Loading...
Stormwater ReportSTORMWATER REPORT Buy Quick Food Mart 7650 Market Street Wilmington, North Carolina for Khalid Saleh Matthew C. Kirchner, P.E. EAGLE ENGINEERING, INC. 2013A Van Buren Ave. Indian Trail, NC 28079 EEI PROJECT NO.: 7057 December 15, 2020 Initials Date SAP 03-10-21 03/10/202100000303000030000030003000000000000000000/10/2021 Buy Quick Food Mart – Wilmington 7057 Stormwater Report March 10, 2021 1.0 Project Address and Summary This project is located at 7650 Market Street, Wilmington, North Carolina in New Hanover County, about 1.7 miles north of its intersection with Military Cutoff Road. The proposed development will include construction of a convenience store as well as a vehicle fueling station. The site development activities will include site grading, building construction, BMP installation, and sanitary sewer and water main service connections. Development of this site will include the installation of a stormwater wetland to be used for stormwater quality. The wetlands has been sized to provide the required water quality and water quantity volumes per the NCDEQ Stormwater BMP Manual. Detention is also being provided for the 2-, 10-, and 25- year storm events. In addition, the 100-year storm event is able to pass through the stormwater wetlands with greater than 6” of freeboard. Soils on the site consist of:  Kr – Kureb Sand, 1 to 8 percent slopes, Hydrologic Soils Group “A”  Le – Leon Sand, Hydrologic Soils Group “A”  Mu – Murville Fine Sane, Hydrologic Soils Group “A” 2.0 Water Quality / Quantity Volume Control and Peak Flow Control Water quality volume and release rate calculations were performed and can be found on the following sheets. 3.0 Predeveloped Conditions The existing conditions currently consist of a commercial site containing existing buildings, asphalt and gravel parking lots, as well as minor wooded areas covering primarily the southern end of the site. The site is bounded by Market Street along on its western edge, commercial properties to the south, east and a portion of the north, and a private access road along the remainder of the northern property line. The entire site generally drains to from northwest to the southeast corner of the site, sheet flowing across the existing land and onto the neighboring southern properties. See the pre-development drainage area map within this report for existing topography of the site. The time of concentration has been calculated using TR-55 and is outlined on the drainage area maps, and calculations. Curve Number (CN) for the drainage basin was computed as a composite average of the various existing land uses in the predevelopment drainage area and resulting post-development drainage area. Calculations have been included with the hydrographs within this report.  Pre-Development Area A: CN = 68 Buy Quick Food Mart – Wilmington 7057 Stormwater Report March 10, 2021 4.0 Post Developed Conditions The development will consist of the construction of a convenience store and a vehicle fueling station, as well as all required pavement, curb and gutter, sidewalks, and grading to allow the site to function properly. The stormwater wetland, parking lot, building, and utility infrastructure will be constructed after the stabilization of all erosion control measures. One stormwater wetland is being proposed to control peak runoff and provide stormwater quality for the site. Drainage area A also consists of a bypass drainage basin. This bypass drainage basin consists of all areas outside the limits of the primary drainage basin A, which is being picked up by the onsite storm drain system and directed to the proposed stormwater wetland. The bypass basin consists mostly of undisturbed, offsite areas consisting of developed commercial parcels, but some portion of the basin will be grading and stabilized grass area with a small amount of impervious area. The combination of the bypass basin with the primary drainage shed has been taken into account when comparing the pre-development and post development hydrographs and flow rates. The post development hydrographs have been modeled for the proposed onsite improvements and the proposed bypass areas and combined for a cumulative comparison to the existing runoff from the site. The composite Curve Numbers calculated for the post developed basins are the following:  Post Development Area A: CN = 92  Post Development Area Bypass: CN = 66 5.0 Detention Stage/Storage Computations One Stormwater Wetland has been designed to treat the water quality volume and control the post-developed peak rate of discharge to below pre-developed discharge rates. The water quality and stage/storage calculations are included within this report. The rainfall intensities used are for the 24 hour storm for each storm event for both the pre-developed and post-developed conditions. The outlet structure for the basin has been placed so that the stage/storage elevation begins at the permanent pool elevation. Water quality and quantity storage and treatment will be provided above the permanent pool in the pond. Buy Quick Food Mart – Wilmington 7057 Stormwater Report March 10, 2021 6.0 Outlet Structures The outlet structure will be constructed within the stormwater wetland near the downstream end of the pond. The structure consists of a rip-rap weir with (2) 10” ADS CPP pipes placed through the embankment and has been designed to efficiently provide water quality control. 7.0 Erosion Control Erosion control will be provided by utilizing a stabilized construction entrance, perimeter silt fence, and several silt fence outlets, and skimmer basin and inlet protection for phase 2. Erosion control devices will be maintained in place until approval by the New Hanover County Inspectors at which time temporary measures will be removed. Please refer to the construction drawings for locations and quantities of erosion control measures. Hydrologic Soil Group—New Hanover County, North Carolina (Market Street - New Hanover Co) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/30/2020 Page 1 of 437971203797130379714037971503797160379717037971803797190379720037972103797220379711037971203797130379714037971503797160379717037971803797190379720037972103797220241500241510241520241530241540241550241560241570241580241590241600241610241620241630241640241650241660241670 241500 241510 241520 241530 241540 241550 241560 241570 241580 241590 241600 241610 241620 241630 241640 241650 241660 34° 17' 2'' N 77° 48' 29'' W34° 17' 2'' N77° 48' 22'' W34° 16' 59'' N 77° 48' 29'' W34° 16' 59'' N 77° 48' 22'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 35 70 140 210 Feet 0 10 20 40 60 Meters Map Scale: 1:803 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: New Hanover County, North Carolina Survey Area Data: Version 21, Jun 4, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 21, 2018—Nov 28, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—New Hanover County, North Carolina (Market Street - New Hanover Co) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/30/2020 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Kr Kureb sand, 1 to 8 percent slopes A 0.1 4.1% Le Leon sand A/D 1.2 78.3% Mu Murville fine sand A/D 0.3 17.6% Totals for Area of Interest 1.5 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—New Hanover County, North Carolina Market Street - New Hanover Co Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/30/2020 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—New Hanover County, North Carolina Market Street - New Hanover Co Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/30/2020 Page 4 of 4 3/8/2021 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2835&lon=-77.8076&data=depth&units=english&series=pds 1/4 NOAA Atlas 14, Volume 2, Version 3 Location name: Wilmington, North Carolina, USA* Latitude: 34.2835°, Longitude: -77.8076° Elevation: 32.84 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.521 (0.486‑0.563) 0.620 (0.577‑0.669) 0.725 (0.673‑0.781) 0.806 (0.747‑0.869) 0.910 (0.839‑0.979) 0.989 (0.907‑1.06) 1.07 (0.976‑1.15) 1.15 (1.04‑1.24) 1.25 (1.13‑1.35) 1.34 (1.19‑1.45) 10-min 0.833 (0.776‑0.899) 0.991 (0.922‑1.07) 1.16 (1.08‑1.25) 1.29 (1.19‑1.39) 1.45 (1.34‑1.56) 1.57 (1.45‑1.69) 1.70 (1.55‑1.83) 1.82 (1.65‑1.96) 1.98 (1.78‑2.14) 2.11 (1.88‑2.28) 15-min 1.04 (0.970‑1.12) 1.25 (1.16‑1.34) 1.47 (1.36‑1.58) 1.63 (1.51‑1.76) 1.84 (1.70‑1.98) 1.99 (1.83‑2.15) 2.15 (1.96‑2.31) 2.30 (2.08‑2.48) 2.50 (2.24‑2.70) 2.65 (2.36‑2.86) 30-min 1.43 (1.33‑1.54) 1.72 (1.60‑1.86) 2.09 (1.94‑2.25) 2.36 (2.19‑2.55) 2.72 (2.51‑2.93) 3.00 (2.76‑3.23) 3.29 (3.00‑3.54) 3.58 (3.24‑3.85) 3.97 (3.56‑4.29) 4.29 (3.81‑4.64) 60-min 1.78 (1.66‑1.92) 2.16 (2.01‑2.33) 2.67 (2.48‑2.88) 3.08 (2.85‑3.32) 3.63 (3.34‑3.90) 4.07 (3.73‑4.38) 4.53 (4.13‑4.87) 5.02 (4.55‑5.41) 5.70 (5.11‑6.15) 6.26 (5.57‑6.77) 2-hr 2.11 (1.94‑2.30) 2.57 (2.37‑2.81) 3.27 (3.01‑3.57) 3.85 (3.54‑4.21) 4.70 (4.29‑5.12) 5.42 (4.93‑5.91) 6.21 (5.61‑6.77) 7.08 (6.34‑7.69) 8.36 (7.41‑9.11) 9.46 (8.32‑10.3) 3-hr 2.25 (2.07‑2.47) 2.74 (2.52‑3.01) 3.51 (3.22‑3.84) 4.17 (3.81‑4.56) 5.15 (4.68‑5.62) 6.01 (5.43‑6.56) 6.96 (6.24‑7.59) 8.02 (7.14‑8.73) 9.64 (8.47‑10.5) 11.1 (9.60‑12.1) 6-hr 2.79 (2.57‑3.08) 3.40 (3.14‑3.75) 4.36 (4.00‑4.79) 5.19 (4.75‑5.70) 6.43 (5.85‑7.04) 7.52 (6.79‑8.23) 8.75 (7.85‑9.56) 10.1 (8.97‑11.1) 12.2 (10.7‑13.4) 14.1 (12.2‑15.4) 12-hr 3.27 (2.99‑3.63) 3.99 (3.64‑4.41) 5.14 (4.68‑5.68) 6.15 (5.58‑6.79) 7.68 (6.90‑8.45) 9.04 (8.08‑9.93) 10.6 (9.38‑11.6) 12.3 (10.8‑13.5) 15.0 (13.0‑16.5) 17.4 (14.8‑19.1) 24-hr 3.86 (3.51‑4.30) 4.68 (4.26‑5.23) 6.06 (5.51‑6.76) 7.27 (6.59‑8.09) 9.13 (8.18‑10.1) 10.8 (9.57‑12.0) 12.7 (11.1‑14.1) 14.8 (12.8‑16.5) 18.1 (15.4‑20.3) 21.1 (17.5‑23.7) 2-day 4.58 (4.18‑5.07) 5.53 (5.06‑6.14) 7.10 (6.47‑7.88) 8.47 (7.68‑9.39) 10.5 (9.48‑11.7) 12.4 (11.0‑13.8) 14.4 (12.7‑16.1) 16.8 (14.6‑18.8) 20.4 (17.3‑23.0) 23.5 (19.6‑26.7) 3-day 4.89 (4.47‑5.41) 5.90 (5.40‑6.54) 7.52 (6.86‑8.34) 8.92 (8.10‑9.88) 11.0 (9.93‑12.2) 12.9 (11.5‑14.3) 14.9 (13.2‑16.6) 17.2 (15.0‑19.3) 20.8 (17.7‑23.4) 23.9 (20.0‑27.0) 4-day 5.20 (4.75‑5.75) 6.27 (5.74‑6.94) 7.94 (7.24‑8.79) 9.37 (8.52‑10.4) 11.5 (10.4‑12.7) 13.3 (11.9‑14.8) 15.4 (13.6‑17.1) 17.7 (15.4‑19.7) 21.1 (18.1‑23.8) 24.2 (20.4‑27.4) 7-day 5.98 (5.52‑6.54) 7.20 (6.65‑7.88) 9.06 (8.34‑9.91) 10.6 (9.74‑11.6) 12.9 (11.7‑14.1) 14.8 (13.4‑16.2) 16.9 (15.1‑18.5) 19.2 (17.0‑21.1) 22.5 (19.6‑25.0) 25.4 (21.8‑28.3) 10-day 6.76 (6.25‑7.35) 8.09 (7.49‑8.82) 10.0 (9.26‑10.9) 11.7 (10.7‑12.7) 14.0 (12.8‑15.3) 16.0 (14.5‑17.5) 18.1 (16.4‑19.8) 20.4 (18.3‑22.4) 23.8 (21.0‑26.3) 26.6 (23.1‑29.7) 20-day 9.05 (8.43‑9.76) 10.8 (10.0‑11.6) 13.1 (12.2‑14.2) 15.1 (14.0‑16.3) 17.9 (16.5‑19.3) 20.2 (18.5‑21.8) 22.6 (20.6‑24.5) 25.2 (22.7‑27.4) 28.8 (25.7‑31.6) 31.9 (28.0‑35.2) 30-day 11.1 (10.4‑11.9) 13.2 (12.4‑14.1) 15.8 (14.9‑16.9) 18.0 (16.8‑19.2) 21.0 (19.5‑22.4) 23.3 (21.6‑25.0) 25.8 (23.8‑27.7) 28.4 (25.9‑30.5) 31.9 (28.8‑34.6) 34.7 (31.1‑37.8) 45-day 13.8 (13.0‑14.7) 16.4 (15.4‑17.4) 19.4 (18.3‑20.7) 21.9 (20.6‑23.3) 25.3 (23.7‑27.0) 28.0 (26.1‑29.9) 30.8 (28.6‑33.0) 33.7 (31.0‑36.2) 37.6 (34.2‑40.6) 40.7 (36.7‑44.2) 60-day 16.6 (15.7‑17.6) 19.6 (18.5‑20.8) 22.9 (21.6‑24.3) 25.6 (24.1‑27.1) 29.1 (27.4‑30.9) 31.9 (29.9‑33.9) 34.7 (32.3‑37.0) 37.5 (34.7‑40.1) 41.2 (37.8‑44.3) 44.1 (40.2‑47.7) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimatesat upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical 3/8/2021 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2835&lon=-77.8076&data=depth&units=english&series=pds 2/4 Back to Top Maps & aerials Small scale terrain 3/8/2021 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2835&lon=-77.8076&data=intensity&units=english&series=pds 1/4 NOAA Atlas 14, Volume 2, Version 3 Location name: Wilmington, North Carolina, USA* Latitude: 34.2835°, Longitude: -77.8076° Elevation: 32.84 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 6.25 (5.83‑6.76) 7.44 (6.92‑8.03) 8.70 (8.08‑9.37) 9.67 (8.96‑10.4) 10.9 (10.1‑11.7) 11.9 (10.9‑12.8) 12.8 (11.7‑13.8) 13.8 (12.5‑14.9) 15.0 (13.5‑16.2) 16.1 (14.3‑17.4) 10-min 5.00 (4.66‑5.39) 5.95 (5.53‑6.41) 6.97 (6.47‑7.50) 7.74 (7.16‑8.33) 8.71 (8.03‑9.36) 9.44 (8.67‑10.2) 10.2 (9.30‑11.0) 10.9 (9.91‑11.8) 11.9 (10.7‑12.9) 12.7 (11.3‑13.7) 15-min 4.16 (3.88‑4.49) 4.98 (4.64‑5.38) 5.87 (5.45‑6.33) 6.52 (6.04‑7.03) 7.36 (6.78‑7.91) 7.97 (7.32‑8.58) 8.59 (7.84‑9.24) 9.19 (8.33‑9.90) 9.98 (8.96‑10.8) 10.6 (9.42‑11.5) 30-min 2.85 (2.66‑3.08) 3.44 (3.20‑3.71) 4.17 (3.87‑4.49) 4.73 (4.38‑5.09) 5.45 (5.02‑5.86) 6.00 (5.51‑6.46) 6.58 (6.00‑7.08) 7.15 (6.49‑7.71) 7.94 (7.13‑8.58) 8.57 (7.63‑9.27) 60-min 1.78 (1.66‑1.92) 2.16 (2.01‑2.33) 2.67 (2.48‑2.88) 3.08 (2.85‑3.32) 3.63 (3.34‑3.90) 4.07 (3.73‑4.38) 4.53 (4.13‑4.87) 5.02 (4.55‑5.41) 5.70 (5.11‑6.15) 6.26 (5.57‑6.77) 2-hr 1.05 (0.970‑1.15) 1.28 (1.18‑1.40) 1.63 (1.51‑1.79) 1.93 (1.77‑2.10) 2.35 (2.14‑2.56) 2.71 (2.46‑2.95) 3.10 (2.81‑3.38) 3.54 (3.17‑3.85) 4.18 (3.71‑4.55) 4.73 (4.16‑5.17) 3-hr 0.749 (0.691‑0.823) 0.912 (0.839‑1.00) 1.17 (1.07‑1.28) 1.39 (1.27‑1.52) 1.71 (1.56‑1.87) 2.00 (1.81‑2.18) 2.32 (2.08‑2.53) 2.67 (2.38‑2.91) 3.21 (2.82‑3.50) 3.68 (3.20‑4.02) 6-hr 0.466 (0.430‑0.514) 0.568 (0.524‑0.626) 0.728 (0.668‑0.801) 0.867 (0.793‑0.951) 1.07 (0.976‑1.18) 1.26 (1.14‑1.37) 1.46 (1.31‑1.60) 1.69 (1.50‑1.85) 2.04 (1.79‑2.23) 2.35 (2.03‑2.58) 12-hr 0.272 (0.248‑0.301) 0.331 (0.302‑0.366) 0.427 (0.389‑0.472) 0.511 (0.463‑0.563) 0.637 (0.573‑0.702) 0.751 (0.671‑0.824) 0.878 (0.778‑0.964) 1.02 (0.897‑1.12) 1.25 (1.08‑1.37) 1.45 (1.23‑1.59) 24-hr 0.161 (0.146‑0.179) 0.195 (0.178‑0.218) 0.253 (0.229‑0.282) 0.303 (0.274‑0.337) 0.380 (0.341‑0.423) 0.449 (0.399‑0.499) 0.528 (0.463‑0.587) 0.617 (0.534‑0.687) 0.756 (0.640‑0.847) 0.879 (0.731‑0.989) 2-day 0.095 (0.087‑0.106) 0.115 (0.105‑0.128) 0.148 (0.135‑0.164) 0.176 (0.160‑0.196) 0.220 (0.197‑0.244) 0.258 (0.230‑0.287) 0.301 (0.265‑0.336) 0.350 (0.304‑0.392) 0.425 (0.361‑0.478) 0.490 (0.409‑0.556) 3-day 0.068 (0.062‑0.075) 0.082 (0.075‑0.091) 0.104 (0.095‑0.116) 0.124 (0.113‑0.137) 0.153 (0.138‑0.170) 0.179 (0.159‑0.198) 0.207 (0.183‑0.231) 0.239 (0.208‑0.268) 0.288 (0.246‑0.324) 0.331 (0.278‑0.375) 4-day 0.054 (0.050‑0.060) 0.065 (0.060‑0.072) 0.083 (0.075‑0.092) 0.098 (0.089‑0.108) 0.120 (0.108‑0.133) 0.139 (0.124‑0.154) 0.160 (0.142‑0.178) 0.184 (0.161‑0.205) 0.220 (0.189‑0.248) 0.252 (0.213‑0.285) 7-day 0.036 (0.033‑0.039) 0.043 (0.040‑0.047) 0.054 (0.050‑0.059) 0.063 (0.058‑0.069) 0.077 (0.070‑0.084) 0.088 (0.080‑0.096) 0.101 (0.090‑0.110) 0.114 (0.101‑0.126) 0.134 (0.117‑0.149) 0.151 (0.130‑0.169) 10-day 0.028 (0.026‑0.031) 0.034 (0.031‑0.037) 0.042 (0.039‑0.046) 0.049 (0.045‑0.053) 0.058 (0.054‑0.064) 0.067 (0.061‑0.073) 0.076 (0.068‑0.083) 0.085 (0.076‑0.093) 0.099 (0.087‑0.110) 0.111 (0.096‑0.124) 20-day 0.019 (0.018‑0.020) 0.022 (0.021‑0.024) 0.027 (0.025‑0.030) 0.031 (0.029‑0.034) 0.037 (0.034‑0.040) 0.042 (0.039‑0.045) 0.047 (0.043‑0.051) 0.052 (0.047‑0.057) 0.060 (0.053‑0.066) 0.066 (0.058‑0.073) 30-day 0.015 (0.014‑0.016) 0.018 (0.017‑0.020) 0.022 (0.021‑0.023) 0.025 (0.023‑0.027) 0.029 (0.027‑0.031) 0.032 (0.030‑0.035) 0.036 (0.033‑0.038) 0.039 (0.036‑0.042) 0.044 (0.040‑0.048) 0.048 (0.043‑0.053) 45-day 0.013 (0.012‑0.014) 0.015 (0.014‑0.016) 0.018 (0.017‑0.019) 0.020 (0.019‑0.022) 0.023 (0.022‑0.025) 0.026 (0.024‑0.028) 0.029 (0.026‑0.031) 0.031 (0.029‑0.033) 0.035 (0.032‑0.038) 0.038 (0.034‑0.041) 60-day 0.012 (0.011‑0.012) 0.014 (0.013‑0.014) 0.016 (0.015‑0.017) 0.018 (0.017‑0.019) 0.020 (0.019‑0.021) 0.022 (0.021‑0.024) 0.024 (0.022‑0.026) 0.026 (0.024‑0.028) 0.029 (0.026‑0.031) 0.031 (0.028‑0.033) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are notchecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical 3/8/2021 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2835&lon=-77.8076&data=intensity&units=english&series=pds 2/4 Back to Top Maps & aerials Small scale terrain 3/8/2021 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2835&lon=-77.8076&data=intensity&units=english&series=pds 3/4 Large scale terrain Large scale map Large scale aerial + – 3km 2mi + – 100km 60mi + – 100km 60mi 3/8/2021 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.2835&lon=-77.8076&data=intensity&units=english&series=pds 4/4 Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi CHARLOTTE-MECKLENBURG STORM WATER DESIGN MANUAL 2-18 Table 2-12 Runoff Curve Numbers1 Curve numbers for ------------------------------Cover description -------------------------------- -----hydrologic soil group----- Average percent Cover type and hydrologic condition impervious area 2/ A B C D Fully developed urban areas (vegetation established) Open space (lawns, parks, golf courses, cemeteries, etc.) 3/: Poor condition (grass cover < 50%) ............................ 68 79 86 89 Fair condition (grass cover 50% to 75%) .................... 49 69 79 84 Good condition (grass cover > 75%) ........................... 39 61 74 80 Impervious areas: Paved parking lots, roofs, driveways, etc. (excluding right-of-way) ..................................... 