Loading...
HomeMy WebLinkAboutTRC Agenda Packet12.15.2021TECHNICAL REVIEW COMMITTEE AGENDA December 15, 2021 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, December 15, 2021 at 2:00 p.m. to discuss the below items. PLEASE NOTE: This meeting will be conducted remotely via teleconference Wednesday, December 15, 2021, at 2:00 p.m. Interested parties can contact the Planning and Land Use Department at 910-798-7165 for more information. 2:00 p.m. Item 1: The Wilmington Hotel and Spa – Commercial Site Plan Request by Frank Braxton, PLA on behalf of Holdings of TCM, Inc. for a 359,188 square foot hotel and spa with 290 units. The subject property is located at 125 NE Battleship Rd. It consists of 13.99 acres and is zoned B-2. The applicant is Frank Braxton, PLA with CLD Engineering, PLLC (fbraxton@cldeng.com). The planner assigned is Amy Doss (adoss@nhcgov.com, 910-798-7571). 2:30 p.m. Item 2: Lake Pointe – Major Subdivision – Preliminary Plan Request by Mark Hargrove, PE on behalf of the owner Chris Dunn for a performance subdivision with 259 homes. The subject property is located at 5408 Woodhaven Drive. It consists of 112.21 acres and is zoned R-15. The applicant is Mark Hargrove, P.E. with Port City Consulting Engineers, PLLC (mark@portcityeng.com). The planner assigned is Amy Doss (adoss@nhcgov.com, 910-798-7571). 2:45 p.m. Item 3: Murray Woods– Major Subdivision – Preliminary Plan Request by Robert C.G. Exum, Murrayville Land Holdings, LLC, for a phased development. This phase encompasses a 97-lot subdivision. The subject property is located at the end of Murray Woods Road. The two parcels amount to approximately 67.23 acres and are zoned R-15. The applicant is Robert C.G. Exum with Murrayville Land Holdings, LLC (bert@exumcompany.com) 910.540.9716. The planner assigned is Julian Griffee, Current Planner (jgriffee@nhcgov.com) 910.798.7444. 3:00 p.m. Item 4: Dollar General – Commercial Site Plan Request by Jennifer Wincklhofer, Rhetson Companies, Inc. for a 10,640 sq ft Dollar General. The subject property is located at 6138 Carolina Beach Road. It consists of 1.77 acres and is zoned B-2. The applicant is Jennifer Wiincklhofer with Rhetson Companies, Inc. (bschuler@paramounte-eng.com) 910.791.6707. The planner assigned is Julian Griffee, Current Planner (jgriffee@nhcgov.com) 910.798.7444. This meeting is open to the public by calling 1-336-218-2051 and entering Conference ID: 198 014 720# Items Heading to the Planning Board for Consideration: (January 6, 2021) • Rezoning Request (Z22-20): Request by Cindee Wolf, applicant, on behalf of Milton T Shaffer, III, property owner, to rezone approximately 1.93 acres of land located at 4629 and 4631 Carolina Beach Road from (CUD) B-2, Regional Business District, and (CUD) B-1, Neighborhood Business District, to (CZD) B-1 Neighborhood Business District, in order to develop 18,000 sf of commercial space. The Wilmington Hotel and Spa – Commercial Site Plan – TRC Review Page | 1 To: Frank Braxton, PLA – CLD Engineering, PLLC (fbraxton@cldeng.com) From: Amy Doss Current Planner Date: December 15, 2021 Egov# SITECN-21-000039 Subject: The Wilmington Hotel and Spa – Commercial Site Plan – TRC Review The following comments have been received for the December 15, 2021 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. Planning, Amy Doss 910-798-7571 1. Please update the plan with the following general corrections: a. Please include “Preliminary Site Plan” in the title block. b. Will the sidewalks shown be ADA accessible? c. To the maximum extent practicable, loading areas should be located to the rear of the use they serve. d. The only signage shown on the site plan is attached to a retaining wall. Please show the location of any additional signs and note any proposed sign is subject to Section 5.6. of the UDO. e. Please note the 100’ height limitation does not apply to appurtenances required to be placed above the roof level and not intended for human occupancy or habitation, UDO Section 3.13. 2. Please work with WMPO on trip generation numbers. 3. Lighting: a. Before the building permit can be issued, a lighting plan must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at a lot line does not surpass 2.0, UDO Section 5.5. 