Loading...
HomeMy WebLinkAboutILM Circle K - Prelim Waters of US Map - 9.23.2019% A AA A gM/ gM/ gM/ gM/ gM/ A A A AA AA gM/ gM/ gM/ gM/ gM/ !(F !(E !(D !(G !(H !(I !(J !(K !(L ")A Culvert Culvert CulvertCulvert Culvert Culvert ")C Culvert ")B FDS-39A1-1FDS-39A1-2 FDS-39E1-1 FDS-39F1-1 FDS-39E1-2 FDS-39F1-239F1-3 39A1-6 39C1-1 39E1-3 39E1-6 FDS-39A2-1 FDS-39A2-2 FDS-39C2-1 FDS-39I2-1 39C2-104 39I2-6 39A2-5 39A2-10 39D2-1 FDS-39I2-2N 23rd St Private Gardner Dr Airp ort Blvd Airport Blvd N 23rd St Path: Y:\805\37630.054 - CK NTI Airport (Wilmington Enviro)\GIS\WTDM\37630.054-WTDM.mxd LegendProject Study Limits - 37.8 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station %DitchCulvertIntermittent Stream (R4)Ephemeral Stream (R6)Stormwater PondsWetlandsPalustrine Open Water (POW)Relatively Permanent Water ³0 200 400100 Feet 1. Waters of the U.S. within the project study limits have been locatedusing submeter, Bluetooth GPS antennas by Timmons Group.2. The eastern half of this site was delineated by Timmons Group as anaddendum to the wetland area previously delineated by WithersRaveneland approved by the U.S. Army Corps of Engineers on 12/21/2010(SAW-2010-01904).3. Waters of the U.S. delineated by S. Thebert and S. Law on 09/18/2019and 10/04/2019.4. Waters of the U.S. have not been confirmed by the U.S. Army Corps ofEngineers until stamped.5. Project limits are approximate.6. Topography based on USGS LiDAR.7. Cowardin Stream Classifications are based solely on fieldobservations. No formal Stream assessment methodology wascompleted to determine these Cowardin Classifications. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. Environmental JOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISION ACHIEVED THROUGH OURS Site Development Residential Infrastructure DATE REVISION DESCRIPTION THIS DRAWING PREPARED AT THE 1001 Boulders Parkway, Suite 300 | Richmond, VA 23225 TEL 804.200.6500 FAX 804.560.1648 www.timmons.com CORPORATE OFFICE Technology CIRCLE K NTI AIRPORT FIGURE 6: PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. DELINEATION MAP 37630.054 NEW HANOVER COUNTY, NORTH CAROLINA 09/23/2019 A. MEHFOUD A. MEHFOUD S. LAW 1 OF 1 1 " = 200 ' 10/07/19 Updated per updated project limits. 10/21/19 Updated per COE comments. 11/08/19 RPW features added. PFO(sq ft)POW(sq ft)PEM (sq ft)PSS (sq ft)RPW (sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 150 NT/NVB94NT/VC57NT/VD3,096 NT/VE2,119 NT/VF1,568 NT/VG2,979 NT/VH805NT/VI6,191 NT/VJ2,185 NT/NVK416NT/NVL1,580 NT/NVTotal6,191 416 2,373 8,194 3,765 0 57 94 150 Confirmation * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland;POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams Resource Identification ResourceDescriptionNotes* Total Wetland Area =Total Stream Length =0.48 ac20,939 sq ft301 lf