Loading...
HomeMy WebLinkAboutIronwood TIAThis report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. TRANSPORTATION IMPACT ANALYSIS June 30, 2022 Ironwood New Hanover County, NC Prepared for Hoosier Daddy, LLC Project #: 210291 Home Office: John Davenport Engineering, Inc. Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 5917 Oleander Drive, Suite 206 NC License: C-2522 Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912 Transportation Impact Analysis Ironwood New Hanover County, NC Prepared for Hoosier Daddy, LLC June 30, 2022 Analysis by: Tou Lee, E.I. Nick Liguori, P.E. Drafting/Graphics by: Tou Lee, E.I. Reviewed by: Nick Liguori, P.E. Don Bennett, P.E. Sealed by: Nick Liguori, P.E. This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL 6/30/2022  6/30/2022 210291 Ironwood – TIA Executive Summary i Ironwood – Transportation Impact Analysis Hanover County, NC Prepared for Hoosier Daddy, LLC. June 30, 2022 Executive Summary The proposed Ironwood development is to be located north of Shiloh Drive and east of Rosa Parks Lane in New Hanover County, NC. The development proposes to utilize the existing Shiloh Drive and two (2) proposed site access points off US 421. Ironwood development will be analyzed for three (3) phases:  Phase 1A will consist of 125 dwelling units of single-family homes. Phase 1A will utilize the existing Shiloh Drive as the site access. The build year for Phase 1A is assumed to be 2023.  Phase 1B includes the addition of approximately 125 dwelling units of townhomes. In addition to the existing Shiloh Drive, Phase 1B proposes a new right-in right-out access connection on US 421 north of Rosa Parks Lane. The build year for Phase 1B is assumed to be 2024.  Phase 2 includes the addition of approximately 116 dwelling units of townhomes. Phase 2 proposes an egress only access connection on US 421 north of Sanders Road, south of the Tregembo Animal Park. The build year for Phase 2 is assumed to be 2026. Based on rates and equations in the ITE Trip Generation Manual, the site has a trip generation potential of 204 trips in the AM peak, 255 trips in the PM peak and a total of 3,058 daily trips. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The need for roadway improvements was reviewed based on the capacity analysis and turn lane warrant analysis. In Phase 1A condition, no improvements are recommended based upon the results. In Phase 1B, based on the capacity analysis, NCDOT turn lane criteria and projected volumes, a right turn lane on US 421 is warranted at Site Access 1. At the intersection of US 421 and SB-NB U-turn south of Rosa Parks Lane, it is recommended to extend the southbound U-turn lane from 450 feet to 500 feet of storage. It is also recommended to optimize the signal timings at this intersection. 6/30/2022 210291 Ironwood – TIA Executive Summary ii Based on the NCDOT nomograph for intersection signalization with two or three approaches, a traffic signal is warranted at US 421 and Beau Rivage Driveway during existing conditions whether the development is built or not. Due to the proximity of the nearby signal, the installation of a signal is not recommended. The committed northbound leftover/U-turn lane storage is expected to be adequate to contain the future queues. Also, exiting traffic can reroute and use alternative accesses to reduce exit delays. Based on the Phase 2 analysis, the recommendations from Phase 1B are expected to remain adequate. Please note that all site access points should be designed according to NCDOT and City of Wilmington standards. The recommended improvements are illustrated in Exhibit A and are summarized in Table A. In conclusion, this analysis has been conducted based on the City of Wilmington and NCDOT guidelines and has identified roadway improvements to mitigate this development’s impacts. 6/30/2022 210291 Ironwood – TIA Executive Summary iii Table A – Recommended Improvement Summary Intersection 2023 Phase 1A Build 2024 Phase 1B Build 2026 Phase 2 Build US 421 at U-turn south of Rosa Parks Lane  No improvements recommended  Extend southbound U-turn lane on US 421 to provide 500 feet of storage and appropriate taper  Optimize signal timings accordingly  No improvements recommended US 421 at Sanders Road  No improvements recommended  No improvements recommended  No improvements recommended US 421 at Beau Rivage Driveway  No improvements recommended  No improvements recommended  No improvements recommended US 421 at Manassas Drive / Sharks Eye Lane  No improvements recommended  No improvements recommended  No improvements recommended Manassas Drive at Shiloh Drive  No improvements recommended  No improvements recommended  No improvements recommended Myrtle Grove Road at Lieutenant Congleton Road  No improvements recommended  No improvements recommended  No improvements recommended US 421 at Site Access 1  Provide northbound right turn lane on US 421 with 250 feet of storage and appropriate taper  Design site access according with NCDOT standards and with one (1) ingress and one (1) egress lanes  No improvements recommended US 421 at Site Access 2  Design site access according with NCDOT standards and with one (1) egress lane *** NOT TO SCALE *** 100' Beau Rivage  Marketplace Driveway N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. US   4 2 1 Sanders Road Manassas DriveSharks Eye  Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road 15 0 ' 50 0 ' 47 5 ' 22 5 ' 12 5 ' 40 0 ' 30 0 ' 300' 200' 25 0 ' 15 0 ' 50 0 ' PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC EXHIBIT A RECOMMENDED IMPROVEMENTS FULL FULL US   4 2 1 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Site Access 1 Site Access 2 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B ORANGE = PROPOSED IN PHASE 2 RIGHT IN / RIGHT OUT DIRECTIONAL CROSSOVER 25 0 ' ~5,544'~1,000' ~8 9 0 ' ~7 1 0 ' ~1 , 7 7 0 ' ~4 2 5 ' Design site access according to NCDOT and City standards Extend southbound U-turn lane from 450 feet of storage currently to 500 feet of storage and optimize signal timings Design site access according to NCDOT and City standards 25 0 ' FULL FULL ~3 9 0 ' FULL 225' 6/30/2022 Ironwood – Transportation Impact Analysis 1 Ironwood – Transportation Impact Analysis Hanover County, NC Prepared for Hoosier Daddy, LLC. June 30, 2022 Table of Contents 1.0 Introduction ............................................................................................................. 3 Figure 1 – Site Plan ..................................................................................................... 5 Figure 2A – Site Location Map .................................................................................... 6 Figure 2B – Vicinity Map .............................................................................................. 7 2.0 Area Conditions ...................................................................................................... 8 2.1 Inventory ................................................................................................................ 8 2.2 Existing Traffic Volumes ........................................................................................ 9 Figure 3 – Existing Lane Geometry ........................................................................... 10 Figure 4 – 2021 Existing Traffic Volumes .................................................................. 11 3.0 Approved Developments and Committed Improvements ................................. 12 3.1 Approved Developments ...................................................................................... 12 3.2 Committed Improvements .................................................................................... 12 3.3 2023 Future No Build Traffic ................................................................................ 12 Figure 5A – Rerouted Traffic ..................................................................................... 13 Figure 5B – 2023 Future No Build Volumes .............................................................. 14 4.0 Methodology ......................................................................................................... 15 4.1 Base Assumptions and Standards ....................................................................... 15 5.0 Capacity Analysis ................................................................................................. 15 5.1 Level of Service Evaluation Criteria ..................................................................... 15 6.0 2023 Phase 1A Build Conditions ......................................................................... 16 6.1 Trip Generation .................................................................................................... 16 6.2 Trip Distribution .................................................................................................... 16 6.3 2023 Phase 1A Build Total Traffic........................................................................ 16 Figure 6 – Phase 1A Trip Distribution ........................................................................ 17 Figure 7 – Phase 1A Site Trip .................................................................................... 18 Figure 8 – 2023 Phase 1A Build Volumes ................................................................. 19 6.4 Phase 1A Discussion of Results .......................................................................... 20 6.5 Phase 1A Queue Results ..................................................................................... 28 Figure 9 – Phase 1A Recommended Improvements .............................................. 32 7.0 2024 Phase 1B Build Conditions ......................................................................... 33 7.1 Trip Generation .................................................................................................... 33 7.2 Trip Distribution .................................................................................................... 33 7.3 2024 Future No Build Traffic ................................................................................ 33 7.4 2024 Phase 1B Build Total Traffic........................................................................ 33 Figure 10 – Phase 1B Trip Distribution ...................................................................... 34 Figure 11 – 2024 Future No Build .............................................................................. 35 Figure 12 – Phase 1B Site Trips ................................................................................ 36 Figure 13 – 2024 Phase 1B Build Volumes ............................................................... 37 7.5 Phase 1B Discussion of Results .......................................................................... 38 6/30/2022 Ironwood – Transportation Impact Analysis 2 7.6 Phase 1B Queue Results ..................................................................................... 47 Figure 14 – Phase 1B Recommended Improvements ............................................... 50 8.0 2026 Phase 2 Build Conditions ........................................................................... 51 8.1 Trip Generation .................................................................................................... 51 8.2 Trip Distribution .................................................................................................... 51 8.3 2026 Future No Build Traffic ................................................................................ 51 8.4 2026 Phase 2 Build Total Traffic .......................................................................... 51 Figure 15 – Phase 2 Trip Distribution ........................................................................ 52 Figure 16 – 2026 Future No Build .............................................................................. 53 Figure 17 – Phase 2 Site Trips .................................................................................. 54 Figure 18 – 2026 Phase 2 Build Volumes .................................................................. 55 8.5 Phase 2 Discussion of Results ............................................................................ 56 8.6 Phase 2 Queue Results ....................................................................................... 66 Figure 19 – Phase 2 Recommended Improvements .................................................. 69 9.0 Summary and Conclusion ................................................................................... 70 Appendix ...................................................................................................................... 72 6/30/2022 Ironwood – Transportation Impact Analysis 3 Ironwood – Transportation Impact Analysis Hanover County, NC Prepared for Hoosier Daddy, LLC. June 30, 2022 1.0 Introduction The proposed Ironwood development is to be located north of Shiloh Drive and east of Rosa Parks Lane in New Hanover County, NC. The development proposes to utilize the existing Shiloh Drive and two (2) proposed site access points off US 421. Figure 1 shows the site plan. Figures 2A and 2B show the site location map and vicinity map, respectively. Ironwood development will be analyzed for three (3) phases:  Phase 1A will consist of 125 dwelling units of single-family homes. Phase 1A will utilize the existing Shiloh Drive as the site access. The build year for Phase 1A is assumed to be 2023.  Phase 1B includes the addition of approximately 125 dwelling units of townhomes. In addition to the existing Shiloh Drive, Phase 1B proposes a new right-in right-out access connection on US 421 north of Rosa Parks Lane. The build year for Phase 1B is assumed to be 2024.  Phase 2 includes the addition of approximately 116 dwelling units of townhomes. Phase 2 proposes an egress only access connection on US 421 north of Sanders Road, south of the Tregembo Animal Park. The build year for Phase 2 is assumed to be 2026. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study:  US 421 at U-turn south of Rosa Parks Lane (signalized)  US 421 at Sanders Road (signalized)  US 421 at Beau Rivage Driveway (unsignalized)  US 421 at Manassas Drive / Sharks Eye Lane (signalized)  Manassas Drive at Shilo Drive (unsignalized)  Myrtle Grove Road at Lieutenant Congleton Road (unsignalized)  US 421 at Proposed Site Access 1 (RIRO, Phase 1B)  US 421 at Proposed Site Access 2 (egress only, Phase 2) 6/30/2022 Ironwood – Transportation Impact Analysis 4 The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions:  2021 Existing Conditions  2023 Future No Build Conditions  2023 Phase 1A Build Conditions  2023 Phase 1A Build Conditions with Improvements  2024 Future No Build Conditions  2024 Phase 1B Build Conditions  2024 Phase 1B Build Conditions with Improvements  2026 Future No Build Conditions  2026 Phase 2 Build Conditions  2026 Phase 2 Build Conditions with Improvements The Wilmington Metropolitan Planning Organization (WMPO) and NCDOT were contacted to obtain background information and to ascertain the elements to be covered in this Transportation Impact Analysis (TIA). The approved scope for this TIA is included in the appendix. Information regarding the property was provided by Hoosier Daddy, LLC and CSD Engineering. FIGURE 1 SITE PLAN      FIGURE 2A SITE LOCATION MAP SITE INDICATOR      FIGURE 2B VICINITY MAP STUDY INTERSECTIONS EXISTING PROPOSED 1 2 3 7 SITE 8 4 5 6 6/30/2022 Ironwood – Transportation Impact Analysis 8 2.0 Area Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 contains the results of this effort. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Carolina Beach Road US 421 4 lanes divided with median Approx. 85’ 55 MPH NCDOT Sanders Road SR 1187 2 lanes undivided Approx. 20’ 45 MPH NCDOT Manassas Drive SR 1581 2-lane divided with median Approx. 58’ 35 MPH NCDOT Shiloh Drive N/A 2-lane undivided Approx. 18’ Not Posted (25 MPH) Local Lieutenant Congleton Road N/A 2-Lane undivided Approx. 24’ Not Posted (25 MPH) Local Myrtle Grove Road SR 1492 2-Lane undivided Approx. 20’ 45 MPH NCDOT 6/30/2022 Ironwood – Transportation Impact Analysis 9 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by Quality Counts staff. Table 2.2 contains the dates these counts were conducted. Schools were in session at the time of traffic counts. Review of the Sanders Road counts indicated that Sanders Road was still closed at the time of recording. After discussion with reviewing agencies, counts taken in September 2021 were provided for use in place of the December 2021 counts. Balancing was applied to the through traffic volumes along US 421 to account for the differences in volumes due to the closure of Sanders Road, rerouting due to the closure and different date of recording. A system peak hour was used for the traffic analysis. The peak hour occurred at approximately 7:30 to 8:30 AM, and 4:15 to 5:15 PM. Figure 4 shows the 2021 existing volumes for AM and PM peak hours. More information can be found in the Traffic Volume Data section of the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: By: US 421 at SB-NB U-turn south of Rosa Parks Lane 12/09/2021 Quality Counts US 421 at Sanders Road 12/09/2021 Quality Counts US 421 at Sanders Road 09/02/2021 Burns Services US 421 at Beau Rivage Market 12/09/2021 Quality Counts US 421 at Manassas Drive / Sharks Eye Lane 12/09/2021 Quality Counts Manassas Drive at Shiloh Drive 12/09/2021 Quality Counts Myrtle Grove Road at Lieutenant Conglenton Road 12/09/2021 Quality Counts *** NOT TO SCALE *** Beau Rivage  Marketplace Driveway N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. US   4 2 1 Sanders Road Manassas DriveSharks Eye  Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED ROADWAY LEGEND 2019 AADT VOLUMESXXXX SPEED LIMIT 55 15 0 ' 45 0 ' 47 5 ' 22 5 ' 12 5 ' 40 0 ' 30 0 ' 300' 200' 25 0 ' 15 0 ' 50 0 ' SPEED LIMIT 45 SPEED LIMIT 35 44 , 9 0 0 12,500 3,000 SPEED LIMIT 55 PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC FIGURE 3 EXISTING LANE GEOMETRY FULL FULL FULL US   4 2 1 ~5,544'~1,000' ~8 9 0 ' ~7 1 0 ' ~2 , 1 6 0 ' DIRECTIONAL CROSSOVER *** NOT TO SCALE *** Beau Rivage  Marketplace Driveway N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK BLACK = EXISTING GREY = UNANALYZED PROJECT NUMBER 210291 FIGURE 4 2021 EXISTING TRAFFIC VOLUMES IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Manassas DriveSharks Eye Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road 23 2 6 / 1 7 7 7 2 / 1 0 15 9 5 / 2 2 9 6 82 / 1 2 1 0 / 3 5 / 4 0 / 0 5 / 5 18 5 2 / 1 4 3 2 462 / 342 0 / 0 147 / 101 20 1 3 / 1 5 6 1 10 2 / 8 9 14 9 1 / 1 9 8 4 33 / 8 7 34 / 107 26 / 2 4 1 / 2 38 / 2 9 17 3 5 / 1 3 9 6 61 / 6 9 96 / 1 3 3 13 9 1 / 1 8 9 0 12 / 4 4 0 / 0 0 / 0 0 / 7 252 / 141 3 / 1 15 / 1 1 0 / 0 20 / 92 37 3 / 5 0 4 20 / 2 6 8 / 4 37 2 / 3 9 4 18 / 28 29 / 13 1 / 2 0 / 0 230 / 120 DIRECTIONAL CROSSOVER 54 / 3 5 2 / 3 13 2 3 / 1 9 3 2 26 3 / 3 6 2 9 / 9 1 / 5 6 / 17 113 / 132 1 / 3 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 6/30/2022 Ironwood – Transportation Impact Analysis 12 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per WMPO staff, there is one (1) approved development to be considered in this analysis, Tarin Woods II Development. The development is expected to consist of 215 single-family homes. 185 out of the 215 homes has been built. The remaining 30 units projected traffic volumes were assumed to be in place in future conditions. More information about the approved development can be found in the Approved Development section of the appendix. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a developer in the area, but not yet constructed. During the scoping of the TIA and recording of the turning movement counts, the three improvements listed below were requirements of the approved TIA for the Tarin Woods II development and were under construction. At the time of submittal for this Ironwood TIA, these improvements are complete, accepted, and in operation. Manassas Drive at Shiloh Drive  Provide an eastbound left turn lane with 100 feet of storage and appropriate taper US 421 at Manassas Drive  Provide a second westbound right turn lane with 225 feet of storage and appropriate taper US 421 at Beau Rivage Driveway  Provide a northbound leftover/U-turn with 250 feet of storage and appropriate taper 3.3 2023 Future No Build Traffic The 2023 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2021 existing traffic volumes and adding approved development trips. With the construction of the committed crossover, existing left and U-turns are expected to reroute to the new crossover. Figure 5A shows the assumed rerouted volumes making these movements. Figure 5B shows 2023 future no build traffic volumes for AM and PM peaks. More information can be found in the Traffic Volume Data section of the appendix. *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT PROJECT NUMBER 210291 FIGURE 5A REROUTED TRIPS IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 -1 4 / - 1 2 -9 / - 3 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 DIRECTIONAL CROSSOVER Sanders Road 14 / 1 2 16 / 1 4 -3 0 / - 2 6 0 / 0 0 / 0 -7 / - 1 1 -2 3 / - 1 5 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT PROJECT NUMBER 210291 FIGURE 5B 2023 FUTURE NO BUILD VOLUMES IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 23 8 8 / 1 8 2 2 3 / 1 1 16 3 4 / 2 3 5 8 84 / 1 2 4 0 / 4 6 / 5 0 / 0 472 / 349 0 / 0 151 / 105 15 1 3 / 2 0 2 8 25 / 8 6 35 / 110 27 / 2 5 2 / 3 41 / 3 4 17 7 0 / 1 4 2 5 63 / 7 1 10 4 / 1 5 2 14 3 5 / 1 9 3 8 13 / 4 5 0 / 0 0 / 0 8 / 1 3 277 / 156 4 / 2 16 / 1 2 0 / 0 21 / 94 38 1 / 5 1 5 21 / 2 7 9 / 5 38 0 / 4 0 2 19 / 29 30 / 14 2 / 3 0 / 0 247 / 131 5 / 12 121 / 147 7 / 18 DIRECTIONAL CROSSOVER Sanders Road 16 / 1 4 18 / 1 6 20 4 0 / 1 5 7 7 6 / 6 19 0 5 / 1 4 7 0 99 / 8 1 33 / 2 1 2 / 6 3 / 4 13 5 6 / 1 9 8 6 26 9 / 3 7 0 10 / 1 0 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d 6/30/2022 Ironwood – Transportation Impact Analysis 15 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents low-volume traffic operations and Level of Service “F” represents high- volume, oversaturated traffic operations. However, in very congested areas, a simple LOS evaluation technique may not be sufficient to determine the true impact of a project. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 1.0% per year for all roadways Analysis Software Synchro/SimTraffic Version 10.0 Base Signal Timing/Phasing NCDOT Lane widths 12-feet Truck percentages 2% Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A  10 A  10 B  10 and  20 B  10 and  15 C  20 and  35 C  15 and  25 D  35 and  55 D  25 and  35 E  55 and  80 E  35 and  50 F  80 F  50 6/30/2022 Ironwood – Transportation Impact Analysis 16 6.0 2023 Phase 1A Build Conditions 6.1 Trip Generation Phase 1A is planned to consist of 125 single-family homes. The ITE Land Use Code of 210 was agreed upon with the City of Wilmington and NCDOT during the scoping process. The choice of adjacent street peak hour trips and rates for this site was based on NCDOT Congestion Management Rate vs Equation Spreadsheet dated July 1, 2018. Table 6.1 presents the results. Table 6.1 - ITE Trip Generation Ironwood - Phase 1A Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Single Family Homes 210 125 Dwelling Units Adjacent /Equation 1,277 24 70 79 47 Total Unadjusted Trips 1,262 24 70 79 47 6.2 Trip Distribution Site trips for this development were distributed based on the existing traffic patterns and engineering judgment. Site trip distribution models were agreed upon with the City of Wilmington and NCDOT staff. The site trip distributions are shown in Figure 6 and utilizes the following overall directional patterns:  65% to and from the north on US 421  20% to and from the south on US 421  5% to and from the west on Sanders Road  5% to and from the west on Beau Rivage Marketplace Driveway  5% to and from the north on Myrtle Grove Road 6.3 2023 Phase 1A Build Total Traffic The 2023 build-out traffic volume was obtained by summing the 2023 future no build volumes and Phase 1A site trips due to the proposed development. Phase 1A site trips are shown in Figure 7. The resulting 2023 Phase 1A build volume totals for AM and PM peaks are shown in Figure 8. *** NOT TO SCALE *** 5% O U T N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace  Driveway Manassas DriveSharks Eye  Lane Lieutenant  Congleton Road DIRECTIONAL CROSSOVER DESTINATION NODE% 65% 5% 20% 5% 5% I N FIGURE 6 PHASE 1A TRIP DISTRIBUTION 5% O U T 5% OUT 5% IN 95% IN 95 % O U T 95% OUT 75 % I N 20 % O U T 20 % I N 20 % O U T 70 % O U T 70 % I N 5% O U T 65 % O U T 5% IN 65 % I N 65 % O U T 65 % I N 5% 5% IN US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK PROJECT NUMBER 210291 FIGURE 7 PHASE 1A SITE TRIPS IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 46 / 3 1 0 / 0 16 / 5 1 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 1 / 4 17 / 5 5 0 / 0 1 / 4 0 / 0 0 / 0 5 / 1 6 0 / 0 0 / 0 18 / 5 9 14 / 9 0 / 0 4 / 2 0 / 0 67 / 4 5 67 / 45 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 1 / 4 0 / 0 0 / 0 4 / 2 0 / 0 0 / 0 1 / 4 0 / 0 23 / 75 0 / 0 0 / 0 DIRECTIONAL CROSSOVER Sanders Road 14 / 9 4 / 2 49 / 3 3 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A 0 / 0 46 / 3 1 4 / 2 0 / 0 0 / 0 16 / 5 1 0 / 0 0 / 0 0 / 0 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK PROJECT NUMBER 210291 FIGURE 8 2023 PHASE 1A BUILD VOLUMES IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 24 3 4 / 1 8 5 3 3 / 1 1 16 5 0 / 2 4 0 9 84 / 1 2 4 0 / 4 6 / 5 0 / 0 472 / 349 0 / 0 152 / 109 15 3 0 / 2 0 8 3 25 / 8 6 36 / 114 27 / 2 5 2 / 3 46 / 5 0 17 7 0 / 1 4 2 5 63 / 7 1 12 2 / 2 1 1 14 4 9 / 1 9 4 7 13 / 4 5 4 / 2 0 / 0 75 / 5 8 344 / 201 4 / 2 16 / 1 2 0 / 0 21 / 94 38 1 / 5 1 5 22 / 3 1 9 / 5 38 0 / 4 0 2 23 / 31 30 / 14 2 / 3 1 / 4 247 / 131 28 / 87 121 / 147 7 / 18 DIRECTIONAL CROSSOVER Sanders Road 30 / 2 3 22 / 1 8 20 8 9 / 1 6 1 0 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A 6 / 6 19 5 1 / 1 5 0 1 10 3 / 8 3 33 / 2 1 3 / 4 13 7 2 / 2 0 3 7 26 9 / 3 7 0 10 / 1 0 2 / 6 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d 6/30/2022 Ironwood – Transportation Impact Analysis 20 6.4 Phase 1A Discussion of Results The following section discusses 2023 Phase 1A levels of service for each intersection. Recommended improvements for Phase 1A are illustrated in Figure 9. US 421 at SB-NB U-turn south of Rosa Parks Lane This signalized intersection currently operates at LOS A during both the AM and PM peak hours. In 2023 future no build conditions, this intersection is expected to operate at LOS B during both the AM and PM peaks. In Phase 1A build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 6.2 - US 421 & SB-NB U turn south of Rosa Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound AM Peak Hour 2021 Existing A (6.2) L T R L T R A (0.1) A (6.4) A (0.1) A (6.4) 2023 Future No-Build B (14.8) L T R L T R F (85.1) B (12.3) F (85.1) B (12.3) 2023 Phase 1A Build B (15.6) L T R L T R F (85.1) B (13.2) F (85.1) B (13.2) PM Peak Hour 2021 Existing A (4.1) L T R L T R A (0.1) A (4.3) A (0.1) A (6.4) 2023 Future No-Build B (16.1) L T R L T R F (82.8) B (11.6) F (82.8) B (11.6) 2023 Phase 1A Build B (16.1) L T R L T R F (82.8) B (11.6) F (82.8) B (11.6) 6/30/2022 Ironwood – Transportation Impact Analysis 21 US 421 at NB-SB U-turn south of Rosa Parks Lane This unsignalized intersection currently operates at LOS C during the AM peak and LOS D in the PM peak. In 2023 future no build and Phase 1A build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 6.3 - US 421 & NB-SB U turn south of Rosa Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Westbound Southbound AM Peak Hour 2021 Existing C (17.9) WB Approach L T R L T R C (17.9) #N/A #N/A #N/A A (0.0) #N/A C (17.9) A (0.0) 2023 Future No-Build C (18.3) WB Approach L T R L T R C (18.3) #N/A #N/A #N/A A (0.0) #N/A C (18.3) A (0.0) 2023 Phase 1A Build C (18.5) WB Approach L T R L T R C (18.5) #N/A #N/A #N/A A (0.0) #N/A C (18.5) A (0.0) PM Peak Hour 2021 Existing D (29.5) WB Approach L T R L T R D (29.5) #N/A #N/A #N/A A (0.0) #N/A D (29.5) A (0.0) 2023 Future No-Build D (30.9) WB Approach L T R L T R D (30.9) #N/A #N/A #N/A A (0.0) #N/A D (30.9) A (0.0) 2023 Phase 1A Build D (32.3) WB Approach L T R L T R D (32.3) #N/A #N/A #N/A A (0.0) #N/A D (32.3) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 22 US 421 at Sanders Road / Storage Driveway This signalized intersection currently operates at LOS C during both the AM and PM peak hours. In 2023 future no build conditions, this intersection is expected to operate at LOS D during the AM peak and LOS C in the PM peak. In Phase 1A build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 6.4 - US 421 & Sanders Rd/North State Storage Driveway Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2021 Existing C (28.2) L T R L T R L T R L T R F (82.1) F (83.6) A (9.5) E (75.8) E (75.8) E (75.8) C (33.0) C (22.5) C (22.5) B (11.6) C (23.7) A (0.3) E (65.3) E (75.8) C (23.3) B (19.8) 2023 Future No-Build D (35.5) L T R L T R L T R L T R F (82.8) F (83.9) A (0.1) E (76.0) E (76.0) E (76.0) F (186.0) C (28.0) C (28.0) E (76.9) C (24.6) A (0.3) E (63.2) E (76.0) D (38.2) C (21.1) 2023 Phase 1A Build D (36.4) L T R L T R L T R L T R F (82.8) F (83.9) A (0.1) E (76.0) E (76.0) E (76.0) F (195.2) C (29.4) C (29.4) E (76.9) C (24.9) A (0.3) E (63.1) E (76.0) D (40.1) C (21.3) PM Peak Hour 2021 Existing C (29.6) L T R L T R L T R L T R F (181.6) F (172.0) B (14.9) E (74.6) E (74.6) E (74.6) F (86.3) A (7.4) A (7.4) A (4.8) C (22.2) A (0.4) F (140.3) E (75.8) C (23.3) B (19.8) 2023 Future No-Build C (32.5) L T R L T R L T R L T R F (181.6) F (186.7) A (0.1) E (75.8) E (75.8) E (75.8) F (151.7) A (8.9) A (8.9) E (74.6) C (24.1) A (0.4) F (141.9) E (75.8) B (18.1) C (20.7) 2023 Phase 1A Build C (33.0) L T R L T R L T R L T R F (181.6) F (186.7) A (0.1) E (75.8) E (75.8) E (75.8) F (153.0) A (8.6) A (8.6) E (74.6) C (25.8) A (0.4) F (140.7) E (75.8) B (17.8) C (22.2) 6/30/2022 Ironwood – Transportation Impact Analysis 23 US 421 at Beau Rivage Marketplace Driveway This unsignalized intersection currently operates at LOS B during the AM peak and LOS D in the PM peak. In 2023 future no build conditions with the committed improvement in place, the LOS is expected to remain unchanged. In Phase 1A build conditions, the intersection is expected to operate at LOS B in the AM peak and LOS E in the PM peak with slight increase in delay. Based on the NCDOT nomograph for intersection signalization with two or three approaches, a traffic signal is warranted in existing conditions whether the development is built or not. Due to the proximity of the nearby signal, the installation of a signal is not recommended. The committed northbound leftover/U-turn lane storage is expected to be adequate to contain the future queues. Also, exiting traffic can reroute and use alternative accesses to reduce exit delays. No improvements are recommended. Table 6.5 - US 421 & Beau Rivage Driveway Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2021 Existing B (13.2) EB Approach L T R L T R L T R #N/A #N/A B (13.2) #N/A - (-) #N/A A (0.0) A (0.0) B (13.2) A (0.0) 2023 Future No-Build B (13.6) EB Approach L T R L T R L T R #N/A #N/A B (13.6) B (11.2) A (0.0) #N/A #N/A A (0.0) A (0.0) B (13.6) A (0.2) A (0.0) 2023 Phase 1A Build B (13.6) EB Approach L T R L T R L T R #N/A #N/A C (13.6) B (11.6) A (0.0) #N/A #N/A A (0.0) A (0.0) C (13.6) A (0.3) A (0.0) PM Peak Hour 2021 Existing D (26.9) EB Approach L T R L T R L T R #N/A #N/A D (26.9) #N/A - (-) #N/A #N/A A (0.0) A (0.0) D (26.9) A (0.0) 2023 Future No-Build D (30.4) EB Approach L T R L T R L T R #N/A #N/A D (30.4) C (22.1) A (0.0) #N/A #N/A A (0.0) A (0.0) D (30.4) A (0.4) A (0.0) 2023 Phase 1A Build E (35.4) EB Approach L T R L T R L T R #N/A #N/A E (35.4) D (28.1) A (0.0) #N/A #N/A A (0.0) A (0.0) E (35.4) A (0.7) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 24 US 421 at Manassas Drive This signalized intersection currently operates at LOS C during the AM peak and LOS B in the PM peak. In 2023 future no build conditions with the committed improvement in place, the LOS is expected to remain unchanged. In Phase 1A build conditions, the intersection is expected to operate at LOS C in both the AM and PM peaks. The increase in delay is expected to be minimal, therefore, no improvements are recommended. Table 6.6 - US 421 & SB Manassas Crossover/Manassas Dr Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound AM Peak Hour 2021 Existing C (23.9) L T R L T R L T R A (0.1) F (128.1) B (10.9) A (4.4) A (0.1) F (128.1) B (10.8) 2023 Future No-Build C (20.4) L T R L T R L T R D (49.0) F (80.2) A (9.3) A (3.9) D (49.0) F (80.2) A (9.2) 2023 Phase 1A Build C (23.9) L T R L T R L T R D (47.0) F (85.2) B (10.6) A (4.3) D (47.0) F (85.2) B (10.4) PM Peak Hour 2021 Existing B (12.2) L T R L T R L T R A (0.1) F (83.0) A (6.6) A (3.9) A (0.1) F (128.1) B (10.8) 2023 Future No-Build B (17.1) L T R L T R L T R E (57.6) E (64.4) A (7.2) A (4.2) E (57.6) E (64.4) A (7.2) 2023 Phase 1A Build C (20.6) L T R L T R L T R E (56.9) E (59.9) A (9.6) A (5.6) E (56.9) E (59.9) A (9.5) 6/30/2022 Ironwood – Transportation Impact Analysis 25 US 421 at Sharks Eye Lane This signalized intersection currently operates at LOS A during both the AM and PM peak hours. In 2023 future no build and Phase 1A build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 6.7 - US 421 & Sharks Eye Lane/NB Manassas Crossover Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Southbound AM Peak Hour 2021 Existing A (1.6) L T R L T R L T R F (81.9) A (0.0) A (0.5) A (0.1) F (81.9) A (0.0) A (0.5) 2023 Future No- Build A (5.4) L T R L T R L T R E (71.0) F (86.6) A (0.7) A (0.2) E (71.0) F (86.6) A (0.7) 2023 Phase 1A Build A (5.3) L T R L T R L T R E (71.0) F (86.6) A (0.7) A (0.2) E (71.0) F (86.6) A (0.7) PM Peak Hour 2021 Existing A (5.0) L T R L T R L T R F (87.2) A (0.0) A (1.3) A (0.5) F (87.3) A (0.0) A (0.5) 2023 Future No- Build A (7.6) L T R L T R L T R F (87.2) E (73.2) A (1.5) A (0.5) F (87.3) E (73.2) A (1.5) 2023 Phase 1A Build A (7.7) L T R L T R L T R F (87.1) E (72.7) A (1.6) A (0.5) F (87.1) E (72.7) A (1.5) 6/30/2022 Ironwood – Transportation Impact Analysis 26 Manassas Drive at Shiloh Drive This unsignalized intersection currently operates at LOS B during both the AM and PM peak hours. In 2023 future no build and Phase 1A build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 6.8 - Shiloh Dr & Manassas Dr Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2021 Existing B (11.4) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.5) A (0.0) A (0.0) B (11.4) B (11.4) B (11.4) B (11.1) B (11.1) B (11.1) A (0.0) A (0.1) B (11.4) B (11.1) 2023 Future No-Build B (11.9) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.5) A (0.0) A (0.0) B (11.9) B (11.9) B (11.9) B (11.1) B (11.1) B (11.1) A (0.0) A (0.1) B (11.9) B (11.1) 2023 Phase 1A Build B (13.4) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.5) A (0.0) A (0.0) B (13.4) B (13.4) B (13.4) B (10.9) B (10.9) B (10.9) A (0.0) A (0.1) B (13.4) B (10.9) PM Peak Hour 2021 Existing B (10.6) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (10.6) B (10.6) B (10.6) B (10.1) B (10.1) B (10.1) A (0.0) A (0.2) B (10.6) B (10.1) 2023 Future No-Build B (11.1) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (11.1) B (11.1) B (11.1) B (10.1) B (10.1) B (10.1) A (0.0) A (0.2) B (11.1) B (10.1) 2023 Phase 1A Build B (13.2) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (13.2) B (13.2) B (13.2) A (9.9) A (9.9) A (9.9) A (0.0) A (0.2) B (13.2) A (9.9) 6/30/2022 Ironwood – Transportation Impact Analysis 27 Myrtle Grove Road at Lieutenant Conglenton Road This unsignalized intersection currently operates at LOS B during the AM peak and LOS C in the PM peak. In 2023 future no build and Phase 1A build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 6.9 - Myrtle Grove Road & Lieutenant Congleton Rd Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2021 Existing B (13.8) EB Approach L T R L T R L T R B (13.8) B (13.8) A (8.2) A (0.0) #N/A #N/A A (0.0) A (0.0) B (13.8) A (0.2) A (0.0) 2023 Future No- Build B (14.1) EB Approach L T R L T R L T R B (14.1) B (14.1) A (8.3) A (0.0) #N/A #N/A A (0.0) A (0.0) B (14.1) A (0.2) A (0.0) 2023 Phase 1A Build B (14.5) EB Approach L T R L T R L T R B (14.5) B (14.5) A (8.3) A (0.0) #N/A #N/A A (0.0) A (0.0) B (14.5) A (0.2) A (0.0) PM Peak Hour 2021 Existing C (18.6) EB Approach L T R L T R L T R C (18.6) C (18.6) A (8.7) A (0.0) #N/A #N/A A (0.0) A (0.0) C (18.6) A (0.1) A (0.0) 2023 Future No- Build C (19.2) EB Approach L T R L T R L T R C (19.2) C (19.2) A (8.7) A (0.0) #N/A #N/A A (0.0) A (0.0) C (19.2) A (0.1) A (0.0) 2023 Phase 1A Build C (19.6) EB Approach L T R L T R L T R C (19.6) C (19.6) A (8.7) A (0.0) #N/A #N/A A (0.0) A (0.0) C (19.6) A (0.1) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 28 6.5 Phase 1A Queue Results Queuing analysis was conducted using SimTraffic simulation for the study intersections, based on a NCDOT-standard 10-minute seeding time and a 60-minute recording time. The maximum queue lengths and Synchro 95% queues are shown, along with existing turn lane lengths. All queue reports can be found in the appendix. The Phase 1A results are shown in Table 6.10 to 6.13 below for all exclusive turn lanes. All queue reports can be found in the Queueing and Blocking Reports section of the appendix. Table 6.10 - Queue Results AM Peak Hour Queues Scenario US 421 & SB-NB U-turn south of Rosa US 421 & NB-SB U-turn south of Rosa 2021 Existing EBL WBL Max Queue (ft) 76 18 95th Percentile Queue (ft) 0 0 Storage Bay (ft) 450 150 2023 No Build EBL WBL Max Queue (ft) 92 25 95th Percentile Queue (ft) 152 0 Storage Bay (ft) 450 150 2023 Phase 1A Build EBL WBL Max Queue (ft) 194 28 95th Percentile Queue (ft) 152 3 Storage Bay (ft) 450 150 PM Peak Hour Queues Scenario US 421 & SB-NB U-turn south of Rosa US 421 & NB-SB U-turn south of Rosa 2021 Existing EBL WBL Max Queue (ft) 84 60 95th Percentile Queue (ft) 0 5 Storage Bay (ft) 450 150 2023 No Build EBL WBL Max Queue (ft) 145 58 95th Percentile Queue (ft) 202 8 Storage Bay (ft) 450 150 2023 Phase 1A Build EBL WBL Max Queue (ft) 143 52 95th Percentile Queue (ft) 202 8 Storage Bay (ft) 450 150 6/30/2022 Ironwood – Transportation Impact Analysis 29 Table 6.11 - Queue Results AM Peak Hour Queues Scenario US 421 at Sanders Road 2021 Existing EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 354 399 274 59 190 304 130 310 95th Percentile Queue (ft) 370 377 64 40 m#162 m#1302 15 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2023 No Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 311 378 275 59 466 587 130 305 95th Percentile Queue (ft) 378 386 0 41 m#314 #1426 41 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2023 Phase 1A Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 360 415 275 67 538 610 132 305 95th Percentile Queue (ft) 378 386 0 41 m#305 #1485 41 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 PM Peak Hour Queues Scenario US 421 at Sanders Road 2021 Existing EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 400 1062 275 59 181 128 119 375 95th Percentile Queue (ft) #415 #404 58 36 #219 586 9 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2023 No Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 400 1049 275 62 280 159 173 306 95th Percentile Queue (ft) #415 #426 0 40 #253 660 40 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2023 Phase 1A Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 400 1058 275 66 226 192 72 373 95th Percentile Queue (ft) #415 #426 0 40 #258 601 40 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 #: 95th percentile volume exceeds capacity, queue may be longer  m: volume for 95th percentile queue is metered by upstream signal  6/30/2022 Ironwood – Transportation Impact Analysis 30 Table 6.12 - Queue Results AM Peak Hour Queues Scenario US 421 at Beau Rivage Marketplace Driveway US 421 & Manassas Dr/ SB Manassas Crossover US 421 & Sharks Eye Lane/NB Manassas Crossover 2021 Existing EBR NBUL SBR EBLT WBR NBR EBR WBLT SBR Max Queue (ft) 67 0 87 637 50 50 72 10 95th Percentile Queue (ft) 8 0 m0 #502 19 53 0 m0 Storage Bay (ft) FULL 300 475 FULL 125 FULL 400 225 2023 No Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 70 176 4 265 339 248 47 63 110 38 95th Percentile Queue (ft) 8 5 0 m182 230 230 20 53 129 m1 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 2023 Phase 1A Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 216 228 260 398 427 273 55 51 99 23 95th Percentile Queue (ft) 8 8 0 m211 #299 #299 21 53 129 m1 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 PM Peak Hour Queues Scenario US 421 at Beau Rivage Marketplace Driveway US 421 & Manassas Dr/ SB Manassas Crossover US 421 & Sharks Eye Lane/NB Manassas Crossover 2021 Existing EBR NBUL SBR EBLT WBR NBR EBR WBLT SBR Max Queue (ft) 191 0 91 222 41 159 72 46 95th Percentile Queue (ft) 50 0 m0 222 16 161 0 m2 Storage Bay (ft) FULL 300 475 FULL 125 FULL 400 225 2023 No Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 187 60 5 239 148 112 49 180 110 49 95th Percentile Queue (ft) 58 13 0 m201 128 128 18 161 132 m2 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 2023 Phase 1A Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 293 87 0 309 154 137 58 170 101 56 95th Percentile Queue (ft) 70 20 0 m280 153 153 30 162 132 m2 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 #: 95th percentile volume exceeds capacity, queue may be longer  m: volume for 95th percentile queue is metered by upstream signal  6/30/2022 Ironwood – Transportation Impact Analysis 31 Table 6.13 - Queue Results AM Peak Hour Queues Scenario Shiloh Dr & Manassas Dr Myrtle Grove Road & Lieutenant Congleton Rd 2021 Existing EBLTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 16 33 35 31 80 52 0 95th Percentile Queue (ft) 0 0 3 3 10 0 0 Storage Bay (ft) FULL FULL FULL FULL FULL FULL FULL 2023 No Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 12 6 28 35 39 68 64 0 95th Percentile Queue (ft) 0 0 0 3 3 10 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL 2023 Phase 1A Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 54 6 34 44 55 79 52 0 95th Percentile Queue (ft) 0 0 5 13 13 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL PM Peak Hour Queues Scenario Shiloh Dr & Manassas Dr Myrtle Grove Road & Lieutenant Congleton Rd 2021 Existing EBLTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 15 9 45 31 65 43 0 95th Percentile Queue (ft) 0 0 3 3 13 0 0 Storage Bay (ft) FULL FULL FULL FULL FULL FULL FULL 2023 No Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 22 0 9 38 40 96 60 0 95th Percentile Queue (ft) 0 0 0 3 3 15 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL 2023 Phase 1A Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 54 0 34 55 63 86 43 0 95th Percentile Queue (ft) 0 0 0 5 8 15 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL *** NOT TO SCALE *** Beau Rivage  Marketplace Driveway N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. US   4 2 1 Sanders Road Manassas DriveSharks Eye  Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED IMPROVEMENTS BLUE = PROPOSED IN PHASE 1A ROADWAY LEGEND 15 0 ' 45 0 ' 47 5 ' 22 5 ' 12 5 ' 40 0 ' 30 0 ' 300' 200' 25 0 ' 15 0 ' 50 0 ' PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC FIGURE 9 PHASE 1A RECOMMENDED IMPROVEMENTS FULL FULL FULL US   4 2 1 DIRECTIONAL CROSSOVER ~5,544'~1,000' ~8 9 0 ' ~7 1 0 ' ~2 , 1 6 0 ' 225' 25 0 ' 100' 6/30/2022 Ironwood – Transportation Impact Analysis 33 7.0 2024 Phase 1B Build Conditions Phase 1B of this development will add 125 dwelling units of townhomes. This brings the developments total unit count to 125 dwelling units of single-family homes and 125 dwelling units of townhomes. 7.1 Trip Generation Similar to Phase 1A, the ITE Land Use Code of 210 and 220 was agreed upon with the City of Wilmington and NCDOT during the scoping process. The choice of adjacent street peak hour trips and rates for this site was based on NCDOT Congestion Management Rate vs Equation Spreadsheet dated July 1, 2018. Table 7.1 presents the results. Table 7.1 - ITE Trip Generation Ironwood - Phase 1B Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Single Family Homes 210 125 Dwelling Units Adjacent /Equation 2,177 24 70 79 47 Townhomes 220 125 Dwelling Units Adjacent /Equation 904 14 45 45 27 Total Unadjusted Trips 2,181 38 115 124 74 7.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. Site trip distribution models were agreed upon with the City of Wilmington and NCDOT staff. The site trip distributions are shown in Figure 10 and utilizes the same overall directional patterns as Phase 1A. 7.3 2024 Future No Build Traffic The 2024 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2021 base traffic volumes, adding approved development trips, and rerouting trips due to the committed improvement. Figure 11 shows 2024 future no build traffic volumes for AM and PM peaks. 7.4 2024 Phase 1B Build Total Traffic The 2024 Phase 1B traffic volume was obtained by summing the 2024 future no build volumes and Phase 1B site trips due to the proposed development. Phase 1B site trips are shown in Figure 12. The 2024 future build volumes for Phase 1B are shown for AM and PM peaks in Figure 13. *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace  Driveway Manassas DriveSharks Eye  Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road DIRECTIONAL CROSSOVER DESTINATION NODE% 65% 5% 20% 5% 5% I N FIGURE 10 PHASE 1B TRIP DISTRIBUTION 5% O U T 5% OUT 5% IN 30% IN 30 % O U T 30% OUT 25 % I N 20 % O U T 20 % O U T 15 % I N + 5 % O U T 20 % I N 5% O U T 15 % I N 5% IN 20 % I N 20 % I N 20 % I N Site Access 1 65% OUT 65 % I N 15 % I N 5% I N 45 % I N 5%5% IN 5% O U T US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sanders Road RIGHT IN / RIGHT OUT *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT PROJECT NUMBER 210291 FIGURE 11 2024 FUTURE NO BUILD VOLUMES IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 24 1 2 / 1 8 4 0 3 / 1 1 16 5 0 / 2 3 8 1 85 / 1 2 5 0 / 4 6 / 5 0 / 0 476 / 353 0 / 0 153 / 106 15 2 9 / 2 0 4 9 25 / 8 7 36 / 111 27 / 2 5 2 / 3 42 / 3 4 17 8 8 / 1 4 3 9 63 / 7 2 10 5 / 1 5 4 14 5 0 / 1 9 5 8 13 / 4 6 0 / 0 0 / 0 8 / 1 3 279 / 158 4 / 2 16 / 1 2 0 / 0 21 / 95 38 5 / 5 2 0 21 / 2 7 9 / 5 38 4 / 4 0 6 19 / 29 30 / 14 2 / 3 0 / 0 249 / 132 5 / 12 122 / 148 7 / 18 DIRECTIONAL CROSSOVER Sanders Road 16 / 1 4 18 / 1 6 20 6 0 / 1 5 9 3 6 / 6 19 2 4 / 1 4 8 5 10 0 / 8 2 33 / 2 2 2 / 6 3 / 4 13 7 0 / 2 0 0 6 27 1 / 3 7 3 10 / 1 0 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK PROJECT NUMBER 210291 FIGURE 12 PHASE 1B SITE TRIPS IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Site Access 1 Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 75 / 48 25 / 8 1 0 / 0 8 / 2 5 0 / 0 8 / 2 5 17 / 5 6 0 / 0 0 / 0 0 / 0 2 / 6 0 / 0 0 / 0 8 / 2 5 0 / 0 2 / 6 0 / 0 0 / 0 2 / 6 6 / 1 9 0 / 0 8 / 2 5 23 / 1 5 0 / 0 6 / 4 0 / 0 35 / 2 2 35 / 22 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 2 / 6 0 / 0 0 / 0 6 / 4 0 / 0 0 / 0 2 / 6 0 / 0 11 / 37 0 / 0 0 / 0 DIRECTIONAL CROSSOVER Sanders Road 23 / 1 5 6 / 4 11 / 2 2 0 / 0 6 / 1 9 6 / 4 0 / 0 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B 0 / 0 8 / 2 5 0 / 0 0 / 0 0 / 0 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d RIGHT IN / RIGHT OUT *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK PROJECT NUMBER 210291 FIGURE 13 2024 PHASE 1B BUILD VOLUMES IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Site Access 1 Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 75 / 48 25 / 8 1 24 9 7 / 1 9 6 5 24 2 0 / 1 8 6 5 3 / 1 1 16 5 8 / 2 4 0 6 10 2 / 1 8 1 0 / 4 6 / 5 0 / 0 478 / 359 0 / 0 153 / 106 15 3 7 / 2 0 7 4 25 / 8 7 38 / 117 27 / 2 5 2 / 3 44 / 4 0 17 9 4 / 1 4 5 8 63 / 7 2 11 3 / 1 7 9 14 7 3 / 1 9 7 3 13 / 4 6 6 / 4 0 / 0 43 / 3 5 314 / 180 4 / 2 16 / 1 2 0 / 0 21 / 95 38 5 / 5 2 0 23 / 3 3 9 / 5 38 4 / 4 0 6 25 / 33 30 / 14 2 / 3 2 / 6 249 / 132 16 / 49 122 / 148 7 / 18 DIRECTIONAL CROSSOVER Sanders Road 39 / 2 9 24 / 2 0 20 7 1 / 1 6 1 5 6 / 6 19 3 0 / 1 5 0 4 10 6 / 8 6 33 / 2 2 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B 3 / 4 13 7 8 / 2 0 3 1 27 1 / 3 7 3 10 / 1 0 2 / 6 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d RIGHT IN / RIGHT OUT 6/30/2022 Ironwood – Transportation Impact Analysis 38 7.5 Phase 1B Discussion of Results The following section discusses 2024 Phase 1B level of service for each intersection. Recommended improvements for Phase 1B are illustrated in Figure 14. US 421 at SB-NB U-turn south of Rosa Parks Lane In 2024 future no build conditions, the intersection is expected to operate at LOS B during both the AM and PM peaks. In Phase 1B build conditions, the intersection is expected to operate at LOS B in the AM peak and LOS C in the PM peak. A comparison of delays without and with the proposed development traffic indicates that a capacity improvement is warranted. Mitigations such as dual U-turn lanes were reviewed but not recommended due to the low turning volumes. A potential mitigation measure is as follows:  Extend southbound U-turn lane on US 421 to provide 500 feet of storage and appropriate taper  Optimize signal timings accordingly With the recommendations in place, the intersection is expected to operate at LOS B in both the AM and PM peaks. It should be noted that the delay increase is expected to be less than 5 seconds, and the queues are expected to be contained within the available storage. Table 7.2 - US 421 & SB-NB U turn south of Rosa Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound AM Peak Hour 2024 Future No-Build B (15.2) L T R L T R F (85.1) B (12.7) F (85.1) B (12.7) 2024 Phase 1B Build B (16.9) L T R L T R F (85.4) B (14.0) F (85.4) B (14.0) 2024 Phase 1B Build with Improvements B (16.9) L T R L T R F (85.4) B (14.0) F (85.4) B (14.0) PM Peak Hour 2024 Future No-Build B (16.3) L T R L T R F (82.9) B (11.8) F (82.9) B (11.8) 2024 Phase 1B Build C (21.2) L T R L T R F (87.4) B (14.8) F (87.4) B (14.8) 2024 Phase 1B Build with Improvements B (19.9) L T R L T R F (94.0) B (12.7) F (94.0) B (12.7) 6/30/2022 Ironwood – Transportation Impact Analysis 39 US 421 at NB-SB U-turn south of Rosa Parks Lane In 2024 future no build conditions, the intersection is expected to operate at LOS C in the AM peak and LOS D in the PM peak. In Phase 1B build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 7.3 - US 421 & NB-SB U turn south of Rosa Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Westbound Southbound AM Peak Hour 2024 Future No- Build C (18.5) WB Approach L T R L T R C (18.5) #N/A #N/A #N/A A (0.0) #N/A C (18.5) A (0.0) 2024 Phase 1B Build C (18.6) WB Approach L T R L T R C (18.6) #N/A #N/A #N/A A (0.0) #N/A C (18.6) A (0.0) PM Peak Hour 2024 Future No- Build D (31.5) WB Approach L T R L T R D (31.5) #N/A #N/A #N/A A (0.0) #N/A D (31.5) A (0.0) 2024 Phase 1B Build D (32.1) WB Approach L T R L T R D (32.1) #N/A #N/A #N/A A (0.0) #N/A D (32.1) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 40 US 421 at Sanders Road / Storage Driveway In 2024 future no build conditions, this intersection is expected to operate at LOS D during the AM peak and LOS C in the PM peak. In Phase 1B build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 7.4 - US 421 & Sanders Rd/North State Storage Driveway Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2024 Future No-Build D (35.8) L T R L T R L T R L T R F (82.7) F (84.2) A (0.1) E (76.0) E (76.0) E (76.0) F (188.4) C (28.5) C (28.5) E (76.9) C (25.0) A (0.3) E (63.3) E (76.0) D (38.8) C (21.4) 2024 Phase 1B Build D (36.8) L T R L T R L T R L T R F (82.8) F (84.3) A (0.1) E (76.0) E (76.0) E (76.0) F (206.2) C (28.6) C (28.6) E (76.9) C (25.2) A (0.3) E (63.4) E (76.0) D (40.6) C (21.5) PM Peak Hour 2024 Future No-Build C (33.2) L T R L T R L T R L T R F (185.4) F (190.5) A (0.1) E (75.8) E (75.8) E (75.8) F (155.6) A (9.0) A (9.0) E (74.6) C (24.8) A (0.4) F (144.8) E (75.8) B (18.5) C (21.3) 2024 Phase 1B Build C (34.5) L T R L T R L T R L T R F (191.1) F (198.4) A (0.1) E (75.8) E (75.8) E (75.8) F (163.0) A (8.8) A (8.8) E (74.6) C (25.6) A (0.4) F (150.7) E (75.8) B (19.1) C (22.0) 6/30/2022 Ironwood – Transportation Impact Analysis 41 US 421 at Beau Rivage Marketplace Driveway In 2024 future no build conditions, the intersection is expected to operate at LOS B in the AM peak and LOS D in the PM peak. In Phase 1B build conditions, the intersection is expected to operate at LOS B in the AM peak and LOS E in the PM peak with slight increase in delay. Based on the NCDOT nomograph for intersection signalization with two or three approaches, a traffic signal is warranted in existing conditions whether the development is built or not. Due to the proximity of the nearby signal, the installation of a signal is not recommended. The committed northbound leftover/U-turn lane storage is expected to be adequate to contain the future queues. Also, exiting traffic can reroute and use alternative accesses to reduce exit delays. No improvements are recommended. Table 7.5 - US 421 & Beau Rivage Driveway Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2024 Future No-Build B (13.6) EB Approach L T R L T R L T R #N/A #N/A B (13.6) B (11.2) A (0.0) #N/A #N/A A (0.0) A (0.0) B (13.6) A (0.2) A (0.0) 2024 Phase 1B Build B (13.7) EB Approach L T R L T R L T R #N/A #N/A B (13.7) B (11.8) A (0.0) #N/A #N/A A (0.0) A (0.0) B (13.7) A (0.3) A (0.0) PM Peak Hour 2024 Future No-Build D (34.6) EB Approach L T R L T R L T R #N/A #N/A D (34.6) C (22.8) A (0.0) #N/A #N/A A (0.0) A (0.0) D (34.6) A (0.4) A (0.0) 2024 Phase 1B Build E (36.2) EB Approach L T R L T R L T R #N/A #N/A E (36.2) D (30.2) A (0.0) #N/A #N/A A (0.0) A (0.0) E (36.2) A (0.9) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 42 US 421 at Manassas Drive In 2024 future no build conditions, the intersection is expected to operate at LOS C in the AM peak and LOS B in the PM peak. In Phase 1B build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 7.6 - US 421 & SB Manassas Crossover/Manassas Dr Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound AM Peak Hour 2024 Future No-Build C (20.5) L T R L T R L T R D (48.6) F (80.2) A (9.5) A (3.9) D (48.6) F (80.2) A (9.4) 2024 Phase 1B Build C (22.4) L T R L T R L T R D (47.3) F (82.7) B (10.3) A (4.2) D (47.3) F (82.7) B (10.1) PM Peak Hour 2024 Future No-Build B (17.2) L T R L T R L T R E (57.4) E (64.4) A (7.4) A (4.2) E (57.4) E (64.4) A (7.3) 2024 Phase 1B Build B (18.8) L T R L T R L T R E (56.6) E (62.5) A (8.5) A (4.8) E (56.6) E (62.5) A (8.4) 6/30/2022 Ironwood – Transportation Impact Analysis 43 US 421 at Sharks Eye Lane In 2024 future no build conditions, the intersection is expected to operate at LOS A during both the AM and PM peak hours. In Phase 1B build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 7.7 - US 421 & Sharks Eye Lane/NB Manassas Crossover Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Southbound AM Peak Hour 2024 Future No-Build A (5.3) L T R L T R L T R E (71.0) F (86.6) A (0.7) A (0.2) E (71.0) F (86.6) A (0.7) 2024 Phase 1B Build A (5.3) L T R L T R L T R E (71.3) F (86.6) A (0.7) A (0.2) E (71.3) F (86.6) A (0.7) PM Peak Hour 2024 Future No-Build A (7.9) L T R L T R L T R F (87.2) E (72.4) A (1.7) A (0.5) F (87.2) E (72.4) A (1.7) 2024 Phase 1B Build A (8.0) L T R L T R L T R F (87.2) E (72.4) A (1.9) A (0.5) F (87.2) E (72.4) A (1.8) 6/30/2022 Ironwood – Transportation Impact Analysis 44 Manassas Drive at Shiloh Drive In 2024 future no build conditions, the intersection is expected to operate at LOS B during both the AM and PM peak hours. In Phase 1B build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 7.8 - Shiloh Dr & Manassas Dr Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2024 Future No-Build B (11.9) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.5) A (0.0) A (0.0) B (11.9) B (11.9) B (11.9) B (11.1) B (11.1) B (11.1) A (0.0) A (0.1) B (11.9) B (11.1) 2024 Phase 1B Build B (12.7) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.5) A (0.0) A (0.0) B (12.7) B (12.7) B (12.7) B (10.8) B (10.8) B (10.8) A (0.0) A (0.1) B (12.7) B (10.8) PM Peak Hour 2024 Future No-Build B (11.1) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (11.1) B (11.1) B (11.1) B (10.1) B (10.1) B (10.1) A (0.0) A (0.2) B (11.1) B (10.1) 2024 Phase 1B Build B (12.0) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (12.0) B (12.0) B (12.0) A (9.9) A (9.9) A (9.9) A (0.0) A (0.2) B (12.0) A (9.9) 6/30/2022 Ironwood – Transportation Impact Analysis 45 Myrtle Grove Road at Lieutenant Conglenton Road In 2024 future no build conditions, the intersection is expected to operate at LOS B during the AM peak and LOS C in the PM peak. In Phase 1B build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 7.9 - Myrtle Grove Road & Lieutenant Congleton Rd Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2024 Future No-Build B (14.2) EB Approach L T R L T R L T R B (14.2) B (14.2) A (8.3) A (0.0) #N/A #N/A A (0.0) A (0.0) B (14.2) A (0.2) A (0) 2024 Phase 1B Build B (14.9) EB Approach L T R L T R L T R B (14.9) B (14.9) A (8.3) A (0.0) #N/A #N/A A (0.0) A (0.0) B (14.9) A (0.2) A (0) PM Peak Hour 2024 Future No-Build C (19.4) EB Approach L T R L T R L T R C (19.4) C (19.4) A (8.7) A (0.0) #N/A #N/A A (0.0) A (0.0) C (19.4) A (0.1) A (0) 2024 Phase 1B Build C (20.1) EB Approach L T R L T R L T R C (20.1) C (20.1) A (8.8) A (0.0) #N/A #N/A A (0.0) A (0.0) C (20.1) A (0.1) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 46 US 421 at Proposed Site Access 1 (RIRO) This proposed stopped-controlled site access has a right-in right-out configuration. In Phase 1B build conditions, this intersection is expected to operate at LOS F during the AM peak and LOS D in the PM peak. Based on NCDOT turn lane criteria and projected volumes, a northbound right turn lane on US 421 is warranted. It is recommended to provide the right turn lane with 250 feet of storage and appropriate taper. The 250 feet of storage is expected to be adequate to contain Phase 2 volumes. LOS F is typical for a minor street entering a major roadway such as US 421. Also, the traffic simulation indicates that delays are short-lived. Table 7.10 - US 421 & Site Access 1 Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Westbound Northbound AM Peak Hour 2024 Phase 1B Build F (72.4) WB Approach L T R L T R #N/A F (72.4) #N/A A (0.0) A (0.0) F (72.4) A (0.0) 2024 Phase 1B Build with Improvements F (69.3) WB Approach L T R L T R #N/A F (69.3) #N/A A (0.0) A (0.0) F (69.3) A (0.0) PM Peak Hour 2024 Phase 1B Build D (30.1) WB Approach L T R L T R #N/A D (30.1) #N/A A (0.0) A (0.0) D (30.1) A (0.0) 2024 Phase 1B Build with Improvements D (27.9) WB Approach L T R L T R #N/A D (27.9) #N/A A (0.0) A (0.0) D (27.9) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 47 7.6 Phase 1B Queue Results Queuing analysis was conducted using SimTraffic simulation for the study intersections, based on a NCDOT-standard 10-minute seeding time and a 60-minute recording time. The maximum queue lengths and Synchro 95% queues are shown, along with existing turn lane lengths. All queue reports can be found in the appendix. The Phase 1B results are shown in Table 7.11 to 6.14 below for all exclusive turn lanes. All queue reports can be found in the Queueing and Blocking Reports section of the appendix. Table 7.11 - Queue Results AM Peak Hour Queues Scenario US 421 & SB-NB U-turn south of Rosa US 421 & NB-SB U-turn south of Rosa 2024 No Build EBL WBL Max Queue (ft) 106 28 95th Percentile Queue (ft) 154 3 Storage Bay (ft) 450 150 2024 Phase 1B Build EBL WBL Max Queue (ft) 154 23 95th Percentile Queue (ft) 176 3 Storage Bay (ft) 450 150 2024 Phase 1B Build + Improvements EBL WBL Max Queue (ft) 137 95th Percentile Queue (ft) 176 Storage Bay (ft) 500 150 PM Peak Hour Queues Scenario US 421 & SB-NB U-turn south of Rosa US 421 & NB-SB U-turn south of Rosa 2024 No Build EBL WBL Max Queue (ft) 136 62 95th Percentile Queue (ft) 203 8 Storage Bay (ft) 450 150 2024 Phase 1B Build EBL WBL Max Queue (ft) 189 69 95th Percentile Queue (ft) 283 8 Storage Bay (ft) 450 150 2024 Phase 1B Build + Improvements EBL WBL Max Queue (ft) 219 95th Percentile Queue (ft) #319 Storage Bay (ft) 500 150 #: 95th percentile volume exceeds capacity, queue may be longer  6/30/2022 Ironwood – Transportation Impact Analysis 48 Table 7.12 - Queue Results AM Peak Hour Queues Scenario US 421 at Sanders Road 2024 No Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 393 440 275 50 540 575 41 309 95th Percentile Queue (ft) 382 #393 0 41 m#314 #1450 41 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2024 Phase 1B Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 362 401 275 55 527 557 178 234 95th Percentile Queue (ft) 385 #396 0 41 m#324 #1458 41 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 PM Peak Hour Queues Scenario US 421 at Sanders Road 2024 No Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 400 1051 275 49 282 241 124 375 95th Percentile Queue (ft) #420 #430 0 40 #258 672 40 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2024 Phase 1B Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 400 1054 275 54 322 282 79 375 95th Percentile Queue (ft) #428 #438 0 40 #271 693 40 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 #: 95th percentile volume exceeds capacity, queue may be longer  m: volume for 95th percentile queue is metered by upstream signal  Table 7.13 - Queue Results AM Peak Hour Queues Scenario US 421 at Beau Rivage Marketplace Driveway US 421 & Manassas Dr/ SB Manassas Crossover US 421 & Sharks Eye Lane/NB Manassas Crossover 2024 No Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 76 192 0 289 285 241 67 72 181 24 95th Percentile Queue (ft) 8 5 0 m180 231 231 20 53 129 m1 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 2024 Phase 1B Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 125 172 65 391 394 252 38 53 201 32 95th Percentile Queue (ft) 8 10 0 m191 260 260 21 55 129 m1 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 PM Peak Hour Queues Scenario US 421 at Beau Rivage Marketplace Driveway US 421 & Manassas Dr/ SB Manassas Crossover US 421 & Sharks Eye Lane/NB Manassas Crossover 2024 No Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 173 87 0 242 120 115 46 201 98 43 95th Percentile Queue (ft) 68 13 0 m202 130 130 19 164 133 m2 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 2024 Phase 1B Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 296 97 0 263 162 148 38 156 80 54 95th Percentile Queue (ft) 73 28 0 m234 143 143 23 164 133 m2 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 #: 95th percentile volume exceeds capacity, queue may be longer  m: volume for 95th percentile queue is metered by upstream signal  6/30/2022 Ironwood – Transportation Impact Analysis 49 Table 7.14 - Queue Results AM Peak Hour Queues Scenario Shiloh Dr & Manassas Dr Myrtle Grove Road & Lieutenant Congleton Rd US 421 at Site Access 1 2024 No Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR WBR NBTR Max Queue (ft) 20 10 32 44 44 70 49 0 95th Percentile Queue (ft) 0 0 0 5 3 10 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL 2024 Phase 1B Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR WBR NBTR Max Queue (ft) 38 6 55 44 67 80 48 0 169 18 95th Percentile Queue (ft) 0 0 0 5 8 13 0 0 85 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL FULL FULL 2024 Phase 1B Build + Improvements EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR WBR NBR Max Queue (ft) 173 0 95th Percentile Queue (ft) 83 0 Storage Bay (ft) FULL FULL FULL FULL FULL FULL FULL FULL 250 PM Peak Hour Queues Scenario Shiloh Dr & Manassas Dr Myrtle Grove Road & Lieutenant Congleton Rd US 421 at Site Access 1 2024 No Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR WBR NBTR Max Queue (ft) 28 0 19 44 36 78 57 0 95th Percentile Queue (ft) 0 0 0 3 3 15 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL 2024 Phase 1B Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR WBR NBTR Max Queue (ft) 42 3 15 35 49 87 61 0 89 22 95th Percentile Queue (ft) 0 0 0 3 5 15 0 0 28 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL FULL FULL 2024 Phase 1B Build + Improvements EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR WBR NBR Max Queue (ft) 75 0 95th Percentile Queue (ft) 25 0 Storage Bay (ft) FULL FULL FULL FULL FULL FULL FULL FULL 250 *** NOT TO SCALE *** 100' Beau Rivage  Marketplace Driveway N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. US   4 2 1 Sanders Road Manassas DriveSharks Eye  Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED IMPROVEMENTS BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B ROADWAY LEGEND 15 0 ' 50 0 ' 47 5 ' 22 5 ' 12 5 ' 40 0 ' 30 0 ' 300' 200' 25 0 ' 15 0 ' 50 0 ' PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC FIGURE 14 PHASE 1B RECOMMENDED IMPROVEMENTS FULL FULL FULL US   4 2 1 DIRECTIONAL CROSSOVER ~5,544'~1,000' ~8 9 0 ' ~7 1 0 ' ~2 , 1 6 0 ' 225' 25 0 ' Site Access 1 ~4 2 5 ' RIGHT IN / RIGHT OUT 25 0 ' FULL Design site access according to NCDOT and City standards Extend southbound U-turn lane from 450 feet of storage currently to 500 feet of storage and optimize signal timings 6/30/2022 Ironwood – Transportation Impact Analysis 51 8.0 2026 Phase 2 Build Conditions Phase 2 of this development will add 116 dwelling units of townhomes. This brings the developments total unit count to 125 dwelling units of single-family homes and 241 dwelling units of townhomes. 8.1 Trip Generation Similar to Phase 1A and Phase 1B, the ITE Land Use Code of 210 and 220 was agreed upon with the City of Wilmington and NCDOT during the scoping process. The choice of adjacent street peak hour trips and rates for this site was based on NCDOT Congestion Management Rate vs Equation Spreadsheet dated July 1, 2018. Table 8.1 presents the results. Table 8.1 - ITE Trip Generation Ironwood - Phase 2 Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Single Family and Townhomes 210 125 Dwelling Units Adjacent /Equation 2,177 24 70 79 47 Townhomes 220 241 Dwelling Units Adjacent /Equation 1,781 25 85 81 48 Total Unadjusted Trips 3,058 49 155 160 95 8.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. Site trip distribution models were agreed upon with the City of Wilmington and NCDOT staff. The site trip distributions are shown in Figure 15 and utilizes the same overall directional patterns as Phase 1A and Phase 1B. 8.3 2026 Future No Build Traffic The 2026 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2021 base traffic volumes, adding approved development trips, and rerouting trips due to the committed improvement. Figure 16 shows 2026 future no build traffic volumes for AM and PM peaks. 