Loading...
Erosion Control Report Wilmington CNG Station Erosion Control Report Erosion and Sediment Control Calculation Report / February 2021 Erosion Control Calculation Report WILMINGTON CNG STATION NEW HANOVER, NORTH CAROLINA PNG-20000 February 15, 2021 DESIGNED BY: KIRK SHEARER REVIEWED BY: BRANDON FINCH, PE 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 NC LIC. # C-0293 Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina i TABLE OF CONTENTS SECTION I ..................................................................................................................................... 3 1.0 PROJECT DESCRIPTION ................................................................................................... 3 2.0 EROSION AND SEDIMENT CONTROL MEASURES .................................................... 3 2.1 Silt Fence ................................................................................................................................................... 3 2.2 Check Dam ................................................................................................................................................ 3 3.0 VEGETATIVE STABILIZATION ...................................................................................... 3 4.0 MAINTENANCE ................................................................................................................. 4 5.0 EROSION CONTROL CALCULATION METHODOLOGY ............................................ 4 5.1 Silt Fence ................................................................................................................................................... 4 5.2 Check Dam ................................................................................................................................................ 4 LIST OF APPENDICES ................................................................................................................. 5 o Project Maps .................................................................................................................................................. 5 o NOAA PFDS Rainfall Data ........................................................................................................................... 5 o Culvert and Dissipator Calculations .............................................................................................................. 5 o Permanent Ditch Calculations ....................................................................................................................... 5 o Ditch Liner Calculations ................................................................................................................................ 5 o Deed ............................................................................................................................................................... 5 Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina ii Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 3 WILMINGTON CNG STATION EROSION CONTROL PERMIT WILMINGTON, NORTH CAROLINA SEDIMENTATION AND EROSION CONTROL REPORT SECTION I 1.0 PROJECT DESCRIPTION This site is located at 141 Sutton Steam Plant Road in Wilmington, North Carolina. Piedmont Natural Gas (PNG) is seeking to build a new compressed natural gas (CNG) fueling station. Proposed improvements include new fueling stations with associated canopy, a CNG compressor pad, driveway and paving improvements, along with supporting utility and stormwater management improvements. The disturbed area for this project is 2.66 acres. 