Southern Asphalt - Narrative and Calcs - Erosion Control and StormwaterF:\GSandE\01-20_New Hanover\43 Southern Asphalt\Permitting\County Erosion & Storm\20-43 County-Narrative.doc DESIGN NARRATIVE 1. GENERAL: Introduction The Southern Asphalt Facility site is located approximately 1-1/2 miles east of the I-40, Castle Hayne/ Holly Shelter interchange in unincorporated New Hanover County, North Carolina. Project Owner: FSS Properties, LLC Mr. James Sanderford 5993 HWY 117 South Burgaw, NC 28425 Project Designer: GS&E, Inc. PO Box 16110 Wilmington, NC 28408 The project is proposed for construction of a new Asphalt Batch Plant with onsite offices, parking and site improvements. General Site Characterization The project site is a former dirt-track, motorsports park. The site has an existing bath-house with ADA parking, concession stand, observation tower, site lighting, along with miscellaneous other improvements. From research with New Hanover County and NCDEQ, there appears to be no existing land disturbance permits from previous work and, although a pond and pond outfall exist on the site, we have determined it is not a permitted stormwater facility. The bath-house, parking and site lighting are to remain. The existing pond will be enlarged and serve as an erosion control feature and a stormwater facility. The area for development drains from north to south toward the existing pond, discharging to the existing perimeter ditching, and on to an unnamed tributary to sturgeon creek. The approximate acreage of land to be disturbed is 7.5 Acres. County Stormwater As the site lies within New Hanover County, the project is designed to attenuate stormwater runoff for the 2, 10 and 25 year storm events. F:\GSandE\01-20_New Hanover\43 Southern Asphalt\Permitting\County Erosion & Storm\20-43 County-Narrative.doc For the onsite drainage area, flows will be conveyed over the improved surfaces of the site to the pipe and swale systems, and to the detention basin forebay. Drainage outside of the Limits of disturbance are considered grandfathered, as the site’s access has been paved/ utilized prior to advent of local and state stormwater regulations. These areas are stabilized and drain to NCDOT roadside facilities or to the existing perimeter ditches. Stormwater runoff characterization and sizing for the drainage systems were modeled using Hydrology Studio 2019. State Stormwater A state stormwater permit is being sought concurrently with County development permits. For this reason, the wet-detention basin BMP detailed in this submittal is also designed to accommodate NCDEMLR requirements for stormwater. 2. EXISTING SITE: Current topography is largely flat. Perimeter ditches drain the site along all sides. Current slopes are generally less than 1%. Native soils appear well-drained based on the existing perimeter ditch configuration with no apparent hydric soils on site. 3. EROSION CONTROL CONSIDERATIONS: With the design of a properly sized stormwater BMP lying on the downslope end of the proposed development, sediment will be collected by using this basin as a construction phase sediment BMP. For that reason, runoff will be controlled through a skimmer drawdown device until the site is permanently stabilized. Calculations are included for the sediment basin and energy dissipaters shown on the plan. Silt fencing will be used where needed or as directed by the owner or engineer. The area of disturbance is within the project area. 4. MAINTENANCE CONSIDERATIONS: During construction, the Contractor shall be required to inspect and repair as needed all erosion control devices after any significant rain event. Any measure found not performing its intended function, shall be repaired immediately. Upon completion of construction, the establishment of permanent ground cover will be a priority. F:\GSandE\01-20_New Hanover\43 Southern Asphalt\Permitting\County Erosion & Storm\20-43 County-Narrative.doc Erosion Control Specifications F:\GSandE\01-20_New Hanover\43 Southern Asphalt\Permitting\County Erosion & Storm\20-43 County-Narrative.doc Erosion and Sedimentation Control 1.01 General: The contractor shall be responsible for erosion and sedimentation control within the construction limits; for prevention of sediment laden runoff leaving the construction limits or entering ditches, streams or water impoundments; and for implementation of necessary erosion and sedimentation control measures to meet the requirements of the North Carolina Department of Environment, Health, and Natural Resources. The Contractor shall also be responsible for all damages or fines resulting from erosion or sediment laden runoff in the execution of his contract. 1.02 Construction Sequence: Erosion control measures shall be installed prior to the commencement of land clearing and shall be fully maintained and periodically inspected until final restoration and stabilization is completed. Unrestored cleared areas shall be kept to a minimum. Disturbed areas ahead of construction shall only be accomplished on those segments for the shortest practical distance as required for continual progress. Final restoration shall not be delayed until completion of the project but will be carried out in phases as the work proceeds. Under no circumstances will any areas be left denuded for more than (15) fifteen working days without some form of stabilization until final restoration is complete. 1.03 Sedimentation: Control Measures: The following are some of the sediment control devices or measures that may be required to prevent sedimentation of streams, water courses, or drainage structures: 1. Earth berms and/or diversion and intercept ditches. 2. Sediment traps 3. Filter berms 4. Filter inlets 5. Silt fences - not to be placed in streams or ditches perpendicular to flow. 6. Check dams gravel filter 7. Gravel construction exit 1.03.1 Erosion Control Measures: Some of the soil erosion control measures which may be required in this contract are: 1. Earth slope protection 2. Diagonal water breaks/ diversion berms 3. Diversion channels 4. Preservation of existing vegetation 5. Storm inlet protection 6. Stream crossings 7. Energy dissipaters 8. Matting of re-seeded areas F:\GSandE\01-20_New Hanover\43 Southern Asphalt\Permitting\County Erosion & Storm\20-43 County-Narrative.doc 1.03.2 Detail Drawing: Examples of sedimentation and erosion control details are shown in these plans for installation at locations designated in the plans or as otherwise required by the regulating agency, or the owner as work proceeds. 1.04 Stream Protection: Where construction activities are necessary in close proximity to streams, and other waterways, they shall be performed in a manner that does not contribute to degradation of or blockage of the stream-flow. In order to prevent possible degradation or blockages, the contractor shall be required to: 1. Keep all construction debris, excavated materials, brush, rocks, refuse and topsoil as far from these waterways as possible. Restrict machinery operation or stream crossings in waterways to the extent necessary for construction of utilities crossings. 2. If construction work areas are necessary in a waterway, they shall be protected as indicated on the plans. 3. If temporary roadways are essential for the construction activities, they shall be constructed of soils which are not highly erodible materials and must not span more than half way across the water course or wetland area at any one time unless otherwise approved by the Engineer. These temporary roadways shall be entirely removed as soon as their requirement is met. Work in these areas shall follow the requirements of the Corp of Engineers or CAMA permit, or plans as applicable. 1.05 Construction Access: The travel of equipment to and from the construction areas shall be minimized not only to protect areas that will not be denuded, but also to prevent the spreading of sediment within and outside of the construction areas. Therefore, special construction equipment travel corridors will be established for this use and instructions shall be issued for their use. Use of these corridors must be fully enforced. Other non-essential traffic will be restricted or discouraged. Indiscriminate and convenience traffic shall not be allowed. 1.06 Stockpile/Barrow Areas: The Contractor shall be responsible for selecting, obtaining and maintaining stockpile or borrow areas which may be required to complete the contract. The Contractor is also required to design and incorporate all necessary sediment and erosion controls measures necessary to prevent erosion and contribution of sediment to adjacent areas. The Contractor is responsible to obtain all necessary permits or approvals for borrow or spoil areas outside the construction limits. 