Loading...
Z20-09 Traffic Technical Memo - reducedThis report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. TECHNICAL MEMORANDUM Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 Technical Memorandum Demarest Pointe New Hanover County, NC Prepared for Middlesound, LLC June 25, 2020 Analysis by: Tou Lee, EI Drafting/Graphics by: Tou Lee, EI Reviewed by: Robert K. Gey, PE E, PTOE Sealed by: Robert K. Gey, PE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. 6/25/2020 Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 1 Intersection Capacity Analysis for Demarest Pointe Technical Memorandum DAVENPORT Project Number 200221 Prepared for Middlesound, LLC June 25, 2020 Introduction DAVENPORT was retained to determine the potential traffic impacts of the Demarest Pointe project at the roundabout of Middle Sound Loop Road and Darden Road and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The proposed project is to be located north-east of the existing Ogden Elementary School in New Hanover County, NC. The project proposes 24 dwelling units of townhomes. Two (2) new restricted site access points are proposed. A right-in only site access is proposed to be located approximately 540 feet east of the existing roundabout at Middle Sound Loop Road and Darden Road. A right-out only site access is proposed to be located approximately 418 feet south of the roundabout. Executive Summary and Conclusion DAVENPORT was retained to determine the potential traffic impacts of this project and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. Based on the trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 10th Edition), this development has a trip generation potential of 141 daily trips, 12 trips (3 entering 9 exiting) in the AM peak hour and 17 trips (11 entering 6 exiting) in the PM peak hour. Demarest Pointe Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Method/Type Volume Enter Exit Enter Exit Townhomes 220 24 Dwelling Units Adjacent/ Equation 141 3 9 11 6 Total Trips 141 3 9 11 6 Roundabout Capacity Analysis Overall, the study intersection currently operates at level of service (LOS) D in the AM peak hour and B during the PM peak hour, as shown in Table 2. In 2022 future no build conditions (without the project site trips) LOS E is expected in the AM peak hour and LOS B in the PM peak hour. In 2022 future build conditions (which includes the proposed Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 2 project site trips) the LOS is expected to remain unchanged. Overall, a slight increase (1.9 seconds per vehicle AM and 0.3 seconds per vehicle PM) in delay is expected at the roundabout. DAVENPORT is in agreement with NCDOT study, dated February 1, 2018 and conclusions regarding the Demarest Pointe development. Table 2 - Middle Sound Loop Road at Darden Road (ROUNDABOUT) Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2020 Base D (31.6) L T R L T R L T R L T R A (9.3) A (9.3) A (9.3) F (66.2) F (66.2) F (66.2) C (22.8) C (22.8) C (22.8) D (28.7) D (28.7) D (28.7) A (9.3) F (66.2) C (22.8) D (28.7) 2022 Future No Build E (40.5) L T R L T R L T R L T R A (9.9) A (9.9) A (9.9) F (91.0) F (91.0) F (91.0) D (27.9) D (27.9) D (27.9) D (31.6) D (31.6) D (31.6) A (9.9) F (91.0) D (27.9) D (31.6) 2022 Future Build E (42.4) L T R L T R L T R L T R A (9.9) A (9.9) A (9.9) F (96.0) F (96.0) F (96.0) D (29.9) D (29.9) D (29.9) D (32.2) D (32.2) D (32.2) A (9.9) F (96.0) D (29.9) D (32.2) PM Peak Hour 2020 Base B (11.1) L T R L T R L T R L T R B (14.0) B (14.0) B (14.0) A (7.7) A (7.7) A (7.7) A (9.2) A (9.2) A (9.2) A (7.4) A (7.4) A (7.4) B (14.0) A (7.7) A (9.2) A (7.4) 2022 Future No Build B (12.2) L T R L T R L T R L T R C (15.5) C (15.5) C (15.5) A (8.2) A (8.2) A (8.2) A (9.9) A (9.9) A (9.9) A (7.8) A (7.8) A (7.8) C (15.5) A (8.2) A (9.9) A (7.8) 2022 Future Build B (12.5) L T R L T R L T R L T R C (16.0) C (16.0) C (16.0) A (8.2) A (8.2) A (8.2) B (10.2) B (10.2) B (10.2) A (7.9) A (7.9) B (11.8) C (16.0) A (8.2) B (10.2) A (7.9) Safety The right-in and right-out driveways paired with the roundabout, provides excellent access management which significantly improves safety when compared to traditional full movement access. Studies have shown that left turns account for 72% of driveway crashes for driveways located near intersections. Left turn movements are typically associated with angle crashes which can often result in injuries. Right turns are more often associated with rear end or sideswipe crashes typically resulting in property damage only. Conclusion In conclusion, this study has reviewed the impacts of both background traffic and proposed development traffic. There is negligible impact from traffic generated by this development and no traffic mitigation measures are recommended. Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 3 Methodology Figure 1 in the Supporting Documents illustrates the site plan. The vicinity map and the existing lane geometry are illustrated in Figure 2 and Figure 3 respectively. Traffic counts collected on December 12, 2017 were used to determine the 2020 base volumes at this study intersection. A 2% annual growth rate, given from a NCDOT previous study, dated February 1, 2018, was applied to the 2017 traffic to obtain the 2020 base volumes. The 2017 count and method were used to reflect the traffic conditions prior to COVID-19 pandemic. The 2020 base volumes were projected out to a future analysis year of 2022 by applying a 2% annual traffic growth rate. 2020 base volumes and 2022 future no build volumes are shown for AM and PM peaks in Figures 4 and 5, respectively. The trip generation potential for this site was projected based on the 10th edition of ITE Trip Generation Manual. Table 1 presents the results. Site trips for this project were distributed based on the existing traffic patterns and engineering judgment. The trip distribution model is shown in Figure 6. The 2022 build-out traffic volumes were obtained by summing the 2022 