2.0 EROSION AND SEDIMENT CONTROL MEASURES All vegetative practices and erosion and sediment control features shall be designed, constructed and maintained to control runoff resulting from the 2 and 10-year frequency storms. Supporting design calculations are attached. Plan-view drawings with details are also provided. 2.1 Silt Fence Silt fences will be provided down gradient of the proposed site grading at the locations shown on the drawings. The sediment fences will act as a filter for sediment laden runoff sheet flowing from slopes or small areas that cannot be directed to a temporary sediment basin. Silt fence outlets will be placed at any low points along the silt fence to allow collected runoff to pass through without overwhelming the fencing. 2.2 Check Dam A small temporary stone dam constructed across drainage way. To reduce erosion in a drainage channel by reducing the velocity of flow. 3.0 VEGETATIVE STABILIZATION Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 4 Vegetative cover shall be re-established within 14 calendar days or less as per NPDES requirements after completion of the activity. Temporary and permanent seeding specifications are included on the plans. 4.0 MAINTENANCE All erosion and sedimentation control measures shall be checked for stability and operation following every runoff-producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all measures as designed. 5.0 EROSION CONTROL CALCULATION METHODOLOGY 5.1 Silt Fence Silt fence proposed meets the ¼ acre per 100 lf of fence requirements in the North Carolina Erosion and Sediment Control Planning and Design Manual. Gravel silt fence outlets are to be installed at low points in the fence lines as indicated on the plans. 5.2 Check Dam Inspect check dams and channels at least weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. Clean out sediment straw, limbs, or other debris that could clog the channel when needed. Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 5 LIST OF APPENDICES o Project Maps o NOAA PFDS Rainfall Data o Culvert and Dissipator Design o Permanent Ditch Design o Ditch Liner Calculations o Deed Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 6 APPENDIX A: PROJECT MAPS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com \\ 1 0 . 1 . 1 . 2 \ M D r i v e \ P r o j e c t s \ P i e d m o n t N G a s \ P N G - 2 0 0 0 0 \ 0 4 - P r o d u c t i o n \ E n g i n e e r i n g \ C o n s t r u c t i o n D r a w i n g s \ C u r r e n t D r a w i n g s \ P N G 2 0 0 0 0 - G D A . d w g , 2/ 1 5 / 2 0 2 1 4 : 4 7 : 1 4 P M , NC S h e PIEDMONT NATURAL GAS DRAINAGE AREA DELINEATION MAP GRAPHIC SCALE 0 20 40 80 1 inch = 40 ft. CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. R Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 7 APPENDIX B: NOAA PFDS RAINFALL DATA NOAA Atlas 14, Volume 2, Version 3 Location name: Wilmington, North Carolina, USA* Latitude: 34.235°, Longitude: -77.946° Elevation: 32.65 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 6.26(5.86‑6.76)7.44(6.95‑8.02)8.71(8.11‑9.36)9.70(9.00‑10.4)11.0(10.1‑11.7)11.9(10.9‑12.8)12.9(11.8‑13.8)13.8(12.6‑14.9)15.1(13.6‑16.2)16.1(14.4‑17.4) 10-min 