Loading...
FXG Parking Lot Expansion_Issued for Permit Review_02-07-22LOCATION MAP CONSULTANTS: PREPARED BY: NO.DATE 0 DESCRIPTION REVISIONS: GOVERNMENT/UTILITY OFFICIALS: SHEET INDEX C-1.0 C-1.1 C-1.2 C-2.0 C-3.0 C-3.0A C-3.1 C-3.2 C-4.0 C-4.1 C-5.0 C-5.1 C-5.2 C-5.2A C-5.3 C-5.4 C-5.5 C-5.6 C-5.7 C-5.8 C-6.0 C-6.4 G-1.0 UE2.0 UE2.1 COVER SHEET ALTA/ASTM LAND TITLE SURVEY (SHEET 1 OF 2) ALTA/ASTM LAND TITLE SURVEY (SHEET 2 OF 2) TREE INVENTORY/REMOVAL PLAN SITE & DIMENSIONING & UTILITY PLAN EXISTING FACILITY SIDEWALK PLAN SITE DETAILS SITE DETAILS GRADING & DRAINAGE PLAN STORM DRAIN PROFILE & DETAILS EROSION & SEDIMENT CONTROL PLAN - PHASE 1 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 EROSION & SEDIMENT CONTROL PLAN - PHASE 3 EROSION & SEDIMENT CONTROL PLAN - PHASE 3 EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL NOTES/DETAILS EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS LANDSCAPE PLAN LANDSCAPE DETAILS & NOTES GEOTECHNICAL SHEET ELECTRICAL SITE (FOR REFERENCE ONLY) SITE PHOTOMETRIC PLAN (FOR REFERENCE ONLY) C E & A , I N C . A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 Fax: (864) 335-4095 Civil En gineeri ng and L and Planning SITE PLANS FOR: GEOTECHNICAL ENGINEER:PLANNING AND ZONING DEPT: LAND DISTURBANCE: POWER: PREPARED FOR: STORMWATER: FIRE MARSHALL: SITE DEVELOPMENT DATA SETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 FAX: (859) 281-6335 3328 PENNINGTON DRIVE WILMINGTON, NC 28405 NEW HANOVER COUNTY ® Freight 02/07/22 SITE ISSUED FOR PERMIT REVIEW PARKING LOT EXPANSION CURRENT PROPERTY OWNER: CERTIFICATIONS: STORMWATER QUALITY: PROPOSED PROPERTY OWNER: 50' ACCESS AND UTILITY EASEMENT AS SHOWN MB 60PG 361 TO BE OFFERED AS DEDICATED RIGHT OF WAYAFTER CONSTRUCTION. THE ROADS HAVE NOT BEENCONSTRUCTED AND DOES NOT SHOW UP ONRECORDED MAPS AFTER THAT DATE#101 N 199889.47 GRND E 2333294.75 GRND EL. 35.62 IPF HALL WATERS DRIVE (60' PUBILC R/W)MB 62 PG 12510' NON M U N I C I P A L U T I L I T Y E A S E M E N T 10' NON MUNICIPAL U T I L I T Y E A S E M E N T 10' NON MUNICIPAL UTILITY EASEMENT SOUTH DRAINAGE EASEMENTPUBLIC 40' WIDEMB 62 PG 125DRAINAGE AND UTILITY EASEMENT MB 50 P G 3 0 5 D B 5 4 1 8 P G 3 8 3 DRAINAGE AND U T I L I T Y E A S E M E N T M B 5 0 P G 3 0 5 D B 5 4 1 8 P G 3 8 3 FLIGHT PATH DRIVE (50' PUBILC R/W)TRASCO INC. DB 5000 PG 2516 MB 63 PG 114 PIN# 3230-17-11-2265 PHASE 3 SECTION 1 OF NORTH KERR INDUSTRIAL PARK MB 50 PG 305 LOTS 31-34 PHASE 3 SECTION 1 OF NORTH KERR INDUSTRIAL PARK MB 50 PG 305 LOTS 36-41 CURVE TABLE CURVE C1 C2 C3 C4 RADIUS 2600.00' 3220.00' 1120.00' 2600.00' LENGTH 391.12' 166.00' 5.25' 189.61' TANGENT 195.93' 83.02' 2.62' 94.85' BEARING S81°29'45"E S75°42'35"E N89°52'57"E S87°53'39"E CHORD 390.75' 165.98' 5.25' 189.57' DELTA ∆ 8°37'08" 2°57'13" 0°16'07" 4°10'42"N04°11'16"E 319.89'S73°25' 2 8 " E 4 4 2 . 8 5 ' N73°26' 5 2 " W 4 0 1 . 5 0 ' N75°19'2 7 " W 1 7 0 . 4 5 ' N79°11'12" W 1 7 4 . 3 4 ' N83°38'24"W 174.5 9 ' N72°19'25"W 10.01' C1 C2 N87°38'16"W 144.77' S85°51'39"W 39.89' 45' DR A I N A G E A N D U T I L I T Y E A S E M E N T M B 5 0 P G 3 0 5 D B 5 4 1 8 P G 3 8 3 PENNIN G T O N D R I V E ( 6 0 ' P U B I L C R / W ) MB 62 P G 1 2 5 ZONED PDZONED I-2LOT 36 LOT 37 LOT 38 LOT 39 LOT 40 LOT 34 LOT 33LOT 32LOT 31 ORIGINAL LOT LINE BETWEEN DB 5000 PG 2505 AND DB 5000 PG 2516S16°32'33"W 319.83'LINE TO BE ABANDONED UPONRECORDATION OF RECOMBINATION PLATN02°19'27"E 323.17'C3 C4 #100 NC GRID NAD83/2011 N 200196.06 GRID E 2333385.82 GRID EL. 35.61 IPF 370,232 SQ.FT. 8.50 ACRES NEW LINETRASCO INC. DB 5000 PG 2516 MB 63 PG 114 PIN# 3230-17-11-2265 1"OE 1"OE 1"OE 38"RBF 38"RBF 38"RBF 38"RBF 38"RBF 38"RBF 58"RBF 319.83 (GRID)1"OE 1"OE R/W R/W R/W R/WR/WPOB PD-4 HW-3 100 HW-2 HW-1 PD-3 PD-2 PD-1 8 8 8 88 8 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 88 88 8 9 99 9 9 9 99 9 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 10 10 10 10 10 10 10 11 8 12 1212 1311 20 20 22 22 121413 1111 11 13 12 12 10 13 11 11 14 12 12 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 8 8 8 8 8 8 8 8 8 8 4 6 5 5 5 9 9 9 9 9 9 9 9 9 612 10 10 10 11 12 12 12 12 13 12 12 12 12 9 8 8 8 8 8 8 88 9 9 9 10 10 10 10 14 11 1111 11 10 10 13 12 12 15 15 BUILDING TRASCO INC. DB 5000 PG 2505 DB 5000 PG 2516 MB 63 PG 114 LOT 4 PIN# 3230-18-20-7261 3228 PENNINGTON DR. WILMINGTON NC 28403 SHEET 1 OF 2 FAX: (910) 251-8282 TELEPHONE: (910) 343-1048 WILMINGTON, NORTH CAROLINA 28401 243 NORTH FRONT STREET NORTH CAROLINA FIRM LICENSE NUMBER: F-1222 TOPOGRAPHIC SURVEY FOR CAMPBELL ENGINEERING & ASSOCIATES, INC. FEDEX PARKING EXPANSION OWNER: TRANSCO INC. DB 5000 PG 2516 CITY OF WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA AUGUST 03, 2021, REVISED JANUARY 24, 2022 1" = 60' DWG SURVEYOR'S NOTES: SITE RIGHT OF WAY BOUNDARY TIE ADJOINER LINE LINE LEGEND EASEMENT LINE CHAINLINK FENCEEDGE OF PAVEMENT SANITARY SEWER ELECTRIC LINE GAS LINE TELEPHONE LINE TELEPHONE FIBER OPTIC WATER LINERIPRAP LEGEND CONTROL POINT IRON FOUND IRON PIPE FOUNDIPF IRON ROD FOUNDIRF OPEN END PIPEOE PINCHED TOP PIPEPINCHED REBAR FOUNDRBF CMF CONCRETE MONUMENT FOUND IRON ROD SET 58" REBAR NOW OR FORMERLYN/F RIGHT OF WAYR/W CALCULATED POINT SANITARY SEWER MANHOLE CLEAN OUT WATER VALVE FIRE HYDRANT TELEPHONE PEDESTAL HAND HOLE ELECTRIC BOX GAS VALVE TRANSFORMER WATER METER HOT BOX ASPHALT BORE LOCATIONPD-1 UTILITY NOTE: POTENTIAL WETLANDS AS PROVIDED BY S&ME CHERRY GUM TALLOW OAK MAGNOLIA MAPLE PINE TREE LEGEND TREE SIZE18 NOTE: SURVEY REVISED