future no build volumes and site trips generated by the proposed project. Site trips are shown in Figure 7. The 2022 future build volumes are shown for AM and PM peaks in Figure 8. Table 1 - ITE Trip Generation Demarest Pointe Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Method/Type Volume Enter Exit Enter Exit Townhomes 220 24 Dwelling Units Adjacent/ Equation 141 3 9 11 6 Total Trips 141 3 9 11 6 SIDRA 8.0 was used to determine the level of service of the study intersection. Queue lengths were also reviewed based on SIDRA 8.0 results. Based on NCDOT standards, roundabout environmental factor would be adjusted to 1.2 to reflect U.S. drivers’ inexperience with roundabout driving. In this specific location, this roundabout has been in place for 10 years. Therefore, based on engineering judgement, the environmental factor was adjusted to 1.0 to reflect the familiarity of the roundabout. In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 4 The following intersection was included in the study: 1. Middle Sound Loop Road at Darden Road (ROUNDABOUT) The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions: • 2020 Base Conditions • 2022 Future No-Build Conditions • 2022 Build Conditions Capacity Analysis Overall, the study intersection currently operates at level of service (LOS) D and B during the AM and PM peak hours respectively, as shown in Table 2 on the next page. In 2022 future no build conditions (without the project site trips) LOS E is expected in the AM peak and LOS B in the PM peak. In 2022 future build conditions (which includes the proposed project site trips) the LOS is expected to remain unchanged. Overall, a slight increase (2 seconds per vehicle AM and 0.3 seconds per vehicle PM) in delay is expected at the intersection. Table 2 - Middle Sound Loop Road at Darden Road (ROUNDABOUT) Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2020 Base D (31.6) L T R L T R L T R L T R A (9.3) A (9.3) A (9.3) F (66.2) F (66.2) F (66.2) C (22.8) C (22.8) C (22.8) D (28.7) D (28.7) D (28.7) A (9.3) F (66.2) C (22.8) D (28.7) 2022 Future No Build E (40.5) L T R L T R L T R L T R A (9.9) A (9.9) A (9.9) F (91.0) F (91.0) F (91.0) D (27.9) D (27.9) D (27.9) D (31.6) D (31.6) D (31.6) A (9.9) F (91.0) D (27.9) D (31.6) 2022 Future Build E (42.4) L T R L T R L T R L T R A (9.9) A (9.9) A (9.9) F (96.0) F (96.0) F (96.0) D (29.9) D (29.9) D (29.9) D (32.2) D (32.2) D (32.2) A (9.9) F (96.0) D (29.9) D (32.2) PM Peak Hour 2020 Base B (11.1) L T R L T R L T R L T R B (14.0) B (14.0) B (14.0) A (7.7) A (7.7) A (7.7) A (9.2) A (9.2) A (9.2) A (7.4) A (7.4) A (7.4) B (14.0) A (7.7) A (9.2) A (7.4) 2022 Future No Build B (12.2) L T R L T R L T R L T R C (15.5) C (15.5) C (15.5) A (8.2) A (8.2) A (8.2) A (9.9) A (9.9) A (9.9) A (7.8) A (7.8) A (7.8) C (15.5) A (8.2) A (9.9) A (7.8) 2022 Future Build B (12.5) L T R L T R L T R L T R C (16.0) C (16.0) C (16.0) A (8.2) A (8.2) A (8.2) B (10.2) B (10.2) B (10.2) A (7.9) A (7.9) B (11.8) C (16.0) A (8.2) B (10.2) A (7.9) Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 5 Queue Length Analysis A summary of the queue length analysis is shown in Table 3 and graphically in Figure 9. Based on the analysis, the northbound queue at the roundabout will extend past the proposed right-out only access. This queue length is expected to be short-lived as majority of the traffic during the morning peak is school traffic. Based on the NCDOT turn lane warrant charts, no turn lanes are warranted. Therefore, it is recommended to design the site access according to NCDOT standards. Figure 10 shows the recommended improvements. Table 3 - Queue Results AM Peak Hour Queues Scenario Middle Sound Loop Road at Darden Road (ROUNDABOUT) 2020 Base EBLTR WBLTR NBLTR SBLTR 95th Percentile Queue (ft) 108.5 637.5 307.2 114.1 Storage Bay (ft) FULL FULL FULL FULL 2022 Future No Build EBLTR WBLTR NBLTR SBLTR 95th Percentile Queue (ft) 118.3 881.8 380.1 127.6 Storage Bay (ft) FULL FULL FULL FULL 2022 Future Build EBLTR WBLTR NBLTR SBLTR 95th Percentile Queue (ft) 119.4 921.4 412.8 129.0 Storage Bay (ft) FULL FULL FULL FULL PM Peak Hour Queues Scenario Middle Sound Loop Road at Darden Road (ROUNDABOUT) 2020 Base EBLTR WBLTR NBLTR SBLTR 95th Percentile Queue (ft) 194.7 45.3 45.2 29.4 Storage Bay (ft) FULL FULL FULL FULL 2022 Future No Build EBLTR WBLTR NBLTR SBLTR 95th Percentile Queue (ft) 219.0 48.9 52.1 31.8 Storage Bay (ft) FULL FULL FULL FULL 2022 Future Build EBLTR WBLTR NBLTR SBLTR 95th Percentile Queue (ft) 254.1 49.2 55.7 32.0 Storage Bay (ft) FULL FULL FULL FULL Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 6 Alternative Analysis An alternative trip generation was reviewed for the Demarest Pointe project. A 27 dwelling unit townhome trip generation was analyzed and compared to the original 24 units of townhomes. Table 4 presents the trip generation results. Overall, compared to the original 24 units of townhome, the alternatives level of service has a slight increase delay. Table 5 presents the future build LOS comparison for both alternatives. Table 4 - ITE Trip Generation Demarest Pointe (27 Townhomes) Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Method/Type Volume Enter Exit Enter Exit Townhomes 220 27 Dwelling Units Adjacent/ Equation 163 3 11 11 7 Total Trips 163 3 11 11 7 Table 5 - Middle Sound Loop Road at Darden Road (ROUNDABOUT) Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 24 Townhomes E (42.4) L T R L T R L T R L T R A (9.9) A (9.9) A (9.9) F (96.0) F (96.0) F (96.0) D (29.9) D (29.9) D (29.9) D (32.2) D (32.2) D (32.2) A (9.9) F (96.0) D (29.9) D (32.2) 27 Townhomes E (42.8) L T R L T R L T R L T R A (9.9) A (9.9) A (9.9) F (97.1) F (97.1) F (97.1) D (30.3) D (30.3) D (30.3) D (32.3) D (32.3) D (32.3) A (9.9) F (97.1) D (30.3) D (32.3) PM Peak Hour 24 Townhomes B (12.5) L T R L T R L T R L T R C (16.0) C (16.0) C (16.0) A (8.2) A (8.2) A (8.2) B (10.2) B (10.2) B (10.2) A (7.9) A (7.9) B (11.8) C (16.0) A (8.2) B (10.2) A (7.9) 27 