5.00 (4.67‑5.39) 5.95 (5.55‑6.41) 6.97 (6.50‑7.49) 7.76 (7.20‑8.33) 8.73 (8.06‑9.35) 9.47 (8.71‑10.2) 10.2 (9.35‑11.0) 11.0 (9.96‑11.8) 11.9 (10.7‑12.9) 12.7 (11.3‑13.7) 15-min 4.17 (3.90‑4.49) 4.99 (4.65‑5.37) 5.88 (5.48‑6.32) 6.54 (6.07‑7.03) 7.38 (6.82‑7.90) 8.00 (7.35‑8.58) 8.62 (7.88‑9.24) 9.22 (8.38‑9.90) 10.0 (9.00‑10.8) 10.6 (9.46‑11.5) 30-min 2.86 (2.67‑3.08) 3.45 (3.21‑3.71) 4.18 (3.89‑4.49) 4.74 (4.40‑5.09) 5.46 (5.05‑5.85) 6.02 (5.54‑6.46) 6.60 (6.03‑7.08) 7.18 (6.52‑7.71) 7.96 (7.16‑8.58) 8.60 (7.66‑9.27) 60-min 1.78 (1.67‑1.92) 2.16 (2.02‑2.33) 2.68 (2.50‑2.88) 3.09 (2.86‑3.32) 3.64 (3.36‑3.90) 4.08 (3.75‑4.38) 4.54 (4.16‑4.88) 5.03 (4.57‑5.41) 5.71 (5.14‑6.16) 6.27 (5.59‑6.77) 2-hr 1.06 (0.974‑1.15) 1.29 (1.19‑1.40) 1.64 (1.51‑1.79) 1.93 (1.78‑2.11) 2.36 (2.16‑2.57) 2.72 (2.48‑2.96) 3.12 (2.83‑3.40) 3.56 (3.20‑3.86) 4.21 (3.74‑4.58) 4.77 (4.20‑5.20) 3-hr 0.751 (0.695‑0.822) 0.914 (0.844‑0.999) 1.17 (1.08‑1.28) 1.39 (1.28‑1.52) 1.72 (1.57‑1.87) 2.01 (1.82‑2.19) 2.33 (2.10‑2.53) 2.69 (2.40‑2.91) 3.23 (2.85‑3.51) 3.71 (3.23‑4.03) 6-hr 0.467(0.432‑0.512)0.568(0.525‑0.623)0.728(0.671‑0.797)0.868(0.797‑0.948)1.08(0.982‑1.17)1.26(1.14‑1.37)1.47(1.32‑1.59)1.70(1.51‑1.85)2.05(1.80‑2.23)2.37(2.05‑2.58) 12-hr 0.272(0.249‑0.300)0.331(0.303‑0.364)0.427(0.390‑0.469)0.511(0.465‑0.561)0.638(0.576‑0.699)0.752(0.675‑0.822)0.881(0.784‑0.962)1.03(0.904‑1.12)1.25(1.09‑1.37)1.45(1.24‑1.59) 24-hr 0.160 (0.146‑0.178) 0.194 (0.177‑0.217) 0.251 (0.228‑0.280) 0.301 (0.273‑0.335) 0.379 (0.340‑0.420) 0.448 (0.398‑0.497) 0.526 (0.463‑0.584) 0.616 (0.534‑0.684) 0.754 (0.640‑0.844) 0.877 (0.731‑0.986) 2-day 0.094 (0.086‑0.104) 0.114 (0.104‑0.126) 0.146 (0.134‑0.162) 0.174 (0.159‑0.193) 0.217 (0.196‑0.241) 0.255 (0.227‑0.283) 0.297 (0.262‑0.331) 0.346 (0.300‑0.386) 0.419 (0.357‑0.472) 0.484 (0.404‑0.547) 3-day 0.067 (0.061‑0.074) 0.081 (0.074‑0.089) 0.103 (0.094‑0.114) 0.122 (0.111‑0.135) 0.151 (0.136‑0.167) 0.176 (0.157‑0.195) 0.204 (0.181‑0.227) 0.236 (0.206‑0.263) 0.284 (0.243‑0.319) 0.326 (0.274‑0.368) 4-day 0.053 (0.049‑0.059) 0.064 (0.059‑0.071) 0.081 (0.074‑0.090) 0.096 (0.087‑0.106) 0.118 (0.106‑0.130) 0.137 (0.122‑0.151) 0.158 (0.140‑0.175) 0.181 (0.158‑0.201) 0.216 (0.186‑0.242) 0.247 (0.209‑0.279) 7-day 0.035 (0.032‑0.038) 0.042 (0.039‑0.046) 0.053 (0.049‑0.058) 0.062 (0.057‑0.068) 0.075 (0.069‑0.082) 0.086 (0.079‑0.094) 0.099 (0.089‑0.108) 0.112 (0.100‑0.123) 0.131 (0.115‑0.145) 0.148 (0.128‑0.165) 10-day 0.028(0.026‑0.030)0.033(0.031‑0.036)0.041(0.038‑0.045)0.048(0.044‑0.052)0.057(0.053‑0.062)0.065(0.060‑0.071)0.074(0.067‑0.081)0.083(0.075‑0.091)0.097(0.086‑0.107)0.109(0.094‑0.121) 20-day 0.019(0.017‑0.020)0.022(0.021‑0.024)0.027(0.025‑0.029)0.031(0.029‑0.033)0.036(0.034‑0.039)0.041(0.038‑0.044)0.046(0.042‑0.050)0.051(0.046‑0.056)0.059(0.053‑0.064)0.065(0.057‑0.072) 30-day 0.015 (0.014‑0.016) 0.018 (0.017‑0.019) 0.022 (0.020‑0.023) 0.025 (0.023‑0.026) 0.029 (0.027‑0.031) 0.032 (0.030‑0.034) 0.035 (0.033‑0.038) 0.039 (0.035‑0.042) 0.044 (0.039‑0.047) 0.047 (0.042‑0.052) 45-day 0.013 (0.012‑0.013) 0.015 (0.014‑0.016) 0.018 (0.017‑0.019) 0.020 (0.019‑0.021) 0.023 (0.022‑0.024) 0.025 (0.024‑0.027) 0.028 (0.026‑0.030) 0.031 (0.028‑0.033) 0.034 (0.031‑0.037) 0.037 (0.033‑0.040) 60-day 0.011 (0.011‑0.012) 0.013 (0.013‑0.014) 0.016 (0.015‑0.017) 0.017 (0.016‑0.019) 0.020 (0.019‑0.021) 0.022 (0.020‑0.023) 0.024 (0.022‑0.025) 0.026 (0.024‑0.027) 