HomeMy WebLinkAboutZ21-01_Staff_Report_PB_2.4.2021aZ21-01 Staff Report PB 2.4.2021 Page 1 of 24
STAFF SUMMARY OF Z21-01
PLANNED DEVELOPMENT APPLICATION
APPLICATION SUMMARY
Case Number: Z21-01
Request:
Rezoning to a Planned Development (PD) district
Applicant: Property Owner(s):
Samuel B. Franck with Ward and Smith, P.A. Dry Pond Partners, LLC
Location: Acreage:
4400 block of S. College Road 64.28
PID(s): Comp Plan Place Type:
R07100-004-004-000 Community Mixed Use/General Residential
Existing Land Use: Proposed Land Use:
Undeveloped Mixed-use development
Current Zoning: Proposed Zoning:
R-15, Residential PD, Planned Development
(ADA = Additional Dwelling Allowance Special Use Permit (SUP) for greater density than permitted by-
right in base zoning district – formerly titled High Density SUP)
SURROUNDING AREA
LAND USE ZONING
North Single-Family Residential R-15
East Single-Family Residential, Townhomes R-15
South Single-Family Residential R-15
West Single-Family Residential, Multi-Family, Electrical
Substation, S. College Road R-15
Z21-01 Staff Report PB 2.4.2021 Page 2 of 24
ZONING HISTORY
October 15, 1969 Initially zoned R-15 (Area Masonboro)
COMMUNITY SERVICES
Water/Sewer Water and sewer services are available through CFPUA.
Fire Protection New Hanover County Fire Services, New Hanover County Northern Fire
District, New Hanover County Wrightsboro Station
Schools Pine Valley Elementary, Myrtle Grove Middle, and Hoggard High Schools
Recreation Halyburton Park, Wade Park, Long Leaf Park, Trails End Park
CONSERVATION, HISTORIC, & ARCHAEOLOGICAL RESOURCES
Conservation No known conservation resources
Historic No known historic resources
Archaeological No known archaeological resources
Z21-01 Staff Report PB 2.4.2021 Page 3 of 24
APPLICANT’S PROPOSED MASTER PLAN
Overview
The Planned Development (PD) district is a type of conditional zoning district that includes a
site specific design (master plan), and mutually agreed upon conditions can be attached.
Master plans for PD districts are intended to be in a bubble format that illustrate the general
location and intensity of the land uses within the development. Planned developments must
be constructed in accordance with the standards established in the approved master plan
and must comply with all other applicable development regulations (stormwater,
landscaping, roadways, parking, etc.). Compliance with the master plan and other
applicable regulations is verified during the review of a site specific development proposal
located within the planned development.
The PD district was established to encourage innovative, integrated, and efficient land
planning and site design concepts that achieve a high quality of development, environmental
sensitivity, and adequate public facilities and services. The PD district can also provide
more flexibility from conventional development standards, such as parking and street
design, in order to help create a more mixed-use, pedestrian-oriented development.
UDO Section 3.3.7 – Planned Development (PD) District
Z21-01 Staff Report PB 2.4.2021 Page 4 of 24
Includes Staff Markups
The proposed PD district would allow for the development of a mixed-use project. The
proposal consists of:
1. Maximum of 460 Residential Units
170 units are proposed to be either detached single-family, duplex, triplex,
or townhome housing. The master plan identifies the proposed areas for
these types of housing, which is generally along the perimeter of the
property abutting existing residential development.
250 units are proposed to be multi-family units. The proposed master plan
identifies that this type of housing will be located near the center of the
property. As proposed, the multi-family structures will be a maximum of 50
feet and 4 stories in height.
40 units are proposed to be included in mixed-use building(s) described
below.
2. Mixed-Use Building(s)
Maximum of 72,000 square feet with first floor commercial and 40
residential units on the second and third floors. The building(s) would be a
maximum of 50 feet in height.
The commercial portion of the building(s) would allow the same uses as the
commercial outparcels described below.
3. Commercial Outparcels
Maximum of 185,000 square feet of commercial buildings.
The uses of these outparcels shall be limited to the following commercial,
institutional, and industrial uses permitted in the PD district:
Z21-01 Staff Report PB 2.4.2021 Page 5 of 24
Commercial:
1) Bar/Nightclub
2) Event Center
3) Indoor Recreation Establishment
4) Outdoor Recreation Establishment
5) Animal Grooming Service
6) Equestrian Facility
7) Veterinary Service
8) Bank and/or Financial Institution
9) Business Service Center
10) Funeral Service
11) Mini-Warehouse/Self-Storage
12) Repair Shop
13) Commercial Kitchen, Catering
14) Microbrewery/Microdistillery
15) Restaurant
16) Campground/Recreational Vehicle (RV)
Park
17) Hotel or Motel
18) Contractor Office
19) Labor Organization
20) Offices for Private Business and
Professional Activities
21) Dry Cleaning/Landry Plant
22) Instructional Services and
Studios
23) Personal Service, General
24) Convenience Store
25) Food Market
26) Grocery Store
27) Pharmacy
28) Retail Nursery
29) Retail Sales, Building and
Construction Supplies
30) Retail Sales, General
31) Boat Dealer
32) Car Wash
33) Equipment Rental and Leasing
34) Farm Implement Sales
35) Fuel Sales
36) Mobile Home and Prefab Building
Sales
37) Vehicle Rentals
38) Vehicle Sales
39) Vehicle Service Station, Large
40) Vehicle Service Station, Minor
41) Vehicle Service Station, Major
Civic and Institutional:
1) Adult Day Care
2) Child Care Center
3) Family Child Care Home
4) Library
5) Community Center
6) Lodges, Fraternal, & Social Organizations
7) Museum
8) Hospital, Medical & Dental Office and Clinic
9) Post Office
10) Nursing and Rehabilitation Center
Industrial:
1) Artisan Manufacturing
The proposal prohibits the following uses:
1) Animal Shelter;
2) Adult Entertainment Establishment;
3) Kennel; and
4) Vehicle Towing Service and Storage Yard.
Z21-01 Staff Report PB 2.4.2021 Page 6 of 24
Community Benefit
In accordance with the standards of the Unified Development Ordinance (UDO), a Planned
Development (PD) District must identify the compensating community benefit of the proposed
project that helps achieve the stated goals of the district (noted on page 3). These benefits
can include, but are not limited to: improved design, natural preservation, improved
connectivity, mixed-use development, green building practices, and the dedication of land
for public purposes. The applicant states the proposal would provide the below community
benefits (quoted text taken directly from the application):
1. Improved Design
“The proposed development encourages a walkable urban environment by
incorporating non-vehicular access points to adjacent properties; five foot (5')
sidewalks along all internal roads within the development other than where
sidewalks would interfere with existing utility easements; and locating high
density multi-family uses in the center of the site to promote easier pedestrian
access to nearby commercial uses without additional vehicle trips.”
2. Natural Preservation
“Unless required for necessary infrastructure or required by the County's land
use and building regulations, existing vegetation that serves as a buffer
between the development site and adjacent residential uses will be left in place,
including a significant number of mature trees that current[ly] have an average
canopy height in excess of fifty feet (50'). These trees are not required by the
UDO—compliance could be obtained with fencing or a less substantial natural
area, but the natural features will remain in substantially their original condition
with limited allowances for required infrastructure and utilities.”
3. Improved Connectivity for Pedestrians and/or Vehicles
“In response to neighbors' requests and in an effort to improve connectivity for
pedestrians, additional connections to neighboring properties are being
provided for pedestrian and bicycle use. At least one of these connections will
also be accessible by a neighboring subdivision's vehicles to allow increased
connectivity to that development and encourage a dispersal of existing vehicle
trips to reduce existing traffic.”
“The proposed development also offers an integrated commercial/residential
node that will serve the residents of the development as well as the surrounding
neighborhoods to reduce the number and distance of additional vehicular trips
and offer nearby retail and commercial services to adjacent and nearby
residents.”
4. Mixed-Use Development
“The proposed development will have a mixture of residential and commercial
uses within the property boundary, integrated through pedestrian and vehicular
paths to promote interconnectivity. Integration is primarily horizontal, but there
are vertical mixed use structures included in the proposed development plan.”
5. Other Community Benefits
“The proposed development would be an example of successful in-fill
development; repurposing a current vacant County parcel into a residential and
commercial project designed to provide additional housing for County
Z21-01 Staff Report PB 2.4.2021 Page 7 of 24
residents, local commercial and retail for those and nearby residents, and
provide a benefit to the County's tax base and citizens.”