98 98 98 98 Streets and roads: Paved; curbs and storm sewers (excluding right-of-way) ....................................................... 98 98 98 98 Paved; open ditches (including right-of-way) .... 83 89 92 93 Gravel (including right-of-way) .......................... 76 85 89 91 Dirt (including right-of-way) .............................. 72 82 87 89 Urban districts: Commercial and business ............................................ 85 89 92 94 95 Industrial ..................................................................... 72 81 88 91 93 Residential districts by average lot size: 1/8 acre or less (town houses) ..................................... 65 77 85 90 92 1/4 acre ........................................................................ 38 61 75 83 87 1/3 acre ........................................................................ 30 57 72 81 86 1/2 acre ........................................................................ 25 54 70 80 85 1 acre ........................................................................... 20 51 68 79 84 2 acres ......................................................................... 12 46 65 77 82 Agricultural Lands Pasture, grassland or range (continuous for age for grazing)4 Poor hydrologic condition ........................................... 68 79 86 89 Fair hydrologic condition ............................................ 49 69 79 84 Good hydrologic condition ......................................... 39 61 74 80 Woods Poor hydrologic condition ........................................... 45 66 77 83 Fair hydrologic condition ............................................ 36 60 73 79 Good hydrologic condition ......................................... 30 55 70 77 Developing urban areas Newly graded areas (pervious areas only, no vegetation) ........................... 77 86 91 94 1 Average runoff condition, and Ia = 0.2S. 2 The average percent impervious area shown was used to develop the composite CN’s. Other assumptions are as follows: impervious areas area directly connected to the drainage system, impervious areas have a CN of 98, and pervious areas are considered equivalent to open space in good hydrologic condition. 3 CN’s shown are equivalent to those of pasture. Composite CN’s may be computed for other combinations of open space cover type. 4 Poor: Forest litter, small trees, and brush are destroyed by heavy grazing or regular burning. Fair: Woods are grazed but not burned, and some forest litter covers the soil. Good: Woods are protected from grazing, and litter and brush adequately cover the soil. Source: 210-VI-TR-55, Second Edition, June 1986 MARKET STREET - U.S. HWY. NO. 17 100' WIDTH PUBLIC R/W 55 53525152 51 5353 55 54 52 51 51 53 51 50 5050 52 51 52 4951 5 25 3 4948 48 51 525454 5454 5354545252515151514849485252525250495353 50Tc>Tc >Tc>Tc>Tc>Tc>Tc>Tc>Tc>Tc>Tc>Tc>Tc >Tc >Tc >Tc>Tc>Tc>Tc>Tc>Tc>Tc>Tc > Tc > Tc > Tc >Tc>Tc >Tc>Tc>Tc>Tc > N S W E E.E.I.PRE-DEVELOPMENTDRAINAGE AREA MAPNO.DATEBYISSUESCALEDESIGNED BYCHECKED BYJOB NUMBERDRAWN BYDATEFIRM LICENSE # C-08732013A VAN BUREN AVENUEINDIAN TRAIL, NC 28079(704) 882-4222WWW.EAGLEONLINE.NETEAGLE ENGINEERINGAS SHOWN09/23/20207057BUY QUICK FOOD MART7650 MARKET ST.WILMINGTON, NCKHALID SALEH3811 COTTONWOOD DRIVEDURHAM, NC 27705JPCJLRJPC0311 21 112-15-20SAPADDRESSED NEW HANOVER COUNTY COMMENTS203-11-21SAPADDRESSED NEW HANOVER COUNTY COMMENTS00 20'40' 20 EX. GRAVEL LOT EX. GRAVEL LOT EX. BUILDING EX. BUILDING EX. BUILDING EX. BUILDING EX. BUILDING EX. STORAGE CONTAINERS EX. PARKING LOT POINT OF ANALYSIS A - B 60' SHEET FLOW @ 3.8% (SHORT GRASS) A B C D B - C 115' SHALLOW CONC. FLOW @ 1.0% (PAVED) C - D 250' SHALLOW CONC. FLOW @ 1.1% (UNPAVED) TOTAL PRE-DEV. DRAINAGE AREA 1 (94,039 SQ. FT. OR 2.16 AC) MARKET STREET - U.S. HWY. NO. 17 100' WIDTH PUBLIC R/W 55 53525152 51 5353 55 54 52 51 51 53 51 50 5050 52 51 52 4951 5 25 3 4948 48 51 525454 5454 5354545252515151514849485252525250495353 50 CB-102 CB-101 15" RCPCB-202 MH-201 1 5 " RC P FES-200 15" RCP Tc>Tc>Tc>Tc>Tc>Tc>Tc>Tc>15" RCP FES-100 N S W E E.E.I.POST-DEVELOPMENTDRAINAGE AREA MAPNO.DATEBYISSUESCALEDESIGNED BYCHECKED BYJOB NUMBERDRAWN BYDATEFIRM LICENSE # C-08732013A VAN BUREN AVENUEINDIAN TRAIL, NC 28079(704) 882-4222WWW.EAGLEONLINE.NETEAGLE ENGINEERINGAS SHOWN09/23/20207057BUY QUICK FOOD MART7650 MARKET ST.WILMINGTON, NCKHALID SALEH3811 COTTONWOOD DRIVEDURHAM, NC 27705JPCJLRJPC0311 21 112-15-20SAPADDRESSED NEW HANOVER COUNTY COMMENTS203-11-21SAPADDRESSED NEW HANOVER COUNTY COMMENTS00 20'40' 20 EX. BUILDING EX. STORAGE CONTAINERS EX. PARKING LOT POINT OF ANALYSIS TOTAL POST-DEV. DRAINAGE AREA 1 (41,545 SQ. FT. OR 0.95 AC) TOTAL POST-DEV. BYPASS DRAINAGE AREA (52,494 SQ. FT. OR 1.21 AC) A - B 60' SHEET FLOW @ 2.5% (SHORT GRASS) B - C 95' SHALLOW CONC. FLOW @ 1.0% (UNPAVED) A B C PROJECT:CLIENT: PROJ. #:DATE: PHASE:DESIGN BY: Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) =41,545 Ft2 0.95 ac New Impervious Area ** =7,569 Ft2 0.17 ac Impervious Fraction (IA) =0.18 18 % 0.21 741 ft3 Rainfall Depth (RD) =1.0 in. Runoff Coefficient (RV) =0.21 unitless Watershed Area (A) =0.95 ac. Permanent Pool Elev. =49.00 Temp. Ponding (WQV) Elev. =50.00 Elev Area (sf) Vol (cf) Total (cf) Temp. Ponding Depth =1.00 OK (Perm. Pool)49.00 2,990 00 WQV Provided  =3,176 ft3 50.00 3,362 3,176 3,176 Surface Area Required =741 ft2 Surface Area Provided =3,362 ft3 Forebay Area Req'd (min.) =336 ft2 (10‐15% Surface) Area Provided:354 ft0 Elev Area (sf) Vol (cf) Total (cf) Design Percentage 11%OK (Entrance)47.00 37 00 Forebay Entrance Depth =2.0 OK (Exit)48.00 220 129 129 Forebay Exit Elevation =48.0 48.50 354 144 272 Deep Pool Area Req'd (min.) =168 ft2 (5‐15% Surface) Area Provided:481 ft0 Elev Area (sf) Vol (cf) Total (cf) Design Percentage 14%OK 47.00 142 00 Deep Pool Depth =2.0 OK 48.00 354 248 248 48.50 481 209 457 Shallow Water Area Req'd =1,177 ft2 (35‐45% Surface) Area Provided:1,326 ft0 Elev Area (sf) Vol (cf) Total (cf) Design Percentage 39%OK 48.50 835 00 Shallow Water Depth =0.5 OK 49.00 2,161 749 749 Inundation Area Req'd =1,177 ft2 (35‐45% Surface) Area Provided:1,200 ft0 Elev Area (sf) Vol (cf) Total (cf) Design Percentage 36%OK 49.00 2,162 00 Inundation Zone Depth =1.0 OK 50.00 3,362 2,762 2,762 Forebay Volume Calculation Deep Pools Volume Calculation Shallow Water Volume Calculation Inundation Zone Volume Calculation Stormwater Wetlands  ‐ NCDEQ BMP Manual Calculate Water Quality Volume Length, Width (Area), Depth, Geometry Dv = 3630*RD*RV*A =  Rv = 0.05+0.9*IA = Design Volume (Water Quality Volume "WQv") Runoff Coefficient WQV Volume Calculation **  The new impervious area is  qualified as the net increase in  impervious from existing conditions. Wetland A SAP Indian Trail, NC 28079 Stormwater Wetlands Buy Quick Food Mart Khalid Saleh 12/9/2020 2013A Van Buren Avenue7057 EEI Project No. 6700  Wet Detention Pond Page 1 Orifice diameter =1 in. Orifice inv. Elev. =49.00 Orifice Equation:Q = CD A (2g(HO/3))0.5 2‐day Avg Discharge (Q2av) =0.0184 cfs (max.)2.48 5‐day Avg Discharge (Q5av) =0.0074 cfs (min.)OK Average Discharge (Q) =0.0148 cfs (provided) Discharge Coefficient (CD) =0.60 HO = X‐sect area of orifice (A) =0.0055 ft2 Accel. due to gravity (g) =32.2 ft/sec2 Avg. driving head (HO) =0.3194 ft WQV Outlet Device Driving Head (ft), measured from the centroid  of the orifice area to the water surface Note: Use HO/3 to compute drawdown to reflect  the fact that head is decreasing as drawdown  occurs Days to Discharge WQV EEI Project No. 6700  Wet Detention Pond Page 2 Hydraflow Table of Contents Stormwater Wetlands.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 2 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE-DEV.............................................................................. 4 TR-55 Tc Worksheet............................................................................................................ 5 Hydrograph No. 3, SCS Runoff, POST-DEV............................................................................ 6 Hydrograph No. 4, Reservoir, Stormwater Wetland................................................................. 7 Pond Report - Stormwater Wetland..................................................................................... 8 Hydrograph No. 5, SCS Runoff, POST-DEV-BYPASS............................................................. 9 TR-55 Tc Worksheet.......................................................................................................... 10 Hydrograph No. 6, Combine, POST-DEV-TOTAL.................................................................. 11 10 - Year Summary Report....................................................................................................................... 12 Hydrograph Reports................................................................................................................. 13 Hydrograph No. 1, SCS Runoff, PRE-DEV............................................................................ 13 Hydrograph No. 3, SCS Runoff, POST-DEV.......................................................................... 14 Hydrograph No. 4, Reservoir, Stormwater Wetland............................................................... 15 Hydrograph No. 5, SCS Runoff, POST-DEV-BYPASS........................................................... 16 Hydrograph No. 6, Combine, POST-DEV-TOTAL.................................................................. 17 25 - Year Summary Report....................................................................................................................... 18 Hydrograph Reports................................................................................................................. 19 Hydrograph No. 1, SCS Runoff, PRE-DEV............................................................................ 19 Hydrograph No. 3, SCS Runoff, POST-DEV.......................................................................... 20 Hydrograph No. 4, Reservoir, Stormwater Wetland............................................................... 21 Hydrograph No. 5, SCS Runoff, POST-DEV-BYPASS........................................................... 22 Hydrograph No. 6, Combine, POST-DEV-TOTAL.................................................................. 23 100 - Year Summary Report....................................................................................................................... 24 Hydrograph Reports................................................................................................................. 25 Hydrograph No. 1, SCS Runoff, PRE-DEV............................................................................ 25 Hydrograph No. 3, SCS Runoff, POST-DEV.......................................................................... 26 Hydrograph No. 4, Reservoir, Stormwater Wetland............................................................... 27 Hydrograph No. 5, SCS Runoff, POST-DEV-BYPASS........................................................... 28 Hydrograph No. 6, Combine, POST-DEV-TOTAL.................................................................. 29 IDF Report.................................................................................................................. 30 13 4 5 6 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Project: Stormwater Wetlands.gpw Wednesday, 03 / 10 / 2021 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s)Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ ------- 5.643 ------- ------- 12.44 17.77 ------- 28.31 PRE-DEV 3 SCS Runoff ------ ------- 5.612 ------- ------- 9.086 11.55 ------- 16.25 POST-DEV 4 Reservoir 3 ------- 2.322 ------- ------- 4.767 9.325 ------- 15.71 Stormwater Wetland 5 SCS Runoff ------ ------- 3.109 ------- ------- 6.976 10.07 ------- 16.22 POST-DEV-BYPASS 6 Combine 4, 5 ------- 5.017 ------- ------- 11.33 17.62 ------- 31.56 POST-DEV-TOTAL Proj. file: Stormwater Wetlands.gpw Wednesday, 03 / 10 / 2021 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 5.643 2 720 12,979 ------ ------ ------ PRE-DEV 3 SCS Runoff 5.612 2 716 12,212 ------ ------ ------ POST-DEV 4 Reservoir 2.322 2 722 9,467 3 50.88 5,852 Stormwater Wetland 5 SCS Runoff 3.109 2 718 6,232 ------ ------ ------ POST-DEV-BYPASS 6 Combine 5.017 2 718 15,699 4, 5 ------ ------ POST-DEV-TOTAL Stormwater Wetlands.gpw Return Period: 2 Year Wednesday, 03 / 10 / 2021 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 5.643 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 12,979 cuft Drainage area = 2.160 ac Curve number = 68* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.60 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.590 x 98) + (0.450 x 76) + (1.120 x 49)] / 2.160 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) PRE-DEV Hyd. No. 1 -- 2 Year Hyd No. 1 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PRE-DEV Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 60.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.68 0.00 0.00 Land slope (%) = 3.80 0.00 0.00 Travel Time (min) = 4.16 + 0.00 + 0.00 = 4.16 Shallow Concentrated Flow Flow length (ft) = 115.00 250.00 0.00 Watercourse slope (%) = 1.00 1.10 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) =2.03 1.69 0.00 Travel Time (min) = 0.94 + 2.46 + 0.00 = 3.41 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 7.60 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 5.612 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 12,212 cuft Drainage area = 0.950 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.850 x 98) + (0.100 x 39)] / 0.950 6 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) POST-DEV Hyd. No. 3 -- 2 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 4 Stormwater Wetland Hydrograph type = Reservoir Peak discharge = 2.322 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 9,467 cuft Inflow hyd. No. = 3 - POST-DEV Max. Elevation = 50.88 ft Reservoir name = Stormwater Wetland Max. Storage = 5,852 cuft Storage Indication method used. 7 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) Stormwater Wetland Hyd. No. 4 -- 2 Year Hyd No. 4 Hyd No. 3 Total storage used = 5,852 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Pond No. 1 - Stormwater Wetland Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 49.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 49.00 2,162 0 0 1.00 50.00 3,362 2,740 2,740 2.00 51.00 3,755 3,556 6,296 3.00 52.00 4,167 3,959 10,255 3.50 52.50 4,382 2,137 12,392 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 10.00 0.00 0.00 0.00 Span (in)= 10.00 0.00 0.00 0.00 No. Barrels = 2 000 Invert El. (ft)= 50.00 0.00 0.00 0.00 Length (ft)= 25.00 0.00 0.00 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a NoNoNo Crest Len (ft)= 20.00 0.00 0.00 0.00 Crest El. (ft)= 51.50 0.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = Rect --- --- --- Multi-Stage = No No No No Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 80.00 Stage (ft) 0.00 49.00 1.00 50.00 2.00 51.00 3.00 52.00 4.00 53.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 5 POST-DEV-BYPASS Hydrograph type = SCS Runoff Peak discharge = 3.109 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 6,232 cuft Drainage area = 1.210 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.90 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.430 x 98) + (0.780 x 49)] / 1.210 9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) POST-DEV-BYPASS Hyd. No. 5 -- 2 Year Hyd No. 5 TR55 Tc Worksheet 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 5 POST-DEV-BYPASS Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 60.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.68 0.00 0.00 Land slope (%) = 2.50 0.00 0.00 Travel Time (min) = 4.92 + 0.00 + 0.00 = 4.92 Shallow Concentrated Flow Flow length (ft) = 95.00 0.00 0.00 Watercourse slope (%) = 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.61 0.00 0.00 Travel Time (min) = 0.98 + 0.00 + 0.00 = 0.98 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 5.90 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 6 POST-DEV-TOTAL Hydrograph type = Combine Peak discharge = 5.017 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 15,699 cuft Inflow hyds. = 4, 5 Contrib. drain. area = 1.210 ac 11 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) POST-DEV-TOTAL Hyd. No. 6 -- 2 Year Hyd No. 6 Hyd No. 4 Hyd No. 5 Hydrograph Summary Report 12 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.44 2 718 28,461 ------ ------ ------ PRE-DEV 3 SCS Runoff 9.086 2 716 20,437 ------ ------ ------ POST-DEV 4 Reservoir 4.767 2 722 17,693 3 51.45 8,065 Stormwater Wetland 5 SCS Runoff 6.976 2 718 14,074 ------ ------ ------ POST-DEV-BYPASS 6 Combine 11.33 2 718 31,767 4, 5 ------ ------ POST-DEV-TOTAL Stormwater Wetlands.gpw Return Period: 10 Year Wednesday, 03 / 10 / 2021 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 12.44 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 28,461 cuft Drainage area = 2.160 ac Curve number = 68* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.60 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.590 x 98) + (0.450 x 76) + (1.120 x 49)] / 2.160 13 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) PRE-DEV Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 9.086 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 20,437 cuft Drainage area = 0.950 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.850 x 98) + (0.100 x 39)] / 0.950 14 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) POST-DEV Hyd. No. 3 -- 10 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 4 Stormwater Wetland Hydrograph type = Reservoir Peak discharge = 4.767 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 17,693 cuft Inflow hyd. No. = 3 - POST-DEV Max. Elevation = 51.45 ft Reservoir name = Stormwater Wetland Max. Storage = 8,065 cuft Storage Indication method used. 15 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Stormwater Wetland Hyd. No. 4 -- 10 Year Hyd No. 4 Hyd No. 3 Total storage used = 8,065 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 5 POST-DEV-BYPASS Hydrograph type = SCS Runoff Peak discharge = 6.976 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 14,074 cuft Drainage area = 1.210 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.90 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.430 x 98) + (0.780 x 49)] / 1.210 16 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) POST-DEV-BYPASS Hyd. No. 5 -- 10 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 6 POST-DEV-TOTAL Hydrograph type = Combine Peak discharge = 11.33 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 31,767 cuft Inflow hyds. = 4, 5 Contrib. drain. area = 1.210 ac 17 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) POST-DEV-TOTAL Hyd. No. 6 -- 10 Year Hyd No. 6 Hyd No. 4 Hyd No. 5 Hydrograph Summary Report 18 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 17.77 2 718 40,775 ------ ------ ------ PRE-DEV 3 SCS Runoff 11.55 2 716 26,392 ------ ------ ------ POST-DEV 4 Reservoir 9.325 2 720 23,648 3 51.65 8,861 Stormwater Wetland 5 SCS Runoff 10.07 2 716 20,387 ------ ------ ------ POST-DEV-BYPASS 6 Combine 17.62 2 718 44,035 4, 5 ------ ------ POST-DEV-TOTAL Stormwater Wetlands.gpw Return Period: 25 Year Wednesday, 03 / 10 / 2021 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 17.77 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 40,775 cuft Drainage area = 2.160 ac Curve number = 68* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.60 min Total precip. = 9.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.590 x 98) + (0.450 x 76) + (1.120 x 49)] / 2.160 19 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) PRE-DEV Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 11.55 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 26,392 cuft Drainage area = 0.950 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.850 x 98) + (0.100 x 39)] / 0.950 20 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) POST-DEV Hyd. No. 3 -- 25 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 4 Stormwater Wetland Hydrograph type = Reservoir Peak discharge = 9.325 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 23,648 cuft Inflow hyd. No. = 3 - POST-DEV Max. Elevation = 51.65 ft Reservoir name = Stormwater Wetland Max. Storage = 8,861 cuft Storage Indication method used. 21 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Stormwater Wetland Hyd. No. 4 -- 25 Year Hyd No. 4 Hyd No. 3 Total storage used = 8,861 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 5 POST-DEV-BYPASS Hydrograph type = SCS Runoff Peak discharge = 10.07 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 20,387 cuft Drainage area = 1.210 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.90 min Total precip. = 9.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.430 x 98) + (0.780 x 49)] / 1.210 22 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) POST-DEV-BYPASS Hyd. No. 5 -- 25 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 6 POST-DEV-TOTAL Hydrograph type = Combine Peak discharge = 17.62 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 44,035 cuft Inflow hyds. = 4, 5 Contrib. drain. area = 1.210 ac 23 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) POST-DEV-TOTAL Hyd. No. 6 -- 25 Year Hyd No. 6 Hyd No. 4 Hyd No. 5 Hydrograph Summary Report 24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 28.31 2 718 65,847 ------ ------ ------ PRE-DEV 3 SCS Runoff 16.25 2 716 37,868 ------ ------ ------ POST-DEV 4 Reservoir 15.71 2 718 35,123 3 51.78 9,385 Stormwater Wetland 5 SCS Runoff 16.22 2 716 33,337 ------ ------ ------ POST-DEV-BYPASS 6 Combine 31.56 2 718 68,460 4, 5 ------ ------ POST-DEV-TOTAL Stormwater Wetlands.gpw Return Period: 100 Year Wednesday, 03 / 10 / 2021 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 28.31 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 65,847 cuft Drainage area = 2.160 ac Curve number = 68* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.60 min Total precip. = 12.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.590 x 98) + (0.450 x 76) + (1.120 x 49)] / 2.160 25 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (hrs) PRE-DEV Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 16.25 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 37,868 cuft Drainage area = 0.950 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.850 x 98) + (0.100 x 39)] / 0.950 26 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) POST-DEV Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 4 Stormwater Wetland Hydrograph type = Reservoir Peak discharge = 15.71 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 35,123 cuft Inflow hyd. No. = 3 - POST-DEV Max. Elevation = 51.78 ft Reservoir name = Stormwater Wetland Max. Storage = 9,385 cuft Storage Indication method used. 27 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) Stormwater Wetland Hyd. No. 4 -- 100 Year Hyd No. 4 Hyd No. 3 Total storage used = 9,385 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 5 POST-DEV-BYPASS Hydrograph type = SCS Runoff Peak discharge = 16.22 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 33,337 cuft Drainage area = 1.210 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.90 min Total precip. = 12.