0.028 (0.026‑0.030) 0.030 (0.027‑0.032) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Back to Top Maps & aerials Small scale terrain Large scale terrain Large scale map + – 3km 2mi + – 100km 60mi + – 100km 60mi Large scale aerial Back to Top US Department of CommerceNational Oceanic and Atmospheric AdministrationNational Weather ServiceNational Water Center1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 8 APPENDIX C: CULVERT AND DISSIPATOR CALCULATIONS Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Feb 15 2021 CULVERT Invert Elev Dn (ft)= 22.00 Pipe Length (ft)= 92.00 Slope (%)= 1.00 Invert Elev Up (ft)= 22.92 Rise (in)= 18.0 Shape= Circular Span (in)= 18.0 No. Barrels= 1 n-Value= 0.013 Culvert Type= Circular Concrete Culvert Entrance= Square edge w/headwall (C) Coeff. K,M,c,Y,k= 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft)= 26.40 Top Width (ft)= 44.00 Crest Width (ft)= 10.00 Calculations Qmin (cfs)= 4.69 Qmax (cfs)= 4.69 Tailwater Elev (ft)= (dc+D)/2 Highlighted Qtotal (cfs)= 4.69 Qpipe (cfs)= 4.69 Qovertop (cfs)= 0.00 Veloc Dn (ft/s)= 3.18 Veloc Up (ft/s)= 4.67 HGL Dn (ft)= 23.17 HGL Up (ft)= 23.75 Hw Elev (ft)= 24.15 Hw/D (ft)= 0.82 Flow Regime= Inlet Control Project:Date:2/10/2021 Project Number:Calculated By: KAS Outlet Number: Outlet flowrate =4.69 cfs Pipe diameter = 18 inches Number of pipes = 1 Pipe separation = 0 feet Outlet Velocity = 3.18 ft/sec Zone from graph above =1 Outlet pipe diameter 18 in.Length =6.0 ft. Outlet flowrate 4.7 cfs Width =3.9 ft. Outlet velocity 3.2 ft/sec Stone diameter =3 in. Material =Class A Thickness =12 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4 x D(o)3 x D(o) 2 Class B 6 18 6 x D(o)3 x D(o) 3 Class I 13 24 8 x D(o)3 x D(o) 4 Class I 13 24 8 x D(o)3 x D(o) 5 Class II 23 36 10 x D(o)3 x D(o) 6 Class II 23 36 10 x D(o)3 x D(o) 7 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET PNG Wilmington PNG-20000 Culvert Special study required 3.2 ft/sec 0 5 10 15 20 25 0 1 2 3 4 5 6 7 8 9 10 Ve l o c i t y ( f t / s e c ) Pipe diameter (ft) Figure 8.06.b.1 Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 9 APPENDIX D: PERMANENT DITCH CALCULATIONS Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Feb 15 2021 PD-1 Triangular Side Slopes (z:1)= 4.00, 4.00 Total Depth (ft)= 1.25 Invert Elev (ft)= 221.00 Slope (%)= 1.00 N-Value= 0.035 Calculations Compute by:Known Q Known Q (cfs)= 3.77 Highlighted Depth (ft)= 0.69 Q (cfs)= 3.770 Area (sqft)= 1.90 Velocity (ft/s)= 1.98 Wetted Perim (ft)= 5.69 Crit Depth, Yc (ft)= 0.57 Top Width (ft)= 5.52 EGL (ft)= 0.75 0 1 2 3 4 5 6 7 8 9 10 11 12 Elev (ft)Depth (ft)Section 220.50-0.50 221.000.00 221.500.50 222.001.00 222.501.50 223.002.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Feb 15 2021 PD-2 Triangular Side Slopes (z:1)= 4.00, 4.00 Total Depth (ft)= 1.25 Invert Elev (ft)= 22.92 Slope (%)= 1.18 N-Value= 0.035 Calculations Compute by:Known Q Known Q (cfs)= 4.69 Highlighted Depth (ft)= 0.72 Q (cfs)= 4.690 Area (sqft)= 2.07 Velocity (ft/s)= 2.26 Wetted Perim (ft)= 5.94 Crit Depth, Yc (ft)= 0.62 Top Width (ft)= 5.76 EGL (ft)= 0.80 0 1 2 3 4 5 6 7 8 9 10 11 12 Elev (ft)Depth (ft)Section 22.00-0.92 22.50-0.42 23.000.08 23.500.58 24.001.08 24.501.58 25.002.08 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Feb 15 2021 PD-3 Triangular Side Slopes (z:1)= 4.00, 4.00 Total Depth (ft)= 1.00 Invert Elev (ft)= 25.00 Slope (%)= 1.95 N-Value= 0.035 Calculations Compute by:Known Q Known Q (cfs)= 2.21 Highlighted Depth (ft)= 0.50 Q (cfs)= 2.210 Area (sqft)= 1.00 Velocity (ft/s)= 2.21 Wetted Perim (ft)= 4.12 Crit Depth, Yc (ft)= 0.46 Top Width (ft)= 4.00 EGL (ft)= 0.58 0 1 2 3 4 5 6 7 8 9 10 Elev (ft)Depth (ft)Section 24.50-0.50 25.000.00 25.500.50 26.001.00 26.501.50 27.002.