“While the specific tenants are not yet identified, it is the applicant's desire to
include a gourmet grocery store, electrical car charging station(s), a coffee
shop, and a consumer-electronics store among the retail uses that will be
available to the public.”
Conditions
In accordance with the standards of the Unified Development Ordinance (UDO), a Planned
Development (PD) District includes a Terms and Conditions document that details any
conditions of approval or proposed modifications to development standards. The follo wing
notable proposed conditions of the proposal are listed below. The full Terms and Conditions
document is included in the application and will be incorporated with the Master Plan if the
rezoning is approved.
1. The use, density of use, and maximum building heights for the areas depicted as
"Mixed Use Building"; "Multi-Family Apartment Homes"; "Townhomes"; "Commercial
Outparcel"; "Townhomes/Duplex/Triplex"; and "Single Family Lots" shall comply
with the approved Master Development Plan ("MDP") as the MDP may be amended
or modified in accordance with County requirements from time to time.
2. Approval of this rezoning does not constitute technical approval of the site plan.
Issuance of all required permits must occur prior to construction commencing.
3. Proposed maximum density of residential units on this MDP is 460 total units, or 7.16
du/ac.
4. Sidewalks will be provided along both sides of the roads within the development at
a width of five feet, except for portions of roads adjacent to the “Utility Easement”
depicted on the MPD Master Plan, where sidewalks will be limited to one side of the
road.
5. Vehicular access from the master planned development site through to Whiskey
Branch Drive is gated for use only by emergency vehicles and owners in the existing
Whiskey Branch planned community.
6. An access point for pedestrian and bicycle use will be provided through to the site
from the existing Bullitt Lane.
7. Existing vegetation will be left undisturbed in the depicted twenty foot (20') buffer,
subject to the applicant's right to install required utilities and infrastructure and make
any changes required by this zoning. To the extent necessary to satisfy County
standards, additional vegetation, as well as fencing, will be added to the buffer
area sufficient to establish required opacity in areas adjacent to residential uses.
8. The street yard landscaping that is required for UMXZ districts shall be provided
along S. College Road.
9. The Mixed Use and Commercial areas of the MDP shall be limited to the uses listed
in the Terms and Conditions document (described above).
Z21-01 Staff Report PB 2.4.2021 Page 8 of 24
ZONING CONSIDERATIONS
The R-15 district in this area was established in 1969. At the time, the purpose of the R-15
district was to ensure that housing served by private septic and well would be developed
at low densities. Since that time, water and sewer services have become available to the
surrounding area; however, it is still mostly zoned for low density housing.
While the R-15 district is the predominant zoning in the surrounding area, several
developments along the S. College Road corridor obtained special use permits to exceed
the maximum density of the base zoning district (2.5 du/ac); many of which also exceed the
density of the proposed planned development.
Under the County’s performance residential standards, the site would be permitted up to
161 dwelling units at a density of 2.5 du/ac. The proposed 460 units equates to an overall
density of 7.16 du/ac.
The subject property was part of an approximately 135-acre parent parcel under unified
ownership. The applicant developed the eastern 71 acres of the tract as a performance
residential development (Whiskey Branch). That development consists of 74 single -family
dwellings, 56 duplex units, and 26 townhomes for a total of 156 dwelling units.
The proposed master plan positions the single-family and attached housing (duplex, triplex,
townhome units) along the perimeter of the property abutting the existing residential
neighborhoods. The proposed multi-family housing is located in the center of the site, with
the closest point to an existing neighborhood being approximately 215 feet. In addition,
the applicant is proposing to retain the existing vegetation within the 20-foot buffer that
would be provided along the existing residential neighborhoods.
The proposed commercial and mixed-use structures are located along S. College Road.
Z21-01 Staff Report PB 2.4.2021 Page 9 of 24
There are three commercial nodes located along S. College Road at Shipyard Blvd, 17th
Street, and Monkey Junction. The subject site is centrally located between the 17th Street
and Monkey Junction nodes, generally 3/4 miles from each.
By adding mixed-use zoning to the subject site, commercial services would be spaced along
the S. College Road corridor from Monkey Junction to Shipyard Blvd about every mile over
the four-mile stretch.
