HomeMy WebLinkAboutILM Circle K Stormwater Impact Analysis - 9.23.2020_________________________________________________________________________________________________________________
Table of Contents:
1. Cover Sheet
2. Table of Contents
3. Project Narrative
4. Reference Material:
a. USGS Map
b. Soil Survey Map
c. FEMA FIRM Map
d. NOAA Rainfall Data
e. Pre-Development Drainage Area Map
f. Post-Developed Drainage Area Map
g. SHWT & Infiltration Test Report
5. Peak Flow Analysis
a. Table of Subareas, Land Uses, Curve Numbers, & Time of Concentration
b. Peak Flow Summary
c. Hydraflow Report
6. Water Quality Calculations
a. Stormwater Grass Swale Calculations
b. Stormwater Extended Dry Detention Pond Calculations
c. Stormwater Supplement Forms
7. Stormwater Operation & Maintenance Agreement
8. Storm Pipe HGL Calculations
_________________________________________________________________________________________________________________
PROJECT NARRATIVE
_________________________________________________________________________________________________________________
Project Data:
Project Name: Circle K – NTI Airport Blvd Wilmington – NC.115
PID: R04200-001-025-F00
Project Address: Airport Blvd, Wilmington, NC 28405
Stormwater Basin: Smith Creek
River Basin: Cape Fear
Water Classification: C;Sw
Site History:
The existing parcel is owned by New Hanover County and is controlled by Wilmington International
Airport. This property is part of an overall airport stormwater master plan, and was previously permitted
with NCDEQ under SW8 050547 – Phase III. The current Wilmington International Airport Stormwater
Master Plan include a proposed Phase 3 expansion to the existing Extended Dry Detention Basin to the
east of our proposed Circle K site, which was intended to accommodate future build-out of the
undeveloped Phase 3 properties. The Phase 3 Extended Dry Detention Basin Expansion was never
constructed. Many of the Phase 3 drainage areas remain undeveloped at this time, and they do not
actually drain into the existing extended dry detention basin at this time.
Project Description:
The project proposes a gas station/convenience store, associated parking lot, canopy, driveways, and
utilities. The project is proposing shared access roads connecting to both N. 23rd Street and Airport Blvd,
as well as water/sewer extensions to serve future development in adjacent land.
This project is a proposed modification to the current 2011 SW8 050547 – Phase III stormwater permit.
Two extended dry detention basins are proposed. Refer to the proposed conditions section below for
additional information.
Existing Conditions:
Refer to the pre-development drainage area map in this report. The study area represents a portion of
the previously permitted Phase III drainage area.
DA 1.1 consists of 4.53 acres of mostly undeveloped lawn and some woods. This drainage area also
includes impervious surfaces from portions of Airport Blvd and N 23rd St. This drainage area runs
through an existing roadside ditch, and into an existing 24”RCP culvert under N 23rd Street, and
discharges to the southwest.
DA 1.2 consists of 4.62 acres of undeveloped lawn and woods. This drainage area surface discharges,
and enters another existing 24”RCP culvert under NC 23rd Street, and discharges to the southwest.
_________________________________________________________________________________________________________________
DA 1.3 consists of 15.47 acres of mostly undeveloped lawn and woods. This drainage area includes
impervious from portions of Airport Blvd, Gardner Road, and an old gravel service drive. This drainage
area runs through existing roadside ditches, culverts, and wetlands channels before it surface discharges
to the south.
DA 1.4 consists of 1.85 acres of offsite undeveloped lawn. This drainage area runs through an existing
roadside ditch and into an existing 24”RCP culvert under N 23rd St, which discharges to the southwest.
All drainage from this area enters Smith Creek, which is roughly ~0.42 miles south of our project area.
Smith Creek flows east which eventually enters the Northeast Cape Fear River approximately ~1.62
miles to the west.
The Soils Survey map shows that the soils on site are as follows:
SOIL TYPES:
SYMBOL RATING UNIT NAME
JO D JOHNSTON SOILS
Le B/D LEON SAND
Pn B/D PANTEGO LOAM
Se A/D SEAGATE FINE SAND
*Soil rating are based on NCDEQ Erosion and Sediment Control Planning and Design Manual –
Chapter 8 – Appendices
A copy of FEMA FIRM map 3720312900K, effective date 08/28/2018, included confirms that there is
no regulatory floodplain on the property.
_________________________________________________________________________________________________________________
Post-Developed Conditions:
Refer to the post-development drainage area map in this report.
DA 2.1 (Bypass):
This drainage area is 2.48 acres and predominantly consists of existing impervious from Airport Blvd
and NC 23rd Street right-of-way, as well as a proposed NC 23rd Street widening required by NCDOT.
This drainage area also consists of lawn/shoulder areas in and adjacent to the public rights-of-way. This
drainage area flows through an existing roadside ditch, and into an existing 24”RCP culvert under NC
23rd Street, which is consistent with the existing condition.
DA 2.2 – Stormwater Phase IIIA:
This drainage area is 4.89 acres and includes the following proposed improvements: Circle K
development, portions of several common drives, one grass pre-treatment swale, and one extended dry
detention basin. This Phase IIIA extended dry detention basin will be constructed by Circle K,
simultaneous with the Circle K project, but it will be a regional stormwater SCM located on New
Hanover County property, but controlled and operated by Wilmington International Airport. Proposed
impervious areas will be collected to the extent practical in the SCMs, and will discharge into an
existing 24”RCP culvert under NC 23rd Street to the southwest, which is consistent with the existing
condition.
The Phase IIIA SCMs are designed to accommodate the below impervious allocation for Phase IIIA
drainage area at buildout:
Phase IIIA Circle K & Common Drives Proposed Impervious: 69,896 SF
Phase IIIA Potential Future Development: 46,702 SF
Phase IIIA Total Impervious Allocation: 116598 SF (Includes potential future development)
_________________________________________________________________________________________________________________
DA 2.3A & 2.3B – Stormwater Phase IIIB:
This drainage area is 16.92 acres and includes impervious portions of existing Airport Blvd and Gardner
Road rights-of-way, lawn/shoulder areas in and adjacent to the public rights-of-way, as well as currently
undeveloped land on the south side of Airport Blvd. The following improvements will be constructed
with the Circle K project, which are located in Phase IIIB:
A portion of a common internal drive.
A left turn lane on Airport Blvd (required by NCDOT).
Phase IIIB includes one proposed grass pretreatment swale and one proposed extended dry detention
basin. The stormwater will discharge to the south, which is consistent with the existing drainage pattern.
The Phase IIIB SCMs are designed to accommodate the below impervious allocation for the Phase IIIB
drainage area at buildout.
Phase IIIB Existing Road Impervious: 89,774 SF
Phase IIIB Road Improvements to be constructed with Circle K: 7,633 SF
Phase IIIB Potential Future Impervious Allocation: 263,671 SF
Phase IIIB Total Impervious Allocation: 361,078 SF (includes potential future development)
DA 2.3C– (Bypass):
This drainage area is 0.51 acres of lawn area to the southeast of the proposed dry pond, which discharges
to the south.
DA 2.4 – (Bypass):
This drainage area is 2.02 acres and predominantly consists of existing NC 23rd Street public right-of-
way and undeveloped lawn to the south. This drainage area flows through an existing roadside ditch,
and into an existing 24”RCP culvert under NC 23rd Street, which is consistent with the existing
condition.
_________________________________________________________________________________________________________________
Stormwater Management Requirements:
1. New Hanover County Stormwater Design Manual:
Detention: 2, 10, 25-yr storms
Retain the 1.5-inch volume and drawdown in 2 to 5 days
2. NCDEQ - 15A NCAC 02H .1005 Stormwater Requirements: Coastal Counties
High Density Option
Retain runoff from 1.0-inch rainfall, drawdown in 2 to 5 days
Design for ultimate buildout of the drainage area
Alternative Design Criteria:
o 85% TSS removal
o Detain 1-year, 24-hr storm
3. Wilmington International Airport Stormwater Master Plan – Approved Engineering Report,
Dated 10/26/04 by Talbert & Bright):
Requires the use of “alternative stormwater management systems”, which do not attract
wildlife, which would be a hazard to aircraft. Intended SCMs include grass swales in
series with extended dry detention basins.
SCMs, which generate a permanent pool are prohibited for reasons of airport safety.
Proposed Stormwater Management:
Volume Control – The proposed stormwater extended dry detention basins will retain the 1.5-
inch volume for the net increase of impervious surfaces and release it over a 2-5 day period.
Peak Flow Detention (1, 2, 10, 25-yr) – The proposed stormwater extended dry detention basins
will reduce peak flows for the 1, 2, 10, and 25-year, 24-hr storm events down to below pre-
developed levels, except as mentioned below. Refer to the Peak Flow Summary Table for pre-
and post- flows for all storm events. (Note that the Phase 3A pond releases negligible flows for
the 1 and 2-yr storms, which slightly exceed the pre-developed levels. However, this cannot be
avoided without exceeding the 2-5 day drawdown requirement. The flows are negligible.)
Alternate Stormwater Management Systems – This project utilizes two pretreatment grass swales
and two extended dry detention basins. These SCM types were selected for the following
reasons:
a. These SCM types are required by the Wilmington International Airport Stormwater
Masterplan.
b. Other SCM types, which have permanent pools of standing water, are prohibited by the
airport and the FAA, because they attract wildlife, which would be a hazard to airplane
safety.
c. There is a precedent for selecting these SCM types, which exist just to the east of our
project.
_________________________________________________________________________________________________________________
Methodology:
The SCS unit hydragaph method has been used for project hydrology, implemented using Hydraflow
software. Time of concentration calculated using the TR-55 segmented approach. Rainfall data was
input based on the NOAA rainfall data. The hydrologic soil groups for the various soil units on the
airport were taken from the Appendix A listing of TR-55. The SCS soil map for New Hanover County
was used to identify soil units. For soils with multiple hydraulic soil groups, the lowest (most well
drained) group was used. The SCS type III 24-hour rainfall distribution was used. Pipeline hydraulic
grade lines were computed using Hydraflow software as well.
Summary of Results:
Refer to the following tables in this report to view the results data:
Table of Subareas, Land Uses, & CN.
Peak Flow Summary Table
Stormwater Grass Swale and Extended Dry Detention Pond Calculations
As shown in the aforementioned tables in this report and plans, NCDEQ, New Hanover County, and the
Airport’s Stormwater Master Plan requirements are satisfied.
Conclusions:
Through the use of two proposed stormwater pretreatment grass swales and two extended dry detention
basins, this project meets or exceeds NCDEQ/New Hanover County/ILM Stormwater Master Plan
requirements listed in the publications below:
New Hanover County Stormwater Design Manual:
NCDEQ - 15A NCAC 02H Stormwater Requirements: Coastal Counties
Wilmington International Airport Stormwater Master Plan – Approved Engineering Report,
Dated 10/26/04 by Talbert & Bright):
Phases IIIA and IIIB were designed to incorporate proposed and future development and resulted in
decreased flows for the 1, 2, 10, and 25-year, 24-hr storm events, except as follows. (Note that the
Phase 3A pond releases negligible flows for the 1 and 2-yr storms, which slightly exceed the pre-
developed levels. However, this cannot be avoided without exceeding the 2-5 day drawdown
requirement. The flows are negligible.)
_________________________________________________________________________________________________________________
REFERENCE MATERIAL
USGS MAP
22
Custom Soil Resource Report
Map—Hydrologic Soil Group
37
9
5
1
0
0
37
9
5
2
0
0
37
9
5
3
0
0
37
9
5
4
0
0
37
9
5
5
0
0
37
9
5
6
0
0
37
9
5
7
0
0
37
9
5
8
0
0
37
9
5
9
0
0
37
9
6
0
0
0
37
9
5
0
0
0
37
9
5
1
0
0
37
9
5
2
0
0
37
9
5
3
0
0
37
9
5
4
0
0
37
9
5
5
0
0
37
9
5
6
0
0
37
9
5
7
0
0
37
9
5
8
0
0
37
9
5
9
0
0
37
9
6
0
0
0
230400 230500 230600 230700 230800 230900 231000 231100 231200 231300 231400 231500 231600 231700 231800 231900
230400 230500 230600 230700 230800 230900 231000 231100 231200 231300 231400 231500 231600 231700 231800 231900
34° 16' 15'' N
77
°
5
5
'
4
2
'
'
W
34° 16' 15'' N
77
°
5
4
'
3
9
'
'
W
34° 15' 41'' N
77
°
5
5
'
4
2
'
'
W
34° 15' 41'' N
77
°
5
4
'
3
9
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84
035070014002100Feet
0100200400600Meters
Map Scale: 1:7,390 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
USGS The National Map: Orthoimagery. Data refreshed October, 2017.
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250Feet
Ü
77°55'33.87"W
34°16'16.18"N
77°54'56.42"W 34°15'46.45"N
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOODHAZARD AREAS
Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone X
Future Conditions 1% AnnualChance Flood Hazard Zone XArea with Reduced Flood Risk due toLevee. See Notes.Zone XArea with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm SewerLevee, Dike, or Floodwall
Cross Sections with 1% Annual Chance17.5 Water Surface ElevationCoastal Transect
Coastal Transect BaselineProfile BaselineHydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of StudyJurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards
The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 4/15/2019 at 2:35:27 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time.
This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes.
Legend
OTHER AREAS OFFLOOD HAZARD
OTHER AREAS
GENERALSTRUCTURES
OTHERFEATURES
MAP PANELS
8
1:6,000
B 20.2
The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location.
