Loading...
Traffic Impact WorksheetTraffic Impact Worksheet Prior to submission of nonresidential site plan, this worksheet must be prepared. A Traffic Impact Analysis will be required for all projects generating 100 peak hour trips or more. The scope of the TIA shall be determined by concurrence of the Planning Director, the MPO coordinator and NCDOT traffic engineer. Any mitigation measures required must be included in the final site plan submitted for review. PROJECT NAME___3007 Hall Waters Drive_____________ PROJECT ADDRESS__3007 Hall Waters Drive___________ DEVELOPER/OWNER_PRD Properties, LLC/Peter Davis____ EXISTING ZONING__I2___________________________ GROSS FLOOR AREA__14850______________sq. ft. NEAREST INTERSECTION__Orville Wright Way/Hall Waters ______________ BEFORE PROPOSED PROJECT Average Daily Traffic (Date)__83.5 (1/1/20) _ LEVEL OF SERVICE (LOS)__D__________________ ITE MANUAL TRAFFIC GENERATION ESTIMATE: *ITE Manual available at Planning Department USE AND VARIABLES:___Light Industrial, antique car restoration___ (Example: Racquet Club; 8 courts; Saturday peaks) AM PEAK HOUR TRIPS___2_____ PM PEAK HOUR TRIPS__2_____ (Traffic generation of 100 peak hour trips will require Traffic Impact Analysis Scoping meeting with Planning Department) _Brad Sedgwick, PE_____________________ Person Providing Estimate Peak Hour estimate confirmed by Planning Department on ______________________ (Date) By __________________________________