HomeMy WebLinkAboutZ22-13 Staff ReportZ22-13 Staff Report PB 5.5.2022 Page 1 of 17
STAFF REPORT FOR Z22-13
PLANNED DEVELOPMENT APPLICATION
APPLICATION SUMMARY
Case Number: Z22-13
Request:
Rezoning to a Conditional Planned Development (PD) district
Applicant: Property Owner(s):
Northside Baptist Church Northside Baptist Church
Location: Acreage:
2501 N College Rd 21
PID(s): Comp Plan Place Type:
R03400-01-013-005 Community Mixed Use
Existing Land Use: Proposed Land Use:
Church Church with addition of school
Current Zoning: Proposed Zoning:
(CZD) B-2, Regional Business (CZD) PD, Planned Development
SURROUNDING AREA
LAND USE ZONING
North Single-Family Residential, Commercial R-15, CZD B-2
East Commercial Services (Circle K & AT&T facility) across
N College Rd. B-2
South Single-Family Residential, Commercial R-15, B-2
West
Single-Family Residential B-2
Z22-13 Staff Report PB 5.5.2022 Page 2 of 17
ZONING HISTORY
July 7, 1972 Initially zoned R-15
April 2, 2012 Approved rezoning case Z-915. Rezoned from R-15 to B-2 to
accommodate on-site McDonald’s.
COMMUNITY SERVICES
Water/Sewer Water services are available through CFPUA. Sanitary sewer is available
through CFPUA.
Fire Protection New Hanover County Fire Services, New Hanover County Northern Fire
District, New Hanover County Murrayville Station
Schools Castle Hayne Elementary, Holly Shelter Middle, and Laney High Schools
Recreation Blue Clay Bike Park & Northern Regional Park at Castle Hayne
CONSERVATION, HISTORIC, & ARCHAEOLOGICAL RESOURCES
Conservation No known conservation resources
Historic No known historic resources
Archaeological No known archaeological resources
Z22-13 Staff Report PB 5.5.2022 Page 3 of 17
APPLICANT’S PROPOSED MASTER PLAN
Overview
• The Planned Development (PD) district is a type of conditional zoning district that includes a
site-specific design (master plan), and mutually agreed upon conditions can be
attached. Master plans for PD districts are intended to be in a bubble format that illustrate
the general location and intensity of the land uses within the development. Planned
developments must be constructed in accordance with the standards established in the
approved master plan and must comply with all other applicable development regulations
(stormwater, landscaping, roadways, parking, etc.). Compliance with the master plan and
other applicable regulations is verified during the review of a site specific development
proposal located within the planned development.
• The PD district was established to encourage innovative, integrated, and efficient land
planning and site design concepts that achieve a high quality of development, environmental
sensitivity, and adequate public facilities and services. The PD district can also provide
more flexibility from conventional development standards, such as parking and street
design, in order to help create a more mixed-use, pedestrian-oriented development.
UDO Section 3.3.7 – Planned Development (PD) District
Z22-13 Staff Report PB 5.5.2022 Page 4 of 17
Includes Staff Markups
• The applicant is proposing to rezone approximately 21 acres to (CZD) PD in order to open
a school. The school phase of this project consists of repurposing an existing 14,659 square
foot building formerly used as a church into Northside Christian School. An additional,
N
C
o
l
l
e
g
e
R
d
Bavarian Ln
Proposed
Site ingress
for school
Ow
l
s
L
n
Re
d
H
a
w
k
R
d
Proposed School
Building
Proposed School
Office Building
Proposed
Site egress
for school
Stormwater
Pond (existing)
Proposed build-
out in future
phases (not
covered under
this PD)
Z22-13 Staff Report PB 5.5.2022 Page 5 of 17
existing 5,000 square foot building on the property is proposed for use as an office for the
school. All buildings on the property are currently used for church purposes. The large
building on the northwestern portion of the property is the sanctuary, while the existing
eastern buildings that parallel N College Rd are used for Sunday School and Youth Ministry.
• Northside Christian School will open year one as kindergarten only. The following year, as
the kindergartners move to first grade, the school will enroll a new class of kindergartners.