Townhomes B (12.5) L T R L T R L T R L T R C (16.0) C (16.0) C (16.0) A (8.3) A (8.3) A (8.3) B (10.3) B (10.3) B (10.3) A (7.9) A (7.9) B (11.8) C (16.0) A (8.3) B (10.3) A (7.9) Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 7 Summary and Conclusion DAVENPORT was retained to determine the potential traffic impacts of this project and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. Based on the trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 10th Edition), this development has a trip generation potential of 141 daily trips, 12 trips (3 entering 9 exiting) in the AM peak hour and 17 trips (11 entering 6 exiting) in the PM peak hour. Roundabout Capacity Analysis Overall, the study intersection currently operates at level of service (LOS) D in the AM peak hour and B during the PM peak hour, as shown in Table 2. In the 2022 future no build conditions (without the project site trips) LOS E is expected in the AM peak hour and LOS B in the PM peak hour. In the 2022 future build conditions (which includes the proposed project site trips) the LOS is expected to remain unchanged. Overall, a slight increase (1.9 seconds per vehicle AM and 0.3 seconds per vehicle PM) in delay is expected at the intersection. DAVENPORT is in agreement with NCDOT study, dated February 1, 2018 and conclusions regarding Demarest Pointe development. The roundabout capacity analysis was also performed for a 27 townhome alternative. Considering the minimal additional traffic volumes generated by the 27 townhome alternative compared to the 24 townhome alternative, the AM peak hour delay would increase by 0.4 seconds per vehicle compared to the 24 townhome alternative. There would be no change in delay per vehicle for the PM peak hour. Safety The right-in and right-out driveways paired with the roundabout, provides excellent access management which significantly improves safety when compared to traditional full movement access. Studies have shown that left turns account for 72% of driveway crashes for driveways located near intersections. Left turn movements are typically associated with angle crashes which can often result in injuries. Right turns are more often associated with rear end or sideswipe crashes typically resulting in property damage only. Conclusion In conclusion, this study has reviewed the impacts of both background traffic and proposed development traffic. There is negligible impact from traffic generated by this development and no traffic mitigation measures are recommended. Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 8 Attached Supporting Documents: 1. Figure 1: Site Plan 2. Figure 2: Vicinity Map 3. Figure 3: Existing Lane Geometry 4. Figure 4: 2020 Base Volumes 5. Figure 5: 2022 Future No Build Vol. 6. Figure 6: Trip Distribution 7. Site Trips 8. Figure 8: 2022 Future Build Volumes 9. Figure 9: Roundabout Queue 10. Figure 10: Recommended Imp. 11. Appendix Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 Supporting Documents FI G U R E 1 SI T E P L A N   FI G U R E 2 VI C I N I T Y M A P IN T E R S E C T I O N S ST U D I E D PR O P O S E D    SI T E   1 2  3  *** NOT TO SCALE *** BLACK = EXISTING TRAFFIC MOVEMENT ROADWAY LEGEND ROUNDABOUT N Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthe specificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORT,shallbewithoutliabilitytoDAVENPORT,andshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE3 EXISTING LANE GEOMETRY DEMAREST POINTENEWHANOVERCOUNTY, NC PROJECT NUMBER 200221 Da r d e n R o a d Middle Sound Loop Road SPEEDLIMIT 35 SPEEDLIMIT35 2018 AADT:6,000 2018 AADT: 7,300 Middle Sound Loop Road Mi d d l e S o u n d Lo o p R o a d *** NOT TO SCALE *** ROUNDABOUTN Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthe specificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORT,shallbewithoutliabilitytoDAVENPORT,andshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 42020 BASE TRAFFIC VOLUMES DEMAREST POINTENEWHANOVERCOUNTY, NC PROJECT NUMBER 200221 Da r d e n R o a d Middle Sound Loop Road BLACK = EXISTING TRAFFIC MOVEMENT ROADWAY LEGEND 48 / 39 413 / 2490 / 5 22 / 5 34 / 3 8 42 7 / 2 0 5 28 / 4 8 69 / 5 8 13 6 / 8 0 156 / 83 268 / 369 143 / 319 AM / PM PEAKS Middle Sound Loop Road Mi d d l e So u n d L o o p *** NOT TO SCALE *** ROUNDABOUTN Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthe specificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORT,shallbewithoutliabilitytoDAVENPORT,andshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 52022 FUTURE NO BUILD VOLUMES DEMAREST POINTENEWHANOVERCOUNTY, NC PROJECT NUMBER 200221 Da r d e n R o a d Middle Sound Loop Road BLACK = EXISTING TRAFFIC MOVEMENT ROADWAY LEGEND 50 / 41 430 / 2600 / 6 23 / 6 36 / 4 0 44 5 / 2 1 4 30 / 5 0 72 / 6 1 14 2 / 8 4 163 / 87 279 / 384 149 / 332 AM / PM PEAKS Middle Sound Loop Road Mi d d l e So u n d L o o p *** NOT TO SCALE *** N TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING BLUE = PROPOSED DESTINATION NODE% IN = ENTERING OUT = EXITING Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthe specificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORT,shallbewithoutliabilitytoDAVENPORT,andshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. Demarest Pointe 100% IN 100%OUT 10 0 % O U T 100% IN 100% FIGURE6 TRIP DISTRIBUTION DEMAREST POINTE NEW HANOVER COUNTY, NC PROJECT NUMBER 200221 Da r d e n R o a d Middle Sound Loop Road Middle Sound Loop Road Mi d d l e S o u n d Lo o p R o a d ROUNDABOUT RIGHTINOR RIGHTOUTONLY Si t e A c c e s s 1 (E n t e r O n l y ) Site Access 2 (Exit Only) *** NOT TO SCALE *** ROUNDABOUTN Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORT,shallbewithout liabilitytoDAVENPORT,andshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 7 SITE TRIPS DEMAREST POINTENEWHANOVERCOUNTY, NC PROJECT NUMBER 200221 0 / 00 / 00 / 0 0 / 0 0 / 0 9 / 6 0 / 0 0 / 0 0 / 0 0 / 0 3 / 110 / 0 BLACK = EXISTING BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND AM / PM PEAKS RIGHTINOR RIGHTOUTONLY Demarest Pointe Da r d e n R o a d Middle Sound Loop Road Middle Sound Loop Road Mi d d l e S o u n d Lo o p R o a d Si t e A c c e s s 1 (E n t e r O n l y ) Site Access 2 (Exit Only) 0 / 03 / 11 0 / 0 0 / 0 9 / 60 / 0 *** NOT TO SCALE *** ROUNDABOUTN Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORT,shallbewithout liabilitytoDAVENPORT,andshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE 82022 FUTURE BUILD VOLUMES DEMAREST POINTENEWHANOVERCOUNTY, NC PROJECT NUMBER 200221 50 / 41430 / 2600 / 6 23 / 6 36 / 4 0 45 4 / 2 2 0 30 / 5 0 72 / 6 1 14 2 / 8 4 163 / 87 282 / 395149 / 332 BLACK = EXISTING BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND AM / PM PEAKS RIGHTINOR RIGHTOUTONLY Demarest Pointe Da r d e n R o a d Middle Sound Loop Road Middle Sound Loop Road Mi d d l e S o u n d Lo o p R o a d Si t e A c c e s s 1 (E n t e r O n l y ) Site Access 2 (Exit Only) 279 / 3843 / 11 480 / 307 50 4 / 2 6 0 9 / 624 4 / 1 9 5 Fi g u r e 9 : R o u n d a b o u t Q u e u e De m a r e s t P o i n t e Le g e n d Fu t u r e N o B u i l d M a x Q u e u e Fu t u r e B u i l d M a x Q u e u e Og d e n   El e m e n t a r y   Sc h o o l De m a r e s t   Po i n t e *** NOT TO SCALE *** ROUNDABOUT RIGHTINOR RIGHTOUTONLY N Thisdocument,togetherwiththeconceptsanddesignspresentedherein,isintendedonlyforthespecificpurposeandclientforwhichitwasprepared.Reuseof,orimproperrelianceon,thisdocumentbyotherswithoutwrittenauthorizationandadaptationbyDAVENPORT,shallbewithout liabilitytoDAVENPORT,andshallbeaviolationoftheagreementbetweenDAVENPORTandtheclient. FIGURE10 RECOMMENDED IMPROVEMENTS DEMAREST POINTENEWHANOVERCOUNTY, NC PROJECT NUMBER 200221 BLACK = EXISTING BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND ~540' Demarest Pointe Da r d e n R o a d Middle Sound Loop Road Middle Sound Loop Road Mi d d l e S o u n d Lo o p R o a d Si t e A c c e s s 1 (E n t e r O n l y ) Site Access 2 (Exit Only) ~4 1 8 ' Design site access according to NCDOT standards Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 3722 Shipyard Boulevard, Suite E Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 Appendix Opposing Lefts Opposing Rights AM 0 0 AM 282 3 PM 0 0 PM 395 11 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY SITE ACCESS 1 • Cumbo, Daniel R <drcumbo@ncdot.gov> To: Scott Stewart Cc: Roan, Jon Mon, Mar 23 at 7:17 AM Scott, Thank you again for coordinating with NCDOT on the review of your proposed development. Please see below NCDOT responses to the items below related to the Demarest Pointe proposed development: 1.Requirement for a Traffic Impact Analysis (TIA); A TIA will not be required by NCDOT and is below the WMPO and County thresholds for requirement of a TIA. 2.Location and proposed alignment for Demarest Pointe entrance, point of Ingress: NCDOT is in agreement with the entrance access as proposed in your conceptual plan. A turn lane will not be required based on our review of the roadway and site traffic volumes. 3.Location and proposed alignment for Demarest Pointe exit, point of Egress; NCDOT is in agreement with the exit access as proposed in your conceptual plan. 4.Commentary regarding preference specific to Egress onto Middle Sound Loop Road, as shown on the attached Master Development Plan or is there a preference for the possible alternate Egress location utilizing the access/utility/drainage easement provided through 3618 Middle Sound Loop Road onto Pickway Court to Middle Sound Loop Road. NCDOT does not have a preference with regard to exit access alternatives described above. 5.General internal vehicular circulation alignment and vehicular flow pattern of the Demarest Pointe neighborhood design relationship (one way vehicular pattern, right in, right out) to the existing vehicular patterns of Middle Sound Loop Road, the Middle Sound Loop Road Round - A - Bout and Ogden Elementary School points of Ingress, Egress and vehicular flow patterns. The Demarest Pointe access design provides excellent access management with limited movement right-in and right-out driveways instead of traditional full movement intersections. The roundabout provides a nearby intersection for vehicular site traffic to make u-turn type movements to accommodate left-in and left-out movements related to the development site. NCDOT does not have any concerns related to the development exit access relative to the school driveways. In general, the development design is well thought out in regard to circulation and flow of traffic. Please let us know if you have any questions or if additional information is needed. Sincerely, -Dan Daniel R. Cumbo, PE Deputy District Engineer Division 3 | District 3 (910)398-9100 Tr i p G e n e r a t i o n S u m m a r y Open Date:Analysis Date:5/20/2020 5/20/2020 Pr o j e c t : D e m a r e s t P o i n t e Alt e r n a t i v e : Alt e r n a t i v e 1 Ph a s e : IT E L a n d U s e En t e r E x i t E n t e r E x i t En t e r E x i t Total To t a l To t a l * * * We e k d a y A v e r a g e D a i l y T r i p s We e k d a y A M P e a k H o u r o f Ad j a c e n t S t r e e t T r a f f i c Weekday PM Peak Hour of Adjacent Street Traffic 22 0 L O W - R I S E 1 24 D w e l l i n g U n i t s 71 7 0 1 4 1 3 9 1 2 1 1 6 1 7 Un a d j u s t e d V o l u m e 71 7 0 1 4 1 3 9 1 2 11617 In t e r n a l C a p t u r e T r i p s 0 0 0 0 0 0 000 00 0 0 0 0 0 0 0 71 7 0 1 4 1 3 9 1 2 11617 Pa s s - B y T r i p s Vo l u m e A d d e d t o A d j a c e n t S t r e e t s To t a l W e e k d a y A v e r a g e D a i l y T r i p s I n t e r n a l C a p t u r e = 0 P e r c e n t To t a l W e e k d a y A M P e a k H o u r o f A d j a c e n t S t r e e t T r a f f i c I n t e r n a l Ca p t u r e = 0 P e r c e n t To t a l W e e k d a y P M P e a k H o u r o f A d j a c e n t S t r e e t T r a f f i c I n t e r n a l Ca p t u r e = 0 P e r c e n t P. 1 TR I P G E N E R A T I O N 1 0 , T R A F F I C W A R E , L L C So u r c e : I n s t i t u t e o f T r a n s p o r t a t i o n E n g i n e e r s , T r i p G e n e r a t i o n M a n u a l 1 0 t h E d i t i o n - C u s t o m r a t e u s e d f o r s e l e c t e d t i m e p e r i o d . * MOVEMENT SUMMARY Site:100 [AM 2020 Base] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 569 2.0 0.787 22.8 LOS C 12.1 307.2 0.93 1.52 2.03 20.0 8 T1 38 2.0 0.787 22.8 LOS C 12.1 307.2 0.93 1.52 2.03 19.7 18 R2 24 2.0 0.787 22.8 LOS C 12.1 307.2 0.93 1.52 2.03 19.4 Approach 632 2.0 0.787 22.8 LOS C 12.1 307.2 0.93 1.52 2.03 19.9 East: Middle Sound Loop Road 1 L2 4 2.0 1.013 66.2 LOS F 25.1 637.5 1.00 2.65 4.56 14.8 6 T1 551 2.0 1.013 66.2 LOS F 25.1 637.5 1.00 2.65 4.56 14.7 16 R2 53 2.0 1.013 66.2 LOS F 25.1 637.5 1.00 2.65 4.56 14.5 Approach 608 2.0 1.013 66.2 LOS F 25.1 637.5 1.00 2.65 4.56 14.6 North: Darden Road 7 L2 31 2.0 0.686 28.7 LOS D 4.5 114.1 0.87 1.22 1.72 19.4 4 T1 77 2.0 0.686 28.7 LOS D 4.5 114.1 0.87 1.22 1.72 19.2 14 R2 181 2.0 0.686 28.7 LOS D 4.5 114.1 0.87 1.22 1.72 18.9 Approach 289 2.0 0.686 28.7 LOS D 4.5 114.1 0.87 1.22 1.72 19.0 West: Middle Sound Loop Road 5 L2 173 2.0 0.550 9.3 LOS A 4.3 108.5 0.45 0.27 0.45 23.3 2 T1 298 2.0 0.550 9.3 LOS A 4.3 108.5 0.45 0.27 0.45 22.9 12 R2 191 2.0 0.550 9.3 LOS A 4.3 108.5 0.45 0.27 0.45 22.4 Approach 662 2.0 0.550 9.3 LOS A 4.3 108.5 0.45 0.27 0.45 22.9 All Vehicles 2191 2.0 1.013 31.6 LOS D 25.1 637.5 0.80 1.42 2.21 18.7 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC | Processed: Monday, June 01, 2020 11:01:30 AM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\CAPACITY ANALYSIS\SIDRA\Roundabout (node 100).sip8 MOVEMENT SUMMARY Site:100 [AM 2022 FNB] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 593 2.0 0.840 27.9 LOS D 15.0 380.1 0.98 1.74 2.41 19.1 8 T1 40 2.0 0.840 27.9 LOS D 15.0 380.1 0.98 1.74 2.41 18.9 18 R2 26 2.0 0.840 27.9 LOS D 15.0 380.1 0.98 1.74 2.41 18.6 Approach 659 2.0 0.840 27.9 LOS D 15.0 380.1 0.98 1.74 2.41 19.1 East: Middle Sound Loop Road 1 L2 4 2.0 1.092 91.0 LOS F 34.7 881.8 1.00 3.29 6.01 12.7 6 T1 573 2.0 1.092 91.0 LOS F 34.7 881.8 1.00 3.29 6.01 12.6 16 R2 56 2.0 1.092 91.0 LOS F 34.7 881.8 1.00 3.29 6.01 12.5 Approach 633 2.0 1.092 91.0 LOS F 34.7 881.8 1.00 3.29 6.01 12.6 North: Darden Road 7 L2 33 2.0 0.724 31.6 LOS D 5.0 127.6 0.88 1.28 1.85 19.0 4 T1 80 2.0 0.724 31.6 LOS D 5.0 127.6 0.88 1.28 1.85 18.7 14 R2 189 2.0 0.724 31.6 LOS D 5.0 127.6 0.88 1.28 1.85 18.4 Approach 303 2.0 0.724 31.6 LOS D 5.0 127.6 0.88 1.28 1.85 18.5 West: Middle Sound Loop Road 5 L2 181 2.0 0.576 9.9 LOS A 4.7 118.3 0.48 0.29 0.48 23.1 2 T1 310 2.0 0.576 9.9 LOS A 4.7 118.3 0.48 0.29 0.48 22.8 12 R2 199 2.0 0.576 9.9 LOS A 4.7 118.3 0.48 0.29 0.48 22.3 Approach 690 2.0 0.576 9.9 LOS A 4.7 118.3 0.48 0.29 0.48 22.8 All Vehicles 2285 2.0 1.092 40.5 LOS E 34.7 881.8 0.82 1.67 2.75 17.4 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC | Processed: Monday, June 01, 2020 11:01:31 AM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\CAPACITY ANALYSIS\SIDRA\Roundabout (node 100).sip8 MOVEMENT SUMMARY Site:100 [AM 2022 FB] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 605 2.0 0.859 29.9 LOS D 16.3 412.8 1.00 1.83 2.56 18.8 8 T1 40 2.0 0.859 29.9 LOS D 16.3 412.8 1.00 1.83 2.56 18.6 18 R2 26 2.0 0.859 29.9 LOS D 16.3 412.8 1.00 1.83 2.56 18.3 Approach 671 2.0 0.859 29.9 LOS D 16.3 412.8 1.00 1.83 2.56 18.8 East: Middle Sound Loop Road 1 L2 4 2.0 1.106 96.0 LOS F 36.3 921.4 1.00 3.40 6.27 12.4 6 T1 573 2.0 1.106 96.0 LOS F 36.3 921.4 1.00 3.40 6.27 12.3 16 R2 56 2.0 1.106 96.0 LOS F 36.3 921.4 1.00 3.40 6.27 12.2 Approach 633 2.0 1.106 96.0 LOS F 36.3 921.4 1.00 3.40 6.27 12.3 North: Darden Road 7 L2 33 2.0 0.728 32.2 LOS D 5.1 129.0 0.88 1.29 1.87 18.9 4 T1 80 2.0 0.728 32.2 LOS D 5.1 129.0 0.88 1.29 1.87 18.6 14 R2 189 2.0 0.728 32.2 LOS D 5.1 129.0 0.88 1.29 1.87 18.3 Approach 303 2.0 0.728 32.2 LOS D 5.1 129.0 0.88 1.29 1.87 18.5 West: Middle Sound Loop Road 5 L2 181 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 23.1 2 T1 313 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 22.8 12 R2 199 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 22.3 Approach 693 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 22.7 All Vehicles 2300 2.0 1.106 42.4 LOS E 36.3 921.4 0.83 1.73 2.87 17.2 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC | Processed: Monday, June 01, 2020 11:01:34 AM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\CAPACITY ANALYSIS\SIDRA\Roundabout (node 100).sip8 MOVEMENT SUMMARY Site:100 [PM 2020 Base] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 228 2.0 0.363 9.2 LOS A 1.8 45.2 0.66 0.68 0.70 22.7 8 T1 42 2.0 0.363 9.2 LOS A 1.8 45.2 0.66 0.68 0.70 22.4 18 R2 6 2.0 0.363 9.2 LOS A 1.8 45.2 0.66 0.68 0.70 22.0 Approach 276 2.0 0.363 9.2 LOS A 1.8 45.2 0.66 0.68 0.70 22.7 East: Middle Sound Loop Road 1 L2 6 2.0 0.351 7.7 LOS A 1.8 45.3 0.57 0.50 0.57 24.0 6 T1 277 2.0 0.351 7.7 LOS A 1.8 45.3 0.57 0.50 0.57 23.6 16 R2 43 2.0 0.351 7.7 LOS A 1.8 45.3 0.57 0.50 0.57 23.1 Approach 326 2.0 0.351 7.7 LOS A 1.8 45.3 0.57 0.50 0.57 23.6 North: Darden Road 7 L2 53 2.0 0.260 7.4 LOS A 1.2 29.4 0.60 0.57 0.60 23.7 4 T1 64 2.0 0.260 7.4 LOS A 1.2 29.4 0.60 0.57 0.60 23.4 14 R2 89 2.0 0.260 7.4 LOS A 1.2 29.4 0.60 0.57 0.60 22.9 Approach 207 2.0 0.260 7.4 LOS A 1.2 29.4 0.60 0.57 0.60 23.2 West: Middle Sound Loop Road 5 L2 92 2.0 0.720 14.0 LOS B 7.7 194.7 0.66 0.41 0.66 22.4 2 T1 410 2.0 0.720 14.0 LOS B 7.7 194.7 0.66 0.41 0.66 22.0 12 R2 354 2.0 0.720 14.0 LOS B 7.7 194.7 0.66 0.41 0.66 21.6 Approach 857 2.0 0.720 14.0 LOS B 7.7 194.7 0.66 0.41 0.66 21.9 All Vehicles 1664 2.0 0.720 11.1 LOS B 7.7 194.7 0.63 0.49 0.64 22.5 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC | Processed: Wednesday, May 27, 2020 11:19:31 AM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\CAPACITY ANALYSIS\SIDRA\Roundabout (node 100).sip8 MOVEMENT SUMMARY Site:100 [PM 2022 FNB] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 238 2.0 0.390 9.9 LOS A 2.1 52.1 0.68 0.73 0.78 22.6 8 T1 44 2.0 0.390 9.9 LOS A 2.1 52.1 