Loading...
NHC TRC Packet - 1-4-20231 TECHNICAL REVIEW COMMITTEE AGENDA January 4, 2023 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, January 4, 2023 at 2:00 p.m. to discuss the below items. PLEASE NOTE: This meeting will be conducted remotely via teleconference. Interested parties can contact the Planning and Land Use Department at 910-798-7165 for more information. Item 1: 2701 Kerr Ave CFPUA Sewer Pump Station – Major Site Plan – SITECN-22-000057 Request by CFPUA for a Sewer Pump Station. The property is located at 2701 Kerr Ave. It consists of 1.65 acres and associated work in rights-of-way and easements. The property is zoned AR. The engineer is Kai Dunston with W.K. Dickson & Co., Inc. (kdunston@wkdickson.com). The planner assigned is Amy Doss (adoss@nhcgov.com, 910-798-7571). Item 2: 3229 Pennington Drive Flex Space – Major Site Plan – SITECN-22-000058 Request by Norris & Tunstall Engineering for office and warehouse space. The property is located at 3229 Pennington Drive. It consists of two parcels totaling 2.22 acres and is zoned I-2. The engineer is John Tunstall, P.E. with Norris & Tunstall Consulting Engineers, P.C. (jtunstall@ntengineers.com). The planner assigned is Amy Doss (adoss@nhcgov.com, 910-798-7571). This meeting is open to the public by calling 1-336-218-2051 and entering Phone Conference ID: 242 596 170# CFPUA Pump Station – Commercial Site Plan – TRC Review Page | 1 To: Kai Dunston, – W.K. Dickson & Co, Inc. (kdunston@wkdickson.com) From: Amy Doss Current Planner Date: January 4, 2023 Energov #: SITECN-22-000057 PID: R03400-001-127-000 Subject: CFPUA Pump Station – 2701 Kerr Ave. – Commercial Site Plan – TRC Review The following comments have been received for the January 4, 2023, TRC meeting. Please note: following the TRC meeting, a revised site plan addressing each of the below items must be resubmitted prior to receiving approval. Planning, Amy Doss 910-798-7571 Please update the plan with the following general corrections: 1. Zoning: AR Airport Residential 2. Use: a. The use is for a CFPUA pump station 3. General Comments: a. Please change the title to Commercial Site Plan. b. Please note: Elevations must be tied to North American Vertical Datum of 1988 (NAVD 88) and horizontal coordinates must be tied to the North Carolina Grid System. Once verified, please add a note to the site plan indicating as such. c. Please show the location of all signs and note any proposed sign is subject to Section 5.6. of the UDO. d. Please include sight triangles on site plan. 4. Landscaping: a. Please provide a detailed landscape plan schedule illustrating the requirements for street yards, and screening plantings have been met. b. Please refer to UDO Section 5.4.4 and 5.4.6. for landscaping standards. 5. Tree Retention: a. If any trees are being removed, please apply for a Tree Removal Permit. CFPUA Pump Station – Commercial Site Plan – TRC Review Page | 2 b. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. c. Please clearly illustrate what trees are being preserved and what trees are proposed to remain. d. All trees on-site and within the utility easement will need to be identified. Trees inside the NCDOT right-of-way or on the airport property do not need to be identified. Trees within the NCDOT right-of-way and on the airport property are exempt from county tree retention standards. e. All specimen trees located within subject tract are required to be illustrated as well. UDO Section 5.3.5.C The removal of any specimen tree is prohibited on any parcel unless exempt according to Section 10.3.11, Variance Zoning and Subdivision. If a specimen tree is removed without a permit, the penalty for this violation shall be twice the mitigation fee. f. Please be aware that there are optional incentives for retaining trees on site, UDO Section 5.3.8.A.2. g. Please see the chart below indicating the documented, significant, and specimen trees regulated by the County. h. Per UDO Section 5.3.4.C, of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. Please add a note to the Landscape Plan showing has this requirement has been met. Please note that required landscaping for the project can be credited to meet this requirement, however, required landscaping does not count towards mitigation, if applicable. i. Per UDO Section 5.3.6.B, please be aware that prior to any construction activity protection fencing is required around protected trees or tree stands. The fencing shall be a minimum of four feet and shall remain in place through completion of construction activities. j. Tree inventory plans are required to reflect the trees being retained and the trees being removed clearly. Please see the example below, which illustrate the trees with the X’s CFPUA Pump Station – Commercial Site Plan – TRC Review Page | 3 being removed and the trees and the trees being preserved showing the protection in the correct placement. k. Please include the tree data within a table as shown below. 6. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 7. Lighting: a. Please note that with the latest update to the UDO, a lighting plan is not required at time of TRC Approval. See below excerpt from Section 5.5.3: i. Information about the exterior lighting for the site that demonstrates compliance with the standards in this section shall be submitted in conjunction with an application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first, approved no later than at time of construction plan approval. b. The lighting plan should illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at a residential lot line meet the UDO Section 5.5. Please refer to Table 5.5.4.B of the UDO for additional standards. Fire Services, Ray Griswold 910-798-7448 1. CFPUA - Northern Reginal Pump Station & Force Main Phase B - County Fire is good with this project. Just make sure proper identification signage is installed on the gate with a 24 hour phone number NHC Engineering, Galen Jamison 910-798-7072 1. The stormwater permit application has been reviewed and request for additional information was sent to the designer via email on December 7, 2022. Please resubmit the additional information for County permit issuance. 2. Please check with NC DEQ for the requirements of a state stormwater permit. 3. Should the land disturbing activities exceed 1 acre, a State erosion control permit will be required. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. There are no CFPUA Comments. This is a CFPUA Capital Project. CFPUA Pump Station – Commercial Site Plan – TRC Review Page | 4 Environmental Health, Dustin Fenske 910-798-6732 1. Proposed improvements of the pump station, sewer mains and manholes must maintain setbacks to any potential wells encountered. Maintain 100' to wells from pump station and manholes. Maintain 50' to any sewer mains. WMPO, Jamar Johnson 910-343-3915 1. No comments. USACE, Brad Shaver 910-251-4611 1. This project has been reviewed and existing nationwide permits are being utilized to fulfill the necessary impacts to waters of the US. Addressing, Katherine May 910-798-7443 1. Current address can be used. No additional comments. Comments not received at this time from: Emergency Services & E911, Steven Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt USACE, Brad Shaver NCDOT, Nick Drees Warehouse – Commercial Site Plan – TRC Review Page | 1 To: John Tunstall – Norris & Tunstall Consulting Engineers, P.C. (jtunstall@ntengineers.com) From: Amy Doss Current Planner Date: January 4, 2023 Energov #: SITECN-22-000058 PID: R03400-001-124-000, R03400-001-125-000 Subject: RFT Holdings –Warehouse – 3229 Pennington Drive – Commercial Site Plan – TRC Review The following comments have been received for the January 4, 2023, TRC meeting. Please note: following the TRC meeting, a revised site plan addressing each of the below items must be resubmitted prior to receiving approval. Planning, Amy Doss 910-798-7571 Please update the plan with the following general corrections: 1. Invoice: 00092267 $75, please call 910-798-7308 to pay the invoice. 2. Zoning: I-2 Industrial 3. Proposal a. Proposed Building height 24 FT. b. Proposed Use is: Warehouse: The storing of goods, wares, and merchandise within an enclosed building, whether for the owners or others. There is little on-site sales activity with the customer present. Uses include: cold storage facilities (including frozen food lockers); distribution warehouses (used primarily for temporary storage pending distribution in response to customer orders); storage warehouses (used for storage by retail stores such as furniture and appliance stores); warehouse storerooms; or similar uses. 4. Please note: Elevations must be tied to North American Vertical Datum of 1988 (NAVD 88) and horizontal coordinates must be tied to the North Carolina Grid System. 5. Please change the title to Commercial Site Plan. 6. Please show site angles on the Site Plan and on the Landscape Plan, when submitted. 7. Landscape notes Warehouse – Commercial Site Plan – TRC Review Page | 2 a. Please provide the landscape plan referenced in the Site Data Table on page C2. b. Ensure the plantings will not interfere with the stormwater design. 