1.07 Disposal of Excess Water from Excavations: The Contractor shall practice management of excess water pumped from excavation to reduce the production and spreading of sediment. Pumped water shall be discharged onto stabilized surfaces and allowed to filter through existing vegetation if possible, otherwise, additional control measures may be necessary. If ditches are required to remove pumped water from construction excavations, they shall be given the same consideration as any other man-made waterway and they shall be stabilized as to not degrade and produce sediment. F:\GSandE\01-20_New Hanover\43 Southern Asphalt\Permitting\County Erosion & Storm\20-43 County-Narrative.doc 1.08 Excavation and Backfill: Excavation shall be closely controlled and all the material removed from the excavation shall be selectively stockpiled in areas where a minimum of sediment will be generated and where other damage will not result from the piled material. Drainage ways shall be protected at all times and the placement of material in Drainage ways for convenience shall not be allowed. Backfilling operations shall be performed in such a manner that remaining trees are not damaged. 1.09 Final Grading and Seeding: Finish grading, topsoiling, seeding and/or sodding shall be performed after the construction phase is complete. Permanent vegetation of the areas, that have been disturbed, shall be re-established as rapidly as possible. If the completion of the construction activities do not coincide with a season in which permanent vegetation can be generated, an interim or temporary program is required. This shall include soil conditioners and mulching as necessary for soil stabilization. In any case, sediment and erosion controls shall be installed promptly and their maintenance assured. 1.10 Approval: The approved Erosion Control Plan will be provided by the Owner. Any standard conditions relating to soil erosion and sediment control issued to the Contractor as a part of any permits shall be available at the job site at all times. Table of Contents Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 2 -Year Hydrograph Summary 1.................................................................................................................................. Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Post-Dev2............................................................................................ Hydrograph No. 2, NRCS Runoff, Post-Dev3............................................................................................ Hydrograph No. 3, Pond Route, Developed pond Count4............................................................................ Detention Pond Reports -Pre-Post Pond5................................................................................... Design Storm Report -NRCS/SCS -Type II9................................................................................ 10 -Year Hydrograph Summary 10................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Post-Dev11.......................................................................................... Hydrograph No. 2, NRCS Runoff, Post-Dev12.......................................................................................... Hydrograph No. 3, Pond Route, Developed pond Count13.......................................................................... Design Storm Report -NRCS/SCS -Type II14.............................................................................. 25 -Year Hydrograph Summary 15................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Post-Dev16.......................................................................................... Hydrograph No. 2, NRCS Runoff, Post-Dev17.......................................................................................... Hydrograph No. 3, Pond Route, Developed pond Count18.......................................................................... Design Storm Report -NRCS/SCS -Type II19.............................................................................. 100 -Year Hydrograph Summary 20................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Post-Dev21.......................................................................................... Hydrograph No. 2, NRCS Runoff, Post-Dev22.......................................................................................... Hydrograph No. 3, Pond Route, Developed pond Count23.......................................................................... Design Storm Report -NRCS/SCS -Type II24.............................................................................. Hydrograph 2-yr Summary Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1NRCS RunoffPost-Dev5.27012.6743,389---- 2NRCS RunoffPost-Dev21.5412.1786,884---- 3Pond RouteDeveloped pond Count1.30714.1062,703222.9459,376 1 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 1 Hydrograph Type= NRCS RunoffPeak Flow= 5.270 cfs Storm Frequency= 2-yrTime to Peak= 12.67 hrs Time Interval= 2 minRunoff Volume= 43,389 cuft Drainage Area= 7.5 acCurve Number= 69 Tc Method= LagTime of Conc. (Tc)= 74.8 min Basin Slope= 0.5 %Hydraulic Length= 1273 ft Total Rainfall= 4.50 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Q ( c f s ) 0 1 2 3 4 5 6 Qp = 5.27 cfs 2 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 2 Hydrograph Type= NRCS RunoffPeak Flow= 21.54 cfs Storm Frequency= 2-yrTime to Peak= 12.17 hrs Time Interval= 2 minRunoff Volume= 86,884 cuft Drainage Area= 7.5 acCurve Number= 87.95* Tc Method= LagTime of Conc. (Tc)= 30.2 min Basin Slope= 0.5 %Hydraulic Length= 855 ft Total Rainfall= 4.50 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 * Composite CN Worksheet AREA (ac)CNDESCRIPTION 2.669Undisturbed 4.998IMPERVIOUS 7.588 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Q ( c f s ) 0 2 4 6 8 10 12 14 16 18 20 22 24 Qp = 21.54 cfs 3 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Developed pond CountHyd. No. 3 Hydrograph Type= Pond RoutePeak Flow= 1.307 cfs Storm Frequency= 2-yrTime to Peak= 14.10 hrs Time Interval= 2 minHydrograph Volume= 62,703 cuft Inflow Hydrograph= 2 -Post-DevMax. Elevation= 22.94 ft Pond Name= Pre-Post PondMax. Storage= 59,376 cuft Pond Routing by Storage Indication MethodCenter of mass detention time = 22.68 hrs Post-Dev Developed pond Count Time (hrs) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Q ( c f s ) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Qp = 1.31 cfs 4 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondStage-Storage DescriptionInput Stage / Storage Table Stage (ft) Elevation (ft) Contour Area (sqft) Incr. Storage (cuft) Total Storage (cuft) User Defined Contours Bottom Elevation, ft Voids (%) Volume Calc 21.00 100.00 None 0.0021.0028,5100.0000.000 1.0022.0030,66629,58829,588 2.0023.0032,87831,77261,360 3.0024.0035,14734,01395,373 4.0025.0037,47336,310131,683 Contours Top of Pond Total Storage (cuft) 0 20000 40000 60000 80000 100000 120000 140000 El e v ( f t ) 21 22 23 24 25 St a g e ( f t ) 0 1 2 3 4 Stage-Storage 5 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondStage-Discharge Culvert / Orifices Rise, in Span, in No. Barrels Invert Elevation, ft Orifice Coefficient, Co Length, ft Barrel Slope, % N-Value, n Culvert Orifices 1*23 302 302 11 20.5021.00 0.600.60 50 .5 0.013 Orifice Plate Orifice Dia, in No. Orifices Invert Elevation, ft Height, ft Orifice Coefficient, Co Weirs Shape / Type Crest Elevation, ft Crest Length, ft Angle, deg Weir Coefficient, Cw Riser*Weirs 1*23 Box RectangularBroad Crested 2422.724.5 16330 18.4 (3:1) 3.33.33.3 Ancillary Exfiltration, in/hr *Routes through Culvert. Top of Pond Culvert Riser Orifice Rectangular Broad Crested Total Q Discharge (cfs) 051015202530354045505560657075 El e v ( f t ) 21 22 23 24 25 St a g e ( f t ) 0 1 2 3 4Stage-Discharge 6 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondStage-Storage-Discharge Summary Stage (ft) Elev. (ft) Storage (cuft) Culvert (cfs) Orifices, cfs 123 Riser (cfs) Weirs, cfs 123 Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 0.0021.000.0000.000 0.0000.000 0.000 0.000 0.000 1.0022.0029,5880.101 ic0.1010.000 0.000 0.000 0.101 2.0023.0061,3601.772 ic0.1450.000 1.627 0.000 1.772 3.0024.0095,37314.12 oc0.1050.000 14.02 s0.000 14.12 4.0025.00131,68342.22 oc0.0000.000 0.000 36.40 78.62 Suffix key: ic = inlet control, oc = outlet control, s = submerged weir 7 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondPond Drawdown St a g e v s . D r a i n T i m e Dr a i n T i m e ( H r s ) 