2/12/2020 Precipitation Frequency Data Server
https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2669&lon=-77.9209&data=depth&units=english&series=pds 1/4
NOAA Atlas 14, Volume 2, Version 3
Location name: Wilmington, North Carolina, USA*
Latitude: 34.2669°, Longitude: -77.9209°
Elevation: 24.99 ft**
* source: ESRI Maps ** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley
NOAA, National Weather Service, Silver Spring, Maryland
PF_tabular | PF_graphical | Maps_&_aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1
Duration Average recurrence interval (years)
1 2 5 10 25 50 100 200 500 1000
5-min 0.521
(0.488‑0.560)
0.618
(0.578‑0.664)
0.724
(0.677‑0.776)
0.808
(0.751‑0.866)
0.913
(0.846‑0.976)
0.991
(0.914‑1.06)
1.07
(0.984‑1.15)
1.15
(1.05‑1.24)
1.26
(1.13‑1.35)
1.34
(1.20‑1.44)
10-min 0.833
(0.780‑0.895)
0.989
(0.925‑1.06)
1.16
(1.08‑1.24)
1.29
(1.20‑1.39)
1.45
(1.35‑1.56)
1.58
(1.46‑1.69)
1.71
(1.56‑1.82)
1.83
(1.67‑1.96)
1.99
(1.79‑2.14)
2.11
(1.89‑2.27)
15-min 1.04
(0.975‑1.12)
1.24
(1.16‑1.34)
1.47
(1.37‑1.57)
1.63
(1.52‑1.75)
1.84
(1.71‑1.97)
2.00
(1.84‑2.14)
2.15
(1.98‑2.31)
2.31
(2.10‑2.47)
2.50
(2.26‑2.69)
2.65
(2.37‑2.85)
30-min 1.43
(1.34‑1.53)
1.72
(1.61‑1.84)
2.09
(1.95‑2.24)
2.37
(2.20‑2.54)
2.73
(2.53‑2.92)
3.01
(2.78‑3.22)
3.30
(3.03‑3.53)
3.59
(3.27‑3.85)
3.98
(3.59‑4.28)
4.29
(3.84‑4.62)
60-min 1.78
(1.67‑1.91)
2.15
(2.02‑2.31)
2.67
(2.50‑2.87)
3.08
(2.87‑3.31)
3.64
(3.37‑3.89)
4.08
(3.76‑4.37)
4.55
(4.17‑4.87)
5.04
(4.59‑5.40)
5.71
(5.15‑6.14)
6.27
(5.61‑6.74)
2-hr 2.10
(1.94‑2.30)
2.56
(2.36‑2.79)
3.27
(3.01‑3.56)
3.86
(3.55‑4.21)
4.73
(4.33‑5.14)
5.48
(4.99‑5.95)
6.30
(5.70‑6.84)
7.20
(6.47‑7.80)
8.54
(7.59‑9.27)
9.69
(8.55‑10.6)
3-hr 2.25
(2.08‑2.46)
2.73
(2.53‑2.98)
3.50
(3.24‑3.81)
4.17
(3.83‑4.54)
5.18
(4.73‑5.61)
6.06
(5.51‑6.58)
7.05
(6.36‑7.64)
8.15
(7.29‑8.81)
9.84
(8.69‑10.6)
11.3
(9.88‑12.3)
6-hr 2.79
(2.59‑3.04)
3.38
(3.14‑3.69)
4.34
(4.01‑4.73)
5.18
(4.78‑5.63)
6.45
(5.90‑6.98)
7.57
(6.89‑8.19)
8.83
(7.99‑9.55)
10.3
(9.16‑11.1)
12.4
(11.0‑13.4)
14.4
(12.5‑15.6)
12-hr 3.26
(3.00‑3.58)
3.96
(3.64‑4.33)
5.11
(4.70‑5.59)
6.14
(5.61‑6.69)
7.69
(6.97‑8.37)
9.09
(8.20‑9.87)
10.7
(9.55‑11.6)
12.5
(11.0‑13.5)
15.3
(13.3‑16.6)
17.7
(15.3‑19.2)
24-hr 3.83
(3.49‑4.27)
4.64
(4.23‑5.19)
6.01
(5.47‑6.70)
7.21
(6.54‑8.03)
9.06
(8.13‑10.1)
10.7
(9.53‑11.9)
12.6
(11.1‑14.0)
14.7
(12.8‑16.4)
18.0
(15.3‑20.2)
21.0
(17.5‑23.5)
2-day 4.53
(4.14‑5.01)
5.47
(5.01‑6.06)
7.02
(6.41‑7.78)
8.36
(7.61‑9.26)
10.4
(9.39‑11.5)
12.2
(10.9‑13.6)
14.2
(12.6‑15.9)
16.6
(14.4‑18.5)
20.1
(17.1‑22.6)
23.1
(19.4‑26.2)
3-day 4.83
(4.42‑5.34)
5.83
(5.34‑6.45)
7.42
(6.78‑8.22)
8.80
(8.01‑9.74)
10.9
(9.81‑12.1)
12.7
(11.3‑14.1)
14.7
(13.0‑16.4)
17.0
(14.8‑19.0)
20.4
(17.5‑23.0)
23.4
(19.7‑26.5)
4-day 5.13
(4.70‑5.67)
6.18
(5.67‑6.83)
7.83
(7.15‑8.65)
9.24
(8.41‑10.2)
11.3
(10.2‑12.6)
13.2
(11.8‑14.6)
15.2
(13.5‑16.9)
17.4
(15.2‑19.4)
20.8
(17.9‑23.3)
23.7
(20.1‑26.8)
7-day 5.91
(5.46‑6.44)
7.11
(6.59‑7.76)
8.94
(8.26‑9.76)
10.5
(9.64‑11.4)
12.7
(11.6‑13.9)
14.6
(13.3‑15.9)
16.6
(15.0‑18.2)
18.9
(16.8‑20.7)
22.1
(19.4‑24.5)
24.9
(21.5‑27.7)
10-day 6.67
(6.18‑7.24)
7.98
(7.40‑8.67)
9.89
(9.14‑10.8)
11.5
(10.6‑12.5)
13.8
(12.7‑15.0)
15.7
(14.4‑17.2)
17.8
(16.1‑19.5)
20.1
(18.0‑22.0)
23.4
(20.7‑25.8)
26.1
(22.8‑29.0)
20-day 8.94
(8.33‑9.62)
10.6
(9.93‑11.5)
13.0
(12.1‑14.0)
14.9
(13.8‑16.0)
17.6
(16.3‑19.0)
19.9
(18.3‑21.5)
22.3
(20.3‑24.1)
24.8
(22.4‑27.0)
28.4
(25.4‑31.1)
31.4
(27.6‑34.6)
30-day 11.0
(10.3‑11.7)
13.0
(12.3‑13.9)
15.6
(14.7‑16.7)
17.8
(16.7‑18.9)
20.7
(19.3‑22.1)
23.1
(21.4‑24.6)
25.5
(23.6‑27.3)
28.0
(25.7‑30.1)
31.5
(28.5‑34.1)
34.2
(30.7‑37.2)
45-day 13.7
(12.9‑14.6)
16.2
(15.3‑17.2)
19.2
(18.1‑20.4)
21.6
(20.4‑22.9)
25.0
(23.5‑26.5)
27.6
(25.8‑29.4)
30.4
(28.2‑32.3)
33.2
(30.6‑35.4)
37.0
(33.7‑39.7)
40.0
(36.2‑43.2)
60-day 16.5
(15.6‑17.4)
19.4
(18.3‑20.5)
22.7
(21.4‑24.0)
25.3
(23.8‑26.8)
28.8
(27.1‑30.5)
31.5
(29.5‑33.5)
34.3
(31.9‑36.4)
37.0
(34.3‑39.4)
40.6
(37.3‑43.5)
43.3
(39.6‑46.7)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency
estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimatesat upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
PF graphical
2/12/2020 Precipitation Frequency Data Server
https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2669&lon=-77.9209&data=intensity&units=english&series=pds 1/4
NOAA Atlas 14, Volume 2, Version 3
Location name: Wilmington, North Carolina, USA*
Latitude: 34.2669°, Longitude: -77.9209°
Elevation: 24.99 ft**
* source: ESRI Maps ** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley
NOAA, National Weather Service, Silver Spring, Maryland
PF_tabular | PF_graphical | Maps_&_aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1
Duration Average recurrence interval (years)
1 2 5 10 25 50 100 200 500 1000
5-min 6.25
(5.86‑6.72)
7.42
(6.94‑7.97)
8.69
(8.12‑9.31)
9.70
(9.01‑10.4)
11.0
(10.2‑11.7)
11.9
(11.0‑12.7)
12.9
(11.8‑13.8)
13.8
(12.6‑14.8)
15.1
(13.6‑16.2)
16.1
(14.4‑17.3)
10-min 5.00
(4.68‑5.37)
5.93
(5.55‑6.37)
6.96
(6.50‑7.46)
7.75
(7.21‑8.31)
8.72
(8.09‑9.33)
9.47
(8.74‑10.1)
10.2
(9.38‑10.9)
11.0
(9.99‑11.8)
11.9
(10.8‑12.8)
12.7
(11.3‑13.6)
15-min 4.16
(3.90‑4.48)
4.97
(4.65‑5.34)
5.87
(5.48‑6.29)
6.54
(6.08‑7.01)
7.37
(6.83‑7.88)
8.00
(7.37‑8.56)
8.62
(7.91‑9.22)
9.22
(8.40‑9.88)
10.0
(9.03‑10.8)
10.6
(9.48‑11.4)
30-min 2.85
(2.67‑3.07)
3.43
(3.21‑3.69)
4.17
(3.90‑4.47)
4.74
(4.41‑5.08)
5.46
(5.06‑5.84)
6.02
(5.55‑6.45)
6.60
(6.05‑7.06)
7.18
(6.54‑7.69)
7.96
(7.18‑8.56)
8.59
(7.68‑9.24)
60-min 1.78
(1.67‑1.91)
2.15
(2.02‑2.31)
2.67
(2.50‑2.87)
3.08
(2.87‑3.31)
3.64
(3.37‑3.89)
4.08
(3.76‑4.37)
4.55
(4.17‑4.87)
5.04
(4.59‑5.40)
5.71
(5.15‑6.14)
6.27
(5.61‑6.74)
2-hr 1.05
(0.972‑1.15)
1.28
(1.18‑1.39)
1.63
(1.51‑1.78)
1.93
(1.78‑2.10)
2.36
(2.16‑2.57)
2.74
(2.49‑2.98)
3.15
(2.85‑3.42)
3.60
(3.23‑3.90)
4.27
(3.79‑4.63)
4.84
(4.27‑5.28)
3-hr 0.750
(0.694‑0.818)
0.909
(0.841‑0.992)
1.17
(1.08‑1.27)
1.39
(1.28‑1.51)
1.72
(1.58‑1.87)
2.02
(1.83‑2.19)
2.35
(2.12‑2.54)
2.71
(2.43‑2.93)
3.28
(2.90‑3.54)
3.77
(3.29‑4.08)
6-hr 0.466
(0.432‑0.508)
0.565
(0.524‑0.617)
0.725
(0.671‑0.790)
0.865
(0.798‑0.941)
1.08
(0.986‑1.17)
1.26
(1.15‑1.37)
1.48
(1.33‑1.59)
1.71
(1.53‑1.85)
2.08
(1.83‑2.25)
2.40
(2.09‑2.60)
12-hr 0.271
(0.249‑0.297)
0.329
(0.302‑0.359)
0.424
(0.390‑0.464)
0.509
(0.466‑0.555)
0.638
(0.579‑0.695)
0.754
(0.680‑0.819)
0.885
(0.793‑0.961)
1.03
(0.916‑1.12)
1.27
(1.11‑1.38)
1.47
(1.27‑1.60)
24-hr 0.160
(0.145‑0.178)
0.194
(0.176‑0.216)
0.250
(0.228‑0.279)
0.300
(0.273‑0.335)
0.378
(0.339‑0.419)
0.446
(0.397‑0.495)
0.525
(0.461‑0.582)
0.614
(0.532‑0.682)
0.751
(0.638‑0.840)
0.873
(0.729‑0.981)
2-day 0.094
(0.086‑0.104)
0.114
(0.104‑0.126)
0.146
(0.134‑0.162)
0.174
(0.159‑0.193)
0.217
(0.196‑0.240)
0.254
(0.228‑0.283)
0.297
(0.262‑0.331)
0.345
(0.300‑0.386)
0.418
(0.356‑0.470)
0.482
(0.404‑0.545)
3-day 0.067
(0.061‑0.074)
0.081
(0.074‑0.090)
0.103
(0.094‑0.114)
0.122
(0.111‑0.135)
0.151
(0.136‑0.167)
0.176
(0.158‑0.196)
0.204
(0.181‑0.227)
0.236
(0.206‑0.263)
0.284
(0.243‑0.319)
0.325
(0.274‑0.368)
4-day 0.053
(0.049‑0.059)
0.064
(0.059‑0.071)
0.082
(0.074‑0.090)
0.096
(0.088‑0.106)
0.118
(0.107‑0.131)
0.137
(0.123‑0.152)
0.158
(0.140‑0.176)
0.181
(0.159‑0.202)
0.216
(0.186‑0.243)
0.247
(0.209‑0.279)
7-day 0.035
(0.033‑0.038)
0.042
(0.039‑0.046)
0.053
(0.049‑0.058)
0.062
(0.057‑0.068)
0.076
(0.069‑0.083)
0.087
(0.079‑0.095)
0.099
(0.089‑0.108)
0.112
(0.100‑0.123)
0.132
(0.116‑0.146)
0.148
(0.128‑0.165)
10-day 0.028
(0.026‑0.030)
0.033
(0.031‑0.036)
0.041
(0.038‑0.045)
0.048
(0.044‑0.052)
0.058
(0.053‑0.063)
0.066
(0.060‑0.071)
0.074
(0.067‑0.081)
0.084
(0.075‑0.092)
0.098
(0.086‑0.108)
0.109
(0.095‑0.121)
20-day 0.019
(0.017‑0.020)
0.022
(0.021‑0.024)
0.027
(0.025‑0.029)
0.031
(0.029‑0.033)
0.037
(0.034‑0.040)
0.041
(0.038‑0.045)
0.046
(0.042‑0.050)
0.052
(0.047‑0.056)
0.059
(0.053‑0.065)
0.065
(0.058‑0.072)
30-day 0.015
(0.014‑0.016)
0.018
(0.017‑0.019)
0.022
(0.020‑0.023)
0.025
(0.023‑0.026)
0.029
(0.027‑0.031)
0.032
(0.030‑0.034)
0.035
(0.033‑0.038)
0.039
(0.036‑0.042)
0.044
(0.040‑0.047)
0.047
(0.043‑0.052)
45-day 0.013
(0.012‑0.013)
0.015
(0.014‑0.016)
0.018
(0.017‑0.019)
0.020
(0.019‑0.021)
0.023
(0.022‑0.025)
0.026
(0.024‑0.027)
0.028
(0.026‑0.030)
0.031
(0.028‑0.033)
0.034
(0.031‑0.037)
0.037
(0.033‑0.040)
60-day 0.011
(0.011‑0.012)
0.013
(0.013‑0.014)
0.016
(0.015‑0.017)
0.018
(0.017‑0.019)
0.020
(0.019‑0.021)
0.022
(0.021‑0.023)
0.024
(0.022‑0.025)
0.026
(0.024‑0.027)
0.028
(0.026‑0.030)
0.030
(0.027‑0.032)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a
given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are notchecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
PF graphical
216 S. Swing Rd., Suite 1 Greensboro, NC 27409 336-662-5487
7/31/2020 Project # 1775 Timmons Group 5410 Trinity Rd., Suite 102 Raleigh, NC 27607
This report details the findings of a seasonally high-water table evaluation for the Wilmington Airport site in New Hanover County, NC. Your office gave the location of the proposed storm water control measures (SCM) and requested boring locations. G. Christopher Murray, Licensed Soil Scientist #1284, conducted the evaluation on July
27th, 2020. The results were as follows: Seasonally High-Water Table Soil Borings Soil boring were completed within the proposed stormwater control measure at the locations shown on the attached map. The depth to the seasonally high-water table
(SHWT) was determined by observing soil indicators, also known as redoximorphic features. Boring 1: Signs of a seasonally high-water table were observed from 8 inches to 120 inches. The
existing grade at this location was 19.5 ft +/-. Boring 2: Signs of a seasonally high-water table were observed from 10 inches to 120 inches. The existing grade at this location was 20.5 ft +/-.
Boring ID SHWT Depth (inches) SHWT Elevation (feet)
1 8-120 18.8 +/-
2 10-120 19.6 +/-
Piedmont Environmental Associates, PA is pleased to perform this work for you. If you have any questions, please feel free to call (336) 662-5487.
Sincerely,
G. Christopher Murray N.C. Licensed Soil Scientist #1284
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
SANSANSAN
SA
N
SA
N
S
A
N
S
A
N
SA
N
SA
N
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
W W W W W W W W W W
EDGE OF
P
A
V
E
M
E
N
T
EDGE OF
P
A
V
E
M
E
N
T
EDGE O
F
P
A
V
E
M
E
N
T
E
D
G
E
O
F
P
A
V
E
M
E
N
T
E
D
G
E
O
F
P
A
V
E
M
E
N
T
GUARD RAIL
RIPRAP
PU
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
DB
6
0
4
5
,
P
G
4
0
O
H
T
O
H
P
O
H
P
O
H
P
OH
P
W
W
W
W
W
W
W
W
W W
W
U
G
P
UG
P
UGP
UGP
UGP UGP
UGT
UGT
UGT
UGT UGT
UGP UGP UGP UGP UGP UGP
UGT UGT UGT UGT UGT UGT
SA
N
SA
N
IRRIGATION WELLAND CONTROL BOX
FENCE
FENCE
FENCE
DITCH
DITCH
SWALE
SWALE
DI
T
C
H
SW
A
L
E
DI
T
C
H
DI
T
C
H
DI
T
C
H
DIT
C
H
SWALE
SWALE
X
X
X
X
X
UG
T
U
G
T
DIT
C
H
DIT
C
H
24" RCP
INV=19.14
INV=18.94
INV=15.90
X
INV=12.50
DIT
C
H
FE
N
C
E
SIGN NOLONGER EXIST
SAN
SAN
FM
8"
W
A
T
E
R
L
I
N
E
36
"
R
C
P
42
"
R
C
P
INTERMITTENT
STREAM BUFFER
22
24
2
6
26
2
6
24
22
2
6
26
26
2
8
2
8
24
26
2
6
26
26
26
24
24
24
24
22
24
2
4
22
2
6
23
22
22
23
24
2
3
1
3
24
24
24
24
2
3
22
21
20
32
30
29
2524
22
22
21
22
2
0
19
23
24
2
5
2
4
2
5
2526
2
6
2
5
24
23 2
2
2
1
20
2
5
25
2
5
2
4
2
3
24
23
22
2122
23
2122
23
24
25
2
6
29
2
8 27 26 25 25 2627
2828
272625
26
27
26
2626
2
1
2324
26
25
24
23
2
2
1
6
17181920
19
2
0
2
0
1
8
1
8
20
2
1
2
2
2
3
1
8 1
9
2
0
1717
21
22
2
3
24
2021
22 21
22 23
26
25
2424
26
2
3
2
3
25
2424
232524
2728
22 23 24 25
23 24 25
26
26
23 24 25
23
22
29
28
27
26
25
24
23
22
20
17
19
20
21
22
23
1
2
1
3
19
1
8
1
9
22
22
23
24
24
20
25
25
22
25
25
24
24
23
2
3
22
23 24
24
18
20
19
16
2
0
1
7
23
23
2
6
27
26
2
3
23
2
2
26 2
6
2525
26
27
21
21
22
23
2
424
25
262
6
AIRPO
R
T
B
O
U
L
E
V
A
R
D
VARIA
B
L
E
W
I
D
T
H
R
O
W
(
P
U
B
L
I
C
)
N
2
3
R
D
S
T
R
E
E
T
(
S
R
-
1
3
0
2
)
1
0
0
'
R
/
W
(
P
U
B
L
I
C
)
Se
Le
Se
JO
JO
Se Se Le
Le
JO
Pn
Le
L
e
P
n
P
n
S
e
P
n
S
e
L
eJ
O
J
OL
e
Se
Le
2326
25
26
23
24
2
4
2
8
24
22
21
20
24
23
22
2120
14 15
19
14
1516
202122
2
3
2
5
26
16
1
6
1
8
9
10
15
17
22
23
24
2
2
2
3
24
26
25
24
22
26
LAWN
LAWN
LAWNLAWN
LAWN
LAWN
WOODS
WOODS
INV=19.05
INV=19.40
INV=18.94 INV=19.14
END UNKNOWN
INV=16.81
INV=16.58
INV=15.90
INV=20.30DI
RIM=21.77
INV(N)=19.46
INV(S)=19.47
INV=19.81
INV=18.40
INV=18.37
G
A
R
D
N
E
R
R
O
A
D
LEGEND
DRAINAGE AREA LIMITS
HYDRAULIC ANALYSIS POINT
NA
D
8
3
0
SCALE 1"=100'
200'100'
DA1.0
PR
E
-
D
E
V
E
L
O
P
M
E
N
T
D
R
A
I
N
A
G
E
A
R
E
A
M
A
P
A. MAY
B. DOWNS
J. DOOLEY
12/04/19
CI
R
C
L
E
K
-
N
T
I
A
I
R
P
O
R
T
B
L
V
D
W
I
L
M
I
N
G
T
O
N
-
N
C
.
1
1
5
WI
L
M
I
N
G
T
O
N
-
NE
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
NO
R
T
H
C
A
R
O
L
I
N
A
37630.054
NOTE:
DRAINAGE AREA MAP BASED ON:
·SURVEY PROVIDED BY PARAMOUNT
ENGINEERING, INC DATED 11/20/19
·NEW HANOVER COUNTY GIS AND
NCONEMAP AERIAL DATED 02/13/2019.
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
YO
U
R
V
I
S
I
O
N
A
C
H
I
E
V
E
D
T
H
R
O
U
G
H
O
U
R
S
.
Th
e
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
a
n
d
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
54
1
0
T
r
i
n
i
t
y
R
o
a
d
,
S
u
i
t
e
1
0
2
|
R
a
l
e
i
g
h
,
N
C
2
7
6
0
7
TE
L
9
1
9
.
8
6
6
.
4
9
5
1
F
A
X
9
1
9
.
8
3
3
.
8
1
2
4
w
w
w
.
t
i
m
m
o
n
s
.
c
o
m
TH
I
S
D
R
A
W
I
N
G
P
R
E
P
A
R
E
D
A
T
T
H
E
RA
L
E
I
G
H
O
F
F
I
C
E
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
PR
E
L
I
M
I
N
A
R
Y
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
s:
\
3
3
2
\
3
7
6
3
0
-
0
5
4
-
n
t
i
_
a
i
r
p
o
r
t
_
w
i
l
m
i
_
n
c
\
D
W
G
\
S
h
e
e
t
\
E
x
h
i
b
i
t
\
3
7
6
3
0
.
0
5
4
-
D
A
1
.
0
-
P
R
E
.
d
w
g
|
P
l
o
t
t
e
d
o
n
8/
2
5
/
2
0
2
0
1
1
:
1
4
A
M
|
b
y
Tr
e
v
o
r
D
a
e
k
e
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, CAPE FEAR
PUBLIC UTILITY AUTHORITY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
ANALYSIS POINT B
86' OF 24" RCP @ 0.46% SLOPE
INVERT IN: 13.97'
INVERT OUT: 13.57'
ANALYSIS POINT C
EX. DITCH
LOW POINT: 15.08'
ANALYSIS POINT A
84' OF 24" RCP @ 0.47% SLOPE
INVERT IN: 16.92'
INVERT OUT: 16.52'
DA 1.1
IMPERV. (A) = 29,425 SF = 0.68 AC
IMPERV. (B) = 760 SF = 0.02 AC
WOODS (B) = 597 SF = 0.01 AC
LAWN (A) = 151,071 SF = 3.47 AC
LAWN (B) = 15,449 SF = 0.35 AC
TOTAL = 197,302 SF = 4.53 AC
DA 1.2
WOODS (A) = 29,406 SF = 0.68 AC
WOODS (B) = 139,512 SF = 3.20 AC
WOODS (D) = 6,048 SF = 0.14 AC
LAWN (A) = 20,349 SF = 0.47 AC
LAWN (B) = 4,557 SF = 0.10 AC
LAWN (D) = 1,296 SF = 0.03 AC
TOTAL = 201,168 SF = 4.62 AC
DA 1.3
IMPERV. (A) = 15,175 SF = 0.35 AC
IMPERV. (B) = 64,893 SF = 1.49 AC
WOODS (B) = 248,842 SF = 5.71 AC
WOODS (D) = 11,356 SF = 0.26 AC
LAWN (A) = 75,978 SF = 1.74 AC
LAWN (B) = 257,685 SF = 5.92 AC
TOTAL = 673,929 SF = 15.47 AC
SOIL TYPES:
SYMBOL RATING UNIT NAME
JO D JOHNSTON SOILS
Le B/D LEON SAND
Pn B/D PANTEGO LOAM
Se A/D SEAGATE FINE SAND
SOIL TYPE BOUNDARIES
EXISTING IMPERVIOUS
EXISTING WOODS
TC FLOW PATH
TC SEGMENT #1
SHEET FLOW
50 LF @ 0.80%
TC SEGMENT #2
SHALLOW CONCENTRATED FLOW
33 LF @ 2.27%
TC SEGMENT #3
DITCH FLOW
852 LF @ 0.93%
TC SEGMENT #1
SHEET FLOW
50 LF @ 1.28%
TC SEGMENT #2
SHALLOW CONCENTRATED FLOW
76 LF @ 1.89%
TC SEGMENT #3
DITCH FLOW
567 LF @ 1.94%
TC SEGMENT #1
SHEET FLOW
50 LF @ 0.50%
TC SEGMENT #2
DITCH FLOW
708 LF @ 0.90%
TC SEGMENT #3
DITCH FLOW
920 LF @ 0.51%
DA 1.4
IMPERV. (B) = 3,595 SF = 0.08 AC
WOODS (A) = 720 SF = 0.02 AC
WOODS (B) = 2,737 SF = 0.06 AC
LAWN (A) = 10,483 SF = 0.24 AC
LAWN (B) = 59,030 SF = 1.36 AC
LAWN (D) = 4,046 SF = 0.09 AC
TOTAL = 80,611 SF = 1.85 AC
TC SEGMENT #1
SHEET FLOW
50 LF @ 0.40%
TC SEGMENT #2
SHALLOW CONCENTRATED FLOW
240 LF @ 0.83%
TC SEGMENT #3
DITCH FLOW
360 LF @ 2.36%
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
SANSANSAN
SA
N
SA
N
S
A
N
S
A
N
SA
N
SA
N
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
W W W W W W W W W W
GUARD RAIL
PU
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
DB
6
0
4
5
,
P
G
4
0
O
H
T
O
H
P
O
H
P
O
H
P
W
W
W
W
W
W
W
W
W W
W
U
G
P
UG
P
UGP
UGP
UGP UGP
UGT
UGT
UGT
UGT UGT
UGP UGP UGP UGP UGP UGP
UGT UGT UGT UGT UGT UGT
SA
N
SA
N
IRRIGATION WELLAND CONTROL BOX
FENCE
FENCE
FENCE
DITCH
DITCH
SWALE
SW
A
L
E
DI
T
C
H
DI
T
C
H
DI
T
C
H
DIT
C
H
SWALE
SWALE
X
X
X
X
X
UG
T
U
G
T
DIT
C
H
DIT
C
H
24" RCP
INV=19.14
INV=18.94
INV=15.90
X
INV=12.50
DIT
C
H
FE
N
C
E
SIGN NOLONGER EXIST
SAN
SAN
FM
8"
W
A
T
E
R
L
I
N
E
36
"
R
C
P
42
"
R
C
P
INTERMITTENT
STREAM BUFFER
22
24
2
6
26
2
6
24
22
2
6
26
26
2
8
2
8
24
26
2
6
26
26
26
24
24
24
24
22
24
2
4
22
2
6
23
22
22
23
24
2
3
1
3
24
24
24
24
2
3
22
21
20
32
30
29
2524
22
22
21
22
2
0
19
23
24
2
5
2
4
2
5
2526
2
6
2
5
24
23 2
2
2
1
20
2
5
25
2
5
2
4
2
3
24
23
22
2122
23
2122
23
24
25
2
6
29
2
8 27 26 25 25 2627
2828
272625
26
27
26
2626
2
1
2324
26
25
24
23
2
2
1
6
17181920
19
2
0
2
0
1
8
1
8
20
2
1
2
2
2
3
1
8 1
9
2
0
1717
21
22
2
3
24
2021
22 21
22 23
26
25
2424
26
2
3
2
3
25
2424
232524
2728
22 23 24 25
23 24 25
26
26
23 24 25
23
22
29
28
27
26
25
24
23
22
20
17
19
20
21
22
23
1
2
1
3
19
1
8
1
9
22
22
23
24
24
20
25
25
22
25
25
24
24
23
2
3
22
23 24
24
18
20
19
16
2
0
1
7
23
23
2
6
27
26
2
3
23
2
2
26 2
6
2525
26
27
21
21
22
23
2
424
25
262
6
INV=19.05
INV=19.40
INV=18.94 INV=19.14
INV=20.30
DI
RIM=21.77
INV(N)=19.46
INV(S)=19.47
INV=19.81
INV=18.40
INV=18.37
NTI-FS
-
P
R
O
T
O
T
Y
P
E
-
5200
S
Q
.
F
T
.
-
0
6
/
0
5
/
2
0
2
0
CK NA
T
I
O
N
A
L
U
P
D
A
T
E
13
6
PRIVA
T
E
S
T
R
E
E
T
(NHC
L
O
C
A
L
S
T
A
N
D
A
R
D
S
)
T
6
AIRPO
R
T
B
O
U
L
E
V
A
R
D
VARIA
B
L
E
W
I
D
T
H
R
O
W
(
P
U
B
L
I
C
)
N
2
3
R
D
S
T
R
E
E
T
(
S
R
-
1
3
0
2
)
1
0
0
'
R
/
W
(
P
U
B
L
I
C
)
Se
Le
Se
JO
JO
Se
Se Le
L
e
J
O
Pn
Le
L
e
P
n
P
n
S
e
P
n
S
e
L
eJ
O
J
OL
e
Se
Le
2326
25
26
23
24
2
4
2
8
24
22
21
20
24
23
22
2120
14 15
19
14
1516
202122
2
3
2
5
26
16
1
6
1
8
9
10
15
17
22
23
24
2
2
2
3
24
26
25
24
22
26
16
WW
W
G
A
R
D
N
E
R
R
O
A
D
LEGEND
DRAINAGE AREA LIMITS
HYDRAULIC ANALYSIS POINT
NA
D
8
3
0
SCALE 1"=100'
200'100'
DA2.0
PO
S
T
-
D
E
V
E
L
O
P
M
E
N
T
D
R
A
I
N
A
G
E
A
R
E
A
M
A
P
A. MAY
B. DOWNS
J. DOOLEY
12/04/19
CI
R
C
L
E
K
-
N
T
I
A
I
R
P
O
R
T
B
L
V
D
W
I
L
M
I
N
G
T
O
N
-
N
C
.
1
1
5
WI
L
M
I
N
G
T
O
N
-
NE
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
NO
R
T
H
C
A
R
O
L
I
N
A
37630.054
NOTE:
1.POST-DEVELOPMENT DRAINAGE AREA
SHOWN IS CONSISTENT WITH
SWB0505047 PHASE III OVERALL
DRAINAGE MAP FOR ULTIMATE BUILDOUT.
2.DRAINAGE AREA MAP BASED ON:
·SURVEY PROVIDED BY PARAMOUNT
ENGINEERING, INC DATED 11/20/19.
·NEW HANOVER COUNTY GIS AND
NCONEMAP AERIAL DATED 02/13/2019.
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
YO
U
R
V
I
S
I
O
N
A
C
H
I
E
V
E
D
T
H
R
O
U
G
H
O
U
R
S
.
Th
e
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
a
n
d
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
54
1
0
T
r
i
n
i
t
y
R
o
a
d
,
S
u
i
t
e
1
0
2
|
R
a
l
e
i
g
h
,
N
C
2
7
6
0
7
TE
L
9
1
9
.
8
6
6
.
4
9
5
1
F
A
X
9
1
9
.
8
3
3
.
8
1
2
4
w
w
w
.
t
i
m
m
o
n
s
.
c
o
m
TH
I
S
D
R
A
W
I
N
G
P
R
E
P
A
R
E
D
A
T
T
H
E
RA
L
E
I
G
H
O
F
F
I
C
E
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
PR
E
L
I
M
I
N
A
R
Y
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
s:
\
3
3
2
\
3
7
6
3
0
-
0
5
4
-
n
t
i
_
a
i
r
p
o
r
t
_
w
i
l
m
i
_
n
c
\
D
W
G
\
S
h
e
e
t
\
E
x
h
i
b
i
t
\
3
7
6
3
0
.
0
5
4
-
D
A
2
.
0
-
P
O
S
T
.
d
w
g
|
P
l
o
t
t
e
d
o
n
8/
2
5
/
2
0
2
0
1
1
:
1
4
A
M
|
b
y
Tr
e
v
o
r
D
a
e
k
e
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, CAPE FEAR
PUBLIC UTILITY AUTHORITY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
DA 2.1 (BYPASS)
IMPERV. (A) = 35,785 SF = 0.82 AC
IMPERV. (B) = 760 SF = 0.02 AC
LAWN (A) = 65,610 SF = 1.51 AC
LAWN (B) = 5,959 SF = 0.14 AC
TOTAL = 108,114 SF = 2.48 AC
DA 2.4 (BYPASS)
IMPERV. (A) = 2,153 SF = 0.05 AC
IMPERV. (B) = 3,595 SF = 0.08 AC
IMPERV. (D) = 1,545 SF = 0.04 AC
LAWN (A) = 11,698 SF = 0.27 AC
LAWN (B) = 61,768 SF = 1.42 AC
LAWN (D) = 7,109 SF = 0.16 AC
TOTAL = 87,868 SF = 2.02 AC
SOIL TYPES:
SYMBOL RATING UNIT NAME
JO D JOHNSTON SOILS
Le B/D LEON SAND
Pn B/D PANTEGO LOAM
Se A/D SEAGATE FINE SAND
SOIL TYPE BOUNDARIES
KNOWN IMPERVIOUS
ANALYSIS POINT B
86' OF 24" RCP @ 0.46% SLOPE
INVERT IN: 13.97'
INVERT OUT: 13.57'
ANALYSIS POINT C
ANALYSIS POINT A
84' OF 24" RCP @ 0.47% SLOPE
INVERT IN: 16.92'
INVERT OUT: 16.52'
PROPOSED GRASS
PRETREATMENT SWALE
PROPOSED GRASS
PRETREATMENT SWALE
BUILDOUT TO EXISTING
PHASE I/II DRY POND
BUILDOUT TO PROPOSED
PHASE IIIB DRY POND
BYPASS AREA
DA 2.3 (TO PHASE IIIB DRY POND)
EXISTING ROAD IMPERVIOUS = 89,774 SF = 2.06 AC
PROPOSED IMPERVIOUS WITH CIRCLE K PROJECT
ROAD = 7,633 SF = 0.18 AC
EXISTING/PROPOSED ROADS IMPERVIOUS
SUBTOTAL = 97,407 SF = 2.24 AC
TOTAL PHASE IIIB IMPERVIOUS ALLOCATION =
361,078 SF = 8.29 AC
PHASE IIIB FUTURE DEVELOPMENT IMPERVIOUS
ALLOCATION REMAINING = 263,671 SF = 6.05 AC
DA 2.3B (TO PHASE IIIB DRY POND)
FUTURE BUILDOUT IMPERV. (B) = 221,399 SF = 5.08 AC
FUTURE BUILDOUT LAWN (A) = 9,701 SF = 0.22 AC
FUTURE BUILDOUT LAWN (B) = 182,650 SF = 4.20 AC
FUTURE BUILDOUT LAWN (D) = 2,489 SF = 0.06 AC
TOTAL = 416,239 SF = 9.56 AC
DA 2.2 (PHASE IIIA DRY POND)
IMPERV. (A) = 61,136 SF = 1.40 AC
IMPERV. (B) = 55,462 SF = 1.27 AC
LAWN (A) = 56,967 SF = 1.31 AC
LAWN (B) = 36,932 SF = 0.85 AC
LAWN (D) = 2,716 SF = 0.06 AC
TOTAL = 213,213 SF = 4.89 AC
PROPOSED PHAS
E
I
I
I
B
D
R
Y
P
O
N
D
PROPOSED IIIA
DRY POND
TC SEGMENT #1
SHEET FLOW
50 LF @ 0.80%
TC SEGMENT #2
SHALLOW CONCENTRATED FLOW
33 LF @ 2.27%
TC SEGMENT #3
DITCH FLOW
852 LF @ 0.93%
TC SEGMENT #1
SHEET FLOW
50 LF @ 0.50%
TC SEGMENT #2
DITCH FLOW
708 LF @ 0.90%
TC SEGMENT #3
DITCH FLOW
1095 LF @ 0.73%
TC SEGMENT #1
SHEET FLOW
50 LF @ 0.40%
TC SEGMENT #2
SHALLOW CONCENTRATED FLOW
240 LF @ 0.83%
TC SEGMENT #3
DITCH FLOW
360 LF @ 2.36%
BUILDOUT TO PROPOSED
PHASE IIIB DRY POND
BUILDOUT TO PROPOSED
PHASE IIIA DRY POND
DA 2.3A (TO PHASE IIIB DRY POND)
FUTURE BUILDOUT IMPERV. (A) = 27,781 SF = 0.64 AC
FUTURE BUILDOUT IMPERV. (B) = 111,898 SF = 2.57 AC
FUTURE BUILDOUT LAWN (A) = 71,539 SF = 1.64 AC
FUTURE BUILDOUT LAWN (B) = 109,371 SF = 2.51 AC
TOTAL = 320,589 SF = 7.36 AC
DA 2.3C (BYPASS)
FUTURE BUILDOUT LAWN (B) = 12,586 SF = 0.29 AC
FUTURE BUILDOUT LAWN (D) = 9,692 SF = 0.22 AC
TOTAL = 22,278 SF = 0.51 AC
DA 2.3B (TO PHASE IIIB DRY POND)
TC = 5 MIN
DA 2.2 (TO PHASE IIIA DRY POND)
TC = 5 MIN
DA 2.2 (TO PHASE IIIA DRY POND)
PROPOSED IMPERVIOUS WITH CIRCLE K PROJECT
= 69,896 SF = 1.60 AC (INCLUDES 0.05 AC
IMPERVIOUS CONTINGENCY
TOTAL PHASE IIIA IMPERVIOUS ALLOCATION
= 116,598 SF = 2.67 AC
PHASE IIIA FUTURE DEVELOPMENT IMPERVIOUS
ALLOCATION REMAINING = 46,702 SF = 1.07 AC
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
SANSANSAN
SA
N
SA
N
S
A
N
S
A
N
SA
N
SA
N
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
W W W W W W W W W W
GUARD RAIL
PU
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
DB
6
0
4
5
,
P
G
4
0
O
H
T
O
H
P
O
H
P
O
H
P
W
W
W
W
W
W
W
W
W W
W
U
G
P
UG
P
UGP
UGP
UGP UGP
UGT
UGT
UGT
UGT UGT
UGP UGP UGP UGP UGP UGP
UGT
UGT UGT UGT UGT UGT
SA
N
SA
N
IRRIGATION WELLAND CONTROL BOX
FENCE
FENCE
FENCE
DITCH
DITCH
SWALE
SW
A
L
E
DI
T
C
H
DI
T
C
H
DI
T
C
H
DI
T
C
H
SWALE
SWALE
X
X
X
X
X
UG
T
U
G
T
DIT
C
H
DIT
C
H
24" RCP
INV=19.14
INV=18.94
INV=15.90
X
INV=12.50
DIT
C
H
FE
N
C
E
SIGN NOLONGER EXIST
SAN
SAN
FM
8"
W
A
T
E
R
L
I
N
E
36
"
R
C
P
42
"
R
C
P
INTERMITTENT
STREAM BUFFER
22
24
2
6
26
2
6
24
22
2
6
26
26
2
8
2
8
24
26
2
6
26
26
26
24
24
24
24
22
24
2
4
2
2
2
6
23
22
22
23
24
2
3
1
3
24
24
24
24
2
3
22
21
20
32
30
29
2524
22
22
21
22
2
0
19
23
24
2
5
2
4
2
5
2526
2
6
2
5
24
23 2
2
2
1
20
2
5
25
2
5
2
4
2
3
24
23
22
2122
23
2122
23
24
25
2
6
29
2
8 27 26 25 25 2627
2828
272625
26
27
26
2626
2
1
2324
26
25
24
23
2
2
1
6
17181920
19
2
0
2
0
1
8
1
8
20
2
1
2
2
2
3
1
8 1
9
2
0
1717
21
22
23
2
4
2021
22 21
22 23
26
25
2424
26
2
3
2
3
25
2424
232524
2728
22 23 24 25
23 24 25
26
26
23 24 25
23
22
29
28
27
26
25
24
23
22
20
17
19
20
21
22
23
1
2
1
3
19
1
8
1
9
22
22
23
24
24
20
25
25
22
25
25
24
24
23
2
3
22
23 24
24
18
20
19
16
2
0
1
7
23
23
2
6
27
26
2
323
2
2
26 2
6
2525
26
27
21
21
22
23
2
424
25
262
6
INV=19.05
INV=19.40
INV=18.94 INV=19.14
INV=20.30
DI
RIM=21.77
INV(N)=19.46
INV(S)=19.47
INV=19.81
INV=18.40
INV=18.37
NTI-FS
-
P
R
O
T
O
T
Y
P
E
-
5200 S
Q
.