The proposal would provide commercial services closer to the surrounding residential
housing, reducing travel time to these services.
In addition, the subject site is the last large undeveloped tract of land along the S. College
Road corridor that could provide a mixed-use development of the proposed scale.
Z21-01 Staff Report PB 2.4.2021 Page 10 of 24
AREA SUBDIVISIONS UNDER DEVELOPMENT
TRANSPORTATION
The site is accessed by S. College Road, a NCDOT-maintained principal arterial street.
Access would also be provided to the existing Whiskey Brach subdivision to the east;
however, Whiskey Branch is a gated subdivision that would allow only emergency services
and residents of the subdivision to access the subject site.
The master plan proposes a pedestrian connection to Bullitt Lane. That road is located north
of the site within the Fox Run subdivision and stubs into the property. While the road was
dedicated for public use, NCDOT has not accepted the road into the state maintenance
system. The 17-foot-wide road provides access to four residential lots and abuts the
subdivision’s amenity center (which includes a swimming pool and tennis court).
NCDOT Average Annual Daily Traffic (AADT) - 2019
Road Location Volume Capacity V/C
S. College Road 4400 Block 39,500 49,240 0.8
Z21-01 Staff Report PB 2.4.2021 Page 11 of 24
As currently zoned, it is estimated the site would generate about 120-160 trips during the
peak hours if developed at the permitted density. The proposed PD development would
increase the estimated number of peak hour trips by 275 in the PM peak and 560 in the
Saturday Peak.
Intensity Approx. Peak Hour Trips
Existing Development: Undeveloped 0 AM / 0 PM
Typical Development
under Current Zoning:
161 single-family
homes 119 AM / 160 PM / 153 Saturday
Proposed PD
Development*: Mixed-Use 432 PM / 710 Saturday
*The TIA for the project examined the PM and Saturday peak times as they are more impacted by the
proposed commercial development.
Z21-01 Staff Report PB 2.4.2021 Page 12 of 24
Traffic Impact Analysis
The applicant has completed a Traffic Impact Analysis (TIA) for the project which has been
approved by NCDOT and the WMPO. The TIA analyzed the development of 510 multi-
family units and about 173,000 square feet of office and shopping center uses. The
applicant later updated the land uses included in the TIA which resulted in a lower estimated
trip generation for the proposed development.
While the proposed Planned Development master plan does not align exactly with what
was analyzed by the TIA, the proposal is intended to provide additional flexibility in housing
location and building type and would not result in changes that exceed the scale of what
was studied, according to the applicant.
The TIA analyzed the Level of Service (LOS) in vehicle delay per second at notable
intersections in the area and requires the following notable roadway improvements:
S. College Road – North of Weybridge Lane (at Lansdowne Road)
Installation of a new signalized northbound to southbound u-turn lane
S. College Road at Northern Access Point
Installation of turn lanes and signalized directional cross over
S. College Road Existing U-Turn Lanes
Signalization of northbound to southbound movement
S. College Road at Southern Access Point
Installation of a turn lane
Z21-01 Staff Report PB 2.4.2021 Page 13 of 24
S. College Road at Southern Access Point (Site Drive #3)
Scenario Westbound Right LOS Delay in Seconds
PM PEAK
2019 Existing N/A N/A
2024 Future without Project N/A N/A
2024 Future with Project &
Improvements D 27
SATURDAY PEAK
2020 Existing N/A N/A
2024 Future without Project N/A N/A
2024 Future with Project &
Improvements F 82
The movement studied at this intersection was the westbound right (which would be the
motorists leaving the site and turning right on S. College Road).
According to the TIA, “The traffic signal at the intersection with Mohican Trail will provide gaps
in northbound traffic on College Road which should allow turns from the side street with less
delay than reported…” In addition, “If there are longer delays at Site Drive #3, it is
anticipated that site traffic would utilize a different driveway since there are multiple egress
options for the site. Additionally, all queues at this intersection are expected to occur internal
to the site and not affect operations on state-maintained roadways.”
Required Notable Improvements to S. College Road at Southern Access Point
Z21-01 Staff Report PB 2.4.2021 Page 14 of 24
S. College Road U-Turns
Scenario Approach LOS Delay in Seconds
PM PEAK
2019 Existing Northbound (NB) – D 25
Southbound (SB) – C 17
2024 Future without Project NB – D 27
SB – C 18
2024 Future with Project &
Improvements
NB – D 36
SB – C 18
SATURDAY PEAK
2020 Existing NB – D 26
SB – C 21
2024 Future without Project NB – D 28
SB – C 22
2024 Future with Project NB – D 43
SB – C 23
Required Notable Improvements to S. College Road U-Turns
Z21-01 Staff Report PB 2.4.2021 Page 15 of 24
S. College Road at Northern Access Point (Site Drive #4)
Scenario Overall LOS Delay in Seconds
PM PEAK
2019 Existing N/A N/A
2024 Future without Project N/A N/A
2024 Future with Project &
Improvements B 16
SATURDAY PEAK
2020 Existing N/A N/A
2024 Future without Project N/A N/A
2024 Future with Project &
Improvements B 19
Required Notable Improvements to S. College at Northern Access Point (Site Drive #4)
Z21-01 Staff Report PB 2.4.2021 Page 16 of 24
S. College Road at Proposed Northbound U-Turn North of Weybridge
Scenario Overall LOS Delay in Seconds
PM PEAK
2019 Existing N/A N/A
2024 Future without Project N/A N/A
2024 Future with Project &
Improvements B 18
SATURDAY PEAK
2020 Existing N/A N/A
2024 Future without Project N/A N/A
2024 Future with Project &
Improvements B 15
Required Notable Improvements to S. College Road at Proposed U-Turn
Z21-01 Staff Report PB 2.4.2021 Page 17 of 24
Nearby Planned Transportation Improvements and Traffic Impact Analyses
Nearby NC STIP Projects:
STIP Project U-5790
o Project to convert the intersection of Carolina Beach Road and College Road to a
continuous flow intersection and widen a portion of Carolina Beach Road south of
that intersection. Continuous flow intersections permit more efficient travel
movements and help alleviate congestion by allowing more of the main street’s
traffic to move through the intersection. Based on the preliminary plans, Piner Road
will consist of the same lane configuration with slight realignment of the roadway
and the westbound right turn lane to S. College Road. The project is currently
scheduled to begin after 2029.
Z21-01 Staff Report PB 2.4.2021 Page 18 of 24
STIP Project U-5702B
o Project to make access management improvements to S. College Road from
Shipyard Blvd to Carolina Beach Road.
o The project is currently scheduled to begin after 2029.
ENVIRONMENTAL
The property does not contain any Special Flood Hazard Areas or Natural Heritage Areas.
The property is within the Whiskey Creek (SA; HQW) watershed.
Per the Classification of Soils in New Hanover County for Septic Tank Suitability, soils on the
property consist of Class II (moderate limitation) and Class III (severe limitation). However,
the site is expected to be served by CFPUA when developed.
OTHER CONSIDERATIONS
SCHOOLS
Students living in the proposed development would be assigned to Pine Valley Elementary
School, Myrtle Grove Middle School, and Hoggard High School. Students may apply to
attend public magnet, year-round elementary, or specialty high schools.
A maximum of 161 dwelling units would be permitted under the current R-15 zoning base
density, and 460 units could potentially be developed under the proposed zoning for an
increase of 299 dwelling units.
Based on a generalized historic generation rate*, staff would estimate that the increase in
homes would result in approximately 72 additional students than would be generated under
current zoning.
County Planning staff has worked with Schools staff to analyze recent trends related to
development patterns and student generation. From 2015 to 2019, student enrollment
remained at a generally stable rate of just over 27,000 students enrolled despite the
issuance of approximately 11,000 permits for new residential units throughout the entire
county. Using the generalized historic generation rate, staff would have estimated that
about 3,000 students would have been generated from the new homes over the 5-year
period. However, this increase is not reflected in the actual enrollment data. As a result,
recent trends indicate new residential development may be generating much less student
population than the historic generation rate would have indicated, and the student
generation estimates for this proposal are likely much larger than the student growth that
can be anticipated to result from the proposed rezoning.