This pattern will continue each year as the school expands until they reach the limit set by
the Traffic Impact Analysis: 5 years or 400 students. At that point, another TIA would be
required for the school to continue to expand. Both elementary and secondary schools are
permitted by-right in the PD zoning district; therefore, future rezoning will not be required
for the schools.
• The long-term vision for the project includes additional phases, which are not currently
included in the proposal under consideration. These will be separate uses from Northside
Christian School and would require a modification of the Planned Development if approved.
Community Benefit
• The proposed development would serve as an expansion of Northside Baptist Church’s
Education Ministry. This is part of the church’s goal in carrying out its vision of serving the
community in spiritual, physical, recreational and community life.
• The proposed school is intended to alleviate some of the pressure put on the public school
system by the increase in population of the Cape Fear Region.
• The proposed future uses in Phases II-IV including café, auto repair shop and fitness center
are part of the church’s vision statement in their intent to serve the community. These phases
are not covered under this PD rezoning.
Conditions
In accordance with the standards of the Unified Development Ordinance (UDO), a Planned
Development (PD) District includes a Terms and Conditions document that details any conditions of
approval or proposed modifications to development standards. The following notable proposed
conditions of the proposal are listed below. The full Terms and Conditions document is included in
the application and will be incorporated with the Master Plan if the rezoning is approved. (Italicized
text taken directly from application)
1) Conditions related to approval of the application for the master planned development zoning
district classifications:
a) Phase 1 on Master Plan to be completed upon approval of rezoning to Planned
Development. Phases 2 thru 4 are listed as future development and cannot be started without
an additional community meeting and a full TIA study encompassing these phases has been
completed.
b) The use and development of our property will comply with all applicable federal, state, and
local laws.
Z22-13 Staff Report PB 5.5.2022 Page 6 of 17
c) The use and other regulations and condition approved may be amended or modified to align
with county requirements.
d) Approval of this rezoning does not give approval of the site plan. All required permits must
occur before construction can begin.
2) References to the Master Development Plan, including any density/intensity standards dimensional
standards and development standards:
a) The Planned Development does not include residential units. The density requirements for
residential units will not apply.
b) The existing building as well as future buildings have been and will be developed in
accordance with the county, state and federal building and environmental regulations.
3) Conditions related to the approval of the MDP Master Plan, including any conditions related to
the form and design of development shown in MDP Master Plan:
a) The subject property already has 2 paved access points connected to North College Road.
b) The subject property also has 2 additional paved access points, one at the end of Owls Lane
and one at the end of Red Hawk Road.
c) There will be no gated access points.
d) The development already has existing vegetation that was planted per county standards. As
future structures are added additional vegetation will be added per county standards.
4) Provisions addressing how transportation, potable water, wastewater, storm water management,
and other infrastructure will be provided to accommodate the prosed development:
a) This proposed Planned Development already has paved roads established throughout the
development.
b) Stormwater management has already been installed (see attached map)
c) Development is already serviced by Cape Fear Public Utilities for water and sewer. This
includes our own sewer pumping station on property.
5) Provisions related to environmental protection and monitoring:
a) Northside Baptist Church has in the past and will continue to follow all local, state, and
federal regulation, laws, and ordinances.
• Because Phases II-IV would require a modification of the PD District, the Terms and
Conditions document may need to be modified to clarify this.
Z22-13 Staff Report PB 5.5.2022 Page 7 of 17
ZONING CONSIDERATIONS
• The B-2 district is intended to provide for the proper site layout and development of larger
format or larger structure size business uses, including big box stores and automobile
dealers. It is also designed to provide for the appropriate location and design of auto-
oriented uses that meet the needs of the motoring public or that rely on pass-by traffic.
Common uses in this district include: Restaurants, hotels, large retailers (Best Buy, Walmart,
etc.) and vehicle and equipment sales and service.
• 2501 N College St was rezoned to B-2 on April 2, 2012 to accommodate an on-site
McDonald’s on church-owned property.
• Much of the surrounding area is developed for residential use and is zoned R-15.
• The properties across N College St are zoned B-2 and used for commercial purposes.
• The PD district was established to encourage innovative, integrated, and efficient land
planning and site design concepts that achieve a high quality of development, environmental
sensitivity, and adequate public facilities and services. The PD district can also provide
more flexibility from conventional development standards, such as parking and street
design, in order to help create a more mixed-use, pedestrian-oriented development.
• The UDO contains controls on exterior lighting on the site, and the maximum illumination
levels at the common property line with the residential properties to the north shall not
exceed 0.5 foot candles. The UDO does not prescribe limitations on the height, wattage,
bulb-type, or fixture type, and these can be further limited with a conditional zoning request
if mutually agreed upon by the applicant.
• If approved, the project would be subject to Zoning Compliance review processes to ensure
full compliance with all ordinance requirements and specific conditions included in the
approval. Only minor deviations from the approved conceptual plan, as defined by the
UDO, would be allowed.
Z22-13 Staff Report PB 5.5.2022 Page 8 of 17
AREA SUBDIVISIONS UNDER DEVELOPMENT
Z22-13 Staff Report PB 5.5.2022 Page 9 of 17
TRANSPORTATION
• Access for Northside Christian School is proposed to be provided to the subject property by
Red Hawk Rd, an NCDOT owned and maintained route.
• Ingress for the School to Red Hawk Rd is full-movement from Bavarian Lane, also NCDOT
owned and maintained.
• Egress for the School is right-out on Southbound N College Rd. Traffic wishing to travel North
on N College Rd will make a U-turn at the light located at the intersection of N College and
Bavarian/Murrayville Rd.
• Existing church traffic uses both points of ingress at N College and Red Hawk Rd. The below
table outlines current traffic numbers for the church on Sundays.
Z22-13 Staff Report PB 5.5.2022 Page 10 of 17
Intensity Approx. Peak Hour Trips
Existing Development Church 404 Sunday
Initial Build First Year of School 90 AM / 68 PM
Full Build Maximum School Capacity 498 AM / 364 PM
Traffic Impact Analysis
• New developments that are anticipated to generate more than 100 trips during any peak
hour period are required to submit a traffic impact analysis (TIA) as part of their rezoning
application. NCDOT conducts TIAs for new schools up to a certain threshold. The TIA for this
project was finalized on February 8, 2022.
• The finalized TIA analyzed the development of both the initial build-out of 70 students to
full build-out of 400 students for Northside Christian School. The Church plans to add other
uses to the Planned Development in the future, at which time the Traffic Analysis will be
revisited. The TIA references the church but does not include the already existing church
traffic generation as the days of use differ.
• Per conversation with NCDOT, the church will be responsible for upfronting the cost for the
roadway improvements and will be reimbursed by NCDOT.
• The TIA approval requires the following notable roadway improvements prior to full school
(5-years or 400 students) build-out:
o Extend the southbound left turn lane to at least 450 feet long, and
o Adjust the signal timing to compensate for the additional school traffic
Extend the
southbound left turn
lane to at least 450
feet long
Z22-13 Staff Report PB 5.5.2022 Page 11 of 17
Nearby Planned Transportation Improvements and Traffic Impact Analyses
Nearby NC STIP Projects:
• STIP Project U-5881
o Upgrade of Gordon Rd to New Centre Drive. Proposed 2029 start date.
• STIP Project U-6202
o Widen roadway from Market St to I-40. Proposed construction to begin in 2022
and finish in 2029.
Z22-13 Staff Report PB 5.5.2022 Page 12 of 17
Nearby Traffic Impact Analyses:
Traffic Impact Analyses (TIAs) are completed in accordance with the WMPO and NCDOT standards.
Approved analyses must be re-examined by NCDOT if the proposed development is not completed
by the build out date established within the TIA.
Proposed Development Land Use/Intensity TIA Status
1. Hawthorne at Smith
Creek • 318 multi-family units
• TIA approved February 7,
2019
• 2020 build out year
The TIA requires improvements be completed at certain intersections in the area. The notable
improvements consisted of:
• At site access construction of a right-in/right-out only access and stop control for egress
traffic.
• Installation of a westbound right-turn land and southbound left-turn lane at Gordon Road
and Blount Drive.
Nearby Proposed Developments included within the TIA:
• The Landing at Lewis Creek Estates Subdivision
Development Status: Completed. All roadway improvements have been completed.
ENVIRONMENTAL
• The property is not within a Natural Heritage Area.
• The property is within the Smith Creek watershed.
• Per the Classification of Soils in New Hanover County for Septic Tank Suitability, soils on the
property consist of Class II & III soils. Class III indicates severe limitation. However, the site
is expected to be served by CFPUA when developed. These soils will not impact this project.
Z22-13 Staff Report PB 5.5.2022 Page 13 of 17
OTHER CONSIDERATIONS
Representative Developments
Existing Church building to be repurposed:
Z22-13 Staff Report PB 5.5.2022 Page 14 of 17
Representative Churches with Schools:
St. Mark’s Catholic School, Eastwood Rd
Myrtle Grove Christian School, Piner Rd
Z22-13 Staff Report PB 5.5.2022 Page 15 of 17
Context and Compatibility
• The property is located along N College St., a major commercial corridor.
• Northside Baptist Church is already developed; this project would use existing buildings on
the property.
• The property is located just south of Trask Middle School and Laney High School and is
located north of a commercial node.
2016 COMPREHENSIVE PLAN
The New Hanover County Future Land Use Map provides a general representation of the vision for
New Hanover County’s future land use, as designated by place types describing the character and
function of the different types of development that make up the community. These place types are
intended to identify general areas for particular development patterns and should not be
interpreted as being parcel specific.
Future Land Use
Map Place Type Community Mixed Use
Place Type
Description
Focuses on small-scale, compact, mixed use development patterns that serve
all modes of travel and act as an attractor for county residents and visitors.
Types of appropriate use include office, retail, mixed use, recreational,
commercial, institutional, multi-family and single-family residential.
Z22-13 Staff Report PB 5.5.2022 Page 16 of 17
Analysis
The subject property is located in the northern portion of the County along
a major road corridor and is just north of a commercial node. It is in close
proximity to both residential uses and other commercial services.
The Comprehensive Plan classifies the property as Community Mixed Use,
which promotes development of small-scale, mixed-use developments. This
place type is common for areas along major road corridors.
The applicant is proposing the repurposing of existing buildings on the
property for the school in Phase I, with Phases II-IV encompassing the
proposed future uses and build-out. The proposed use is in line with what
the Comprehensive Plan recommends for this place type and aims to meet
the needs of the surrounding community. While the PD district was not
intended for this type of project, it is the most appropriate for the future
uses proposed by Northside Baptist Church.
Consistency
Recommendation
The proposed rezoning is generally CONSISTENT with the 2016
Comprehensive Plan because the project provides for the type of use that
is recommended in the Community Mixed Use place type.
STAFF RECOMMENDATION
This project, located in close proximity to a commercial node and area schools, is intended to meet
the needs of the surrounding community. While this is not a development that is common in the PD
district, it is in line with the Comprehensive Plan for this area of the County. Both the immediate and
near-future proposed uses will serve the needs of this part of the County.
As a result, Staff recommends approval of the proposal and suggests the following motion:
I move recommend APPROVAL of the proposed rezoning. I find it to be CONSISTENT
with the purposes and intent of the Comprehensive Plan because it is located near a
commercial node and along a major corridor. It also provides for the uses intended by
the Community Mixed Use place type. I also find APPROVAL of the rezoning request
is reasonable and in the public interest because the proposal provides uses that will
serve the needs of the surrounding community.
Staff also recommends the following conditions:
1. Prior to the approval of any future phase of this project or expansion of school
beyond 400 students, required NCDOT road improvements, as included in the
TIA, must be completed.
2. The Terms & Conditions document shall be revised to clarify the process for
approval of future development. Section 1A shall be revised as follows:
“Phase 1 on Master Plan to be completed upon approval of rezoning to
Planned Development. Phases 2 thru 4 are listed as future development and
Z22-13 Staff Report PB 5.5.2022 Page 17 of 17
cannot be started without an approved modification to the Planned
Development District.”
Alternative Motion for Denial
I move to recommend DENIAL of the proposed rezoning. While I find it to be
CONSISTENT with the purposes and intent of the Comprehensive Plan because it is
located near a commercial node and along a major corridor, I find DENIAL of the
rezoning request is reasonable and in the public interest because the full proposal
would have a negative impact on the surrounding area.