Loading...
TRC Agenda Packet 6.15.2022TECHNICAL REVIEW COMMITTEE AGENDA June 15th, 2022 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, June 15th, 2022 at 2:00 p.m. to discuss the below item. PLEASE NOTE: This meeting will be conducted remotely via teleconference Wednesday, June 15th, at 2:00 p.m. Interested parties can contact the Planning and Land Use Department at 910-798-7165 for more information. Item 1: Lot 11 N Kerr Industrial Park – Commercial Site Plan (Energov: SITECN-22-000025) Request by Mark Maynard with Orville Wright Properties, LLC for a warehouse in the N Kerr Industrial Park. The subject property is located at 2944 Orville Wright Way. It consists of 1.1 acres and is zoned I-2. The engineer is Charlie Cazier with Intracoastal Engineering (charlie@intracoastalengineering.com). The planner assigned is Zach Dickerson (zdickerson@nhcgov.com, 910-798-7450) Item 2: Tidal Wave Auto Spa – Commercial Site Plan (Energov: SITECN-22-000026) Request by Martie Murphy, SHJ Construction Group, LLC, for a car wash. The subject property is located at 5978 Carolina Beach Road. It consists of 1.35 acres zoned B-1. The engineer is Cody Rogers, P.E., with EMC Engineering Services, Inc. (Cody_Rogers@emc-eng.com). The planner assigned is Amy Doss (adoss@nhcgov.com, 910-798-7571). Additional discussion Topics: Please be prepared to discuss a sketch plan for additional lots to be added to the existing North Kerr Industrial Park. This meeting is open to the public by calling 1-336-218-2051 and entering Phone Conference ID: 232 753 505# 2944 Orville Wright Way- Warehouse – TRC Review Page | 1 To: Mark Maynard, Orville Wright Way Properties LLC Charlie Cazier – Intracoastal Engineering From: Zach Dickerson, Current Planner Egov # SITECN-22-000025 PID: R03400-001-070-000 Date: June 15, 2022 Subject: 2944 Orville Wright Way – Commercial Site Plan – TRC Review The following comments have been received for the June 15, 2022 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. Planning, Zach Dickerson 910-798-7450 1. Zoning district: I-2 2. Uses (2): a. The first defined use is Warehousing: The storing of goods, wares, and merchandise within an enclosed building, whether for the owners or others. There is little on-site sales activity with the customer present. Uses include: cold storage facilities (including frozen food lockers); distribution warehouses (used primarily for temporary storage pending distribution in response to customer orders); storage warehouses (used for storage by retail stores such as furniture and appliance stores); warehouse storerooms; or similar uses. b. The second defined use is Contractor Office: An establishment primarily engaged in the day-to-day administrative and clerical services for businesses providing contracted services, such as building contractors, heating and air conditioning (HVAC) repair, landscaping and janitorial services, etc., that require outside and/or fleet storage. The use may include some on-site repair and material preparation work. 3. General comments: a. Is the western side of the building proposed for loading bays for the warehouse? If so, please clearly label these on the site plan. b. Please be aware that land disturbance permits will not be issued until the tree permit has been approved. 2944 Orville Wright Way- Warehouse – TRC Review Page | 2 c. Where will the HVAC units be placed? It looks like the building to the east of this site has HVAC units in the parking area behind the structure. This is not a building/safety code note, but if the plan is to place the HVAC units in a similar way to the building next door, we’d suggest bollards to protect the systems from damage. 4. Signs: a. Please note any sign is subject to Section 5.6. of the UDO and note any other planned locations of signs. 5. Access: a. Please provide all NCDOT approvals upon receipt. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 6. Landscaping/Buffering: a. Please provide a Landscape Plan with calculations, UDO Section 5.4., to include the following (these details are noted in the site data table, but I did not see a Landscape Plan included with the submittal): i. Street Yards, both primary and secondary. ii. Foundation plantings to equal 12% of the face of the building. iii. Interior parking landscaping, this is required to equal 8% of the parking area. iv. Screening is required for the dumpsters if applicable, a detail showing materials and the screening is required, UDO Section 5.4.4.C.2. v. Please show the correct buffer width per UDO section 5.4.3 vi. Please show locations of a proposed signage. 