0.68 0.73 0.78 22.3 18 R2 7 2.0 0.390 9.9 LOS A 2.1 52.1 0.68 0.73 0.78 21.8 Approach 289 2.0 0.390 9.9 LOS A 2.1 52.1 0.68 0.73 0.78 22.5 East: Middle Sound Loop Road 1 L2 7 2.0 0.374 8.2 LOS A 1.9 48.9 0.59 0.53 0.59 23.9 6 T1 289 2.0 0.374 8.2 LOS A 1.9 48.9 0.59 0.53 0.59 23.5 16 R2 46 2.0 0.374 8.2 LOS A 1.9 48.9 0.59 0.53 0.59 23.0 Approach 341 2.0 0.374 8.2 LOS A 1.9 48.9 0.59 0.53 0.59 23.5 North: Darden Road 7 L2 56 2.0 0.279 7.8 LOS A 1.3 31.8 0.61 0.60 0.61 23.6 4 T1 68 2.0 0.279 7.8 LOS A 1.3 31.8 0.61 0.60 0.61 23.3 14 R2 93 2.0 0.279 7.8 LOS A 1.3 31.8 0.61 0.60 0.61 22.8 Approach 217 2.0 0.279 7.8 LOS A 1.3 31.8 0.61 0.60 0.61 23.1 West: Middle Sound Loop Road 5 L2 97 2.0 0.755 15.5 LOS C 8.6 219.0 0.73 0.47 0.73 22.0 2 T1 427 2.0 0.755 15.5 LOS C 8.6 219.0 0.73 0.47 0.73 21.7 12 R2 369 2.0 0.755 15.5 LOS C 8.6 219.0 0.73 0.47 0.73 21.3 Approach 892 2.0 0.755 15.5 LOS C 8.6 219.0 0.73 0.47 0.73 21.5 All Vehicles 1739 2.0 0.755 12.2 LOS B 8.6 219.0 0.68 0.54 0.70 22.3 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC | Processed: Wednesday, May 27, 2020 11:19:31 AM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\CAPACITY ANALYSIS\SIDRA\Roundabout (node 100).sip8 MOVEMENT SUMMARY Site:100 [PM 2022 FB] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 244 2.0 0.404 10.2 LOS B 2.2 55.7 0.69 0.76 0.83 22.5 8 T1 44 2.0 0.404 10.2 LOS B 2.2 55.7 0.69 0.76 0.83 22.2 18 R2 7 2.0 0.404 10.2 LOS B 2.2 55.7 0.69 0.76 0.83 21.7 Approach 296 2.0 0.404 10.2 LOS B 2.2 55.7 0.69 0.76 0.83 22.4 East: Middle Sound Loop Road 1 L2 7 2.0 0.377 8.2 LOS A 1.9 49.2 0.60 0.53 0.60 23.9 6 T1 289 2.0 0.377 8.2 LOS A 1.9 49.2 0.60 0.53 0.60 23.5 16 R2 46 2.0 0.377 8.2 LOS A 1.9 49.2 0.60 0.53 0.60 23.0 Approach 341 2.0 0.377 8.2 LOS A 1.9 49.2 0.60 0.53 0.60 23.4 North: Darden Road 7 L2 56 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 23.6 4 T1 68 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 23.2 14 R2 93 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 22.7 Approach 217 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 23.1 West: Middle Sound Loop Road 5 L2 97 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.9 2 T1 439 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.6 12 R2 369 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.2 Approach 904 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.4 All Vehicles 1758 2.0 0.765 12.5 LOS B 10.0 254.1 0.69 0.57 0.73 22.2 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC | Processed: Wednesday, May 27, 2020 11:19:32 AM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\CAPACITY ANALYSIS\SIDRA\Roundabout (node 100).sip8 Home Office: 305 West Fourth Street, Suite 2A Winston-Salem, NC 27101 Main: 336.744.1636 Fax: 336.458.9377 25 MPH Count Number: 17-02640 Division: 3 County: New Hanover City: Wilmington Day 1 Count Date: 12/12/2017 Count Time: 6:00am-7:00pm Weather Conditions: 65-Hi/34-Lo/Prec: Milepost: N/A Intersection: SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) 13-Hour Traffic Volume: 13,421 Vehicles 0” Comments: 1. Counted By: M. Martin 2. Data Processor: C. Bowers 3. Method Used: JAMAR Traffic Data Collector with video 4. Equipment Operating as Specified by the Manufacturer: Yes 5. School in Session: Yes 6. Break Times: None 7. Area Lighting Present: None present 8. Traffic Control: Roundabout - Single Lane 9. Signal Cabinet Number: N/A 10. Disabled Pedestrians: None observed 11. Construction Present: No 12. Traffic Flow Disruption: None observed 13. Railroad Crossings: None within 200 ft of each leg 14. Other Signal or Stop Controlled Intersections: None within 300 ft of each leg House Trees Vicinity Map Trees Count Site Intersection Sketch School File Name: 17-02640 Site Code: 1702640 Start Date: 12/12/2017 Page No: 1 Counted By: M. Martin Groups Printed- All Vehicles Darden Road Southbound Middle Sound Loop Road Westbound Middle Sound Loop Road Northbound Middle Sound Loop Road Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total06:00 AM 310 0 4 0160 0 16 0117 0 18 6114 0 21 05959 06:15 AM 210 0 3 0240 0 24 1227 0 30 8217 0 36 09393 06:30 AM 430 0 7 2391 0 42 0437 0 41 18236 0 47 0137137 06:45 AM 1041 0 15 3520 1 55 0346 0 49 211913 0 53 1172173 Total 19 9 1 0 29 5 131 1 1 137 1 10 127 0 138 53 74 30 0 157 1 461 462 07:00 AM 734 0 14 5701 0 76 0568 0 73 171811 0 46 0209209 07:15 AM 2670 0 33 6950 1 101 1665 0 72 242716 0 67 1273274 07:30 AM 3251 0 38 8882 0 98 4586 0 95 153920 0 74 0305305 07:45 AM 20104 0 34 7730 0 80 3582 0 90 214423 0 88 0292292 Total 85 25 9 0 119 26 326 3 1 355 8 21 301 0 330 77 128 70 0 275 1 1079 1080 08:00 AM 27145 0 46 10990 0 109 4796 0 107 296032 0 121 0383383 08:15 AM 38198 0 65 131110 0 124 69107 0 122 397343 0 155 0466466 08:30 AM 39208 0 67 14930 0 107 610102 0 118 416745 0 153 0445445 08:45 AM 24125 0 41 8860 0 94 4697 0 107 255227 0 104 0346346 Total 128 65 26 0 219 45 389 0 0 434 20 32 402 0 454 134 252 147 0 533 0 1640 1640 09:00 AM 1352 0 20 2512 0 55 2760 0 69 25356 0 66 0210210 09:15 AM 1784 0 29 2690 0 71 0558 0 63 38275 0 70 0233233 09:30 AM 1092 0 21 3420 0 45 1643 0 50 343112 0 77 0193193 09:45 AM 833 0 14 8441 0 53 1651 0 58 323312 0 77 0202202 Total 48 25 11 0 84 15 206 3 0 224 4 24 212 0 240 129 126 35 0 290 0 838 838 10:00 AM 10103 0 23 7471 0 55 1950 1 60 412817 0 86 1224225 10:15 AM 1172 0 20 6381 0 45 1839 1 48 233814 0 75 1188189 10:30 AM 14105 0 29 4500 1 54 2552 0 59 362815 0 79 1221222 10:45 AM 1575 0 27 5491 0 55 0950 0 59 413017 0 88 0229229 Total 50 34 15 0 99 22 184 3 1 209 4 31 191 2 226 141 124 63 0 328 3 862 865 11:00 AM 13154 0 32 4501 0 55 31051 1 64 312214 0 67 1218219 11:15 AM 1253 0 20 5431 0 49 01145 0 56 374613 0 96 0221221 11:30 AM 771 0 15 4451 0 50 1736 0 44 44349 0 87 0196196 11:45 AM 6157 0 28 5521 0 58 1663 0 70 42358 0 85 0241241 Total 38 42 15 0 95 18 190 4 0 212 5 34 195 1 234 154 137 44 0 335 1 876 877 12:00 PM 21171 0 39 9442 0 55 2457 0 63 473611 0 94 0251251 12:15 PM 1176 0 24 4582 0 64 1646 0 53 344115 0 90 0231231 12:30 PM 10116 0 27 5460 0 51 0642 0 48 523417 0 103 0229229 12:45 PM 1765 0 28 10350 0 45 1444 1 49 453521 0 101 1223224 Total 59 41 18 0 118 28 183 4 0 215 4 20 189 1 213 178 146 64 0 388 1 934 935 01:00 PM 24134 1 41 19300 1 49 1847 1 56 394718 1 104 4250254 01:15 PM 1213 0 16 4411 1 46 0554 0 59 385220 0 110 1231232 01:30 PM 1343 0 20 8441 0 53 11254 0 67 525211 0 115 0255255 01:45 PM 2188 0 37 6471 0 54 4834 0 46 604615 0 121 0258258 Total 70 26 18 1 114 37 162 3 2 202 6 33 189 1 228 189 197 64 1 450 5 994 999 02:00 PM 1398 0 30 5560 1 61 11560 0 76 513714 0 102 1269270 02:15 PM 1573 0 25 12491 0 62 41368 0 85 493914 0 102 0274274 02:30 PM 14810 0 32 7460 0 53 11133 0 45 405117 0 108 0238238 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name: 17-02640 Site Code: 1702640 Start Date: 12/12/2017 Page No: 2 Groups Printed- All Vehicles Darden Road Southbound Middle Sound Loop Road Westbound Middle Sound Loop Road Northbound Middle Sound Loop Road Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total02:45 PM 14197 0 40 5600 0 65 01261 0 73 395311 0 103 0281281 Total 56 43 28 0 127 29 211 1 1 241 6 51 222 0 279 179 180 56 0 415 1 1062 1063 03:00 PM 1362 0 21 6461 0 53 2955 0 66 376721 0 125 0265265 03:15 PM 15716 0 38 5350 0 40 41360 0 77 395511 0 105 0260260 03:30 PM 14109 0 33 8591 0 68 11054 0 65 575815 0 130 0296296 03:45 PM 13105 0 28 5382 0 45 3638 0 47 466616 0 128 0248248 Total 55 33 32 0 120 24 178 4 0 206 10 38 207 0 255 179 246 63 0 488 0 1069 1069 04:00 PM 11104 0 25 4410 0 45 11149 0 61 446114 0 119 0250250 04:15 PM 15162 0 33 12471 0 60 31047 0 60 476518 0 130 0283283 04:30 PM 131015 0 38 7461 0 54 41158 0 73 557921 0 155 0320320 04:45 PM 11184 0 33 6520 0 58 41354 0 71 598125 0 165 0327327 Total 50 54 25 0 129 29 186 2 0 217 12 45 208 0 265 205 286 78 0 569 0 1180 1180 05:00 PM 231313 0 49 14611 0 76 0765 0 72 797613 0 168 0365365 05:15 PM 17129 0 38 9520 0 61 1939 0 49 9810320 0 221 0369369 05:30 PM 19199 0 47 5582 0 65 2835 0 45 709117 0 178 0335335 05:45 PM 161014 0 40 8631 0 72 11154 0 66 537728 0 158 0336336 Total 75 54 45 0 174 36 234 4 0 274 4 35 193 0 232 300 347 78 0 725 0 1405 1405 06:00 PM 14110 0 25 11500 0 61 3965 0 77 446621 0 131 0294294 06:15 PM 1688 0 32 6432 0 51 0749 0 56 45619 0 115 0254254 06:30 PM 16106 0 32 3281 0 32 11361 0 75 495611 0 116 0255255 06:45 PM 1284 0 24 5230 0 28 0643 0 49 554913 0 117 0218218 Total 58 37 18 0 113 25 144 3 0 172 4 35 218 0 257 193 232 54 0 479 0 1021 1021 Grand Total 791488261 1 1540 339 2724 35 6 3098 88409 2854 5 3351 21112475 846 1 5432 13 1342113434 Apprch %51.431.716.9 10.987.9 1.1 2.6 12.285.2 38.945.615.6 Total %5.93.61.9 11.5 2.5 20.3 0.3 23.1 0.73 21.3 25 15.718.4 6.3 40.5 0.199.9 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name: 17-02640 Site Code: 1702640 Start Date: 12/12/2017 Page No: 3 Darden Road M i d d l e S o u n d L o o p R o a d M i d d l e S o u n d L o o p R o a d Middle Sound Loop Road Right 791 Thru 488 Left 261 InOut Total 1594 1540 3134 Rig h t 33 9 Th r u 27 2 4 Le f t 35 Ou t To t a l In 28 2 4 30 9 8 59 2 2 Left 2854 Thru 409 Right 88 Out TotalIn 2634 3351 5985 Le f t 84 6 Th r u 24 7 5 Ri g h t 21 1 1 To t a l Ou t In 63 6 9 54 3 2 11 8 0 1 12/12/2017 06:00 AM 12/12/2017 06:45 PM All Vehicles North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name: 17-02640 Site Code: 1702640 Start Date: 12/12/2017 Page No: 4 Darden Road Southbound Middle Sound Loop Road Westbound Middle Sound Loop Road Northbound Middle Sound Loop Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 06:00 AM to 10:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 2714546 10990109 4796107 296032121 383 08:15 AM 3819 8 65 13 111 0 124 6 9 107122 39 73 43 155 466 08:30 AM 3920 8 67 14 930107 6 10 102118 41 67 45 153 445 08:45 AM 2412541 886094 4697107 255227104 346 Total Volume 128 65 26 219 45 389 0 434 20 32 402 454 134 252 147 533 1640 % App. Total 58.4 29.7 11.9 10.4 89.6 0 4.4 7 88.5 25.1 47.3 27.6 PHF .821 .813 .813 .817 .804 .876 .000 .875 .833 .800 .939 .930 .817 .863 .817 .860 .880 Darden Road M i d d l e S o u n d L o o p R o a d M i d d l e S o u n d L o o p R o a d Middle Sound Loop Road Right 128 Thru 65 Left 26 InOut Total 224 219 443 Ri g h t 45 Th r u 38 9 Le f t 0 Ou t To t a l In 29 8 43 4 73 2 Left 402 Thru 32 Right 20 Out TotalIn 199 454 653 Le f t14 7 Th r u25 2 Rig h t 13 4 To t a l Ou t In 91 9 53 3 14 5 2 Peak Hour Begins at 08:00 AM All Vehicles Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name: 17-02640 Site Code: 1702640 Start Date: 12/12/2017 Page No: 5 Darden Road Southbound Middle Sound Loop Road Westbound Middle Sound Loop Road Northbound Middle Sound Loop Road Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 11:00 AM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 23 1313 49 14 611 76 07 6572 797613168 365 05:15 PM 1712938 952061 193949 98103 20 221 369 05:30 PM 19 19 947 558 2 65 2 83545 709117178 335 05:45 PM 1610 14 40 8 63 172 1 11 5466 5377 28 158 336 Total Volume 75 54 45 174 36 234 4 274 4 35 193 232 300 347 78 725 1405 % App. Total 43.1 31 25.9 13.1 85.4 1.5 1.7 15.1 83.2 41.4 47.9 10.8 PHF .815 .711 .804 .888 .643 .929 .500 .901 .500 .795 .742 .806 .765 .842 .696 .820 .952 Darden Road M i d d l e S o u n d L o o p R o a d M i d d l e S o u n d L o o p R o a d Middle Sound Loop Road Right 75 Thru 54 Left 45 InOut Total 149 174 323 Rig h t 36 Th r u 23 4 Le f t 4 Ou t To t a l In 39 6 27 4 67 0 Left 193 Thru 35 Right 4 Out TotalIn 358 232 590 Le f t 78 Th r u 34 7 Ri g h t 30 0 To t a l Ou t In 50 2 72 5 12 2 7 Peak Hour Begins at 05:00 PM All Vehicles Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 DAVENPORT Project #17-02640 NCDOT Count #17-02640 SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road), New Hanover County, NC SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Northbound Facing North SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Northbound Facing South DAVENPORT Project #17-02640 NCDOT Count #17-02640 SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road), New Hanover County, NC SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Southbound Facing South SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Southbound Facing North DAVENPORT Project #17-02640 NCDOT Count #17-02640 SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road), New Hanover County, NC SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Westbound Facing West SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Westbound Facing East DAVENPORT Project #17-02640 NCDOT Count #17-02640 SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road), New Hanover County, NC SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Eastbound Facing East SR 1403 (Middle Sound Loop Road) and SR 1407 (Darden Road) Eastbound Facing West Tr i p G e n e r a t i o n S u m m a r y Open Date:Analysis Date:5/27/2020 5/27/2020 Pr o j e c t : D e m a r e s t P o i n t e Alt e r n a t i v e : Alt e r n a t i v e 1 Ph a s e : IT E L a n d U s e En t e r E x i t E n t e r E x i t En t e r E x i t Total To t a l To t a l * * * We e k d a y A v e r a g e D a i l y T r i p s We e k d a y A M P e a k H o u r o f Ad j a c e n t S t r e e t T r a f f i c Weekday PM Peak Hour of Adjacent Street Traffic 22 0 L O W - R I S E 1 27 D w e l l i n g U n i t s 82 8 1 1 6 3 3 1 1 1 4 1 1 7 1 8 Un a d j u s t e d V o l u m e 82 8 1 1 6 3 3 1 1 1 4 11718 In t e r n a l C a p t u r e T r i p s 0 0 0 0 0 0 000 00 0 0 0 0 0 0 0 82 8 1 1 6 3 3 1 1 1 4 11718 Pa s s - B y T r i p s Vo l u m e A d d e d t o A d j a c e n t S t r e e t s To t a l W e e k d a y A v e r a g e D a i l y T r i p s I n t e r n a l C a p t u r e = 0 P e r c e n t To t a l W e e k d a y A M P e a k H o u r o f A d j a c e n t S t r e e t T r a f f i c I n t e r n a l Ca p t u r e = 0 P e r c e n t To t a l W e e k d a y P M P e a k H o u r o f A d j a c e n t S t r e e t T r a f f i c I n t e r n a l Ca p t u r e = 0 P e r c e n t P. 1 TR I P G E N E R A T I O N 1 0 , T R A F F I C W A R E , L L C So u r c e : I n s t i t u t e o f T r a n s p o r t a t i o n E n g i n e e r s , T r i p G e n e r a t i o n M a n u a l 1 0 t h E d i t i o n - C u s t o m r a t e u s e d f o r s e l e c t e d t i m e p e r i o d . * MOVEMENT SUMMARY Site: 100 [AM 2022 FB 27 Townhomes] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 608 2.0 0.862 30.3 LOS D 16.5 419.6 1.00 1.84 2.59 18.8 8 T1 40 2.0 0.862 30.3 LOS D 16.5 419.6 1.00 1.84 2.59 18.5 18 R2 26 2.0 0.862 30.3 LOS D 16.5 419.6 1.00 1.84 2.59 18.2 Approach 674 2.0 0.862 30.3 LOS D 16.5 419.6 1.00 1.84 2.59 18.7 East: Middle Sound Loop Road 1 L2 4 2.0 1.109 97.1 LOS F 36.6 930.3 1.00 3.43 6.33 12.3 6 T1 573 2.0 1.109 97.1 LOS F 36.6 930.3 1.00 3.43 6.33 12.2 16 R2 56 2.0 1.109 97.1 LOS F 36.6 930.3 1.00 3.43 6.33 12.1 Approach 633 2.0 1.109 97.1 LOS F 36.6 930.3 1.00 3.43 6.33 12.2 North: Darden Road 7 L2 33 2.0 0.729 32.3 LOS D 5.1 129.3 0.89 1.30 1.88 18.9 4 T1 80 2.0 0.729 32.3 LOS D 5.1 129.3 0.89 1.30 1.88 18.6 14 R2 189 2.0 0.729 32.3 LOS D 5.1 129.3 0.89 1.30 1.88 18.3 Approach 303 2.0 0.729 32.3 LOS D 5.1 129.3 0.89 1.30 1.88 18.4 West: Middle Sound Loop Road 5 L2 181 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 23.1 2 T1 313 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 22.8 12 R2 199 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 22.3 Approach 693 2.0 0.579 9.9 LOS A 4.7 119.4 0.49 0.29 0.49 22.7 All Vehicles 2303 2.0 1.109 42.8 LOS E 36.6 930.3 0.83 1.74 2.89 17.1 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0| Copyright © 2000-2019 Akcelik and Associates Pty Ltd| sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC| Processed: Monday, June 01, 2020 1:29:11 PM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\TIA DOCUMENTS\27 Townhomes\Roundabout (27TH).sip8 MOVEMENT SUMMARY Site: 100 [PM 2022 FB 27 Townhomes] Roundabout -Middle Sound Loop Road @ Darden Road Site Category: (None) Roundabout Movement Performance -Vehicles Demand Flows 95% Back of QueueMov ID Turn Deg. Satn Average Delay Level of Service Prop. Queued Effective Stop Rate Aver. No. Cycles Average Speed Total HV Vehicles Distance veh/h %v/c sec veh ft mph South: Middle Sound Loop Road 3 L2 246 2.0 0.406 10.3 LOS B 2.2 56.1 0.69 0.76 0.83 22.5 8 T1 44 2.0 0.406 10.3 LOS B 2.2 56.1 0.69 0.76 0.83 22.2 18 R2 7 2.0 0.406 10.3 LOS B 2.2 56.1 0.69 0.76 0.83 21.7 Approach 297 2.0 0.406 10.3 LOS B 2.2 56.1 0.69 0.76 0.83 22.4 East: Middle Sound Loop Road 1 L2 7 2.0 0.377 8.3 LOS A 1.9 49.3 0.60 0.54 0.60 23.9 6 T1 289 2.0 0.377 8.3 LOS A 1.9 49.3 0.60 0.54 0.60 23.5 16 R2 46 2.0 0.377 8.3 LOS A 1.9 49.3 0.60 0.54 0.60 23.0 Approach 341 2.0 0.377 8.3 LOS A 1.9 49.3 0.60 0.54 0.60 23.4 North: Darden Road 7 L2 56 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 23.6 4 T1 68 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 23.2 14 R2 93 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 22.7 Approach 217 2.0 0.281 7.9 LOS A 1.3 32.0 0.62 0.60 0.62 23.1 West: Middle Sound Loop Road 5 L2 97 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.9 2 T1 439 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.6 12 R2 369 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.2 Approach 904 2.0 0.765 16.0 LOS C 10.0 254.1 0.74 0.51 0.78 21.4 All Vehicles 1759 2.0 0.765 12.5 LOS B 10.0 254.1 0.69 0.57 0.73 22.2 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Sign Control. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: US HCM 6. HCM Delay Formula option is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option applies. Gap-Acceptance Capacity: Traditional M1. HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 8.0| Copyright © 2000-2019 Akcelik and Associates Pty Ltd| sidrasolutions.com Organisation: JOHN DAVENPORT ENGINEERING INC| Processed: Monday, June 01, 2020 1:40:27 PM Project: Z:\2020\200221_MiddlesoundLLC_DemarestPointe\TRAFFIC ENGINEERING\TIA DOCUMENTS\27 Townhomes\Roundabout (27TH).sip8