Loading...
807 N 6 Street7 6 5 4 3 2 1 ®® date drafter checked by proj. no. A3.1 Foundation, Wall & Roof Framing Details FO U N D A T I O N D E T A I L S FR A M I N G D E T A I L S RA K E & E A V E D E T A I L S WI N D O W I N S T A L L A T I O N Co n s t r u c t i o n De t a i l s THIS PLAN IS AUTHORIZED FOR THIS ADDRESS ONLY AND IS NOT TO BE USED FOR ANY ADDITIONAL ADDRESSES WITHOUT THE PURCHASE OF ADDITIONAL LICENSES OR WRITTEN AUTHORIZATION FROM TIGHTLINES: R.L.M. C.A.C. 01.14.21 T-20080.1 Unlimited Use License date drafter checked by proj. no. ---- 01.14.21 T-20080.1 R.L.M. C.A.C. A3.2 ENERGY STAR ® Details TH E R M A L E N C L O S U R E HV A C Q U A L I T Y WA T E R M A N A G E M E N T EN E R G Y S T A R ® De t a i l s THIS PAGE CONTAINS ILLUSTRATED DETAILS THAT ARE REQUIRED FOR ENERGY STAR ® CERTIFICATION AND ARE RECOMMENDED FOR THE CONSTRUCTION OF ANY TIGHTLINES HOUSE. THIS SHEET IS NOT A COMPREHENSIVE CHECKLIST FOR ANY CERTIFICATION PROCESS. date drafter checked by proj. no. ---- 01.14.21 T-20080.1 R.L.M. C.A.C. G1 "Green" Opportunities Gr e e n THIS PAGE CONTAINS A LIST OF SUGGESTIONS THAT TIGHLINES DESIGNS BELIEVES WILL BE BENEFICIAL IN THE CONSTRUCTION OF A TIGHTLINES HOUSE. THIS IS NOT INTENDED AS A SPECIFICATION SHEET, NOR IS IT A COMPREHENSIVE CHECK LIST FOR ANY CERTIFICATION PROCESS. Op p o r t u n i t i e s