TO SHOW ADDITIONAL RIGHT OF WAY TOPO, ASPHALT BORE SITES AND TREES, NOVEMBER 11, 2021. SURVEY REVISED JANUARY 21, 2022 TO SHOW ADDITIONAL TOPO AND LOCATION AREAS. SHEET 2 OF 2 FAX: (910) 251-8282 TELEPHONE: (910) 343-1048 WILMINGTON, NORTH CAROLINA 28401 243 NORTH FRONT STREET NORTH CAROLINA FIRM LICENSE NUMBER: F-1222 TOPOGRAPHIC SURVEY FOR CAMPBELL ENGINEERING & ASSOCIATES, INC. FEDEX PARKING EXPANSION OWNER: TRANSCO INC. DB 5000 PG 2516 CITY OF WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA AUGUST 03, 2021, REVISED JANUARY 24, 2022 1" = 60' DWG SITE RIGHT OF WAY BOUNDARY TIE ADJOINER LINE LINE LEGEND EASEMENT LINE CHAINLINK FENCEEDGE OF PAVEMENT SANITARY SEWER ELECTRIC LINE GAS LINE TELEPHONE LINE TELEPHONE FIBER OPTIC WATER LINERIPRAP LEGEND CONTROL POINT IRON FOUND IRON PIPE FOUNDIPF IRON ROD FOUNDIRF OPEN END PIPEOE PINCHED TOP PIPEPINCHED REBAR FOUNDRBF CMF CONCRETE MONUMENT FOUND IRON ROD SET 58" REBAR NOW OR FORMERLYN/F RIGHT OF WAYR/W CALCULATED POINT SANITARY SEWER MANHOLE CLEAN OUT WATER VALVE FIRE HYDRANT TELEPHONE PEDESTAL HAND HOLE ELECTRIC BOX GAS VALVE TRANSFORMER WATER METER HOT BOX ASPHALT BORE LOCATIONPD-1 POTENTIAL WETLANDS AS PROVIDED BY S&ME CHERRY GUM TALLOW OAK MAGNOLIA MAPLE PINE TREE LEGEND TREE SIZE18 NOTE: SURVEY REVISED TO SHOW ADDITIONAL RIGHT OF WAY TOPO, ASPHALT BORE SITES AND TREES, NOVEMBER 11, 2021. SURVEY REVISED JANUARY 21, 2022 TO SHOW ADDITIONAL TOPO AND LOCATION AREAS. FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29.98 ' 48"RCP SINV 31.38'24"CPP INV 31.31'X X XX X X X X X XSS SS SS SS SSSSSSSSSSSSSSSSSSINV 30.39 'XXXXXXXXXXXW W W W W W INV 29.98 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSINV 30.43 ' G G G G WM W 18"RCP INV 33.36' 18"RCP 18"RCP FESI 34.43' INV 29.98 ' INV 30.43 ' 18"RCP INV 33.31'INV 31.71' INV 31.54' 18"RCP FESI 34.43' 8 8 8 88 8 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 88 8 88 88 8 9 99 9 9 9 99 9 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 10 10 10 10 10 10 10 11 8 12 12121311 20 20 22 22 1214131111 11 13 12 12 10 13 11 11 14 12 12 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 8 8 8 8 8 8 8 8 8 4 6 5 5 5 9 9 9 9 9 9 9 9 9 612 10 10 10 11 12 12 12 12 13 12 12 12 12 9 8 8 8 8 8 8 88 9 9 9 10 10 10 10 14 11 11 11 11 1010 13 12 12 15 15 8 8 8 88 8 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 88 8 88 88 8 9 99 9 9 9 99 9 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 10 10 10 10 10 10 10 11 8 12 12121311 20 20 22 22 1214131111 11 13 12 12 10 13 11 11 14 12 12 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 8 8 8 8 8 8 8 8 8 8 4 6 5 5 5 9 9 9 9 9 9 9 9 9 612 10 10 10 11 12 12 12 12 13 12 12 12 12 9 8 8 8 8 8 8 88 9 9 9 10 10 10 10 14 11 11 11 11 1010 13 12 12 15 15 MB 62, PG 1 2 5 60' PUBLI C R / W PENNINGT O N D R I V E MB 62, PG 12560' PUBLIC R/WHALL WATER DRIVEE DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONVICINITY MAP MAG-DATE SITE C-2.0 TREE INVENTORY/ REMOVAL PLAN LEGEND DEMOLITION NOTES: CONTRACTOR SHALL INSTALL PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO DEMOLITION. SEE SHEET C-5.0 CHERRY GUM TALLOW OAK MAGNOLIA MAPLE PINE TREE LEGEND TREE SIZE18 ANTICIPATED TREES TO BE REMOVED: CAUTION: INFORMATION ON THIS DRAWING CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. FLIGHT PATH DRIVE (50' PUBILC R/W)X X XX X X X X X XSS SS SS SS SS SS SSSSSSSSSSSSSSSSSSZONED PDZONED I-2XXXXXXXXXXXX X X X X X UCCUCCUCCUCCUCCUCCUCCUCC W W W W W W CO SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSG G G G G E E E E E E E E E E WM E W EPD-4 HW-3 100 HW-2 HW-1 PD-3 PD-2 PD-1 E E8 8 8 88 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 88 8 88 88 8 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 9 9 9 12 10 12 12 12 12 15 15 8 8 8 88 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 88 8 88 88 8 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 9 9 9 12 10 12 12 12 15 15 X X XX X X X X X X X X XX X X XXXXXXXXXXXXMB 62, PG 12 5 60' PUBLIC R/ W PENNINGTON D R I V E MB 62, PG 12560' PUBLIC R/WHALL WATER DRIVEE UGEUGE UGE UGE UGE UGE DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONMAG-DATEC-3.0 SITE DEVELOPMENT DATA SITE & DIMENSIONING & UTILITY PLAN EXISTING FEDEX FACILITY VICINITY MAP SITE FLOOD ZONE: LEGEND AUTHORITY AND RESPONSIBILITY: PERMITS, BONDS, AND INSPECTIONS: TRAFFIC CONTROL: SITE NOTES: GENERAL NOTES: CAUTION: INFORMATION ON THIS DRAWING CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. SEE NCDOT DETAIL 1101.02 'TEMPORARY LANE CLOSURES' FOR TRAFFIC CONTROL MEASURES SEE SHEET C-3.0A FOR SIDEWALK/CONDUIT PLACEMENT ON EXISTING FXG PROPERTY SS SS SSMH TOP 34.34' INV W 26.62' INV E 27.65' 8"PVC SSMH TOP 35.00' INV N 28.69' INV W 28.52' INV E 28.59'SS6"PVCSSMH TOP 36.39' INV S 31.19' INV W 29.90' INV E 29.95'8"PVC 8"PVCXXXXXXXXXX UCCUCCUCCUCCUCCUCCUCC W W COSSSSSSSSSSSSSSSSSSSS SS SS SS SS TFO TFO TFO TFO TFOTFO TFO TFO TFO TFO G G G G E E E E E E E E WM E THH TELEPHONE RUNS WITH TELEPHONE FIBER OPTIC 18"RCP INV 33.36' 18"RCP PD-2 PD-1 E THH TELEPHONE RUNS WITH TELEPHONE FIBER OPTIC 18"RCP INV 33.31'INV 31.71' INV 31.54' MB 62, PG 1 2 5 60' PUBLIC R / W PENNINGT O N D R I V E UGE UGE UGE UGESSSSXXXXXXXXXUCCUCCUCCUCCUCCUCC W W W W W W SS SS SS SS SS SS SS SS SS TFO TFO TFO TFO TFO TFO G G G G G E E E E E PD-1 E WWWWW W W W W W W W MAG-DATEINSET "A" SIDEWALK/CONDUIT INSTALLATION PLAN R/W R/W INSET "B" INSET "B" INSET "A" PARKING LOT EXPANSION SITE ACROSS STREET PARKING LOT EXPANSION