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.430 x 98) + (0.780 x 49)] / 1.210 28 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) POST-DEV-BYPASS Hyd. No. 5 -- 100 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Hyd. No. 6 POST-DEV-TOTAL Hydrograph type = Combine Peak discharge = 31.56 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 68,460 cuft Inflow hyds. = 4, 5 Contrib. drain. area = 1.210 ac 29 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) POST-DEV-TOTAL Hyd. No. 6 -- 100 Year Hyd No. 6 Hyd No. 4 Hyd No. 5 Hydraflow Rainfall Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 10 / 2021 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 76.3783 12.3000 0.8781 -------- 2 91.7027 12.7000 0.8745 -------- 3 0.0000 0.0000 0.0000 -------- 5 98.3565 12.9000 0.8409 -------- 10 95.4203 12.4000 0.8018 -------- 25 86.9079 11.3000 0.7442 -------- 50 76.4692 9.8000 0.6909 -------- 100 73.7168 9.3000 0.6581 -------- File name: New Hanover County NC.IDF Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period(Yrs)5 min1015202530354045505560 1 6.25 5.00 4.19 3.61 3.18 2.85 2.58 2.37 2.18 2.03 1.90 1.78 2 7.43 5.98 5.02 4.34 3.84 3.44 3.12 2.86 2.64 2.46 2.30 2.16 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.70 7.07 5.99 5.21 4.63 4.17 3.80 3.50 3.24 3.02 2.83 2.67 10 9.66 7.89 6.71 5.87 5.23 4.73 4.33 3.99 3.71 3.47 3.26 3.08 25 10.89 8.92 7.63 6.70 6.00 5.45 5.01 4.64 4.33 4.06 3.83 3.63 50 11.88 9.72 8.32 7.33 6.58 6.00 5.53 5.14 4.81 4.53 4.28 4.07 100 12.80 10.51 9.03 7.98 7.20 6.58 6.08 5.67 5.32 5.02 4.76 4.53 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) Precip. file name: X:\Lib\IDF CURVES\New Hanover County NC.pcp Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.86 4.68 0.00 4.44 7.27 9.13 10.80 12.70 SCS 6-Hr 0.00 0.00 0.00 3.16 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CB-102 CB-101 0.38 0% 100% 0.95 9.67 3.44 3.44 0.013 0.50% 12313.5153.7 4.58 75% 0.65 1.12 4.18 0.55 0.49 49.84 49.22 52.77 1.43 RCP -CB-101 FES-100 0.08 0% 100% 0.95 9.67 0.75 4.19 0.013 0.50% 314.5153.7 4.57 92% 0.74 1.14 4.24 0.02 0.01 49.02 49.00 52.56 2.04 RCP -CB-202 MH-201 0.24 0% 100% 0.95 9.67 2.20 2.20 0.013 0.50% 12611.4153.7 4.56 48% 0.47 0.94 3.49 0.57 0.60 49.92 49.29 53.02 1.60 RCP -MH-201 FES-200 #N/A - - - 9.67 0.00 2.20 0.013 0.50% 1711.4153.7 4.56 48% 0.47 0.94 3.49 0.08 0.08 49.09 49.00 52.49 1.91 RCP -Pipe Input/Cover CalculationsOriginal Date:Location Storm RunoffInlet AreasPipe Sizing CalculationsStorm Network 100From StructureTo Structure (acres)Composite Runoff Coeff. CcVfull (fps)Size (in)Dtheo (in)Pipe Length (ft)Pipe Capacity Q-full (cfs)Q-full (%)Inlet Discharge Q (cfs)Percent Pervious (%)Percent Impervios (%)I (in/hr) Material nBuy Quick Food MartDescriptionPM:SAPRevision Date:DB:SAP3/10/21N/AProject Number:7057v/V-fulld/dm ratioPipe Slope (%)Combined Discharge Qpipe (cfs)Actual Vpipe (fps)Pipe Inv. OutPipe Inv. InStructure Rim Elevation (Flowline)Depth Of Cover (Based on Rim)Pipe MaterialPipe Material ClassPipe Time (min) - Full Cond.Actual Pipe Time (min) BASIN 2 Project Client Project #Date Designation Designer Total Drainage Area 0.95 Acres 41,505 Square Feet Total Disturbed Area 0.95 Acres 41,505 Square Feet C 0.50 TC 5 Minutes I10 9.67 Inches per Hour Q10 4.61 CFS Contour Area Volume Net Volume 49 2,660 00 Required Volume 1,715 Cubic Feet (1800 CF*DA)50 3,362 00 Required Surface Area 1,497 Square Feet (325 SF*Q10)51 3,755 3,559 3,559 51.5 3,956 1,928 5,486 Provided Volume 5,486 Cubic Feet OK 52 4,167 2,031 7,517 Provided Surface Area 3,956 Square Feet OK 52.5 4,382 2,137 9,654 Length 98 Feet Width 44 Feet Q10 4.61 CFS H 1 Feet Spillway Elevation 51.5 *Provides 1 Foot Freeboard C 3.367 Surface Area at Spillway 3,956 L 1.37 Feet Top of Berm Elevation 52.5 Spillway Length 20 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 2 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.7 Inches Max Flow 67.3 CFS OK Orifice Diameter 1.4 Inches 2013A Van Buren Ave. SKIMMER BASIN #1 Buy Quick Food Mart Khalid Saleh 7057 3/10/2021 Spillway & Skimmer Design SB‐1 PH‐2 SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Minimum Spillway Design EAGLE, ENGINEERING, INC.  2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 Project: Structure: DO =15 in.d50 (6"min.)=6 in. Q10 =4.19 cfs dmax =9.00 in. 3DO =3.75 ft. th= 13.50 in. La =8 ft. W =9.25 ft. Rip Rap Apron Design Buy Quick Food Mart FES‐100 NCDENR Erosion and Sediment Control  Planning and Design Manual EEI Project No. 5858  Rip Rap Apron Design Project: Structure: DO =15 in.d50 (6"min.)=6 in. Q10 =2.2 cfs dmax =9.00 in. 3DO =3.75 ft. th= 13.50 in. La =8 ft. W =9.25 ft. Rip Rap Apron Design Buy Quick Food Mart FES‐200 NCDENR Erosion and Sediment Control  Planning and Design Manual EEI Project No. 5858  Rip Rap Apron Design Project: Structure: DO =20 in.d50 (6"min.)=6 in. Q10 =2.2 cfs dmax =9.00 in. 3DO =5 ft. th= 13.50 in. La =8 ft. W =9.67 ft. Rip Rap Apron Design Buy Quick Food Mart Outfall NCDENR Erosion and Sediment Control  Planning and Design Manual EEI Project No. 5858  Rip Rap Apron Design