HomeMy WebLinkAboutZ20-14 Staff Report PB 8.6.2020Z20-14 Staff Report PB 8.6.2020 Page 1 of 14
STAFF REPORT FOR Z20-14
CONDITIONAL ZONING DISTRICT APPLICATION
APPLICATION SUMMARY
Case Number: Z20-14
Request:
Rezoning 3.6 acres from R-15 to (CZD) R-5 in order to develop 22 single-family units
Applicant: Property Owner(s):
Cindee Wolf, Design Solutions Ripwood Company, Inc.
Location: Acreage:
600 block of Spring Branch Road 3.6
PID(s): Comp Plan Place Type:
R04900-001-014-000 General Residential
Existing Land Use: Proposed Land Use:
Undeveloped Single-Family Detached Dwellings
Current Zoning: Proposed Zoning:
R-15 (CZD) R-5 Moderate-High Residential
SURROUNDING AREA
LAND USE ZONING
North Single-Family Residential R-15
East N. College Road Right-of-Way, Single-Family Residential R-15
South MLK Parkway Right-of-Way, Electrical Substation, Corning Industrial
(City of Wilmington)
West Undeveloped, Single-Family Residential R-15
Z20-14 Staff Report PB 8.6.2020 Page 2 of 14
ZONING HISTORY
July 1, 1972 Initially zoned R-15 (Area 9A)
COMMUNITY SERVICES
Water/Sewer Water and sewer services are available through CFPUA. Specific design
will be determined during site plan review.
Fire Protection New Hanover County Fire Services, New Hanover County Northern Fire
District, New Hanover County Station Murrayville
Schools
Wrightsboro Elementary, Holly Shelter Middle, and Laney High schools
For more information, see the full School statistics below
Recreation Kings Grant Park
CONSERVATION, HISTORIC, & ARCHAEOLOGICAL RESOURCES
Conservation
Conservation resource maps indicate that swamp forest may be present in
the southwestern corner of the site, however according to the applicant,
there is no evidence of wetlands on the property. The location of any
wetlands will be verified during the TRC review process.
Historic No known historic resources
Archaeological No known archaeological resources
Z20-14 Staff Report PB 8.6.2020 Page 3 of 14
APPLICANT’S PROPOSED CONCEPTUAL PLAN
The applicant is proposing to rezone approximately 3.6 acres from R-15 to (CZD) R-5 in
order to develop 22 detached single-family homes under the County’s performance
residential standards.
The applicant has indicated that the subject property will be subdivided into 22 individual
lots. The resultant lots will have the same dimensions as the footprint of each building, and
the area outside of each footprint will be dedicated common area in which a Homeowners
Association will assume responsibility for maintenance of the open space, recreation
facilities, and other common areas within the development.
The conceptual plan shows the homes on either side of a circular drive aisle at the terminus
of Spring Branch Drive with driveways large enough for two vehicles for each unit. In
addition, there are three visitor parking areas that provide an additional 14 spaces. A 5-
foot-wide sidewalk connects the proposed development to the existing Spring View Estates
neighborhood to the north.
The subject site is located at the northwest corner of Martin Luther King Jr. Parkway and
N. College Road where future NCDOT improvements are planned. To anticipate these
improvements, the applicant has shown the area that NCDOT may require for future right-
of-way and has designed the site to accommodate the land needed for that project.
Additional information is provided in the Transportation Section below.
Proposed Conceptual Site Plan with Staff Markups
Z20-14 Staff Report PB 8.6.2020 Page 4 of 14
ZONING CONSIDERATIONS
Under the County’s performance residential standards, the subject property would be
permitted up to 9 dwelling units at a maximum density of 2.5 dwelling units per acre
(du/ac). The applicant is proposing a total of 22 detached single-family dwelling units on
3.6 acres at a net density of 6.11 du/ac, which is about 2 units per acre less than the
maximum (8 du/ac) permitted in the R-5 district.
R-15 R-5 Proposed CZD
Min Lot Size
(Conventional) 15,000 sf 5,000 sf N/A
Max Density
(Performance)
2.5 du/ac
(9 total units)
8 du/ac
(29 total units)
6.11 du/ac
(22 total units)
Additional
Dwelling Unit
Allowance SUP
10.2 du/ac
(37 total units) N/A N/A
Permitted Housing
Types
Single-family, mobile
home, duplex,
townhomes, multi-family
Single-family, duplex,
townhomes
(max 4-units/building)
Detached single-
family homes
Nonresidential
Uses ≈ 20 uses w/ SUP
(convenience stores,
kennels, camping)
≈ 15 uses by-right
(wholesale nurseries,
stables)
≈ 10 uses w/ SUP
(recreation
establishments, day care
centers)
≈ 10 uses by-right
(parks, libraries,
churches)
N/A
AREA SUBDIVISIONS UNDER DEVELOPMENT
Z20-14 Staff Report PB 8.6.2020 Page 5 of 14
TRANSPORTATION
Access is provided to the subject property using the internal roads of Spring View Estates.