DRIVEWAY AND SIDEWALK (SEE SHT. C-3.0) SEE SHEET C-3.0 FOR SITE NOTES AND LEGEND EXISTING INFORMATION BASED ON PREVIOUS CAD FILE BY PARAMOUNTE ENGINEERING. SURVEY INFORMATION NOT YET RECEIVED AT TIME OF THIS PLAN. PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM OWNER:3241 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM, LLC 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM C-3.0A EXISTING FACILITY SIDEWALK PLAN C-3.1 SITE DETAILS DUAL OH TRUSS GATE ARRANGEMENT ASPHALT AT CONCRETE SECTION PERIMETER FENCE - TYP. DOUBLE STRIPE BACK-IN TRAILER PARKING 11'-6" WIDE SPACE CONCRETE CURB DETAIL CURB AND GUTTER JOINTS 8" BOLLARD 6" BOLLARD FEDEX DETAIL 02830-040 FEDEX DETAIL 02870-001 FEDEX DETAIL 02870-002 FEDEX DETAIL 02002-006 FEDEX DETAIL 02522-002 FEDEX DETAIL 02510-007 FEDEX DETAIL 02830-006 CONCRETE CURB & GUTTER FEDEX DETAIL 02522-001 DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONPEDESTRIAN GATE FOR REMOTE LOTS FEDEX DETAIL 02830-038 C-3.2 SITE DETAILS DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONEMERGENCY ACCESS PEDESTRIAN GATE FEDEX DETAIL 02830-007 FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29.98 ' 48"RCP SINV 31.38'24"CPP INV 31.31'X X XX X X X X X XSS SS SS SS SSSSSSSSSSSSSSSSSSINV 30.39 'XXXXXXXXXXXX X X X X X W W W W W W INV 29.98 ' CO CO SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSINV 30.43 ' G G G G WM W 18"RCP INV 33.36' 18"RCP 18"RCP FESI 34.43' PD-4 HW-3 100 HW-2 HW-1 PD-3 PD-2 PD-1 INV 29.98 ' INV 30.43 ' 18"RCP INV 33.31'INV 31.71' INV 31.54' 18"RCP FESI 34.43' 8 8 8 88 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 88 8 88 88 8 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 9 9 9 12 10 12 12 12 12 15 15 8 8 8 88 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 88 8 88 88 8 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 9 9 9 12 10 12 12 12 15 15 X X XX X X X X X X X X XX X X XXXXXXXXXXXXMB 62, PG 1 2 5 60' PUBLI C R / W PENNINGT O N D R I V E MB 62, PG 12560' PUBLIC R/WHALL WATER DRIVEE NON-WETLAND IMPACT ±3,720 SF (±0.085 AC.) DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONC-4.0 GRADING & DRAINAGE PLAN VICINITY MAP ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE NORTH AMERICAN GREEN P300 ALONG FACE OF SLOPE. MAXIMUM SLOPE SHALL BE 2:1 LEGEND MAG-DATE SITE GRADING NOTES THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ENGINEER AN AS-BUILT SURVEY OF PROJECT UPON COMPLETION OF CONSTRUCTION. CONTRACTOR TO REVIEW GEOTECHNICAL EXPLORATION REPORT REGARDING EXISTING ON-SITE SOILS PRIOR TO BIDDING CONTRACTOR TO INSTALL GROUNDCOVER ON ALL EXPOSED PERIMETER SLOPES AND SLOPES STEEPER THAN 3:1 WITHIN 7 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, GROUNDCOVER FOR ALL REMAINING DISTURBED AREAS SHALL BE INSTALLED WITHIN 14 DAYS. CONTRACTOR TO ENSURE THAT ANY OFF-SITE RELATED BORROW OR WASTE AREAS RELATED TO THIS PROJECT ARE PROPERTY PERMITTED UNDER THE NPDES GENERAL PERMIT OR DEQ. EXACT LOCATION OF TOPSOIL STOCKPILE LOCATION NOT KNOWN AT THIS TIME. STOCKPILE LOCATION WILL BE LOCATED WITHIN LIMITS OF DISTURBANCE AND PER DETAIL SHOWN ON EROSION CONTROL DETAIL SHEETS. CONTRACTOR TO COORDINATE EXACT LOCATION IN FIELD WITH EROSION CONTROL INSPECTOR. EXISTING FEDEX FACILITY SWALE #3 (EXISTING)SWALE A (EXISTING) A A SWALE B (EXISTING) B B EX. SWALE B (SEE SECT. THIS SHT): EX. SWALE A (SEE SECT. THIS SHT): EX. SWALE #3 (SEE SECT. THIS SHT): S5 S5 EX. ROAD SIDE SWALE 5 (SEE SECT. THIS SHT): ROADSIDE SWALE #5 (EXISTING) STORMWATER QUALITY AND QUANTITY ARE ACCOUNTED FOR IN OFF-SITE DETENTION POND, PER NCDEQ STORMWATER PERMIT KNIP SW PERMIT SW8960411 OVERALL DRAINAGE DELINEATION BOUNDARY TO POND #5 - PHASE 3B (TAKEN FROM DRAINAGE AREA PLAN FOR NKIP BY NORRIS & TUNSTALL, DATED 07/01/19) OVERALL DRAINAGE DELINEATION BOUNDARY TO POND #5 - PHASE 3A (TAKEN FROM DRAINAGE AREA PLAN FOR NKIP BY NORRIS & TUNSTALL, DATED 07/01/19) DRAINAGE AREA TO NKIP POND #4 DRAINAGE AREA TO NKIP POND #5 DRAINAGE AREA TO NKIP POND #5 USACOE NW-18 PERMIT ISSUED FOR DISTURBING ±0.09 ACRES OF NON-WETLAND IMPACTS; ACTION ID: SAW-2021-01550, APPROVED ON 11/16/21. DRAINAGE AREA TO NKIP POND #5 DRAINAGE AREA TO FEDEX ON-SITE PONDS - PERMIT SW8 150803 OVERALL DRAINAGE DELINEATION BOUNDARY TO POND #5 - PHASE 3B (TAKEN FROM DRAINAGE AREA PLAN FOR NKIP BY NORRIS & TUNSTALL, DATED 07/01/19) DRAINAGE AREA TO NKIP POND #5 DRAINAGE AREA TO NKIP POND #4 SITE DEVELOPMENT DATA FLOOD ZONE: RIP RAP @ CURB OPENING 3 3 STORM DRAIN PROFILE & DETAILS C-4.1 DRIVEWAY PIPE PROFILE; STR. #1 - #2 DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSION FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29.98 ' 48"RCP SINV 31.38'24"CPP INV 31.31'X X XX X X X X X XSS SS SS SS SSSSSSSSSSSSSSSSSSINV 30.39 'XXXXXXXXXXXW W W W W W INV 29.98 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSINV 30.43 ' G G G G WM W 18"RCP INV 33.36' 18"RCP 18"RCP FESI 34.43' INV 29.98 ' INV 30.43 ' 18"RCP INV 33.31'INV 31.71' INV 31.54' 18"RCP FESI 34.43'8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 99 9 9 9 99 9 10 10 10 10 10 10 10 11 8 12 12121311 20 20 22 22 1214131111 11 13 12 12 10 13 11 11 14 12 12 8 8 8 8 8 8 8 8 8 4 6 5 5 5 9 9 9 9 9 9 6 10 10 11 12 12 13 12 12 9 8 8 8 8 8 8 88 9 9 9 10 10 10 10 14 11 11 11 11 1010 13 12 12 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 99 9 9 9 99 9 10 10 10 10 10 10 10 11 8 12 12121311 20 20 22 22 1214131111 11 13 12 12 10 13 11 11 14 12 12 8 8 8 8 8 8 8 8 8 8 4 6 5 5 5 9 9 9 9 9 9 6 10 10 11 12 12 13 12 12 12 9 8 8 8 8 8 8 88 9 9 9 10 10 10 10 14 11 11 11 11 1010 13 12 12 MB 62, PG 1 2 5 60' PUBLI C R / W PENNINGT O N D R I V E MB 62, PG 12560' PUBLIC R/WHALL WATER DRIVEE NON-WETLAND IMPACT ±3,720 SF (±0.085 AC.) SEDIMENT BASIN DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONVICINITY MAP ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE NORTH AMERICAN GREEN P300 ALONG FACE OF SLOPE. MAXIMUM SLOPE SHALL BE 2:1 MAG-DATE SITE NCDEQ SELF INSPECTION PROGRAM STORMWATER QUALITY AND QUANTITY ARE ACCOUNTED FOR IN OFF-SITE DETENTION POND, PER NCDEQ STORMWATER PERMIT KNIP SW PERMIT SW8960411 USACOE NW-18 PERMIT ISSUED FOR DISTURBING ±0.09 ACRES OF NON-WETLAND IMPACTS; ACTION ID: SAW-2021-01550, APPROVED ON 11/16/21. C-5.0 EROSION & SEDIMENT CONTROL PLAN - PH 1 PH. 1 DISTURBED AREA ±3.0 ACRES TOTAL DISTURBED AREA = ±5.5 ACRES SEQUENCE OF CONSTRUCTION PHASE 1:MAINTENANCE PLAN: SEE SHEET C-5.4 FOR SELF INSPECTION NOTES CONTRACTOR TO ADJUST SILT FENCE AS NECESSARY DURING DEMOLITION AND GRADING OPERATIONS TO ENSURE NO SEDIMENT IS RELEASED DURING ANY PHASE OF CONSTRUCTION. WETLAND LOCATIONS SHOWN ON PLANS. WETLANDS TO BE DISTURBED ARE NOTED PER APPROVED NW-18 PERMIT. CONTRACTOR TO ENSURE THAT ANY OFF-SITE RELATED BORROW OR WASTE AREAS RELATED TO THIS PROJECT ARE PROPERTY PERMITTED UNDER THE NPDES GENERAL PERMIT OR NCDEQ WATER QUALITY DIVISION. NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY DOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, MASON'S AREA, FUEL AND MATERIAL STORAGE AREAS/CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED TO ON THE SITE MAPS. RESPONSIBLE PARTY: CONTRACTOR TO INSTALL GROUNDCOVER ON ALL EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE INSTALLED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS(WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. STORMWATER DISCHARGE POINT EROSION & SEDIMENT CONTROL LEGEND CONTRACTOR TO ENSURE ALL PORTA-JOHNS ARE NOT PLACED ON CATCH BASINS AND OTHER DRAINAGE STRUCTURES. LITTER AND CONSTRUCTION DEBRIS SHOULD BE PLACED IN IDENTIFIED AREAS AND EMPTIED ON A ROUTINE BASIS FOR THE DURATION OF THE PROJECT Mu To Mu SOIL TYPE LEGEND ToESTIMATED CONSTRUCTION DATES: START DATE: MAY 2022 END DATE: SEPTEMBER 2022 ZONED:I-2 3317 KITTY HAWK ROAD MAJESTIC KITCHEN & BATH/ PRECISION WALLS INC. ZONED:I-2 3313 KITTY HAWK ROAD VACANT ZONED:I-2 3305 KITTY HAWK ROAD THE TONER EXCHANGE ZONED:I-2 3012 KITTY HAWK ROAD MNT PERFORMANCE ZONED: I-2 VACANT ZONED:PD 3030 HALL WATERS DR. ZONED:I-2 3235 KITTY HAWK ROAD ZONED:I-2 3309 KITTY HAWK ROAD MOTIV MOTORSPORTS SEDIMENT BASIN - PHASE 1 FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29.98 ' 48"RCP SINV 31.38'24"CPP INV 31.31'X X XX X X X X X XSS SS SS SS SSSSSSSSSSSSSSSSSSINV 30.39 'XXXXXXXXXXXW W W W W W INV 29.98 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSINV 30.43 ' G G G G WM W 18"RCP INV 33.36' 18"RCP 18"RCP FESI 34.43' INV 29.98 ' INV 30.43 ' 18"RCP INV 33.31'INV 31.71' INV 31.54' 18"RCP FESI 34.43' MB 62, PG 1 2 5 60' PUBLI C R / W PENNINGT O N D R I V E MB 62, PG 12560' PUBLIC R/WHALL WATER DRIVE35.335.235.936.336.637.135.838.738.538.138.037.737.436.637.037.637.237.137.638.8E DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONVICINITY MAP ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE NORTH AMERICAN GREEN P300 ALONG FACE OF SLOPE. MAXIMUM SLOPE SHALL BE 2:1 MAG-DATE SITE NCDEQ SELF INSPECTION PROGRAM STORMWATER QUALITY AND QUANTITY ARE ACCOUNTED FOR IN OFF-SITE DETENTION POND, PER NCDEQ STORMWATER PERMIT KNIP SW PERMIT SW8960411 USACOE NW-18 PERMIT ISSUED FOR DISTURBING ±0.09 ACRES OF NON-WETLAND IMPACTS; ACTION ID: SAW-2021-01550, APPROVED ON 11/16/21. C-5.1 EROSION & SEDIMENT CONTROL PLAN - PH 2 PH. 2 DISTURBED AREA ±5.5 ACRES TOTAL DISTURBED AREA = ±5.5 ACRES SEQUENCE OF CONSTRUCTION PHASE 2:MAINTENANCE PLAN: CONTRACTOR TO ADJUST SILT FENCE AS NECESSARY DURING DEMOLITION AND GRADING OPERATIONS TO ENSURE NO SEDIMENT IS RELEASED DURING ANY PHASE OF CONSTRUCTION. WETLAND LOCATIONS SHOWN ON PLANS. WETLANDS TO BE DISTURBED ARE NOTED PER APPROVED NW-18 PERMIT. CONTRACTOR TO ENSURE THAT ANY OFF-SITE RELATED BORROW OR WASTE AREAS RELATED TO THIS PROJECT ARE PROPERTY PERMITTED UNDER THE NPDES GENERAL PERMIT OR NCDEQ WATER QUALITY DIVISION. NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY DOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, MASON'S AREA, FUEL AND MATERIAL STORAGE AREAS/CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED TO ON THE SITE MAPS. RESPONSIBLE PARTY: CONTRACTOR TO INSTALL GROUNDCOVER ON ALL EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE INSTALLED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS(WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. STORMWATER DISCHARGE POINT EROSION & SEDIMENT CONTROL LEGEND CONTRACTOR TO ENSURE ALL PORTA-JOHNS ARE NOT PLACED ON CATCH BASINS AND OTHER DRAINAGE STRUCTURES. LITTER AND CONSTRUCTION DEBRIS SHOULD BE PLACED IN IDENTIFIED AREAS AND EMPTIED ON A ROUTINE BASIS FOR THE DURATION OF THE PROJECT MuTo SEDIMENT BASIN - PHASE 2 SEE SHEET C-5.4 FOR SELF INSPECTION NOTES FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29.98 ' 48"RCP SINV 31.38'24"CPP INV 31.31'X X XX X X X X X XSS SS SS SS SSSSSSSSSSSSSSSSSSINV 30.39 'XXXXXXXXXXXX X X X X X W W W W W W INV 29.98 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSINV 30.43 ' G G G G WM W 18"RCP INV 33.36' 18"RCP 18"RCP FESI 34.43' INV 29.98 ' INV 30.43 ' 18"RCP INV 33.31'INV 31.71' INV 31.54' 18"RCP FESI 34.43'X X XX X X X X X X X X XX X X XXXXXXXXXXXXMB 62, PG 1 2 5 60' PUBLI C R / W PENNINGT O N D R I V E MB 62, PG 12560' PUBLIC R/WHALL WATER DRIVE35.335.235.936.336.637.135.838.738.538.138.037.737.436.637.037.637.237.137.638.8E DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONVICINITY MAP ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE NORTH AMERICAN GREEN P300 ALONG FACE OF SLOPE. MAXIMUM SLOPE SHALL BE 2:1 MAG-DATE SITE NCDEQ SELF INSPECTION PROGRAM STORMWATER QUALITY AND QUANTITY ARE ACCOUNTED FOR IN OFF-SITE DETENTION POND, PER NCDEQ STORMWATER PERMIT KNIP SW PERMIT SW8960411 C-5.2 EROSION & SEDIMENT CONTROL PLAN - PH 3 PH. 3 DISTURBED AREA ±5.5 ACRES TOTAL DISTURBED AREA = ±5.5 ACRES SEQUENCE OF CONSTRUCTION PHASE 3:ACREAGE SUMMARY (IN ACRES) ON-SITE DISTURBED AREA OFF-SITE DISTURBED AREA PROPERTY AREA IMPERVIOUS AREA AT COMPLETION PERVIOUS/ SEEDED AREA ±5.5 AC. ±5.5 AC. ±0.0 AC. ±8.5 AC. ±3.7 AC. ±1.8 AC. TOTAL DISTURBED AREA MAINTENANCE PLAN: CONTRACTOR TO ADJUST SILT FENCE AS NECESSARY DURING DEMOLITION AND GRADING OPERATIONS TO ENSURE NO SEDIMENT IS RELEASED DURING ANY PHASE OF CONSTRUCTION. WETLAND LOCATIONS SHOWN ON PLANS. WETLANDS TO BE DISTURBED ARE NOTED PER APPROVED NW-18 PERMIT. CONTRACTOR TO ENSURE THAT ANY OFF-SITE RELATED BORROW OR WASTE AREAS RELATED TO THIS PROJECT ARE PROPERTY PERMITTED UNDER THE NPDES GENERAL PERMIT OR NCDEQ WATER QUALITY DIVISION. NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY DOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, MASON'S AREA, FUEL AND MATERIAL STORAGE AREAS/CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED TO ON THE SITE MAPS. RESPONSIBLE PARTY: CONTRACTOR TO INSTALL GROUNDCOVER ON ALL EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE INSTALLED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS(WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. STORMWATER DISCHARGE POINT EROSION & SEDIMENT CONTROL LEGEND CONTRACTOR TO ENSURE ALL PORTA-JOHNS ARE NOT PLACED ON CATCH BASINS AND OTHER DRAINAGE STRUCTURES. LITTER AND CONSTRUCTION DEBRIS SHOULD BE PLACED IN IDENTIFIED AREAS AND EMPTIED ON A ROUTINE BASIS FOR THE DURATION OF THE PROJECT SEE SHEET C-5.4 FOR SELF INSPECTION NOTES SEE SHEET C-5.2A FOR EROSION AND SEDIMENT CONTROL MEASURES FOR SIDEWALK / ASPHALT REMOVAL MEASURES XXXXXXXXXXUCCUCCUCCUCCUCCUCCUCC E E E E E E E E E18"RCP INV 33.36' 18"RCP PD-2 PD-1 E18"RCP INV 33.31'INV 31.71' INV 31.54' MB 62, PG 1 2 5 60' PUBLIC R / W PENNINGT O N D R I V E E UGE UGE UGE UGESSSSXXXXXXXXXXXUCCUCCUCCUCCUCCUCC W W W W W W W SS SS SS SS SS SS SS SS G G G G G GE E E E E E PD-1 E SS SS SS SS SS SS SS W W W EE XMB 62, PG 1 2 5 60' PUBLI C R / W PENNING T O N D R I V E C-5.2AMAG-DATEINSET "A" SEDIMENT CONTROL PLAN - PHASE 3 R/W R/W INSET "B" INSET "B" INSET "A" ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE NORTH AMERICAN GREEN P300 ALONG FACE OF SLOPE. MAXIMUM SLOPE SHALL BE 2:1 TOTAL DISTURBED AREA = ±2,700 SF (±0.06 AC.) CONTRACTOR TO ADJUST SILT FENCE AS NECESSARY DURING DEMOLITION AND GRADING OPERATIONS TO ENSURE NO SEDIMENT IS RELEASED DURING ANY PHASE OF CONSTRUCTION. CONTRACTOR TO ENSURE THAT ANY OFF-SITE RELATED BORROW OR WASTE AREAS RELATED TO THIS PROJECT ARE PROPERTY PERMITTED UNDER THE NPDES GENERAL PERMIT OR NCDEQ WATER QUALITY DIVISION. CONTRACTOR TO INSTALL GROUNDCOVER ON ALL EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE INSTALLED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS(WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. EROSION & SEDIMENT CONTROL LEGEND PARKING LOT EXPANSION SITE ACROSS STREET PARKING LOT EXPANSION DRIVEWAY AND SIDEWALK (SEE SHT. C-3.0) EROSION & SEDIMENT CONTROL PLAN - PH 3 MAINTENANCE PLAN: EXISTING INFORMATION BASED ON PREVIOUS CAD FILE BY PARAMOUNTE ENGINEERING. SURVEY INFORMATION NOT YET RECEIVED AT TIME OF THIS PLAN. PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM OWNER:3241 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM, LLC 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM INSET "C" INSET "C" C-5.3 EROSION & SEDIMENT CONTROL DETAILS BA SPILLWAY PROFILE SKIMMER BASIN SPILLWAY CROSS SECTION DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONSK SPILLWAY = 37.0' TOP = 38.2' 33.5 BOTTOM OF BASIN =32.0 4" SCH 40 PVC INV. OUT = 33.5 SEDIMENT STORAGE VOLUME REQ'D = 4.0 AC. x 1,800 CF = 7,200 CF PROVIDED = ±8,900 CF (EL. 32.0 - 33.5) TEMP STORAGE VOLUME PROVIDED = ±33,525 CF (EL. TOP 37.0 - 33.5) 4.0" FAIRCLOTH SKIMMER (SEE DETAIL THIS SHEET) W/3" ORIFICE INV. OUT THROUGH BERM EL. 33.5 SEDIMENT CLEANOUT STAKE MARKED @ EL. 32.8 (DO NOT MARK TOP OF STAKE AS CLEANOUT EL.) EROSION & SEDIMENT CTRL NOTES/ DETAILS C-5.4 SELF INSPECTION NOTES: CE SF MEDIAN 8" DIA. RIP-RAP 1'-0"1'-0" A A 3'-0" MIN. 30" TOP OF FENCE AASHTO #57 STONE FACE ON UPSTREAM SIDE 1.5 1 (MAX)1 (MAX) 1.5 5/6 H 6" MIN. THICKNESS AASHTO #57 STONE FACE ON UPSTREAM SIDE1.5 1 (MAX)1 (MAX) 1.5 FLOW MEDIAN 8" DIA. RIP-RAP SILT FENCE ROCK OUTLET ELEVATION - UP-SLOPE FACE SECTION A-A NON-WOVEN FILTER FABRIC SHALL BE INSTALLED UNDER ALL STONE NON-WOVEN FILTER FABRIC DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSION C-5.5 RR GROUND STABILIZATION: EROSION & SEDIMENT CONTROL DETAILS DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONPH-1 TEMPORARY DIVERSION SWALE #1 PH 1- TEMPORARY DIVERSION SWALE #2 PH-2 TEMPORARY DIVERSION SWALE #1 PH 2- TEMPORARY DIVERSION SWALE #2 