4. Fill requirements: a. Detailed in 9.8.2.E apply, which states that fill greater than two feet must include an analysis prepared by a qualified registered design professional demonstrating no harmful diversion of floodwaters or wave run-up, and wave reflection that would increase damage to adjacent elevated buildings and structures. The Wilmington Hotel and Spa – Commercial Site Plan – TRC Review Page | 2 5. Flood requirements: a. General note 5 indicates that that a LOMA has not been provided to NFIP – has it been applied for? b. As shown, the structure appears to be an elevated structure in the AE zone. As such, flood openings will be required per Section 9.8.2 D (4) of the UDO. c. Per Section 9.8.1 D of the UDO, all new electrical, heating, ventilation, plumbing, air conditioning equipment, and other service equipment shall be located at or above the Regulatory Flood Protection Elevation (RFPE) or designed and installed to prevent water from entering or accumulating within the components during the occurrence of the base flood. These include, but are not limited to, HVAC equipment, water softener units, bath/kitchen fixtures, ductwork, electric/gas meter panels/boxes, utility/cable boxes, water heaters, and electric outlets/switches. Note that the RFPE at the site is 11’. d. An Elevation Certificate will be required to establish that the reference level (first habitable floor space) is above the RFPE (11’) is met for an elevated building as shown. It appears this reference level is at 35’. 6. Conservation Resources: a. Please verify the date of the last division for COD applicability. b. Please list the areas and acreage of land identified as Class IV Soils by the 1980 NHC Soils Report, or by a licensed Soil Scientist. c. Based upon our data, it appears that there are CODs located on the subject site. 7. Easements: a. Please label Storm Sewer, Sanitary Sewer, and Water Main Utility Easements, UDO Section 6.2.2. 8. Landscaping: a. For the pump station, please include a street yard to meet the standards per Section 5.4.6.B of the UDO. b. Please include calculations for foundation plantings, UDO Section 5.4.7. 9. Parking: a. Please show a parking detail and verify all parking dimensions per Section 5.1.4.B. b. Please ensure proper determination of use when calculation parking requirements. Commercial kitchen use may not apply, UDO Section 2.3 Definitions and Terms. 10. Tree Retention: a. Section 5.3.4.C of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. b. Please note that required landscaping for the project can be credited to meet this requirement. c. Please be aware that there are new tree retention requirements with the UDO that have updated the classifications of regulated trees. Please see Section 5.3.4 for more specifics. In addition, trees preserved on the site may be credited toward mitigation. d. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. e. Please see the attached tree mitigation worksheet to help determine and verify required mitigation. 11. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. The Wilmington Hotel and Spa – Commercial Site Plan – TRC Review Page | 3 Fire Services, Ray Griswold 910-508-0234 I conducted a site visit and plan review last week. Here are County Fire concerns & observations: 1. How will the fire dept. aerial apparatus access these structures? More details will be required as this project moves forward. 2. How will fire water flow requirements be met? What will it be for the largest structure and also in elevation? Can CFPUA and the developer meet these requirements? 3. A fire hydrant layout shall be required. All Fire Dept. Connections shall have a fire hydrant within 100 feet of the connection(s). 4. What will the highest elevation of each building be? 5. How will CFPUA get water to this site? 6. Parking / Fire Lane / Fire Dept. access? Concerns need to be addressed as this project moves forward. 7. Section 510 of the NC Fire Prevention Code shall be followed - Emergency Radio Coverage for first responders. 8. Appendix J guidelines of the NC Fire Code shall be followed 10 Chapter 36 of the NC Fire Code shall be followed when designing the Marina. Fire Dept. access is required, along with a Fire Dept. Standpipe System. The FDC for this requires a Fire Hydrant within 100 feet of the connection, along with Fire Apparatus access to it as well. NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing permit issued by the County will be required. Please submit for permit as the design is completed. 2. The development will be subject to control of the post development peak discharge rate of the 2, 10 and 25 year storm event to the pre development conditions. The size of underground stormwater treatment vault doesn’t appear to be sized for the storm attenuation requirements. Please submit for a stormwater permit as the design is completed. 3. This project may submit as a Low Impact Development (LID) project utilizing the approved LID guidelines shared by the County and City of Wilmington. http://laserfiche.nhcgov.com/weblink/0/edoc/3273331/LID-Manual.pdf. Should LID principles be incorporated into the project, the requirements for pre and post development storm attenuation would not be required. 4. There appears to be offsite stormwater drainage coming from the north and southeast along the existing ditch. A public drainage easement sized in accordance with NHC Stormwater Manual will be required for these two outfall ditches to the Cape Fear River. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available through mainline extension; and installation of forcemain and pump station. 4. At this time capacity is available; DWQ permit application will require a Planning FTSE. 5. Capacity is also dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. The Wilmington Hotel and Spa – Commercial Site Plan – TRC Review Page | 4 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Patrick Wurzel 910-398-9100 These preliminary comments and are based on the plans as submitted for the proposed site and are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. 1. A NCDOT Driveway Permit is required. Submit a plan in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State road. Submit to the local NCDOT District Engineer’s Office. 2. We will have additional comments once the TIA has been approved. 3. A NCDOT Encroachment Agreement is required for any utility connections or installation within NCDOT right-of-way. 4. NCDOT Driveway Permits are now submitted through the NCDOT Driveway website. https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx 5. Address any ingress / egress impacts along the route to US 74 / 421 (Particular during high tide event) Environmental Health, Dustin Fenske 910-798-6732 No comments as the site will be on water and septic. WMPO, Scott James 910-473-5130 Planning (Addressing), Kathrine May 910-798-7443 1. Subject site has an existing address, no comment at this time. The Wilmington Hotel and Spa – Commercial Site Plan – TRC Review Page | 5 Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACE, Rachel Capito NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt Lake Pointe – Preliminary Site Plan – TRC Review Page | 1 To: Mark Hargrove – Port City Consulting Engineers, PLLC (mark@portcityeng.com) From: Amy Doss, Current Planner Egov# SUBPP-21-0017 Date: December 15, 2021 Subject: Lake Pointe – Performance Residential – Preliminary Plan Major Subdivision – TRC Review The following comments have been received for the December 15, 2021 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. Planning, Amy Doss 910-798-7571 1. Please update the plan with the following general corrections: a. Please include “Preliminary Site Plan” in the title block. b. Please include the roadway designations and the street names. c. Please add a Development Note stating that the dwelling units shall be spaced a minimum of 10 feet from each other. 2. Is the amenity included in this submittal or will it be a separate submittal? 3. Are any sidewalk proposed and if so will the sidewalks be ADA accessible? 4. Please show location of signage and note any sign is subject to Section 5.6. 5. Please verify that there are not Conservation Resources on the site. 6. Please label all mail kiosks and provide a typical detail. A paved area with ingress/egress is required to allow vehicles to pull off, park, and re-enter the roadway safely shall be required for each kiosk area. Kiosks shall be located in areas that will best allow for vehicle parking, which shall be designed so as not to create pedestrian or vehicle safety issues. 7. Environmental Features: a. Has a wetland delineation been completed? b. Portions of the development are within the AE flood zone and floodway. All development must comply with applicable provisions in Article 9 of the UDO which details standards for elevation and flood openings. c. Residential structures must have the reference level elevated at or above the regulatory flood protection elevation (Base Flood Elevation + 2’ of freeboard). Lake Pointe – Preliminary Site Plan – TRC Review Page | 2 d. Proposed development within areas delineated as floodway must provide a hydraulic analysis demonstrating that there will not any increase in the flood levels during the occurrence of the base flood discharge. e. If fill is proposed, requirements detailed in 9.8.2 E will apply. This includes when fill is greater than two feet, an analysis prepared by a qualified registered design professional demonstrating no harmful diversion of floodwaters or wave run-up, and wave reflection that would increase damage to adjacent elevated buildings and structures shall be provided. 8. Tree Retention: a. Please provide tree protection fencing detail. b. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. c. The tree retention standards have recently been updated. Please provide the specific species (Loblolly pine, Long Leaf pine, etc.) of all regulated trees to be removed or credited for mitigation. In addition to the significant trees, please list all regulated trees to be removed. d. Please see the attached tree mitigation worksheet to help determine and verify required mitigation. 9. Landscaping: a. Please note that parking lot interior landscaping it 8% of the total area used for parking for the amenity areas, mail kiosks, etc. b. For the pump station and clubhouse, please include a street yard to meet the standards per Section 5.4.6.B of the UDO. 10. Please provide all NCDOT approvals upon receipt. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 11. Easements: a. Per Section 6.2.2, please label Storm Sewer, Sanitary Sewer, and Water Main Utility Easements. 12. Roadway Design: a. Please verify that the tangent lengths meet the code requirements specified by the County’s private road standards. 13. Property Owners’ Association (POA): a. Please be aware that the Property owners’ associations is responsible for continuing upkeep and maintenance of all private infrastructure facilities and common areas within the respective subdivision. 14. Please include trip peak hour trip generation and talk with the MPO representative about scheduling a scoping meeting. Fire Services, Ray Griswold 910-508-0234 I have conducted a series of site visits and conducted the plan review. The following items / comments are as follows: Here are County Fire concerns & observations: 1. Move the Fire Hydrant at Lot #34/35 back to Lot #31 2. Move the Fire Hydrant at Lot #159/160 back to Lot#152 3. Use the Main Road divider as discussed 4. Add additional Culvert Capacity due to flooding issues 5. Elevate the roadway over the floodway as discussed 6. The roadway shall measure 26 feet wide in both directions for the divided portions of the roadway. Lake Pointe – Preliminary Site Plan – TRC Review Page | 3 NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and stormwater permit issued by the County will be required. Please submit for permits as the design is completed. 2. The offsite stormwater drainage in tributary #3 routed through the site will require a public drainage easement sized in accordance with NHC Stormwater Manual or floodway width, whichever is greater, will be required. The same easements are required for any existing or proposed drainage conveyance measure that will handle offsite drainage (ie from north and east existing ditches). Construction of offsite drainage conveyance measures (proposed culvert) that will be maintained by the county will need to be observed during construction by Stormwater Services and a turnover meeting scheduled once the system is ready to be conveyed to the county. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available through mainline extension; and installation of forcemain and pump station. 4. At this time capacity is available; DWQ permit application will require a Planning FTSE. 5. Capacity is also dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Patrick Wurzel 910-398-9100 No comments have been received. Environmental Health, Dustin Fenske 910-798-6732 No comments as the site will be on water and septic. WMPO, Scott James 910-473-5130 Lake Pointe – Preliminary Site Plan – TRC Review Page | 4 Planning (Addressing), Katherine May 910-798-7443 1. New addresses will be created upon TRC approval. Please submit proposed street names to addressing. Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACE, Rachel Capito NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt Murray Woods Preliminary Plat TRC Review Page | 1 To: Robert C.G. Exum, Murrayville Land Holdings, LLC From: Julian Griffee, Current Planner Egov #: SUBPP-21-0018 Date: December 15th, 2021 Subject: Murray Woods – Performance Residential – Preliminary Plan Major Subdivision – TRC Review The following comments have been received for the December 15 2021 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: A revised plat addressing each of the below items must be resubmitted prior to receiving major subdivision approval. Planning, Julian Griffee 910-798-7444 1. Roadways: a) Will there be access provided by way of a connection with Murray Woods Road? This may affect NHC Fire. b) Are the roads public or private? 