F
T
.
-
0
6
/
0
5
/
2
0
2
0
CK NA
T
I
O
N
A
L
U
P
D
A
T
E
13
6
PRIVA
T
E
S
T
R
E
E
T
(NHC
L
O
C
A
L
S
T
A
N
D
A
R
D
S
)
T
6
AIRPO
R
T
B
O
U
L
E
V
A
R
D
VARIA
B
L
E
W
I
D
T
H
R
O
W
(
P
U
B
L
I
C
)
N
2
3
R
D
S
T
R
E
E
T
(
S
R
-
1
3
0
2
)
1
0
0
'
R
/
W
(
P
U
B
L
I
C
)
2326
25
26
23
24
2
4
2
8
24
22
21
20
24
23
22
2120
14 15
19
14
1516
202122
2
3
2
5
26
16
1
6
1
8
9
10
15
17
22
23
24
2
2
2
3
24
26
25
24
22
26
16
WW
W
G
A
R
D
N
E
R
R
O
A
D
PREVIOUSLY PERMITTED PLAN REVISION (LOT #9 & ROADWAY) 7/16/15
BASIN INFORMATION PHASE III
RECEIVING STREAM NAME SMITH CREEK
STREAM CLASS & INDEX NO.C, Sw 18-74-63
DRAINAGE AREA (SF)1,511,968
ON-SITE DRAINAGE AREA (SF)1,511,968
OFF-SITE DRAINAGE (SF)0
PROPOSED IMPERVIOUS * AREA (SF)1,230,351
% IMPERVIOUS * AREA (TOTAL)81.40%
IMPERVIOUS * SURFACE AREA N/A
ON-SITE BUILDINGS (SF)N/A
ON-SITE STREETS (SF)N/A
ON-SITE PARKING (SF)N/A
ON-SITE SIDEWALKS (SF)N/A
OTHER ON-SITE (SF)N/A
FUTURE DEVELOPMENT (SF)899,275
OFF-SITE (SF)331,076
EXISTING BUA *** (SF)N/A
TOTAL (SF)1,230,351
PLAN REVISION
BASIN INFORMATION PHASE IIIA PHASE IIIB
RECEIVING STREAM NAME SMITH CREEK SMITH CREEK
STREAM CLASS & INDEX NO.C, Sw 18-74-63 C, Sw 18-74-63
DRAINAGE AREA (SF)213,213 736,828
ON-SITE DRAINAGE AREA (SF)213,213 736,828
OFF-SITE DRAINAGE (SF)0 0
PROPOSED IMPERVIOUS * AREA (SF)116,598 361,078
% IMPERVIOUS * AREA (TOTAL)54.70%49.00%
IMPERVIOUS * SURFACE AREA
ON-SITE BUILDINGS (SF)5,333 0
ON-SITE STREETS (SF)13,746 93,119
ON-SITE PARKING (SF)44,451 0
ON-SITE SIDEWALKS (SF)4,228 0
OTHER ON-SITE (SF)52 0
FUTURE DEVELOPMENT (SF)48,788 267,959
OFF-SITE (SF)N/A N/A
EXISTING BUA *** (SF)N/A N/A
TOTAL (SF)116,598 361,078
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
YO
U
R
V
I
S
I
O
N
A
C
H
I
E
V
E
D
T
H
R
O
U
G
H
O
U
R
S
.
Th
e
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
a
n
d
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
54
1
0
T
r
i
n
i
t
y
R
o
a
d
,
S
u
i
t
e
1
0
2
|
R
a
l
e
i
g
h
,
N
C
2
7
6
0
7
TE
L
9
1
9
.
8
6
6
.
4
9
5
1
F
A
X
9
1
9
.
8
3
3
.
8
1
2
4
w
w
w
.
t
i
m
m
o
n
s
.
c
o
m
TH
I
S
D
R
A
W
I
N
G
P
R
E
P
A
R
E
D
A
T
T
H
E
RA
L
E
I
G
H
O
F
F
I
C
E
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
PR
E
L
I
M
I
N
A
R
Y
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
S:
\
3
3
2
\
3
7
6
3
0
-
0
5
4
-
N
T
I
_
A
i
r
p
o
r
t
_
W
i
l
m
i
_
N
C
\
D
W
G
\
S
h
e
e
t
\
E
x
h
i
b
i
t
\
3
7
6
3
0
.
0
5
4
-
D
A
3
.
0
.
d
w
g
|
P
l
o
t
t
e
d
o
n
8/
2
7
/
2
0
2
0
2
:
1
2
P
M
|
b
y
Al
e
x
M
a
y
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, CAPE FEAR
PUBLIC UTILITY AUTHORITY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
NA
D
8
3
0
SCALE 1"=100'
200'100'
PH
A
S
E
I
I
I
A
&
I
I
I
B
B
A
S
I
N
M
A
P
A. MAY
B. DOWNS
R. BAKER
12/04/19
CI
R
C
L
E
K
-
N
T
I
A
I
R
P
O
R
T
B
L
V
D
W
I
L
M
I
N
G
T
O
N
-
N
C
.
1
1
5
WI
L
M
I
N
G
T
O
N
-
NE
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
NO
R
T
H
C
A
R
O
L
I
N
A
37630.054
PHASE IIIA
PHASE IIIB
_________________________________________________________________________________________________________________
PEAK FLOW ANALYSIS
Circle K - NTI Airport Blvd Wimington
Stormwater Summary Table
24-Aug-20
Pre-Dev Table of Subareas, Land Uses, & Curve Numbers
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Pre-DA 1.1504.53Impervious (A)980.68
Impervious (B)980.02
Woods (B)550.01
Lawn (A)393.47
Lawn (B)610.35
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Pre-DA 1.2504.62Woods (A)300.68
Woods (B)553.20
Woods (D)700.14
Lawn (A)390.47
Lawn (B)610.10
Lawn (D)740.03
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Pre-DA 1.36115.47Impervious (A)980.35
Impervious (B)981.49
Woods (B)555.71
Woods (D)700.26
Lawn (A)391.74
Lawn (B)615.92
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Pre-DA 1.4601.85Impervious (B)980.08
Woods (A)300.02
Woods (B)550.06
Lawn (A)390.24
Lawn (B)611.36
Lawn (D)740.09
Circle K - NTI Airport Blvd Wimington
Stormwater Summary Table
24-Aug-20
Post- Dev Table of Subareas, Land Uses, & Curve Numbers
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Post-DA 2.2 (Phase IIIA)764.89Impervious (A)981.40
PERCENT IMPERV.54.7%Impervious (B)981.27
Lawn (A)391.31
Lawn (B)610.85
Lawn (D)740.06
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Post-DA 2.3A (Phase IIIB)727.36Future Impervious (A)980.64
PERCENT IMPERV.43.6%Future Impervious (B)982.57
Future Lawn (A)391.64
Future Lawn (B)612.51
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Post-DA 2.3B (Phase IIIB)809.56Future Impervious (B)985.08
PERCENT IMPERV.53.2%Future Lawn (A)390.22
Future Lawn (B)614.19
Future Lawn (D)740.06
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Post-DA 2.3C (Phase IIIB)670.51Future Lawn (B)610.29
PERCENT IMPERV.0.0%Future Lawn (D)740.22
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Post-DA 2.1602.48Impervious (A)980.82
Impervious (B)980.02
Lawn (A)391.51
Lawn (B)610.14
Subarea:Composite CN:Total Area (ac)Land Use:CN:Area (ac)
Post-DA 2.4 622.02Impervious (A)980.05
Impervious (B)980.08
Impervious (D)980.04
Lawn (A)390.27
Lawn (B)611.42
Lawn (D)740.16
Ci
r
c
l
e
K
-
N
T
I
A
i
r
p
o
r
t
B
l
v
d
W
i
m
i
n
g
t
o
n
St
o
r
m
w
a
t
e
r
S
u
m
m
a
r
y
T
a
b
l
e
27
-
A
u
g
-
2
0
Pe
a
k
F
l
o
w
S
u
m
m
a
r
y
Su
b
a
r
e
a
:
1
-
Y
r
F
l
o
w
(
c
f
s
)
2
-
Y
r
F
l
o
w
(
c
f
s
)
1
0
-
Y
r
F
l
o
w
(
c
f
s
)
2
5
-
Y
r
F
l
o
w
(
c
f
s
)
1
0
0
-
Y
r
F
l
o
w
(
c
f
s
)
N
o
t
e
s
:
Pr
e
D
A
1
.
1
(
O
u
t
l
e
t
A
)
0
.
0
4
5
0
.
2
3
4
2
.
0
6
2
3
.
7
8
4
7
.
5
4
9
Pr
e
D
A
1
.
2
0
.
0
4
3
0
.
2
6
5
2
.
7
8
0
5
.
2
2
9
1
0
.
6
8
0
Pr
e
D
A
1
.
3
(
O
u
t
l
e
t
C
)
2
.
7
7
5
6
.
2
9
4
2
0
.
8
6
0
3
0
.
9
7
0
5
0
.
6
1
0
Pr
e
D
A
1
.
4
0
.
2
8
1
0
.
6
6
4
2
.
3
4
5
3
.
5
2
8
5
.
8
3
8
Pr
e
D
e
v
O
u
t
l
e
t
B
0
.
2
8
1
0
.
8
7
0
4
.
8
4
8
8
.
3
8
9
1
5
.
6
2
0
Pr
e
D
e
v
T
o
t
a
l
3
.
0
5
6
7
.
1
2
1
2
6
.
7
9
0
4
1
.
3
5
0
7
0
.
8
3
0
Po
s
t
D
A
2
.
1
(
O
u
t
l
e
t
A
)
0
.
3
4
1
0
.
7
7
6
2
.
6
4
1
3
.
9
7
8
6
.
6
1
1
Po
s
t
D
A
2
.
2
5
.
0
2
0
7
.
4
4
0
1
5
.
0
8
0
1
9
.
7
7
0
2
8
.
2
5
0
Po
s
t
D
A
2
.
3
A
4
.
8
2
2
7
.
6
1
3
1
6
.
7
6
0
2
2
.
6
2
0
3
3
.
4
3
0
Po
s
t
D
A
2
.
3
B
1
9
.
1
0
0
2
6
.
4
0
0
4
9
.
1
2
0
6
2
.
6
9
0
8
6
.
8
3
0
Po
s
t
D
A
2
.
3
C
0
.
4
2
8
0
.
7
1
8
1
.
6
9
3
2
.
3
1
9
3
.
5
0
4
Po
s
t
D
A
2
.
4
0
.
4
2
5
0
.
9
2
2
2
.
8
8
8
4
.
2
3
7
6
.
8
4
0
Dr
y
P
o
n
d
O
u
t
-
P
h
a
s
e
I
I
I
A
0
.
0
7
0
0
.
2
5
5
2
.
5
6
9
4
.
3
1
1
1
0
.
7
1
0
Dr
y
P
o
n
d
O
u
t
-
P
h
a
s
e
I
I
I
B
0
.
2
8
9
0
.
5
9
0
8
.
1
4
3
1
5
.
2
1
0
3
1
.
6
7
0
Po
s
t
D
e
v
O
u
t
l
e
t
B
(
D
e
t
a
i
n
e
d
)
0
.
4
8
4
0
.
9
8
6
4
.
1
5
6
7
.
3
3
7
1
7
.
3
9
0
Po
s
t
D
e
v
O
u
t
l
e
t
C
(
D
e
t
a
i
n
e
d
)
0
.
6
5
7
0
.
9
6
5
8
.
2
7
4
1
5
.
4
4
0
3
2
.
0
9
0
Po
s
t
O
u
t
T
o
t
a
l
(
D
e
t
a
i
n
e
d
)
1
.
0
9
8
2
.
0
5
6
1
3
.
7
9
0
2
5
.
5
9
0
5
4
.
5
1
0
Po
s
t
‐
D
e
v
e
l
o
p
e
d
F
l
o
w
s
a
r
e
r
e
q
u
i
r
e
d
t
o
d
i
s
c
h
a
r
g
e
t
h
e
1
.
5
‐
in
c
h
w
a
t
e
r
q
u
a
l
i
t
y
v
o
l
u
m
e
in 2‐5 day drawdown.
1234
6
7
9 10 11 12 13 14
16
17
18
20
21
22
Watershed Model SchematicHydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Project: 37630.054 - Hydraflow - 2020.08.26-SJB.gpw Thursday, 08 / 27 / 2020
Hydrograph Summary Report
Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph
No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription
(origin)(cfs)(min)(min)(cuft)(ft)(cuft)
1SCS Runoff0.04528881,222------------------Pre DA 1.1 (Outlet A)
2SCS Runoff0.04328781,168------------------Pre DA 1.2
3SCS Runoff2.775273818,991------------------Pre DA 1.3 (Outlet C)
4SCS Runoff0.28127382,064------------------Pre DA 1.4
6Combine0.28127383,2332, 4,------------Pre-Dev Outlet B
7Combine3.056273823,4461, 3, 6------------Pre-Dev TOTAL OUT
9SCS Runoff0.34127462,684------------------Post DA 2.1 (Outlet A)
10SCS Runoff5.020272415,781------------------Post DA 2.2
11SCS Runoff4.822273020,643------------------Post DA 2.3A
12SCS Runoff19.10271838,244------------------Post DA 2.3B
13SCS Runoff0.4282718930------------------Post DA 2.3C
14SCS Runoff0.42527362,716------------------Post DA 2.4
16Reservoir0.0702144015,7801017.4312,707DRY POND - WEST
17Combine20.59271858,88711, 12,------------Post Inflow to East Pond
18Reservoir0.2892144258,8851716.4545,825DRY POND - EAST
20Combine0.484273618,49514, 16,------------Post-Dev Outlet B (Detained)
21Combine0.657271859,81613, 18,------------Post-Dev Outlet C (Detained)
22Combine1.098274080,9959, 20, 21------------Post Out Total (Detained)
37630.054 - Hydraflow - 2020.08.26-SJB.gpwReturn Period: 1 Year Thursday, 08 / 27 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 1
Pre DA 1.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 0.045 cfs
Storm frequency= 1 yrsTime to peak= 888 min
Time interval= 2 minHyd. volume= 1,222 cuft
Drainage area= 4.530 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.50 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (min)
Pre DA 1.1 (Outlet A)
Hyd. No. 1 -- 1 Year
Hyd No. 1
TR55 Tc Worksheet
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hyd. No. 1
Pre DA 1.1 (Outlet A)
Description A B C Totals
Sheet Flow
Manning's n-value= 0.1500.0110.011
Flow length (ft)= 50.00.00.0
Two-year 24-hr precip. (in)= 4.640.000.00
Land slope (%)= 0.800.000.00
Travel Time (min)=6.74+0.00+0.00=6.74
Shallow Concentrated Flow
Flow length (ft)= 33.000.000.00
Watercourse slope (%)= 2.270.000.00
Surface description= UnpavedPavedPaved
Average velocity (ft/s)=2.430.000.00
Travel Time (min)=0.23+0.00+0.00=0.23
Channel Flow
X sectional flow area (sqft)= 0.830.000.00
Wetted perimeter (ft)= 6.800.000.00
Channel slope (%)= 0.930.000.00
Manning's n-value= 0.0260.0150.015
Velocity (ft/s)=1.35
0.00
0.00
Flow length (ft)({0})852.00.00.0
Travel Time (min)=10.52+0.00+0.00=10.52
Total Travel Time, Tc ..............................................................................17.50 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 2
Pre DA 1.2
Hydrograph type= SCS RunoffPeak discharge= 0.043 cfs
Storm frequency= 1 yrsTime to peak= 878 min
Time interval= 2 minHyd. volume= 1,168 cuft
Drainage area= 4.620 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 6.40 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (min)
Pre DA 1.2
Hyd. No. 2 -- 1 Year
Hyd No. 2
TR55 Tc Worksheet
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hyd. No. 2
Pre DA 1.2
Description A B C Totals
Sheet Flow
Manning's n-value= 0.1500.0110.011
Flow length (ft)= 50.00.00.0
Two-year 24-hr precip. (in)= 4.640.000.00
Land slope (%)= 1.280.000.00
Travel Time (min)=5.59+0.00+0.00=5.59
Shallow Concentrated Flow
Flow length (ft)= 76.000.000.00
Watercourse slope (%)= 1.890.000.00
Surface description= UnpavedPavedPaved
Average velocity (ft/s)=2.220.000.00
Travel Time (min)=0.57+0.00+0.00=0.57
Channel Flow
X sectional flow area (sqft)= 13.560.000.00
Wetted perimeter (ft)= 1.000.000.00
Channel slope (%)= 1.940.000.00
Manning's n-value= 0.0260.0150.015
Velocity (ft/s)=45.79
0.00
0.00
Flow length (ft)({0})567.00.00.0
Travel Time (min)=0.21+0.00+0.00=0.21
Total Travel Time, Tc ..............................................................................6.40 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 3
Pre DA 1.3 (Outlet C)
Hydrograph type= SCS RunoffPeak discharge= 2.775 cfs
Storm frequency= 1 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 18,991 cuft
Drainage area= 15.470 ac Curve number= 61*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.90 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Pre DA 1.3 (Outlet C)
Hyd. No. 3 -- 1 Year
Hyd No. 3
TR55 Tc Worksheet
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hyd. No. 3
Pre DA 1.3 (Outlet C)
Description A B C Totals
Sheet Flow
Manning's n-value= 0.1500.0110.011
Flow length (ft)= 50.00.00.0
Two-year 24-hr precip. (in)= 4.640.000.00
Land slope (%)= 0.500.000.00
Travel Time (min)=8.14+0.00+0.00=8.14
Shallow Concentrated Flow
Flow length (ft)= 0.000.000.00
Watercourse slope (%)= 0.000.000.00
Surface description= PavedPavedPaved
Average velocity (ft/s)=0.000.000.00
Travel Time (min)=0.00+0.00+0.00=0.00
Channel Flow
X sectional flow area (sqft)= 1.5012.440.00
Wetted perimeter (ft)= 2.404.000.00
Channel slope (%)= 0.900.510.00
Manning's n-value= 0.0260.0260.015
Velocity (ft/s)=3.97
8.75
0.00
Flow length (ft)({0})708.0920.00.0
Travel Time (min)=2.97+1.75+0.00=4.73
Total Travel Time, Tc ..............................................................................12.90 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 4
Pre DA 1.4
Hydrograph type= SCS RunoffPeak discharge= 0.281 cfs
Storm frequency= 1 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 2,064 cuft
Drainage area= 1.850 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Pre DA 1.4
Hyd. No. 4 -- 1 Year
Hyd No. 4
TR55 Tc Worksheet
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hyd. No. 4
Pre DA 1.4
Description A B C Totals
Sheet Flow
Manning's n-value= 0.1500.0110.011
Flow length (ft)= 50.00.00.0
Two-year 24-hr precip. (in)= 4.640.000.00
Land slope (%)= 0.400.000.00
Travel Time (min)=8.90+0.00+0.00=8.90
Shallow Concentrated Flow
Flow length (ft)= 240.000.000.00
Watercourse slope (%)= 0.830.000.00
Surface description= UnpavedPavedPaved
Average velocity (ft/s)=1.470.000.00
Travel Time (min)=2.72+0.00+0.00=2.72
Channel Flow
X sectional flow area (sqft)= 12.600.000.00
Wetted perimeter (ft)= 12.000.000.00
Channel slope (%)= 2.360.000.00
Manning's n-value= 0.0260.0150.015
Velocity (ft/s)=9.10
0.00
0.00
Flow length (ft)({0})360.00.00.0
Travel Time (min)=0.66+0.00+0.00=0.66
Total Travel Time, Tc ..............................................................................12.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 6
Pre-Dev Outlet B
Hydrograph type= CombinePeak discharge= 0.281 cfs
Storm frequency= 1 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 3,233 cuft
Inflow hyds.= 2, 4Contrib. drain. area= 6.470 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Pre-Dev Outlet B
Hyd. No. 6 -- 1 Year
Hyd No. 6 Hyd No. 2 Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 7
Pre-Dev TOTAL OUT
Hydrograph type= CombinePeak discharge= 3.056 cfs
Storm frequency= 1 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 23,446 cuft
Inflow hyds.= 1, 3, 6Contrib. drain. area= 20.000 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Pre-Dev TOTAL OUT
Hyd. No. 7 -- 1 Year
Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 9
Post DA 2.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 0.341 cfs
Storm frequency= 1 yrsTime to peak= 746 min
Time interval= 2 minHyd. volume= 2,684 cuft
Drainage area= 2.480 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.40 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.820 x 98) + (1.660 x 61)] / 2.480
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Post DA 2.1 (Outlet A)
Hyd. No. 9 -- 1 Year
Hyd No. 9
TR55 Tc Worksheet
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hyd. No. 9
Post DA 2.1 (Outlet A)
Description A B C Totals
Sheet Flow
Manning's n-value= 0.1500.0110.011
Flow length (ft)= 50.00.00.0
Two-year 24-hr precip. (in)= 4.640.000.00
Land slope (%)= 0.800.000.00
Travel Time (min)=6.74+0.00+0.00=6.74