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 1 0 0 1 1 0 1 2 0 1 3 0 1 4 0 1 5 0 1 6 0 1 7 0 1 8 0 1 9 0 Elev (ft) 2122232425 Stage (ft) 01234 Pr e - P o s t P o n d - D r a i n T i m e 8 Design Storm Report Custom Storm filename: 2017-1203first-attempt.cds Hydrology Studio v 3.0.0.13 02-27-2020 Storm Distribution: NRCS/SCS -Type II Total Rainfall Volume (in)Storm Duration 1-yr 2-yr3-yr5-yr10-yr25-yr50-yr100-yr 24 hrs 0.004.500.005.807.008.059.0010.00 Incremental Rainfall Distribution, 2-yr TimeTimeTimeTimeTimePrecipPrecipPrecipPrecipPrecip (hrs)(hrs)(hrs)(hrs)(hrs)(in)(in)(in)(in)(in) 10.900.010100 10.930.010300 10.970.010500 11.000.010700 11.030.011039 11.070.011520 11.100.012000 11.130.012480 11.170.012960 11.200.013440 11.230.013920 11.270.014400 11.300.014880 11.330.015360 11.370.015840 11.400.016320 11.430.016800 11.470.017280 11.500.017760 11.530.023954 11.570.035760 11.600.047600 11.630.059440 11.670.071280 11.700.083120 11.730.094960 11.770.108998 11.800.139727 11.830.172660 11.870.205594 11.900.238527 11.930.217677 11.970.142574 12.000.067625 12.030.030084 12.070.028440 12.100.027300 12.130.026160 12.170.025020 12.200.023880 12.230.022740 12.270.021600 12.300.020460 12.330.019320 12.370.018180 12.400.017040 12.430.015900 12.470.014760 12.500.013620 12.530.012921 12.570.012660 12.600.012400 12.630.012140 12.670.011880 12.700.011620 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 Pr e c i p ( i n ) 0 1 2 3 4 5 Pr e c i p ( i n ) 0 1 2 3 4 5 9 Hydrograph 10-yr Summary Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1NRCS RunoffPost-Dev12.2512.6795,148---- 2NRCS RunoffPost-Dev36.9112.17152,126---- 3Pond RouteDeveloped pond Count10.1712.60127,688223.7185,476 10 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 1 Hydrograph Type= NRCS RunoffPeak Flow= 12.25 cfs Storm Frequency= 10-yrTime to Peak= 12.67 hrs Time Interval= 2 minRunoff Volume= 95,148 cuft Drainage Area= 7.5 acCurve Number= 69 Tc Method= LagTime of Conc. (Tc)= 74.8 min Basin Slope= 0.5 %Hydraulic Length= 1273 ft Total Rainfall= 7.00 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Q ( c f s ) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Qp = 12.25 cfs 11 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 2 Hydrograph Type= NRCS RunoffPeak Flow= 36.91 cfs Storm Frequency= 10-yrTime to Peak= 12.17 hrs Time Interval= 2 minRunoff Volume= 152,126 cuft Drainage Area= 7.5 acCurve Number= 87.95* Tc Method= LagTime of Conc. (Tc)= 30.2 min Basin Slope= 0.5 %Hydraulic Length= 855 ft Total Rainfall= 7.00 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 * Composite CN Worksheet AREA (ac)CNDESCRIPTION 2.669Undisturbed 4.998IMPERVIOUS 7.588 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Q ( c f s ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Qp = 36.91 cfs 12 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Developed pond CountHyd. No. 3 Hydrograph Type= Pond RoutePeak Flow= 10.17 cfs Storm Frequency= 10-yrTime to Peak= 12.60 hrs Time Interval= 2 minHydrograph Volume= 127,688 cuft Inflow Hydrograph= 2 -Post-DevMax. Elevation= 23.71 ft Pond Name= Pre-Post PondMax. Storage= 85,476 cuft Pond Routing by Storage Indication Method Center of mass detention time = 8.99 hrs Post-Dev Developed pond Count Time (hrs) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Q ( c f s ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Qp = 10.17 cfs 13 Design Storm Report Custom Storm filename: 2017-1203first-attempt.cds Hydrology Studio v 3.0.0.13 02-27-2020 Storm Distribution: NRCS/SCS -Type II Total Rainfall Volume (in)Storm Duration 1-yr2-yr3-yr5-yr 10-yr25-yr50-yr100-yr 24 hrs 0.004.500.005.807.008.059.0010.00 Incremental Rainfall Distribution, 10-yr TimeTimeTimeTimeTimePrecipPrecipPrecipPrecipPrecip (hrs)(hrs)(hrs)(hrs)(hrs)(in)(in)(in)(in)(in) 10.900.015711 10.930.016022 10.970.016333 11.000.016644 11.030.017171 11.070.017920 11.100.018667 11.130.019413 11.170.020160 11.200.020907 11.230.021653 11.270.022400 11.300.023147 11.330.023893 11.370.024640 11.400.025387 11.430.026133 11.470.026880 11.500.027627 11.530.037261 11.570.055627 11.600.074045 11.630.092462 11.670.110880 11.700.129298 11.730.147716 11.770.169553 11.800.217353 11.830.268582 11.870.319812 11.900.371042 11.930.338609 11.970.221783 12.000.105194 12.030.046797 12.070.044240 12.100.042467 12.130.040693 12.170.038920 12.200.037147 12.230.035373 12.270.033600 12.300.031827 12.330.030053 12.370.028280 12.400.026506 12.430.024734 12.470.022960 12.500.021187 12.530.020100 12.570.019693 12.600.019289 12.630.018885 12.670.018480 12.700.018075 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 14 Hydrograph 25-yr Summary Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1NRCS RunoffPost-Dev15.4212.67118,927---- 2NRCS RunoffPost-Dev43.3212.17179,988---- 3Pond RouteDeveloped pond Count14.9812.57155,477224.0396,427 15 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 1 Hydrograph Type= NRCS RunoffPeak Flow= 15.42 cfs Storm Frequency= 25-yrTime to Peak= 12.67 hrs Time Interval= 2 minRunoff Volume= 118,927 cuft Drainage Area= 7.5 acCurve Number= 69 Tc Method= LagTime of Conc. (Tc)= 74.8 min Basin Slope= 0.5 %Hydraulic Length= 1273 ft Total Rainfall= 8.05 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Q ( c f s ) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Qp = 15.42 cfs 16 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 2 Hydrograph Type= NRCS RunoffPeak Flow= 43.32 cfs Storm Frequency= 25-yrTime to Peak= 12.17 hrs Time Interval= 2 minRunoff Volume= 179,988 cuft Drainage Area= 7.5 acCurve Number= 87.95* Tc Method= LagTime of Conc. (Tc)= 30.2 min Basin Slope= 0.5 %Hydraulic Length= 855 ft Total Rainfall= 8.05 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 * Composite CN Worksheet AREA (ac)CNDESCRIPTION 2.669Undisturbed 4.998IMPERVIOUS 7.588 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Q ( c f s ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Qp = 43.32 cfs 17 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Developed pond CountHyd. No. 3 Hydrograph Type= Pond RoutePeak Flow= 14.98 cfs Storm Frequency= 25-yrTime to Peak= 12.57 hrs Time Interval= 2 minHydrograph Volume= 155,477 cuft Inflow Hydrograph= 2 -Post-DevMax. Elevation= 24.03 ft Pond Name= Pre-Post PondMax. Storage= 96,427 cuft Pond Routing by Storage Indication Method Center of mass detention time = 2.22 hrs Post-Dev Developed pond Count Time (hrs) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Q ( c f s ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Qp = 14.98 cfs 18 Design Storm Report Custom Storm filename: 2017-1203first-attempt.cds Hydrology Studio v 3.0.0.13 02-27-2020 Storm Distribution: NRCS/SCS -Type II Total Rainfall Volume (in)Storm Duration 1-yr2-yr3-yr5-yr10-yr 25-yr50-yr100-yr 24 hrs 0.004.500.005.807.008.059.0010.00 Incremental Rainfall Distribution, 25-yr TimeTimeTimeTimeTimePrecipPrecipPrecipPrecipPrecip (hrs)(hrs)(hrs)(hrs)(hrs)(in)(in)(in)(in)(in) 10.900.018068 10.930.018426 10.970.018783 11.000.019141 11.030.019747 11.070.020608 11.100.021467 11.130.022325 11.170.023184 11.200.024043 11.230.024901 11.270.025760 11.300.026618 11.330.027478 11.370.028336 11.400.029195 11.430.030053 11.470.030912 11.500.031771 11.530.042850 11.570.063971 11.600.085151 11.630.106332 11.670.127512 11.700.148693 11.730.169873 11.770.194985 11.800.249956 11.830.308870 11.870.367784 11.900.426698 11.930.389401 11.970.255050 12.000.120973 12.030.053816 12.070.050876 12.100.048837 12.130.046797 12.170.044758 12.200.042719 12.230.040679 12.270.038640 12.300.036601 12.330.034561 12.370.032522 12.400.030483 12.430.028443 12.470.026404 12.500.024364 12.530.023115 12.570.022647 12.600.022182 12.630.021717 12.670.021252 12.700.020787 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 8 9 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 8 9 19 Hydrograph 100-yr Summary Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1NRCS RunoffPost-Dev21.5012.67164,994---- 2NRCS RunoffPost-Dev55.1512.17232,095---- 3Pond RouteDeveloped pond Count30.1712.43207,475224.42110,534 20 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 1 Hydrograph Type= NRCS RunoffPeak Flow= 21.50 cfs Storm Frequency= 100-yrTime to Peak= 12.67 hrs Time Interval= 2 minRunoff Volume= 164,994 cuft Drainage Area= 7.5 acCurve Number= 69 Tc Method= LagTime of Conc. (Tc)= 74.8 min Basin Slope= 0.5 %Hydraulic Length= 1273 ft Total Rainfall= 10.00 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Q ( c f s ) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Qp = 21.50 cfs 21 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 2 Hydrograph Type= NRCS RunoffPeak Flow= 55.15 cfs Storm Frequency= 100-yrTime to Peak= 12.17 hrs Time Interval= 2 minRunoff Volume= 232,095 cuft Drainage Area= 7.5 acCurve Number= 87.95* Tc Method= LagTime of Conc. (Tc)= 30.2 min Basin Slope= 0.5 %Hydraulic Length= 855 ft Total Rainfall= 10.00 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 * Composite CN Worksheet AREA (ac)CNDESCRIPTION 2.669Undisturbed 4.998IMPERVIOUS 7.588 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Q ( c f s ) 0 5 10 15 20 25 30 35 40 45 50 55 60 Qp = 55.15 cfs 22 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Developed pond CountHyd. No. 3 Hydrograph Type= Pond RoutePeak Flow= 30.17 cfs Storm Frequency= 100-yrTime to Peak= 12.43 hrs Time Interval= 2 minHydrograph Volume= 207,475 cuft Inflow Hydrograph= 2 -Post-DevMax. Elevation= 24.42 ft Pond Name= Pre-Post PondMax. Storage= 110,534 cuft Pond Routing by Storage Indication Method Center of mass detention time = 1.82 hrs Post-Dev Developed pond Count Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Q ( c f s ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 Qp = 30.17 cfs 23 Design Storm Report Custom Storm filename: 2017-1203first-attempt.cds Hydrology Studio v 3.0.0.13 02-27-2020 Storm Distribution: NRCS/SCS -Type II Total Rainfall Volume (in)Storm Duration 1-yr2-yr3-yr5-yr10-yr25-yr50-yr 100-yr 24 hrs 0.004.500.005.807.008.059.0010.00 Incremental Rainfall Distribution, 100-yr TimeTimeTimeTimeTimePrecipPrecipPrecipPrecipPrecip (hrs)(hrs)(hrs)(hrs)(hrs)(in)(in)(in)(in)(in) 10.900.022444 10.930.022889 10.970.023333 11.000.023778 11.030.024530 11.070.025600 11.100.026667 11.130.027733 11.170.028800 11.200.029867 11.230.030933 11.270.032000 11.300.033067 11.330.034133 11.370.035200 11.400.036267 11.430.037333 11.470.038400 11.500.039467 11.530.053231 11.570.079467 11.600.105778 11.630.132089 11.670.158400 11.700.184711 11.730.211023 11.770.242218 11.800.310504 11.830.383689 11.870.456874 11.900.530059 11.930.483727 11.970.316832 12.000.150277 12.030.066853 12.070.063200 12.100.060667 12.130.058133 12.170.055600 12.200.053067 12.230.050533 12.270.048000 12.300.045467 12.330.042933 12.370.040400 12.400.037867 12.430.035334 12.470.032800 12.500.030267 12.530.028714 12.570.028133 12.600.027555 12.630.026978 12.670.026400 12.700.025822 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 8 9 10 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 8 9 10 24 Table of Contents Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 100 -Year Hydrograph Summary 1.................................................................................................................................. Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Post-Dev2............................................................................................ Hydrograph No. 2, NRCS Runoff, Post-Dev3............................................................................................ Hydrograph No. 3, Pond Route, Developed pond Count4............................................................................ Detention Pond Reports -Pre-Post Pond5................................................................................... Design Storm Report -NRCS/SCS -Type II9................................................................................ Hydrograph 100-yr Summary Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1NRCS RunoffPost-Dev21.5012.67164,994---- 2NRCS RunoffPost-Dev55.1512.17232,095---- 3Pond RouteDeveloped pond Count27.9512.47118,566224.92128,776 1 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 1 Hydrograph Type= NRCS RunoffPeak Flow= 21.50 cfs Storm Frequency= 100-yrTime to Peak= 12.67 hrs Time Interval= 2 minRunoff Volume= 164,994 cuft Drainage Area= 7.5 acCurve Number= 69 Tc Method= LagTime of Conc. (Tc)= 74.8 min Basin Slope= 0.5 %Hydraulic Length= 1273 ft Total Rainfall= 10.00 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Q ( c f s ) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Qp = 21.50 cfs 2 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Post-DevHyd. No. 2 Hydrograph Type= NRCS RunoffPeak Flow= 55.15 cfs Storm Frequency= 100-yrTime to Peak= 12.17 hrs Time Interval= 2 minRunoff Volume= 232,095 cuft Drainage Area= 7.5 acCurve Number= 87.95* Tc Method= LagTime of Conc. (Tc)= 30.2 min Basin Slope= 0.5 %Hydraulic Length= 855 ft Total Rainfall= 10.00 inDesign Storm= Type II Storm Duration= 24 hrsShape Factor= 484 * Composite CN Worksheet AREA (ac)CNDESCRIPTION 2.669Undisturbed 4.998IMPERVIOUS 7.588 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Q ( c f s ) 0 5 10 15 20 25 30 35 40 45 50 55 60 Qp = 55.15 cfs 3 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Developed pond CountHyd. No. 3 Hydrograph Type= Pond RoutePeak Flow= 27.95 cfs Storm Frequency= 100-yrTime to Peak= 12.47 hrs Time Interval= 2 minHydrograph Volume= 118,566 cuft Inflow Hydrograph= 2 -Post-DevMax. Elevation= 24.92 ft Pond Name= Pre-Post PondMax. Storage= 128,776 cuft Pond Routing by Storage Indication Method Center of mass detention time = 2.16 hrs Post-Dev Developed pond Count Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Q ( c f s ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 Qp = 27.95 cfs 4 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondStage-Storage DescriptionInput Stage / Storage Table Stage (ft) Elevation (ft) Contour Area (sqft) Incr. Storage (cuft) Total Storage (cuft) User Defined Contours Bottom Elevation, ft Voids (%) Volume Calc 21.00 100.00 None 0.0021.0028,5100.0000.000 1.0022.0030,66629,58829,588 2.0023.0032,87831,77261,360 3.0024.0035,14734,01395,373 4.0025.0037,47336,310131,683 Contours Top of Pond Total Storage (cuft) 0 20000 40000 60000 80000 100000 120000 140000 El e v ( f t ) 21 22 23 24 25 St a g e ( f t ) 0 1 2 3 4 Stage-Storage 5 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondStage-Discharge Culvert / Orifices Rise, in Span, in No. Barrels Invert Elevation, ft Orifice Coefficient, Co Length, ft Barrel Slope, % N-Value, n Culvert Orifices 1*23 302 302 11 20.5021.00 0.600.60 50 .5 0.013 Orifice Plate Orifice Dia, in No. Orifices Invert Elevation, ft Height, ft Orifice Coefficient, Co Weirs Shape / Type Crest Elevation, ft Crest Length, ft Angle, deg Weir Coefficient, Cw Riser*Weirs 1*23 Box RectangularBroad Crested 2422.724.5 16330 18.4 (3:1) 3.33.33.3 Ancillary Exfiltration, in/hr *Routes through Culvert. Top of Pond Broad Crested Total Q Discharge (cfs) 024681012141618202224262830323436 El e v ( f t ) 21 22 23 24 25 St a g e ( f t ) 0 1 2 3 4Stage-Discharge 6 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondStage-Storage-Discharge Summary Stage (ft) Elev. (ft) Storage (cuft) Culvert (cfs) Orifices, cfs 123 Riser (cfs) Weirs, cfs 123 Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 0.0021.000.0000.000 0.0000.000 0.000 0.000 0.000 1.0022.0029,5880.000 0.0000.000 0.000 0.000 0.000 2.0023.0061,3600.000 0.0000.000 0.000 0.000 0.000 3.0024.0095,3730.000 0.0000.000 0.000 0.000 0.000 4.0025.00131,6830.000 0.0000.000 0.000 36.40 36.40 Suffix key: ic = inlet control, oc = outlet control, s = submerged weir 7 Pond Report Project Name: Hydrology Studio v 3.0.0.13 02-27-2020 Pre-Post PondPond Drawdown St a g e v s . D r a i n T i m e Dr a i n T i m e ( H r s ) 0 0 . 0 5 0 . 1 0 . 1 5 0 . 2 0 . 2 5 0 . 3 0 . 3 5 0 . 4 0 . 4 5 0 . 5 0 . 5 5 0 . 6 0 . 6 5 0 . 7 0 . 7 5 0 . 8 0 . 8 5 0 . 9 0 . 9 5 Elev (ft) 2122232425 Stage (ft) 01234 Pr e - P o s t P o n d - D r a i n T i m e 8 Design Storm Report Custom Storm filename: 2017-1203first-attempt.cds Hydrology Studio v 3.0.0.13 02-27-2020 Storm Distribution: NRCS/SCS -Type II Total Rainfall Volume (in)Storm Duration 1-yr2-yr3-yr5-yr10-yr25-yr50-yr 100-yr 24 hrs 0.004.500.005.807.008.059.0010.00 Incremental Rainfall Distribution, 100-yr TimeTimeTimeTimeTimePrecipPrecipPrecipPrecipPrecip (hrs)(hrs)(hrs)(hrs)(hrs)(in)(in)(in)(in)(in) 10.900.022444 10.930.022889 10.970.023333 11.000.023778 11.030.024530 11.070.025600 11.100.026667 11.130.027733 11.170.028800 11.200.029867 11.230.030933 11.270.032000 11.300.033067 11.330.034133 11.370.035200 11.400.036267 11.430.037333 11.470.038400 11.500.039467 11.530.053231 11.570.079467 11.600.105778 11.630.132089 11.670.158400 11.700.184711 11.730.211023 11.770.242218 11.800.310504 11.830.383689 11.870.456874 11.900.530059 11.930.483727 11.970.316832 12.000.150277 12.030.066853 12.070.063200 12.100.060667 12.130.058133 12.170.055600 12.200.053067 12.230.050533 12.270.048000 12.300.045467 12.330.042933 12.370.040400 12.400.037867 12.430.035334 12.470.032800 12.500.030267 12.530.028714 12.570.028133 12.600.027555 12.630.026978 12.670.026400 12.700.025822 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 8 9 10 Pr e c i p ( i n ) 0 1 2 3 4 5 6 7 8 9 10 9