Loading...
C2-0 Preliminary Grading PlanHALL WATERS DRIVE (60' PUBILC R/W)MB 62 PG 125FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29.98 ' INV 29.98 ' 48"RCPSINV 31.38'24"CPP INV 31.31'X X XX X X X X X XSS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSINV 30.4 3 ' INV 30.39 ' PENNINGTO N D R I V E ( 6 0 ' P U B I L C R / W ) MB 62 PG 12 5 X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXNON-WETLAND IMPACT ±3,720 SF (±0.085 AC.) DEVELOPER: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 Fax: (864) 335-4095 Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 FAX: (859) 281-6335 C-2.0 PRELIMINARY GRADING PLAN VICINITY MAP ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE NORTH AMERICAN GREEN P300 ALONG FACE OF SLOPE. MAXIMUM SLOPE SHALL BE 2:1 LEGEND MAG-DATE SITE GRADING NOTES THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ENGINEER AN AS-BUILT SURVEY OF PROJECT UPON COMPLETION OF CONSTRUCTION. CONTRACTOR TO REVIEW GEOTECHNICAL EXPLORATION REPORT REGARDING EXISTING ON-SITE SOILS PRIOR TO BIDDING CONTRACTOR TO INSTALL GROUNDCOVER ON ALL EXPOSED PERIMETER SLOPES AND SLOPES STEEPER THAN 3:1 WITHIN 7 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, GROUNDCOVER FOR ALL REMAINING DISTURBED AREAS SHALL BE INSTALLED WITHIN 14 DAYS. CONTRACTOR TO ENSURE THAT ANY OFF-SITE RELATED BORROW OR WASTE AREAS RELATED TO THIS PROJECT ARE PROPERTY PERMITTED UNDER THE NPDES GENERAL PERMIT OR DEQ. EXACT LOCATION OF TOPSOIL STOCKPILE LOCATION NOT KNOWN AT THIS TIME. STOCKPILE LOCATION WILL BE LOCATED WITHIN LIMITS OF DISTURBANCE AND PER DETAIL SHOWN ON EROSION CONTROL DETAIL SHEETS. CONTRACTOR TO COORDINATE EXACT LOCATION IN FIELD WITH EROSION CONTROL INSPECTOR. EROSION CONTROL NOTES: EROSION CONTROL NOTES: EROSION CONTROL NOTES: EROSION CONTROL NOTES: EROSION CONTROL NOTES: EROSION CONTROL NOTES: NO FORMAL DESIGN HAS BEEN DONE ON THIS PRELIMINARY PLAN. ALL BOUNDARY INFORMATION IS PRELIMINARY AND SUBJECT TO CHANGE. EROSION CONTROL NOTES: EROSION CONTROL NOTES: NCDEQ SELF INSPECTION PROGRAM EROSION CONTROL NOTES: STORMWATER QUALITY AND QUANTITY ARE ACCOUNTED FOR IN OFF-SITE DETENTION POND, PER NCDEQ STORMWATER PERMIT KNIP SW PERMIT SW8960411 EROSION CONTROL NOTES: EXISTING FEDEX FACILITY