Shallow Concentrated Flow
Flow length (ft)= 33.000.000.00
Watercourse slope (%)= 2.270.000.00
Surface description= PavedPavedPaved
Average velocity (ft/s)=3.060.000.00
Travel Time (min)=0.18+0.00+0.00=0.18
Channel Flow
X sectional flow area (sqft)= 0.830.000.00
Wetted perimeter (ft)= 6.800.000.00
Channel slope (%)= 0.930.000.00
Manning's n-value= 0.0260.0150.015
Velocity (ft/s)=1.35
0.00
0.00
Flow length (ft)({0})852.00.00.0
Travel Time (min)=10.52+0.00+0.00=10.52
Total Travel Time, Tc ..............................................................................17.40 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 10
Post DA 2.2
Hydrograph type= SCS RunoffPeak discharge= 5.020 cfs
Storm frequency= 1 yrsTime to peak= 724 min
Time interval= 2 minHyd. volume= 15,781 cuft
Drainage area= 4.890 ac Curve number= 76*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
Post DA 2.2
Hyd. No. 10 -- 1 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 11
Post DA 2.3A
Hydrograph type= SCS RunoffPeak discharge= 4.822 cfs
Storm frequency= 1 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 20,643 cuft
Drainage area= 7.360 ac Curve number= 72*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 12.90 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(9.400 x 98) + (2.000 x 39) + (7.120 x 61) + (0.280 x 74)] / 7.360
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Post DA 2.3A
Hyd. No. 11 -- 1 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 12
Post DA 2.3B
Hydrograph type= SCS RunoffPeak discharge= 19.10 cfs
Storm frequency= 1 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 38,244 cuft
Drainage area= 9.560 acCurve number= 80
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 2.90 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
Post DA 2.3B
Hyd. No. 12 -- 1 Year
Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 13
Post DA 2.3C
Hydrograph type= SCS RunoffPeak discharge= 0.428 cfs
Storm frequency= 1 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 930 cuft
Drainage area= 0.510 acCurve number= 67
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 2.90 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Post DA 2.3C
Hyd. No. 13 -- 1 Year
Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 14
Post DA 2.4
Hydrograph type= SCS RunoffPeak discharge= 0.425 cfs
Storm frequency= 1 yrsTime to peak= 736 min
Time interval= 2 minHyd. volume= 2,716 cuft
Drainage area= 2.020 ac Curve number= 62*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 2.90 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Post DA 2.4
Hyd. No. 14 -- 1 Year
Hyd No. 14
TR55 Tc Worksheet
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hyd. No. 14
Post DA 2.4
Description A B C Totals
Sheet Flow
Manning's n-value= 0.1500.0110.011
Flow length (ft)= 50.00.00.0
Two-year 24-hr precip. (in)= 4.640.000.00
Land slope (%)= 0.400.000.00
Travel Time (min)=8.90+0.00+0.00=8.90
Shallow Concentrated Flow
Flow length (ft)= 240.000.000.00
Watercourse slope (%)= 0.830.000.00
Surface description= UnpavedPavedPaved
Average velocity (ft/s)=1.470.000.00
Travel Time (min)=2.72+0.00+0.00=2.72
Channel Flow
X sectional flow area (sqft)= 12.600.000.00
Wetted perimeter (ft)= 12.000.000.00
Channel slope (%)= 2.360.000.00
Manning's n-value= 0.0260.0150.015
Velocity (ft/s)=9.10
0.00
0.00
Flow length (ft)({0})360.00.00.0
Travel Time (min)=0.66+0.00+0.00=0.66
Total Travel Time, Tc ..............................................................................12.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 16
DRY POND - WEST
Hydrograph type= ReservoirPeak discharge= 0.070 cfs
Storm frequency= 1 yrsTime to peak= 1440 min
Time interval= 2 minHyd. volume= 15,780 cuft
Inflow hyd. No.= 10 - Post DA 2.2Max. Elevation= 17.43 ft
Reservoir name= Dry Pond - WESTMax. Storage= 12,707 cuft
Storage Indication method used.
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
DRY POND - WEST
Hyd. No. 16 -- 1 Year
Hyd No. 16 Hyd No. 10 Total storage used = 12,707 cuft
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Pond No. 1 - Dry Pond - WEST
Pond Data
Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 14.50 ft
Stage / Storage Table
Stage (ft)Elevation (ft)Contour area (sqft)Incr. Storage (cuft)Total storage (cuft)
0.0014.500000
0.5015.001363434
1.5016.002,5961,3661,400
2.5017.0010,1086,3527,752
3.5018.0012,88211,49519,2474.5019.0015,81914,35133,598
5.5020.0018,92117,37050,968
6.0020.5015,0718,49859,466
Culvert / Orifice StructuresWeir Structures
[A][B][C][PrfRsr][A][B][C][D]
Rise (in)= 15.001.254.000.00
Span (in)= 15.001.2536.000.00
No. Barrels = 1110
Invert El. (ft)= 14.3514.5017.700.00
Length (ft)= 60.005.005.000.00
Slope (%)= 0.251.001.00n/a
N-Value = .013.013.013n/a
Orifice Coeff.= 0.600.600.600.60
Multi-Stage = n/aYesYesNo
Crest Len (ft)= 16.0015.00Inactive0.00
Crest El. (ft)= 18.5019.000.000.00
Weir Coeff.= 3.332.603.333.33
Weir Type = 1BroadRect---
Multi-Stage = YesNoNoNo
Exfil.(in/hr)= 0.000(by Contour)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
0.00 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 80.00 88.00
Stage (ft)
0.00 14.50
1.00 15.50
2.00 16.50
3.00 17.50
4.00 18.50
5.00 19.50
6.00 20.50
Elev (ft)
Discharge (cfs)
Stage / Discharge
Total Q
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 17
Post Inflow to East Pond
Hydrograph type= CombinePeak discharge= 20.59 cfs
Storm frequency= 1 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 58,887 cuft
Inflow hyds.= 11, 12Contrib. drain. area= 16.920 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
Post Inflow to East Pond
Hyd. No. 17 -- 1 Year
Hyd No. 17 Hyd No. 11 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 18
DRY POND - EAST
Hydrograph type= ReservoirPeak discharge= 0.289 cfs
Storm frequency= 1 yrsTime to peak= 1442 min
Time interval= 2 minHyd. volume= 58,885 cuft
Inflow hyd. No.= 17 - Post Inflow to East PondMax. Elevation= 16.45 ft
Reservoir name= Dry Pond - EASTMax. Storage= 45,825 cuft
Storage Indication method used.
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
DRY POND - EAST
Hyd. No. 18 -- 1 Year
Hyd No. 18 Hyd No. 17 Total storage used = 45,825 cuft
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Pond No. 2 - Dry Pond - EAST
Pond Data
Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 13.25 ft
Stage / Storage Table
Stage (ft)Elevation (ft)Contour area (sqft)Incr. Storage (cuft)Total storage (cuft)
0.0013.250000
0.7514.00422158158
1.7515.0010,2665,3445,502
2.7516.0034,76822,51728,019
3.7517.0045,22539,99768,0164.7518.0051,88648,556116,571
5.7519.0057,01854,452171,023
6.7520.0056,69656,857227,880
Culvert / Orifice StructuresWeir Structures
[A][B][C][PrfRsr][A][B][C][D]
Rise (in)= 36.002.506.000.00
Span (in)= 36.002.5036.000.00
No. Barrels = 1130
Invert El. (ft)= 13.0513.2516.900.00
Length (ft)= 30.005.005.000.00
Slope (%)= 0.501.001.00n/a
N-Value = .013.013.013n/a
Orifice Coeff.= 0.600.600.600.60
Multi-Stage = n/aYesYesNo
Crest Len (ft)= 20.0050.00Inactive0.00
Crest El. (ft)= 18.0018.500.000.00
Weir Coeff.= 3.332.603.333.33
Weir Type = 1BroadRect---
Multi-Stage = YesNoNoNo
Exfil.(in/hr)= 0.000(by Contour)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 300.0 330.0
Stage (ft)
0.00 13.25
1.00 14.25
2.00 15.25
3.00 16.25
4.00 17.25
5.00 18.25
6.00 19.25
7.00 20.25
Elev (ft)
Discharge (cfs)
Stage / Discharge
Total Q
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 20
Post-Dev Outlet B (Detained)
Hydrograph type= CombinePeak discharge= 0.484 cfs
Storm frequency= 1 yrsTime to peak= 736 min
Time interval= 2 minHyd. volume= 18,495 cuft
Inflow hyds.= 14, 16Contrib. drain. area= 2.020 ac
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Post-Dev Outlet B (Detained)
Hyd. No. 20 -- 1 Year
Hyd No. 20 Hyd No. 14 Hyd No. 16
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 21
Post-Dev Outlet C (Detained)
Hydrograph type= CombinePeak discharge= 0.657 cfs
Storm frequency= 1 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 59,816 cuft
Inflow hyds.= 13, 18Contrib. drain. area= 0.510 ac
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Post-Dev Outlet C (Detained)
Hyd. No. 21 -- 1 Year
Hyd No. 21 Hyd No. 13 Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 22
Post Out Total (Detained)
Hydrograph type= CombinePeak discharge= 1.098 cfs
Storm frequency= 1 yrsTime to peak= 740 min
Time interval= 2 minHyd. volume= 80,995 cuft
Inflow hyds.= 9, 20, 21Contrib. drain. area= 2.480 ac
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
Post Out Total (Detained)
Hyd. No. 22 -- 1 Year
Hyd No. 22 Hyd No. 9 Hyd No. 20 Hyd No. 21
Hydrograph Summary Report
Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph
No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription
(origin)(cfs)(min)(min)(cuft)(ft)(cuft)
1SCS Runoff0.23427543,216------------------Pre DA 1.1 (Outlet A)
2SCS Runoff0.26527423,075------------------Pre DA 1.2
3SCS Runoff6.294273233,167------------------Pre DA 1.3 (Outlet C)
4SCS Runoff0.66427343,680------------------Pre DA 1.4
6Combine0.87027366,7552, 4,------------Pre-Dev Outlet B
7Combine7.121273443,1391, 3, 6------------Pre-Dev TOTAL OUT
9SCS Runoff0.77627404,784------------------Post DA 2.1 (Outlet A)
10SCS Runoff7.440272422,721------------------Post DA 2.2
11SCS Runoff7.613273030,883------------------Post DA 2.3A
12SCS Runoff26.40271853,237------------------Post DA 2.3B
13SCS Runoff0.71827181,475------------------Post DA 2.3C
14SCS Runoff0.92227324,654------------------Post DA 2.4
16Reservoir0.2552100222,4651017.7616,447DRY POND - WEST
17Combine29.17271884,12011, 12,------------Post Inflow to East Pond
18Reservoir0.5902117284,1191716.9365,177DRY POND - EAST
20Combine0.986273227,11914, 16,------------Post-Dev Outlet B (Detained)
21Combine0.965271885,59413, 18,------------Post-Dev Outlet C (Detained)
22Combine2.0562736117,4979, 20, 21------------Post Out Total (Detained)
37630.054 - Hydraflow - 2020.08.26-SJB.gpwReturn Period: 2 Year Thursday, 08 / 27 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 1
Pre DA 1.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 0.234 cfs
Storm frequency= 2 yrsTime to peak= 754 min
Time interval= 2 minHyd. volume= 3,216 cuft
Drainage area= 4.530 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.50 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Pre DA 1.1 (Outlet A)
Hyd. No. 1 -- 2 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 2
Pre DA 1.2
Hydrograph type= SCS RunoffPeak discharge= 0.265 cfs
Storm frequency= 2 yrsTime to peak= 742 min
Time interval= 2 minHyd. volume= 3,075 cuft
Drainage area= 4.620 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 6.40 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Pre DA 1.2
Hyd. No. 2 -- 2 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 3
Pre DA 1.3 (Outlet C)
Hydrograph type= SCS RunoffPeak discharge= 6.294 cfs
Storm frequency= 2 yrsTime to peak= 732 min
Time interval= 2 minHyd. volume= 33,167 cuft
Drainage area= 15.470 ac Curve number= 61*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.90 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
7.00 7.00
Q (cfs)
Time (min)
Pre DA 1.3 (Outlet C)
Hyd. No. 3 -- 2 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 4
Pre DA 1.4
Hydrograph type= SCS RunoffPeak discharge= 0.664 cfs
Storm frequency= 2 yrsTime to peak= 734 min
Time interval= 2 minHyd. volume= 3,680 cuft
Drainage area= 1.850 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Pre DA 1.4
Hyd. No. 4 -- 2 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 6
Pre-Dev Outlet B
Hydrograph type= CombinePeak discharge= 0.870 cfs
Storm frequency= 2 yrsTime to peak= 736 min
Time interval= 2 minHyd. volume= 6,755 cuft
Inflow hyds.= 2, 4Contrib. drain. area= 6.470 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Pre-Dev Outlet B
Hyd. No. 6 -- 2 Year
Hyd No. 6 Hyd No. 2 Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 7
Pre-Dev TOTAL OUT
Hydrograph type= CombinePeak discharge= 7.121 cfs
Storm frequency= 2 yrsTime to peak= 734 min
Time interval= 2 minHyd. volume= 43,139 cuft
Inflow hyds.= 1, 3, 6Contrib. drain. area= 20.000 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Pre-Dev TOTAL OUT
Hyd. No. 7 -- 2 Year
Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 9
Post DA 2.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 0.776 cfs
Storm frequency= 2 yrsTime to peak= 740 min
Time interval= 2 minHyd. volume= 4,784 cuft
Drainage area= 2.480 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.40 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.820 x 98) + (1.660 x 61)] / 2.480
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Post DA 2.1 (Outlet A)
Hyd. No. 9 -- 2 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 10
Post DA 2.2
Hydrograph type= SCS RunoffPeak discharge= 7.440 cfs
Storm frequency= 2 yrsTime to peak= 724 min
Time interval= 2 minHyd. volume= 22,721 cuft
Drainage area= 4.890 ac Curve number= 76*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Post DA 2.2
Hyd. No. 10 -- 2 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 11
Post DA 2.3A
Hydrograph type= SCS RunoffPeak discharge= 7.613 cfs
Storm frequency= 2 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 30,883 cuft
Drainage area= 7.360 ac Curve number= 72*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 12.90 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(9.400 x 98) + (2.000 x 39) + (7.120 x 61) + (0.280 x 74)] / 7.360
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Post DA 2.3A
Hyd. No. 11 -- 2 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 12
Post DA 2.3B
Hydrograph type= SCS RunoffPeak discharge= 26.40 cfs
Storm frequency= 2 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 53,237 cuft
Drainage area= 9.560 acCurve number= 80
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 3.50 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Post DA 2.3B
Hyd. No. 12 -- 2 Year
Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 13
Post DA 2.3C
Hydrograph type= SCS RunoffPeak discharge= 0.718 cfs
Storm frequency= 2 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 1,475 cuft
Drainage area= 0.510 acCurve number= 67
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 3.50 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Post DA 2.3C
Hyd. No. 13 -- 2 Year
Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 14
Post DA 2.4
Hydrograph type= SCS RunoffPeak discharge= 0.922 cfs
Storm frequency= 2 yrsTime to peak= 732 min
Time interval= 2 minHyd. volume= 4,654 cuft
Drainage area= 2.020 ac Curve number= 62*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 3.50 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Post DA 2.4
Hyd. No. 14 -- 2 Year
Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 16
DRY POND - WEST
Hydrograph type= ReservoirPeak discharge= 0.255 cfs
Storm frequency= 2 yrsTime to peak= 1002 min
Time interval= 2 minHyd. volume= 22,465 cuft
Inflow hyd. No.= 10 - Post DA 2.2Max. Elevation= 17.76 ft
Reservoir name= Dry Pond - WESTMax. Storage= 16,447 cuft
Storage Indication method used.