Development Type Intensity Estimated Student Generation
(generalized historic student generation rate)*
Existing Development Undeveloped Total: 0
(0 elementary, 0 middle, 0 high
Typical Development
under Current R-15 Zoning
161 residential
units
Total: 40
(18 elementary, 9 middle, 13 high)
Proposed Planned
Development
460 residential
units
Total: 112
(51 elementary, 24 middle, 37 high)
Z21-01 Staff Report PB 2.4.2021 Page 19 of 24
* Generalized historic generation rates are calculated by dividing the projected New Hanover County public school
student enrollment for the 2020-2021 school year by the estimated number of dwelling units in the county. Currently, there are an average of 0.24 public school students (0.11 for elementary, 0.05 for middle, and 0.08 for high)
generated per dwelling unit across New Hanover County. These numbers are updated annually and include students
attending out-of-district specialty schools, such as year-round elementary schools, Isaac Bear, and SeaTECH. Generation rates do not take into account different housing types and different locations, which typically yield different numbers
of students.
Since the residential components associated with the proposed rezoning are likely to have
a build-out date within 5 years per the Traffic Impact Analysis, staff has outlined existing
school capacity to provide a general idea of the potential impact on public schools.
These numbers do not reflect any future capacity upgrades that may occur over the next
five years or changes to student populations.
School Enrollment* and Capacity** - 2020-2021 Estimates
* Enrollment is based on the New Hanover County Schools enrollment that was projected for the 2020-2021 school year.
** Capacity calculations were determined by New Hanover County Schools for the 2020-2021 school year and are
based on NC DPI Facility Guidelines & Class Size Requirements. Modifications refer to specific program requirements
unique to a particular school. These may include exceptional children’s classrooms beyond the original building design,
classrooms to serve a unique population such as ESL, or classrooms designated for art and music if the building wasn’t
specifically designed with those spaces.
School staff presented a facility needs survey to the Board of Education on January 5, 2021
that included updated NC Department of Public Instruction student growth projections and
school capacity data. While Planning staff does not yet have information specific to the
projected enrollment and capacity of the schools that would be affected by this request, it
appears that planned facility upgrades, combined with changes to student enrollment
patterns, will result in adequate capacity district-wide over the next five to ten years if
facility upgrades are funded.
NEW HANOVER COUNTY STRATEGIC PLAN
One of the goals of the New Hanover County Strategic Plan for 2018-2023 is to encourage
the development of complete communities in the unincorporated county by increasing
housing diversity and access to basic goods and services.
The proposed PD zoning district would allow for a mixture of uses that could increase housing
diversity and increase access to basic goods and services.
The subject site is located in the Monkey Junction community area, where 68% of residents
currently live within one-mile of a convenience need (grocery store, retail staples,
Level
Total
NHC %
Capacity School
Enrollment
of Assigned
School
Capacity
of
Assigned
School w/
Portables
% of
Capacity of
Assigned
School
Funded
Capacity
Upgrades
Elementary 97% Pine Valley 482 501 96% None
Middle 107% Myrtle Grove 714 738 97% None
High 105% Hoggard 2,098 1,882 111% None
Z21-01 Staff Report PB 2.4.2021 Page 20 of 24
pharmacies, etc.), a support service (urgent care, primary doctor’s office, child & adult care,
etc.), and a community facility (public park, school, museum etc.).
The predominant housing type is single family detached at 77%. If developed under the
current R-15 zoning district, single family housing would remain the dominant housing type
and the number of residences within one-mile of a convenience need would decrease to
from 68% to 67%.
Under the proposed PD district the site would allow for a mixture of housing types. It would
increase housing type diversity by reducing the percentage of single family detached (80%
to 76%), and increase single family attached (7% to 9%) and multi-family residences (7%
to 9%).
The proposed PD district could also allow for a provider of a convenience need, support
service and/or community facility. The addition of just a convenience need on the proposed
site would increase the number of residences within one-mile from 93% to 95%, and the
addition of both a convenience need and community facility would increase the number of
residences within one-mile from 68% to 72%.
REPRESENTATIVE DEVELOPMENTS
Representative Developments of R-15:
Grayson Park Clay Crossing
Plantation Landing
Z21-01 Staff Report PB 2.4.2021 Page 21 of 24
Representative Developments of PD:
River Bluffs:
Northchase:
Z21-01 Staff Report PB 2.4.2021 Page 22 of 24
Context and Compatibility
While the area was zoned for low density housing in the late 1960s and early 1970s, the
2016 Comprehensive Plan recommends a mixture of commercial uses and residential
densities ranging from 8 to 15 dwelling units per acre. In addition, there are several
residential developments along the S. College Corridor that obtained a Special Use Permit
to exceed the maximum density of the base residential zoning district, many of which are
permitted up to 10.2 dwelling units per acre.
The subject property is the last large undeveloped tract of land on S. College Road, a
major road corridor. The property is located between two commercial nodes and by
adding a mixed-use project to the subject site, commercial services would be evenly spaced
along S. College Road from Monkey Junction to Shipyard Blvd.
The proposed master plan positions the commercial components along S. College Road and
places lower density housing adjacent to existing residential neighborhoods.
2016 COMPREHENSIVE PLAN
The New Hanover County Future Land Use Map provides a general representation of the vision for
New Hanover County’s future land use, as designated by place types describing the character and
function of the different types of development that make up the community . These place types are
intended to identify general areas for particular development patterns and should not be
interpreted as being parcel specific.
Future Land Use
Map Place Type Community Mixed Use & General Residential
Z21-01 Staff Report PB 2.4.2021 Page 23 of 24
Place Type
Description
Community Mixed Use:
Focuses on small-scale, compact, mixed use development patterns that serve
all modes of travel and act as an attractor for county residents and visitors.
Types of appropriate uses include office, retail, mixed use, recreational,
commercial, institutional, and multi-family and single-family residential.
General Residential:
Focuses on lower-density housing and associated civic and commercial
services. Typically, housing is single-family or duplexes. Commercial uses
should be limited to strategically located office and retail spaces, while
recreation and school facilities are encouraged throughout. Types of uses
include single-family residential, low-density multi-family, residential, light
commercial, civic, and recreational.
Analysis
The subject property is located approximately halfway between the
commercial and services nodes at 17th Street and Monkey Junction along
the S. College Road arterial. The Comprehensive Plan classifies the portion
of the property closest to S. College Road as Community Mixed Use, which
is intended to promote the development of commercial services and
moderate to high density residential development (between approximately
8 to 15 units per acre). The eastern portion of the property closer to existing
single-family neighborhoods is designated as General Residential to
provide a transition to lower density housing (about 8 units per acre or less).
The design of the proposed planned development provides the type of
transition in land use intended by the plan, and the overall residential
density of the project is in line with the recommendation for areas adjacent
to existing neighborhoods.
In addition, the property is strategically located between two commercial
nodes. Providing commercial services on the site could reduce travel times
for the nearby residents, and the proposed residential component of the
project supports the Comprehensive Plan’s goal to provide for a range of
housing types and opportunities for households of different sizes and income
levels.
Consistency
Recommendation
The proposed PD rezoning is generally CONSISTENT with the 2016
Comprehensive Plan because the project provides for the types and mixture
of uses recommended in the Community Mixed Use and General Residential
Place Types, the residential densities are in-line with those recommended
for the property, and the project will provide commercial services in close
proximity to nearby residents.
Z21-01 Staff Report PB 2.4.2021 Page 24 of 24
STAFF RECOMMENDATION
Staff recommends approval of this application and suggests the following motion:
I move to APPROVE the proposed rezoning to a PD district. I find it to be CONSISTENT
with the purposes and intent of the Comprehensive Plan because the project provides
for the types and mixture of uses recommended in the Community Mixed Use and
General Residential Place Types, the residential densities are in-line with those
recommended for the property, and the project will provide commercial services in
close proximity to nearby residents. I also find APPROVAL of the rezoning request is
reasonable and in the public interest because the proposal would benefit the community
by providing diverse housing options and commercial services to nearby residents and
promoting principals of walkable urbanism.
Alternative Motion for Denial
I move to DENY the proposed rezoning to a PD district. While I find it to be
CONSISTENT with the purposes and intent of the Comprehensive Plan because the
project provides for the types and mixture of uses recommended in the Community
Mixed Use and General Residential Place Types, the residential densities are in -line
with those recommended for the property, and the project will provide commercial
services in close proximity to nearby residents, I find DENIAL of the rezoning request
is reasonable and in the public interest because the proposal is not consistent with the
desired character of the surrounding community and the density will adversely impact
the adjacent neighborhoods.