NON-WOVEN FILTER FABRIC SHALL BE INSTALLED UNDER ALL STONE Considerations Practice Applies Planning To prevent erosion at the outlet of a channel or conduit by reducing the velocity A structure designed to control erosion at the outlet of a channel or conduit. of flow and dissipating the energy. Purpose Definition 6.41 OUTLET STABILIZATION STRUCTURE Conditions Where Maintenance Specifications Construction SECTION A-A PLAN VIEW SECTION A-A PLAN VIEW A od o3d A L a d PIPE OUTLET TO FLAT AREA - NO WELL DEFINED CHANNEL PIPE OUTLET TO WELL DEFINED CHANNEL Fig. 6.41c Riprap outlet protection (modified from Va SWCC). d FILTER FABRIC FILTER FABRIC OP NON-WOVEN FILTER FABRIC SHALL BE INSTALLED UNDER ALL STONE C-5.6 EROSION & SEDIMENT CONTROL DETAILS TOPSOIL STOCKPILE DETAIL DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSION C-5.7 EROSION & SEDIMENT CONTROL DETAILS DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSION C-5.8 EROSION & SEDIMENT CONTROL DETAILS DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSION FLIGHT PATH DRIVE (50' PUBILC R/W)INV 29 . 9 8 ' 48"RC P SINV 31.38'24"CP P INV 31.31'X X XX X X X X X XSS SS SS SS SS 8"PVC SSMH TOP 34.34' INV W 26.62' INV E 27.65' 8"PVC SSMH TOP 35.00' INV N 28.69' INV W 28.52' INV E 28.59'SS6"PVCSSMH TOP 36.39' INV S 31.19' INV W 29.90' INV E 29.95' 8"PVC 8"PVC SSMH TOP 37.25' INV S 31.28' INV W 30.76' INV E 30.81' 8"PVC SSMH TOP 38.00' INV W 32.52' INV N 32.48' INV S 32.46'6"PVCSSSS6"PVC6"PVCSSMH TOP 36.69' INV SW 27.44' INV NE 27.40'SSSSSSSSSSSSSSMH TOP 35.75' INV NE 26.47'12"PVC12"PVCINV 30 . 3 9 'XXXXXXXXXXXX X X X X X UCCUCCUCCUCCUCCUCCUCC W W W W W W INV 29 . 9 8 ' CO CO SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSINV 30 . 4 3 ' TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO TFO G G G G G E E E E E E E E E WM E T THH HH W TELEPHONE RUNS WITH TELEPHONE FIBER OPTIC TELEPHONE RUNS WITH TELEPHONE FIBER OPTIC E18"RCP INV 33.36' 18"RCP HBSD18"RCP FESI 34.43'AT&TVAULTPD-4 HW-3 100 HW-2 HW-1 PD-3 PD-2 PD-1 INV 29 . 9 8 ' INV 30 . 4 3 ' E T THH HH TELEPHONE RUNS WITH TELEPHONE FIBER OPTIC TELEPHONE RUNS WITH TELEPHONE FIBER OPTIC E18"RCP INV 33.31' INV 31.71' INV 31.54'HBSD18"RCP FESI 34.43' INV 30.70' INV 30.58'AT&TVAULT8 8 8 88 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 88 8 88 88 8 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 9 9 9 12 10 12 12 12 12 15 15 8 8 8 88 8 8 8 8 8 8 12 10 9 14 12 13 12 10 8 88 8 88 88 8 9 9 99 9 99 9 10 10 10 10 9 7 5 10 1112 4 12 12 15 12 20 111111 14 1315 12 12 12 12 1314 14 14 8 8 9 9 9 12 10 12 12 12 15 15 X XXX X X X X X X X X XX X X XXXXXXXXXXXXMB 62, P G 1 2 5 60' PUB L I C R / W PENNI N G T O N D R I V E MB 62, PG 12560' PUBLIC R/WHALL WATER DRIVEE UGEUGE UGE UGE UGE UGE DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSIONC-6.0 LANDSCAPE PLAN VICINITY MAP ALL SLOPES STEEPER THAN 3:1 SHALL RECEIVE NORTH AMERICAN GREEN P300 ALONG FACE OF SLOPE. MAXIMUM SLOPE SHALL BE 2:1 MAG-DATE SITE LANDSCAPING BOTANICAL NAMECOMMON NAME PLANT LIST QTYKEY MINIMUM SIZE AT TIME OF PLANTING TREE LEGENDTREE RETENTION STANDARDS CHERRY GUM TALLOW OAK MAGNOLIA MAPLE PINE TREE LEGEND TREE SIZE18 ANTICIPATED TREES TO BE SAVED: EXISTING FEDEX FACILITY MITIGATION: C-6.1 LANDSCAPE DETAILS & NOTES GENERAL NOTES & SPECIFICATIONS: SMALL TREE PLANTING DETAIL TREE PLANTING ON SLOPE CANOPY TREE PLANTING SHRUB / GROUND COVER PLANTING DEVELOPER/FUTURE PROP. ONLY: PLANS PREPARED BY: C E & A, INC. A M P B E L L 31 Boland Court Greenville, SC 29615 (864) 335-4090 EMAIL: Civil Engineering and Land Planning 3328 PENNINGTON DRIVEWILMINGTON, NC 28405NEW HANOVER COUNTYSETZER PROPERTIES WILM DE, LP 354 WALLER AVENUE, STE 200 LEXINGTON , KY 40504 CONTACT: ROBBIE McATEE (859) 514-7767 EMAIL: RMCATEE@BRETTCON.COM CURRENT PROPERTY OWNER TRASCO, INC. 1202 EASTWOOD ROAD WILMINGTON, NC 28403 CONTACT: D. WEBSTER TRASK (910) 313-0795 EMAIL: WEBTRASK@EC.RR.COM TIM.CAMPBELL@CAMPBELL-ENGINEERING-SC.COM PARKING LOT EXPANSION FLEXIBLE PAVEMENT DESIGN SECTIONS THICKNESS MATERIAL 1.0" 6" N/A S-9.5B APPROVED SUBGRADE STANDARD DUTY FLEXIBLE ABC STONE 1.0"S-9.5B N/A HEAVY DUTY FLEXIBLE 8" THICKNESS MATERIAL 1.5" 2.5" S-9.5B APPROVED SUBGRADE ABC STONE I-19.OC N/A CONCRETE PAVEMENT SECTION 6" THICKNESS MATERIAL 8" APPROVED SUBGRADE ABC STONE CONCRETE (4,000 psi) DRAWING NUMBER PROJECT NUMBER BYDESCRIPTIONDATENO.CHKAPVDRAWING PATH: T:\GEO\Projects\2021\213904_Campbell Eng&Assoc_FedEx Parking Lot_Wilmington\CAD\Record_Drawings\FedEx Geotsht.dwgFEDEX GROUND FACILITY213904 G-1.0 1GEOTECHNICAL SHEETCAMPBELLENGINEERING &ASSOCIATES, INC.31 BOLAND STREETGREENVILLE, SOUTH CAROLINA 29615PREPARED FOR3006 Hall Waters Drive Suite 100 Wilmington, NC 28405 THESE SPECIFICATIONS ARE BASED ON THE S&ME GEOTECHNICAL REPORT DATED 8-13-2021 WHICH SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. IN ADDITION, THESE GENERAL SPECIFICATIONS SHALL BE USED IN CONJUNCTION WITH THE PROJECT SPECIFICATIONS. Earthwork Stripping The site is wooded and will require clearing and stripping the proposed construction areas prior to grading of the site. Topsoil thicknesses of approximately 6 inches were measured at the boring locations. Typically, wooded sites in the project area have numerous roots (ie. rootmat). Lower lying areas can have deeper areas of topsoil and organics that will require removal during stripping, such as within existing ditch areas. Site Preparation Initial site preparation should begin by clearing trees and vegetation, stripping of organics and topsoil, and any other deleterious materials for a lateral distance of at least 10 feet beyond the limits of new construction. Due to the wet conditions at the site, the contractor should use tracked equipment to remove organics to limit rutting of the near surface materials. Any voids created from stripping should be cleaned and filled with well-compacted structural fill. Existing ditches will require stripping and mucking of soft sediment prior to fill placement. We anticipate that the spoil piles observed adjacent to the ditches are from the original ditch excavations and will not be suitable for reuse as structural fill. Ditches should be backfilled with select structural fill and compacted following our recommendations presented in section 6.2 of the geotechnical report. Since the site is relatively flat and wet, after stripping of the site, temporary ditches are recommended to help dry the near surface soils. In addition, to help with site drainage and stormwater diverging during mass grading the contractor may consider installation of the stormwater pond and stormwater collection system prior to mass grading the site. We would recommend that the site be raised to gain distance between the groundwater elevation and the proposed pavement. During fill placement operation, the roller in vibratory mode will likely draw the shallow groundwater into the loose near-surface soils potentially making unstable soil conditions and compaction difficult. If design grades are to remain near existing grades, compaction with the roller operating in static mode will likely be required. Alternatively, if site grades can be raised, other recommendations such as the use of woven or non-woven geotextile and geogrid materials may be needed in “bridging” out of the loose surface materials. On-site soils will be moisture sensitive and can deteriorate under repeated construction traffic causing the soils to become unstable during grading operations and during rain events. The contractor should seal off fill soils at the end of each day using a smooth drum roller and provide positive drainage to not allow water to pond. Temporary ditches during construction may be needed to help divert stormwater Subgrade Preparation, Repair, and Improvement Methods After the required initial site clearing has been completed, we recommend that the exposed subgrade soils be proofrolled with a 10-ton smooth-drum self-propelled roller operating in the static mode or a loaded dump truck to locate any areas of soft, very loose, or otherwise unsuitable surface conditions. Any area that ruts or pumps should be disced, moisture conditioned to near the soil's optimum moisture content by drying or wetting, and recompacted. Relatively low-consistency silty sands that will likely be unstable under proofroll were encountered near anticipated final subgrade elevations at boring locations B-1, B-3, B-4, B-5, and B-9. Discing, drying, and recompacting of these soils may be required to provide stability for structural fill placed above. Please note that groundwater levels were encountered within 1 to 2½ feet of the existing ground surface. The exposed subgrade can deteriorate and lose support when exposed to construction traffic, improper moisture conditioning, and adverse weather conditions. Deterioration can occur in the form or rutting, pumping, freezing, or erosion. During construction, exposed subgrade surfaces should be moisture conditioned and sealed at the end of each day or when wet weather is forecast. Water should not be allowed to pond on exposed subgrades, however, areas that become dry may require additional moisture conditioning to keep the soils stable. Temporary ditches during construction may be needed to help divert stormwater to permanent storm drain features. Heavy rubber-tired construction equipment should not be allowed to operate on exposed subgrades during wet conditions. Immediately prior to pavement construction, exposed subgrade soils should be evaluated by proofrolling to determine their stability. Soils which rut, pump, or deflect under proofrolling should be repaired prior to ABC stone placement. Repair measures may include moisture conditioning of dry of optimum moisture content soils and recompacting, scarifying/drying/recompacting, undercutting, placement of geotextiles, use of chemical additives, or some combination of these measures. Actual repair measures will be influenced by project schedule and weather conditions and can only be determined in the field by the geotechnical engineer. Excavation Considerations Temporary construction slopes and excavation shoring should comply with local, state, and federal governing regulations, including OSHA (29 CFR Part 1926) excavation trench safety standards. Temporary excavations should be cut to a stable slope or the excavations should be temporarily braced, depending upon the excavation depth, nearby site features, and encountered subsurface conditions. The Contractor's Competent Person will need to determine the soil type(s) encountered in excavations and the appropriate excavation slope or bracing. The responsibility for excavation safety, stability of temporary construction excavations, and deflections/settlement of existing site features lie solely with the contractor. This information is provided only as a service and under no circumstance should S&ME be assumed to be responsible for construction site safety, stability of temporary excavations, or the effectiveness of the contractor's excavation support system. Management of Shallow Water Water was observed in all geotechnical borings at depths ranging from approximately 1 to 2½ feet below the ground surface. Groundwater levels should be expected to fluctuate with seasonal changes and with rainfall and evaporation rates at other times of the year. Utility excavations which extend near or below groundwater should be dewatered with the contractor prepared to maintain groundwater levels at least 2 feet below the excavation bottom at all times. Potential groundwater control methods for the temporary construction excavations include open pumping, predrainage dewatering, and cutoff/exclusion. Open pumping utilizes submersible sump pumps in pits or trenches excavated below the bottom of the excavation and backfilled with No. 57 stone. Submersible sump pumps placed in perforated or slotted plastic pipe installed in angled pits backfilled with No. 57 stone below the bottom of the excavation to remove water from the construction excavation, but should be continuous (24 hours a day) to maintain excavation bottom stability. Predrainage dewatering requires the installation of temporary wells and/or wellpoints within or around the excavations, with continuous (24 hours a day) pumping both before excavation and while the excavations are in use to lower the groundwater adequately beneath the entire excavation areas. Cutoff or exclusion involves the installation of sheetpiling completely around the excavations and open pumping from inside the sheeting during excavation. Predrainage dewatering outside the sheeting can be implemented to reduce groundwater pressure on the sheetpiling and potential leakage of the sheeting at joints. Based on our experience with similar subsurface conditions and similar projects in coastal North Carolina, predrainage dewatering or open pumping may be necessary for utility, stormwater basin, pipe, or structure construction that extends below the water table. The responsibility for dewatering of construction excavations of site features due to dewatering should lie solely with the contractor. This information is provided only as a service and under no circumstance should S&ME be assumed to be responsible for the effectiveness of the construction dewatering method(s) selected by the contractor. Structural Fill and Backfill Structural fill should have; a Unified Soil Classification of SP, SP-SM, SP-SC, or SM, should be free of organics, contain less than 5% organics, be free of debris, have a maximum particle size of 2 inches or less, have a minimum standard Proctor maximum dry density of 100 pounds per cubic foot, and contain no more than 20 percent fines(silt/clay). The soils in the stormwater pond area will be excavated beneath the groundwater table. Groundwater is anticipated during construction excavation and the excavated soils will likely require drying prior to reuse as compacted structural fill. Because of the sandy nature of the near surface soils, we would anticipate observed groundwater levels to fluctuate and perch in the surface soils with prevailing weather conditions. Stockpiling of soil may also be required for deeper excavations, such as the stormwater pond, which will be below the groundwater table to allow the soils to dry. All new structural fill soil should be placed in 8 to 10-inch loose lifts and compacted to at least 95 percent of the standard Proctor maximum dry density (MDD) (ASTM D 698). The top 12 inches should be compacted to at least 98 percent of the materials standard Proctor MDD. The moisture content of structural fill should be maintained at +/- 3 percent of optimum moisture content during compaction. A qualified S&ME soil technician working under the supervision of the geotechnical engineer should observe fill placement and compaction. An appropriate number of soil density tests should be conducted to confirm that adequate fill compaction is achieved. In addition, stability of the soils should be observed by S&ME during fill placement. Construction equipment such as the smooth drum roller and be observed during compactive effort. Unstable areas should be identified and repaired prior to additional lifts of fill material being placed. Recommended Asphalt Sections Standard Duty Pavement Section (Parking Stalls) Asphalt Surface Course - 2 inches S-9.5B Aggregate Base Course - 6 inches Heavy Duty Pavement Section Asphalt Surface Course - 1.5 inches S-9.5B Asphalt Initial Course - 2.5 inches I-19.0C Aggregate Base Course - 8 inches All materials and construction methods should conform to the 2018 edition of the NCDOT “Standard Specifications for Roads and Structures.” In-place density tests of subgrade soils and crushed stone base course should be performed by a qualified soils technician and the area should be thoroughly proofrolled under his observation. Asphaltic concrete should conform to Section 610 in the 2018 edition of the NCDOT “Standard Specifications for Roads and Structures.” Sufficient testing and observation should be performed during pavement construction to confirm that the required thickness, density, and quality requirements of the specifications are achieved. Recommended Concrete Pavement Sections 4,000 psi Concrete - 8 inches Aggregate Base Course - 6 inches Load transfer dowels shall be placed as recommended in S&ME Geotechnical Report Addendum 1 dated September 29, 2021.