile Q(veh)0-0.1-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build C. Steiss Page 4 Intersection Int Delay, s/veh0.5 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h22811586117116 Future Vol, veh/h22811586117116 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow23112651130118 Major/MinorMinor2Major1Major2 Conflicting Flow All1977130113010-0 Stage 11301 ----- Stage 2676 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver68197532--- Stage 1255 ----- Stage 2505 ----- Platoon blocked, %--- Mov Cap-1 Maneuver66197532--- Mov Cap-2 Maneuver179 ----- Stage 1255 ----- Stage 2487 ----- ApproachEBNBSB HCM Control Delay, s27.10.20 HCM LOSD Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)532-196-- HCM Lane V/C Ratio0.023-0.17-- HCM Control Delay (s)11.9027.1-- HCM Lane LOSBAD-- HCM 95th %tile Q(veh)0.1-0.6-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM 2023 FNB C. Steiss Page 4 Intersection Int Delay, s/veh0.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h254594118715 Future Vol, veh/h254594118715 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow264660131917 Major/MinorMinor2Major1Major2 Conflicting Flow All1988131913190-0 Stage 11319 ----- Stage 2669 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver67192524--- Stage 1250 ----- Stage 2509 ----- Platoon blocked, %--- Mov Cap-1 Maneuver66192524--- Mov Cap-2 Maneuver178 ----- Stage 1250 ----- Stage 2503 ----- ApproachEBNBSB HCM Control Delay, s250.10 HCM LOSD Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)524-188-- HCM Lane V/C Ratio0.008-0.041-- HCM Control Delay (s)11.9025-- HCM Lane LOSBAD-- HCM 95th %tile Q(veh)0-0.1-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/20/2018 180243 BRC Castle Hayne AM 2023 Build C. Steiss Page 4 Intersection Int Delay, s/veh0.6 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h23011602121119 Future Vol, veh/h23011602121119 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow23312669134621 Major/MinorMinor2Major1Major2 Conflicting Flow All2039134613460-0 Stage 11346 ----- Stage 2693 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver62185512--- Stage 1242 ----- Stage 2496 ----- Platoon blocked, %--- Mov Cap-1 Maneuver60185512--- Mov Cap-2 Maneuver171 ----- Stage 1242 ----- Stage 2478 ----- ApproachEBNBSB HCM Control Delay, s29.20.20 HCM LOSD Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)512-184-- HCM Lane V/C Ratio0.024-0.193-- HCM Control Delay (s)12.2029.2-- HCM Lane LOSBAD-- HCM 95th %tile Q(veh)0.1-0.7-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM Exist C. Steiss Page 4 Intersection Int Delay, s/veh0.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h32687867310 Future Vol, veh/h32687867310 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow32797674811 Major/MinorMinor2Major1Major2 Conflicting Flow All17377487480-0 Stage 1748 ----- Stage 2989 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver96412861--- Stage 1468 ----- Stage 2360 ----- Platoon blocked, %--- Mov Cap-1 Maneuver94412861--- Mov Cap-2 Maneuver226 ----- Stage 1468 ----- Stage 2354 ----- ApproachEBNBSB HCM Control Delay, s18.30.10 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)861-276-- HCM Lane V/C Ratio0.008-0.02-- HCM Control Delay (s)9.2018.3-- HCM Lane LOSAAC-- HCM 95th %tile Q(veh)0-0.1-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM 2021 FNB C. Steiss Page 4 Intersection Int Delay, s/veh0.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h32694771710 Future Vol, veh/h32694771710 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow327105279711 Major/MinorMinor2Major1Major2 Conflicting Flow All18637977970-0 Stage 1797 ----- Stage 21066 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver80387825--- Stage 1444 ----- Stage 2331 ----- Platoon blocked, %--- Mov Cap-1 Maneuver78387825--- Mov Cap-2 Maneuver205 ----- Stage 1444 ----- Stage 2324 ----- ApproachEBNBSB HCM Control Delay, s19.60.10 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)825-252-- HCM Lane V/C Ratio0.008-0.022-- HCM Control Delay (s)9.4019.6-- HCM Lane LOSAAC-- HCM 95th %tile Q(veh)0-0.1-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build C. Steiss Page 4 Intersection Int Delay, s/veh0.3 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h3152895472217 Future Vol, veh/h3152895472217 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow31731106080219 Major/MinorMinor2Major1Major2 Conflicting Flow All19248028020-0 Stage 1802 ----- Stage 21122 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver73384822--- Stage 1441 ----- Stage 2311 ----- Platoon blocked, %--- Mov Cap-1 Maneuver66384822--- Mov Cap-2 Maneuver185 ----- Stage 1441 ----- Stage 2282 ----- ApproachEBNBSB HCM Control Delay, s16.80.30 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)822-326-- HCM Lane V/C Ratio0.038-0.061-- HCM Control Delay (s)9.6016.8-- HCM Lane LOSAAC-- HCM 95th %tile Q(veh)0.1-0.2-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM 2023 FNB C. Steiss Page 4 Intersection Int Delay, s/veh0.1 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h32696573111 Future Vol, veh/h32696573111 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow327107281212 Major/MinorMinor2Major1Major2 Conflicting Flow All18988128120-0 Stage 1812 ----- Stage 21086 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver76379814--- Stage 1437 ----- Stage 2324 ----- Platoon blocked, %--- Mov Cap-1 Maneuver74379814--- Mov Cap-2 Maneuver200 ----- Stage 1437 ----- Stage 2317 ----- ApproachEBNBSB HCM Control Delay, s19.90.10 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)814-247-- HCM Lane V/C Ratio0.008-0.022-- HCM Control Delay (s)9.5019.9-- HCM Lane LOSAAC-- HCM 95th %tile Q(veh)0-0.1-- HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/20/2018 180243 BRC Castle Hayne PM 2023 Full Build C. Steiss Page 4 Intersection Int Delay, s/veh0.4 MovementEBLEBRNBLNBTSBTSBR Lane Configurations Traffic Vol, veh/h3162998874523 Future Vol, veh/h3162998874523 Conflicting Peds, #/hr0 00000 Sign Control StopStopFreeFreeFreeFree RT Channelized-None-None-None Storage Length0 ----0 Veh in Median Storage, #0--00- Grade, %0--00- Peak Hour Factor909090909090 Heavy Vehicles, %2 22222 Mvmt Flow31832109882826 Major/MinorMinor2Major1Major2 Conflicting Flow All19908288280-0 Stage 1828 ----- Stage 21162 ----- Critical Hdwy6.426.224.12--- Critical Hdwy Stg 15.42 ----- Critical Hdwy Stg 25.42 ----- Follow-up Hdwy3.5183.3182.218--- Pot Cap-1 Maneuver67371803--- Stage 1429 ----- Stage 2298 ----- Platoon blocked, %--- Mov Cap-1 Maneuver60371803--- Mov Cap-2 Maneuver176 ----- Stage 1429 ----- Stage 2268 ----- ApproachEBNBSB HCM Control Delay, s17.20.30 HCM LOSC Minor Lane/Major MvmtNBLNBTEBLn1SBTSBR Capacity (veh/h)803-316-- HCM Lane V/C Ratio0.04-0.067-- HCM Control Delay (s)9.7017.2-- HCM Lane LOSAAC-- HCM 95th %tile Q(veh)0.1-0.2-- 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Queueing and Blocking Reports Queuing and Blocking Report AM Exist 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)7453522057618417438829948415 Average Queue (ft)242113115267037262821814 95th Queue (ft)6054411756011814042018836114 Link Distance (ft)362362362981374836 Upstream Blk Time (%)1 Queuing Penalty (veh)8 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)00311 Queuing Penalty (veh)1043 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)42322 Average Queue (ft)532 95th Queue (ft)23144 Link Distance (ft)309469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 16 Queuing and Blocking Report AM 2021 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)118969644830017417539030037241 Average Queue (ft)5254511868599272671592176 95th Queue (ft)9795863322341639640927034221 Link Distance (ft)362362362981374836 Upstream Blk Time (%)2 Queuing Penalty (veh)10 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)123214 Queuing Penalty (veh)33888 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)42154 Average Queue (ft)617 95th Queue (ft)2480 Link Distance (ft)309469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 68 Queuing and Blocking Report AM 2021 Ph1 Build 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)1801169639530020817538130065642 Average Queue (ft)79655719772101302451942919 95th Queue (ft)1471119332121318510440631551430 Link Distance (ft)362362362981374836 Upstream Blk Time (%)1 Queuing Penalty (veh)4 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)20012528 Queuing Penalty (veh)551171318 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)64416 Average Queue (ft)2052 95th Queue (ft)44223 Link Distance (ft)309469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 99 Queuing and Blocking Report AM 2021 Ph1 Build + Imps 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)13613513526711823625038530059061 Average Queue (ft)70686416348109432671782857 95th Queue (ft)1241161162359518416138731446527 Link Distance (ft)362362362981374836 Upstream Blk Time (%)1 Queuing Penalty (veh)4 Storage Bay Dist (ft)200200225275475 Storage Blk Time (%)511709 Queuing Penalty (veh)1345021 Intersection: 200: Castle Hayne Road & Site Access MovementEBNBSB Directions ServedLRLTR Maximum Queue (ft)4429320 Average Queue (ft)22371 95th Queue (ft)451596 Link Distance (ft)309469374 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 47 Queuing and Blocking Report AM 2023 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)969613732630024517537729961615 Average Queue (ft)54575217654110332531842434 95th Queue (ft)96969726914218311540331743515 Link Distance (ft)362362362981374836 Upstream Blk Time (%)0 Queuing Penalty (veh)2 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)712945 Queuing Penalty (veh)20283112 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)42125 Average Queue (ft)713 95th Queue (ft)2569 Link Distance (ft)309469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 74 Queuing and Blocking Report AM 2023 Build 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)13116315638130022024938929955840 Average Queue (ft)72796816076109312311822987 95th Queue (ft)12013312327319620010736531349424 Link Distance (ft)362362362981374836 Upstream Blk Time (%)2 Queuing Penalty (veh)13 Storage Bay Dist (ft)200200225275475 Storage Blk Time (%)70110010 Queuing Penalty (veh)20023024 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)70484 Average Queue (ft)1661 95th Queue (ft)43264 Link Distance (ft)309469 Upstream Blk Time (%)1 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 62 Queuing and Blocking Report PM Exist 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)336535220327825017439118921039 Average Queue (ft)172251013163142633861001213 95th Queue (ft)317563519816622617739215819517 Link Distance (ft)362362362981374836 Upstream Blk Time (%)31 Queuing Penalty (veh)274 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)10350 Queuing Penalty (veh)20529 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)86521 Average Queue (ft)31372 95th Queue (ft)76612 Link Distance (ft)309469 Upstream Blk Time (%)30 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 310 Queuing and Blocking Report PM 2021 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)28614111858430025017539230087042 Average Queue (ft)12467462621801901093662152888 95th Queue (ft)2211299850235327219145232961629 Link Distance (ft)362362362981374836 Upstream Blk Time (%)183 Queuing Penalty (veh)1720 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)17320437113 Queuing Penalty (veh)665413339638 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)40484 Average Queue (ft)8258 95th Queue (ft)29575 Link Distance (ft)309469 Upstream Blk Time (%)7 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 427 Queuing and Blocking Report PM 2021 Ph1 Build 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)2221519354930025017539030054241 Average Queue (ft)125693625118618210937220824610 95th Queue (ft)2091268045734524620143531842031 Link Distance (ft)362362362981374836 Upstream Blk Time (%)12 Queuing Penalty (veh)117 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)1821023625 Queuing Penalty (veh)7441916391413 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)66484 Average Queue (ft)16206 95th Queue (ft)44466 Link Distance (ft)309469 Upstream Blk Time (%)4 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 296 Queuing and Blocking Report PM 2021 Ph1 Build + Imps 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)24216211835130025025039029941142 Average Queue (ft)10680402021311761443831661899 95th Queue (ft)1741458632328323030539226433530 Link Distance (ft)362362362981374836 Upstream Blk Time (%)26 Queuing Penalty (veh)245 Storage Bay Dist (ft)200200225275475 Storage Blk Time (%)152604102 Queuing Penalty (veh)6051234507 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)212508 Average Queue (ft)55399 95th Queue (ft)146647 Link Distance (ft)309469 Upstream Blk Time (%)32 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 378 Queuing and Blocking Report PM 2023 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)286160118699300250175392300870700 Average Queue (ft)132703238222719310934925542575 95th Queue (ft)24813580683392283196444354881416 Link Distance (ft)362362362981374836 Upstream Blk Time (%)147 Queuing Penalty (veh)1330 Storage Bay Dist (ft)200200150275475 Storage Blk Time (%)42427735262 Queuing Penalty (veh)16785560361486 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)22503 Average Queue (ft)4201 95th Queue (ft)16511 Link Distance (ft)309469 Upstream Blk Time (%)6 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 614 Queuing and Blocking Report PM 2023 Full Build 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue MovementEBEBEBWBWBWBNBNBSBSBSB Directions ServedLTRLTRLTRLTR Maximum Queue (ft)30416211560830024525039130042761 Average Queue (ft)139824720112517614238220222011 95th Queue (ft)2581419939723623627539131038232 Link Distance (ft)362362362981374836 Upstream Blk Time (%)28 Queuing Penalty (veh)282 Storage Bay Dist (ft)200200225275475 Storage Blk Time (%)111704414 Queuing Penalty (veh)47215056514 Intersection: 200: Castle Hayne Road & Site Access MovementEBNB Directions ServedLRLT Maximum Queue (ft)65532 Average Queue (ft)13477 95th Queue (ft)38552 Link Distance (ft)309469 Upstream Blk Time (%)49 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 421 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Trip Generation 24 Hour Two-Way Land Use ITE Land Code Data Source Volume Enter Exit Enter Exit Apartments220216 Dwelling Units Adjacent /Equation 1,59223767443 1,59223767443 24 Hour Two-Way Land Use ITE Land Code Data Source Volume Enter Exit Enter Exit Apartments220360 Dwelling Units Adjacent /Equation 2,6813712411668 2,6813712411668 ITE Trip Generation Size Average Weekday Driveway Volumes Total Trips BRC Castle Hayne (Phase 1) AM Peak Hour PM Peak Hour Total Trips ITE Trip Generation BRC Castle Hayne (Full Build) Average Weekday Driveway Volumes AM Peak Hour PM Peak Hour Size 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Traffic Volume Data 10 0 AM P e a k 20 1 8 TM C Ba l a n c i n g 20 1 8 Ex i s t i n g 20 2 1 Pr o j e c t e d Ap p d De v 20 2 1 Fu t u r e N o Bu i l d Ph a s e 1 S i t e Tr i p s 20 2 1 P h a s e 1 B u i l d 20 2 3 Pr o j e c t e d Ap p d D e v 20 2 3 F u t u r e No B u i l d Fu l l B u i l d Sit e T r i p s 20 2 3 F u l l Build EB L 3 5 3 5 3 6 2 8 6 4 3 0 9 5 3 7 2 8 6 5 5 0 1 1 5 EB T 3 4 3 4 3 5 2 8 6 3 1 5 7 8 3 6 2 8 6 4 2 5 8 9 EB R 2 7 2 7 2 8 3 8 6 6 8 7 3 2 8 3 8 6 6 2 5 9 0 WB L 2 5 1 2 5 1 2 5 9 2 5 9 2 5 9 2 6 4 2 6 4 2 6 4 WB T 6 0 6 0 6 2 9 7 1 5 7 6 6 3 9 7 2 7 8 0 WB R 1 9 5 1 9 5 2 0 1 2 0 1 2 0 1 2 0 5 2 0 5 2 0 5 NB L 1 3 1 3 1 3 1 2 2 5 2 2 8 1 4 1 2 2 6 7 3 4 NB T 4 1 0 4 1 0 4 2 2 4 2 2 4 2 2 4 3 1 4 3 1 4 3 1 NB R 8 7 8 7 9 0 9 0 9 0 9 1 9 1 9 1 SB L 2 0 6 2 0 6 2 1 2 2 1 2 2 1 2 2 1 7 2 1 7 2 1 7 SB T 7 6 4 7 6 4 7 8 7 7 8 7 2 7 8 9 8 0 3 8 0 3 4 8 0 7 SB R 1 2 1 2 1 2 9 2 1 7 2 8 1 3 9 2 2 1 1 3 3 To t a l 2 0 9 4 0 2 0 9 4 2 1 5 7 1 2 5 2 2 8 2 6 9 2 3 5 1 2 2 0 2 1 2 5 2 3 2 7 1 2 9 2 4 5 6 20 0 AM P e a k 20 1 8 TM C Ba l a n c i n g 20 1 8 Ex i s t i n g 20 2 1 Pr o j e c t e d Ap p d De v 20 2 1 Fu t u r e N o Bu i l d Ph a s e 1 S i t e Tr i p s 20 2 1 P h a s e 1 B u i l d 20 2 3 Pr o j e c t e d Ap p d D e v 20 2 3 F u t u r e No B u i l d Fu l l B u i l d Sit e T r i p s 20 2 3 F u l l Build EB L 2 2 2 2 2 2 2 2 EB T 0 0 0 0 0 0 0 0 EB R 5 5 5 5 2 3 2 8 5 5 2 5 3 0 WB L 0 0 0 0 0 0 0 0 WB T 0 0 0 0 0 0 0 0 WB R 0 0 0 0 0 0 0 0 NB L 4 4 4 4 7 1 1 4 4 7 1 1 NB T 5 5 4 5 5 4 5 7 1 1 2 5 8 3 2 5 8 6 5 8 2 1 2 5 9 4 7 6 0 2 NB R 0 0 0 0 0 0 0 0 SB L 0 0 0 0 0 0 0 0 SB T 1 0 9 3 1 0 9 3 1 1 2 6 3 8 1 1 6 4 8 1 1 7 1 1 1 4 9 3 8 1 1 8 7 2 5 1 2 1 1 SB R 1 4 1 4 1 4 1 4 2 1 6 1 5 1 5 4 1 9 To t a l 1 6 7 2 0 1 6 7 2 1 7 2 2 5 0 1 7 7 2 4 2 1 8 1 4 1 7 5 7 5 0 1 8 0 7 6 8 1 8 7 5 NC 1 3 3 ( C a s t l e H a y n e R o a d ) a t N o r t h K e r r A v e n u e / R i v e r s i d e D r i v e NC 1 3 3 ( C a s t l e H a y n e R o a d ) a t S i t e A c c e s s 10 0 PM P e a k 20 1 8 TM C Ba l a n c i n g 20 1 8 Ex i s t i n g 20 2 1 Pr o j e c t e d Ap p d De v 20 2 1 Fu t u r e N o Bu i l d Ph a s e 1 S i t e Tr i p s 20 2 1 P h a s e 1 B u i l d 20 2 3 Pr o j e c t e d Ap p d D e v 20 2 3 F u t u r e No B u i l d Fu l l B u i l d Si t e T r i p s 20 2 3 F u l l Bu i l d EB L 9 9 9 9 1 0 2 1 8 1 2 0 1 7 1 3 8 1 0 4 1 8 1 2 2 2 7 1 5 0 EB T 4 9 4 9 5 0 1 8 6 8 9 7 7 5 1 1 8 6 9 1 4 8 3 EB R 1 3 1 3 1 3 2 4 3 7 4 4 2 1 4 2 4 3 8 1 4 5 2 WB L 1 9 8 1 9 8 2 0 4 2 0 4 2 0 4 2 0 8 2 0 8 2 0 8 WB T 6 0 6 0 6 2 3 1 9 3 1 5 1 0 8 6 3 3 1 9 4 2 3 1 1 7 WB R 2 8 8 2 8 8 2 9 7 2 9 7 2 9 7 3 0 3 3 0 3 3 0 3 NB L 5 9 5 9 6 1 4 2 1 0 3 7 1 1 0 6 2 4 2 1 0 4 2 3 1 2 7 NB T 6 8 3 6 8 3 7 0 4 7 0 4 7 0 4 7 1 8 7 1 8 7 1 8 NB R 9 0 9 0 9 3 9 3 9 3 9 5 9 5 9 5 SB L 2 1 1 2 1 1 2 1 7 2 1 7 2 1 7 2 2 2 2 2 2 2 2 2 SB T 5 0 8 5 0 8 5 2 3 5 2 3 7 5 3 0 5 3 4 5 3 4 1 2 5 4 6 SB R 1 2 1 2 1 2 3 1 4 3 2 2 6 5 1 3 3 1 4 4 3 5 7 9 To t a l 2 2 7 0 0 2 2 7 0 2 3 3 8 1 6 5 2 5 0 3 8 2 2 5 8 5 2 3 8 7 1 6 5 2 5 5 2 1 4 7 2 6 9 9 20 0 PM P e a k 20 1 8 TM C Ba l a n c i n g 20 1 8 Ex i s t i n g 20 2 1 Pr o j e c t e d Ap p d De v 20 2 1 Fu t u r e N o Bu i l d Ph a s e 1 S i t e Tr i p s 20 2 1 P h a s e 1 B u i l d 20 2 3 Pr o j e c t e d Ap p d D e v 20 2 3 F u t u r e No B u i l d Fu l l B u i l d Si t e T r i p s 20 2 3 F u l l Bu i l d EB L 3 3 3 3 3 3 3 3 EB T 0 0 0 0 0 0 0 0 EB R 2 2 2 2 1 3 1 5 2 2 1 4 1 6 WB L 0 0 0 0 0 0 0 0 WB T 0 0 0 0 0 0 0 0 WB R 0 0 0 0 0 0 0 0 NB L 6 6 6 6 2 2 2 8 6 6 2 3 2 9 NB T 8 7 8 8 7 8 9 0 5 4 2 9 4 7 7 9 5 4 9 2 3 4 2 9 6 5 2 3 9 8 8 NB R 0 0 0 0 0 0 0 0 SB L 0 0 0 0 0 0 0 0 SB T 6 7 3 6 7 3 6 9 3 2 4 7 1 7 4 7 2 2 7 0 7 2 4 7 3 1 1 4 7 4 5 SB R 1 0 1 0 1 0 1 0 7 1 7 1 1 1 1 1 2 2 3 To t a l 1 5 7 2 0 1 5 7 2 1 6 1 9 6 6 1 6 8 5 5 4 1 7 3 9 1 6 5 2 6 6 1 7 1 8 8 5 1 8 0 3 NC 1 3 3 ( C a s t l e H a y n e R o a d ) a t N o r t h K e r r A v e n u e / R i v e r s i d e D r i v e NC 1 3 3 ( C a s t l e H a y n e R o a d ) a t S i t e A c c e s s File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 1 Counted By: N. Baskett Weather: Clear Groups Printed- Cars - Trucks and Buses - Bicycles NC 133 (Castle Hayne Road) Southbound N Kerr Avenue Westbound NC 133 (Castle Hayne Road) Northbound N Kerr Avenue Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total07:00 AM 7 187 46 0 240 47 2 34 0 83 21 73 5 0 99 3 9 4 0 16 0 438 438 07:15 AM 5 233 55 0 293 72 11 59 0 142 28 92 2 0 122 6 16 12 0 34 0 591 591 07:30 AM 2 160 39 0 201 30 11 59 0 100 26 92 7 0 125 4 9 11 0 24 0 450 450 07:45 AM 1 186 62 0 249 57 10 85 0 152 23 101 2 0 126 4 6 14 0 24 0 551 551 Total 15 766 202 0 983 206 34 237 0 477 98 358 16 0 472 17 40 41 0 98 0 2030 2030 08:00 AM 3 188 48 0 239 51 15 47 0 113 21 100 1 0 122 5 11 7 0 23 0 497 497 08:15 AM 3 226 39 0 268 35 14 45 0 94 29 104 2 0 135 12 12 7 0 31 0 528 528 08:30 AM 5 164 57 0 226 52 21 74 0 147 14 105 8 0 127 6 5 7 0 18 0 518 518 08:45 AM 5 206 38 0 249 52 11 56 0 119 24 101 4 0 129 4 10 18 0 32 0 529 529 Total 16 784 182 0 982 190 61 222 0 473 88 410 15 0 513 27 38 39 0 104 0 2072 2072 ***BREAK*** 04:00 PM 1 128 62 0 191 44 14 29 0 87 19 146 8 0 173 11 8 21 0 40 0 491 491 04:15 PM 3 123 41 0 167 64 10 45 0 119 16 142 18 0 176 15 15 28 0 58 0 520 520 04:30 PM 2 150 43 0 195 95 12 42 0 149 26 188 19 0 233 5 11 22 0 38 0 615 615 04:45 PM 3 102 24 0 129 44 12 40 0 96 11 116 13 0 140 10 12 31 0 53 0 418 418 Total 9 503 170 0 682 247 48 156 0 451 72 592 58 0 722 41 46 102 0 189 0 2044 2044 05:00 PM 2 147 57 0 206 78 11 