8. Please provide a detail showing required screening and materials for the dumpster, UDO Section 5.4.4.C.2. 9. Please show the location of any signage and note any proposed sign is subject to UDO Section 5.6. Ensure the sign is located outside of the sight triangle. 10. Parking/Loading: a. Please label ADA accessible ramp. 11. Tree Retention: a. If any trees are being removed, please apply for a Tree Removal Permit. b. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. c. Please clearly illustrate what trees are being preserved and what trees are proposed to remain. d. All specimen trees located within subject tract are required to be illustrated as well. UDO Section 5.3.5.C The removal of any specimen tree is prohibited on any parcel unless exempt according to Section 10.3.11, Variance Zoning and Subdivision. If a specimen tree is removed without a permit, the penalty for this violation shall be twice the mitigation fee. e. Please be aware that there are optional incentives for retaining trees on site, UDO Section 5.3.8.A.2. f. Please see the chart below indicating the documented, significant, and specimen trees regulated by the County. g. Per UDO Section 5.3.4.C, of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. Please add a note to the Landscape Plan showing has this requirement has been met. Please note that required landscaping for the project can be credited to meet this requirement, however, required landscaping does not count towards mitigation, if applicable. Warehouse – Commercial Site Plan – TRC Review Page | 3 h. Per UDO Section 5.3.6.B, please be aware that prior to any construction activity protection fencing is required around protected trees or tree stands. The fencing shall be a minimum of four feet and shall remain in place through completion of construction activities. i. Tree inventory plans are required to reflect the trees being retained and the trees being removed clearly. Please see the example below, which illustrate the trees with the X’s being removed and the trees and the trees being preserved showing the protection in the correct placement. j. Please include the tree data within a table as shown below. 12. Before the building permit can be issued, a lighting plan must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at a lot line does not surpass 2.0, UDO Section 5.5. Please update the note on Sheet C5 to reflect NHC requirements. 13. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 14. Please be aware that land disturbance permits will not be issued until the tree permit has been approved. Fire Services, Ray Griswold 910-798-7464 Refine Tile - 3229 Pennington Drive - New 21,000 sq. ft. Building I have visited this site this am. The following questions / observations are here by being made: 1. Will this building be sprinklered. A fire hydrant shall be placed within 100 feet of the building if it is. 2. No storage over 12 feet allowed unless proper fire protection requirements are met. 3. A section 510 study is required - Emergency First Responder Coverage 4. Please follow Appendix J of the fire code for Building Information Signage. 5. If any gates are installed, then obtain the proper Gate Permit and install the proper KNOX Gate entry system for fire dept. access. NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and a stormwater permit issued by the County are required for this project in addition to the State stormwater permit. Please submit for permits as the design is completed. 2. Please forward a copy of the latest state stormwater permit. Warehouse – Commercial Site Plan – TRC Review Page | 4 Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available. WMPO, Scott James 910-473-5130 Environmental Health, Dustin Fenske 910-798-6664 1. Site plan reflects connections to public water and sewer. If these connections cannot be obtained then individual well and septic system permits must be issued. Environmental Health has no records of any properties on well or septic systems on Pennington Dr. USACE, Brad Shaver 910-251-4611 1. This project has been reviewed and existing nationwide permits are being utilized to fulfill the necessary impacts to waters of the US. Planning (Addressing), Katherine May 910-798-7443 1. Current address 3229 Pennington can be used for the main building. 2. If units are expected, please contact planning for unit assignments following TRC approval. Comments not received at this time from: Emergency Services & E911, Steven Still NCDEQ, Chad Coburn NCDOT, Patrick Wurzel New Hanover Soil & Water, Dru Harrison NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt