Traffic Impact WorksheetTraffic Impact Worksheet
Prior to submission of nonresidential site plan, this worksheet must be prepared. A
Traffic Impact Analysis will be required for all projects generating 100 peak hour trips
or more. The scope of the TIA shall be determined by concurrence of the Planning
Director, the MPO coordinator and NCDOT traffic engineer. Any mitigation measures
required must be included in the final site plan submitted for review.
PROJECT NAME___3007 Hall Waters Drive_____________
PROJECT ADDRESS__3007 Hall Waters Drive___________
DEVELOPER/OWNER_PRD Properties, LLC/Peter Davis____
EXISTING ZONING__I2___________________________
GROSS FLOOR AREA__14850______________sq. ft.
NEAREST INTERSECTION__Orville Wright Way/Hall Waters
______________
BEFORE PROPOSED PROJECT
Average Daily Traffic (Date)__83.5 (1/1/20) _
LEVEL OF SERVICE (LOS)__D__________________
ITE MANUAL TRAFFIC GENERATION ESTIMATE:
*ITE Manual available at Planning Department
USE AND VARIABLES:___Light Industrial, antique car restoration___
(Example: Racquet Club; 8 courts; Saturday peaks)
AM PEAK HOUR TRIPS___2_____ PM PEAK HOUR TRIPS__2_____
(Traffic generation of 100 peak hour trips will require Traffic Impact Analysis Scoping
meeting with Planning Department)
_Brad Sedgwick, PE_____________________
Person Providing Estimate
Peak Hour estimate confirmed by Planning Department on ______________________
(Date)
By __________________________________