Specifically, via Spring Branch Road (SR 2059) which connects to N. College Road (NC
132/US 117) by way of Spring View Drive (SR 1378) and Kings Drive (SR 2057). Spring
View Drive is currently an unsignalized intersection with limited turning movements to enter
the neighborhood and exit onto N. College Road. Kings Drive, however, is a signalized
intersection allowing traffic to enter and exit the neighborhood from all directions.
Once the two planned roadway projects along MLK and College Road are complete,
traffic associated with this development will be required to use the Kings Drive full
movement intersection to access the site. Please refer to the Planned Transportation
Improvements Section for additional information.
A by-right residential development on the site under the current zoning (R-15) would allow
9 dwelling units, which is estimated to generate about 11 trips in the AM and 10 trips in
the PM peak hours. Under the proposed R-5 zoning, 22 detached single-family homes
could be constructed on the site, which is estimated to generate about 20 trips in the AM
and 24 trips in the PM peak hours. The expected net difference in traffic would be an
increase of 9 AM and 14 PM peak trips when compared to current zoning.
Z20-14 Staff Report PB 8.6.2020 Page 6 of 14
Intensity Approx. Peak Hour Trips
Existing Development: Undeveloped 0 AM / 0 PM
Typical Development under
Current Zoning: 9 single-family homes 11 AM / 10 PM
Proposed Development under
Proposed R-5 Zoning: 22 single-family homes 20 AM / 24 PM
Net Increase under Proposed
R-5 Zoning: – 9 AM / 14 PM
Because there have been no recent traffic impact analyses in the area addressing relevant
intersections, staff has provided the volume to capacity ratio for Martin Luther King Jr.
Parkway and N. College Road near the subject site. While volume to capacity ratio, based
on average daily trips, can provide a general idea of the function of adjacent roadways,
the delay vehicles take in seconds to pass through intersections is generally considered a
more effective measure when determining the Level of Service of a roadway. The peak
hour traffic estimated to be generated by this proposal represents less than 1% of the
capacity of the large adjacent limited access highways and is not expected to have a
noticeable impact on those roads.
NCDOT Average Annual Daily Traffic (AADT) - 2018
Road Location Volume Capacity V/C
MLK Parkway East of N. College Road 26,500 34,600 0.77
West of N. College Road 36,500 34,600 1.06
N. College Road North of MLK Parkway 45,500 53,000 0.86
South of MLK Parkway 38,500 53,000 0.73
Z20-14 Staff Report PB 8.6.2020 Page 7 of 14
Nearby Planned Transportation Improvements and Traffic Impact Analyses
Nearby Traffic Impact Analyses:
There are no pending or recently approved Traffic Impact Analyses within the 1-mile radius of the
subject property that include improvements that affect this proposal.
Nearby NC STIP Projects:
U-5792 (College/MLK Interchange) & U-5881 (College Road Improvements)
o The NC State Transportation Improvement Program includes two projects (U-5792
& U-5881) that will upgrade College Road from Gordon Road to New Centre Drive.
NCDOT’s recommended plans for these projects include converting certain
intersections along College Road into interchanges, including at MLK Parkway and
Kings Drive. The current preliminary plans for the roadway project show that
additional right-of-way will likely be required from the subject site.
o The production schedule for the College/MLK Interchange and College Road
Improvements projects were to begin right-of-way acquisition in 2024 and 2025,
Z20-14 Staff Report PB 8.6.2020 Page 8 of 14
respectively, and bidding of the projects in 2026 and 2028, respectively. However,
both of these projects are currently on hold for the foreseeable future.
o According to preliminary plans, the STIP projects will also close existing accessways
to N. College Road. Specifically, Spring View Drive and Kings Grant Road will be
converted into cul-de-sacs, and Kenningston Street will be converted into a right-
in/right-out intersection that directs traffic towards Kings Drive without entering N.