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Feb 15 2021 PD-4 Triangular Side Slopes (z:1)= 4.00, 4.00 Total Depth (ft)= 1.10 Invert Elev (ft)= 24.00 Slope (%)= 2.19 N-Value= 0.035 Calculations Compute by:Known Q Known Q (cfs)= 3.36 Highlighted Depth (ft)= 0.57 Q (cfs)= 3.360 Area (sqft)= 1.30 Velocity (ft/s)= 2.59 Wetted Perim (ft)= 4.70 Crit Depth, Yc (ft)= 0.54 Top Width (ft)= 4.56 EGL (ft)= 0.67 0 1 2 3 4 5 6 7 8 9 10 11 Elev (ft)Depth (ft)Section 23.50-0.50 24.000.00 24.500.50 25.001.00 25.501.50 26.002.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Feb 15 2021 PD-5 Triangular Side Slopes (z:1)= 4.00, 4.00 Total Depth (ft)= 1.50 Invert Elev (ft)= 223.00 Slope (%)= 1.67 N-Value= 0.035 Calculations Compute by:Known Q Known Q (cfs)= 11.48 Highlighted Depth (ft)= 0.94 Q (cfs)= 11.48 Area (sqft)= 3.53 Velocity (ft/s)= 3.25 Wetted Perim (ft)= 7.75 Crit Depth, Yc (ft)= 0.88 Top Width (ft)= 7.52 EGL (ft)= 1.10 0 2 4 6 8 10 12 14 16 Elev (ft)Depth (ft)Section 222.50-0.50 223.000.00 223.500.50 224.001.00 224.501.50 225.002.00 Reach (ft) Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 10 APPENDIX E: DITCH LINER CALCULATIONS Project Name:Wilmington CNG Station Date:2/11/2021 Project Number:PNG-20000 Calculated By:KAS Channel Number:PD-1 I. FLOW CALCULATIONS Drainage Area =0.46 acres SCS CN =92 Rational C =0.84 TC =5.00 min I2 =7.44 in/hr Calculated values are for the Raleigh-Durham area. For other areas, values will have to be input manually. I10 =9.70 in/hr Q2 =2.87 cfs Q10 =3.75 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =1.00% Left Sideslope =4.00 H:V Right Sideslope =4.00 H:V Maximum Vel. =4.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.059 1.25 6.25 10.31 0.61 1.80 1.09 3.75 11.28 0.78 Tall Fescue 0.059 0.034 0.4 0.64 3.30 0.19 1.46 n/a 3.75 0.94 0.25 ERONET P300 0.034 ------->NO PERMANENT LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted PerimeterHydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.75 2.25 6.18 0.36 3.44 n/a 2.87 7.74 0.47 Bare Earth - 0.055 1.05 4.41 8.66 0.51 1.72 n/a 2.87 7.60 0.66 ERONET S75 0.043 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle T = Top; B = Bottom; M = Middle 100% Straw Fiber - 0.5lb/sy T(only): Lightweight photodegradable - 1.5lb/10000sf 5.0 1.55 Description Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Allowable Partially Vegetated Shear Stress [lb/ft^2] 8.0 Temporary Liner Specifications -ERONET S75 Matrix Netting 100% UV Stable Polypropylene Fiber - 0.7lb/sy T: UV-Stabilized Polypropylene - 5lb/1000sf B: UV-Stabilized Polypropylene - 3lb/1000sf Allowabe Partially Vegetated Velocity (f/s) 9.0 Manning's "n" Manning's "n" EROSION CONTROL CHANNEL DESIGN 12 Months Permanent Liner Specifications -ERONET P300 C = 0.020 x CN - 1.0 Conservative assumption For established grass lined channel For newly graded areas, HSG 'A' soils Project Name:Wilmington CNG Station Date:2/11/2021 Project Number:PNG-20000 Calculated By:KAS Channel Number:PD-2 I. FLOW CALCULATIONS Drainage Area =0.75 acres SCS CN =92 Rational C =0.84 TC =5.00 min I2 =7.44 in/hr Calculated values are for the Raleigh-Durham area. For other areas, values will have to be input manually. I10 =9.70 in/hr Q2 =4.69 cfs Q10 =6.11 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =1.18% Left Sideslope =4.00 H:V Right Sideslope =4.00 H:V Maximum Vel. =4.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.165 0.7 1.96 5.77 0.34 0.48 0.16 6.11 0.93 0.52 Tall Fescue 0.165 0.034 0.5 1.00 4.12 0.24 1.85 n/a 6.11 1.85 0.37 ERONET P300 0.034 ------->NO PERMANENT LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted PerimeterHydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.4 0.64 3.30 0.19 2.46 n/a 4.69 1.57 0.29 Bare Earth - 0.055 0.5 1.00 4.12 0.24 1.14 n/a 4.69 1.14 0.37 ERONET S75 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle T = Top; B = Bottom; M = Middle 8.0 100% Straw Fiber - 0.5lb/sy T(only): Lightweight photodegradable - 1.5lb/10000sf 5.0 1.55 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Temporary Liner Specifications -ERONET S75 Manning's "n"Description 12 Months Permanent Liner Specifications -ERONET P300 Matrix Netting Allowabe Partially Vegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 100% UV Stable Polypropylene Fiber - 0.7lb/sy T: UV-Stabilized Polypropylene - 5lb/1000sf B: UV-Stabilized Polypropylene - 3lb/1000sf 9.0 Manning's "n" EROSION CONTROL CHANNEL DESIGN For newly graded areas, HSG 'A' soils C = 0.020 x CN - 1.0 Conservative assumption For established grass lined channel Project Name:Wilmington CNG Station Date:2/11/2021 Project Number:PNG-20000 Calculated By:KAS Channel Number:PD-3 I. FLOW CALCULATIONS Drainage Area =0.27 acres SCS CN =92 Rational C =0.84 TC =5.00 min I2 =7.44 in/hr Calculated values are for the Raleigh-Durham area. For other areas, values will have to be input manually. I10 =9.70 in/hr Q2 =1.69 cfs Q10 =2.20 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =1.95% Left Sideslope =3.00 H:V Right Sideslope =4.00 H:V Maximum Vel. =4.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.110 0.75 1.97 5.46 0.36 0.96 0.34 2.20 1.88 0.91 Tall Fescue 0.110 0.032 0.75 1.97 5.46 0.36 3.28 n/a 2.20 6.46 0.91 ERONET P300 0.032 ------->NO PERMANENT LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted PerimeterHydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.4 0.56 2.91 0.19 3.14 n/a 1.69 1.76 0.49 Bare Earth - 0.055 0.5 0.88 3.64 0.24 1.46 n/a 1.69 1.28 0.61 ERONET S75 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle T = Top; B = Bottom; M = Middle 8.0 100% Straw Fiber - 0.5lb/sy T(only): Lightweight photodegradable - 1.5lb/10000sf 5.0 1.55 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Temporary Liner Specifications -ERONET S75 Manning's "n"Description 12 Months Permanent Liner Specifications -ERONET P300 Matrix Netting Allowabe Partially Vegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 100% UV Stable Polypropylene Fiber - 0.7lb/sy T: UV-Stabilized Polypropylene - 5lb/1000sf B: UV-Stabilized Polypropylene - 3lb/1000sf 9.0 Manning's "n" EROSION CONTROL CHANNEL DESIGN For newly graded areas, HSG 'A' soils C = 0.020 x CN - 1.0 Conservative assumption For established grass lined channel Project Name:Wilmington CNG Station Date:2/11/2021 Project Number:PNG-20000 Calculated By:KAS Channel Number:PD-4 I. FLOW CALCULATIONS Drainage Area =0.41 acres SCS CN =92 Rational C =0.84 TC =5.00 min I2 =7.44 in/hr Calculated values are for the Raleigh-Durham area. For other areas, values will have to be input manually. I10 =9.70 in/hr Q2 =2.56 cfs Q10 =3.34 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =2.19% Left Sideslope =4.00 H:V Right Sideslope =3.00 H:V Maximum Vel. =4.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.110 0.75 1.97 5.46 0.36 1.01 0.36 3.34 1.99 1.02 Tall Fescue 0.110 0.032 0.75 1.97 5.46 0.36 3.48 n/a 3.34 6.85 1.02 ERONET P300 0.032 ------->NO PERMANENT LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted PerimeterHydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.4 0.56 2.91 0.19 3.33 n/a 2.56 1.86 0.55 Bare Earth - 0.055 0.5 0.88 3.64 0.24 1.54 n/a 2.56 1.35 0.68 ERONET S75 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle T = Top; B = Bottom; M = Middle Manning's "n" EROSION CONTROL CHANNEL DESIGN For newly graded areas, HSG 'A' soils C = 0.020 x CN - 1.0 Conservative assumption For established grass lined channel Temporary Liner Specifications -ERONET S75 Manning's "n"Description 12 Months Permanent Liner Specifications -ERONET P300 Matrix Netting Allowabe Partially Vegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 100% UV Stable Polypropylene Fiber - 0.7lb/sy T: UV-Stabilized Polypropylene - 5lb/1000sf B: UV-Stabilized Polypropylene - 3lb/1000sf 9.0 8.0 100% Straw Fiber - 0.5lb/sy T(only): Lightweight photodegradable - 1.5lb/10000sf 5.0 1.55 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Project Name:Wilmington CNG Station Date:2/11/2021 Project Number:PNG-20000 Calculated By:KAS Channel Number:PD-5 I. FLOW CALCULATIONS Drainage Area =1.59 acres SCS CN =92 Rational C =0.84 TC =5.00 min I2 =7.44 in/hr Calculated values are for the Raleigh-Durham area. For other areas, values will have to be input manually. I10 =9.70 in/hr Q2 =9.94 cfs Q10 =12.96 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =1.67% Left Sideslope =4.00 H:V Right Sideslope =4.00 H:V Maximum Vel. =4.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.110 0.75 2.25 6.18 0.36 0.89 0.32 12.96 2.00 0.78 Tall Fescue 0.110 0.032 0.75 2.25 6.18 0.36 3.06 n/a 12.96 6.88 0.78 ERONET P300 0.032 ------->NO PERMANENT LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted PerimeterHydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.4 0.64 3.30 0.19 2.92 n/a 9.94 1.87 0.42 Bare Earth - 0.055 0.5 1.00 4.12 0.24 1.36 n/a 9.94 1.36 0.52 ERONET S75 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle T = Top; B = Bottom; M = Middle Manning's "n" EROSION CONTROL CHANNEL DESIGN For newly graded areas, HSG 'A' soils C = 0.020 x CN - 1.0 Conservative assumption For established grass lined channel Temporary Liner Specifications -ERONET S75 Manning's "n"Description 12 Months Permanent Liner Specifications -ERONET P300 Matrix Netting Allowabe Partially Vegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 100% UV Stable Polypropylene Fiber - 0.7lb/sy T: UV-Stabilized Polypropylene - 5lb/1000sf B: UV-Stabilized Polypropylene - 3lb/1000sf 9.0 8.0 100% Straw Fiber - 0.5lb/sy T(only): Lightweight photodegradable - 1.5lb/10000sf 5.0 1.55 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Sedimentation and Erosion Control Report Then John R. McAdams Company Piedmont Natural Gas 2/15/2021 Wilmington CNG Station Wilmington, North Carolina 11 APPENDIX F: DEED