Loading...
New Hanover County Comment Responses 2023.02.09New Hanover County Comment Responses (2/9/23) Planning Comments 1. a. Added “Use” to Cover Sheet 2. a. Demolition Permit shall be applied for prior to demolition. b. The parcels are to be recombined. c. No traffic calming devices are planned for at this time. 3. a. Bollards were added for the six spaces referenced. 4. Tree Retention/Removal Plan has been added to plan set. Awaiting Arborist Report to accompany plan. We will forward that information as soon as we have it in hand. 5. a. Landscaping Plan has been added to plan set. 6. Lighting Plan noted. 7. Sign permits will be applied for prior to installation. 8. NCDOT submittals have been made and we are awaiting approvals/comments. 9. Noted Fire Services 1. Demolition Permits shall be applied for prior to demolition. 2. Fire hydrants have been added at all requested locations. 3. Fire hydrant has been moved. 4. Noted. 5. Noted. NHC Engineering 1. Noted. 2. NCDEQ submittals have been made for Stormwater Permits. 3. Noted. 4. Easement has been added to plans. See sheet C5.1 for location and curb inlets have been adjusted to limit any impacts to said pipe. No structures shall be turned over. Cape Fear Public Utilities 1. Comments provided by David Daily with CFPUA have been addressed and State Permits for waterline extension and forcemain installation will be submitted. Permits will be forwarded to CFPUA once they are obtained. NCDOT 1. Noted. 2. DOT submittals have been made. Permits will be forwarded once they are obtained. 3. Noted. a. Sight triangles have been adjusted and shown. b. Noted. c. Noted. 4. Noted. Environmental Health 1. Waterline extensions and forcemain installations have been submitted to CFPUA and to the State for permitting. WMPO 1. A different and accurate truck template was used for the Auto-turn program. Plan has been revised. 2. a. Noted. b. Noted. Planning (Addressing) 1. No comments. Army Corp of Engineers 1. Wetland permit application has been submitted. Awaiting permit/comments. Permit will be forwarded once it is obtained. Note that a few items are outstanding, but we wanted to get the revisions made and resubmitted that we had control over. The outstanding items will be forwarded once they are obtained by our office. Regards, Tommy Holt Bowman Senior Project Manager