Loading...
Site Plan v2N O R T HProposed Site Plan New Independent Living Multifamily Building - 120 Units / Four Story / 50’ High SEEKING HEIGHT EXTENSION TO 50’ New Wellness Center for Healthy Living - One Story / 35’ High New Independent Living Cottages - 32 Units / One Story / 25’ High New Central Services Building - One Story / 25’ High New NCDOT Drive - Gate at North Entrance Independent Living Campus Future Independent Living Expansion - 30 Units / Four Story / 50’ High New Memorial Garden Existing Community Center - One Story / 25’ High (Under Renovation) Existing Fire Station Existing Skilled Nursing Pods - 34 Beds / One Story / 25’ High Existing Assisted Living - 123 Beds / Three Story / 35’ High Existing Skilled Nursing -145 Beds / One Story / 25’ High Existing Main Entrance - Existing Gate to Be Relocated to Improve Vehicle Stacking Existing South Service Drive - Independent Living / Wellness Center Undeveloped Parcel Existing Admin / Pharmacy - One Story / 25’ High Existing Rehab & Wellness - One Story / 25’ High Existing HR Building - One Story / 25’ High New 100 Year Storm Stormwater Infiltration Pond Conservation Zone Nature Trails Greenspace Remove Existing Wet 25 Year Storm Pond Remove Existing Tower - Cell Antenna Relocated New Gated Bike & Foot Trail (Non-Vehicular) Champ Davis Memorial Garden Overhead Power Easement Memory Care Courtyard Existing Service Area Trails to Be Reworked or Embellished Covered Parking Level One East Driveway Entrance - Rehab East Driveway Entrance - IL & SN Future Parking for 30 Unit Expansion Future Covered Surface Parking Enclose Existing Carport 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 24 22 23 A101Proposed Site Plan CONDITIONAL USE PERMITPHASE ONE JUNE 2020 - NOVEMBER 2020 INSTALL NEW POND AND CENTRALIZED SERVICES BUILDING PHASING SCHEDULE PHASE TWO DECEMBER 2020 - MAY 2021 RENOVATE COMMUNITY CENTER, FILL IN OLD POND & BUILD FIRST COTTAGES PHASE THREE JANUARY 2021 - JUNE 2022 BUILD MULTIFAMILY BUILDING & WELLNESS BUILDING PHASE FOUR JANUARY 2021 - JUNE 2022 BUILD FINAL PORTION OF COTTAGES TO SYNC COMPLETION WITH MULTI FAMILY BUILDING NEW BUILDING FOOTPRINT LEGEND EXISTING BUILDING FOOTPRINT MAIN BUILDING ENTRANCE NEW PAVED SURFACE EXISTING PAVED SURFACE 404 WETLANDS NO WORK UNDEVELOPED PARCEL OPEN SPACE scale: 1" = 100'-0" 0'100'200'400' 50’ SETBACK - 50’ MAX HEIGHT 25 26 27 28 29 EXISTING DECORATIVE FENCE & GATE 30 NEW DECORATIVE FENCE & GATE 31 LIMIT OF SITE DISTURBANCE EXTEND STORM WATER PIPES TO MEET NCDOT REQUIREMENTS - TEMP ROAD CONSTRUCTION AND CLOSURE TO BE COORDINATED WITH NCDOT 32 33 DATES TENTATIVE RELOCATED CELL ANTENNA FROM WATER TOWER NEW DECORATIVE WOOD FENCE 20’ MINIMUM PLANTED BUFFER YARD - INTERIOR OF PROPERTY LINE 34 35 36 FEBRUARY 21, 2020The Davis Community The Independent Living Campus 1011 Porters Neck Road Wilmington, NC 284112/13/20, 9:39 AM JOB NUMBER DRAWN BY CHECKED BY DATE SHEET NUMBER Ball REVISIONS 514 Market Street Wilmington, NC 28401 Tel - (910) 762-2621 Bowman February 6, 2020 5951 WIL MINGT O N ,N CHCAR N O RT O L IN A BRU C E F.BOW M A NREGS T E R ED ARCH T ECTII FOR ZONING REVIEW ONLY 2/13/20, 9:39 AM 11 2 22 34 1 1 2 22 34 1 2 3 4 SHIRAZ WAYPORTERS NECK ROAD JEAN E L L E M O O R E B L V D .CHAMP DAVIS ROADCHAMP DAVI S R O A DFUTCH CREEK RD1 2 3 3 4 5 6 7 8 9 1010 11 12 12 1314 15 15 16 17 19 20 21 18 22 KEYED NOTES 23 24 SITE DATA EXISTING DEVELOPED SITE AREA 37.45 ACRES NET ADDITIONAL PROPOSED DEVELOPED AREA 17.91 ACRES NET DEVELOPED POND AREA 5.00 ACRES NET TOTAL DEVELOPED SITE AREA 60.36 ACRES NET UNDEVELOPED SITE AREA 15.48 ACRES CONSERVATION SITE AREA 7.12 ACRES TOTAL SITE AREA 75.60 ACRES GROSS MINIMUM SITE AREA REQUIRED 20.00 ACRES GROSS MINIMUM OPEN SPACE REQUIRED 21.13 ACRES OPEN SPACE PROVIDED 22.73 ACRES NET TOTAL BUILDING FOOTPRINT 5.00 ACRES APPROX TOTAL IMPERVIOUS COVERAGE 35.00 ACRES APPROX PARKING DATA PREFERRED POWERLINE RELOCATION TO EXISTING POWER EASEMENT SEE SHEET A102 FOR ALL EASEMENT LOCATIONS 25 26 27 2727 28INTERIOR SERVICE DRIVENEW 29 31 31 3030 COTT A G E DRIVE32 33 28 30 30 34 35 36 35 179 SKILLED NURSING BEDS/ 1 SPACE PER 4 BEDS 45 SPACES 1 PER EMPLOYEE @ LARGEST SHIFT (PENDING VERIFICATION) 105 SPACES 123 ASSISTED LIVING UNITS AT 1.5 SPACES PER UNIT 185 SPACES 150 INDEPENDENT LIVING UNITS AT 1.5 SPACES PER UNIT 225 SPACES 32 COTTAGE UNITS AT 1.5 SPACE PER UNIT 48 SPACES WELLNESS BUILDING AT 25,000 SF X 1 SPACE PER 400 GSF 63 SPACES TOTAL REQUIRED PARKING SPACES 671 SPACES TOTAL PROVIDED SPACES 734 SPACES R1 R1 R1R1