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
DRY POND - WEST
Hyd. No. 16 -- 2 Year
Hyd No. 16 Hyd No. 10 Total storage used = 16,447 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 17
Post Inflow to East Pond
Hydrograph type= CombinePeak discharge= 29.17 cfs
Storm frequency= 2 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 84,120 cuft
Inflow hyds.= 11, 12Contrib. drain. area= 16.920 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
Post Inflow to East Pond
Hyd. No. 17 -- 2 Year
Hyd No. 17 Hyd No. 11 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 18
DRY POND - EAST
Hydrograph type= ReservoirPeak discharge= 0.590 cfs
Storm frequency= 2 yrsTime to peak= 1172 min
Time interval= 2 minHyd. volume= 84,119 cuft
Inflow hyd. No.= 17 - Post Inflow to East PondMax. Elevation= 16.93 ft
Reservoir name= Dry Pond - EASTMax. Storage= 65,177 cuft
Storage Indication method used.
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
DRY POND - EAST
Hyd. No. 18 -- 2 Year
Hyd No. 18 Hyd No. 17 Total storage used = 65,177 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 20
Post-Dev Outlet B (Detained)
Hydrograph type= CombinePeak discharge= 0.986 cfs
Storm frequency= 2 yrsTime to peak= 732 min
Time interval= 2 minHyd. volume= 27,119 cuft
Inflow hyds.= 14, 16Contrib. drain. area= 2.020 ac
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Post-Dev Outlet B (Detained)
Hyd. No. 20 -- 2 Year
Hyd No. 20 Hyd No. 14 Hyd No. 16
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 21
Post-Dev Outlet C (Detained)
Hydrograph type= CombinePeak discharge= 0.965 cfs
Storm frequency= 2 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 85,594 cuft
Inflow hyds.= 13, 18Contrib. drain. area= 0.510 ac
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Post-Dev Outlet C (Detained)
Hyd. No. 21 -- 2 Year
Hyd No. 21 Hyd No. 13 Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 22
Post Out Total (Detained)
Hydrograph type= CombinePeak discharge= 2.056 cfs
Storm frequency= 2 yrsTime to peak= 736 min
Time interval= 2 minHyd. volume= 117,497 cuft
Inflow hyds.= 9, 20, 21Contrib. drain. area= 2.480 ac
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post Out Total (Detained)
Hyd. No. 22 -- 2 Year
Hyd No. 22 Hyd No. 9 Hyd No. 20 Hyd No. 21
Hydrograph Summary Report
Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph
No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription
(origin)(cfs)(min)(min)(cuft)(ft)(cuft)
1SCS Runoff2.062274012,826------------------Pre DA 1.1 (Outlet A)
2SCS Runoff2.780272612,264------------------Pre DA 1.2
3SCS Runoff20.86273086,687------------------Pre DA 1.3 (Outlet C)
4SCS Runoff2.34527309,871------------------Pre DA 1.4
6Combine4.848272622,1352, 4,------------Pre-Dev Outlet B
7Combine26.792730121,6491, 3, 6------------Pre-Dev TOTAL OUT
9SCS Runoff2.641273612,832------------------Post DA 2.1 (Outlet A)
10SCS Runoff15.08272445,090------------------Post DA 2.2
11SCS Runoff16.76272865,044------------------Post DA 2.3A
12SCS Runoff49.122716100,102------------------Post DA 2.3B
13SCS Runoff1.69327183,386------------------Post DA 2.3C
14SCS Runoff2.888273011,869------------------Post DA 2.4
16Reservoir2.569275244,7721018.1421,247DRY POND - WEST
17Combine55.502718165,14611, 12,------------Post Inflow to East Pond
18Reservoir8.1432756165,1431717.3082,766DRY POND - EAST
20Combine4.156273856,64114, 16,------------Post-Dev Outlet B (Detained)
21Combine8.2742754168,52813, 18,------------Post-Dev Outlet C (Detained)
22Combine13.792748238,0029, 20, 21------------Post Out Total (Detained)
37630.054 - Hydraflow - 2020.08.26-SJB.gpwReturn Period: 10 YearThursday, 08 / 27 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 1
Pre DA 1.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 2.062 cfs
Storm frequency= 10 yrsTime to peak= 740 min
Time interval= 2 minHyd. volume= 12,826 cuft
Drainage area= 4.530 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.50 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Pre DA 1.1 (Outlet A)
Hyd. No. 1 -- 10 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 2
Pre DA 1.2
Hydrograph type= SCS RunoffPeak discharge= 2.780 cfs
Storm frequency= 10 yrsTime to peak= 726 min
Time interval= 2 minHyd. volume= 12,264 cuft
Drainage area= 4.620 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 6.40 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Pre DA 1.2
Hyd. No. 2 -- 10 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 3
Pre DA 1.3 (Outlet C)
Hydrograph type= SCS RunoffPeak discharge= 20.86 cfs
Storm frequency= 10 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 86,687 cuft
Drainage area= 15.470 ac Curve number= 61*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.90 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
Pre DA 1.3 (Outlet C)
Hyd. No. 3 -- 10 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 4
Pre DA 1.4
Hydrograph type= SCS RunoffPeak discharge= 2.345 cfs
Storm frequency= 10 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 9,871 cuft
Drainage area= 1.850 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Pre DA 1.4
Hyd. No. 4 -- 10 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 6
Pre-Dev Outlet B
Hydrograph type= CombinePeak discharge= 4.848 cfs
Storm frequency= 10 yrsTime to peak= 726 min
Time interval= 2 minHyd. volume= 22,135 cuft
Inflow hyds.= 2, 4Contrib. drain. area= 6.470 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Pre-Dev Outlet B
Hyd. No. 6 -- 10 Year
Hyd No. 6 Hyd No. 2 Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 7
Pre-Dev TOTAL OUT
Hydrograph type= CombinePeak discharge= 26.79 cfs
Storm frequency= 10 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 121,649 cuft
Inflow hyds.= 1, 3, 6Contrib. drain. area= 20.000 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Pre-Dev TOTAL OUT
Hyd. No. 7 -- 10 Year
Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 9
Post DA 2.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 2.641 cfs
Storm frequency= 10 yrsTime to peak= 736 min
Time interval= 2 minHyd. volume= 12,832 cuft
Drainage area= 2.480 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.40 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.820 x 98) + (1.660 x 61)] / 2.480
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post DA 2.1 (Outlet A)
Hyd. No. 9 -- 10 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 10
Post DA 2.2
Hydrograph type= SCS RunoffPeak discharge= 15.08 cfs
Storm frequency= 10 yrsTime to peak= 724 min
Time interval= 2 minHyd. volume= 45,090 cuft
Drainage area= 4.890 ac Curve number= 76*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
Post DA 2.2
Hyd. No. 10 -- 10 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 11
Post DA 2.3A
Hydrograph type= SCS RunoffPeak discharge= 16.76 cfs
Storm frequency= 10 yrsTime to peak= 728 min
Time interval= 2 minHyd. volume= 65,044 cuft
Drainage area= 7.360 ac Curve number= 72*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 12.90 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(9.400 x 98) + (2.000 x 39) + (7.120 x 61) + (0.280 x 74)] / 7.360
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
Post DA 2.3A
Hyd. No. 11 -- 10 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 12
Post DA 2.3B
Hydrograph type= SCS RunoffPeak discharge= 49.12 cfs
Storm frequency= 10 yrsTime to peak= 716 min
Time interval= 2 minHyd. volume= 100,102 cuft
Drainage area= 9.560 acCurve number= 80
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 5.21 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Post DA 2.3B
Hyd. No. 12 -- 10 Year
Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 13
Post DA 2.3C
Hydrograph type= SCS RunoffPeak discharge= 1.693 cfs
Storm frequency= 10 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 3,386 cuft
Drainage area= 0.510 acCurve number= 67
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 5.21 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
Post DA 2.3C
Hyd. No. 13 -- 10 Year
Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 14
Post DA 2.4
Hydrograph type= SCS RunoffPeak discharge= 2.888 cfs
Storm frequency= 10 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 11,869 cuft
Drainage area= 2.020 ac Curve number= 62*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 5.21 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post DA 2.4
Hyd. No. 14 -- 10 Year
Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 16
DRY POND - WEST
Hydrograph type= ReservoirPeak discharge= 2.569 cfs
Storm frequency= 10 yrsTime to peak= 752 min
Time interval= 2 minHyd. volume= 44,772 cuft
Inflow hyd. No.= 10 - Post DA 2.2Max. Elevation= 18.14 ft
Reservoir name= Dry Pond - WESTMax. Storage= 21,247 cuft
Storage Indication method used.
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
DRY POND - WEST
Hyd. No. 16 -- 10 Year
Hyd No. 16 Hyd No. 10 Total storage used = 21,247 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 17
Post Inflow to East Pond
Hydrograph type= CombinePeak discharge= 55.50 cfs
Storm frequency= 10 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 165,146 cuft
Inflow hyds.= 11, 12Contrib. drain. area= 16.920 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Post Inflow to East Pond
Hyd. No. 17 -- 10 Year
Hyd No. 17 Hyd No. 11 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 18
DRY POND - EAST
Hydrograph type= ReservoirPeak discharge= 8.143 cfs
Storm frequency= 10 yrsTime to peak= 756 min
Time interval= 2 minHyd. volume= 165,143 cuft
Inflow hyd. No.= 17 - Post Inflow to East PondMax. Elevation= 17.30 ft
Reservoir name= Dry Pond - EASTMax. Storage= 82,766 cuft
Storage Indication method used.
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
DRY POND - EAST
Hyd. No. 18 -- 10 Year
Hyd No. 18 Hyd No. 17 Total storage used = 82,766 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 20
Post-Dev Outlet B (Detained)
Hydrograph type= CombinePeak discharge= 4.156 cfs
Storm frequency= 10 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 56,641 cuft
Inflow hyds.= 14, 16Contrib. drain. area= 2.020 ac
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Post-Dev Outlet B (Detained)
Hyd. No. 20 -- 10 Year
Hyd No. 20 Hyd No. 14 Hyd No. 16
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 21
Post-Dev Outlet C (Detained)
Hydrograph type= CombinePeak discharge= 8.274 cfs
Storm frequency= 10 yrsTime to peak= 754 min
Time interval= 2 minHyd. volume= 168,528 cuft
Inflow hyds.= 13, 18Contrib. drain. area= 0.510 ac
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
Q (cfs)
Time (min)
Post-Dev Outlet C (Detained)
Hyd. No. 21 -- 10 Year
Hyd No. 21 Hyd No. 13 Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 22
Post Out Total (Detained)
Hydrograph type= CombinePeak discharge= 13.79 cfs
Storm frequency= 10 yrsTime to peak= 748 min
Time interval= 2 minHyd. volume= 238,002 cuft
Inflow hyds.= 9, 20, 21Contrib. drain. area= 2.480 ac
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
14.00 14.00
Q (cfs)
Time (min)
Post Out Total (Detained)
Hyd. No. 22 -- 10 Year
Hyd No. 22 Hyd No. 9 Hyd No. 20 Hyd No. 21
Hydrograph Summary Report
Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph
No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription
(origin)(cfs)(min)(min)(cuft)(ft)(cuft)
1SCS Runoff3.784273820,427------------------Pre DA 1.1 (Outlet A)
2SCS Runoff5.229272419,531------------------Pre DA 1.2
3SCS Runoff30.972730123,959------------------Pre DA 1.3 (Outlet C)
4SCS Runoff3.528273014,222------------------Pre DA 1.4
6Combine8.389272633,7532, 4,------------Pre-Dev Outlet B
7Combine41.352730178,1391, 3, 6------------Pre-Dev TOTAL OUT
9SCS Runoff3.978273418,487------------------Post DA 2.1 (Outlet A)
10SCS Runoff19.77272459,132------------------Post DA 2.2
11SCS Runoff22.62272886,996------------------Post DA 2.3A
12SCS Runoff62.692716128,906------------------Post DA 2.3B
13SCS Runoff2.31927184,655------------------Post DA 2.3C
14SCS Runoff4.237273016,851------------------Post DA 2.4
16Reservoir4.311274858,7881018.5226,723DRY POND - WEST
17Combine71.392718215,90211, 12,------------Post Inflow to East Pond
18Reservoir15.212748215,8951717.6398,549DRY POND - EAST
20Combine7.337273275,63814, 16,------------Post-Dev Outlet B (Detained)
21Combine15.442746220,55013, 18,------------Post-Dev Outlet C (Detained)
22Combine25.592738314,6769, 20, 21------------Post Out Total (Detained)
37630.054 - Hydraflow - 2020.08.26-SJB.gpwReturn Period: 25 YearThursday, 08 / 27 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 1
Pre DA 1.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 3.784 cfs
Storm frequency= 25 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 20,427 cuft
Drainage area= 4.530 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.50 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Pre DA 1.1 (Outlet A)
Hyd. No. 1 -- 25 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 2
Pre DA 1.2
Hydrograph type= SCS RunoffPeak discharge= 5.229 cfs
Storm frequency= 25 yrsTime to peak= 724 min
Time interval= 2 minHyd. volume= 19,531 cuft
Drainage area= 4.620 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 6.40 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
Pre DA 1.2
Hyd. No. 2 -- 25 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 3
Pre DA 1.3 (Outlet C)
Hydrograph type= SCS RunoffPeak discharge= 30.97 cfs
Storm frequency= 25 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 123,959 cuft
Drainage area= 15.470 ac Curve number= 61*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.90 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Pre DA 1.3 (Outlet C)
Hyd. No. 3 -- 25 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 4
Pre DA 1.4
Hydrograph type= SCS RunoffPeak discharge= 3.528 cfs
Storm frequency= 25 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 14,222 cuft
Drainage area= 1.850 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Pre DA 1.4
Hyd. No. 4 -- 25 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 6
Pre-Dev Outlet B
Hydrograph type= CombinePeak discharge= 8.389 cfs
Storm frequency= 25 yrsTime to peak= 726 min
Time interval= 2 minHyd. volume= 33,753 cuft
Inflow hyds.= 2, 4Contrib. drain. area= 6.470 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
Q (cfs)
Time (min)
Pre-Dev Outlet B
Hyd. No. 6 -- 25 Year
Hyd No. 6 Hyd No. 2 Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 7
Pre-Dev TOTAL OUT
Hydrograph type= CombinePeak discharge= 41.35 cfs
Storm frequency= 25 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 178,139 cuft
Inflow hyds.= 1, 3, 6Contrib. drain. area= 20.000 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Pre-Dev TOTAL OUT
Hyd. No. 7 -- 25 Year
Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 9
Post DA 2.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 3.978 cfs
Storm frequency= 25 yrsTime to peak= 734 min
Time interval= 2 minHyd. volume= 18,487 cuft
Drainage area= 2.480 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.40 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.820 x 98) + (1.660 x 61)] / 2.480
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Post DA 2.1 (Outlet A)
Hyd. No. 9 -- 25 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 10
Post DA 2.2
Hydrograph type= SCS RunoffPeak discharge= 19.77 cfs
Storm frequency= 25 yrsTime to peak= 724 min
Time interval= 2 minHyd. volume= 59,132 cuft
Drainage area= 4.890 ac Curve number= 76*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
Post DA 2.2
Hyd. No. 10 -- 25 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 11
Post DA 2.3A
Hydrograph type= SCS RunoffPeak discharge= 22.62 cfs
Storm frequency= 25 yrsTime to peak= 728 min
Time interval= 2 minHyd. volume= 86,996 cuft
Drainage area= 7.360 ac Curve number= 72*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 12.90 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(9.400 x 98) + (2.000 x 39) + (7.120 x 61) + (0.280 x 74)] / 7.360
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
Q (cfs)
Time (min)
Post DA 2.3A
Hyd. No. 11 -- 25 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 12
Post DA 2.3B
Hydrograph type= SCS RunoffPeak discharge= 62.69 cfs
Storm frequency= 25 yrsTime to peak= 716 min
Time interval= 2 minHyd. volume= 128,906 cuft
Drainage area= 9.560 acCurve number= 80
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 6.20 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Post DA 2.3B
Hyd. No. 12 -- 25 Year
Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 13
Post DA 2.3C
Hydrograph type= SCS RunoffPeak discharge= 2.319 cfs
Storm frequency= 25 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 4,655 cuft
Drainage area= 0.510 acCurve number= 67
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 6.20 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post DA 2.3C
Hyd. No. 13 -- 25 Year
Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 14
Post DA 2.4
Hydrograph type= SCS RunoffPeak discharge= 4.237 cfs
Storm frequency= 25 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 16,851 cuft
Drainage area= 2.020 ac Curve number= 62*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 6.20 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Post DA 2.4
Hyd. No. 14 -- 25 Year
Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 16
DRY POND - WEST
Hydrograph type= ReservoirPeak discharge= 4.311 cfs
Storm frequency= 25 yrsTime to peak= 748 min
Time interval= 2 minHyd. volume= 58,788 cuft
Inflow hyd. No.= 10 - Post DA 2.2Max. Elevation= 18.52 ft
Reservoir name= Dry Pond - WESTMax. Storage= 26,723 cuft
Storage Indication method used.
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
DRY POND - WEST
Hyd. No. 16 -- 25 Year
Hyd No. 16 Hyd No. 10 Total storage used = 26,723 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 17
Post Inflow to East Pond
Hydrograph type= CombinePeak discharge= 71.39 cfs
Storm frequency= 25 yrsTime to peak= 718 min
Time interval= 2 minHyd. volume= 215,902 cuft
Inflow hyds.= 11, 12Contrib. drain. area= 16.920 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Post Inflow to East Pond
Hyd. No. 17 -- 25 Year
Hyd No. 17 Hyd No. 11 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 18
DRY POND - EAST
Hydrograph type= ReservoirPeak discharge= 15.21 cfs
Storm frequency= 25 yrsTime to peak= 748 min
Time interval= 2 minHyd. volume= 215,895 cuft
Inflow hyd. No.= 17 - Post Inflow to East PondMax. Elevation= 17.63 ft
Reservoir name= Dry Pond - EASTMax. Storage= 98,549 cuft
Storage Indication method used.
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
DRY POND - EAST
Hyd. No. 18 -- 25 Year
Hyd No. 18 Hyd No. 17 Total storage used = 98,549 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 20
Post-Dev Outlet B (Detained)
Hydrograph type= CombinePeak discharge= 7.337 cfs
Storm frequency= 25 yrsTime to peak= 732 min
Time interval= 2 minHyd. volume= 75,638 cuft
Inflow hyds.= 14, 16Contrib. drain. area= 2.020 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Post-Dev Outlet B (Detained)
Hyd. No. 20 -- 25 Year
Hyd No. 20 Hyd No. 14 Hyd No. 16
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 21
Post-Dev Outlet C (Detained)
Hydrograph type= CombinePeak discharge= 15.44 cfs
Storm frequency= 25 yrsTime to peak= 746 min
Time interval= 2 minHyd. volume= 220,550 cuft
Inflow hyds.= 13, 18Contrib. drain. area= 0.510 ac
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
Post-Dev Outlet C (Detained)
Hyd. No. 21 -- 25 Year
Hyd No. 21 Hyd No. 13 Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 22
Post Out Total (Detained)
Hydrograph type= CombinePeak discharge= 25.59 cfs
Storm frequency= 25 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 314,676 cuft
Inflow hyds.= 9, 20, 21Contrib. drain. area= 2.480 ac
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Post Out Total (Detained)
Hyd. No. 22 -- 25 Year
Hyd No. 22 Hyd No. 9 Hyd No. 20 Hyd No. 21
Hydrograph Summary Report
Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph
No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription
(origin)(cfs)(min)(min)(cuft)(ft)(cuft)
1SCS Runoff7.549273636,499------------------Pre DA 1.1 (Outlet A)
2SCS Runoff10.68272434,897------------------Pre DA 1.2
3SCS Runoff50.612730197,279------------------Pre DA 1.3 (Outlet C)
4SCS Runoff5.838273022,825------------------Pre DA 1.4
6Combine15.62272657,7222, 4,------------Pre-Dev Outlet B
7Combine70.832728291,5001, 3, 6------------Pre-Dev TOTAL OUT
9SCS Runoff6.611273429,671------------------Post DA 2.1 (Outlet A)
10SCS Runoff28.25272485,077------------------Post DA 2.2
11SCS Runoff33.432728128,132------------------Post DA 2.3A
12SCS Runoff86.832716181,479------------------Post DA 2.3B
13SCS Runoff3.50427167,081------------------Post DA 2.3C
14SCS Runoff6.840273026,600------------------Post DA 2.4
16Reservoir10.71273884,6981018.9432,795DRY POND - WEST
17Combine100.262716309,61111, 12,------------Post Inflow to East Pond
18Reservoir31.672738309,5971718.26130,440DRY POND - EAST
20Combine17.392730111,29914, 16,------------Post-Dev Outlet B (Detained)
21Combine32.092738316,67813, 18,------------Post-Dev Outlet C (Detained)
22Combine54.512736457,6479, 20, 21------------Post Out Total (Detained)
37630.054 - Hydraflow - 2020.08.26-SJB.gpwReturn Period: 100 YearThursday, 08 / 27 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 1
Pre DA 1.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 7.549 cfs
Storm frequency= 100 yrsTime to peak= 736 min
Time interval= 2 minHyd. volume= 36,499 cuft
Drainage area= 4.530 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.50 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Pre DA 1.1 (Outlet A)
Hyd. No. 1 -- 100 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 2
Pre DA 1.2
Hydrograph type= SCS RunoffPeak discharge= 10.68 cfs
Storm frequency= 100 yrsTime to peak= 724 min
Time interval= 2 minHyd. volume= 34,897 cuft
Drainage area= 4.620 ac Curve number= 50*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 6.40 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
Q (cfs)
Time (min)
Pre DA 1.2
Hyd. No. 2 -- 100 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 3
Pre DA 1.3 (Outlet C)
Hydrograph type= SCS RunoffPeak discharge= 50.61 cfs
Storm frequency= 100 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 197,279 cuft
Drainage area= 15.470 ac Curve number= 61*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.90 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Pre DA 1.3 (Outlet C)
Hyd. No. 3 -- 100 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 4
Pre DA 1.4
Hydrograph type= SCS RunoffPeak discharge= 5.838 cfs
Storm frequency= 100 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 22,825 cuft
Drainage area= 1.850 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
Pre DA 1.4
Hyd. No. 4 -- 100 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 6
Pre-Dev Outlet B
Hydrograph type= CombinePeak discharge= 15.62 cfs
Storm frequency= 100 yrsTime to peak= 726 min
Time interval= 2 minHyd. volume= 57,722 cuft
Inflow hyds.= 2, 4Contrib. drain. area= 6.470 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
Pre-Dev Outlet B
Hyd. No. 6 -- 100 Year
Hyd No. 6 Hyd No. 2 Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 7
Pre-Dev TOTAL OUT
Hydrograph type= CombinePeak discharge= 70.83 cfs
Storm frequency= 100 yrsTime to peak= 728 min
Time interval= 2 minHyd. volume= 291,500 cuft
Inflow hyds.= 1, 3, 6Contrib. drain. area= 20.000 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Pre-Dev TOTAL OUT
Hyd. No. 7 -- 100 Year
Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 9
Post DA 2.1 (Outlet A)
Hydrograph type= SCS RunoffPeak discharge= 6.611 cfs
Storm frequency= 100 yrsTime to peak= 734 min
Time interval= 2 minHyd. volume= 29,671 cuft
Drainage area= 2.480 ac Curve number= 60*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 17.40 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.820 x 98) + (1.660 x 61)] / 2.480
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
7.00 7.00
Q (cfs)
Time (min)
Post DA 2.1 (Outlet A)
Hyd. No. 9 -- 100 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 10
Post DA 2.2
Hydrograph type= SCS RunoffPeak discharge= 28.25 cfs
Storm frequency= 100 yrsTime to peak= 724 min
Time interval= 2 minHyd. volume= 85,077 cuft
Drainage area= 4.890 ac Curve number= 76*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
Post DA 2.2
Hyd. No. 10 -- 100 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 11
Post DA 2.3A
Hydrograph type= SCS RunoffPeak discharge= 33.43 cfs
Storm frequency= 100 yrsTime to peak= 728 min
Time interval= 2 minHyd. volume= 128,132 cuft
Drainage area= 7.360 ac Curve number= 72*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 12.90 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(9.400 x 98) + (2.000 x 39) + (7.120 x 61) + (0.280 x 74)] / 7.360
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Post DA 2.3A
Hyd. No. 11 -- 100 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 12
Post DA 2.3B
Hydrograph type= SCS RunoffPeak discharge= 86.83 cfs
Storm frequency= 100 yrsTime to peak= 716 min
Time interval= 2 minHyd. volume= 181,479 cuft
Drainage area= 9.560 acCurve number= 80
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 7.95 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
Q (cfs)
Time (min)
Post DA 2.3B
Hyd. No. 12 -- 100 Year
Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 13
Post DA 2.3C
Hydrograph type= SCS RunoffPeak discharge= 3.504 cfs
Storm frequency= 100 yrsTime to peak= 716 min
Time interval= 2 minHyd. volume= 7,081 cuft
Drainage area= 0.510 acCurve number= 67
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 7.95 inDistribution= Type II
Storm duration= 24 hrsShape factor= 484
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Post DA 2.3C
Hyd. No. 13 -- 100 Year
Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 14
Post DA 2.4
Hydrograph type= SCS RunoffPeak discharge= 6.840 cfs
Storm frequency= 100 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 26,600 cuft
Drainage area= 2.020 ac Curve number= 62*
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= TR55Time of conc. (Tc)= 12.30 min
Total precip.= 7.95 inDistribution= Type III
Storm duration= 24 hrsShape factor= 484
* Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
7.00 7.00
Q (cfs)
Time (min)
Post DA 2.4
Hyd. No. 14 -- 100 Year
Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 16
DRY POND - WEST
Hydrograph type= ReservoirPeak discharge= 10.71 cfs
Storm frequency= 100 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 84,698 cuft
Inflow hyd. No.= 10 - Post DA 2.2Max. Elevation= 18.94 ft
Reservoir name= Dry Pond - WESTMax. Storage= 32,795 cuft
Storage Indication method used.
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
DRY POND - WEST
Hyd. No. 16 -- 100 Year
Hyd No. 16 Hyd No. 10 Total storage used = 32,795 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 17
Post Inflow to East Pond
Hydrograph type= CombinePeak discharge= 100.26 cfs
Storm frequency= 100 yrsTime to peak= 716 min
Time interval= 2 minHyd. volume= 309,611 cuft
Inflow hyds.= 11, 12Contrib. drain. area= 16.920 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
Q (cfs)
Time (min)
Post Inflow to East Pond
Hyd. No. 17 -- 100 Year
Hyd No. 17 Hyd No. 11 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 18
DRY POND - EAST
Hydrograph type= ReservoirPeak discharge= 31.67 cfs
Storm frequency= 100 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 309,597 cuft
Inflow hyd. No.= 17 - Post Inflow to East PondMax. Elevation= 18.26 ft
Reservoir name= Dry Pond - EASTMax. Storage= 130,440 cuft
Storage Indication method used.
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
Q (cfs)
Time (min)
DRY POND - EAST
Hyd. No. 18 -- 100 Year
Hyd No. 18 Hyd No. 17 Total storage used = 130,440 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 20
Post-Dev Outlet B (Detained)
Hydrograph type= CombinePeak discharge= 17.39 cfs
Storm frequency= 100 yrsTime to peak= 730 min
Time interval= 2 minHyd. volume= 111,299 cuft
Inflow hyds.= 14, 16Contrib. drain. area= 2.020 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
Post-Dev Outlet B (Detained)
Hyd. No. 20 -- 100 Year
Hyd No. 20 Hyd No. 14 Hyd No. 16
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 21
Post-Dev Outlet C (Detained)
Hydrograph type= CombinePeak discharge= 32.09 cfs
Storm frequency= 100 yrsTime to peak= 738 min
Time interval= 2 minHyd. volume= 316,678 cuft
Inflow hyds.= 13, 18Contrib. drain. area= 0.510 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Post-Dev Outlet C (Detained)
Hyd. No. 21 -- 100 Year
Hyd No. 21 Hyd No. 13 Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2Thursday, 08 / 27 / 2020
Hyd. No. 22
Post Out Total (Detained)
Hydrograph type= CombinePeak discharge= 54.51 cfs
Storm frequency= 100 yrsTime to peak= 736 min
Time interval= 2 minHyd. volume= 457,647 cuft
Inflow hyds.= 9, 20, 21Contrib. drain. area= 2.480 ac
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Post Out Total (Detained)
Hyd. No. 22 -- 100 Year
Hyd No. 22 Hyd No. 9 Hyd No. 20 Hyd No. 21
_________________________________________________________________________________________________________________
WATER QUALITY CALCULATIONS
Project: Circle K - Wilmington AirportProject No.: 37630.054
Calculated By: TKDDate: 08/26/2020
Dry Extended Detention Basin Design
1) Impervious Area
Impervious AreaAcres
Offsite Impervious Area 0.00
Onsite Impervious Area 1.60
Total Impervious Area 1.60
Total Drainage Area To BMP 4.89
Percent Impervious Area33%
2.A) Water Quality Runoff Volume Calculation (Required)
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(I)Where:Rv = Runoff Coefficient, in/in
I = Percent Impervious
I=33%
Rv =0.344
Runoff volume, S=(Design rainfall) (Rv) (Drainage Area)
Design Rainfall =1.5 inch
Drainage Area = 4.89 acres
Storage Required =9,172cu. ft.
* Must have forebay if storage required is over 10 acre-inches (36,300 c.f.)
Detention Volume Required9,172cu ft
25% Additonal Sed. Storage 11,465 cu ft (Minimum volume required at bottom of spillway)
2.B) Water Quality Runoff Volume Calculation (Provided)
Contour Elevation
Contour
Area
Incremental
Volume
Accumulated
VolumeStage, Z
sq ftcu ftcu ftft
14.500 000.00Bottom of Basin/Outlet
15.00136 34340.50
16.002,596 1,3661,4001.50
17.0010,108 6,3527,7522.50
17.7012,050 7,75515,5073.20Orifice for Water Quality
18.0012,882 3,74019,2473.50
18.5014,342 6,80626,0534.00Top of Control Structure
19.0015,819 7,54033,5934.50Spillway Crest
20.0018,921 17,37050,9635.50
20.5015,071 8,49859,4616.00Top of Basin
*Green shading is water quality elevation; Maximum allowed depth of dry pond = 10 ft
Provided Volume of Dry Basin 33,593 cu ft (to bottom of spillway)
3) Size Water Quality Orifice for (2-5) Day Drawdown for Runoff Volume
Q= CdA(2gh)1/2 (Orifice Equation; Cd=0.60 & h=h/3; Pg 3-13 BMP Manual)
3.20 Water Quality Stage (ft)
1.25 Orfice Diameter (inches)
1.05Driving Head (h/3) to Centroid of Orifice (ft)
0.04Drawdown Rate (cfs)
15,507 Water Quality Volume (VWQ)
VWQ/(Q x 86,400)Drawdown Time (days)
4.3 Drawdown Time (days) (2 - 5 days)
TIMMONS GROUP
Drainage Area to BMP
Water Quality Runoff Volume:
IIIA
Project: Circle K - Wilmington AirportProject No.: 37630.054
Calculated By: TKDDate: 08/26/2020
Dry Extended Detention Basin Design
1) Impervious Area
Impervious AreaAcres
Offsite Impervious Area 0.00
Onsite Impervious Area 9.40
Total Impervious Area 9.40
Total Drainage Area To BMP 17.43
Percent Impervious Area54%
2.A) Water Quality Runoff Volume Calculation (Required)
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(I)Where:Rv = Runoff Coefficient, in/in
I = Percent Impervious
I=54%
Rv =0.535
Runoff volume, S=(Design rainfall) (Rv) (Drainage Area)
Design Rainfall =1.5 inch
Drainage Area = 17.43 acres
Storage Required =50,810cu. ft.
* Must have forebay if storage required is over 10 acre-inches (36,300 c.f.)