College Road. Traffic from the existing neighborhoods would have to utilize Kings
Drive to access N. College Road. This intersection will be converted to an interchange
in order to accommodate the additional traffic. The interchange is currently designed
with N. College Road overpassing the intersection with a roundabout installed under
the bridge, which will allow for the existing signal at the intersection to be removed,
permitting free flow east and west movements.
Future Improvements
According to the Build Capacity Analysis Report for the College/MLK Interchange and
College Road Improvement projects, which considered an annual approximate 2% increase
in traffic volumes to the year 2040, the intersections of both N. College Road/Martin Luther
King Jr. Parkway and N. College Road/Kings Drive are expected to operate at or above
acceptable Levels of Service during the AM and PM peak hours once the improvements are
constructed. In addition, the Kings Drive roundabout is also expected to operate at or above
an acceptable Level of Service in both the AM and PM peak hours.
Proposed NCDOT Improvements Along N. College Road (STIP U-5792 & U-5881):
*Based upon 15% Plans that are preliminary and subject to change
Z20-14 Staff Report PB 8.6.2020 Page 9 of 14
SCHOOLS
Students generated from this development would be assigned to Wrightsboro Elementary,
Holly Shelter Middle, and Laney High schools. Students may apply to attend public magnet,
year-round elementary, or specialty high schools.
Nine dwelling units would be permitted under the current R-15 zoning base density, and 22
units would be allowed under the proposed zoning for an increase of 13 dwelling homes.
Based on average student generation rates,* there are an average of 0.24 public school
students (0.11 for elementary, 0.05 for middle, and 0.08 for high) generated per dwelling
unit across New Hanover County. The proposed development can be estimated to generate
5.3 (2.4 elementary, 1.2 middle, and 1.7 high) students, which is approximately 3.1 more
than if developed under existing zoning.
Development Type Intensity Estimated Student Generation
Existing Development Undeveloped Total: 0
(0 elementary, 0 middle, 0 high
Typical Development
under Current Zoning 9 residential units Total: 2.2
(1.0 elementary, 0.5 middle, 0.7 high)
Proposed Development
under Proposed (CZD)
R-5 Zoning
22 residential units Total: 5.3
(2.4 elementary, 1.2 middle, 1.7 high)
*Average student generation rates are calculated by dividing the projected New Hanover County public school student
enrollment for the 2020-2021 school year by the estimated number of dwelling units in the county. While different
housing types and different locations typically yield different numbers of students, these average generation rates can
provide a general guide for the number of students to anticipate. Total projected student enrollment was used, which
includes students attending out-of-district specialty schools, such as year-round elementary schools, Isaac Bear, and
SeaTECH.
School Enrollment* and Capacity**—2021-2022 Estimates
*Enrollment is based on projected New Hanover County Schools enrollment for the 2020-2021 school year.
**Capacity calculations were determined by New Hanover County Schools for the 2020-2021 school year and are
based on NC DPI Facility Guidelines & Class Size Requirements. Modifications refer to specific program requirements
unique to a particular school. These may include exceptional children’s classrooms beyond the original building design;
classrooms to serve a unique population such as ESL; or classrooms designated for art and music if the building wasn’t
specifically designed with those spaces.
Level
Total
NHC %
Capacity School
Enrollment of
Assigned
School
Capacity of
Assigned
School w/
Portables
% of
Capacity of
Assigned
School
Funded
Capacity
Upgrades
Elementary 97% Wrightsboro 547 564 97% None
Middle 107% Holly Shelter 917 934 98% None
High 105% Laney 2,063 1,903 108% None
Z20-14 Staff Report PB 8.6.2020 Page 10 of 14
ENVIRONMENTAL
A small portion of the southwestern portion of the property, approximately 2,900 square
feet in area, is within the AE Special Flood Hazard Area, however, no buildings are
proposed within this area.
The property does not contain any Natural Heritage Areas.
The property is within the Smith Creek (C;Sw) watershed.
Per the Classification of Soils in New Hanover County for Septic Tank Suitability, soils on
the property consist of Class II (moderate limitation) and Class IV (unsuitable) soils.
However, the subject site will be served by public water and sewer.
CONTEXT AND COMPATIBILITY
The property is located at the southern end of Spring Branch Road which is a residential
collector road that serves as the connecting street between local residential roads and the
thoroughfare system.
The development is designed like a traditional detached single-family neighborhood with
driveways and one-car garages. However, ownership will be structured similar to a
townhome project where residents will own the land beneath the house and a small yard
while the remainder of the site will be in common ownership.
The site is located adjacent to an established residential neighborhood at the northwest
corner of Martin Luther King Jr. Parkway and North College Road.
The proposed detached homes will be two stories but are restricted to the same maximum
35-foot height that applies to the existing and adjacent areas zoned R-15.
Although the homes will be on smaller lots than the nearby neighborhoods, they are
detached single-family homes, functioning as a transition from the high intensity adjacent
highways to the existing homes.
Representative Detached Single-Family Developments in R-5:
Smith Creek Village on New Centre Drive Avenir off Greenville Loop Road
near Kerr Avenue near Pine Grove Drive
Z20-14 Staff Report PB 8.6.2020 Page 11 of 14
Avenir
Representative Developments in R-15:
Kings Grant Spring View Estates
Z20-14 Staff Report PB 8.6.2020 Page 12 of 14
Spring View Estates
2016 COMPREHENSIVE LAND USE PLAN
The New Hanover County Future Land Use Map provides a general representation of the vision for
New Hanover County’s future land use, as designated by place types describing the character and
function of the different types of development that make up the community. These place types are
intended to identify general areas for particular development patterns and should not be
interpreted as being parcel specific.
Z20-14 Staff Report PB 8.6.2020 Page 13 of 14
Future Land Use
Map Place Type General Residential
Place Type
Description
Focuses on lower-density housing and associated civic and commercial
services. Typically, housing is single-family or duplexes. Commercial uses
should be limited to strategically located office and retail spaces, while
recreation and school facilities are encouraged throughout. Types of uses
include single-family residential, low-density multi-family residential, light
commercial, civic, and recreational.
Analysis
The General Residential place type provides opportunities for lower-
density housing (up to approximately eight units per acre) and associated
civic and commercial services. The overall project density of 6.1 units per
acre for the proposed development is in-line with the preferred density
range for the General Residential place type.
The subject property is located between the residential Spring View
neighborhood and the intersection of N. College Road and Martin Luther
King Jr. Parkway where a future NCDOT project is planned. This road
project will have a major impact on the area, converting certain intersections
along College Road into interchanges, closing existing access ways to N.
College Road, and converting Spring View Drive into a cul-de-sac.
The design of the proposed project supports the transitional nature of this
development, clustering the new single-family homes to provide a buffer
from the high intensity roadways and future road design while maintaining
compatibility with the existing residences. In addition, the building footprints
outlined in the conceptual plan are set back further from property lines
shared with the existing neighborhood than required by the ordinance.
The Comprehensive Plan indicates that a variety of housing types such as
single family residential and duplexes are typical in the General Residential
place type. The proposed single-family development will provide an
orderly transition between the high intensity roadway corridors and the
existing residential neighborhood while offering a diversity of ownership
structure.
Consistency
Recommendation
The proposed CZD R-5 rezoning is generally CONSISTENT with the
Comprehensive Plan because the project’s density is in line with the density
and housing type recommendations for the General Residential areas. The
project provides an orderly transition between the high intensity roadway
corridors and the existing residential neighborhood.
Z20-14 Staff Report PB 8.6.2020 Page 14 of 14
STAFF RECOMMENDATION
The proposed (CZD) R-5 rezoning is generally CONSISTENT with the 2016 Comprehensive Plan
because the proposed number of units is in-line with the recommended densities in the General
Residential place type and the lower-density residential development would provide an orderly
transition between the high intensity roadway corridors and the existing residential neighborhoods.
Therefore, staff recommends approval of this application and suggests the following motion:
I move to APPROVE the proposed rezoning to a (CZD) R-5 district. I find it to be
CONSISTENT with the purposes and intent of the Comprehensive Plan because the
project’s density is in-line with the density and housing type recommendations for the
General Residential place type, and because this proposal will provide an orderly
transition between the high intensity roadway corridors and the existing residential
neighborhoods. I also find APPROVAL of the rezoning request is reasonable and in
the public interest because the proposal assists with providing a diversity of ownership
options in the area while supporting opportunities for housing with a range of price
points.
Alternative Motion for Denial
I move to DENY the proposed rezoning to a (CZD) R-5 district. While I find it to be
CONSISTENT with the purposes and intent of the Comprehensive Plan because the
project’s density is in-line with the density and housing type recommendations for the
General Residential place type, and because this proposal will provide an orderly
transition between the high intensity roadway corridors and the existing residential
neighborhoods, I find DENIAL of the rezoning request is reasonable and in the public
interest because the proposal is not consistent with the desired character of the
surrounding community and the density will adversely impact the adjacent
neighborhoods.