2. Tree Survey: a) Page C 1 depicts an inventory of trees that looks to align with the infrastructure (stormwater and roadways). It is advised that a tree inventory be conducted for all areas that are expected to be disturbed due to site improvements with this proposal. This would verify that no significant trees exist in portions of the tracts of land that will be developed. In the event that a significant tree is found, this may warrant a variance or create a non-conforming lot situation. b) Identify the species of trees, i.e. what type of pine? Depending on species and measurement, a tree’s designation may change that would trigger other requirements. 3. Tree Retention: a) Please be aware that a Tree Removal Permit is required before the issuance of any clearing, grading, building permits, and or other authorizations, UDO Section 5.3.5.B. b) Please note that there are optional incentives for retaining trees. Murray Woods Preliminary Plat TRC Review Page | 2 4. Easements: a) Please note that Section 6.2.2. requires the labelling of all storm sewer, sanitary sewer, and water main utility easements. 5. Please clearly indicate the location for any proposed signage if applicable, UDO Section 5.6. 6. UDO Section 5.2.3., please provide all NCDOT approvals upon receipt. 7. TIA is under development for full buildout. What will the total lot count be to include future phases? 8. Open Space is stated to be 3.3 acres. Section 5.8.2 of the UDO states that residential performance developments must dedicate 20% of the project area to open space. 9. Please add page to encompass the entire project bounds. 10. Please clarify the phasing as well. 11. Some lots are lacking square footage calculations. 12. Please verify block widths. Blocks shall not exceed 1,000 feet in length and need verification that this is not being exceeded. 13. Is there an intention to connect to Murray Farms Road? 14. Are any traffic calming devices planned? 15. Please show the location of your mail kiosk. A paved area with ingress/egress to allow vehicles to pull off, park, and re-enter the roadway safely shall be required for each kiosk area. Kiosks shall be located in areas that will best allow for vehicle parking, which shall be designed so as not to create pedestrian or vehicle safety issues. 16. Please delineate the open space areas. 17. Please label the future development areas. Planning (Addressing), Katherine May, 910-798-7443 1. New addresses will be created upon TRC approval. Please submit proposed street names to addressing. Environmental Health, Dustin Fenske, 910-798-6732 2. Site appears that it will connect with CFPUA water and sewer. 3. Developer must express due diligence to locate any old wells and/or septic systems and abandon properly according to law. 4. Must maintain proper setbacks from existing properties with septic or wells to/from stormwater ditching, stormwater ponds, sewer force mains and manholes. CFPUA, Bernice Johnson, 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available through mainline extension. 4. At this time capacity is available; DWQ permit application will require a Planning FTSE. 5. Capacity is also dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. Murray Woods Preliminary Plat TRC Review Page | 3 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NHC Engineering, Galen Jamieson, 910-798-7072 1. A land disturbing and stormwater permit issued by the County will be required. Please submit for permits as the design is completed. 2. Please provide details and/or grading information to ensure the backyard roofs for the perimeter lots are directed to the pond. Similar design approaches used at other developments have resulted in portions of the roofs bypassing the SCM. 3. Note, the extension and connection of Springer and Retriever Dr is to a private road not maintained by NCDOT. 4. A drainage study for the existing downstream culvert under Murrayville road. A preliminary design for ditch and culvert improvements should be included should the existing downstream public SCM be found to be undersized for the 25 year storm. NCDOT, Joseph Wurzel, 910-398-9118 1. No comments were received. WMPO, Scott James, 910-473-5130 1. The applicant lists an ongoing TIA for the entire build out – the approved scope of this TIA should be included in the application for verification. 2. NCDOT Projects: a) Tip projects in Area: U-4751. Project Description: Military Cutoff Extension from SR 1409 (MILITARY CUTOFF ROAD) TO US 17 (MARKET STREET) IN WILMINGTON. MULTI-LANES ON NEW LOCATION. Construction Date: under construction. b) TIP Projects in the area: R-3300. Project Description: Hampstead Bypass, US17 Bypass south of Hampstead to US 17 North of Hampstead, Construct new Freeway on new location. Construction Date: TBD. 3. WMP 2045 Projects: a) RW-99 Murrayville Road Modernization and Extension, Improve Safety on Murrayville Road between North College Road and US 17 and bring roadway up to modern standards. 4. New Hanover CTP: a) N/A. 5. TIA: a) Please show all phases of the development to complete the trip generation estimates. A TIA may be required for the project, based on the following trip generation: Murray Woods Preliminary Plat TRC Review Page | 4 NHC Fire Department, Raymond Griswold, 910-798-7448 1. Murray Woods - Single Family Preliminary Plan - End of Murray Farm Rd & Retriever Dr. 2. County Fire has looked at these plans. 3. I conducted a site visit and plan review yesterday and today. 4. At this point all items meet County Fires Expectations. Dollar General – Commercial Site Plan TRC Review Page | 1 To: Jennifer Winklhofer, Rhetson Companies, Inc. From: Julian Griffee, Current Planner Egov #: SITECN-21-000038 Date: December 15th, 2021 Subject: Dollar General at 6138 Carolina Beach Road – Commercial Site Plan – TRC Review The following comments have been received for the December 15 2021 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: A revised plat addressing each of the below items must be resubmitted prior to receiving approval. Planning, Julian Griffee 910-798-7444 1. Location of the loading bay and/or births? Loading bays are subject to Section 5.1.5. of the UDO. 2. Please provide the estimated traffic counts and land-use code based on the 10th edition ITE Manual to determine whether or not a Traffic Impact Analysis is required. 3. Please be sure to provide a light plan to illustrate that street lighting, all exterior lighting, and indoor lighting visible from the outside shall be designed and located so that the maximum illumination measure in foot candles, at ground level, and at a lot line do not surpass 0.5 foot-candles as specified in Section 5.5.4. of the UDO. a. General Notes Points 7 and 8 address the lighting plan, please reference that this plan is subject to Section 5.5.4. of the UDO. 4. A survey indicating locations of trees on site has been provided a. Please indicate which trees will be removed. 5. Please correct the spelling of ‘Commercial’ on pages 2 and 3. 6. Parking provided according to the place will be 29 parking spaces with 22 required. Staff has calculated that the number of spaces required is 27. Please update this figure. 7. The north entrance into the proposed Dollar General, is that existing curbing that will be removed for the 30’ proposed width? 8. The width of the parking lot is wider than required. 9. Screening for the dumpster is subject to Section 5.4.4 of the UDO. Dollar General – Commercial Site Plan TRC Review Page | 2 10. Please note if the existing southern driveway entrance of the parcel will be removed. 11. The island at the front of the proposed structure must be equipped with two trees as there should be one tree every 144 square feet and the island amounts to 300 square feet. 12. Would the applicant prefer an easement for the billboard? 13. Trees may slightly encroach into the sight lines. Please note that the sight lines must be clear and free of obstruction. 14. The structure is in close proximity to the 50’ setback line. Please note the proposed building is subject to Section 3.4.5. of the UDO. Environmental Health, Dustin Fenske, 910-798-6732 1. Approved, no comments. CFPUA, Bernice Johnson, 910-332-6620 1. No CFPUA water and sewer available. NHC Engineering, Galen Jamieson, 910-798-7072 1. A land disturbing permit issued by the County will be required. Please submit for permit as the design is completed. 2. A modification to stormwater ATC #818-09/01/21 will be required. Please submit for permit modification as the design is completed. NCDOT, Joseph Wurzel, 910-398-9118 1. No comments were received. WMPO, Scott James, 910-473-5130 1. NCDOT Projects: a) Tip Projects in the Area: N/A 2. WMP 2045 Projects: a) No comment. 3. New Hanover CTP: a) N/A. 4. TIA: a) A TIA is not required for the project, based on the following trip generation: NHC Fire Department, Raymond Griswold, 910-798-7448 1. Dollar General - 6138 Carolina Beach Road - Commercial Site Plan Review I have conducted a site visit last week. Dollar General – Commercial Site Plan TRC Review Page | 2 2. County Fire has approved this project with the following note. The Fire hydrant shown on the plan shall meet the CFPUA Design Standards. 3. I understand this is an Aqua NC / America area of service. 4. The county only recognizes the CFPUA Spec. 5. If anyone has any questions, please feel free to contact me at any time.