7. Lighting: a. Please provide a light plan, approval of the lighting plan is required before site plan approval (Section 10.3.6, Site Plan) or zoning compliance approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first. A lighting plan must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at a residential lot line does not surpass 0.5, UDO Section 5.5. Please refer to Table 5.5.4.B of the UDO for additional standards. 8. Tree Retention: a. Tree Removal Permit Received and will be processed. b. Is there any way to retain the trees on the western edge of the site? I’m not sure of the intended purpose of that side of the building, or the exact distance of the proposed building to the trees, but we do encourage the retention of as many trees as possible. Fire Services, Ray Griswold 910-508-0234 1. I have conducted a site visit yesterday, along with a plan review. Everything we require is noted on the site plans. County Fire approves their part of this review. NHC Engineering, Galen Jamison 910-798-7072 1. The stormwater permit application has been reviewed and request for additional information was sent to the designer via email on June 1, 2022. Please resubmit the additional information for permit issuance. 2. A land disturbing permit issued by the County and is currently under review. Any additional information necessary will be requested from the engineer. 2944 Orville Wright Way- Warehouse – TRC Review Page | 3 Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA water and sewer available. 2. CFPUA Plan Review has been completed. Any changes that affect water and sewer utilities will need to be re-reviewed. NCDOT, Patrick Wurzel 910-398-9100 1. We currently have a driveway permit. It is being reviewed. Environmental Health, Dustin Fenske 910-798-6732 1. Plan indicates site will be on public water and sewer. Records review indicates no septic or well setbacks will be affected by infrastructure developments. WMPO, Jamar Johnson 910-343-3915 1. Provide details for pavement markings and sidewalk 2. Note: All pavement markings in public right of way shall comply with the NC MUTCD Addressing, Katherine May 910-798-7443 1. The current address is acceptable. 2. List all planned units/ suites if applicable. Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACE, Brad Shaver NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt 5978 Carolina Beach Road – Car Wash – Commercial Site Plan – TRC Review Page | 1 To: Martie Murphy – SHJ Construction Group, LLC. (martie@shjconstructiongroup.com) From: Amy Doss Current Planner Date: June 15, 2022 Egov#: SITECN-22-000026 PID: R07905-004-004-000 Subject: Car Wash – 5978 Carolina Beach Road – Commercial Site Plan – TRC Review The following comments have been received for the June 15, 2022 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. Planning, Amy Doss 910-798-7571 1. Invoice has been paid for the site plan review. 2. Please correct Zoning district: CZD B-1 3. Please list the proposed building height. 4. Please include the total number of trips for this use per the ITE trip generator, 11th edition. 5. Please update the plan with the following general corrections: a. Please include “Site Plan” in the title block. b. Please show sight triangles on the landscape plan. c. Please show the location of any signs and note any proposed sign is subject to Section 5.6. of the UDO. 6. Lighting: a. Please provide a light plan, approval of the lighting plan is required before site plan approval (Section 10.3.6, Site Plan) or zoning compliance approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first. A lighting plan must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at a residential lot line meet the UDO Section 5.5. Please refer to Table 5.5.4.B of the UDO for additional standards. 7. Easements: a. Please label Storm Sewer, Sanitary Sewer, and Water Main Utility Easements, UDO Section 6.2.2. 5978 Carolina Beach Road – Car Wash – Commercial Site Plan – TRC Review Page | 2 b. There appears to be an access easement (DB 6074, PG 278) located on the south east corner of the parcel. Please clarify the exact bounds and purposed of this easement. This may require more discussion depending on what the easement’s location and purpose is. 8. Landscaping: i. Please illustrate how each of the following have been addressed Screening, Parking Lot Perimeter Landscaping, Parking Lot Interiors Landscaping, and Street yard Landscaping (both Primary and secondary must be specified). A. Screening: 1. If there are any dumpster or trash receptacle storage areas, they must be screened in accordance with Section 5.4.4. Please provide a detail. B. Parking Lot Perimeter Landscaping: 1. Please provided a landscaped strip along any side of a parking lot abutting land in a Residential zoning district. The perimeter landscaping strip shall be a minimum of ten feet in width. C. Parking Lot Interiors: 1. Please provide landscaped areas in the interior of parking lot to equal to eight percent of the total area to be used for parking. D. Street yard: 1. Please provide primary and secondary street yard plantings in accordance with Section 5.4.6. 