57 0 146 34 170 15 0 219 2 7 17 0 26 0 597 597 05:15 PM 5 135 41 0 181 78 20 55 0 153 20 178 9 0 207 6 12 35 0 53 0 594 594 05:30 PM 2 125 47 0 174 70 14 45 0 129 18 178 18 0 214 2 13 17 0 32 0 549 549 05:45 PM 3 101 66 0 170 62 15 41 0 118 18 157 17 0 192 3 17 30 0 50 0 530 530 Total 12 508 211 0 731 288 60 198 0 546 90 683 59 0 832 13 49 99 0 161 0 2270 2270 Grand Total 52 2561 765 0 3378 931 203 813 0 1947 348 2043 148 0 2539 98 173 281 0 552 0 8416 8416 Apprch %1.5 75.8 22.6 47.8 10.4 41.8 13.7 80.5 5.8 17.8 31.3 50.9 Total %0.6 30.4 9.1 40.1 11.1 2.4 9.7 23.1 4.1 24.3 1.8 30.2 1.2 2.1 3.3 6.6 0 100 Cars 50 2477 739 3266 896 203 773 1872 326 1990 146 2462 94 171 273 538 0 0 8138 % Cars 96.2 96.7 96.6 0 96.7 96.2 100 95.1 0 96.1 93.7 97.4 98.6 0 97 95.9 98.8 97.2 0 97.5 0 0 96.7 Trucks and Buses 2 84 26 112 35 0 40 75 22 53 2 77 4 2 8 14 0 0 278 % Trucks and Buses 3.8 3.3 3.4 0 3.3 3.8 0 4.9 0 3.9 6.3 2.6 1.4 0 3 4.1 1.2 2.8 0 2.5 0 0 3.3 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 ** PDF file created with demo version of the ComponentOne VSPDF8 control. ** File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 2 NC 133 (Castle Hayne Road) N K e r r A v e n u e N K e r r A v e n u e NC 133 (Castle Hayne Road) Right 50 2 0 52 Thru 2477 84 0 2561 Left 739 26 0 765 InOut Total 3159 3266 6425 96 112 208 0 0 0 3255 6633 3378 Rig h t 89 6 35 0 93 1 Th r u 20 3 0 0 20 3 Le f t 77 3 40 0 81 3 Ou t To t a l In 12 3 6 18 7 2 31 0 8 50 75 12 5 0 0 0 12 8 6 32 3 3 19 4 7 Left 146 2 0 148 Thru 1990 53 0 2043 Right 326 22 0 348 Out TotalIn 3344 2462 5806 128 77 205 0 0 0 3472 6011 2539 Le f t 27 3 8 0 28 1 Th r u17 1 2 0 17 3 Ri g h t 94 4 0 98 To t a l Ou t In 39 9 53 8 93 7 4 14 18 0 0 0 40 3 95 5 55 2 10/18/2018 07:00 AM 10/18/2018 05:45 PM Cars Trucks and Buses Bicycles North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 3 NC 133 (Castle Hayne Road) Southbound N Kerr Avenue Westbound NC 133 (Castle Hayne Road) Northbound N Kerr Avenue Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 1 186 62 249 57 10 85 152 23 101 2 126 4 6 14 24 551 08:00 AM 3 188 48 239 51 15 47 113 21 100 1 122 5 11 7 23 497 08:15 AM 3 226 39 268 35 14 45 94 29 104 2 135 12 12 7 31 528 08:30 AM 5 164 57 226 52 21 74 147 14 105 8 127 6 5 7 18 518 Total Volume 12 764 206 982 195 60 251 506 87 410 13 510 27 34 35 96 2094 % App. Total 1.2 77.8 21 38.5 11.9 49.6 17.1 80.4 2.5 28.1 35.4 36.5 PHF .600 .845 .831 .916 .855 .714 .738 .832 .750 .976 .406 .944 .563 .708 .625 .774 .950 Cars 11 729 195 935 185 60 239 484 82 387 13 482 24 34 35 93 1994 % Cars 91.7 95.4 94.7 95.2 94.9 100 95.2 95.7 94.3 94.4 100 94.5 88.9 100 100 96.9 95.2 Trucks and Buses 1 35 11 47 10 0 12 22 5 23 0 28 3 0 0 3 100 % Trucks and Buses 8.3 4.6 5.3 4.8 5.1 0 4.8 4.3 5.7 5.6 0 5.5 11.1 0 0 3.1 4.8 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NC 133 (Castle Hayne Road) N K e r r A v e n u e N K e r r A v e n u e NC 133 (Castle Hayne Road) Right 11 1 0 12 Thru 729 35 0 764 Left 195 11 0 206 InOut Total 607 935 1542 33 47 80 0 0 0 640 1622 982 Ri g h t 18 5 10 0 19 5 Th r u 60 0 0 60 Le f t 23 9 12 0 25 1 Ou t To t a l In 31 1 48 4 79 5 16 22 38 0 0 0 32 7 83 3 50 6 Left 13 0 0 13 Thru 387 23 0 410 Right 82 5 0 87 Out TotalIn 992 482 1474 50 28 78 0 0 0 1042 1552 510 Le f t 35 0 0 35 Th r u 34 0 0 34 Rig h t 24 3 0 27 To t a l Ou t In 84 93 17 7 1 3 4 0 0 0 85 18 1 96 Peak Hour Begins at 07:45 AM Cars Trucks and Buses Bicycles Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 4 NC 133 (Castle Hayne Road) Southbound N Kerr Avenue Westbound NC 133 (Castle Hayne Road) Northbound N Kerr Avenue Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 2 147 57 206 78 11 57 146 34 170 15 219 2 7 17 26 597 05:15 PM 5 135 41 181 78 20 55 153 20 178 9 207 6 12 35 53 594 05:30 PM 2 125 47 174 70 14 45 129 18 178 18 214 2 13 17 32 549 05:45 PM 3 101 66 170 62 15 41 118 18 157 17 192 3 17 30 50 530 Total Volume 12 508 211 731 288 60 198 546 90 683 59 832 13 49 99 161 2270 % App. Total 1.6 69.5 28.9 52.7 11 36.3 10.8 82.1 7.1 8.1 30.4 61.5 PHF .600 .864 .799 .887 .923 .750 .868 .892 .662 .959 .819 .950 .542 .721 .707 .759 .951 Cars 12 496 203 711 284 60 190 534 82 681 59 822 13 48 93 154 2221 % Cars 100 97.6 96.2 97.3 98.6 100 96.0 97.8 91.1 99.7 100 98.8 100 98.0 93.9 95.7 97.8 Trucks and Buses 0 12 8 20 4 0 8 12 8 2 0 10 0 1 6 7 49 % Trucks and Buses 0 2.4 3.8 2.7 1.4 0 4.0 2.2 8.9 0.3 0 1.2 0 2.0 6.1 4.3 2.2 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NC 133 (Castle Hayne Road) N K e r r A v e n u e N K e r r A v e n u e NC 133 (Castle Hayne Road) Right 12 0 0 12 Thru 496 12 0 508 Left 203 8 0 211 InOut Total 1058 711 1769 12 20 32 0 0 0 1070 1801 731 Rig h t 28 4 4 0 28 8 Th r u 60 0 0 60 Le f t 19 0 8 0 19 8 Ou t To t a l In 33 3 53 4 86 7 17 12 29 0 0 0 35 0 89 6 54 6 Left 59 0 0 59 Thru 681 2 0 683 Right 82 8 0 90 Out TotalIn 699 822 1521 20 10 30 0 0 0 719 1551 832 Le f t 93 6 0 99 Th r u 48 1 0 49 Ri g h t 13 0 0 13 To t a l Ou t In 13 1 15 4 28 5 0 7 7 0 0 0 13 1 29 2 16 1 Peak Hour Begins at 05:00 PM Cars Trucks and Buses Bicycles Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name: 180243 NC 133 at Dollar General Driveway Site Code: 00180243 Start Date: 10/18/2018 Page No: 1 Counted By: N. Baskett Weather: Clear Groups Printed- Cars - Trucks and Buses - Bikes (NC 133) Castle Hayne Road Southbound N/A Westbound (NC 133) Castle Hayne Road Northbound Dollar General Driveway Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total07:00 AM 022500225 00000 012310124 10001 0350350 07:15 AM 027600276 00000 012410125 00000 0401401 07:30 AM 224900251 30003 013610137 00000 0391391 07:45 AM 228400286 00121 015510156 00101 2444446 Total 4 1034 0 0 1038 3 0 1 2 4 0 538 4 0 542 1 0 1 0 2 2 1586 1588 08:00 AM 427400278 00000 013020132 20002 0412412 08:15 AM 428300287 00000 013800138 10102 0427427 08:30 AM 425200256 00101 013110132 20002 0391391 08:45 AM 225500257 00101 011911120 10203 1381382 Total 14 1064 0 0 1078 0 0 2 0 2 0 518 4 1 522 6 0 3 0 9 1 1611 1612 ***BREAK*** 04:00 PM 217000172 00202 017510176 40004 0354354 04:15 PM 317800181 00000 017180179 10102 0362362 04:30 PM 214100143 00000 019660202 10102 0347347 04:45 PM 218100183 00000 022610227 00101 0411411 Total 9 670 0 0 679 0 0 2 0 2 0 768 16 0 784 6 0 3 0 9 0 1474 1474 05:00 PM 322000223 00000 025210253 00101 0477477 05:15 PM 216600168 00000 021320215 10001 0384384 05:30 PM 014600146 00000 020700207 00101 0354354 05:45 PM 514100146 00000 020630209 10102 0357357 Total 10 673 0 0 683 0 0 0 0 0 0 878 6 0 884 2 0 3 0 5 0 1572 1572 Grand Total 37 3441 003478 30528 0 2702 3012732 15010025 362436246 Apprch %1.1 98.9 0 37.5 0 62.5 0 98.9 1.1 60040 Total %0.6 55.1 055.7 000.10.1 0 43.3 0.543.8 0.200.20.4 0100 Cars 37 3326 0 3363 3 0 5 10 0 2621 30 2652 14 0 10 24 0 0 6049 % Cars 100 96.7 0096.7 1000100100100 09710010097 93.3 0100096 0096.8 Trucks and Buses 0 115 0 115 0 0 0 0 0 81 0 81 1 0 0 1 0 0 197 % Trucks and Buses 03.3003.3 00000 03003 6.70004 003.2 Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes 00000 00000 00000 00000 000 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at Dollar General Driveway Site Code : 00180243 Start Date : 10/18/2018 Page No : 2 (NC 133) Castle Hayne Road D o l l a r G e n e r a l D r i v e w a y N / A (NC 133) Castle Hayne Road Right 37 0 0 37 Thru 3326 115 0 3441 Left 0 0 0 0 InOut Total 2634 3363 5997 81 115 196 0 0 0 2715 6193 3478 Rig h t 3 0 0 3 Th r u 0 0 0 0 Le f t 5 0 0 5 Ou t To t a l In 0 8 8 0 0 0 0 0 0 0 8 8 Left 30 0 0 30 Thru 2621 81 0 2702 Right 0 0 0 0 Out TotalIn 3345 2651 5996 116 81 197 0 0 0 3461 6193 2732 Le f t 10 0 0 10 Th r u 0 0 0 0 Ri g h t 14 1 0 15 To t a l Ou t In 67 24 91 0 1 1 0 0 0 67 92 25 10/18/2018 07:00 AM 10/18/2018 05:45 PM Cars Trucks and Buses Bikes North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at Dollar General Driveway Site Code : 00180243 Start Date : 10/18/2018 Page No : 3 (NC 133) Castle Hayne Road Southbound N/A Westbound (NC 133) Castle Hayne Road Northbound Dollar General Driveway Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:45 AM to 08:30 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 2 284 0 286 0 0 1 1 0 155 1 156 0 0 1 1 444 08:00 AM 4 274 0 278 0 0 0 0 0 130 2 132 2 0 0 2 412 08:15 AM 4 283 0 287 0 0 0 0 0 138 0 138 1 0 1 2 427 08:30 AM 4 252 0 256 0 0 1 1 0 131 1 132 2 0 0 2 391 Total Volume 14 1093 0 1107 0 0 2 2 0 554 4 558 5 0 2 7 1674 % App. Total 1.3 98.7 0 0 0 100 0 99.3 0.7 71.4 0 28.6 PHF .875 .962 .000 .964 .000 .000 .500 .500 .000 .894 .500 .894 .625 .000 .500 .875 .943 Cars 14 1039 0 1053 0 0 2 2 0 526 4 530 5 0 2 7 1592 % Cars 100 95.1 0 95.1 0 0 100 100 0 94.9 100 95.0 100 0 100 100 95.1 Trucks and Buses 0 54 0 54 0 0 0 0 0 28 0 28 0 0 0 0 82 % Trucks and Buses 0 4.9 0 4.9 0 0 0 0 0 5.1 0 5.0 0 0 0 0 4.9 Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (NC 133) Castle Hayne Road D o l l a r G e n e r a l D r i v e w a y N / A (NC 133) Castle Hayne Road Right 14 0 0 14 Thru 1039 54 0 1093 Left 0 0 0 0 InOut Total 528 1053 1581 28 54 82 0 0 0 556 1663 1107 Ri g h t 0 0 0 0 Th r u 0 0 0 0 Le f t 2 0 0 2 Ou t To t a l In 0 2 2 0 0 0 0 0 0 0 2 2 Left 4 0 0 4 Thru 526 28 0 554 Right 0 0 0 0 Out TotalIn 1046 530 1576 54 28 82 0 0 0 1100 1658 558 Le f t 2 0 0 2 Th r u 0 0 0 0 Rig h t 5 0 0 5 To t a l Ou t In 18 7 25 0 0 0 0 0 0 18 25 7 Peak Hour Begins at 07:45 AM Cars Trucks and Buses Bikes Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at Dollar General Driveway Site Code : 00180243 Start Date : 10/18/2018 Page No : 4 (NC 133) Castle Hayne Road Southbound N/A Westbound (NC 133) Castle Hayne Road Northbound Dollar General Driveway Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 05:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 3 220 0 223 0 0 0 0 0 252 1 253 0 0 1 1 477 05:15 PM 2 166 0 168 0 0 0 0 0 213 2 215 1 0 0 1 384 05:30 PM 0 146 0 146 0 0 0 0 0 207 0 207 0 0 1 1 354 05:45 PM 5 141 0 146 0 0 0 0 0 206 3 209 1 0 1 2 357 Total Volume 10 673 0 683 0 0 0 0 0 878 6 884 2 0 3 5 1572 % App. Total 1.5 98.5 0 0 0 0 0 99.3 0.7 40 0 60 PHF .500 .765 .000 .766 .000 .000 .000 .000 .000 .871 .500 .874 .500 .000 .750 .625 .824 Cars 10 662 0 672 0 0 0 0 0 870 6 876 2 0 3 5 1553 % Cars 100 98.4 0 98.4 0 0 0 0 0 99.1 100 99.1 100 0 100 100 98.8 Trucks and Buses 0 11 0 11 0 0 0 0 0 8 0 8 0 0 0 0 19 % Trucks and Buses 0 1.6 0 1.6 0 0 0 0 0 0.9 0 0.9 0 0 0 0 1.2 Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (NC 133) Castle Hayne Road D o l l a r G e n e r a l D r i v e w a y N / A (NC 133) Castle Hayne Road Right 10 0 0 10 Thru 662 11 0 673 Left 0 0 0 0 InOut Total 873 672 1545 8 11 19 0 0 0 881 1564 683 Rig h t 0 0 0 0 Th r u 0 0 0 0 Le f t 0 0 0 0 Ou t To t a l In 0 0 0 0 0 0 0 0 0 0 0 0 Left 6 0 0 6 Thru 870 8 0 878 Right 0 0 0 0 Out TotalIn 664 876 1540 11 8 19 0 0 0 675 1559 884 Le f t 3 0 0 3 Th r u 0 0 0 0 Ri g h t 2 0 0 2 To t a l Ou t In 16 5 21 0 0 0 0 0 0 16 21 5 Peak Hour Begins at 05:00 PM Cars Trucks and Buses Bikes Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Supporting Documentation ex ex ex ex ex ex ex ex 4A 4B 5A 2A 8B8A 1A SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: 0 Division 3 1"=40' 40 Signal Upgrade N Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way T N T T I N DE P A R T ME N OF TRA SPORT A ON STA E OF NORTH CAROL A 750 N. Greenfield Pkwy, Garner, NC 27529 WJ Hamilton RKA PROJ. NO: Prepared For: PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND PHASING DIAGRAM 02+6 02+5 01+6 01+5 04+8 SIGNAL FACE I.D. All Heads L.E.D. R Y F Y 12" R Y G 12" 51 11 R Y F Y 12" 81 41 R R RGG Y TABLE OF OPERATION FACE SIGNAL PHASE F L A S H 0 1 + 6 0 1 + 5 0 2 + 5 0 2 + 6 0 4 + 8 R R R YGG R R R R RG 11 21,22 51 61,62 YF Y F Y R YRF Y F Y 81 R R R R RF Y R R R R RG42,43 41 R R R R RF Y TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N EW C ARD N EW LO O P S YSTEM LO O P - - - 1 2 Y Y Y Y Y Y - - - - - - - - - - -Y Y -- 6 Y Y --- 5A -5 Y Y -- 2 Y Y -- FU LL TIME D ELA Y EXTEN SIO N C ALLIN G -Y Y -- -6 Y Y --- -Y Y --- OASIS 2070 LOOP & DETECTOR INSTALLATION CHART 6x40 6X6 4A 4 6X404B 4 6X40 6X6 6X408A 82-4-2 8B 8 2A 1A 15 15 0 NOTES https://connect.ncdot.gov/resources/safety/pages/its-and-signals.aspx FEATURE PHASE 1 2 4 5 6 8 MIN RECALL MIN RECALL YELLOW YELLOW ON ON --- --- ---- ---- ---- --ON --ON ---- ---- ON ON ON ON Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don't Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap ---- ---- OASIS 2070 TIMING CHART is shown. Min Green for all other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what 7 7 7 7 3.0 3.0 2.02.02.02.0 20 60 60 403020 3.0 3.0 RAMEY KEMP Transportation Engineers www.rameykemp.com 919-872-5115 Tel. 919-878-5416 Fax. Raleigh, North Carolina 27609 5808 Faringdon Place, Suite 100 ASSOCIATES, INC. & Prepared in the offices of: Sig-1 +5 Division of Highways NC Dept of Transportation Final Drawing Date: ITS & Signals Unit I REENGN E FES IOS SEAL PR O NA L N ORTH CARO LINA 32396 NOTLIMAH .J MAIL LIW 03-0191 SR 1322 (North Kerr Avenue) at NC 133 (Castle Hayne Road) New Hanover County Wilmington Isolated Fully Actuated 5 Phase 82 42,43 61,62 21,22 R Y Y G 12" 83 R R RG 82 83 R R TS Popelka 300 - 6X60 +5 - - +5 3 10 - 3 +5 - -300 -Y Y --102-4-21B 6X40 6X40 0 Y Y Y 3 - DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ex ex 1.9 4.5 1.7 2.2 3.2 4.5 1.7 4.5 - - - - - - 3.2 1.0 July 2016 62 61 11 81 82 83 51 21 22414243 0 2-4-2 - - - - Y 1B Oa k b o r o S h o p p i n g Ce n t e r En t r a n c e t o NC 133 (Castle Hayne Road) 45 MPH 0% Grade NC 133 (Castle Hayne Road) 45 MPH 0% Grade S R 1 3 2 2 ( N. Ke r r Av e . ) 4 5 MP H 0 % Gr a d e 2 5 MP H 0 % Gr a d e 2-4-2 2-4-2 2-4-2 2-4-2 1 Y Y DE P A R T ME NT OF TRANSPORT AT IO N STAT E OF NORTH CAROLI N A Traffic E n gineering and Safety Systems Br a n c h Signals M anagement Section 36249.3618 - - 12 12 ex 6A 4 4 6A Abandon Existing Loop Abandon Existing Loop 14255.02 (040) 2.5 2.5 34 34 15 40 15 40 3.0 3.0 10. Relabel existing loop 6B as 6A. 9. Relabel existing signal heads 41 as 42 and 42 as 43. 8. Pavement markings are existing unless otherwise shown. Signal Design Section. Signals Design Manual and submit a of Plan of Record to the 7. In the event of loop replacement, refer to the current ITS and 6. Set all detector units to presence mode. 5. Reposition existing signal heads numbered 21, 42, 43, 61, and 82. 4. Phase 1 and/or phase 5 may be lagged. 3. Disable backup protect for phases 2 and 6. otherwise directed by the Engineer. 2. Do not program signal for late night flashing operation unless following website: generic Project Special Provisions. The PSP can be accessed at the January 2012 and all applicable sections of the latest verson of the "Standard Specifications for Roads and Structures" dated 1. Refer to "Roadway Standard Drawings NCDOT" dated January 2012, DocuSign Envelope ID: 99A18306-3BCA-4C38-BBBA-D4BE6C6942E3 7/13/2016 7/13/2016  Do c u S i g n E n v e l o p e I D : 8 4 B 4 E F F A - 7 F 9 E - 4 B 6 8 - 8 C 4 C - 5 F 1 8 5 6 A 0 9 3 F 0  B- 1 B- 1 B- 1 B- 1 A- 2 A- 2 A- 2 A- 2 B- 1 B- 1 B- 1 B- 1 A- 2 A- 2 A- 2 A- 2 B-1 B-1 B-1 B-1 A-2 A-2 A-2 A-2 C-1 C-1 C-1 A-1A-1 A-1A-1 C-1 B- 3 B- 3 B- 3 B- 3 A- 2 A- 2 A- 2 A- 2 C-1 C-1 C-1 A-1A-1 A-1A-1 C-1 B-3 B-3 B-3 B-3 A-2 A-2 A-2 A-2TY P E 2 4 2 6 24 U N I T S 3 S T O R Y BL D G H T : 3 6 ' - 7 " 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S TYPE 2440 24 UNITS 3 STORY BLDG HT: 36'-7" 12 - 1 BEDROOMS 12 - 3 BEDROOMS T Y P E 2 4 2 6 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S T Y P E 2 4 2 2 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S T Y P E 2 4 2 2 2 4 U N I T S 3 S T O R Y BL D G H T : 3 6 ' - 7 " 24 - 2 B E D R O O M S TY P E 2 4 6 8 24 U N I T S 3 S T O R Y 12 - 1 BEDROOMS 12 - 3 BEDROOMS TYPE 2440 24 UNITS 3 STORY BLDG HT: 36'-7" 12 - 1 BEDROOM S 12 - 2 BEDROOM S TYPE 2422 24 UNITS 3 STORY BLDG HT: 36'-7" 24 - 2 B E D R O O M S TY P E 2 4 6 8 24 U N I T S 3 S T O R Y PO O L CL U B H O U S E 20' E A S E M E N T 20' E A S E M E N T 30 ' E A S E M E N T 30 ' E A S E M E N T 10' UTILITY EASE M E N T 10' UTILITY EASEM E N T DRAINAGE & UTIL E A S E M E N T 38 ' D R A I N A G E & U T I L E A S E M E N T 38 ' D R A I N A G E & U T I L E A S E M E N T 20 ' E A S E M E N T 20 ' E A S E M E N T 20' EAS E M E N T 20' EAS E M E N T D.E. MB 32 PG 2 5 9 D.E . M B 3 2 P G 2 5 9 D. E . M B 3 2 P G 2 5 9 D. E . M B 3 2 P G 2 5 9 D.E. MB 32 PG 259 D.E. MB 32 PG 25 9 D. E . M B 3 2 P G 2 5 9 B- 3B- 3 B- 3B- 3 A- 2 A- 2 A- 2 A- 2 TY P E 2 4 2 6 24 U N I T S 3 S T O R Y BL D G H T : 3 6 ' - 7 " 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S B- 3B- 3 B- 3B- 3 A- 2 A- 2 A- 2 A- 2 TY P E 2 4 2 6 24 U N I T S 3 S T O R Y BL D G H T : 3 6 ' - 7 " 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S B- 1B- 1 B- 1B- 1 A- 2 A- 2 A- 2 A- 2 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S TY P E 2 4 2 2 24 U N I T S 3 S T O R Y BL D G H T : 3 6 ' - 7 " B-1 B-1 B-1 B-1 A-2 A-2 A-2 A-2 12 - 1 BEDROOMS 12 - 2 BEDROOMS TYPE 2422 24 UNITS 3 STORY BLDG HT: 36'-7" 24 - 2 BEDROOMS TYPE 2468 24 UNITS 3 STORY C- 1 C- 1C- 1 A- 1 A- 1 A- 1 A- 1 C- 1 12 - 1 B E D R O O M S 12 - 3 B E D R O O M S TY P E 2 4 4 0 24 U N I T S 3 S T O R Y BL D G H T : 3 6 ' - 7 " N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D DE S T I N A T I O N NO D E % 30 % 30 % I N 5%IN 5% 20 % I N 30%IN SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) 20 % ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 5 TR I P D I S T R I B U T I O N 5% 40 % 30 % O U T 40%IN 5%IN 30 % O U T 40 % O U T NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) 20 % O U T 5% O U T 5% O U T 6/12/1515-222 Riverside Development–Transportation Impact Analysis19 8.0Full Build Conditions Full Build considers the development to include a total of 165single family homes and 72 apartments.This phase of development is envisioned to be completed in 2019. 8.1Trip Generation Trips for this development were projected using TripGen 2013 software, based on the 9th edition of ITE Trip Generation Manual. Table 8.1 contains the results. Table 8.1-ITE Trip Generation Riverside Development -Full Build Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak HourTwo-Way Land Use ITE Land Code Size Volume Enter Exit Enter Exit Single Family Homes 210165 Dwelling Units 1,665319410461 Apartments22072 Dwelling Units 5608313720 Total Trips 2,225 39 125 141 81 8.2Trip Distribution Sitetrips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The Full Build distribution for site trips is the same as Phase 1, shown in Figure 5. 8.32019 Future No Build Traffic The 2019background volumes were obtained by applying a 2.0% compounded annual growth rate to the 2015existing traffic volumesand adding approved development trips andPhase 1tripsassociated with the proposed development. Figure 9shows the 2019 future no build traffic volumes for AM and PM peaks. 8.42019FullBuild Traffic Full build-out traffic volumes were obtained as the sum of 2019 future no build volumes and site trips due to Full Build.Full Buildsite tripsareshown in Figure 10.The 2019Full Build future build volumes are shown for AM and PM peaks in Figure 8. More information can be found in the Traffic Volume Data section of the appendix. *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared. Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORTshallbewithoutliabilityto DAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE A APPROVED DEVELOPMENT TRIPS 38 / 24 0 / 0 9 / 3 1 0 / 0 38 / 2 4 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 0 / 0 0 / 0 28 / 18 28 / 18 9 / 31 0 / 0 12 / 4 2 0 / 0 0 / 0 0 / 0 12 / 4 2 0 / 0 0 / 0 Riverside Drive LEGEND AM PEAK HOUR, VL PM PEAK HOUR, VL AM PEAK HOUR, VR PM PEAK HOUR, VR TURN LANE WARRANT SUMMARY Phase 1 Castle Hayne Road at Site Access Peak Hour Volumes Opposing Lefts AM 1187 11 PM 739 28 Peak Hour Volumes Opposing Rights LEGEND AM PEAK HOUR, VL PM PEAK HOUR, VL AM PEAK HOUR, VR PM PEAK HOUR, VR TURN LANE WARRANT SUMMARY Full Build Castle Hayne Road at Site Access Peak Hour Volumes Opposing Lefts AM 1230 11 PM 768 29 Peak Hour Volumes Opposing Rights November 7, 2018 Mr. Dan Cumbo, PE Davenport Transportation Consultants 3722 Shipyard Blvd, Suite E Wilmington, NC 28403 RE: Revised Phasing and Landuse Intensity - Approved Scope for the Traffic Impact Analysis (TIA) associated with the proposed BRC Castle Hayne Development New Hanover County, NC Dear Mr. Cumbo Based on the revised information provided, and conversations held to date, it is our understanding that the proposed development will consist of:  Phase 1: 216 multi-family dwelling units  Full Build: 360 multi-family dwelling units (north side of Riverside Drive) The site plan provided proposes access at the following points:  NC 133 (Castle Hayne Road) and Site Access #1 Below please find the scope to be used for the Traffic Impact Analysis: 1. Data Collection - Analysis Parameters: a) Study Intersections i. For existing intersections, provide turning movement counts for weekday during school (T,W,TH) AM (7:00am-9:00am) and PM (4:00pm-6:00pm) peak periods, signal timing (if applicable), and lane geometry:  NC 133 (Castle Hayne Road) at SR-1322 (North Kerr Avenue)  NC 133 (Castle Hayne Road) at Site Access #1 (full access) ii. Signal plans may be acquired by sending an email request to NCDOT Traffic Services: Ross Kimbro, rkimbro@ncdot.gov or by calling (910) 341-0300 b) Site Trip Generation, Site Trip Distribution and Background Traffic Assumptions i. Site Trip Generation Estimate Page 2 of 3  Trip Generation (approved revised as attached) ii. Site Trip Distribution  Approved per attached Figure 5 &10 comments. iii. Adjacent Development (approved but not yet built):  Riverside – Phase 2 of BRC Castle Hayne Development was originally studied as a part of the Riverside Development. Remove the Trip Generation associated with the 72 apartments from the TIA but include the required improvements. iv. Planned Roadway Improvements  n/a v. Background Traffic Assumptions  Phase 1 2021  Full Build 2023  Growth rate – 1% per year 2. Capacity Analysis: Week day AM & PM Peak Hour (as listed and for locations per 1-a-i) a) Technical Analysis i. 2018 Existing Conditions Phase 1 ii. 2021 Future No-Build [Existing + 1% background growth + approved development trips] iii. 2021 Phase 1 Build Conditions [Existing + 1% background growth + approved development trips + site trips] iv. 2021 Phase 1 Build Conditions + improvements Full Build v. 2023 Future No-Build [Existing + 1% background growth + approved development trips + Phase 1 trips] vi. 2023 Full Build Conditions [Existing + 1% background growth + approved development trips + Phase 1 trips + site trips] vii. 2023 Full Build Conditions + improvements 3. Final Report Submittal: a) Completed TIA Application b) Signed and sealed by a Professional Engineer c) Four bound copies d) Four Electronic copies to include PDF of TIA and Synchro output files and Synchro analysis files in digital format 4. Notes: a) This scope shall remain valid for three months from the date of this letter. b) Please note that if any changes occur (including but not limited to; land use, intensity, phasing, and/or site access) additional analysis may be required. Please contact me at 910-772-4170 with any questions regarding this scope. Sincerely, Page 3 of 3 Fred Royal, PE, CFM Project Engineer Wilmington Metropolitan Planning Organization Attachments: Trip Generation Summary (approved as attached) Traffic Impact Analysis Supplemental Guidelines Site Map (provided by Davenport) Trip Distribution (approved per comments attached) ec: Ben Hughes, PE, District Engineer, NCDOT Alex Stewart, PE, Deputy District Engineer, NCDOT Madi Lee, EI, Development Review Engineer, NCDOT Jon Roan, Assistant District Engineer, NCDOT Jessi Leonard, PE, Division Traffic Engineer, NCDOT Kirsten Spirakis, PE, Sr. Assistant Traffic Engineer, Division 3, NCDOT Brad Shuler, Planner, New Hanover County Sam Burgess, Senior Planner, New Hanover County Mike Kozlosky, Executive Director, WMPO Amy Kimes, PE, Senior Project Engineer, WMPO Bill McDow, Transportation Planner, WMPO +RXU 7ZR:D\ /DQG8VH ,7(/DQG &RGH 'DWD 6RXUFH 9ROXPH (QWHU ([LW (QWHU ([LW $SDUWPHQWV'ZHOOLQJ 8QLWV $GMDFHQW (TXDWLRQ   +RXU 7ZR:D\ /DQG8VH ,7(/DQG &RGH 'DWD 6RXUFH 9ROXPH (QWHU ([LW (QWHU ([LW $SDUWPHQWV'ZHOOLQJ 8QLWV $GMDFHQW (TXDWLRQ   ,7(7ULS*HQHUDWLRQ 6L]H $YHUDJH:HHNGD\'ULYHZD\9ROXPHV 7RWDO7ULSV %5&&DVWOH+D\QH 3KDVH $03HDN +RXU 303HDN +RXU 7RWDO7ULSV ,7(7ULS*HQHUDWLRQ %5&&DVWOH+D\QH )XOO%XLOG $YHUDJH:HHNGD\'ULYHZD\9ROXPHV $03HDN +RXU 303HDN +RXU 6L]H FI G U R E 2 VI C I N I T Y M A P ST U D Y I N T E R S E C T I O N S BA C K G R O U N D PR O P O S E D SI T E SI T E *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Thisdocument,togetherwiththeconceptsanddesignspresentedherein,is intendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwritten authorizationandadaptationbyDAVENPORTshallbewithoutliabilitytoDAVENPORTandshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. BLACK = EXISTING 1% DESTINATION NODE% FIGURE5PHASE 1TRIP DISTRIBUTION North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d Riverside Drive 30% 30% 40% 30 % I N 30 % I N 30% IN 30% OUT 30% OUT 30% OUT 10 % I N 10 % O U T 10 % I N 10% OUT Traffic Impact Analysis Supplemental Guidelines Developed by: NCDOT Division 3 Page 1 of 2 Updated: 10/10/2018 Submittal Framework for TIAs Step 1: Scoping Document - The documents to include for review and approval are: 1. Site Plan/Vicinity Map 2. Proposed Land Uses and Trip Generation 3. Proposed Study Intersections and Types of Accesses 4. Proposed Annual Growth Rate 5. Proposed Build Out Year 6. Study Method for Capacity Analysis – peak periods and conditions 7. Approved Developments 8. Committed Improvements If the proposed development is to be phased, then land uses, trip generation, build out year, roadway improvements and analysis must reflect the proposed phasing. The phase breakdown must be submitted for approval prior to use in the TIA. Step 2: Trip Generation with Pass-by and Internal Capture, Trip Distribution, and Proposed Volume Balancing 1. Traffic counts must be performed prior to submittal of this step. Step 3: Draft TIA Report for Input Verification - A digital copy to include the following: 1. All previously approved information from prior stages of submittal. 2. All diagrams – Existing Traffic Volumes, Future No Build Volumes, and Future Build Volumes 3. Synchro / Sidra Network Model Framework – Submit the framework for the Future No Build analysis. This Synchro / Sidra model can be modified for Existing analysis. Step 4: Final Sealed TIA Report - This is to be a hardcopy submittal of the completed document Direction for the Congestion Management Guidelines Site Trip Generation, Site Trip Distribution, and Background Traffic Assumptions 1. Peak Hour Determination – In efforts to establish a consistent peak hour that will be reported and studied, the peak hour for the controlling intersection shall be determined. Once determined, that peak hour timeframe shall be used for all other intersections. To further clarify: a) Analyze all study intersection volumes and determine the controlling intersection (intersection with highest total volume). b) Identify relevant peak hour for the controlling intersection. c) Use the same peak hour for all intersections in the study. 2. Site Trip Generation: a) Unadjusted Trips – Use the appropriate Land Use Code in the current ITE Trip Generation Manual (currently the 10th Edition). The NCDOT Congestion Management Rate vs. Equation Spreadsheet (currently July 1, 2018) specifies the variable, peak hour type, and type of trip calculation method to use. b) Internal Capture - The Congestion Management Guidelines state that “reductions for internal capture should be limited to the land use categories and time periods included in the current Handbook.” The current ITE Trip Generation Handbook is the 3rd Edition. It does not provide internal capture data for Saturdays, therefore none should be used. The Congestion Management Guidelines also state that “internal capture rates may be estimated using the NCHRP 684 spreadsheet procedure referenced in the current Handbook.” The current Handbook now uses this spreadsheet as the only method for determining internal capture. The Congestion Management Guidelines give guidance on using the spreadsheet: “When using this spreadsheet, transit or non-motorized splits should not be used unless otherwise justified and approved. Vehicle occupancy should be “1.1” in accordance with North Carolina averages. The Walking Distances between land uses should be 4000’ or the calculated maximum distance between a given pair of land use categories in the proposed site.” To determine the internal capture entering and exiting per Land Use, use the percentages in Table 6-P: Internal Capture Percentages by Land Use with the “Estimated Vehicle-Trips” in Table 1-P: Base Vehicle-Trip Generation The NCDOT Congestion Management Capacity Analysis Guidelines shall be the basis for the development of all TIA reports. This Supplement provides a submittal framework for TIAs, as well as direction on certain items within the Congestion Management Guidelines. Any deviations from the Congestion Management Guidelines or this supplement must be approved prior to preparation of the TIA. Developed by: NCDOT Division 3 Page 2 of 2 Updated: 10/10/2018 Estimates. (Tables found in the NCHRP 684 Internal Trip Capture Estimation Tool.) c) Pass-by – The Congestion Management Guidelines state that “pass-by percentages should be obtained from the ITE Trip Generation Handbook.” The current ITE Trip Generation Handbook is the 3rd Edition. The calculation of the trips should be based on the total peak hour trips with a 50/50 entering/exiting split; they are pass-by trips which means they enter and exit along the same path, in the same direction, within the same hour. 3. Site Trip Distribution – To be determined based on collected traffic count data. Both site trip distribution and pass-by trip distribution shall be submitted for approval prior to use in the TIA. Signal Analysis 1. For existing signals, the size and position of the detector loops and the signal timings set in Synchro must match the existing signal plans. 2. For proposed signals, size and place the detector loops in Synchro according to Part 1, Section 4 of the NCDOT Signal Design Manual. 3. Existing signal timings shall be “locked” for all scenarios unless phase changes are recommended as an improvement. 4. Check for Recall Mode on Signalized Intersection. If simulating ‘free run’ operation (actuated-uncoordinated), use Min Recall on main street phase. If simulating ‘Coordinated Mode’ (Actuated-Coordinate), use C-Max. 5. Use the Guidelines for Signalization of Intersections with Two or Three Approaches (ITRE report dated December 31, 2017) where applicable, to determine possible signalization. Synchro Analysis and Data Reports 1. Any “Field Condition” analysis that the engineer wishes to include is supplemental to that which is required by the approved scope and Congestion Management Guidelines. a) Congestion Management Guidelines state that right-turn-on-red (RTOR) is not to be used in existing or future conditions. b) Congestion Management Guidelines state that analysis of protected-only phasing in future conditions will identify required storage in the event that protected-only phasing is necessary. Existing permissive left-turn phasing should remain permissive in future conditions, except where protected-only phasing is being analyzed as an improvement to the intersection in the Future + Improvement condition. 2. The “Future No-Build” and “Future Build” analysis conditions should only include improvements that are currently a requirement of another approved development or a State/Municipal project to be constructed in the build year for the proposed development. Any other capacity gained from lane improvements shown in the analysis is assumed to be proposed by the developer and should only be included in the “Future Build+Improvements” analysis condition. 3. The TIA shall include a chart that shows the “Level of Service” and “Delay” for each movement, approach, and overall intersection, for every access alternative and build scenario. 4. A SimTraffic “Queuing and Blocking Report” for the network shall be included for review. 5. A comparison chart listing the Synchro 95th Percentile Queues and the SimTraffic Maximum Queues shall be provided for all exclusive turn lanes. Recommendations of the TIA Report 1. The NCDOT Policy On Street And Driveway Access to North Carolina Highways (p. 21-22) states, “The applicant shall be required to identify mitigation improvements to the roadway network if at least one of the following conditions exists when comparing base network conditions to project conditions: a) The total average delay at an intersection or individual approach increases by 25% or greater, while maintaining the same level of service, b) The Level of Service degrades by at least one level, or c) Level of Service is “F.” 2. The Congestion Management Guidelines state “when performing analyses, providing an adequate overall intersection LOS alone is not sufficient. Items such as queuing, individual movement level of service, and volume-to-capacity ratio should be evaluated and addressed.” The information in the charts listed under “Synchro Analysis and Data Reports” in the previous section, should be used when determining the improvements to address the impacts of site-generated traffic. 3. Recommended storage lane lengths shall be provided for all exclusive turn lanes and based on the Synchro 95th Percentile Queue or the SimTraffic Maximum Queue, whichever is larger. 4. If phase changes are recommended as an improvement, then a Synchro analysis for “Future Build+Improvements” shall be included in the TIA. 5. Signal timing adjustments and/or Signal Optimization in Synchro (i.e. “Optimize Splits”) shall not be used unless phase changes are recommended as an improvement. Signal timing adjustment and/or Signal Optimization as a sole “improvement” to mitigate the impacts of site-generated traffic will not be permitted.