Detention Volume Required50,810cu ft
25% Additonal Sed. Storage 63,513 cu ft (Minimum volume required at bottom of spillway)
2.B) Water Quality Runoff Volume Calculation (Provided)
Contour Elevation
Contour
Area
Incremental
Volume
Accumulated
VolumeStage, Z
sq ftcu ftcu ftft
13.250 000.00Bottom of Basin/Outlet
14.00422 1581580.75
15.0010,266 5,3445,5021.75
16.0034,768 22,51728,0192.75
16.9044,578 35,70663,7253.65WQE
17.0045,225 4,49068,2153.75Top of Control Structure
18.0051,886 48,556116,7714.75Spillway Crest
19.0057,018 54,452171,2235.75
19.5060,014 29,258200,4816.25Top of Basin
*Green shading is water quality elevation; Maximum allowed depth of dry pond = 10 ft
Provided Volume of Dry Basin 116,771 cu ft (to bottom of spillway)
3) Size Water Quality Orifice for (2-5) Day Drawdown for Runoff Volume
Q = CdA(2gh)1/2 (Orifice Equation; Cd=0.60 & h=h/3; Pg 3-13 BMP Manual)
3.65 Water Quality Stage (ft)
2.50 Orfice Diameter (inches)
1.18Driving Head (h/3) to Centroid of Orifice (ft)
0.18Drawdown Rate (cfs)
63,725 Water Quality Volume (VWQ)
VWQ/(Q x 86,400)Drawdown Time (days)
4.1 Drawdown Time (days) (2 - 5 days)
TIMMONS GROUP
Drainage Area to BMP
Water Quality Runoff Volume:
IIIB
Pre Treatment Grass Swale - IIIA
Area (A) =4.36 (Acres)
Coef. (C) = 0.77 (Dimensionless)
Inte. (I) =0.75 (in/hr)
Flow (Q10) =2.5 (cfs)
Line channel with:6 " rip-rap (Assume 6" even if using grass)
Manning n =0.040 (Dimensionless)Ditch Length = 150 LF
Slope =0.001(ft/ft)Highest Elevation = 16.5
Z Required =2.14RatioLowest Elevation = 16.35
Side Slope (M) =6 :1
Flow Depth (Y) =0.50 ft 6.0 in
Bottom Width (B) =6.00 ft 72.0 in
Freeboard = 0.50 ft 6.0 in
T=YxDxSY = Weight of water (62.4 LB/CUFT)
T = 0.03LB/SFD=Depth of flow in channel (ft)
S=Slope of channel (ft/ft)
LB/SF
Jute Net0.45 LB/SF
Curled Mat1.55S751.55
Class A (4"@9"THK)2.00S1501.75
Class B (8"@18"THK)3.50SC1502.10
Class I (12"@22"THK)5.00C1252.25
Class II (18"@30"THK)7.50P3008.00
New A =4.50SF
New P =12.08Wetted perimeterL=240V
New R =0.37Hydraulic radiusV<=0.625
Z Actual =2.33 Must be greater than z required=>2.14 Okay
New V =0.61fps
HRT = 4.1 min
Liner:#N/A LB/SF > 0.04 LB/SF #N/A
Min. Ditch Depth = 1 ft
6
1
Side Slope
6:1
*RED IS USER INPUT
6.000.5018
Grassed SwalePre Treatment Grass Swale - IIIA
Top Width = 18 ft
Variable Quantities (Ditch Width & Depth)
This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side
slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming
n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will
be correct; select appropriate lining based on tractive force)
Watershed Data
Known Quantities
Compute Tractive Force
Hydraulic Residence Time
Drainage Ditch Design (Velocity Constraint)
PROJECT NAME
PROJECT NUMBER
37630.054
DITCH NAME
CALCULATED BY
Jacob Dooley
Circle K - Airport Blvd
Ditch Liner
Grass
Grass
General Lining North American
Green Lining
Determine If Z Actual Is Greater Than Z Required
Minimum Design Geometry
Min. Ditch Depth (ft)
1.00
Bottom Width (ft)
Flow Depth (Y) = 0.5 ft
Ditch Geometry
Bottom Width (B) = 6 ft
Top Width (ft)Flow Depth (ft)
LATEST REVISION: 8/27/2020 4:03 PM
Pre Treatment Grass Swale - IIIB
Area (A) =15.17 (Acres)
Coef. (C) = 0.77 (Dimensionless)
Inte. (I) =0.75 (in/hr)
Flow (Q10) =8.8 (cfs)
Line channel with:6 " rip-rap (Assume 6" even if using grass)
Manning n =0.060 (Dimensionless)Ditch Length = 150 LF
Slope =0.002(ft/ft)Highest Elevation = 14.8
Z Required =8.64RatioLowest Elevation = 14.55
Side Slope (M) =5 :1
Flow Depth (Y) =0.50 ft 6.0 in
Bottom Width (B) =27.00 ft 324.0 in
Freeboard = 0.25 ft 3.0 in
T=YxDxSY = Weight of water (62.4 LB/CUFT)
T = 0.05LB/SFD=Depth of flow in channel (ft)
S=Slope of channel (ft/ft)
LB/SF
Jute Net0.45 LB/SF
Curled Mat1.55S751.55
Class A (4"@9"THK)2.00S1501.75
Class B (8"@18"THK)3.50SC1502.10
Class I (12"@22"THK)5.00C1252.25
Class II (18"@30"THK)7.50P3008.00
New A =14.75SF
New P =32.10Wetted perimeterL=240V
New R =0.46Hydraulic radiusV<=0.625
Z Actual =8.78 Must be greater than z required=>8.64 Okay
New V =0.60fps
HRT = 4.1 min
Liner:1.55 LB/SF > 0.06 LB/SF Okay
Min. Ditch Depth = 0.75 ft
5
1
Side Slope
5:1
*RED IS USER INPUT
27.000.5034.5
Grassed SwalePre Treatment Grass Swale - IIIB
Top Width = 34.5 ft
Variable Quantities (Ditch Width & Depth)
This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side
slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming
n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will
be correct; select appropriate lining based on tractive force)
Watershed Data
Known Quantities
Compute Tractive Force
Hydraulic Residence Time
Drainage Ditch Design (Velocity Constraint)
PROJECT NAME
PROJECT NUMBER
37630.054
DITCH NAME
CALCULATED BY
Jacob Dooley
Circle K - Airport Blvd
Ditch Liner
North American Green, S75
North American Green, S75
General Lining North American
Green Lining
Determine If Z Actual Is Greater Than Z Required
Minimum Design Geometry
Min. Ditch Depth (ft)
0.75
Bottom Width (ft)
Flow Depth (Y) = 0.5 ft
Ditch Geometry
Bottom Width (B) = 27 ft
Top Width (ft)Flow Depth (ft)
LATEST REVISION: 8/27/2020 4:20 PM
VEGETATIVE SWALE IIIA
Area (A) =(Acres)
Coef. (C) = (Dimensionless)
Inte. (I) =(in/hr)
Flow (Q10) =2.6 (cfs)
Line channel with:6 " rip-rap (Assume 6" even if using grass)
Manning n =0.030 (Dimensionless)Ditch Length = 60 LF
Slope =0.003(ft/ft)Highest Elevation = 14.2
Z Required =0.90RatioLowest Elevation = 14
Side Slope (M) =3 :1
Flow Depth (Y) =0.50 ft 6.0 in
Bottom Width (B) =5.00 ft 60.0 in
Freeboard = 0.50 ft 6.0 in
T=YxDxSY = Weight of water (62.4 LB/CUFT)
T = 0.10LB/SFD=Depth of flow in channel (ft)
S=Slope of channel (ft/ft)
LB/SF
Jute Net0.45 LB/SF
Curled Mat1.55S751.55
Class A (4"@9"THK)2.00S1501.75
Class B (8"@18"THK)3.50SC1502.10
Class I (12"@22"THK)5.00C1252.25
Class II (18"@30"THK)7.50P3008.00
New A =3.25SF
New P =8.16Wetted perimeter
New R =0.40Hydraulic radius
Z Actual =1.76 Must be greater than z required=>0.90 Okay
New V =1.55fps
Liner:1.55 LB/SF > 0.11 LB/SF Okay
Min. Ditch Depth = 1 ft
3
1
Side Slope
3:1
*RED IS USER INPUT
Ditch Liner
North American Green, S75
North American Green, S75
General Lining North American
Green Lining
Determine If Z Actual Is Greater Than Z Required
Minimum Design Geometry
Min. Ditch Depth (ft)
1.00
Bottom Width (ft)
Flow Depth (Y) = 0.5 ft
Ditch Geometry
Bottom Width (B) = 5 ft
Top Width (ft)Flow Depth (ft)
Drainage Ditch Design (Velocity Constraint)
PROJECT NAME
PROJECT NUMBER
37630.054
DITCH NAME
CALCULATED BY
Jacob Dooley
CIRCLE K - AIRPORT
5.000.5011
PERMANENT DIVERSION DITCH:VEGETATIVE SWALE IIIA
Top Width = 11 ft
Variable Quantities (Ditch Width & Depth)
This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side
slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming
n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will
be correct; select appropriate lining based on tractive force)
Watershed Data
Known Quantities
Compute Tractive Force
LATEST REVISION: 9/1/2020 2:21 PM
VEGETATIVE SWALE IIIB
Area (A) =(Acres)
Coef. (C) = (Dimensionless)
Inte. (I) =(in/hr)
Flow (Q10) =8.1 (cfs)
Line channel with:6 " rip-rap (Assume 6" even if using grass)
Manning n =0.030 (Dimensionless)Ditch Length = 60 LF
Slope =0.003(ft/ft)Highest Elevation = 12.8
Z Required =2.91RatioLowest Elevation = 12.61
Side Slope (M) =3 :1
Flow Depth (Y) =0.75 ft 9.0 in
Bottom Width (B) =6.00 ft 72.0 in
Freeboard = 0.50 ft 6.0 in
T=YxDxSY = Weight of water (62.4 LB/CUFT)
T = 0.15LB/SFD=Depth of flow in channel (ft)
S=Slope of channel (ft/ft)
LB/SF
Jute Net0.45 LB/SF
Curled Mat1.55S751.55
Class A (4"@9"THK)2.00S1501.75
Class B (8"@18"THK)3.50SC1502.10
Class I (12"@22"THK)5.00C1252.25
Class II (18"@30"THK)7.50P3008.00
New A =6.19SF
New P =10.74Wetted perimeter
New R =0.58Hydraulic radius
Z Actual =4.28 Must be greater than z required=>2.91 Okay
New V =1.93fps
Liner:1.55 LB/SF > 0.15 LB/SF Okay
Min. Ditch Depth = 1.25 ft
3
1
Side Slope
3:1
*RED IS USER INPUT
6.000.7513.5
PERMANENT DIVERSION DITCH:VEGETATIVE SWALE IIIB
Top Width = 13.5 ft
Variable Quantities (Ditch Width & Depth)
This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side
slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming
n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will
be correct; select appropriate lining based on tractive force)
Watershed Data
Known Quantities
Compute Tractive Force
Drainage Ditch Design (Velocity Constraint)
PROJECT NAME
PROJECT NUMBER
37630.054
DITCH NAME
CALCULATED BY
Jacob Dooley
CIRCLE K - AIRPORT
Ditch Liner
North American Green, S75
North American Green, S75
General Lining North American
Green Lining
Determine If Z Actual Is Greater Than Z Required
Minimum Design Geometry
Min. Ditch Depth (ft)
1.25
Bottom Width (ft)
Flow Depth (Y) = 0.75 ft
Ditch Geometry
Bottom Width (B) = 6 ft
Top Width (ft)Flow Depth (ft)
LATEST REVISION: 9/1/2020 2:26 PM
_________________________________________________________________________________________________________________
STORMWATER OPERATION AND MAINTENANCE
AGREEMENT
Permit Number:___________________
(to be provided by DWQ)
Drainage Area Number:_____________
Form SW401-Dry Detention O&M-Rev.3 Page 1 of 4
Dry Extended Detention Basin
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The dry extended detention basin system is defined as the dry detention basin, outlet
structure, pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
does does not incorporate a vegetated filter at the outlet.
This system (check one):
does does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
The drainage area will be managed to reduce the sediment load to the dry
extended detention basin.
Immediately after the dry extended detention basin is established, the vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
No portion of the dry extended detention pond will be fertilized after the first
initial fertilization that is required to establish the vegetation.
I will maintain the vegetation in and around the basin at a height of
approximately six inches.
Once a year, a dam safety expert will inspect the embankment.
After the dry extended detention basin is established, it will be inspected once a quarter
and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in
a Coastal County). Records of operation and maintenance will be kept in a known set
location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential problem: How I will remediate the problem:
The entire BMP Trash/debris is present. Remove the trash/debris.
The perimeter of the dry
extended detention
basin
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Form SW401-Dry Detention O&M-Rev.3 Page 2 of 4
BMP element: Potential problem: How I will remediate the problem:
The inlet device: pipe or
swale
The pipe is clogged (if
applicable).
Unclog the pipe. Dispose of the
sediment off-site.
The pipe is cracked or
otherwise damaged (if
applicable).
Replace the pipe.
Erosion is occurring in the
swale (if applicable).
Regrade the swale if necessary to
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay Sediment has accumulated
and reduced the depth to 75%
of the original design depth
(see diagram below).
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
riprap is displaced.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present. Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
The main treatment area Sediment has accumulated
and reduced the depth to 75%
of the original design depth
(see diagram below).
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Revegetate disturbed
areas immediately with sod
(preferred) or seed protected with
securely staked erosion mat.
Water is standing more than
5 days after a storm event.
Check outlet structure for clogging.
If it is a design issue, consult an
appropriate professional.
Weeds and noxious plants are
growing in the main
treatment area.
Remove the plants by hand or by
wiping them with pesticide (do not
spray).
Form SW401-Dry Detention O&M-Rev.3 Page 3 of 4
BMP element: Potential problem: How I will remediate the problem:
The embankment Shrubs or trees have started
to grow on the embankment.
Remove shrubs or trees
immediately.
Grass cover is unhealthy or
eroding.
Restore the health of the grass cover
– consult a professional if necessary.
Signs of seepage on the
downstream face.
Consult a professional.
Evidence of muskrat or
beaver activity is present.
Use traps to remove muskrats and
consult a professional to remove
beavers.
An annual inspection by an
appropriate professional
shows that the embankment
needs repair.
Make all needed repairs.
The outlet device Clogging has occurred. Clean out the outlet device. Dispose
of the sediment off-site.
The outlet device is damaged Repair or replace the outlet device.
The receiving water Erosion or other signs of
damage have occurred at the
outlet.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
The measuring device used to determine the sediment elevation shall be such that it will
give an accurate depth reading and not readily penetrate into accumulated sediments.
When the basin depth reads 15.50 feet in the main pond, the sediment shall be removed.
When the basin depth reads NA feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
Temporary Pool Elevation 17.70
Sediment Removal El. NA Temporary Pool Temporary Pool
Volume Sediment Removal Elevation 15.50 Volume
Bottom Elevation NA 25%
Sediment Bottom Elevation 14.50 25% Sediment Storage Storage FOREBAY MAIN POND
Permit Number:_______________________
(to be provided by DWQ)
Form SW401-Dry Detention O&M-Rev.3 Page 4 of 4
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115
BMP drainage area number:PHASE 3A
Print name:DICK GRANSEUR
Title:DIRECTOR - NEW HANOVER COUNTY AIRPORT AUTHORITY
Address:1740 AIRPORT BLVD, WILMINGTON, NC 28405
Phone:910-341-4333
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, _____________________________________, a Notary Public for the State of
____________________, County of ____________________, do hereby certify that
______________________________________ personally appeared before me this
day of _________________, _______, and acknowledge the due execution of the
forgoing dry detention basin maintenance requirements. Witness my hand and official
seal,
SEAL
My commission expires
Permit Number:___________________
(to be provided by DWQ)
Drainage Area Number:_____________
Form SW401-Dry Detention O&M-Rev.3 Page 1 of 4
Dry Extended Detention Basin
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The dry extended detention basin system is defined as the dry detention basin, outlet
structure, pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
does does not incorporate a vegetated filter at the outlet.
This system (check one):
does does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
The drainage area will be managed to reduce the sediment load to the dry
extended detention basin.
Immediately after the dry extended detention basin is established, the vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
No portion of the dry extended detention pond will be fertilized after the first
initial fertilization that is required to establish the vegetation.
I will maintain the vegetation in and around the basin at a height of
approximately six inches.
Once a year, a dam safety expert will inspect the embankment.
After the dry extended detention basin is established, it will be inspected once a quarter
and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in
a Coastal County). Records of operation and maintenance will be kept in a known set
location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential problem: How I will remediate the problem:
The entire BMP Trash/debris is present. Remove the trash/debris.
The perimeter of the dry
extended detention
basin
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Form SW401-Dry Detention O&M-Rev.3 Page 2 of 4
BMP element: Potential problem: How I will remediate the problem:
The inlet device: pipe or
swale
The pipe is clogged (if
applicable).
Unclog the pipe. Dispose of the
sediment off-site.
The pipe is cracked or
otherwise damaged (if
applicable).
Replace the pipe.
Erosion is occurring in the
swale (if applicable).
Regrade the swale if necessary to
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay Sediment has accumulated
and reduced the depth to 75%
of the original design depth
(see diagram below).
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
riprap is displaced.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present. Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
The main treatment area Sediment has accumulated
and reduced the depth to 75%
of the original design depth
(see diagram below).
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Revegetate disturbed
areas immediately with sod
(preferred) or seed protected with
securely staked erosion mat.
Water is standing more than
5 days after a storm event.
Check outlet structure for clogging.
If it is a design issue, consult an
appropriate professional.
Weeds and noxious plants are
growing in the main
treatment area.
Remove the plants by hand or by
wiping them with pesticide (do not
spray).
Form SW401-Dry Detention O&M-Rev.3 Page 3 of 4
BMP element: Potential problem: How I will remediate the problem:
The embankment Shrubs or trees have started
to grow on the embankment.
Remove shrubs or trees
immediately.
Grass cover is unhealthy or
eroding.
Restore the health of the grass cover
– consult a professional if necessary.
Signs of seepage on the
downstream face.
Consult a professional.
Evidence of muskrat or
beaver activity is present.
Use traps to remove muskrats and
consult a professional to remove
beavers.
An annual inspection by an
appropriate professional
shows that the embankment
needs repair.
Make all needed repairs.
The outlet device Clogging has occurred. Clean out the outlet device. Dispose
of the sediment off-site.
The outlet device is damaged Repair or replace the outlet device.
The receiving water Erosion or other signs of
damage have occurred at the
outlet.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
The measuring device used to determine the sediment elevation shall be such that it will
give an accurate depth reading and not readily penetrate into accumulated sediments.
When the basin depth reads 15.00 feet in the main pond, the sediment shall be removed.
When the basin depth reads NA feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
Temporary Pool Elevation 16.90
Sediment Removal El. NA Temporary Pool Temporary Pool
Volume Sediment Removal Elevation 15.00 Volume
Bottom Elevation NA 25%
Sediment Bottom Elevation 13.25 25% Sediment Storage Storage FOREBAY MAIN POND
Permit Number:_______________________
(to be provided by DWQ)
Form SW401-Dry Detention O&M-Rev.3 Page 4 of 4
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115
BMP drainage area number:PHASE 3B
Print name:DICK GRANSEUR
Title:DIRECTOR - NEW HANOVER COUNTY AIRPORT AUTHORITY
Address:1740 AIRPORT BLVD, WILMINGTON, NC 28405
Phone:910-341-4333
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, _____________________________________, a Notary Public for the State of
____________________, County of ____________________, do hereby certify that
______________________________________ personally appeared before me this
day of _________________, _______, and acknowledge the due execution of the
forgoing dry detention basin maintenance requirements. Witness my hand and official
seal,
SEAL
My commission expires
Permit Name:___________________
(to be provided by DWQ)
Drainage Area Number:___________
Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2
Grassed Swale Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
The drainage area of the grassed swale will be carefully managed to reduce the
sediment load to the grassed swale.
After the first-time fertilization to establish the grass in the swale, fertilizer will
not be applied to the grassed swale.
The grassed swale will be inspected once a quarter. Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential problem: How I will remediate the problem:
The entire length of the
swale
Trash/debris is present. Remove the trash/debris.
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then re-sod
(or plant with other appropriate
species) and water until established.
Provide lime and a one-time
fertilizer application.
Sediment covers the grass at
the bottom of the swale.
Remove sediment and dispose in an
area that will not impact streams or
BMPs. Re-sod if necessary.
Vegetation is too short or too
long.
Maintain vegetation at a height of
approximately six inches.
The receiving water Erosion or other signs of
damage have occurred at the
outlet.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
Permit Number:_______________________
(to be provided by DWQ)
Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115
BMP drainage area number:PHASE 3A
Print name:Dick Granseur
Title:Director - New Hanover County Airport Authority
Address:1740 Airport Blvd, Wilmington, NC 28405
Phone:910-341-4333
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, _____________________________________, a Notary Public for the State of
____________________, County of ____________________, do hereby certify that
______________________________________ personally appeared before me this
day of _________________, _______, and acknowledge the due execution of the
forgoing grassed swale maintenance requirements. Witness my hand and official seal,
SEAL
My commission expires
Permit Name:___________________
(to be provided by DWQ)
Drainage Area Number:___________
Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2
Grassed Swale Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
The drainage area of the grassed swale will be carefully managed to reduce the
sediment load to the grassed swale.
After the first-time fertilization to establish the grass in the swale, fertilizer will
not be applied to the grassed swale.
The grassed swale will be inspected once a quarter. Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential problem: How I will remediate the problem:
The entire length of the
swale
Trash/debris is present. Remove the trash/debris.
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then re-sod
(or plant with other appropriate
species) and water until established.
Provide lime and a one-time
fertilizer application.
Sediment covers the grass at
the bottom of the swale.
Remove sediment and dispose in an
area that will not impact streams or
BMPs. Re-sod if necessary.
Vegetation is too short or too
long.
Maintain vegetation at a height of
approximately six inches.
The receiving water Erosion or other signs of
damage have occurred at the
outlet.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
Permit Number:_______________________
(to be provided by DWQ)
Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115
BMP drainage area number:PHASE 3B
Print name:Dick Granseur
Title:Director - New Hanover County Airport Authority
Address:1740 Airport Blvd, Wilmington, NC 28405
Phone:910-341-4333
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, _____________________________________, a Notary Public for the State of
____________________, County of ____________________, do hereby certify that
______________________________________ personally appeared before me this
day of _________________, _______, and acknowledge the due execution of the
forgoing grassed swale maintenance requirements. Witness my hand and official seal,
SEAL
My commission expires
_________________________________________________________________________________________________________________
STORM PIPE HGL CALCULATIONS