9. Tree Retention; will any trees proposed to be removed, if so the following will apply: a. Please apply for a Tree Removal Permit. b. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. c. Clearly illustrate what trees are being preserved and what trees are proposed to remain. d. Please see the chart below for an example of what Staff is looking for as a tree inventory requirement. e. All specimen trees located within subject tract are required to be illustrated as well. UDO Section 5.3.5.C The removal of any specimen tree is prohibited on any parcel unless exempt according to Section 10.3.11, Variance Zoning and Subdivision. If a specimen tree is removed without a permit, the penalty for this violation shall be twice the mitigation fee. f. Please be aware that there are optional incentives for retaining trees on site, UDO Section 5.3.8.A.2. g. Please see the chart below indicating the documented, significant, and specimen trees regulated by the County. 5978 Carolina Beach Road – Car Wash – Commercial Site Plan – TRC Review Page | 3 i. Per UDO Section 5.3.4.C, of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. Please add a note to the Landscape Plan showing has this requirement has been met. a. Please note that required landscaping for the project can be credited to meet this requirement, however, required landscaping does not count towards mitigation, if applicable. h. Per UDO Section 5.3.6.B, please be aware that prior to any construction activity protection fencing is required around protected trees or tree stands. The fencing shall be a minimum of four feet and shall remain in place through completion of construction activities. i. Tree inventory plans are required to reflect the trees being retained and the trees being removed clearly. Please see the example below, which illustrate the trees with the X’s being removed and the trees and the trees being preserved showing the protection in the correct placement. j. Please include the tree data within a table as shown below. 5978 Carolina Beach Road – Car Wash – Commercial Site Plan – TRC Review Page | 4 10. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 11. Please label all setbacks clearly for verification of zoning district standards. 12. Please provide documentation showing proof of legal access to the private drives attached. 13. Please reference the CZD case number for the approved shopping center. Fire Services, Ray Griswold 910-508-0234 1. I conducted a site visit this am and plan review. County Fire Accepts this proposed plan. NHC Engineering, Galen Jamison 910-798-7072 1. The stormwater permit has already been obtained. Should changes be made as a result of the TRC, please submit updated plans and calculations. 2. The land disturbing permit application permit has been reviewed and request for additional information was sent to the designer via email on May 14, 2022. Please resubmit the additional information for permit issuance. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA sewer is available; water provided through NC Aqua. 2. CFPUA plan review has been completed. Any changes that affect sewer utilities will need to be re-reviewed. NCDOT, Patrick Wurzel 910-398-9100 1. No comments at this time. Environmental Health, Dustin Fenske 910-798-6732 1. This site at one time was a Mobile Home Park with individual septic systems. If a septic tank is encountered during construction then it shall be pumped, crushed and filled. 2. If any wells are encountered during construction then the well shall apply for a well abandonment permit and have the well properly abandoned by a certified well driller. 5978 Carolina Beach Road – Car Wash – Commercial Site Plan – TRC Review Page | 5 WMPO, Scott James and Scott James 910-473-5130 1. No TIA revision will be necessary. 2. Please clarify if the car wash is being substituted for one of the approved land uses or is a new addition to the previously approved land uses. 3. Please provide a trip generation table that shows which land use(s) are being replaced with the car wash and the change in the number of trips. Planning (Addressing), Kathrine May 910-798-7443 1. No changes to the current address are needed. Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACOE, Brad Shaver NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt