HomeMy WebLinkAboutC2-0 Preliminary Grading PlanHALL WATERS DRIVE (60' PUBILC R/W)MB 62 PG 125FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29.98
'
INV 29.98
'
48"RCPSINV 31.38'24"CPP
INV 31.31'X X XX X X X X X
XSS
SS
SS SS SS SS SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSINV 30.4
3
'
INV 30.39
'
PENNINGTO
N
D
R
I
V
E
(
6
0
'
P
U
B
I
L
C
R
/
W
)
MB 62 PG 12
5
X
X X X X X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXNON-WETLAND IMPACT
±3,720 SF
(±0.085 AC.)
DEVELOPER:
PLANS PREPARED BY:
C
E & A, INC.
A M P B E L L
31 Boland Court
Greenville, SC 29615
(864) 335-4090
Fax: (864) 335-4095
Civil Engineering and Land Planning
3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP
354 WALLER AVENUE, STE 200
LEXINGTON , KY 40504
CONTACT: ROBBIE McATEE
(859) 514-7767
FAX: (859) 281-6335
C-2.0
PRELIMINARY
GRADING PLAN
VICINITY MAP
ALL SLOPES STEEPER THAN 3:1
SHALL RECEIVE NORTH
AMERICAN GREEN P300 ALONG
FACE OF SLOPE. MAXIMUM SLOPE
SHALL BE 2:1
LEGEND
MAG-DATE SITE
GRADING NOTES THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ENGINEER AN AS-BUILT SURVEY OF PROJECT UPON
COMPLETION OF CONSTRUCTION.
CONTRACTOR TO REVIEW GEOTECHNICAL EXPLORATION
REPORT REGARDING EXISTING ON-SITE SOILS PRIOR TO
BIDDING
CONTRACTOR TO INSTALL GROUNDCOVER ON ALL EXPOSED
PERIMETER SLOPES AND SLOPES STEEPER THAN 3:1 WITHIN 7
CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF
GRADING, GROUNDCOVER FOR ALL REMAINING DISTURBED
AREAS SHALL BE INSTALLED WITHIN 14 DAYS.
CONTRACTOR TO ENSURE THAT ANY OFF-SITE RELATED
BORROW OR WASTE AREAS RELATED TO THIS PROJECT ARE
PROPERTY PERMITTED UNDER THE NPDES GENERAL PERMIT
OR DEQ.
EXACT LOCATION OF TOPSOIL STOCKPILE LOCATION NOT
KNOWN AT THIS TIME. STOCKPILE LOCATION WILL BE
LOCATED WITHIN LIMITS OF DISTURBANCE AND PER DETAIL
SHOWN ON EROSION CONTROL DETAIL SHEETS. CONTRACTOR
TO COORDINATE EXACT LOCATION IN FIELD WITH EROSION
CONTROL INSPECTOR.
EROSION CONTROL NOTES:
EROSION CONTROL NOTES:
EROSION CONTROL NOTES:
EROSION CONTROL NOTES:
EROSION CONTROL NOTES:
EROSION CONTROL NOTES:
NO FORMAL DESIGN HAS BEEN DONE ON
THIS PRELIMINARY PLAN. ALL BOUNDARY
INFORMATION IS PRELIMINARY AND
SUBJECT TO CHANGE.
EROSION CONTROL NOTES:
EROSION CONTROL NOTES:
NCDEQ SELF INSPECTION PROGRAM
EROSION CONTROL NOTES:
STORMWATER QUALITY AND QUANTITY ARE
ACCOUNTED FOR IN OFF-SITE DETENTION
POND, PER NCDEQ STORMWATER PERMIT
KNIP SW PERMIT SW8960411
EROSION CONTROL NOTES:
EXISTING FEDEX
FACILITY