8.4 2026 Phase 2 Build Total Traffic The 2026 Phase 2 traffic volume was obtained by summing the 2026 future no build volumes and Phase 2 site trips due to the proposed development. Phase 2 site trips are shown in Figure 17. The 2026 future build volumes for Phase 2 are shown for AM and PM peaks in Figure 18. *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B ORANGE = PROPOSED IN PHASE 2 PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace  Driveway Manassas DriveSharks Eye  Lane Lieutenant  Congleton Road DIRECTIONAL CROSSOVER DESTINATION NODE% 65% 5% 20% 5% 5% I N FIGURE 15 PHASE 2 TRIP DISTRIBUTION 5% O U T 5% OUT 5% IN 30% IN 30 % O U T 30% OUT 25 % I N 20 % O U T 20 % O U T 15 % I N + 5 % O U T 20 % I N 5% O U T 15 % I N 5% IN 20 % I N 20 % I N + 20 % O U T 20 % I N Site Access 1 45% OUT 65 % I N 15 % I N 5% I N 45 % I N Site Access 2 20% OUT 20 % I N 20 % O U T 5% 5% IN 5% O U T US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   Ro a d US   4 2 1 US   4 2 1 RIGHT IN / RIGHT OUT *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT PROJECT NUMBER 210291 FIGURE 16 2026 FUTURE NO BUILD VOLUMES IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 24 6 0 / 1 8 7 7 3 / 1 1 16 8 3 / 2 4 2 9 87 / 1 2 8 0 / 4 6 / 5 0 / 0 486 / 360 0 / 0 156 / 108 15 6 0 / 2 0 9 0 26 / 8 9 36 / 113 28 / 2 6 2 / 3 42 / 3 5 18 2 4 / 1 4 6 8 65 / 7 3 10 7 / 1 5 6 14 7 8 / 1 9 9 7 13 / 4 7 0 / 0 0 / 0 8 / 1 3 284 / 161 4 / 2 16 / 1 2 0 / 0 22 / 97 39 3 / 5 3 0 22 / 2 8 9 / 5 39 1 / 4 1 5 19 / 30 31 / 14 2 / 3 0 / 0 254 / 135 5 / 12 124 / 151 7 / 18 DIRECTIONAL CROSSOVER Sanders Road 16 / 1 4 18 / 1 6 21 0 2 / 1 6 2 5 6 / 6 19 6 2 / 1 5 1 5 10 2 / 8 4 34 / 2 2 2 / 6 3 / 4 13 9 7 / 2 0 4 6 27 7 / 3 8 1 10 / 1 0 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d *** NOT TO SCALE *** N This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK PROJECT NUMBER 210291 FIGURE 17 PHASE 2 SITE TRIPS IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC US   4 2 1 Site Access 1 Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road 70 / 43 32 / 1 0 4 31 / 1 9 31 / 19 41 / 5 1 0 / 0 10 / 3 2 22 / 7 2 0 / 0 0 / 0 0 / 0 0 / 0 7 / 2 4 2 / 8 0 / 0 0 / 0 8 / 5 10 / 3 2 0 / 0 2 / 8 0 / 0 0 / 0 2 / 8 7 / 2 4 0 / 0 12 / 4 0 31 / 1 9 0 / 0 8 / 5 0 / 0 47 / 2 9 47 / 29 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 2 / 8 0 / 0 0 / 0 8 / 5 0 / 0 0 / 0 2 / 8 0 / 0 15 / 48 0 / 0 0 / 0 DIRECTIONAL CROSSOVER 31 / 1 9 8 / 5 15 / 2 9 Site Access 2 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B ORANGE = PROPOSED IN PHASE 2 0 / 0 10 / 3 2 0 / 0 0 / 0 Sanders Road 0 / 0 10 / 3 2 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 RIGHT IN / RIGHT OUT *** NOT TO SCALE *** N This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK PROJECT NUMBER 210291 FIGURE 18 2026 PHASE 2 BUILD VOLUMES IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC US   4 2 1 Site Access 1 Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road 70 / 43 32 / 1 0 4 25 7 8 / 2 0 2 4 31 / 19 25 0 1 / 1 9 2 8 3 / 1 1 16 9 3 / 2 4 6 1 10 9 / 2 0 0 0 / 4 6 / 5 0 / 0 6 / 6 19 6 9 / 1 5 3 9 488 / 368 0 / 0 156 / 108 11 0 / 8 9 15 7 0 / 2 1 2 2 26 / 8 9 38 / 121 28 / 2 6 2 / 3 44 / 4 3 18 3 1 / 1 4 9 2 65 / 7 3 11 9 / 1 9 6 15 0 9 / 2 0 1 6 13 / 4 7 8 / 5 0 / 0 55 / 4 2 331 / 190 4 / 2 16 / 1 2 0 / 0 22 / 97 39 3 / 5 3 0 24 / 3 6 9 / 5 39 1 / 4 1 5 27 / 35 31 / 14 2 / 3 2 / 8 254 / 135 20 / 60 124 / 151 7 / 18 DIRECTIONAL CROSSOVER 47 / 3 3 26 / 2 1 21 1 7 / 1 6 5 4 Site Access 2 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B ORANGE = PROPOSED IN PHASE 2 3 / 4 14 0 7 / 2 0 7 8 27 7 / 3 8 1 10 / 1 0 Sanders Road 2 / 6 24 7 4 / 1 9 2 2 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 RIGHT IN / RIGHT OUT 6/30/2022 Ironwood – Transportation Impact Analysis 56 8.5 Phase 2 Discussion of Results The following section discusses 2026 Phase 2 level of service for each intersection. Recommended improvements for Phase 2 are illustrated in Figure 19. US 421 at SB-NB U-turn south of Rosa Parks Lane In 2026 future no build conditions, the intersection is expected to operate at LOS B during both the AM and PM peaks. In Phase 2 build conditions with Phase 1B recommendations, the intersection is expected to operate at LOS B in the AM peak and LOS C in the PM peak. The delay increase is expected to be 5 seconds or less, and the queues are expected to be contained within the available storage. Therefore, no additional improvements are recommended in Phase 2. Table 8.2 - US 421 & SB-NB U turn south of Rosa Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound AM Peak Hour 2026 Future No- Build B (16.1) L T R L T R F (85.4) B (13.7) F (85.4) B (13.7) 2026 Phase 2 Build B (19.6) L T R L T R F (85.2) B (16.7) F (85.2) B (16.7) PM Peak Hour 2026 Future No- Build B (16.9) L T R L T R F (82.9) B (12.4) F (82.9) B (12.4) 2026 Phase 2 Build C (21.9) L T R L T R F (100.1) B (13.8) F (100.1) B (13.8) 6/30/2022 Ironwood – Transportation Impact Analysis 57 US 421 at NB-SB U-turn south of Rosa Parks Lane In 2026 future no build conditions, the intersection is expected to operate at LOS C in the AM peak and LOS D in the PM peak. In Phase 2 build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 8.3 - US 421 & NB-SB U turn south of Rosa Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Westbound Southbound AM Peak Hour 2026 Future No- Build C (18.9) WB Approach L T R L T R C (18.9) #N/A #N/A #N/A A (0.0) #N/A C (18.9) A (0.0) 2026 Phase 2 Build C (19.0) WB Approach L T R L T R C (19.0) #N/A #N/A #N/A A (0.0) #N/A C (19.0) A (0.0) PM Peak Hour 2026 Future No- Build D (32.7) WB Approach L T R L T R D (32.7) #N/A #N/A #N/A A (0.0) #N/A D (32.7) A (0.0) 2026 Phase 2 Build D (33.6) WB Approach L T R L T R D (33.6) #N/A #N/A #N/A A (0.0) #N/A D (33.6) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 58 US 421 at Sanders Road / Storage Driveway In 2026 future no build conditions, this intersection is expected to operate at LOS D during the AM peak and LOS C in the PM peak. In Phase 2 build conditions, the intersection is expected to operate at LOS D during both the AM and PM peaks with slight increase in delay. No improvements are recommended. Table 8.4 - US 421 & Sanders Rd/North State Storage Driveway Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2026 Future No-Build D (36.9) L T R L T R L T R L T R F (83.5) F (84.7) A (0.1) E (76.0) E (76.0) E (76.0) F (195.6) C (29.6) C (29.6) E (76.9) C (25.7) A (0.3) E (63.8) E (76.0) D (40.3) C (21.9) 2026 Phase 2 Build D (38.1) L T R L T R L T R L T R F (83.6) F (84.7) A (0.1) E (76.0) E (76.0) E (76.0) F (219.1) C (29.8) C (29.8) E (76.9) C (25.9) A (0.3) E (63.9) E (76.0) D (42.7) C (22.2) PM Peak Hour 2026 Future No-Build C (34.6) L T R L T R L T R L T R F (193.1) F (198.4) A (0.1) E (75.8) E (75.8) E (75.8) F (158.7) A (9.1) A (9.1) E (74.6) C (26.2) A (0.4) F (151) E (75.8) B (18.8) C (22.4) 2026 Phase 2 Build D (36.2) L T R L T R L T R L T R F (201.0) F (208.5) A (0.1) E (75.8) E (75.8) E (75.8) F (167.4) A (8.6) A (8.6) E (74.6) C (27.6) A (0.4) F (158.7) E (75.8) B (19.2) C (23.6) 6/30/2022 Ironwood – Transportation Impact Analysis 59 US 421 at Beau Rivage Marketplace Driveway In 2026 future no build conditions, the intersection is expected to operate at LOS B in the AM peak and LOS E in the PM peak. In Phase 2 build conditions, the LOS is expected to remain unchanged with slight increase in delay. Based on the NCDOT nomograph for intersection signalization with two or three approaches, a traffic signal is warranted in existing conditions whether the development is built or not. Due to the proximity of the nearby signal, the installation of a signal is not recommended. The committed northbound leftover/U-turn lane storage is expected to be adequate to contain the future queues. Also, exiting traffic can reroute and use alternative accesses to reduce exit delays. No improvements are recommended. Table 8.5 - US 421 & Beau Rivage Driveway Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2026 Future No-Build B (14.0) EB Approach L T R L T R L T R #N/A #N/A B (14.0) B (11.5) A (0.0) #N/A #N/A A (0.0) A (0.0) B (14.0) A (0.2) A (0.0) 2026 Phase 2 Build B (14.1) EB Approach L T R L T R L T R #N/A #N/A B (14.1) B (12.4) A (0.0) #N/A #N/A A (0.0) A (0.0) B (14.1) A (0.4) A (0.0) PM Peak Hour 2026 Future No-Build E (40.4) EB Approach L T R L T R L T R #N/A #N/A E (40.4) D (27.2) A (0.0) #N/A #N/A A (0.0) A (0.0) E (40.4) A (0.5) A (0.0) 2026 Phase 2 Build E (43.4) EB Approach L T R L T R L T R #N/A #N/A E (43.4) E (39.5) A (0.0) #N/A #N/A A (0.0) A (0.0) E (43.4) A (1.2) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 60 US 421 at Manassas Drive In 2026 future no build conditions, the intersection is expected to operate at LOS C in the AM peak and LOS B in the PM peak. In Phase 2 build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 8.6 - US 421 & SB Manassas Crossover/Manassas Dr Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound AM Peak Hour 2026 Future No-Build C (20.9) L T R L T R L T R D (48.4) F (80.3) A (10.0) A (4.0) D (48.4) F (80.3) A (9.9) 2026 Phase 2 Build C (23.4) L T R L T R L T R D (47.2) F (83.7) B (11.0) A (4.2) D (47.2) F (83.7) B (10.9) PM Peak Hour 2026 Future No-Build B (17.3) L T R L T R L T R E (56.8) E (64.2) A (7.6) A (4.3) E (56.8) E (64.2) A (7.6) 2026 Phase 2 Build B (19.7) L T R L T R L T R E (56.1) E (60.9) A (9.5) A (5.2) E (56.1) E (60.9) A (9.4) 6/30/2022 Ironwood – Transportation Impact Analysis 61 US 421 at Sharks Eye Lane In 2026 future no build conditions, the intersection is expected to operate at LOS A during both the AM and PM peak hours. In Phase 2 build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 8.7 - US 421 & Sharks Eye Lane/NB Manassas Crossover Scenario Overall LOS Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Southbound AM Peak Hour 2026 Future No-Build A (5.4) L T R L T R L T R E (71.0) F (86.6) F (86.6) A (0.7) A (0.2) E (71.0) F (86.6) A (0.7) 2026 Phase 2 Build A (5.3) L T R L T R L T R E (71.0) F (86.6) F (86.6) A (0.7) A (0.2) E (71.0) F (86.6) A (0.7) PM Peak Hour 2026 Future No-Build A (8.2) L T R L T R L T R F (87.2) E (72.1) E (72.1) A (2.1) A (0.5) F (87.2) E (72.1) A (2.1) 2026 Phase 2 Build A (8.3) L T R L T R L T R F (87.2) E (72.1) E (72.1) A (2.3) A (0.5) F (87.2) E (72.1) A (2.2) 6/30/2022 Ironwood – Transportation Impact Analysis 62 Manassas Drive at Shiloh Drive In 2026 future no build conditions, the intersection is expected to operate at LOS B during both the AM and PM peak hours. In Phase 2 build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 8.8 - Shiloh Dr & Manassas Dr Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2026 Future No-Build B (12.0) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.5) A (0.0) A (0.0) B (12.0) B (12.0) B (12.0) B (11.2) B (11.2) B (11.2) A (0.0) A (0.1) B (12.0) B (11.2) 2026 Phase 2 Build B (13.0) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.5) A (0.0) A (0.0) B (13.0) B (13.0) B (13.0) B (10.9) B (10.9) B (10.9) A (0.0) A (0.1) B (13.0) B (10.9) PM Peak Hour 2026 Future No-Build B (11.2) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (11.2) B (11.2) B (11.2) B (10.1) B (10.1) B (10.1) A (0.0) A (0.2) B (11.2) B (10.1) 2026 Phase 2 Build B (12.5) NB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (12.5) B (12.5) B (12.5) B (10.0) B (10.0) B (10.0) A (0.0) A (0.2) B (12.5) B (10.0) 6/30/2022 Ironwood – Transportation Impact Analysis 63 Myrtle Grove Road at Lieutenant Conglenton Road In 2026 future no build conditions, the intersection is expected to operate at LOS B during the AM peak and LOS C in the PM peak. In Phase 2 build conditions, the LOS is expected to remain unchanged with slight increase in delay. No improvements are recommended. Table 8.9 - Myrtle Grove Road & Lieutenant Congleton Rd Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2026 Future No-Build B (14.3) EB Approach L T R L T R L T R B (14.3) #N/A B (14.3) A (8.3) A (0.0) #N/A #N/A A (0.0) A (0.0) B (14.3) A (0.2) A (0.0) 2026 Phase 2 Build C (15.3) EB Approach L T R L T R L T R C (15.3) #N/A C (15.3) A (8.3) A (0.0) #N/A #N/A A (0.0) A (0.0) C (15.3) A (0.2) A (0.0) PM Peak Hour 2026 Future No-Build C (20.1) EB Approach L T R L T R L T R C (20.1) #N/A C (20.1) A (8.8) A (0.0) #N/A #N/A A (0.0) A (0.0) C (20.1) A (0.1) A (0.0) 2026 Phase 2 Build C (20.9) EB Approach L T R L T R L T R C (20.9) #N/A C (20.9) A (8.8) A (0.0) #N/A #N/A A (0.0) A (0.0) C (20.9) A (0.1) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 64 US 421 at Proposed Site Access 1 (RIRO) In Phase 2 build conditions, this intersection is expected to operate at LOS F during the AM peak and LOS D in the PM peak. The northbound right turn lane recommended in Phase 1B is expected to be adequate to contain Phase 2 queues. LOS F is typical for a minor street entering a major roadway such as US 421. Also, the traffic simulation indicates that delays are short-lived. Table 8.10 - US 421 & Site Access 1 Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Westbound Northbound AM Peak Hour 2026 Phase 2 Build F (73.6) WB Approach L T R L T R #N/A #N/A F (73.6) #N/A A (0.0) A (0.0) F (73.6) A (0) PM Peak Hour 2026 Phase 2 Build D (28.7) WB Approach L T R L T R #N/A #N/A D (28.7) #N/A A (0.0) A (0.0) D (28.7) A (0) 6/30/2022 Ironwood – Transportation Impact Analysis 65 US 421 at Proposed Site Access 2 (egress only) This proposed stopped-controlled site access has a right-out only configuration. In Phase 2 build conditions, this intersection is expected to operate at LOS E during the AM peak and LOS C in the PM peak. LOS E is typical for a minor street entering a major roadway such as US 421. Also, the traffic simulation indicates that delays are short-lived. Table 8.11 - US 421 & Site Access 2 Scenario LOS of Worst Approach Level of Service per Movement by Approach (Delay in sec/veh) Westbound Northbound AM Peak Hour 2026 Phase 2 Build E (40.6) WB Approach L T R L T R #N/A #N/A E (40.6) #N/A A (0.0) #N/A E (40.6) A (0.0) PM Peak Hour 2026 Phase 2 Build C (23.3) WB Approach L T R L T R #N/A #N/A C (23.3) #N/A A (0.0) #N/A C (23.3) A (0.0) 6/30/2022 Ironwood – Transportation Impact Analysis 66 8.6 Phase 2 Queue Results Queuing analysis was conducted using SimTraffic simulation for the study intersections, based on a NCDOT-standard 10-minute seeding time and a 60-minute recording time. The maximum queue lengths and Synchro 95% queues are shown, along with existing turn lane lengths. All queue reports can be found in the appendix. The Phase 2 results are shown in Table 8.12 to 8.16 below for all exclusive turn lanes. All queue reports can be found in the Queueing and Blocking Reports section of the appendix. Table 8.12 - Queue Results AM Peak Hour Queues Scenario US 421 & SB-NB U-turn south of Rosa US 421 & NB-SB U-turn south of Rosa 2026 No Build EBL WBL Max Queue (ft) 120 24 95th Percentile Queue (ft) 158 3 Storage Bay (ft) 450 150 2026 Phase 2 Build EBL WBL Max Queue (ft) 132 24 95th Percentile Queue (ft) 186 3 Storage Bay (ft) 450 150 PM Peak Hour Queues Scenario US 421 & SB-NB U-turn south of Rosa US 421 & NB-SB U-turn south of Rosa 2026 No Build EBL WBL Max Queue (ft) 121 65 95th Percentile Queue (ft) 206 8 Storage Bay (ft) 450 150 2026 Phase 2 Build EBL WBL Max Queue (ft) 250 70 95th Percentile Queue (ft) #368 8 Storage Bay (ft) 450 150 #: 95th percentile volume exceeds capacity, queue may be longer  6/30/2022 Ironwood – Transportation Impact Analysis 67 Table 8.13 - Queue Results AM Peak Hour Queues Scenario US 421 at Sanders Road 2026 No Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 370 416 275 54 522 607 130 375 95th Percentile Queue (ft) #397 #414 0 41 m#313 #1496 41 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2026 Phase 2 Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 374 468 275 66 569 620 226 312 95th Percentile Queue (ft) #407 #414 0 41 m#323 #1506 41 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 PM Peak Hour Queues Scenario US 421 at Sanders Road 2026 No Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 400 1045 275 54 300 241 227 375 95th Percentile Queue (ft) #430 #438 0 40 #265 695 40 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 2026 Phase 2 Build EBL EBLT EBR WBLTR NBUL NBTR SBUL SBR Max Queue (ft) 400 1047 275 67 236 160 178 336 95th Percentile Queue (ft) #440 #453 0 40 #280 636 40 0 Storage Bay (ft) 300 FULL 200 FULL 500 FULL 150 250 #: 95th percentile volume exceeds capacity, queue may be longer  m: volume for 95th percentile queue is metered by upstream signal  Table 8.14 - Queue Results AM Peak Hour Queues Scenario US 421 at Beau Rivage Marketplace Driveway US 421 & Manassas Dr/ SB Manassas Crossover US 421 & Sharks Eye Lane/NB Manassas Crossover 2026 No Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 86 183 10 320 288 244 56 59 114 34 95th Percentile Queue (ft) 8 5 0 m180 235 235 20 55 132 m1 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 2026 Phase 2 Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 90 204 75 353 264 222 41 62 91 30 95th Percentile Queue (ft) 8 13 0 m197 #277 #277 21 55 132 m1 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 PM Peak Hour Queues Scenario US 421 at Beau Rivage Marketplace Driveway US 421 & Manassas Dr/ SB Manassas Crossover US 421 & Sharks Eye Lane/NB Manassas Crossover 2026 No Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 230 86 4 238 126 122 46 161 112 52 95th Percentile Queue (ft) 78 15 0 m201 131 131 19 167 135 m2 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 2026 Phase 2 Build EBR NBUL SBR EBLT WBR WBR NBR EBR WBLT SBR Max Queue (ft) 280 107 8 244 125 125 53 162 98 48 95th Percentile Queue (ft) 88 40 0 m252 147 147 25 167 135 m2 Storage Bay (ft) FULL 250 300 475 FULL 225 125 FULL 400 225 #: 95th percentile volume exceeds capacity, queue may be longer  m: volume for 95th percentile queue is metered by upstream signal  6/30/2022 Ironwood – Transportation Impact Analysis 68 Table 8.15 - Queue Results AM Peak Hour Queues Scenario Shiloh Dr & Manassas Dr Myrtle Grove Road & Lieutenant Congleton Rd 2026 No Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 12 34 42 40 40 60 40 0 95th Percentile Queue (ft) 0 0 0 5 3 10 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL 2026 Phase 2 Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 29 26 43 48 64 85 49 4 95th Percentile Queue (ft) 0 0 0 5 10 13 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL PM Peak Hour Queues Scenario Shiloh Dr & Manassas Dr Myrtle Grove Road & Lieutenant Congleton Rd 2026 No Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 27 0 10 35 44 75 48 0 95th Percentile Queue (ft) 0 0 0 3 3 15 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL 2026 Phase 2 Build EBUL EBTR WBLTR NBLTR SBLTR EBLR NBLT SBTR Max Queue (ft) 34 0 10 35 54 98 32 4 95th Percentile Queue (ft) 0 0 0 3 5 18 0 0 Storage Bay (ft) 100 FULL FULL FULL FULL FULL FULL FULL Table 8.16 - Queue Results AM Peak Hour Queues Scenario US 421 at Site Access 1 US 421 at Site Access 2 2026 Phase 2 Build WBR NBTR WBR Max Queue (ft) 174 0 86 95th Percentile Queue (ft) 80 0 25 Storage Bay (ft) FULL FULL FULL PM Peak Hour Queues Scenario US 421 at Site Access 1 US 421 at Site Access 2 2026 Phase 2 Build WBR NBTR WBR Max Queue (ft) 71 0 51 95th Percentile Queue (ft) 23 0 8 Storage Bay (ft) FULL FULL FULL *** NOT TO SCALE *** 100' Beau Rivage  Marketplace Driveway N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. US   4 2 1 Sanders Road Manassas DriveSharks Eye  Lane Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Lieutenant  Congleton Road 15 0 ' 50 0 ' 47 5 ' 22 5 ' 12 5 ' 40 0 ' 30 0 ' 300' 200' 25 0 ' 15 0 ' 50 0 ' PROJECT NUMBER 210291 IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC FIGURE 19 PHASE 2 RECOMMENDED IMPROVEMENTS FULL FULL US   4 2 1 SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND Site Access 1 Site Access 2 BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT BLUE = PROPOSED IN PHASE 1A PURPLE = PROPOSED IN PHASE 1B ORANGE = PROPOSED IN PHASE 2 RIGHT IN / RIGHT OUT DIRECTIONAL CROSSOVER 25 0 ' ~5,544'~1,000' ~8 9 0 ' ~7 1 0 ' ~1 , 7 7 0 ' ~4 2 5 ' Design site access according to NCDOT and City standards Extend southbound U-turn lane from 450 feet of storage currently to 500 feet of storage and optimize signal timings Design site access according to NCDOT and City standards 25 0 ' FULL FULL ~3 9 0 ' FULL 225' 6/30/2022 Ironwood – Transportation Impact Analysis 70 9.0 Summary and Conclusion The proposed Ironwood development is to be located north of Shiloh Drive and east of Rosa Parks Lane in New Hanover County, NC. The development proposes to utilize the existing Shiloh Drive and two (2) proposed site access points off US 421. Ironwood development will be analyzed for three (3) phases:  Phase 1A will consist of 125 dwelling units of single-family homes. Phase 1A will utilize the existing Shiloh Drive as the site access. The build year for Phase 1A is assumed to be 2023.  Phase 1B includes the addition of approximately 125 dwelling units of townhomes. In addition to the existing Shiloh Drive, Phase 1B proposes a new right-in right-out access connection on US 421 north of Rosa Parks Lane. The build year for Phase 1B is assumed to be 2024.  Phase 2 includes the addition of approximately 116 dwelling units of townhomes. Phase 2 proposes an egress only access connection on US 421 north of Sanders Road, south of the Tregembo Animal Park. The build year for Phase 2 is assumed to be 2026. Based on rates and equations in the ITE Trip Generation Manual, the site has a trip generation potential of 204 trips in the AM peak, 255 trips in the PM peak and a total of 3,058 daily trips. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The need for roadway improvements was reviewed based on the capacity analysis and turn lane warrant analysis. In Phase 1A condition, no improvements are recommended based upon the results. In Phase 1B, based on the capacity analysis, NCDOT turn lane criteria and projected volumes, a right turn lane on US 421 is warranted at Site Access 1. At the intersection of US 421 and SB-NB U-turn south of Rosa Parks Lane, it is recommended to extend the southbound U-turn lane from 450 feet to 500 feet of storage. It is also recommended to optimize the signal timings at this intersection. Based on the NCDOT nomograph for intersection signalization with two or three approaches, a traffic signal is warranted at US 421 and Beau Rivage Driveway during existing conditions whether the development is built or not. Due to the proximity of the nearby signal, the installation of a signal is not recommended. The committed northbound leftover/U-turn lane storage is expected to be adequate to contain the future queues. Also, exiting traffic can reroute and use alternative accesses to reduce exit delays. 6/30/2022 Ironwood – Transportation Impact Analysis 71 Based on the Phase 2 analysis, the recommendations from Phase 1B are expected to remain adequate. Please note that all site access points should be designed according to NCDOT and City of Wilmington standards. The recommended improvements are illustrated in Figure 19 and are summarized in Table 11.1. In conclusion, this analysis has been conducted based on the City of Wilmington and NCDOT guidelines and has identified roadway improvements to mitigate this development’s impacts. Table 11.1 – Recommended Improvement Summary Intersection 2023 Phase 1A Build 2024 Phase 1B Build 2026 Phase 2 Build US 421 at U-turn south of Rosa Parks Lane  No improvements recommended  Extend southbound U-turn lane on US 421 to provide 500 feet of storage and appropriate taper  Optimize signal timings accordingly  No improvements recommended US 421 at Sanders Road  No improvements recommended  No improvements recommended  No improvements recommended US 421 at Beau Rivage Driveway  No improvements recommended  No improvements recommended  No improvements recommended US 421 at Manassas Drive / Sharks Eye Lane  No improvements recommended  No improvements recommended  No improvements recommended Manassas Drive at Shiloh Drive  No improvements recommended  No improvements recommended  No improvements recommended Myrtle Grove Road at Lieutenant Congleton Road  No improvements recommended  No improvements recommended  No improvements recommended US 421 at Site Access 1  Provide northbound right turn lane on US 421 with 250 feet of storage and appropriate taper  Design site access according with NCDOT standards and with one (1) ingress and one (1) egress lanes  No improvements recommended US 421 at Site Access 2  Design site access according with NCDOT standards and with one (1) egress lane 6/30/2022 Ironwood – Transportation Impact Analysis 72 Appendix Ironwood – Transportation Impact Analysis Level of Service Analysis Ironwood – Transportation Impact Analysis AM 2021 Existing Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 82 0 0 2326 0 0 Future Volume (vph) 82 0 0 2326 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 1479 Travel Time (s) 1.8 1.4 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 91 0 0 2584 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 91 0 0 2584 0 0 Turn Type D.P+P NA Protected Phases 1 2! Permitted Phases 2! Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 156.0 140.2 Actuated g/C Ratio 1.00 0.90 v/c Ratio 0.05 0.81 Control Delay 0.1 6.4 Queue Delay 0.0 0.0 Total Delay 0.1 6.4 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS A A Approach Delay 0.1 6.4 Approach LOS A A Queue Length 50th (ft) 0 291 Queue Length 95th (ft) 0 96 Internal Link Dist (ft) 1 36 1399 Turn Bay Length (ft) Base Capacity (vph) 1770 3180 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.05 0.81 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBEB, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 6.2 Intersection LOS: A Intersection Capacity Utilization 115.9% ICU Level of Service H Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)400001595 Future Volume (vph)400001595 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 93 1109 102 Travel Time (s) 2.1 13.7 1.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)400001772 Shared Lane Traffic (%) Lane Group Flow (vph)400001772 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 67.6% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 4 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 00001595 Future Vol, veh/h 4 00001595 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 4 00001772 Major/Minor Minor1 Major2 Conflicting Flow All 886 - - - Stage 1 0 - - - Stage 2 886 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 284 0 0 - Stage 1 - 0 0 - Stage 2 363 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 284 - - - Mov Cap-2 Maneuver 284 - - - Stage 1 - - - - Stage 2 363 - - - Approach WB SB HCM Control Delay, s 17.9 0 HCM LOS C Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 284 - HCM Lane V/C Ratio 0.016 - HCM Control Delay (s) 17.9 - HCM Lane LOS C - HCM 95th %tile Q(veh) 0 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 462 4 147 4 4 5 54 102 1852 5 9 4 Future Volume (vph) 462 4 147 4 4 5 54 102 1852 5 9 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.942 Flt Protected 0.950 0.953 0.986 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1730 0 0 1770 3539 0 0 1770 Flt Permitted 0.950 0.953 0.986 0.090 0.044 Satd. Flow (perm) 1681 1686 1583 0 1730 0 0 168 3539 0 0 82 Right Turn on Red Yes No No Satd. Flow (RTOR) 163 Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1091 679 Travel Time (s) 16.4 29.8 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 513 4 163 4 4 6 60 113 2058 6 10 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 256 261 163 0 14 0 0 173 2064 0 0 14 Turn Type Split NA Perm Split NA pm+pt pm+pt NA pm+pt pm+pt Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases 4 2 2 6 6 Detector Phase 44433 552 11 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 38.0 38.0 38.0 15.0 15.0 16.0 16.0 87.0 16.0 16.0 Total Split (%) 24.4% 24.4% 24.4% 9.6% 9.6% 10.3% 10.3% 55.8% 10.3% 10.3% Maximum Green (s) 31.1 31.1 31.1 8.6 8.6 9.9 9.9 80.7 10.1 10.1 Yellow Time (s) 5.0 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None None C-Max None None Act Effct Green (s) 28.9 28.9 28.9 7.3 111.6 107.2 102.0 Actuated g/C Ratio 0.19 0.19 0.19 0.05 0.72 0.69 0.65 v/c Ratio 0.82 0.84 0.38 0.17 0.75 0.85 0.12 Control Delay 82.1 83.6 9.5 75.8 33.0 22.5 11.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 82.1 83.6 9.5 75.8 33.0 22.5 11.6 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1323 263 Future Volume (vph) 1323 263 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1063 Travel Time (s) 13.2 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 1470 292 Shared Lane Traffic (%) Lane Group Flow (vph) 1470 292 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 87.0 Total Split (%) 55.8% Maximum Green (s) 80.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 95.9 156.0 Actuated g/C Ratio 0.61 1.00 v/c Ratio 0.68 0.18 Control Delay 23.7 0.3 Queue Delay 0.0 0.0 Total Delay 23.7 0.3 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E C C B Approach Delay 65.3 75.8 23.3 Approach LOS E E C Queue Length 50th (ft) 264 270 0 14 39 755 3 Queue Length 95th (ft) 370 377 64 40 m#162 m#1302 15 Internal Link Dist (ft) 1003 1011 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 355 356 463 110 233 2431 175 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.72 0.73 0.35 0.13 0.74 0.85 0.08 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 116 (74%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 28.2 Intersection LOS: C Intersection Capacity Utilization 87.6% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 19.8 Approach LOS B Queue Length 50th (ft) 463 0 Queue Length 95th (ft) 713 0 Internal Link Dist (ft) 983 Turn Bay Length (ft) 250 Base Capacity (vph) 2175 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.68 0.18 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 9 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 34 0 2013 1491 33 Future Volume (vph) 0 34 0 2013 1491 33 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 300 Storage Lanes 0 1 0 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected Satd. Flow (prot) 0 1611 0 3539 3539 1583 Flt Permitted Satd. Flow (perm) 0 1611 0 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1069 425 679 Travel Time (s) 24.3 5.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 38 0 2237 1657 37 Shared Lane Traffic (%) Lane Group Flow (vph) 0 38 0 2237 1657 37 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 59.0% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 10 Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 34 0 2013 1491 33 Future Vol, veh/h 0 34 0 2013 1491 33 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 300 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 38 0 2237 1657 37 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 829 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 *477 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % 1 - - - Mov Cap-1 Maneuver - *477 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 13.2 0 0 HCM LOS B Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 477 - - HCM Lane V/C Ratio - 0.079 - - HCM Control Delay (s) - 13.2 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 26 96 0 0 0 252 0 1735 38 0 0 0 Future Volume (vph) 26 96 0 0 0 252 0 1735 38 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.865 0.850 Flt Protected 0.989 Satd. Flow (prot) 0 1842 0 0 0 1611 0 3539 1583 0 0 0 Flt Permitted 0.989 Satd. Flow (perm) 0 1842 0 0 0 1611 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 477 Travel Time (s) 2.6 19.3 1.5 5.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 29 107 0 0 0 280 0 1928 42 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 136 0 0 0 280 0 1928 42 0 0 0 Turn Type custom NA Perm NA Perm Protected Phases 7 7 2! Permitted Phases 2! 2! 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 31.0 31.0 31.0 125.0 125.0 Total Split (%) 19.9% 19.9% 19.9% 80.1% 80.1% Maximum Green (s) 25.2 25.2 25.2 118.7 118.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.8 2.8 2.8 1.0 1.0 Lost Time Adjust (s) -0.8 -0.8 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 156.0 26.0 120.0 120.0 Actuated g/C Ratio 1.00 0.17 0.77 0.77 v/c Ratio 0.07 1.04 0.71 0.03 Control Delay 0.1 128.1 10.9 4.4 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 0.1 128.1 10.9 4.4 LOS A F B A Approach Delay 0.1 128.1 10.8 Approach LOS A F B Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 0 ~308 464 9 Queue Length 95th (ft) m0 #502 534 19 Internal Link Dist (ft) 1 911 42 397 Turn Bay Length (ft) Base Capacity (vph) 1842 268 2722 1217 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.07 1.04 0.71 0.03 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 60 (38%), Referenced to phase 2:NBEB, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.04 Intersection Signal Delay: 23.9 Intersection LOS: C Intersection Capacity Utilization 82.6% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 20 4 61 000001391 12 Future Volume (vph) 0 0 20 4 61 000001391 12 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.997 Satd. Flow (prot) 0 0 1611 0 1857 000003539 1583 Flt Permitted 0.997 Satd. Flow (perm) 0 0 1611 0 1857 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 22 4 68 000001546 13 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 22 0 72 000001546 13 Turn Type Perm custom NA NA Perm Protected Phases 3 3 6! Permitted Phases 3 6! 6! 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 25.0 25.0 25.0 131.0 131.0 Total Split (%) 16.0% 16.0% 16.0% 84.0% 84.0% Maximum Green (s) 19.7 19.7 19.7 124.9 124.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 7.1 156.0 138.9 138.9 Actuated g/C Ratio 0.05 1.00 0.89 0.89 v/c Ratio 0.30 0.04 0.49 0.01 Control Delay 81.9 0.0 0.5 0.1 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 81.9 0.0 0.5 0.1 LOS F A A A Approach Delay 81.9 0.5 Approach LOS F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 22 0 7 0 Queue Length 95th (ft) 53 0 7 m0 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 206 1857 3150 1409 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.11 0.04 0.49 0.01 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 94 (60%), Referenced to phase 6:WBSB, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 1.6 Intersection LOS: A Intersection Capacity Utilization 59.3% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 4 4 113 6 4 230 4 15 4444 Future Volume (vph) 4 4 113 6 4 230 4 15 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.993 0.998 0.978 0.955 Flt Protected 0.997 0.999 0.967 0.984 Satd. Flow (prot) 0 0 1844 0 0 1857 0 0 1762 0 0 1750 Flt Permitted 0.997 0.999 0.967 0.984 Satd. Flow (perm) 0 0 1844 0 0 1857 0 0 1762 0 0 1750 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 4 126 7 4 256 4 17 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 141 0 0 264 0 0 25 0 0 12 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 23.5% ICU Level of Service A Analysis Period (min) 15 Lane Group SBR Lane Configurations Traffic Volume (vph) 4 Future Volume (vph) 4 Ideal Flow (vphpl) 1900 Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 4 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 16 Intersection Int Delay, s/veh 1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 4 113 6 4 230 4 15 4 4 4 4 4 Future Vol, veh/h 4 4 113 6 4 230 4 15 4 4 4 4 4 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length ------------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 4 4 126 7 4 256 4 17 4 4 4 4 4 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 260 0 0 133 0 0 408 414 130 408 415 258 Stage 1 -------138146-266266- Stage 2 -------270268-142149- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1304 - - 1452 - - 554 529 920 554 528 781 Stage 1 -------865776-739689- Stage 2 -------736687-861774- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ ~ - - 1452 - - 546 527 920 547 526 781 Mov Cap-2 Maneuver -------546527-547526- Stage 1 -------865776-739687- Stage 2 -------725685-852774- Approach EB WB NB SB HCM Control Delay, s 0.1 11.4 11.1 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 584 ~ - - 1452 - - 599 HCM Lane V/C Ratio 0.044 ~ - - 0.003 - - 0.022 HCM Control Delay (s) 11.4 - - - 7.5 0 - 11.1 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.1 ~ - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 17 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 18 29 8 372 373 20 Future Volume (vph) 18 29 8 372 373 20 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.917 0.993 Flt Protected 0.981 0.999 Satd. Flow (prot) 1676 0 0 1861 1850 0 Flt Permitted 0.981 0.999 Satd. Flow (perm) 1676 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 20 32 9 413 414 22 Shared Lane Traffic (%) Lane Group Flow (vph) 52 0 0 422 436 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.0% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/06/2022 210291 Ironwood AM 2021 Existing T. Lee Page 18 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 18 29 8 372 373 20 Future Vol, veh/h 18 29 8 372 373 20 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 20 32 9 413 414 22 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 856 425 436 0 - 0 Stage 1 425 ----- Stage 2 431 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 328 629 1124 - - - Stage 1 659 ----- Stage 2 655 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 325 629 1124 - - - Mov Cap-2 Maneuver 325 ----- Stage 1 652 ----- Stage 2 655 ----- Approach EB NB SB HCM Control Delay, s 13.8 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1124 - 463 - - HCM Lane V/C Ratio 0.008 - 0.113 - - HCM Control Delay (s) 8.2 0 13.8 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0 - 0.4 - - Ironwood – Transportation Impact Analysis AM 2023 Future No Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 84 0 0 2388 0 0 Future Volume (vph) 84 0 0 2388 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 1479 Travel Time (s) 1.8 1.4 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 93 0 0 2653 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 93 0 0 2653 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 13.4 132.6 Actuated g/C Ratio 0.09 0.85 v/c Ratio 0.61 0.88 Control Delay 85.1 12.3 Queue Delay 0.0 0.0 Total Delay 85.1 12.3 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 85.1 12.3 Approach LOS F B Queue Length 50th (ft) 93 1237 Queue Length 95th (ft) 152 452 Internal Link Dist (ft) 1 36 1399 Turn Bay Length (ft) Base Capacity (vph) 317 3008 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.29 0.88 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 14.8 Intersection LOS: B Intersection Capacity Utilization 118.7% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)400001634 Future Volume (vph)400001634 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 93 1109 102 Travel Time (s) 2.1 13.7 1.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)400001816 Shared Lane Traffic (%) Lane Group Flow (vph)400001816 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 69.3% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 4 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 00001634 Future Vol, veh/h 4 00001634 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 4 00001816 Major/Minor Minor1 Major2 Conflicting Flow All 908 - - - Stage 1 0 - - - Stage 2 908 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 275 0 0 - Stage 1 - 0 0 - Stage 2 354 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 275 - - - Mov Cap-2 Maneuver 275 - - - Stage 1 - - - - Stage 2 354 - - - Approach WB SB HCM Control Delay, s 18.3 0 HCM LOS C Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 275 - HCM Lane V/C Ratio 0.016 - HCM Control Delay (s) 18.3 - HCM Lane LOS C - HCM 95th %tile Q(veh) 0 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 472 4 151 4 4 6 33 99 1905 6 10 4 Future Volume (vph) 472 4 151 4 4 6 33 99 1905 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.937 Flt Protected 0.950 0.953 0.987 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Flt Permitted 0.950 0.953 0.987 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1091 683 Travel Time (s) 16.4 29.8 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 524 4 168 4 4 7 37 110 2117 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 262 266 168 0 15 0 0 147 2124 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 38.0 38.0 15.0 15.0 16.0 16.0 87.0 16.0 16.0 Total Split (%) 24.4% 24.4% 9.6% 9.6% 10.3% 10.3% 55.8% 10.3% 10.3% Maximum Green (s) 31.1 31.1 8.6 8.6 9.9 9.9 80.7 10.1 10.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 29.2 29.2 156.0 7.4 11.0 106.0 6.9 Actuated g/C Ratio 0.19 0.19 1.00 0.05 0.07 0.68 0.04 v/c Ratio 0.83 0.84 0.11 0.19 1.19 0.88 0.19 Control Delay 82.8 83.9 0.1 76.0 186.0 28.0 76.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 82.8 83.9 0.1 76.0 186.0 28.0 76.9 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1356 269 Future Volume (vph) 1356 269 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1063 Travel Time (s) 13.2 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 1507 299 Shared Lane Traffic (%) Lane Group Flow (vph) 1507 299 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 87.0 Total Split (%) 55.8% Maximum Green (s) 80.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 95.3 156.0 Actuated g/C Ratio 0.61 1.00 v/c Ratio 0.70 0.19 Control Delay 24.6 0.3 Queue Delay 0.0 0.0 Total Delay 24.6 0.3 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F C E Approach Delay 63.2 76.0 38.2 Approach LOS E E D Queue Length 50th (ft) 269 274 0 15 ~176 840 15 Queue Length 95th (ft) 378 386 0 41 m#314 #1426 41 Internal Link Dist (ft) 1003 1011 603 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 355 356 1583 110 124 2405 124 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.74 0.75 0.11 0.14 1.19 0.88 0.12 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 116 (74%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 130 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.19 Intersection Signal Delay: 35.5 Intersection LOS: D Intersection Capacity Utilization 89.4% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 21.1 Approach LOS C Queue Length 50th (ft) 489 0 Queue Length 95th (ft) 746 0 Internal Link Dist (ft) 983 Turn Bay Length (ft) 250 Base Capacity (vph) 2161 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.70 0.19 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 35 16 18 2040 1513 25 Future Volume (vph) 0 35 16 18 2040 1513 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1069 418 683 Travel Time (s) 24.3 5.2 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 39 18 20 2267 1681 28 Shared Lane Traffic (%) Lane Group Flow (vph) 0 39 0 38 2267 1681 28 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 59.7% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 10 Intersection Int Delay, s/veh 0.2 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 35 16 18 2040 1513 25 Future Vol, veh/h 0 35 16 18 2040 1513 25 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 39 18 20 2267 1681 28 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 841 1681 1709 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *458 *603 *684 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *458 *618 *618 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 13.6 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) * 618 - 458 - - HCM Lane V/C Ratio 0.061 - 0.085 - - HCM Control Delay (s) 11.2 - 13.6 - - HCM Lane LOS B - B - - HCM 95th %tile Q(veh) 0.2 - 0.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 27 104 0 0 0 277 0 1770 41 0 0 0 Future Volume (vph) 27 104 0 0 0 277 0 1770 41 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.990 Satd. Flow (prot) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.990 Satd. Flow (perm) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 477 Travel Time (s) 2.6 19.3 1.5 5.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 30 116 0 0 0 308 0 1967 46 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 146 0 0 0 308 0 1967 46 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.6 10.6 10.6 20.3 20.3 Total Split (s) 31.0 31.0 31.0 125.0 125.0 Total Split (%) 19.9% 19.9% 19.9% 80.1% 80.1% Maximum Green (s) 25.4 25.4 25.4 118.7 118.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 21.7 21.7 124.3 124.3 Actuated g/C Ratio 0.14 0.14 0.80 0.80 v/c Ratio 0.57 0.80 0.70 0.04 Control Delay 49.0 80.2 9.3 3.9 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 49.0 80.2 9.3 3.9 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS D F A A Approach Delay 49.0 80.2 9.2 Approach LOS D F A Queue Length 50th (ft) 141 175 422 9 Queue Length 95th (ft) m182 230 557 20 Internal Link Dist (ft) 1 911 42 397 Turn Bay Length (ft) 225 Base Capacity (vph) 307 464 2819 1261 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.48 0.66 0.70 0.04 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 60 (38%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 20.4 Intersection LOS: C Intersection Capacity Utilization 78.1% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 21 4 63 000001435 13 Future Volume (vph) 0 0 21 4 63 000001435 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.997 Satd. Flow (prot) 0 0 1611 0 1857 000003539 1583 Flt Permitted 0.997 Satd. Flow (perm) 0 0 1611 0 1857 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 23 4 70 000001594 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 23 0 74 000001594 14 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 25.0 25.0 25.0 131.0 131.0 Total Split (%) 16.0% 16.0% 16.0% 84.0% 84.0% Maximum Green (s) 19.7 19.7 19.7 124.9 124.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 10.9 10.9 135.1 135.1 Actuated g/C Ratio 0.07 0.07 0.87 0.87 v/c Ratio 0.21 0.57 0.52 0.01 Control Delay 71.0 86.6 0.7 0.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 71.0 86.6 0.7 0.2 LOS E F A A Approach Delay 71.0 86.6 0.7 Approach LOS E F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 23 75 12 0 Queue Length 95th (ft) 53 129 m17 m1 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 206 238 3064 1370 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.11 0.31 0.52 0.01 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 94 (60%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.57 Intersection Signal Delay: 5.4 Intersection LOS: A Intersection Capacity Utilization 60.5% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 4 5 121 7 4 247 4 15 4444 Future Volume (vph) 4 5 121 7 4 247 4 15 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.992 0.998 0.978 0.929 Flt Protected 0.950 0.999 0.967 0.988 Satd. Flow (prot) 0 1770 1848 0 0 1857 0 0 1762 0 0 1710 Flt Permitted 0.950 0.999 0.967 0.988 Satd. Flow (perm) 0 1770 1848 0 0 1857 0 0 1762 0 0 1710 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Confl. Peds. (#/hr)4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 6 134 8 4 274 4 17 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 10 142 0 0 282 0 0 25 0 0 17 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 27.7% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 8 Future Volume (vph) 8 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Ped Bike Factor Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) 4 Peak Hour Factor 0.90 Adj. Flow (vph) 9 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 17 Intersection Int Delay, s/veh 1.1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 5 121 7 4 247 4 15 4 4 4 4 8 Future Vol, veh/h 4 5 121 7 4 247 4 15 4 4 4 4 8 Conflicting Peds, #/hr 0 000000000404 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 4 6 134 8 4 274 4 17 4 4 4 4 9 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 278 0 0 142 0 0 445 444 142 442 446 280 Stage 1 -------150158-284284- Stage 2 -------295286-158162- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1285 - - 1441 - - 523 508 906 526 507 759 Stage 1 -------853767-723676- Stage 2 -------713675-844764- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ ~ - - 1441 - - 510 506 903 517 505 756 Mov Cap-2 Maneuver -------510506-517505- Stage 1 -------853767-723674- Stage 2 -------695673-832764- Approach EB WB NB SB HCM Control Delay, s 0.1 11.9 11.1 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 551 ~ - - 1441 - - 610 HCM Lane V/C Ratio 0.046 ~ - - 0.003 - - 0.029 HCM Control Delay (s) 11.9 - - - 7.5 0 - 11.1 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.1 ~ - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 19 30 9 380 381 21 Future Volume (vph) 19 30 9 380 381 21 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.917 0.993 Flt Protected 0.981 0.999 Satd. Flow (prot) 1676 0 0 1861 1850 0 Flt Permitted 0.981 0.999 Satd. Flow (perm) 1676 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 21 33 10 422 423 23 Shared Lane Traffic (%) Lane Group Flow (vph) 54 0 0 432 446 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.2% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2023 Future No Build T. Lee Page 19 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 19 30 9 380 381 21 Future Vol, veh/h 19 30 9 380 381 21 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 21 33 10 422 423 23 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 877 435 446 0 - 0 Stage 1 435 ----- Stage 2 442 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 319 621 1114 - - - Stage 1 653 ----- Stage 2 648 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 315 621 1114 - - - Mov Cap-2 Maneuver 315 ----- Stage 1 645 ----- Stage 2 648 ----- Approach EB NB SB HCM Control Delay, s 14.1 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1114 - 451 - - HCM Lane V/C Ratio 0.009 - 0.121 - - HCM Control Delay (s) 8.3 0 14.1 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0 - 0.4 - - Ironwood – Transportation Impact Analysis AM 2023 Phase 1A Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 84 0 0 2434 0 0 Future Volume (vph) 84 0 0 2434 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 592 Travel Time (s) 1.8 1.4 7.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 93 0 0 2704 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 93 0 0 2704 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 13.4 132.6 Actuated g/C Ratio 0.09 0.85 v/c Ratio 0.61 0.90 Control Delay 85.1 13.2 Queue Delay 0.0 0.0 Total Delay 85.1 13.2 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 85.1 13.2 Approach LOS F B Queue Length 50th (ft) 93 1300 Queue Length 95th (ft) 152 481 Internal Link Dist (ft) 1 36 512 Turn Bay Length (ft) Base Capacity (vph) 317 3008 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.29 0.90 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 15.6 Intersection LOS: B Intersection Capacity Utilization 120.4% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)400001650 Future Volume (vph)400001650 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 93 1109 102 Travel Time (s) 2.1 13.7 1.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)400001833 Shared Lane Traffic (%) Lane Group Flow (vph)400001833 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 70.6% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 4 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 00001650 Future Vol, veh/h 4 00001650 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 4 00001833 Major/Minor Minor1 Major2 Conflicting Flow All 917 - - - Stage 1 0 - - - Stage 2 917 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 271 0 0 - Stage 1 - 0 0 - Stage 2 350 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 271 - - - Mov Cap-2 Maneuver 271 - - - Stage 1 - - - - Stage 2 350 - - - Approach WB SB HCM Control Delay, s 18.5 0 HCM LOS C Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 271 - HCM Lane V/C Ratio 0.016 - HCM Control Delay (s) 18.5 - HCM Lane LOS C - HCM 95th %tile Q(veh) 0.1 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 472 4 152 4 4 6 33 103 1951 6 10 4 Future Volume (vph) 472 4 152 4 4 6 33 103 1951 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Ped Bike Factor 0.97 Frt 0.850 0.937 Flt Protected 0.950 0.953 0.987 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Flt Permitted 0.950 0.953 0.987 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1723 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1091 679 Travel Time (s) 16.4 29.8 8.4 Confl. Peds. (#/hr)1370 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 524 4 169 4 4 7 37 114 2168 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 262 266 169 0 15 0 0 151 2175 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 38.0 38.0 15.0 15.0 16.0 16.0 87.0 16.0 16.0 Total Split (%) 24.4% 24.4% 9.6% 9.6% 10.3% 10.3% 55.8% 10.3% 10.3% Maximum Green (s) 31.1 31.1 8.6 8.6 9.9 9.9 80.7 10.1 10.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 29.2 29.2 156.0 7.4 11.0 106.0 6.9 Actuated g/C Ratio 0.19 0.19 1.00 0.05 0.07 0.68 0.04 v/c Ratio 0.83 0.84 0.11 0.19 1.22 0.90 0.19 Control Delay 82.8 83.9 0.1 76.0 195.2 29.4 76.9 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1372 269 Future Volume (vph) 1372 269 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Ped Bike Factor Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1063 Travel Time (s) 13.2 Confl. Peds. (#/hr) Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 1524 299 Shared Lane Traffic (%) Lane Group Flow (vph) 1524 299 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 87.0 Total Split (%) 55.8% Maximum Green (s) 80.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 95.3 156.0 Actuated g/C Ratio 0.61 1.00 v/c Ratio 0.71 0.19 Control Delay 24.9 0.3 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 82.8 83.9 0.1 76.0 195.2 29.4 76.9 LOS F F A E F C E Approach Delay 63.1 76.0 40.1 Approach LOS E E D Queue Length 50th (ft) 269 274 0 15 ~185 904 15 Queue Length 95th (ft) 378 386 0 41 m#305 #1485 41 Internal Link Dist (ft) 1003 1011 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 355 356 1583 110 124 2405 124 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.74 0.75 0.11 0.14 1.22 0.90 0.12 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 116 (74%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.22 Intersection Signal Delay: 36.4 Intersection LOS: D Intersection Capacity Utilization 90.6% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 8 Lane Group SBT SBR Queue Delay 0.0 0.0 Total Delay 24.9 0.3 LOS C A Approach Delay 21.3 Approach LOS C Queue Length 50th (ft) 499 0 Queue Length 95th (ft) 759 0 Internal Link Dist (ft) 983 Turn Bay Length (ft) 250 Base Capacity (vph) 2161 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.71 0.19 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 36 30 22 2089 1530 25 Future Volume (vph) 0 36 30 22 2089 1530 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1069 425 679 Travel Time (s) 24.3 5.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 40 33 24 2321 1700 28 Shared Lane Traffic (%) Lane Group Flow (vph) 0 40 0 57 2321 1700 28 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 61.1% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 10 Intersection Int Delay, s/veh 0.3 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 36 30 22 2089 1530 25 Future Vol, veh/h 0 36 30 22 2089 1530 25 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 40 33 24 2321 1700 28 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 850 1700 1728 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *458 *603 *684 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *458 *603 *603 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 13.6 0.3 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) * 603 - 458 - - HCM Lane V/C Ratio 0.096 - 0.087 - - HCM Control Delay (s) 11.6 - 13.6 - - HCM Lane LOS B - B - - HCM 95th %tile Q(veh) 0.3 - 0.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 27 122 0 0 0 344 0 1770 46 0 0 0 Future Volume (vph) 27 122 0 0 0 344 0 1770 46 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.991 Satd. Flow (prot) 0 1846 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.991 Satd. Flow (perm) 0 1846 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 477 Travel Time (s) 2.6 19.3 1.5 5.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 30 136 0 0 0 382 0 1967 51 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 166 0 0 0 382 0 1967 51 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.6 10.6 10.6 20.3 20.3 Total Split (s) 31.0 31.0 31.0 125.0 125.0 Total Split (%) 19.9% 19.9% 19.9% 80.1% 80.1% Maximum Green (s) 25.4 25.4 25.4 118.7 118.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 24.4 24.4 121.6 121.6 Actuated g/C Ratio 0.16 0.16 0.78 0.78 v/c Ratio 0.58 0.88 0.71 0.04 Control Delay 47.0 85.2 10.6 4.3 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 47.0 85.2 10.6 4.3 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS D F B A Approach Delay 47.0 85.2 10.4 Approach LOS D F B Queue Length 50th (ft) 158 216 485 11 Queue Length 95th (ft) m211 #299 557 21 Internal Link Dist (ft) 1 911 42 397 Turn Bay Length (ft) 225 Base Capacity (vph) 307 464 2758 1233 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.54 0.82 0.71 0.04 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 60 (38%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 23.9 Intersection LOS: C Intersection Capacity Utilization 81.4% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 21 4 63 000001449 13 Future Volume (vph) 0 0 21 4 63 000001449 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.997 Satd. Flow (prot) 0 0 1611 0 1857 000003539 1583 Flt Permitted 0.997 Satd. Flow (perm) 0 0 1611 0 1857 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 23 4 70 000001610 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 23 0 74 000001610 14 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 25.0 25.0 25.0 131.0 131.0 Total Split (%) 16.0% 16.0% 16.0% 84.0% 84.0% Maximum Green (s) 19.7 19.7 19.7 124.9 124.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 10.9 10.9 135.1 135.1 Actuated g/C Ratio 0.07 0.07 0.87 0.87 v/c Ratio 0.21 0.57 0.53 0.01 Control Delay 71.0 86.6 0.7 0.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 71.0 86.6 0.7 0.2 LOS E F A A Approach Delay 71.0 86.6 0.7 Approach LOS E F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 23 75 12 0 Queue Length 95th (ft) 53 129 m16 m1 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 206 238 3064 1370 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.11 0.31 0.53 0.01 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 94 (60%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.57 Intersection Signal Delay: 5.3 Intersection LOS: A Intersection Capacity Utilization 60.9% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 4 28 121 7 4 247 4 16 4464 Future Volume (vph) 4 28 121 7 4 247 4 16 4464 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.992 0.998 0.979 0.881 Flt Protected 0.950 0.999 0.967 0.996 Satd. Flow (prot) 0 1770 1848 0 0 1857 0 0 1763 0 0 1635 Flt Permitted 0.950 0.999 0.967 0.996 Satd. Flow (perm) 0 1770 1848 0 0 1857 0 0 1763 0 0 1635 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Confl. Peds. (#/hr)4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 31 134 8 4 274 4 18 4474 Shared Lane Traffic (%) Lane Group Flow (vph) 0 35 142 0 0 282 0 0 26 0 0 94 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.0% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 75 Future Volume (vph) 75 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Ped Bike Factor Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) 4 Peak Hour Factor 0.90 Adj. Flow (vph) 83 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 17 Intersection Int Delay, s/veh 2.4 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 28 121 7 4 247 4 16 4 4 6 4 75 Future Vol, veh/h 4 28 121 7 4 247 4 16 4 4 6 4 75 Conflicting Peds, #/hr 0 000000000404 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 4 31 134 8 4 274 4 18 4 4 7 4 83 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 278 0 0 142 0 0 532 494 142 492 496 280 Stage 1 -------200208-284284- Stage 2 -------332286-208212- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1285 - - 1441 - - 458 476 906 487 475 759 Stage 1 -------802730-723676- Stage 2 -------681675-794727- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -8 ~ -8 - - 1441 - - 402 475 903 478 474 756 Mov Cap-2 Maneuver -------402475-478474- Stage 1 -------802730-723674- Stage 2 -------598673-782727- Approach EB WB NB SB HCM Control Delay, s 0.1 13.4 10.9 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 456 + - - 1441 - - 707 HCM Lane V/C Ratio 0.058 - - - 0.003 - - 0.134 HCM Control Delay (s) 13.4 - - - 7.5 0 - 10.9 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.2 - - - 0 - - 0.5 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 23 30 9 380 381 22 Future Volume (vph) 23 30 9 380 381 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.924 0.993 Flt Protected 0.978 0.999 Satd. Flow (prot) 1683 0 0 1861 1850 0 Flt Permitted 0.978 0.999 Satd. Flow (perm) 1683 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 26 33 10 422 423 24 Shared Lane Traffic (%) Lane Group Flow (vph) 59 0 0 432 447 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.2% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2023 Phase 1A Build T. Lee Page 19 Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 23 30 9 380 381 22 Future Vol, veh/h 23 30 9 380 381 22 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 26 33 10 422 423 24 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 877 435 447 0 - 0 Stage 1 435 ----- Stage 2 442 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 319 621 1113 - - - Stage 1 653 ----- Stage 2 648 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 315 621 1113 - - - Mov Cap-2 Maneuver 315 ----- Stage 1 645 ----- Stage 2 648 ----- Approach EB NB SB HCM Control Delay, s 14.5 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1113 - 437 - - HCM Lane V/C Ratio 0.009 - 0.135 - - HCM Control Delay (s) 8.3 0 14.5 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0 - 0.5 - - Ironwood – Transportation Impact Analysis AM 2024 Future No Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 85 0 0 2412 0 0 Future Volume (vph) 85 0 0 2412 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 1479 Travel Time (s) 1.8 1.4 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 94 0 0 2680 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 94 0 0 2680 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 13.5 132.5 Actuated g/C Ratio 0.09 0.85 v/c Ratio 0.61 0.89 Control Delay 85.1 12.7 Queue Delay 0.0 0.0 Total Delay 85.1 12.7 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 85.1 12.7 Approach LOS F B Queue Length 50th (ft) 94 1263 Queue Length 95th (ft) 154 467 Internal Link Dist (ft) 1 36 1399 Turn Bay Length (ft) Base Capacity (vph) 317 3006 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.30 0.89 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 15.2 Intersection LOS: B Intersection Capacity Utilization 119.8% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)400001650 Future Volume (vph)400001650 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 93 1109 102 Travel Time (s) 2.1 13.7 1.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)400001833 Shared Lane Traffic (%) Lane Group Flow (vph)400001833 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 70.0% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 4 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 00001650 Future Vol, veh/h 4 00001650 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 4 00001833 Major/Minor Minor1 Major2 Conflicting Flow All 917 - - - Stage 1 0 - - - Stage 2 917 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 271 0 0 - Stage 1 - 0 0 - Stage 2 350 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 271 - - - Mov Cap-2 Maneuver 271 - - - Stage 1 - - - - Stage 2 350 - - - Approach WB SB HCM Control Delay, s 18.5 0 HCM LOS C Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 271 - HCM Lane V/C Ratio 0.016 - HCM Control Delay (s) 18.5 - HCM Lane LOS C - HCM 95th %tile Q(veh) 0.1 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 476 4 153 4 4 6 33 100 1924 6 10 4 Future Volume (vph) 476 4 153 4 4 6 33 100 1924 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.937 Flt Protected 0.950 0.953 0.987 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Flt Permitted 0.950 0.953 0.987 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1091 683 Travel Time (s) 16.4 29.8 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 529 4 170 4 4 7 37 111 2138 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 264 269 170 0 15 0 0 148 2145 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 38.0 38.0 15.0 15.0 16.0 16.0 87.0 16.0 16.0 Total Split (%) 24.4% 24.4% 9.6% 9.6% 10.3% 10.3% 55.8% 10.3% 10.3% Maximum Green (s) 31.1 31.1 8.6 8.6 9.9 9.9 80.7 10.1 10.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 29.4 29.4 156.0 7.4 11.0 105.9 6.9 Actuated g/C Ratio 0.19 0.19 1.00 0.05 0.07 0.68 0.04 v/c Ratio 0.83 0.85 0.11 0.19 1.19 0.89 0.19 Control Delay 82.7 84.2 0.1 76.0 188.4 28.5 76.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 82.7 84.2 0.1 76.0 188.4 28.5 76.9 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1370 271 Future Volume (vph) 1370 271 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1063 Travel Time (s) 13.2 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 1522 301 Shared Lane Traffic (%) Lane Group Flow (vph) 1522 301 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 87.0 Total Split (%) 55.8% Maximum Green (s) 80.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 95.1 156.0 Actuated g/C Ratio 0.61 1.00 v/c Ratio 0.71 0.19 Control Delay 25.0 0.3 Queue Delay 0.0 0.0 Total Delay 25.0 0.3 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F C E Approach Delay 63.3 76.0 38.8 Approach LOS E E D Queue Length 50th (ft) 271 277 0 15 ~179 861 15 Queue Length 95th (ft) 382 #393 0 41 m#314 #1450 41 Internal Link Dist (ft) 1003 1011 603 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 355 356 1583 110 124 2401 124 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.74 0.76 0.11 0.14 1.19 0.89 0.12 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 116 (74%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.19 Intersection Signal Delay: 35.8 Intersection LOS: D Intersection Capacity Utilization 90.0% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 21.4 Approach LOS C Queue Length 50th (ft) 501 0 Queue Length 95th (ft) 758 0 Internal Link Dist (ft) 983 Turn Bay Length (ft) 250 Base Capacity (vph) 2157 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.71 0.19 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 36 16 18 2060 1529 25 Future Volume (vph) 0 36 16 18 2060 1529 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1069 418 683 Travel Time (s) 24.3 5.2 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 40 18 20 2289 1699 28 Shared Lane Traffic (%) Lane Group Flow (vph) 0 40 0 38 2289 1699 28 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 60.3% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 10 Intersection Int Delay, s/veh 0.2 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 36 16 18 2060 1529 25 Future Vol, veh/h 0 36 16 18 2060 1529 25 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 40 18 20 2289 1699 28 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 850 1699 1727 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *458 *603 *684 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *458 *617 *617 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 13.6 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) * 617 - 458 - - HCM Lane V/C Ratio 0.061 - 0.087 - - HCM Control Delay (s) 11.2 - 13.6 - - HCM Lane LOS B - B - - HCM 95th %tile Q(veh) 0.2 - 0.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 27 105 0 0 0 279 0 1788 42 0 0 0 Future Volume (vph) 27 105 0 0 0 279 0 1788 42 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.990 Satd. Flow (prot) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.990 Satd. Flow (perm) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 477 Travel Time (s) 2.6 19.3 1.5 5.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 30 117 0 0 0 310 0 1987 47 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 147 0 0 0 310 0 1987 47 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.6 10.6 10.6 20.3 20.3 Total Split (s) 31.0 31.0 31.0 125.0 125.0 Total Split (%) 19.9% 19.9% 19.9% 80.1% 80.1% Maximum Green (s) 25.4 25.4 25.4 118.7 118.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 21.8 21.8 124.2 124.2 Actuated g/C Ratio 0.14 0.14 0.80 0.80 v/c Ratio 0.57 0.80 0.71 0.04 Control Delay 48.6 80.2 9.5 3.9 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 48.6 80.2 9.5 3.9 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS D F A A Approach Delay 48.6 80.2 9.4 Approach LOS D F A Queue Length 50th (ft) 142 176 434 9 Queue Length 95th (ft) m180 231 570 20 Internal Link Dist (ft) 1 911 42 397 Turn Bay Length (ft) 225 Base Capacity (vph) 307 464 2818 1260 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.48 0.67 0.71 0.04 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 60 (38%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 20.5 Intersection LOS: C Intersection Capacity Utilization 78.7% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 21 4 63 000001450 13 Future Volume (vph) 0 0 21 4 63 000001450 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.997 Satd. Flow (prot) 0 0 1611 0 1857 000003539 1583 Flt Permitted 0.997 Satd. Flow (perm) 0 0 1611 0 1857 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 23 4 70 000001611 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 23 0 74 000001611 14 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 25.0 25.0 25.0 131.0 131.0 Total Split (%) 16.0% 16.0% 16.0% 84.0% 84.0% Maximum Green (s) 19.7 19.7 19.7 124.9 124.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 10.9 10.9 135.1 135.1 Actuated g/C Ratio 0.07 0.07 0.87 0.87 v/c Ratio 0.21 0.57 0.53 0.01 Control Delay 71.0 86.6 0.7 0.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 71.0 86.6 0.7 0.2 LOS E F A A Approach Delay 71.0 86.6 0.7 Approach LOS E F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 23 75 12 0 Queue Length 95th (ft) 53 129 m17 m1 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 206 238 3064 1370 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.11 0.31 0.53 0.01 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 94 (60%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.57 Intersection Signal Delay: 5.3 Intersection LOS: A Intersection Capacity Utilization 60.9% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 4 5 122 7 4 249 4 16 4444 Future Volume (vph) 4 5 122 7 4 249 4 16 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.992 0.998 0.979 0.929 Flt Protected 0.950 0.999 0.967 0.988 Satd. Flow (prot) 0 1770 1848 0 0 1857 0 0 1763 0 0 1710 Flt Permitted 0.950 0.999 0.967 0.988 Satd. Flow (perm) 0 1770 1848 0 0 1857 0 0 1763 0 0 1710 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Confl. Peds. (#/hr)4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 6 136 8 4 277 4 18 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 10 144 0 0 285 0 0 26 0 0 17 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 27.8% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 8 Future Volume (vph) 8 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Ped Bike Factor Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) 4 Peak Hour Factor 0.90 Adj. Flow (vph) 9 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 17 Intersection Int Delay, s/veh 1.1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 5 122 7 4 249 4 16 4 4 4 4 8 Future Vol, veh/h 4 5 122 7 4 249 4 16 4 4 4 4 8 Conflicting Peds, #/hr 0 000000000404 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 4 6 136 8 4 277 4 18 4 4 4 4 9 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 281 0 0 144 0 0 450 449 144 447 451 283 Stage 1 -------152160-287287- Stage 2 -------298289-160164- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1282 - - 1438 - - 519 505 903 522 504 756 Stage 1 -------850766-720674- Stage 2 -------711673-842762- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ ~ - - 1438 - - 507 503 900 513 502 753 Mov Cap-2 Maneuver -------507503-513502- Stage 1 -------850766-720672- Stage 2 -------693671-830762- Approach EB WB NB SB HCM Control Delay, s 0.1 11.9 11.1 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 546 ~ - - 1438 - - 606 HCM Lane V/C Ratio 0.049 ~ - - 0.003 - - 0.029 HCM Control Delay (s) 11.9 - - - 7.5 0 - 11.1 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.2 ~ - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 19 30 9 384 385 21 Future Volume (vph) 19 30 9 384 385 21 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.917 0.993 Flt Protected 0.981 0.999 Satd. Flow (prot) 1676 0 0 1861 1850 0 Flt Permitted 0.981 0.999 Satd. Flow (perm) 1676 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 21 33 10 427 428 23 Shared Lane Traffic (%) Lane Group Flow (vph) 54 0 0 437 451 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.4% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2024 Future No Build T. Lee Page 19 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 19 30 9 384 385 21 Future Vol, veh/h 19 30 9 384 385 21 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 21 33 10 427 428 23 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 887 440 451 0 - 0 Stage 1 440 ----- Stage 2 447 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 315 617 1109 - - - Stage 1 649 ----- Stage 2 644 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 311 617 1109 - - - Mov Cap-2 Maneuver 311 ----- Stage 1 641 ----- Stage 2 644 ----- Approach EB NB SB HCM Control Delay, s 14.2 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1109 - 447 - - HCM Lane V/C Ratio 0.009 - 0.122 - - HCM Control Delay (s) 8.3 0 14.2 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0 - 0.4 - - Ironwood – Transportation Impact Analysis AM 2024 Phase 1B Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 102 0 0 2420 0 0 Future Volume (vph) 102 0 0 2420 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 416 Travel Time (s) 1.8 1.4 5.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 113 0 0 2689 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 113 0 0 2689 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 15.1 130.9 Actuated g/C Ratio 0.10 0.84 v/c Ratio 0.66 0.91 Control Delay 85.4 14.0 Queue Delay 0.0 0.0 Total Delay 85.4 14.0 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 85.4 14.0 Approach LOS F B Queue Length 50th (ft) 113 1304 Queue Length 95th (ft) 176 473 Internal Link Dist (ft) 1 36 336 Turn Bay Length (ft) Base Capacity (vph) 317 2969 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.36 0.91 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 16.9 Intersection LOS: B Intersection Capacity Utilization 121.4% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)400001658 Future Volume (vph)400001658 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 93 1109 102 Travel Time (s) 2.1 13.7 1.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)400001842 Shared Lane Traffic (%) Lane Group Flow (vph)400001842 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 70.2% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 4 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 00001658 Future Vol, veh/h 4 00001658 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 4 00001842 Major/Minor Minor1 Major2 Conflicting Flow All 921 - - - Stage 1 0 - - - Stage 2 921 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 270 0 0 - Stage 1 - 0 0 - Stage 2 348 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 270 - - - Mov Cap-2 Maneuver 270 - - - Stage 1 - - - - Stage 2 348 - - - Approach WB SB HCM Control Delay, s 18.6 0 HCM LOS C Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 270 - HCM Lane V/C Ratio 0.016 - HCM Control Delay (s) 18.6 - HCM Lane LOS C - HCM 95th %tile Q(veh) 0.1 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 478 4 153 4 4 6 33 106 1930 6 10 4 Future Volume (vph) 478 4 153 4 4 6 33 106 1930 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Ped Bike Factor 0.97 Frt 0.850 0.937 Flt Protected 0.950 0.953 0.987 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Flt Permitted 0.950 0.953 0.987 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1721 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1091 679 Travel Time (s) 16.4 29.8 8.4 Confl. Peds. (#/hr)1370 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 531 4 170 4 4 7 37 118 2144 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 265 270 170 0 15 0 0 155 2151 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 38.0 38.0 15.0 15.0 16.0 16.0 87.0 16.0 16.0 Total Split (%) 24.4% 24.4% 9.6% 9.6% 10.3% 10.3% 55.8% 10.3% 10.3% Maximum Green (s) 31.1 31.1 8.6 8.6 9.9 9.9 80.7 10.1 10.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 29.5 29.5 156.0 7.4 11.0 105.8 6.9 Actuated g/C Ratio 0.19 0.19 1.00 0.05 0.07 0.68 0.04 v/c Ratio 0.84 0.85 0.11 0.19 1.25 0.90 0.19 Control Delay 82.8 84.3 0.1 76.0 206.2 28.6 76.9 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1378 271 Future Volume (vph) 1378 271 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Ped Bike Factor Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1063 Travel Time (s) 13.2 Confl. Peds. (#/hr) Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 1531 301 Shared Lane Traffic (%) Lane Group Flow (vph) 1531 301 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 87.0 Total Split (%) 55.8% Maximum Green (s) 80.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 95.0 156.0 Actuated g/C Ratio 0.61 1.00 v/c Ratio 0.71 0.19 Control Delay 25.2 0.3 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 82.8 84.3 0.1 76.0 206.2 28.6 76.9 LOS F F A E F C E Approach Delay 63.4 76.0 40.6 Approach LOS E E D Queue Length 50th (ft) 272 278 0 15 ~194 879 15 Queue Length 95th (ft) 385 #396 0 41 m#324 #1458 41 Internal Link Dist (ft) 1003 1011 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 355 356 1583 110 124 2400 124 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.75 0.76 0.11 0.14 1.25 0.90 0.12 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 116 (74%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.25 Intersection Signal Delay: 36.8 Intersection LOS: D Intersection Capacity Utilization 90.2% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 8 Lane Group SBT SBR Queue Delay 0.0 0.0 Total Delay 25.2 0.3 LOS C A Approach Delay 21.5 Approach LOS C Queue Length 50th (ft) 507 0 Queue Length 95th (ft) 765 0 Internal Link Dist (ft) 983 Turn Bay Length (ft) 250 Base Capacity (vph) 2156 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.71 0.19 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 38 39 24 2071 1537 25 Future Volume (vph) 0 38 39 24 2071 1537 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1069 425 679 Travel Time (s) 24.3 5.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 42 43 27 2301 1708 28 Shared Lane Traffic (%) Lane Group Flow (vph) 0 42 0 70 2301 1708 28 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 60.6% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 10 Intersection Int Delay, s/veh 0.3 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 38 39 24 2071 1537 25 Future Vol, veh/h 0 38 39 24 2071 1537 25 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 42 43 27 2301 1708 28 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 854 1708 1736 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *458 *603 681 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *458 *596 596 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 13.7 0.3 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 596 - 458 - - HCM Lane V/C Ratio 0.117 - 0.092 - - HCM Control Delay (s) 11.8 - 13.7 - - HCM Lane LOS B - B - - HCM 95th %tile Q(veh) 0.4 - 0.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 27 113 0 0 0 314 0 1794 44 0 0 0 Future Volume (vph) 27 113 0 0 0 314 0 1794 44 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.990 Satd. Flow (prot) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.990 Satd. Flow (perm) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 477 Travel Time (s) 2.6 19.3 1.5 5.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 30 126 0 0 0 349 0 1993 49 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 156 0 0 0 349 0 1993 49 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.6 10.6 10.6 20.3 20.3 Total Split (s) 31.0 31.0 31.0 125.0 125.0 Total Split (%) 19.9% 19.9% 19.9% 80.1% 80.1% Maximum Green (s) 25.4 25.4 25.4 118.7 118.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 23.3 23.3 122.7 122.7 Actuated g/C Ratio 0.15 0.15 0.79 0.79 v/c Ratio 0.57 0.84 0.72 0.04 Control Delay 47.3 82.7 10.3 4.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 47.3 82.7 10.3 4.2 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS D F B A Approach Delay 47.3 82.7 10.1 Approach LOS D F B Queue Length 50th (ft) 149 197 473 10 Queue Length 95th (ft) m191 260 574 21 Internal Link Dist (ft) 1 911 42 397 Turn Bay Length (ft) 225 Base Capacity (vph) 307 464 2784 1245 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.51 0.75 0.72 0.04 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 60 (38%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 22.4 Intersection LOS: C Intersection Capacity Utilization 80.5% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 22 4 63 000001473 13 Future Volume (vph) 0 0 22 4 63 000001473 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.997 Satd. Flow (prot) 0 0 1611 0 1857 000003539 1583 Flt Permitted 0.997 Satd. Flow (perm) 0 0 1611 0 1857 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 24 4 70 000001637 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 24 0 74 000001637 14 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 25.0 25.0 25.0 131.0 131.0 Total Split (%) 16.0% 16.0% 16.0% 84.0% 84.0% Maximum Green (s) 19.7 19.7 19.7 124.9 124.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 10.9 10.9 135.1 135.1 Actuated g/C Ratio 0.07 0.07 0.87 0.87 v/c Ratio 0.21 0.57 0.53 0.01 Control Delay 71.3 86.6 0.7 0.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 71.3 86.6 0.7 0.2 LOS E F A A Approach Delay 71.3 86.6 0.7 Approach LOS E F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 24 75 12 0 Queue Length 95th (ft) 55 129 m17 m1 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 206 238 3064 1370 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.12 0.31 0.53 0.01 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 94 (60%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.57 Intersection Signal Delay: 5.3 Intersection LOS: A Intersection Capacity Utilization 61.6% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 4 16 122 7 4 249 4 16 4464 Future Volume (vph) 4 16 122 7 4 249 4 16 4464 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.992 0.998 0.979 0.890 Flt Protected 0.950 0.999 0.967 0.994 Satd. Flow (prot) 0 1770 1848 0 0 1857 0 0 1763 0 0 1648 Flt Permitted 0.950 0.999 0.967 0.994 Satd. Flow (perm) 0 1770 1848 0 0 1857 0 0 1763 0 0 1648 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Confl. Peds. (#/hr)4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 18 136 8 4 277 4 18 4474 Shared Lane Traffic (%) Lane Group Flow (vph) 0 22 144 0 0 285 0 0 26 0 0 59 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.4% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 43 Future Volume (vph) 43 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Ped Bike Factor Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) 4 Peak Hour Factor 0.90 Adj. Flow (vph) 48 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 17 Intersection Int Delay, s/veh 1.9 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 16 122 7 4 249 4 16 4 4 6 4 43 Future Vol, veh/h 4 16 122 7 4 249 4 16 4 4 6 4 43 Conflicting Peds, #/hr 0 000000000404 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 4 18 136 8 4 277 4 18 4 4 7 4 48 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 281 0 0 144 0 0 493 473 144 471 475 283 Stage 1 -------176184-287287- Stage 2 -------317289-184188- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1282 - - 1438 - - 486 490 903 503 488 756 Stage 1 -------826747-720674- Stage 2 -------694673-818745- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -5 ~ -5 - - 1438 - - 449 489 900 494 487 753 Mov Cap-2 Maneuver -------449489-494487- Stage 1 -------826747-720672- Stage 2 -------641671-806745- Approach EB WB NB SB HCM Control Delay, s 0.1 12.7 10.8 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 497 + - - 1438 - - 684 HCM Lane V/C Ratio 0.054 - - - 0.003 - - 0.086 HCM Control Delay (s) 12.7 - - - 7.5 0 - 10.8 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.2 - - - 0 - - 0.3 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 25 30 9 384 385 23 Future Volume (vph) 25 30 9 384 385 23 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.927 0.992 Flt Protected 0.978 0.999 Satd. Flow (prot) 1689 0 0 1861 1848 0 Flt Permitted 0.978 0.999 Satd. Flow (perm) 1689 0 0 1861 1848 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 28 33 10 427 428 26 Shared Lane Traffic (%) Lane Group Flow (vph) 61 0 0 437 454 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.4% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 19 Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 25 30 9 384 385 23 Future Vol, veh/h 25 30 9 384 385 23 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 28 33 10 427 428 26 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 888 441 454 0 - 0 Stage 1 441 ----- Stage 2 447 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 314 616 1107 - - - Stage 1 648 ----- Stage 2 644 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 310 616 1107 - - - Mov Cap-2 Maneuver 310 ----- Stage 1 640 ----- Stage 2 644 ----- Approach EB NB SB HCM Control Delay, s 14.9 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1107 - 425 - - HCM Lane V/C Ratio 0.009 - 0.144 - - HCM Control Delay (s) 8.3 0 14.9 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0 - 0.5 - - Lanes, Volumes, Timings 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 20 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 0 75 2497 25 0 0 Future Volume (vph) 0 75 2497 25 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt 0.865 0.999 Flt Protected Satd. Flow (prot) 0 1611 3536 0 0 0 Flt Permitted Satd. Flow (perm) 0 1611 3536 0 0 0 Link Speed (mph) 30 55 55 Link Distance (ft) 1311 416 1000 Travel Time (s) 29.8 5.2 12.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 83 2774 28 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 83 2802 0 0 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 81.1% ICU Level of Service D Analysis Period (min) 15 HCM 6th TWSC 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build T. Lee Page 21 Intersection Int Delay, s/veh 2.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 75 2497 25 0 0 Future Vol, veh/h 0 75 2497 25 0 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - 0 - - 16979 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 83 2774 28 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - 1401 0 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 130 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 130 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach WB NB HCM Control Delay, s 72.4 0 HCM LOS F Minor Lane/Major Mvmt NBT NBRWBLn1 Capacity (veh/h) - - 130 HCM Lane V/C Ratio - - 0.641 HCM Control Delay (s) - - 72.4 HCM Lane LOS - - F HCM 95th %tile Q(veh) - - 3.4 Ironwood – Transportation Impact Analysis AM 2024 Phase 1B Build + Improvements Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build with Improvements T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 102 0 0 2420 0 0 Future Volume (vph) 102 0 0 2420 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 416 Travel Time (s) 1.8 1.4 5.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 113 0 0 2689 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 113 0 0 2689 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 15.1 130.9 Actuated g/C Ratio 0.10 0.84 v/c Ratio 0.66 0.91 Control Delay 85.4 14.0 Queue Delay 0.0 0.0 Total Delay 85.4 14.0 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build with Improvements T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 85.4 14.0 Approach LOS F B Queue Length 50th (ft) 113 1304 Queue Length 95th (ft) 176 473 Internal Link Dist (ft) 1 36 336 Turn Bay Length (ft) Base Capacity (vph) 317 2969 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.36 0.91 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 16.9 Intersection LOS: B Intersection Capacity Utilization 121.4% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 102: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build with Improvements T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)00001021658 Future Volume (vph)00001021658 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 450 Storage Lanes 0 0 0 1 Taper Length (ft) 25 125 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot)00001770 3539 Flt Permitted 0.950 Satd. Flow (perm)00001770 3539 Link Speed (mph) 30 55 55 Link Distance (ft) 80 102 1345 Travel Time (s) 1.8 1.3 16.7 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)00001131842 Shared Lane Traffic (%) Lane Group Flow (vph)00001131842 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 120.2% ICU Level of Service H Analysis Period (min) 15 Lanes, Volumes, Timings 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build with Improvements T. Lee Page 4 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 0 75 2497 25 0 0 Future Volume (vph) 0 75 2497 25 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 0 Storage Lanes 0 1 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 0.95 1.00 1.00 1.00 Frt 0.865 0.850 Flt Protected Satd. Flow (prot) 0 1611 3539 1583 0 0 Flt Permitted Satd. Flow (perm) 0 1611 3539 1583 0 0 Link Speed (mph) 30 55 55 Link Distance (ft) 1311 416 1000 Travel Time (s) 29.8 5.2 12.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 83 2774 28 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 83 2774 28 0 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 80.3% ICU Level of Service D Analysis Period (min) 15 HCM 6th TWSC 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood AM 2024 Phase 1B Build with Improvements T. Lee Page 5 Intersection Int Delay, s/veh 2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 75 2497 25 0 0 Future Vol, veh/h 0 75 2497 25 0 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - 250 - - Veh in Median Storage, # 0 - 0 - - 16979 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 83 2774 28 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - 1387 0 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 133 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 133 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach WB NB HCM Control Delay, s 69.3 0 HCM LOS F Minor Lane/Major Mvmt NBT NBRWBLn1 Capacity (veh/h) - - 133 HCM Lane V/C Ratio - - 0.627 HCM Control Delay (s) - - 69.3 HCM Lane LOS - - F HCM 95th %tile Q(veh) - - 3.3 Ironwood – Transportation Impact Analysis AM 2026 Future No Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 87 0 0 2460 0 0 Future Volume (vph) 87 0 0 2460 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 1479 Travel Time (s) 1.8 1.4 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 97 0 0 2733 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 97 0 0 2733 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 13.7 132.3 Actuated g/C Ratio 0.09 0.85 v/c Ratio 0.63 0.91 Control Delay 85.4 13.7 Queue Delay 0.0 0.0 Total Delay 85.4 13.7 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 85.4 13.7 Approach LOS F B Queue Length 50th (ft) 97 1319 Queue Length 95th (ft) 158 496 Internal Link Dist (ft) 1 36 1399 Turn Bay Length (ft) Base Capacity (vph) 317 3000 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.31 0.91 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 16.1 Intersection LOS: B Intersection Capacity Utilization 122.0% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)400001683 Future Volume (vph)400001683 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 93 1109 102 Travel Time (s) 2.1 13.7 1.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)400001870 Shared Lane Traffic (%) Lane Group Flow (vph)400001870 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 71.3% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 4 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 00001683 Future Vol, veh/h 4 00001683 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 4 00001870 Major/Minor Minor1 Major2 Conflicting Flow All 935 - - - Stage 1 0 - - - Stage 2 935 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 264 0 0 - Stage 1 - 0 0 - Stage 2 342 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 264 - - - Mov Cap-2 Maneuver 264 - - - Stage 1 - - - - Stage 2 342 - - - Approach WB SB HCM Control Delay, s 18.9 0 HCM LOS C Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 264 - HCM Lane V/C Ratio 0.017 - HCM Control Delay (s) 18.9 - HCM Lane LOS C - HCM 95th %tile Q(veh) 0.1 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 486 4 156 4 4 6 34 102 1962 6 10 4 Future Volume (vph) 486 4 156 4 4 6 34 102 1962 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.937 Flt Protected 0.950 0.953 0.987 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Flt Permitted 0.950 0.953 0.987 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1091 683 Travel Time (s) 16.4 29.8 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 540 4 173 4 4 7 38 113 2180 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 270 274 173 0 15 0 0 151 2187 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 38.0 38.0 15.0 15.0 16.0 16.0 87.0 16.0 16.0 Total Split (%) 24.4% 24.4% 9.6% 9.6% 10.3% 10.3% 55.8% 10.3% 10.3% Maximum Green (s) 31.1 31.1 8.6 8.6 9.9 9.9 80.7 10.1 10.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 29.7 29.7 156.0 7.4 11.0 105.5 6.9 Actuated g/C Ratio 0.19 0.19 1.00 0.05 0.07 0.68 0.04 v/c Ratio 0.84 0.85 0.11 0.19 1.22 0.91 0.19 Control Delay 83.5 84.7 0.1 76.0 195.6 29.6 76.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 83.5 84.7 0.1 76.0 195.6 29.6 76.9 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1397 277 Future Volume (vph) 1397 277 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1063 Travel Time (s) 13.2 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 1552 308 Shared Lane Traffic (%) Lane Group Flow (vph) 1552 308 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 87.0 Total Split (%) 55.8% Maximum Green (s) 80.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 94.8 156.0 Actuated g/C Ratio 0.61 1.00 v/c Ratio 0.72 0.19 Control Delay 25.7 0.3 Queue Delay 0.0 0.0 Total Delay 25.7 0.3 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F C E Approach Delay 63.8 76.0 40.3 Approach LOS E E D Queue Length 50th (ft) 277 282 0 15 ~186 905 15 Queue Length 95th (ft) #397 #414 0 41 m#313 #1496 41 Internal Link Dist (ft) 1003 1011 603 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 355 356 1583 110 124 2394 124 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.76 0.77 0.11 0.14 1.22 0.91 0.12 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 116 (74%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.22 Intersection Signal Delay: 36.9 Intersection LOS: D Intersection Capacity Utilization 91.3% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 21.9 Approach LOS C Queue Length 50th (ft) 525 0 Queue Length 95th (ft) 784 0 Internal Link Dist (ft) 983 Turn Bay Length (ft) 250 Base Capacity (vph) 2150 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.72 0.19 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 36 16 18 2102 1560 26 Future Volume (vph) 0 36 16 18 2102 1560 26 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1069 418 683 Travel Time (s) 24.3 5.2 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 40 18 20 2336 1733 29 Shared Lane Traffic (%) Lane Group Flow (vph) 0 40 0 38 2336 1733 29 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 61.4% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 10 Intersection Int Delay, s/veh 0.2 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 36 16 18 2102 1560 26 Future Vol, veh/h 0 36 16 18 2102 1560 26 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 40 18 20 2336 1733 29 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 867 1733 1762 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *438 *577 *655 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *438 *590 *590 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 14 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) * 590 - 438 - - HCM Lane V/C Ratio 0.064 - 0.091 - - HCM Control Delay (s) 11.5 - 14 - - HCM Lane LOS B - B - - HCM 95th %tile Q(veh) 0.2 - 0.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 28 107 0 0 0 284 0 1824 42 0 0 0 Future Volume (vph) 28 107 0 0 0 284 0 1824 42 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.990 Satd. Flow (prot) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.990 Satd. Flow (perm) 0 1844 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 477 Travel Time (s) 2.6 19.3 1.5 5.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 31 119 0 0 0 316 0 2027 47 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 150 0 0 0 316 0 2027 47 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.6 10.6 10.6 20.3 20.3 Total Split (s) 31.0 31.0 31.0 125.0 125.0 Total Split (%) 19.9% 19.9% 19.9% 80.1% 80.1% Maximum Green (s) 25.4 25.4 25.4 118.7 118.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 22.1 22.1 123.9 123.9 Actuated g/C Ratio 0.14 0.14 0.79 0.79 v/c Ratio 0.58 0.80 0.72 0.04 Control Delay 48.4 80.3 10.0 4.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 48.4 80.3 10.0 4.0 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS D F A A Approach Delay 48.4 80.3 9.9 Approach LOS D F A Queue Length 50th (ft) 144 178 462 9 Queue Length 95th (ft) m180 235 597 20 Internal Link Dist (ft) 1 911 42 397 Turn Bay Length (ft) 225 Base Capacity (vph) 307 464 2811 1257 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.49 0.68 0.72 0.04 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 60 (38%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 20.9 Intersection LOS: C Intersection Capacity Utilization 80.0% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 22 4 65 000001478 13 Future Volume (vph) 0 0 22 4 65 000001478 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.997 Satd. Flow (prot) 0 0 1611 0 1857 000003539 1583 Flt Permitted 0.997 Satd. Flow (perm) 0 0 1611 0 1857 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 24 4 72 000001642 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 24 0 76 000001642 14 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 25.0 25.0 25.0 131.0 131.0 Total Split (%) 16.0% 16.0% 16.0% 84.0% 84.0% Maximum Green (s) 19.7 19.7 19.7 124.9 124.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 11.1 11.1 134.9 134.9 Actuated g/C Ratio 0.07 0.07 0.86 0.86 v/c Ratio 0.21 0.58 0.54 0.01 Control Delay 71.0 86.6 0.7 0.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 71.0 86.6 0.7 0.2 LOS E F A A Approach Delay 71.0 86.6 0.7 Approach LOS E F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 24 76 13 0 Queue Length 95th (ft) 55 132 m18 m1 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 206 238 3060 1369 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.12 0.32 0.54 0.01 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 94 (60%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 45 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 5.4 Intersection LOS: A Intersection Capacity Utilization 61.7% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 4 5 124 7 4 254 4 16 4444 Future Volume (vph) 4 5 124 7 4 254 4 16 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.992 0.998 0.979 0.929 Flt Protected 0.950 0.999 0.967 0.988 Satd. Flow (prot) 0 1770 1848 0 0 1857 0 0 1763 0 0 1710 Flt Permitted 0.950 0.999 0.967 0.988 Satd. Flow (perm) 0 1770 1848 0 0 1857 0 0 1763 0 0 1710 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Confl. Peds. (#/hr)4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 6 138 8 4 282 4 18 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 10 146 0 0 290 0 0 26 0 0 17 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.1% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 8 Future Volume (vph) 8 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Ped Bike Factor Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) 4 Peak Hour Factor 0.90 Adj. Flow (vph) 9 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 17 Intersection Int Delay, s/veh 1.1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 5 124 7 4 254 4 16 4 4 4 4 8 Future Vol, veh/h 4 5 124 7 4 254 4 16 4 4 4 4 8 Conflicting Peds, #/hr 0 000000000404 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 4 6 138 8 4 282 4 18 4 4 4 4 9 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 286 0 0 146 0 0 457 456 146 454 458 288 Stage 1 -------154162-292292- Stage 2 -------303294-162166- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1276 - - 1436 - - 514 501 901 516 499 751 Stage 1 -------848764-716671- Stage 2 -------706670-840761- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ ~ - - 1436 - - 501 499 898 507 498 748 Mov Cap-2 Maneuver -------501499-507498- Stage 1 -------848764-716669- Stage 2 -------688668-828761- Approach EB WB NB SB HCM Control Delay, s 0.1 12 11.2 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 540 ~ - - 1436 - - 601 HCM Lane V/C Ratio 0.049 ~ - - 0.003 - - 0.03 HCM Control Delay (s) 12 - - - 7.5 0 - 11.2 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.2 ~ - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 19 31 9 391 393 22 Future Volume (vph) 19 31 9 391 393 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.917 0.993 Flt Protected 0.981 0.999 Satd. Flow (prot) 1676 0 0 1861 1850 0 Flt Permitted 0.981 0.999 Satd. Flow (perm) 1676 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 21 34 10 434 437 24 Shared Lane Traffic (%) Lane Group Flow (vph) 55 0 0 444 461 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.8% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood AM 2026 Future No Build T. Lee Page 19 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 19 31 9 391 393 22 Future Vol, veh/h 19 31 9 391 393 22 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 21 34 10 434 437 24 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 903 449 461 0 - 0 Stage 1 449 ----- Stage 2 454 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 308 610 1100 - - - Stage 1 643 ----- Stage 2 640 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 304 610 1100 - - - Mov Cap-2 Maneuver 304 ----- Stage 1 635 ----- Stage 2 640 ----- Approach EB NB SB HCM Control Delay, s 14.3 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1100 - 441 - - HCM Lane V/C Ratio 0.009 - 0.126 - - HCM Control Delay (s) 8.3 0 14.3 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0 - 0.4 - - Ironwood – Transportation Impact Analysis AM 2026 Phase 2 Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 109 0 0 2501 0 0 Future Volume (vph) 109 0 0 2501 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 80 116 382 Travel Time (s) 1.8 1.4 4.7 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 121 0 0 2779 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 121 0 0 2779 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 33.0 123.0 Total Split (%) 21.2% 78.8% Maximum Green (s) 27.2 117.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 15.8 130.2 Actuated g/C Ratio 0.10 0.83 v/c Ratio 0.68 0.94 Control Delay 85.2 16.7 Queue Delay 0.0 0.0 Total Delay 85.2 16.7 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 85.2 16.7 Approach LOS F B Queue Length 50th (ft) 121 1408 Queue Length 95th (ft) 186 #555 Internal Link Dist (ft) 1 36 302 Turn Bay Length (ft) Base Capacity (vph) 317 2952 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.38 0.94 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 109 (70%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 19.6 Intersection LOS: B Intersection Capacity Utilization 125.8% ICU Level of Service H Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)400001693 Future Volume (vph)400001693 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 93 1789 102 Travel Time (s) 2.1 22.2 1.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)400001881 Shared Lane Traffic (%) Lane Group Flow (vph)400001881 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 72.5% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 4 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 00001693 Future Vol, veh/h 4 00001693 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 4 00001881 Major/Minor Minor1 Major2 Conflicting Flow All 941 - - - Stage 1 0 - - - Stage 2 941 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 262 0 0 - Stage 1 - 0 0 - Stage 2 340 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 262 - - - Mov Cap-2 Maneuver 262 - - - Stage 1 - - - - Stage 2 340 - - - Approach WB SB HCM Control Delay, s 19 0 HCM LOS C Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 262 - HCM Lane V/C Ratio 0.017 - HCM Control Delay (s) 19 - HCM Lane LOS C - HCM 95th %tile Q(veh) 0.1 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 488 4 156 4 4 6 34 110 1969 6 10 4 Future Volume (vph) 488 4 156 4 4 6 34 110 1969 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Ped Bike Factor 0.97 Frt 0.850 0.937 Flt Protected 0.950 0.953 0.987 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1770 Flt Permitted 0.950 0.953 0.987 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1723 0 0 1770 3539 0 0 1724 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1091 679 Travel Time (s) 16.4 29.8 8.4 Confl. Peds. (#/hr)1370 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 542 4 173 4 4 7 38 122 2188 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 271 275 173 0 15 0 0 160 2195 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 38.0 38.0 15.0 15.0 16.0 16.0 87.0 16.0 16.0 Total Split (%) 24.4% 24.4% 9.6% 9.6% 10.3% 10.3% 55.8% 10.3% 10.3% Maximum Green (s) 31.1 31.1 8.6 8.6 9.9 9.9 80.7 10.1 10.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 29.8 29.8 156.0 7.4 11.0 105.5 6.9 Actuated g/C Ratio 0.19 0.19 1.00 0.05 0.07 0.68 0.04 v/c Ratio 0.84 0.85 0.11 0.19 1.29 0.92 0.19 Control Delay 83.6 84.7 0.1 76.0 219.1 29.8 76.9 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1407 277 Future Volume (vph) 1407 277 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Ped Bike Factor Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 383 Travel Time (s) 4.7 Confl. Peds. (#/hr) Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 1563 308 Shared Lane Traffic (%) Lane Group Flow (vph) 1563 308 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 87.0 Total Split (%) 55.8% Maximum Green (s) 80.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 94.7 156.0 Actuated g/C Ratio 0.61 1.00 v/c Ratio 0.73 0.19 Control Delay 25.9 0.3 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 83.6 84.7 0.1 76.0 219.1 29.8 76.9 LOS F F A E F C E Approach Delay 63.9 76.0 42.7 Approach LOS E E D Queue Length 50th (ft) 278 283 0 15 ~206 928 15 Queue Length 95th (ft) #407 #414 0 41 m#323 #1506 41 Internal Link Dist (ft) 1003 1011 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 355 356 1583 110 124 2392 124 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.76 0.77 0.11 0.14 1.29 0.92 0.12 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 116 (74%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.29 Intersection Signal Delay: 38.1 Intersection LOS: D Intersection Capacity Utilization 91.6% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 8 Lane Group SBT SBR Queue Delay 0.0 0.0 Total Delay 25.9 0.3 LOS C A Approach Delay 22.2 Approach LOS C Queue Length 50th (ft) 532 0 Queue Length 95th (ft) 794 0 Internal Link Dist (ft) 303 Turn Bay Length (ft) 250 Base Capacity (vph) 2148 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.73 0.19 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 38 47 26 2117 1570 26 Future Volume (vph) 0 38 47 26 2117 1570 26 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1069 425 679 Travel Time (s) 24.3 5.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 42 52 29 2352 1744 29 Shared Lane Traffic (%) Lane Group Flow (vph) 0 42 0 81 2352 1744 29 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 61.9% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 10 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 38 47 26 2117 1570 26 Future Vol, veh/h 0 38 47 26 2117 1570 26 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 42 52 29 2352 1744 29 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 872 1744 1773 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *438 *577 *655 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *438 *566 *566 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 14.1 0.4 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) * 566 - 438 - - HCM Lane V/C Ratio 0.143 - 0.096 - - HCM Control Delay (s) 12.4 - 14.1 - - HCM Lane LOS B - B - - HCM 95th %tile Q(veh) 0.5 - 0.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 28 119 0 0 0 331 0 1831 44 0 0 0 Future Volume (vph) 28 119 0 0 0 331 0 1831 44 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.991 Satd. Flow (prot) 0 1846 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.991 Satd. Flow (perm) 0 1846 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 477 Travel Time (s) 2.6 19.3 1.5 5.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 31 132 0 0 0 368 0 2034 49 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 163 0 0 0 368 0 2034 49 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.6 10.6 10.6 20.3 20.3 Total Split (s) 31.0 31.0 31.0 125.0 125.0 Total Split (%) 19.9% 19.9% 19.9% 80.1% 80.1% Maximum Green (s) 25.4 25.4 25.4 118.7 118.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 24.0 24.0 122.0 122.0 Actuated g/C Ratio 0.15 0.15 0.78 0.78 v/c Ratio 0.57 0.86 0.74 0.04 Control Delay 47.2 83.7 11.0 4.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 47.2 83.7 11.0 4.2 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS D F B A Approach Delay 47.2 83.7 10.9 Approach LOS D F B Queue Length 50th (ft) 155 207 520 10 Queue Length 95th (ft) m197 #277 602 21 Internal Link Dist (ft) 1 911 42 397 Turn Bay Length (ft) 225 Base Capacity (vph) 307 464 2767 1237 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.53 0.79 0.74 0.04 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 60 (38%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 23.4 Intersection LOS: C Intersection Capacity Utilization 82.5% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 22 4 65 000001509 13 Future Volume (vph) 0 0 22 4 65 000001509 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.997 Satd. Flow (prot) 0 0 1611 0 1857 000003539 1583 Flt Permitted 0.997 Satd. Flow (perm) 0 0 1611 0 1857 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 24 4 72 000001677 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 24 0 76 000001677 14 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 25.0 25.0 25.0 131.0 131.0 Total Split (%) 16.0% 16.0% 16.0% 84.0% 84.0% Maximum Green (s) 19.7 19.7 19.7 124.9 124.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 11.1 11.1 134.9 134.9 Actuated g/C Ratio 0.07 0.07 0.86 0.86 v/c Ratio 0.21 0.58 0.55 0.01 Control Delay 71.0 86.6 0.7 0.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 71.0 86.6 0.7 0.2 LOS E F A A Approach Delay 71.0 86.6 0.7 Approach LOS E F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 24 76 12 0 Queue Length 95th (ft) 55 132 m18 m1 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 206 238 3060 1369 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.12 0.32 0.55 0.01 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 94 (60%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 45 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 5.3 Intersection LOS: A Intersection Capacity Utilization 62.5% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 4 20 124 7 4 254 4 16 4484 Future Volume (vph) 4 20 124 7 4 254 4 16 4484 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.992 0.998 0.979 0.889 Flt Protected 0.950 0.999 0.967 0.994 Satd. Flow (prot) 0 1770 1848 0 0 1857 0 0 1763 0 0 1646 Flt Permitted 0.950 0.999 0.967 0.994 Satd. Flow (perm) 0 1770 1848 0 0 1857 0 0 1763 0 0 1646 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Confl. Peds. (#/hr)4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 22 138 8 4 282 4 18 4494 Shared Lane Traffic (%) Lane Group Flow (vph) 0 26 146 0 0 290 0 0 26 0 0 74 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.9% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 55 Future Volume (vph) 55 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Ped Bike Factor Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) 4 Peak Hour Factor 0.90 Adj. Flow (vph) 61 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 17 Intersection Int Delay, s/veh 2.1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 20 124 7 4 254 4 16 4 4 8 4 55 Future Vol, veh/h 4 20 124 7 4 254 4 16 4 4 8 4 55 Conflicting Peds, #/hr 0 000000000404 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 4 22 138 8 4 282 4 18 4 4 9 4 61 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 286 0 0 146 0 0 515 488 146 486 490 288 Stage 1 -------186194-292292- Stage 2 -------329294-194198- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1276 - - 1436 - - 470 480 901 492 479 751 Stage 1 -------816740-716671- Stage 2 -------684670-808737- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -6 ~ -6 - - 1436 - - 426 479 898 483 478 748 Mov Cap-2 Maneuver -------426479-483478- Stage 1 -------816740-716669- Stage 2 -------620668-796737- Approach EB WB NB SB HCM Control Delay, s 0.1 13 10.9 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 477 + - - 1436 - - 680 HCM Lane V/C Ratio 0.056 - - - 0.003 - - 0.109 HCM Control Delay (s) 13 - - - 7.5 0 - 10.9 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.2 - - - 0 - - 0.4 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 27 31 9 391 393 24 Future Volume (vph) 27 31 9 391 393 24 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.928 0.992 Flt Protected 0.977 0.999 Satd. Flow (prot) 1689 0 0 1861 1848 0 Flt Permitted 0.977 0.999 Satd. Flow (perm) 1689 0 0 1861 1848 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 30 34 10 434 437 27 Shared Lane Traffic (%) Lane Group Flow (vph) 64 0 0 444 464 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.9% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 19 Intersection Int Delay, s/veh 1.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 27 31 9 391 393 24 Future Vol, veh/h 27 31 9 391 393 24 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 30 34 10 434 437 27 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 905 451 464 0 - 0 Stage 1 451 ----- Stage 2 454 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 307 608 1097 - - - Stage 1 642 ----- Stage 2 640 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 303 608 1097 - - - Mov Cap-2 Maneuver 303 ----- Stage 1 634 ----- Stage 2 640 ----- Approach EB NB SB HCM Control Delay, s 15.3 0.2 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1097 - 414 - - HCM Lane V/C Ratio 0.009 - 0.156 - - HCM Control Delay (s) 8.3 0 15.3 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.5 - - Lanes, Volumes, Timings 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 20 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 0 70 2578 32 0 0 Future Volume (vph) 0 70 2578 32 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 0 Storage Lanes 0 1 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 0.95 1.00 1.00 1.00 Frt 0.865 0.850 Flt Protected Satd. Flow (prot) 0 1611 3539 1583 0 0 Flt Permitted Satd. Flow (perm) 0 1611 3539 1583 0 0 Link Speed (mph) 30 55 55 Link Distance (ft) 1177 382 1006 Travel Time (s) 26.8 4.7 12.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 78 2864 36 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 78 2864 36 0 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 82.3% ICU Level of Service E Analysis Period (min) 15 HCM 6th TWSC 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 21 Intersection Int Delay, s/veh 1.9 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 70 2578 32 0 0 Future Vol, veh/h 0 70 2578 32 0 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - 250 - - Veh in Median Storage, # 0 - 0 - - 16979 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 78 2864 36 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - 1432 0 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 124 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 124 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach WB NB HCM Control Delay, s 73.6 0 HCM LOS F Minor Lane/Major Mvmt NBT NBRWBLn1 Capacity (veh/h) - - 124 HCM Lane V/C Ratio - - 0.627 HCM Control Delay (s) - - 73.6 HCM Lane LOS - - F HCM 95th %tile Q(veh) - - 3.2 Lanes, Volumes, Timings 800: US 421 & Site Access 2 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 22 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 1697 0 0 31 0 2474 0000 Future Volume (vph) 0 0 1697 0 0 31 0 2474 0000 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.88 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.865 Flt Protected Satd. Flow (prot) 0 0 2787 0 0 1611 0 3539 0000 Flt Permitted Satd. Flow (perm) 0 0 2787 0 0 1611 0 3539 0000 Link Speed (mph) 55 25 55 55 Link Distance (ft) 1789 1077 383 1727 Travel Time (s) 22.2 29.4 4.7 21.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 1886 0 0 34 0 2749 0000 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 1886 0 0 34 0 2749 0000 Sign Control Free Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 78.4% ICU Level of Service D Analysis Period (min) 15 HCM 6th TWSC 800: US 421 & Site Access 2 05/05/2022 210291 Ironwood 01/06/2022 AM 2026 Phase 2 Build Synchro 10 Report T. Lee Page 23 Intersection Int Delay, s/veh 0.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 1697 0 0 31 0 2474 0 0 0 0 Future Vol, veh/h 0 0 1697 0 0 31 0 2474 0 0 0 0 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - 0 - - 0 ------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 16979 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 0 0 1886 0 0 34 0 2749 0 0 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - - 1375 - 0 - Stage 1 ------ Stage 2 ------ Critical Hdwy - - 6.94 - - - Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - - 3.32 - - - Pot Cap-1 Maneuver 0 0 135 0 - 0 Stage 1 0 0 - 0 - 0 Stage 2 0 0 - 0 - 0 Platoon blocked, % - Mov Cap-1 Maneuver - 0 135 - - - Mov Cap-2 Maneuver - 0 ---- Stage 1 - 0 ---- Stage 2 - 0 ---- Approach WB NB HCM Control Delay, s 40.6 0 HCM LOS E Minor Lane/Major Mvmt NBTWBLn1 Capacity (veh/h) - 135 HCM Lane V/C Ratio - 0.255 HCM Control Delay (s) - 40.6 HCM Lane LOS - E HCM 95th %tile Q(veh) - 1 Ironwood – Transportation Impact Analysis PM 2021 Existing Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 121 0 0 1777 0 0 Future Volume (vph) 121 0 0 1777 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 1479 Travel Time (s) 2.2 1.8 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 134 0 0 1974 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 134 0 0 1974 0 0 Turn Type D.P+P NA Protected Phases 1 2! Permitted Phases 2! Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 30.0 122.0 Total Split (%) 19.7% 80.3% Maximum Green (s) 24.2 116.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 152.0 136.2 Actuated g/C Ratio 1.00 0.90 v/c Ratio 0.08 0.62 Control Delay 0.1 4.3 Queue Delay 0.0 0.0 Total Delay 0.1 4.3 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS A A Approach Delay 0.1 4.3 Approach LOS A A Queue Length 50th (ft) 0 377 Queue Length 95th (ft) 0 m48 Internal Link Dist (ft) 18 64 1399 Turn Bay Length (ft) Base Capacity (vph) 1770 3170 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.08 0.62 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBEB, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.62 Intersection Signal Delay: 4.1 Intersection LOS: A Intersection Capacity Utilization 120.1% ICU Level of Service H Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 10 00002296 Future Volume (vph) 10 00002296 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 96 1045 149 Travel Time (s) 2.2 13.0 1.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 11 00002551 Shared Lane Traffic (%) Lane Group Flow (vph) 11 00002551 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 119.3% ICU Level of Service H Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 4 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 10 00002296 Future Vol, veh/h 10 00002296 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 11 00002551 Major/Minor Minor1 Major2 Conflicting Flow All 1276 - - - Stage 1 0 - - - Stage 2 1276 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 158 0 0 - Stage 1 - 0 0 - Stage 2 226 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 158 - - - Mov Cap-2 Maneuver 158 - - - Stage 1 - - - - Stage 2 226 - - - Approach WB SB HCM Control Delay, s 29.5 0 HCM LOS D Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 158 - HCM Lane V/C Ratio 0.07 - HCM Control Delay (s) 29.5 - HCM Lane LOS D - HCM 95th %tile Q(veh) 0.2 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 342 4 101 4 4 4 35 89 1432 5 9 4 Future Volume (vph) 342 4 101 4 4 4 35 89 1432 5 9 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.955 0.999 Flt Protected 0.950 0.953 0.984 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1750 0 0 1770 3536 0 0 1770 Flt Permitted 0.950 0.953 0.984 0.037 0.120 Satd. Flow (perm) 1681 1686 1583 0 1750 0 0 69 3536 0 0 224 Right Turn on Red Yes No No Satd. Flow (RTOR) 116 Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1002 679 Travel Time (s) 16.4 27.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 380 4 112 4 4 4 39 99 1591 6 10 4 Shared Lane Traffic (%) 49% Lane Group Flow (vph) 194 190 112 0 12 0 0 138 1597 0 0 14 Turn Type Split NA Perm Split NA pm+pt pm+pt NA pm+pt pm+pt Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases 4 2 2 6 6 Detector Phase 44433 552 11 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 20.0 20.0 20.0 12.0 12.0 15.0 15.0 105.0 15.0 15.0 Total Split (%) 13.2% 13.2% 13.2% 7.9% 7.9% 9.9% 9.9% 69.1% 9.9% 9.9% Maximum Green (s) 13.1 13.1 13.1 5.6 5.6 8.9 8.9 98.7 9.1 9.1 Yellow Time (s) 5.0 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None None C-Max None None Act Effct Green (s) 15.0 15.0 15.0 6.6 121.8 117.8 113.5 Actuated g/C Ratio 0.10 0.10 0.10 0.04 0.80 0.78 0.75 v/c Ratio 1.18 1.14 0.43 0.16 0.85 0.58 0.06 Control Delay 181.6 172.0 14.9 74.6 86.3 7.4 4.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 181.6 172.0 14.9 74.6 86.3 7.4 4.8 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1932 362 Future Volume (vph) 1932 362 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1060 Travel Time (s) 13.1 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 2147 402 Shared Lane Traffic (%) Lane Group Flow (vph) 2147 402 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 105.0 Total Split (%) 69.1% Maximum Green (s) 98.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 107.6 152.0 Actuated g/C Ratio 0.71 1.00 v/c Ratio 0.86 0.25 Control Delay 22.2 0.4 Queue Delay 0.0 0.0 Total Delay 22.2 0.4 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F B E F A A Approach Delay 140.3 74.6 13.6 Approach LOS F E B Queue Length 50th (ft) ~240 ~231 0 12 88 130 2 Queue Length 95th (ft) #415 #404 58 36 #219 586 9 Internal Link Dist (ft) 1003 922 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 165 166 260 80 167 2740 274 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 1.18 1.14 0.43 0.15 0.83 0.58 0.05 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.18 Intersection Signal Delay: 29.6 Intersection LOS: C Intersection Capacity Utilization 89.0% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 18.7 Approach LOS B Queue Length 50th (ft) 678 0 Queue Length 95th (ft) 1059 0 Internal Link Dist (ft) 980 Turn Bay Length (ft) 250 Base Capacity (vph) 2505 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.86 0.25 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 9 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 107 0 1561 1984 87 Future Volume (vph) 0 107 0 1561 1984 87 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 300 Storage Lanes 0 1 0 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected Satd. Flow (prot) 0 1611 0 3539 3539 1583 Flt Permitted Satd. Flow (perm) 0 1611 0 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1086 422 679 Travel Time (s) 24.7 5.2 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 119 0 1734 2204 97 Shared Lane Traffic (%) Lane Group Flow (vph) 0 119 0 1734 2204 97 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 68.1% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 10 Intersection Int Delay, s/veh 0.8 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 107 0 1561 1984 87 Future Vol, veh/h 0 107 0 1561 1984 87 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 300 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 119 0 1734 2204 97 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1102 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 *281 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % 1 - - - Mov Cap-1 Maneuver - *281 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 26.9 0 0 HCM LOS D Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 281 - - HCM Lane V/C Ratio - 0.423 - - HCM Control Delay (s) - 26.9 - - HCM Lane LOS - D - - HCM 95th %tile Q(veh) - 2 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 24 133 0 0 0 141 0 1396 29 0 0 0 Future Volume (vph) 24 133 0 0 0 141 0 1396 29 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.865 0.850 Flt Protected 0.992 Satd. Flow (prot) 0 1848 0 0 0 1611 0 3539 1583 0 0 0 Flt Permitted 0.992 Satd. Flow (perm) 0 1848 0 0 0 1611 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 480 Travel Time (s) 2.6 19.3 1.5 6.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 27 148 0 0 0 157 0 1551 32 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 175 0 0 0 157 0 1551 32 0 0 0 Turn Type custom NA Perm NA Perm Protected Phases 7 7 2! Permitted Phases 2! 2! 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 40.0 40.0 40.0 112.0 112.0 Total Split (%) 26.3% 26.3% 26.3% 73.7% 73.7% Maximum Green (s) 34.2 34.2 34.2 105.7 105.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.8 2.8 2.8 1.0 1.0 Lost Time Adjust (s) -0.8 -0.8 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 152.0 20.1 121.9 121.9 Actuated g/C Ratio 1.00 0.13 0.80 0.80 v/c Ratio 0.09 0.74 0.55 0.03 Control Delay 0.1 83.0 6.6 3.9 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 0.1 83.0 6.6 3.9 LOS A F A A Approach Delay 0.1 83.0 6.6 Approach LOS A F A Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 0 152 243 6 Queue Length 95th (ft) m0 222 366 16 Internal Link Dist (ft) 1 911 42 400 Turn Bay Length (ft) Base Capacity (vph) 1848 370 2839 1269 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.09 0.42 0.55 0.03 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 135 (89%), Referenced to phase 2:NBEB, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 12.2 Intersection LOS: B Intersection Capacity Utilization 68.1% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 92 4 69 000001890 44 Future Volume (vph) 0 0 92 4 69 000001890 44 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.998 Satd. Flow (prot) 0 0 1611 0 1859 000003539 1583 Flt Permitted 0.998 Satd. Flow (perm) 0 0 1611 0 1859 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 102 4 77 000002100 49 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 102 0 81 000002100 49 Turn Type Perm custom NA NA Perm Protected Phases 3 3 6! Permitted Phases 3 6! 6! 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 32.0 32.0 32.0 120.0 120.0 Total Split (%) 21.1% 21.1% 21.1% 78.9% 78.9% Maximum Green (s) 26.7 26.7 26.7 113.9 113.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 14.3 152.0 127.7 127.7 Actuated g/C Ratio 0.09 1.00 0.84 0.84 v/c Ratio 0.68 0.04 0.71 0.04 Control Delay 87.2 0.0 1.3 0.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 87.2 0.0 1.3 0.5 LOS F A A A Approach Delay 87.3 1.2 Approach LOS F A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 100 0 21 1 Queue Length 95th (ft) 161 0 47 m2 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 286 1859 2973 1329 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.36 0.04 0.71 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 5 (3%), Referenced to phase 6:WBSB, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 5.0 Intersection LOS: A Intersection Capacity Utilization 74.6% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 5 4 132 17 4 120 4 11 4444 Future Volume (vph) 5 4 132 17 4 120 4 11 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.985 0.996 0.973 0.932 Flt Protected 0.997 0.999 0.971 0.988 Satd. Flow (prot) 0 0 1829 0 0 1853 0 0 1760 0 0 1715 Flt Permitted 0.997 0.999 0.971 0.988 Satd. Flow (perm) 0 0 1829 0 0 1853 0 0 1760 0 0 1715 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 6 4 147 19 4 133 4 12 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 176 0 0 141 0 0 20 0 0 16 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.9% ICU Level of Service A Analysis Period (min) 15 Lane Group SBR Lane Configurations Traffic Volume (vph) 7 Future Volume (vph) 7 Ideal Flow (vphpl) 1900 Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 8 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 16 Intersection Int Delay, s/veh 1.2 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 5 4 132 17 4 120 4 11 4 4 4 4 7 Future Vol, veh/h 5 4 132 17 4 120 4 11 4 4 4 4 7 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length ------------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 6 4 147 19 4 133 4 12 4 4 4 4 8 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 137 0 0 166 0 0 314 322 157 312 329 135 Stage 1 -------165177-143143- Stage 2 -------149145-169186- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1447 - - 1412 - - 639 595 889 641 590 914 Stage 1 -------837753-860779- Stage 2 -------854777-833746- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ ~ - - 1412 - - 629 593 889 633 588 914 Mov Cap-2 Maneuver -------629593-633588- Stage 1 -------837753-860777- Stage 2 -------839775-824746- Approach EB WB NB SB HCM Control Delay, s 0.2 10.6 10.1 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 661 ~ - - 1412 - - 722 HCM Lane V/C Ratio 0.032 ~ - - 0.003 - - 0.023 HCM Control Delay (s) 10.6 - - - 7.6 0 - 10.1 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.1 ~ - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 17 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 28 13 4 394 504 26 Future Volume (vph) 28 13 4 394 504 26 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.958 0.993 Flt Protected 0.967 Satd. Flow (prot) 1726 0 0 1863 1850 0 Flt Permitted 0.967 Satd. Flow (perm) 1726 0 0 1863 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 31 14 4 438 560 29 Shared Lane Traffic (%) Lane Group Flow (vph) 45 0 0 442 589 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.1% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/06/2022 210291 Ironwood PM 2021 Existing T. Lee Page 18 Intersection Int Delay, s/veh 0.8 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 28 13 4 394 504 26 Future Vol, veh/h 28 13 4 394 504 26 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 31 14 4 438 560 29 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1021 575 589 0 - 0 Stage 1 575 ----- Stage 2 446 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 262 518 986 - - - Stage 1 563 ----- Stage 2 645 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 261 518 986 - - - Mov Cap-2 Maneuver 261 ----- Stage 1 560 ----- Stage 2 645 ----- Approach EB NB SB HCM Control Delay, s 18.6 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 986 - 310 - - HCM Lane V/C Ratio 0.005 - 0.147 - - HCM Control Delay (s) 8.7 0 18.6 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.5 - - Ironwood – Transportation Impact Analysis PM 2023 Future No Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 124 0 0 1822 0 0 Future Volume (vph) 124 0 0 1822 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 1479 Travel Time (s) 2.2 1.8 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 138 0 0 2024 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 138 0 0 2024 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 30.0 122.0 Total Split (%) 19.7% 80.3% Maximum Green (s) 24.2 116.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 17.0 125.0 Actuated g/C Ratio 0.11 0.82 v/c Ratio 0.70 0.70 Control Delay 82.8 11.6 Queue Delay 0.0 0.0 Total Delay 82.8 11.6 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 82.8 11.6 Approach LOS F B Queue Length 50th (ft) 134 522 Queue Length 95th (ft) 202 m799 Internal Link Dist (ft) 18 64 1399 Turn Bay Length (ft) Base Capacity (vph) 291 2909 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.47 0.70 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.70 Intersection Signal Delay: 16.1 Intersection LOS: B Intersection Capacity Utilization 123.0% ICU Level of Service H Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 11 00002358 Future Volume (vph) 11 00002358 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 96 1045 149 Travel Time (s) 2.2 13.0 1.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 12 00002620 Shared Lane Traffic (%) Lane Group Flow (vph) 12 00002620 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 122.2% ICU Level of Service H Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 4 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 11 00002358 Future Vol, veh/h 11 00002358 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 12 00002620 Major/Minor Minor1 Major2 Conflicting Flow All 1310 - - - Stage 1 0 - - - Stage 2 1310 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 151 0 0 - Stage 1 - 0 0 - Stage 2 217 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 151 - - - Mov Cap-2 Maneuver 151 - - - Stage 1 - - - - Stage 2 217 - - - Approach WB SB HCM Control Delay, s 30.9 0 HCM LOS D Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 151 - HCM Lane V/C Ratio 0.081 - HCM Control Delay (s) 30.9 - HCM Lane LOS D - HCM 95th %tile Q(veh) 0.3 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 349 4 105 4 4 5 21 81 1470 6 10 4 Future Volume (vph) 349 4 105 4 4 5 21 81 1470 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.942 0.999 Flt Protected 0.950 0.953 0.986 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Flt Permitted 0.950 0.953 0.986 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1002 679 Travel Time (s) 16.4 27.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 388 4 117 4 4 6 23 90 1633 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 194 198 117 0 14 0 0 113 1640 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 20.0 20.0 12.0 12.0 15.0 15.0 105.0 15.0 15.0 Total Split (%) 13.2% 13.2% 7.9% 7.9% 9.9% 9.9% 69.1% 9.9% 9.9% Maximum Green (s) 13.1 13.1 5.6 5.6 8.9 8.9 98.7 9.1 9.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 15.0 15.0 152.0 6.6 10.0 117.0 6.9 Actuated g/C Ratio 0.10 0.10 1.00 0.04 0.07 0.77 0.05 v/c Ratio 1.18 1.19 0.07 0.19 0.97 0.60 0.19 Control Delay 181.6 186.7 0.1 75.8 151.7 8.9 74.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 181.6 186.7 0.1 75.8 151.7 8.9 74.6 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 1986 370 Future Volume (vph) 1986 370 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1060 Travel Time (s) 13.1 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 2207 411 Shared Lane Traffic (%) Lane Group Flow (vph) 2207 411 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 105.0 Total Split (%) 69.1% Maximum Green (s) 98.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 107.2 152.0 Actuated g/C Ratio 0.71 1.00 v/c Ratio 0.88 0.26 Control Delay 24.1 0.4 Queue Delay 0.0 0.0 Total Delay 24.1 0.4 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F A E Approach Delay 141.9 75.8 18.1 Approach LOS F E B Queue Length 50th (ft) ~240 ~248 0 14 118 150 15 Queue Length 95th (ft) #415 #426 0 40 #253 660 40 Internal Link Dist (ft) 1003 922 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 165 166 1583 79 116 2720 116 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 1.18 1.19 0.07 0.18 0.97 0.60 0.13 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.19 Intersection Signal Delay: 32.5 Intersection LOS: C Intersection Capacity Utilization 89.5% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 20.7 Approach LOS C Queue Length 50th (ft) 729 0 Queue Length 95th (ft) 1140 0 Internal Link Dist (ft) 980 Turn Bay Length (ft) 250 Base Capacity (vph) 2495 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.88 0.26 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 110 14 16 1577 2028 86 Future Volume (vph) 0 110 14 16 1577 2028 86 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1086 422 679 Travel Time (s) 24.7 5.2 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 122 16 18 1752 2253 96 Shared Lane Traffic (%) Lane Group Flow (vph) 0 122 0 34 1752 2253 96 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 69.5% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 10 Intersection Int Delay, s/veh 1 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 110 14 16 1577 2028 86 Future Vol, veh/h 0 110 14 16 1577 2028 86 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 122 16 18 1752 2253 96 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1127 2253 2349 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *261 *345 303 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *261 *244 244 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 30.4 0.4 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 244 - 261 - - HCM Lane V/C Ratio 0.137 - 0.468 - - HCM Control Delay (s) 22.1 - 30.4 - - HCM Lane LOS C - D - - HCM 95th %tile Q(veh) 0.5 - 2.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 152 0 0 0 156 0 1425 34 0 0 0 Future Volume (vph) 25 152 0 0 0 156 0 1425 34 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.993 Satd. Flow (prot) 0 1850 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.993 Satd. Flow (perm) 0 1850 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 480 Travel Time (s) 2.6 19.3 1.5 6.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 28 169 0 0 0 173 0 1583 38 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 197 0 0 0 173 0 1583 38 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 40.0 40.0 40.0 112.0 112.0 Total Split (%) 26.3% 26.3% 26.3% 73.7% 73.7% Maximum Green (s) 34.4 34.4 34.4 105.7 105.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 21.2 21.2 120.8 120.8 Actuated g/C Ratio 0.14 0.14 0.79 0.79 v/c Ratio 0.76 0.45 0.56 0.03 Control Delay 57.6 64.4 7.2 4.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 57.6 64.4 7.2 4.2 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E E A A Approach Delay 57.6 64.4 7.2 Approach LOS E E A Queue Length 50th (ft) 191 90 264 7 Queue Length 95th (ft) m201 128 393 18 Internal Link Dist (ft) 1 911 42 400 Turn Bay Length (ft) 225 Base Capacity (vph) 425 641 2812 1258 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.46 0.27 0.56 0.03 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 135 (89%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 45 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 17.1 Intersection LOS: B Intersection Capacity Utilization 66.7% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 92 4 71 000001938 45 Future Volume (vph) 0 0 92 4 71 000001938 45 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.998 Satd. Flow (prot) 0 0 1611 0 1859 000003539 1583 Flt Permitted 0.998 Satd. Flow (perm) 0 0 1611 0 1859 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 102 4 79 000002153 50 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 102 0 83 000002153 50 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 32.0 32.0 32.0 120.0 120.0 Total Split (%) 21.1% 21.1% 21.1% 78.9% 78.9% Maximum Green (s) 26.7 26.7 26.7 113.9 113.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 14.3 14.3 127.7 127.7 Actuated g/C Ratio 0.09 0.09 0.84 0.84 v/c Ratio 0.68 0.48 0.72 0.04 Control Delay 87.2 73.2 1.5 0.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 87.2 73.2 1.5 0.5 LOS F E A A Approach Delay 87.3 73.2 1.5 Approach LOS F E A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 100 80 25 1 Queue Length 95th (ft) 161 132 36 m2 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 286 330 2973 1329 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.36 0.25 0.72 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 5 (3%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 7.6 Intersection LOS: A Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 6 12 147 18 4 131 4 12 4444 Future Volume (vph) 6 12 147 18 4 131 4 12 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.984 0.996 0.974 0.914 Flt Protected 0.950 0.999 0.970 0.991 Satd. Flow (prot) 0 1770 1833 0 0 1853 0 0 1760 0 0 1687 Flt Permitted 0.950 0.999 0.970 0.991 Satd. Flow (perm) 0 1770 1833 0 0 1853 0 0 1760 0 0 1687 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 7 13 163 20 4 146 4 13 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 20 183 0 0 154 0 0 21 0 0 22 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.4% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 13 Future Volume (vph) 13 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 17 Intersection Int Delay, s/veh 1.3 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 6 12 147 18 4 131 4 12 4 4 4 4 13 Future Vol, veh/h 6 12 147 18 4 131 4 12 4 4 4 4 13 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 7 13 163 20 4 146 4 13 4 4 4 4 14 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 150 0 0 183 0 0 364 371 173 359 379 148 Stage 1 -------199213-156156- Stage 2 -------165158-203223- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1431 - - 1392 - - 592 559 871 596 553 899 Stage 1 -------803726-846769- Stage 2 -------837767-799719- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -3 ~ -3 - - 1392 - - 578 557 871 588 551 899 Mov Cap-2 Maneuver -------578557-588551- Stage 1 -------803726-846767- Stage 2 -------816765-790719- Approach EB WB NB SB HCM Control Delay, s 0.2 11.1 10.1 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 615 + - - 1392 - - 736 HCM Lane V/C Ratio 0.036 - - - 0.003 - - 0.032 HCM Control Delay (s) 11.1 - - - 7.6 0 - 10.1 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.1 - - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 29 14 5 402 515 27 Future Volume (vph) 29 14 5 402 515 27 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.955 0.993 Flt Protected 0.968 0.999 Satd. Flow (prot) 1722 0 0 1861 1850 0 Flt Permitted 0.968 0.999 Satd. Flow (perm) 1722 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 32 16 6 447 572 30 Shared Lane Traffic (%) Lane Group Flow (vph) 48 0 0 453 602 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.7% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2023 Future No Build T. Lee Page 19 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 29 14 5 402 515 27 Future Vol, veh/h 29 14 5 402 515 27 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 32 16 6 447 572 30 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1046 587 602 0 - 0 Stage 1 587 ----- Stage 2 459 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 253 510 975 - - - Stage 1 556 ----- Stage 2 636 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 251 510 975 - - - Mov Cap-2 Maneuver 251 ----- Stage 1 552 ----- Stage 2 636 ----- Approach EB NB SB HCM Control Delay, s 19.2 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 975 - 301 - - HCM Lane V/C Ratio 0.006 - 0.159 - - HCM Control Delay (s) 8.7 0 19.2 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.6 - - Ironwood – Transportation Impact Analysis PM 2023 Phase 1A Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 124 0 0 1853 0 0 Future Volume (vph) 124 0 0 1853 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 1479 Travel Time (s) 2.2 1.8 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 138 0 0 2059 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 138 0 0 2059 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 30.0 122.0 Total Split (%) 19.7% 80.3% Maximum Green (s) 24.2 116.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 17.0 125.0 Actuated g/C Ratio 0.11 0.82 v/c Ratio 0.70 0.71 Control Delay 82.8 11.6 Queue Delay 0.0 0.0 Total Delay 82.8 11.6 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 82.8 11.6 Approach LOS F B Queue Length 50th (ft) 134 558 Queue Length 95th (ft) 202 m834 Internal Link Dist (ft) 18 64 1399 Turn Bay Length (ft) Base Capacity (vph) 291 2909 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.47 0.71 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 16.1 Intersection LOS: B Intersection Capacity Utilization 125.3% ICU Level of Service H Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 11 00002409 Future Volume (vph) 11 00002409 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 96 1045 149 Travel Time (s) 2.2 13.0 1.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 12 00002677 Shared Lane Traffic (%) Lane Group Flow (vph) 12 00002677 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 124.5% ICU Level of Service H Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 4 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 11 00002409 Future Vol, veh/h 11 00002409 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 12 00002677 Major/Minor Minor1 Major2 Conflicting Flow All 1339 - - - Stage 1 0 - - - Stage 2 1339 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 144 0 0 - Stage 1 - 0 0 - Stage 2 209 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 144 - - - Mov Cap-2 Maneuver 144 - - - Stage 1 - - - - Stage 2 209 - - - Approach WB SB HCM Control Delay, s 32.3 0 HCM LOS D Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 144 - HCM Lane V/C Ratio 0.085 - HCM Control Delay (s) 32.3 - HCM Lane LOS D - HCM 95th %tile Q(veh) 0.3 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 349 4 109 4 4 5 21 83 1501 6 10 4 Future Volume (vph) 349 4 109 4 4 5 21 83 1501 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.942 0.999 Flt Protected 0.950 0.953 0.986 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Flt Permitted 0.950 0.953 0.986 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1002 679 Travel Time (s) 16.4 27.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 388 4 121 4 4 6 23 92 1668 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 194 198 121 0 14 0 0 115 1675 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 20.0 20.0 12.0 12.0 15.0 15.0 105.0 15.0 15.0 Total Split (%) 13.2% 13.2% 7.9% 7.9% 9.9% 9.9% 69.1% 9.9% 9.9% Maximum Green (s) 13.1 13.1 5.6 5.6 8.9 8.9 98.7 9.1 9.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 15.0 15.0 152.0 6.6 10.0 117.0 6.9 Actuated g/C Ratio 0.10 0.10 1.00 0.04 0.07 0.77 0.05 v/c Ratio 1.18 1.19 0.08 0.19 0.99 0.62 0.19 Control Delay 181.6 186.7 0.1 75.8 153.0 8.6 74.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 181.6 186.7 0.1 75.8 153.0 8.6 74.6 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 2037 370 Future Volume (vph) 2037 370 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1060 Travel Time (s) 13.1 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 2263 411 Shared Lane Traffic (%) Lane Group Flow (vph) 2263 411 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 105.0 Total Split (%) 69.1% Maximum Green (s) 98.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 107.2 152.0 Actuated g/C Ratio 0.71 1.00 v/c Ratio 0.91 0.26 Control Delay 25.8 0.4 Queue Delay 0.0 0.0 Total Delay 25.8 0.4 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F A E Approach Delay 140.7 75.8 17.8 Approach LOS F E B Queue Length 50th (ft) ~240 ~248 0 14 120 169 15 Queue Length 95th (ft) #415 #426 0 40 #258 601 40 Internal Link Dist (ft) 1003 922 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 165 166 1583 79 116 2720 116 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 1.18 1.19 0.08 0.18 0.99 0.62 0.13 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.19 Intersection Signal Delay: 33.0 Intersection LOS: C Intersection Capacity Utilization 91.0% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 22.2 Approach LOS C Queue Length 50th (ft) 780 0 Queue Length 95th (ft) #1315 0 Internal Link Dist (ft) 980 Turn Bay Length (ft) 250 Base Capacity (vph) 2495 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.91 0.26 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 114 23 18 1610 2083 86 Future Volume (vph) 0 114 23 18 1610 2083 86 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1086 422 679 Travel Time (s) 24.7 5.2 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 127 26 20 1789 2314 96 Shared Lane Traffic (%) Lane Group Flow (vph) 0 127 0 46 1789 2314 96 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 71.3% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 10 Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 114 23 18 1610 2083 86 Future Vol, veh/h 0 114 23 18 1610 2083 86 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 127 26 20 1789 2314 96 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1157 2314 2410 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *241 *318 268 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *241 *201 201 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 35.4 0.7 0 HCM LOS E Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 201 - 241 - - HCM Lane V/C Ratio 0.227 - 0.526 - - HCM Control Delay (s) 28.1 - 35.4 - - HCM Lane LOS D - E - - HCM 95th %tile Q(veh) 0.8 - 2.8 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 211 0 0 0 201 0 1425 50 0 0 0 Future Volume (vph) 25 211 0 0 0 201 0 1425 50 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.995 Satd. Flow (prot) 0 1853 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.995 Satd. Flow (perm) 0 1853 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 480 Travel Time (s) 2.6 19.3 1.5 6.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 28 234 0 0 0 223 0 1583 56 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 262 0 0 0 223 0 1583 56 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 40.0 40.0 40.0 112.0 112.0 Total Split (%) 26.3% 26.3% 26.3% 73.7% 73.7% Maximum Green (s) 34.4 34.4 34.4 105.7 105.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 26.4 26.4 115.6 115.6 Actuated g/C Ratio 0.17 0.17 0.76 0.76 v/c Ratio 0.81 0.46 0.59 0.05 Control Delay 56.9 59.9 9.6 5.6 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 56.9 59.9 9.6 5.6 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E E A A Approach Delay 56.9 59.9 9.5 Approach LOS E E A Queue Length 50th (ft) 253 115 319 12 Queue Length 95th (ft) m280 153 467 30 Internal Link Dist (ft) 1 911 42 400 Turn Bay Length (ft) 225 Base Capacity (vph) 426 641 2690 1203 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.62 0.35 0.59 0.05 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 135 (89%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 20.6 Intersection LOS: C Intersection Capacity Utilization 71.4% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 94 4 71 000001947 45 Future Volume (vph) 0 0 94 4 71 000001947 45 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.998 Satd. Flow (prot) 0 0 1611 0 1859 000003539 1583 Flt Permitted 0.998 Satd. Flow (perm) 0 0 1611 0 1859 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 104 4 79 000002163 50 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 104 0 83 000002163 50 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 32.0 32.0 32.0 120.0 120.0 Total Split (%) 21.1% 21.1% 21.1% 78.9% 78.9% Maximum Green (s) 26.7 26.7 26.7 113.9 113.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 14.5 14.5 127.5 127.5 Actuated g/C Ratio 0.10 0.10 0.84 0.84 v/c Ratio 0.68 0.47 0.73 0.04 Control Delay 87.1 72.7 1.6 0.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 87.1 72.7 1.6 0.5 LOS F E A A Approach Delay 87.1 72.7 1.5 Approach LOS F E A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 102 79 26 1 Queue Length 95th (ft) 162 132 37 m2 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 286 330 2968 1327 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.36 0.25 0.73 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 5 (3%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.73 Intersection Signal Delay: 7.7 Intersection LOS: A Intersection Capacity Utilization 76.3% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 6 87 147 18 4 131 4 12 4444 Future Volume (vph) 6 87 147 18 4 131 4 12 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.984 0.996 0.974 0.880 Flt Protected 0.950 0.999 0.970 0.997 Satd. Flow (prot) 0 1770 1833 0 0 1853 0 0 1760 0 0 1634 Flt Permitted 0.950 0.999 0.970 0.997 Satd. Flow (perm) 0 1770 1833 0 0 1853 0 0 1760 0 0 1634 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 7 97 163 20 4 146 4 13 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 104 183 0 0 154 0 0 21 0 0 72 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 31.8% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 58 Future Volume (vph) 58 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 64 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 17 Intersection Int Delay, s/veh 2 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 6 87 147 18 4 131 4 12 4 4 4 4 58 Future Vol, veh/h 6 87 147 18 4 131 4 12 4 4 4 4 58 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 7 97 163 20 4 146 4 13 4 4 4 4 64 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 150 0 0 183 0 0 557 539 173 527 547 148 Stage 1 -------367381-156156- Stage 2 -------190158-371391- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1431 - - 1392 - - 441 449 871 462 445 899 Stage 1 -------653613-846769- Stage 2 -------812767-649607- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -16 ~ -16 - - 1392 - - 405 448 871 455 444 899 Mov Cap-2 Maneuver -------405448-455444- Stage 1 -------653613-846767- Stage 2 -------747765-641607- Approach EB WB NB SB HCM Control Delay, s 0.2 13.2 9.9 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 463 + - - 1392 - - 802 HCM Lane V/C Ratio 0.048 - - - 0.003 - - 0.091 HCM Control Delay (s) 13.2 - - - 7.6 0 - 9.9 HCM Lane LOS B - - - A A - A HCM 95th %tile Q(veh) 0.2 - - - 0 - - 0.3 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 31 14 5 402 515 31 Future Volume (vph) 31 14 5 402 515 31 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.957 0.992 Flt Protected 0.967 0.999 Satd. Flow (prot) 1724 0 0 1861 1848 0 Flt Permitted 0.967 0.999 Satd. Flow (perm) 1724 0 0 1861 1848 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 34 16 6 447 572 34 Shared Lane Traffic (%) Lane Group Flow (vph) 50 0 0 453 606 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 39.0% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2023 Phase 1A Build T. Lee Page 19 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 31 14 5 402 515 31 Future Vol, veh/h 31 14 5 402 515 31 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 34 16 6 447 572 34 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1048 589 606 0 - 0 Stage 1 589 ----- Stage 2 459 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 252 508 972 - - - Stage 1 554 ----- Stage 2 636 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 250 508 972 - - - Mov Cap-2 Maneuver 250 ----- Stage 1 550 ----- Stage 2 636 ----- Approach EB NB SB HCM Control Delay, s 19.6 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 972 - 297 - - HCM Lane V/C Ratio 0.006 - 0.168 - - HCM Control Delay (s) 8.7 0 19.6 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.6 - - Ironwood – Transportation Impact Analysis PM 2024 Future No Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 125 0 0 1840 0 0 Future Volume (vph) 125 0 0 1840 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 1479 Travel Time (s) 2.2 1.8 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 139 0 0 2044 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 139 0 0 2044 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 30.0 122.0 Total Split (%) 19.7% 80.3% Maximum Green (s) 24.2 116.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 17.1 124.9 Actuated g/C Ratio 0.11 0.82 v/c Ratio 0.70 0.70 Control Delay 82.9 11.8 Queue Delay 0.0 0.0 Total Delay 82.9 11.8 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 82.9 11.8 Approach LOS F B Queue Length 50th (ft) 135 532 Queue Length 95th (ft) 203 m812 Internal Link Dist (ft) 18 64 1399 Turn Bay Length (ft) Base Capacity (vph) 291 2908 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.48 0.70 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.70 Intersection Signal Delay: 16.3 Intersection LOS: B Intersection Capacity Utilization 124.2% ICU Level of Service H Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 11 00002381 Future Volume (vph) 11 00002381 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 96 1045 149 Travel Time (s) 2.2 13.0 1.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 12 00002646 Shared Lane Traffic (%) Lane Group Flow (vph) 12 00002646 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 123.3% ICU Level of Service H Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 4 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 11 00002381 Future Vol, veh/h 11 00002381 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 12 00002646 Major/Minor Minor1 Major2 Conflicting Flow All 1323 - - - Stage 1 0 - - - Stage 2 1323 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 148 0 0 - Stage 1 - 0 0 - Stage 2 213 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 148 - - - Mov Cap-2 Maneuver 148 - - - Stage 1 - - - - Stage 2 213 - - - Approach WB SB HCM Control Delay, s 31.5 0 HCM LOS D Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 148 - HCM Lane V/C Ratio 0.083 - HCM Control Delay (s) 31.5 - HCM Lane LOS D - HCM 95th %tile Q(veh) 0.3 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 353 4 106 4 4 5 22 82 1485 6 10 4 Future Volume (vph) 353 4 106 4 4 5 22 82 1485 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.942 0.999 Flt Protected 0.950 0.953 0.986 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Flt Permitted 0.950 0.953 0.986 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1002 679 Travel Time (s) 16.4 27.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 392 4 118 4 4 6 24 91 1650 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 196 200 118 0 14 0 0 115 1657 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 20.0 20.0 12.0 12.0 15.0 15.0 105.0 15.0 15.0 Total Split (%) 13.2% 13.2% 7.9% 7.9% 9.9% 9.9% 69.1% 9.9% 9.9% Maximum Green (s) 13.1 13.1 5.6 5.6 8.9 8.9 98.7 9.1 9.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 15.0 15.0 152.0 6.6 10.0 117.0 6.9 Actuated g/C Ratio 0.10 0.10 1.00 0.04 0.07 0.77 0.05 v/c Ratio 1.19 1.20 0.07 0.19 0.99 0.61 0.19 Control Delay 185.4 190.5 0.1 75.8 155.6 9.0 74.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 185.4 190.5 0.1 75.8 155.6 9.0 74.6 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 2006 373 Future Volume (vph) 2006 373 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1060 Travel Time (s) 13.1 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 2229 414 Shared Lane Traffic (%) Lane Group Flow (vph) 2229 414 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 105.0 Total Split (%) 69.1% Maximum Green (s) 98.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 107.2 152.0 Actuated g/C Ratio 0.71 1.00 v/c Ratio 0.89 0.26 Control Delay 24.8 0.4 Queue Delay 0.0 0.0 Total Delay 24.8 0.4 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F A E Approach Delay 144.8 75.8 18.5 Approach LOS F E B Queue Length 50th (ft) ~244 ~252 0 14 121 152 15 Queue Length 95th (ft) #420 #430 0 40 #258 672 40 Internal Link Dist (ft) 1003 922 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 165 166 1583 79 116 2720 116 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 1.19 1.20 0.07 0.18 0.99 0.61 0.13 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.20 Intersection Signal Delay: 33.2 Intersection LOS: C Intersection Capacity Utilization 90.3% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 21.3 Approach LOS C Queue Length 50th (ft) 748 0 Queue Length 95th (ft) #1197 0 Internal Link Dist (ft) 980 Turn Bay Length (ft) 250 Base Capacity (vph) 2495 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.89 0.26 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 111 14 16 1593 2049 87 Future Volume (vph) 0 111 14 16 1593 2049 87 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1086 422 679 Travel Time (s) 24.7 5.2 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 123 16 18 1770 2277 97 Shared Lane Traffic (%) Lane Group Flow (vph) 0 123 0 34 1770 2277 97 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 70.2% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 10 Intersection Int Delay, s/veh 1.2 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 111 14 16 1593 2049 87 Future Vol, veh/h 0 111 14 16 1593 2049 87 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 123 16 18 1770 2277 97 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1139 2277 2374 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *241 *318 307 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *241 *225 225 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 34.6 0.4 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 225 - 241 - - HCM Lane V/C Ratio 0.148 - 0.512 - - HCM Control Delay (s) 23.8 - 34.6 - - HCM Lane LOS C - D - - HCM 95th %tile Q(veh) 0.5 - 2.7 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 154 0 0 0 158 0 1439 34 0 0 0 Future Volume (vph) 25 154 0 0 0 158 0 1439 34 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.993 Satd. Flow (prot) 0 1850 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.993 Satd. Flow (perm) 0 1850 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 480 Travel Time (s) 2.6 19.3 1.5 6.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 28 171 0 0 0 176 0 1599 38 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 199 0 0 0 176 0 1599 38 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 40.0 40.0 40.0 112.0 112.0 Total Split (%) 26.3% 26.3% 26.3% 73.7% 73.7% Maximum Green (s) 34.4 34.4 34.4 105.7 105.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 21.4 21.4 120.6 120.6 Actuated g/C Ratio 0.14 0.14 0.79 0.79 v/c Ratio 0.77 0.45 0.57 0.03 Control Delay 57.4 64.4 7.4 4.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 57.4 64.4 7.4 4.2 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E E A A Approach Delay 57.4 64.4 7.3 Approach LOS E E A Queue Length 50th (ft) 192 92 271 7 Queue Length 95th (ft) m202 130 402 19 Internal Link Dist (ft) 1 911 42 400 Turn Bay Length (ft) 225 Base Capacity (vph) 425 641 2808 1256 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.47 0.27 0.57 0.03 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 135 (89%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 45 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 17.2 Intersection LOS: B Intersection Capacity Utilization 67.3% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 95 4 72 000001958 46 Future Volume (vph) 0 0 95 4 72 000001958 46 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.998 Satd. Flow (prot) 0 0 1611 0 1859 000003539 1583 Flt Permitted 0.998 Satd. Flow (perm) 0 0 1611 0 1859 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 106 4 80 000002176 51 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 106 0 84 000002176 51 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 32.0 32.0 32.0 120.0 120.0 Total Split (%) 21.1% 21.1% 21.1% 78.9% 78.9% Maximum Green (s) 26.7 26.7 26.7 113.9 113.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 14.7 14.7 127.3 127.3 Actuated g/C Ratio 0.10 0.10 0.84 0.84 v/c Ratio 0.68 0.47 0.73 0.04 Control Delay 87.2 72.4 1.7 0.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 87.2 72.4 1.7 0.5 LOS F E A A Approach Delay 87.2 72.4 1.7 Approach LOS F E A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 103 80 25 1 Queue Length 95th (ft) 164 133 37 m2 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 286 330 2964 1325 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.37 0.25 0.73 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 5 (3%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.73 Intersection Signal Delay: 7.9 Intersection LOS: A Intersection Capacity Utilization 76.7% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 6 12 148 18 4 132 4 12 4444 Future Volume (vph) 6 12 148 18 4 132 4 12 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.984 0.997 0.974 0.914 Flt Protected 0.950 0.999 0.970 0.991 Satd. Flow (prot) 0 1770 1833 0 0 1855 0 0 1760 0 0 1687 Flt Permitted 0.950 0.999 0.970 0.991 Satd. Flow (perm) 0 1770 1833 0 0 1855 0 0 1760 0 0 1687 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 7 13 164 20 4 147 4 13 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 20 184 0 0 155 0 0 21 0 0 22 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.5% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 13 Future Volume (vph) 13 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 17 Intersection Int Delay, s/veh 1.3 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 6 12 148 18 4 132 4 12 4 4 4 4 13 Future Vol, veh/h 6 12 148 18 4 132 4 12 4 4 4 4 13 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 7 13 164 20 4 147 4 13 4 4 4 4 14 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 151 0 0 184 0 0 366 373 174 361 381 149 Stage 1 -------200214-157157- Stage 2 -------166159-204224- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1430 - - 1391 - - 590 557 869 595 552 898 Stage 1 -------802725-845768- Stage 2 -------836766-798718- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -3 ~ -3 - - 1391 - - 576 555 869 587 550 898 Mov Cap-2 Maneuver -------576555-587550- Stage 1 -------802725-845766- Stage 2 -------815764-789718- Approach EB WB NB SB HCM Control Delay, s 0.2 11.1 10.1 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 613 + - - 1391 - - 735 HCM Lane V/C Ratio 0.036 - - - 0.003 - - 0.032 HCM Control Delay (s) 11.1 - - - 7.6 0 - 10.1 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.1 - - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 29 14 5 406 520 27 Future Volume (vph) 29 14 5 406 520 27 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.955 0.993 Flt Protected 0.968 0.999 Satd. Flow (prot) 1722 0 0 1861 1850 0 Flt Permitted 0.968 0.999 Satd. Flow (perm) 1722 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 32 16 6 451 578 30 Shared Lane Traffic (%) Lane Group Flow (vph) 48 0 0 457 608 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 39.0% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2024 Future No Build T. Lee Page 19 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 29 14 5 406 520 27 Future Vol, veh/h 29 14 5 406 520 27 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 32 16 6 451 578 30 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1056 593 608 0 - 0 Stage 1 593 ----- Stage 2 463 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 250 506 970 - - - Stage 1 552 ----- Stage 2 634 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 248 506 970 - - - Mov Cap-2 Maneuver 248 ----- Stage 1 548 ----- Stage 2 634 ----- Approach EB NB SB HCM Control Delay, s 19.4 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 970 - 297 - - HCM Lane V/C Ratio 0.006 - 0.161 - - HCM Control Delay (s) 8.7 0 19.4 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.6 - - Ironwood – Transportation Impact Analysis PM 2024 Phase 1B Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 181 0 0 1865 0 0 Future Volume (vph) 181 0 0 1865 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 434 Travel Time (s) 2.2 1.8 5.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 201 0 0 2072 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 201 0 0 2072 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 30.0 122.0 Total Split (%) 19.7% 80.3% Maximum Green (s) 24.2 116.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 21.3 120.7 Actuated g/C Ratio 0.14 0.79 v/c Ratio 0.81 0.74 Control Delay 87.4 14.8 Queue Delay 0.0 0.0 Total Delay 87.4 14.8 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 87.4 14.8 Approach LOS F B Queue Length 50th (ft) 195 600 Queue Length 95th (ft) 283 m848 Internal Link Dist (ft) 18 64 354 Turn Bay Length (ft) Base Capacity (vph) 291 2810 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.69 0.74 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 21.2 Intersection LOS: C Intersection Capacity Utilization 130.8% ICU Level of Service H Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 11 00002406 Future Volume (vph) 11 00002406 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 96 1045 149 Travel Time (s) 2.2 13.0 1.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 12 00002673 Shared Lane Traffic (%) Lane Group Flow (vph) 12 00002673 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 124.7% ICU Level of Service H Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 4 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 11 00002406 Future Vol, veh/h 11 00002406 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 12 00002673 Major/Minor Minor1 Major2 Conflicting Flow All 1337 - - - Stage 1 0 - - - Stage 2 1337 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 145 0 0 - Stage 1 - 0 0 - Stage 2 210 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 145 - - - Mov Cap-2 Maneuver 145 - - - Stage 1 - - - - Stage 2 210 - - - Approach WB SB HCM Control Delay, s 32.1 0 HCM LOS D Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 145 - HCM Lane V/C Ratio 0.084 - HCM Control Delay (s) 32.1 - HCM Lane LOS D - HCM 95th %tile Q(veh) 0.3 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 359 4 106 4 4 5 22 86 1504 6 10 4 Future Volume (vph) 359 4 106 4 4 5 22 86 1504 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.942 0.999 Flt Protected 0.950 0.953 0.986 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Flt Permitted 0.950 0.953 0.986 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1002 679 Travel Time (s) 16.4 27.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 399 4 118 4 4 6 24 96 1671 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 199 204 118 0 14 0 0 120 1678 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 20.0 20.0 12.0 12.0 15.0 15.0 105.0 15.0 15.0 Total Split (%) 13.2% 13.2% 7.9% 7.9% 9.9% 9.9% 69.1% 9.9% 9.9% Maximum Green (s) 13.1 13.1 5.6 5.6 8.9 8.9 98.7 9.1 9.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 15.0 15.0 152.0 6.6 10.0 117.0 6.9 Actuated g/C Ratio 0.10 0.10 1.00 0.04 0.07 0.77 0.05 v/c Ratio 1.21 1.23 0.07 0.19 1.03 0.62 0.19 Control Delay 191.1 198.4 0.1 75.8 163.0 8.8 74.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 191.1 198.4 0.1 75.8 163.0 8.8 74.6 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 2031 373 Future Volume (vph) 2031 373 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1060 Travel Time (s) 13.1 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 2257 414 Shared Lane Traffic (%) Lane Group Flow (vph) 2257 414 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 105.0 Total Split (%) 69.1% Maximum Green (s) 98.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 107.2 152.0 Actuated g/C Ratio 0.71 1.00 v/c Ratio 0.90 0.26 Control Delay 25.6 0.4 Queue Delay 0.0 0.0 Total Delay 25.6 0.4 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F A E Approach Delay 150.7 75.8 19.1 Approach LOS F E B Queue Length 50th (ft) ~251 ~261 0 14 ~129 161 15 Queue Length 95th (ft) #428 #438 0 40 #271 693 40 Internal Link Dist (ft) 1003 922 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 165 166 1583 79 116 2720 116 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 1.21 1.23 0.07 0.18 1.03 0.62 0.13 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.23 Intersection Signal Delay: 34.5 Intersection LOS: C Intersection Capacity Utilization 91.3% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 22.0 Approach LOS C Queue Length 50th (ft) 775 0 Queue Length 95th (ft) #1308 0 Internal Link Dist (ft) 980 Turn Bay Length (ft) 250 Base Capacity (vph) 2495 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.90 0.26 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 117 29 20 1615 2074 87 Future Volume (vph) 0 117 29 20 1615 2074 87 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1086 422 679 Travel Time (s) 24.7 5.2 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 130 32 22 1794 2304 97 Shared Lane Traffic (%) Lane Group Flow (vph) 0 130 0 54 1794 2304 97 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 71.2% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 10 Intersection Int Delay, s/veh 1.5 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 117 29 20 1615 2074 87 Future Vol, veh/h 0 117 29 20 1615 2074 87 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 130 32 22 1794 2304 97 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1152 2304 2401 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *241 *318 277 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *241 *197 197 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 36.2 0.9 0 HCM LOS E Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 197 - 241 - - HCM Lane V/C Ratio 0.276 - 0.539 - - HCM Control Delay (s) 30.2 - 36.2 - - HCM Lane LOS D - E - - HCM 95th %tile Q(veh) 1.1 - 2.9 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 179 0 0 0 180 0 1458 40 0 0 0 Future Volume (vph) 25 179 0 0 0 180 0 1458 40 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.994 Satd. Flow (prot) 0 1852 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.994 Satd. Flow (perm) 0 1852 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 480 Travel Time (s) 2.6 19.3 1.5 6.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 28 199 0 0 0 200 0 1620 44 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 227 0 0 0 200 0 1620 44 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 40.0 40.0 40.0 112.0 112.0 Total Split (%) 26.3% 26.3% 26.3% 73.7% 73.7% Maximum Green (s) 34.4 34.4 34.4 105.7 105.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 23.6 23.6 118.4 118.4 Actuated g/C Ratio 0.16 0.16 0.78 0.78 v/c Ratio 0.79 0.46 0.59 0.04 Control Delay 56.6 62.5 8.5 4.8 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 56.6 62.5 8.5 4.8 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E E A A Approach Delay 56.6 62.5 8.4 Approach LOS E E A Queue Length 50th (ft) 220 103 303 9 Queue Length 95th (ft) m234 143 445 23 Internal Link Dist (ft) 1 911 42 400 Turn Bay Length (ft) 225 Base Capacity (vph) 426 641 2755 1232 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.53 0.31 0.59 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 135 (89%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 18.8 Intersection LOS: B Intersection Capacity Utilization 69.9% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 95 4 72 000001973 46 Future Volume (vph) 0 0 95 4 72 000001973 46 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.998 Satd. Flow (prot) 0 0 1611 0 1859 000003539 1583 Flt Permitted 0.998 Satd. Flow (perm) 0 0 1611 0 1859 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 106 4 80 000002192 51 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 106 0 84 000002192 51 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 32.0 32.0 32.0 120.0 120.0 Total Split (%) 21.1% 21.1% 21.1% 78.9% 78.9% Maximum Green (s) 26.7 26.7 26.7 113.9 113.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 14.7 14.7 127.3 127.3 Actuated g/C Ratio 0.10 0.10 0.84 0.84 v/c Ratio 0.68 0.47 0.74 0.04 Control Delay 87.2 72.4 1.9 0.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 87.2 72.4 1.9 0.5 LOS F E A A Approach Delay 87.2 72.4 1.8 Approach LOS F E A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 103 80 24 1 Queue Length 95th (ft) 164 133 35 m2 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 286 330 2964 1325 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.37 0.25 0.74 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 5 (3%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 8.0 Intersection LOS: A Intersection Capacity Utilization 77.1% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 6 49 148 18 4 132 6 12 4444 Future Volume (vph) 6 49 148 18 4 132 6 12 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.984 0.994 0.974 0.888 Flt Protected 0.950 0.999 0.970 0.996 Satd. Flow (prot) 0 1770 1833 0 0 1850 0 0 1760 0 0 1648 Flt Permitted 0.950 0.999 0.970 0.996 Satd. Flow (perm) 0 1770 1833 0 0 1850 0 0 1760 0 0 1648 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 7 54 164 20 4 147 7 13 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 61 184 0 0 158 0 0 21 0 0 47 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.9% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 35 Future Volume (vph) 35 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 39 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 17 Intersection Int Delay, s/veh 1.6 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 6 49 148 18 4 132 6 12 4 4 4 4 35 Future Vol, veh/h 6 49 148 18 4 132 6 12 4 4 4 4 35 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 7 54 164 20 4 147 7 13 4 4 4 4 39 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 154 0 0 184 0 0 462 458 174 445 465 151 Stage 1 -------282296-159159- Stage 2 -------180162-286306- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1426 - - 1391 - - 510 499 869 523 495 895 Stage 1 -------725668-843766- Stage 2 -------822764-721662- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -9 ~ -9 - - 1391 - - 483 498 869 516 494 895 Mov Cap-2 Maneuver -------483498-516494- Stage 1 -------725668-843764- Stage 2 -------779762-713662- Approach EB WB NB SB HCM Control Delay, s 0.2 12 9.9 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 534 + - - 1391 - - 782 HCM Lane V/C Ratio 0.042 - - - 0.003 - - 0.061 HCM Control Delay (s) 12 - - - 7.6 0 - 9.9 HCM Lane LOS B - - - A A - A HCM 95th %tile Q(veh) 0.1 - - - 0 - - 0.2 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 33 14 5 406 520 33 Future Volume (vph) 33 14 5 406 520 33 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.959 0.992 Flt Protected 0.966 0.999 Satd. Flow (prot) 1726 0 0 1861 1848 0 Flt Permitted 0.966 0.999 Satd. Flow (perm) 1726 0 0 1861 1848 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 37 16 6 451 578 37 Shared Lane Traffic (%) Lane Group Flow (vph) 53 0 0 457 615 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 39.4% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 19 Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 33 14 5 406 520 33 Future Vol, veh/h 33 14 5 406 520 33 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 37 16 6 451 578 37 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1060 597 615 0 - 0 Stage 1 597 ----- Stage 2 463 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 248 503 965 - - - Stage 1 550 ----- Stage 2 634 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 246 503 965 - - - Mov Cap-2 Maneuver 246 ----- Stage 1 546 ----- Stage 2 634 ----- Approach EB NB SB HCM Control Delay, s 20.1 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 965 - 290 - - HCM Lane V/C Ratio 0.006 - 0.18 - - HCM Control Delay (s) 8.8 0 20.1 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.6 - - Lanes, Volumes, Timings 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 20 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 0 48 1965 81 0 0 Future Volume (vph) 0 48 1965 81 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt 0.865 0.994 Flt Protected Satd. Flow (prot) 0 1611 3518 0 0 0 Flt Permitted Satd. Flow (perm) 0 1611 3518 0 0 0 Link Speed (mph) 25 55 55 Link Distance (ft) 1732 434 1009 Travel Time (s) 47.2 5.4 12.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 53 2183 90 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 53 2273 0 0 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 66.9% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build T. Lee Page 21 Intersection Int Delay, s/veh 0.7 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 48 1965 81 0 0 Future Vol, veh/h 0 48 1965 81 0 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - 0 - - 16979 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 53 2183 90 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - 1137 0 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 196 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 196 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach WB NB HCM Control Delay, s 30.1 0 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1 Capacity (veh/h) - - 196 HCM Lane V/C Ratio - - 0.272 HCM Control Delay (s) - - 30.1 HCM Lane LOS - - D HCM 95th %tile Q(veh) - - 1.1 Ironwood – Transportation Impact Analysis PM 2024 Phase 1B Build + Improvements Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build with Improvements T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 181 0 0 1865 0 0 Future Volume (vph) 181 0 0 1865 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 434 Travel Time (s) 2.2 1.8 5.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 201 0 0 2072 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 201 0 0 2072 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 27.0 125.0 Total Split (%) 17.8% 82.2% Maximum Green (s) 21.2 119.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 20.3 121.7 Actuated g/C Ratio 0.13 0.80 v/c Ratio 0.85 0.73 Control Delay 94.0 12.7 Queue Delay 0.0 0.0 Total Delay 94.0 12.7 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build with Improvements T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 94.0 12.7 Approach LOS F B Queue Length 50th (ft) 195 558 Queue Length 95th (ft) #319 m781 Internal Link Dist (ft) 18 64 354 Turn Bay Length (ft) Base Capacity (vph) 256 2832 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.79 0.73 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 19.9 Intersection LOS: B Intersection Capacity Utilization 130.8% ICU Level of Service H Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 102: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build with Improvements T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)00001812406 Future Volume (vph)00001812406 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 450 Storage Lanes 0 0 0 1 Taper Length (ft) 25 125 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot)00001770 3539 Flt Permitted 0.950 Satd. Flow (perm)00001770 3539 Link Speed (mph) 30 55 55 Link Distance (ft) 98 149 1301 Travel Time (s) 2.2 1.8 16.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)00002012673 Shared Lane Traffic (%) Lane Group Flow (vph)00002012673 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 125.6% ICU Level of Service H Analysis Period (min) 15 Lanes, Volumes, Timings 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build with Improvements T. Lee Page 4 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 0 48 1965 81 0 0 Future Volume (vph) 0 48 1965 81 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 0 Storage Lanes 0 1 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 0.95 1.00 1.00 1.00 Frt 0.865 0.850 Flt Protected Satd. Flow (prot) 0 1611 3539 1583 0 0 Flt Permitted Satd. Flow (perm) 0 1611 3539 1583 0 0 Link Speed (mph) 25 55 55 Link Distance (ft) 1732 434 1009 Travel Time (s) 47.2 5.4 12.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 53 2183 90 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 53 2183 90 0 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 64.3% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood PM 2024 Phase 1B Build with Improvements T. Lee Page 5 Intersection Int Delay, s/veh 0.6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 48 1965 81 0 0 Future Vol, veh/h 0 48 1965 81 0 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - 250 - - Veh in Median Storage, # 0 - 0 - - 16979 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 53 2183 90 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - 1092 0 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 210 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 210 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach WB NB HCM Control Delay, s 27.9 0 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1 Capacity (veh/h) - - 210 HCM Lane V/C Ratio - - 0.254 HCM Control Delay (s) - - 27.9 HCM Lane LOS - - D HCM 95th %tile Q(veh) - - 1 Ironwood – Transportation Impact Analysis PM 2026 Future No Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 128 0 0 1877 0 0 Future Volume (vph) 128 0 0 1877 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 1479 Travel Time (s) 2.2 1.8 18.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 142 0 0 2086 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 142 0 0 2086 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 30.0 122.0 Total Split (%) 19.7% 80.3% Maximum Green (s) 24.2 116.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 17.3 124.7 Actuated g/C Ratio 0.11 0.82 v/c Ratio 0.71 0.72 Control Delay 82.9 12.4 Queue Delay 0.0 0.0 Total Delay 82.9 12.4 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 82.9 12.4 Approach LOS F B Queue Length 50th (ft) 138 557 Queue Length 95th (ft) 206 m845 Internal Link Dist (ft) 18 64 1399 Turn Bay Length (ft) Base Capacity (vph) 291 2902 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.49 0.72 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 16.9 Intersection LOS: B Intersection Capacity Utilization 126.5% ICU Level of Service H Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 11 00002429 Future Volume (vph) 11 00002429 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 96 1045 149 Travel Time (s) 2.2 13.0 1.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 12 00002699 Shared Lane Traffic (%) Lane Group Flow (vph) 12 00002699 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 125.7% ICU Level of Service H Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 4 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 11 00002429 Future Vol, veh/h 11 00002429 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 12 00002699 Major/Minor Minor1 Major2 Conflicting Flow All 1350 - - - Stage 1 0 - - - Stage 2 1350 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 142 0 0 - Stage 1 - 0 0 - Stage 2 206 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 142 - - - Mov Cap-2 Maneuver 142 - - - Stage 1 - - - - Stage 2 206 - - - Approach WB SB HCM Control Delay, s 32.7 0 HCM LOS D Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 142 - HCM Lane V/C Ratio 0.086 - HCM Control Delay (s) 32.7 - HCM Lane LOS D - HCM 95th %tile Q(veh) 0.3 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 360 4 108 4 4 5 22 84 1515 6 10 4 Future Volume (vph) 360 4 108 4 4 5 22 84 1515 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.942 0.999 Flt Protected 0.950 0.953 0.986 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Flt Permitted 0.950 0.953 0.986 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1002 679 Travel Time (s) 16.4 27.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 400 4 120 4 4 6 24 93 1683 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 200 204 120 0 14 0 0 117 1690 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 20.0 20.0 12.0 12.0 15.0 15.0 105.0 15.0 15.0 Total Split (%) 13.2% 13.2% 7.9% 7.9% 9.9% 9.9% 69.1% 9.9% 9.9% Maximum Green (s) 13.1 13.1 5.6 5.6 8.9 8.9 98.7 9.1 9.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 15.0 15.0 152.0 6.6 10.0 117.0 6.9 Actuated g/C Ratio 0.10 0.10 1.00 0.04 0.07 0.77 0.05 v/c Ratio 1.21 1.23 0.08 0.19 1.01 0.62 0.19 Control Delay 193.1 198.4 0.1 75.8 158.7 9.1 74.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 193.1 198.4 0.1 75.8 158.7 9.1 74.6 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 2046 381 Future Volume (vph) 2046 381 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 1060 Travel Time (s) 13.1 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 2273 423 Shared Lane Traffic (%) Lane Group Flow (vph) 2273 423 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 105.0 Total Split (%) 69.1% Maximum Green (s) 98.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 107.2 152.0 Actuated g/C Ratio 0.71 1.00 v/c Ratio 0.91 0.27 Control Delay 26.2 0.4 Queue Delay 0.0 0.0 Total Delay 26.2 0.4 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F A E Approach Delay 151.0 75.8 18.8 Approach LOS F E B Queue Length 50th (ft) ~253 ~261 0 14 ~124 155 15 Queue Length 95th (ft) #430 #438 0 40 #265 695 40 Internal Link Dist (ft) 1003 922 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 165 166 1583 79 116 2720 116 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 1.21 1.23 0.08 0.18 1.01 0.62 0.13 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.23 Intersection Signal Delay: 34.6 Intersection LOS: C Intersection Capacity Utilization 91.7% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 22.4 Approach LOS C Queue Length 50th (ft) 790 0 Queue Length 95th (ft) #1326 0 Internal Link Dist (ft) 980 Turn Bay Length (ft) 250 Base Capacity (vph) 2495 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.91 0.27 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 113 14 16 1625 2090 89 Future Volume (vph) 0 113 14 16 1625 2090 89 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1086 422 679 Travel Time (s) 24.7 5.2 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 126 16 18 1806 2322 99 Shared Lane Traffic (%) Lane Group Flow (vph) 0 126 0 34 1806 2322 99 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 71.4% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 10 Intersection Int Delay, s/veh 1.4 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 113 14 16 1625 2090 89 Future Vol, veh/h 0 113 14 16 1625 2090 89 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 126 16 18 1806 2322 99 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1161 2322 2421 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *222 *292 287 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *222 *195 195 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 40.4 0.5 0 HCM LOS E Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 195 - 222 - - HCM Lane V/C Ratio 0.171 - 0.566 - - HCM Control Delay (s) 27.2 - 40.4 - - HCM Lane LOS D - E - - HCM 95th %tile Q(veh) 0.6 - 3.1 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 26 156 0 0 0 161 0 1468 35 0 0 0 Future Volume (vph) 26 156 0 0 0 161 0 1468 35 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.993 Satd. Flow (prot) 0 1850 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.993 Satd. Flow (perm) 0 1850 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 480 Travel Time (s) 2.6 19.3 1.5 6.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 29 173 0 0 0 179 0 1631 39 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 202 0 0 0 179 0 1631 39 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 40.0 40.0 40.0 112.0 112.0 Total Split (%) 26.3% 26.3% 26.3% 73.7% 73.7% Maximum Green (s) 34.4 34.4 34.4 105.7 105.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 21.6 21.6 120.4 120.4 Actuated g/C Ratio 0.14 0.14 0.79 0.79 v/c Ratio 0.77 0.45 0.58 0.03 Control Delay 56.8 64.2 7.6 4.3 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 56.8 64.2 7.6 4.3 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E E A A Approach Delay 56.8 64.2 7.6 Approach LOS E E A Queue Length 50th (ft) 196 94 283 7 Queue Length 95th (ft) m201 131 421 19 Internal Link Dist (ft) 1 911 42 400 Turn Bay Length (ft) 225 Base Capacity (vph) 425 641 2802 1253 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.48 0.28 0.58 0.03 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 135 (89%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 45 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 17.3 Intersection LOS: B Intersection Capacity Utilization 68.4% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 97 4 73 000001997 47 Future Volume (vph) 0 0 97 4 73 000001997 47 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.998 Satd. Flow (prot) 0 0 1611 0 1859 000003539 1583 Flt Permitted 0.998 Satd. Flow (perm) 0 0 1611 0 1859 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 108 4 81 000002219 52 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 108 0 85 000002219 52 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 32.0 32.0 32.0 120.0 120.0 Total Split (%) 21.1% 21.1% 21.1% 78.9% 78.9% Maximum Green (s) 26.7 26.7 26.7 113.9 113.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 14.9 14.9 127.1 127.1 Actuated g/C Ratio 0.10 0.10 0.84 0.84 v/c Ratio 0.69 0.47 0.75 0.04 Control Delay 87.2 72.1 2.1 0.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 87.2 72.1 2.1 0.5 LOS F E A A Approach Delay 87.2 72.1 2.1 Approach LOS F E A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 105 81 26 1 Queue Length 95th (ft) 167 135 38 m2 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 286 330 2959 1323 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.38 0.26 0.75 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 5 (3%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 8.2 Intersection LOS: A Intersection Capacity Utilization 77.9% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 6 12 151 18 4 135 4 12 4444 Future Volume (vph) 6 12 151 18 4 135 4 12 4444 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.984 0.997 0.974 0.914 Flt Protected 0.950 0.999 0.970 0.991 Satd. Flow (prot) 0 1770 1833 0 0 1855 0 0 1760 0 0 1687 Flt Permitted 0.950 0.999 0.970 0.991 Satd. Flow (perm) 0 1770 1833 0 0 1855 0 0 1760 0 0 1687 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 7 13 168 20 4 150 4 13 4444 Shared Lane Traffic (%) Lane Group Flow (vph) 0 20 188 0 0 158 0 0 21 0 0 22 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.6% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 13 Future Volume (vph) 13 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 14 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 17 Intersection Int Delay, s/veh 1.3 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 6 12 151 18 4 135 4 12 4 4 4 4 13 Future Vol, veh/h 6 12 151 18 4 135 4 12 4 4 4 4 13 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 7 13 168 20 4 150 4 13 4 4 4 4 14 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 154 0 0 188 0 0 373 380 178 368 388 152 Stage 1 -------204218-160160- Stage 2 -------169162-208228- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1426 - - 1386 - - 584 552 865 588 547 894 Stage 1 -------798723-842766- Stage 2 -------833764-794715- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -3 ~ -3 - - 1386 - - 569 550 865 580 545 894 Mov Cap-2 Maneuver -------569550-580545- Stage 1 -------798723-842764- Stage 2 -------812762-785715- Approach EB WB NB SB HCM Control Delay, s 0.2 11.2 10.1 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 606 + - - 1386 - - 730 HCM Lane V/C Ratio 0.037 - - - 0.003 - - 0.032 HCM Control Delay (s) 11.2 - - - 7.6 0 - 10.1 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.1 - - - 0 - - 0.1 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 30 14 5 415 530 28 Future Volume (vph) 30 14 5 415 530 28 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.956 0.993 Flt Protected 0.967 0.999 Satd. Flow (prot) 1722 0 0 1861 1850 0 Flt Permitted 0.967 0.999 Satd. Flow (perm) 1722 0 0 1861 1850 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 33 16 6 461 589 31 Shared Lane Traffic (%) Lane Group Flow (vph) 49 0 0 467 620 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 39.6% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2026 Future No Build T. Lee Page 19 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 30 14 5 415 530 28 Future Vol, veh/h 30 14 5 415 530 28 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 33 16 6 461 589 31 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1078 605 620 0 - 0 Stage 1 605 ----- Stage 2 473 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 242 498 960 - - - Stage 1 545 ----- Stage 2 627 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 240 498 960 - - - Mov Cap-2 Maneuver 240 ----- Stage 1 541 ----- Stage 2 627 ----- Approach EB NB SB HCM Control Delay, s 20.1 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 960 - 287 - - HCM Lane V/C Ratio 0.006 - 0.17 - - HCM Control Delay (s) 8.8 0 20.1 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.6 - - Ironwood – Transportation Impact Analysis PM 2026 Phase 2 Build Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 200 0 0 1928 0 0 Future Volume (vph) 200 0 0 1928 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 325 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 0 0 3539 0 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 0 0 3539 0 0 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 30 55 55 Link Distance (ft) 98 144 413 Travel Time (s) 2.2 1.8 5.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 222 0 0 2142 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 222 0 0 2142 0 0 Turn Type Prot NA Protected Phases 1 2 Permitted Phases Detector Phase 1 2 Switch Phase Minimum Initial (s) 5.0 12.0 Minimum Split (s) 10.8 17.5 Total Split (s) 27.0 125.0 Total Split (%) 17.8% 82.2% Maximum Green (s) 21.2 119.5 Yellow Time (s) 3.0 4.5 All-Red Time (s) 2.8 1.0 Lost Time Adjust (s) -0.8 -0.5 Total Lost Time (s) 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 2.0 6.0 Minimum Gap (s) 2.0 3.0 Time Before Reduce (s) 0.0 30.0 Time To Reduce (s) 0.0 60.0 Recall Mode None C-Max Act Effct Green (s) 21.2 120.8 Actuated g/C Ratio 0.14 0.79 v/c Ratio 0.90 0.76 Control Delay 100.1 13.8 Queue Delay 0.0 0.0 Total Delay 100.1 13.8 Lanes, Volumes, Timings 100: US 421 & SB-NB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 2 Lane Group EBL EBR NBL NBT SBT SBR LOS F B Approach Delay 100.1 13.8 Approach LOS F B Queue Length 50th (ft) 219 597 Queue Length 95th (ft) #368 m830 Internal Link Dist (ft) 18 64 333 Turn Bay Length (ft) Base Capacity (vph) 256 2812 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.87 0.76 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 40 (26%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 21.9 Intersection LOS: C Intersection Capacity Utilization 135.6% ICU Level of Service H Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 100: US 421 & SB-NB U turn south of Rosa Lanes, Volumes, Timings 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 11 00002461 Future Volume (vph) 11 00002461 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 Satd. Flow (prot) 1770 00003539 Flt Permitted 0.950 Satd. Flow (perm) 1770 00003539 Link Speed (mph) 30 55 55 Link Distance (ft) 96 1696 149 Travel Time (s) 2.2 21.0 1.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 12 00002734 Shared Lane Traffic (%) Lane Group Flow (vph) 12 00002734 Sign Control Stop Stop Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 128.0% ICU Level of Service H Analysis Period (min) 15 HCM 6th TWSC 101: US 421 & NB-SB U turn south of Rosa 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 4 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 11 00002461 Future Vol, veh/h 11 00002461 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Stop Stop Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 16974 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 12 00002734 Major/Minor Minor1 Major2 Conflicting Flow All 1367 - - - Stage 1 0 - - - Stage 2 1367 - - - Critical Hdwy 6.84 - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 - - - Pot Cap-1 Maneuver 138 0 0 - Stage 1 - 0 0 - Stage 2 202 0 0 - Platoon blocked, % - Mov Cap-1 Maneuver 138 - - - Mov Cap-2 Maneuver 138 - - - Stage 1 - - - - Stage 2 202 - - - Approach WB SB HCM Control Delay, s 33.6 0 HCM LOS D Minor Lane/Major Mvmt WBLn1 SBT Capacity (veh/h) 138 - HCM Lane V/C Ratio 0.089 - HCM Control Delay (s) 33.6 - HCM Lane LOS D - HCM 95th %tile Q(veh) 0.3 - Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph) 368 4 108 4 4 5 22 89 1539 6 10 4 Future Volume (vph) 368 4 108 4 4 5 22 89 1539 6 10 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 300 200 0 0 500 0 150 Storage Lanes 1 1 00101 Taper Length (ft) 100 25 75 125 Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 0.95 0.95 1.00 Frt 0.850 0.942 0.999 Flt Protected 0.950 0.953 0.986 0.950 0.950 Satd. Flow (prot) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Flt Permitted 0.950 0.953 0.986 0.950 0.950 Satd. Flow (perm) 1681 1686 1583 0 1730 0 0 1770 3536 0 0 1770 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph) 45 25 55 Link Distance (ft) 1083 1002 679 Travel Time (s) 16.4 27.3 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 409 4 120 4 4 6 24 99 1710 7 11 4 Shared Lane Traffic (%) 50% Lane Group Flow (vph) 204 209 120 0 14 0 0 123 1717 0 0 15 Turn Type Split NA Free Split NA Prot Prot NA Prot Prot Protected Phases 4 4 3 3 5 5 2 1 1 Permitted Phases Free Detector Phase 4 4 3 3 5 5 2 1 1 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 4.0 5.0 5.0 14.0 5.0 5.0 Minimum Split (s) 11.9 11.9 10.4 10.4 11.1 11.1 20.3 10.9 10.9 Total Split (s) 20.0 20.0 12.0 12.0 15.0 15.0 105.0 15.0 15.0 Total Split (%) 13.2% 13.2% 7.9% 7.9% 9.9% 9.9% 69.1% 9.9% 9.9% Maximum Green (s) 13.1 13.1 5.6 5.6 8.9 8.9 98.7 9.1 9.1 Yellow Time (s) 5.0 5.0 3.2 3.2 3.0 3.0 5.3 3.0 3.0 All-Red Time (s) 1.9 1.9 3.2 3.2 3.1 3.1 1.0 2.9 2.9 Lost Time Adjust (s) -1.9 -1.9 -1.4 -1.1 -1.3 -0.9 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead Lead Lead Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 Recall Mode None None None None None None C-Max None None Act Effct Green (s) 15.0 15.0 152.0 6.6 10.0 117.0 6.9 Actuated g/C Ratio 0.10 0.10 1.00 0.04 0.07 0.77 0.05 v/c Ratio 1.24 1.26 0.08 0.19 1.06 0.63 0.19 Control Delay 201.0 208.5 0.1 75.8 167.4 8.6 74.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 201.0 208.5 0.1 75.8 167.4 8.6 74.6 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph) 2078 381 Future Volume (vph) 2078 381 Ideal Flow (vphpl) 1900 1900 Storage Length (ft) 250 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot) 3539 1583 Flt Permitted Satd. Flow (perm) 3539 1583 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph) 55 Link Distance (ft) 407 Travel Time (s) 5.0 Peak Hour Factor 0.90 0.90 Adj. Flow (vph) 2309 423 Shared Lane Traffic (%) Lane Group Flow (vph) 2309 423 Turn Type NA Free Protected Phases 6 Permitted Phases Free Detector Phase 6 Switch Phase Minimum Initial (s) 14.0 Minimum Split (s) 20.6 Total Split (s) 105.0 Total Split (%) 69.1% Maximum Green (s) 98.4 Yellow Time (s) 5.3 All-Red Time (s) 1.3 Lost Time Adjust (s) -1.6 Total Lost Time (s) 5.0 Lead/Lag Lag Lead-Lag Optimize? Yes Vehicle Extension (s) 6.0 Minimum Gap (s) 3.4 Time Before Reduce (s) 15.0 Time To Reduce (s) 45.0 Recall Mode C-Max Act Effct Green (s) 107.2 152.0 Actuated g/C Ratio 0.71 1.00 v/c Ratio 0.93 0.27 Control Delay 27.6 0.4 Queue Delay 0.0 0.0 Total Delay 27.6 0.4 Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL LOS F F A E F A E Approach Delay 158.7 75.8 19.2 Approach LOS F E B Queue Length 50th (ft) ~262 ~272 0 14 ~135 165 15 Queue Length 95th (ft) #440 #453 0 40 #280 636 40 Internal Link Dist (ft) 1003 922 599 Turn Bay Length (ft) 300 200 500 150 Base Capacity (vph) 165 166 1583 79 116 2720 116 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 1.24 1.26 0.08 0.18 1.06 0.63 0.13 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.26 Intersection Signal Delay: 36.2 Intersection LOS: D Intersection Capacity Utilization 93.1% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 421 & Sanders Rd/North State Storage Driveway Lanes, Volumes, Timings 200: US 421 & Sanders Rd/North State Storage Driveway 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 8 Lane Group SBT SBR LOS C A Approach Delay 23.6 Approach LOS C Queue Length 50th (ft) 826 0 Queue Length 95th (ft) #1364 0 Internal Link Dist (ft) 327 Turn Bay Length (ft) 250 Base Capacity (vph) 2495 1583 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.93 0.27 Intersection Summary Lanes, Volumes, Timings 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 9 Lane Group EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 121 33 21 1654 2122 86 Future Volume (vph) 0 121 33 21 1654 2122 86 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 300 Storage Lanes 0 1 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1611 0 1770 3539 3539 1583 Flt Permitted 0.950 Satd. Flow (perm) 0 1611 0 1770 3539 3539 1583 Link Speed (mph) 30 55 55 Link Distance (ft) 1086 422 679 Travel Time (s) 24.7 5.2 8.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 134 37 23 1838 2358 96 Shared Lane Traffic (%) Lane Group Flow (vph) 0 134 0 60 1838 2358 96 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 72.8% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 300: US 421 & Beau Rivage Driveway 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 10 Intersection Int Delay, s/veh 1.8 Movement EBL EBR NBU NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 121 33 21 1654 2122 86 Future Vol, veh/h 0 121 33 21 1654 2122 86 Conflicting Peds, #/hr 0 000000 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - - None - None Storage Length - 0 - 250 - - 300 Veh in Median Storage, # 0 - - - 0 0 - Grade, % 0 - - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222 Mvmt Flow 0 134 37 23 1838 2358 96 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1179 2358 2454 0 - 0 Stage 1 ------- Stage 2 ------- Critical Hdwy - 6.94 6.44 4.14 - - - Critical Hdwy Stg 1 ------- Critical Hdwy Stg 2 ------- Follow-up Hdwy - 3.32 2.52 2.22 - - - Pot Cap-1 Maneuver 0 *222 *292 251 - - - Stage 1 0 ------ Stage 2 0 ------ Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver - *222 *163 163 - - - Mov Cap-2 Maneuver ------- Stage 1 ------- Stage 2 ------- Approach EB NB SB HCM Control Delay, s 43.4 1.2 0 HCM LOS E Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 163 - 222 - - HCM Lane V/C Ratio 0.368 - 0.606 - - HCM Control Delay (s) 39.5 - 43.4 - - HCM Lane LOS E - E - - HCM 95th %tile Q(veh) 1.6 - 3.5 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 26 196 0 0 0 190 0 1492 43 0 0 0 Future Volume (vph) 26 196 0 0 0 190 0 1492 43 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 225 0 0 0 0 Storage Lanes 0 0 0 1 0 1 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.994 Satd. Flow (prot) 0 1852 0 0 0 2787 0 3539 1583 0 0 0 Flt Permitted 0.994 Satd. Flow (perm) 0 1852 0 0 0 2787 0 3539 1583 0 0 0 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 20 35 55 55 Link Distance (ft) 76 991 122 480 Travel Time (s) 2.6 19.3 1.5 6.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 29 218 0 0 0 211 0 1658 48 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 247 0 0 0 211 0 1658 48 0 0 0 Turn Type Perm NA Prot NA Perm Protected Phases 7 7 2 Permitted Phases 7 2 Detector Phase 7 7 7 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.8 10.8 10.8 20.3 20.3 Total Split (s) 40.0 40.0 40.0 112.0 112.0 Total Split (%) 26.3% 26.3% 26.3% 73.7% 73.7% Maximum Green (s) 34.4 34.4 34.4 105.7 105.7 Yellow Time (s) 3.0 3.0 3.0 5.3 5.3 All-Red Time (s) 2.6 2.6 2.6 1.0 1.0 Lost Time Adjust (s) -0.6 -0.6 -1.3 -1.3 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 25.2 25.2 116.8 116.8 Actuated g/C Ratio 0.17 0.17 0.77 0.77 v/c Ratio 0.80 0.46 0.61 0.04 Control Delay 56.1 60.9 9.5 5.2 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 56.1 60.9 9.5 5.2 Lanes, Volumes, Timings 400: US 421 & SB Manassas Crossover/Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 12 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E E A A Approach Delay 56.1 60.9 9.4 Approach LOS E E A Queue Length 50th (ft) 239 109 334 10 Queue Length 95th (ft) m252 147 490 25 Internal Link Dist (ft) 1 911 42 400 Turn Bay Length (ft) 225 Base Capacity (vph) 426 641 2718 1216 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.58 0.33 0.61 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 135 (89%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 19.7 Intersection LOS: B Intersection Capacity Utilization 72.1% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 421 & SB Manassas Crossover/Manassas Dr Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 97 4 73 000002016 47 Future Volume (vph) 0 0 97 4 73 000002016 47 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.998 Satd. Flow (prot) 0 0 1611 0 1859 000003539 1583 Flt Permitted 0.998 Satd. Flow (perm) 0 0 1611 0 1859 000003539 1583 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 20 55 55 Link Distance (ft) 1063 61 1306 125 Travel Time (s) 29.0 2.1 16.2 1.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 108 4 81 000002240 52 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 108 0 85 000002240 52 Turn Type Prot Perm NA NA Perm Protected Phases 3 3 6 Permitted Phases 3 6 Detector Phase 3 3 3 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 14.0 14.0 Minimum Split (s) 10.3 10.3 10.3 20.1 20.1 Total Split (s) 32.0 32.0 32.0 120.0 120.0 Total Split (%) 21.1% 21.1% 21.1% 78.9% 78.9% Maximum Green (s) 26.7 26.7 26.7 113.9 113.9 Yellow Time (s) 3.0 3.0 3.0 5.1 5.1 All-Red Time (s) 2.3 2.3 2.3 1.0 1.0 Lost Time Adjust (s) -0.3 -0.3 -1.1 -1.1 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.4 3.4 Time Before Reduce (s) 0.0 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 45.0 45.0 Recall Mode None None None C-Max C-Max Act Effct Green (s) 14.9 14.9 127.1 127.1 Actuated g/C Ratio 0.10 0.10 0.84 0.84 v/c Ratio 0.69 0.47 0.76 0.04 Control Delay 87.2 72.1 2.3 0.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 87.2 72.1 2.3 0.5 LOS F E A A Approach Delay 87.2 72.1 2.2 Approach LOS F E A Lanes, Volumes, Timings 401: US 421 & Sharks Eye Lane/NB Manassas Crossover 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 105 81 25 1 Queue Length 95th (ft) 167 135 37 m2 Internal Link Dist (ft) 983 1 1226 45 Turn Bay Length (ft) Base Capacity (vph) 286 330 2959 1323 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.38 0.26 0.76 0.04 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 5 (3%), Referenced to phase 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 8.3 Intersection LOS: A Intersection Capacity Utilization 78.4% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 15 Lane Group EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 6 60 151 18 4 135 8 12 4454 Future Volume (vph) 6 60 151 18 4 135 8 12 4454 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 Taper Length (ft) 100 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.984 0.993 0.974 0.889 Flt Protected 0.950 0.999 0.970 0.995 Satd. Flow (prot) 0 1770 1833 0 0 1848 0 0 1760 0 0 1648 Flt Permitted 0.950 0.999 0.970 0.995 Satd. Flow (perm) 0 1770 1833 0 0 1848 0 0 1760 0 0 1648 Link Speed (mph) 35 35 25 25 Link Distance (ft) 991 283 1139 1074 Travel Time (s) 19.3 5.5 31.1 29.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 7 67 168 20 4 150 9 13 4464 Shared Lane Traffic (%) Lane Group Flow (vph) 0 74 188 0 0 163 0 0 21 0 0 57 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 31.2% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 16 Lane Group SBR Lane Configurations Traffic Volume (vph) 42 Future Volume (vph) 42 Ideal Flow (vphpl) 1900 Storage Length (ft) 0 Storage Lanes 0 Taper Length (ft) Lane Util. Factor 1.00 Frt Flt Protected Satd. Flow (prot) 0 Flt Permitted Satd. Flow (perm) 0 Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor 0.90 Adj. Flow (vph) 47 Shared Lane Traffic (%) Lane Group Flow (vph) 0 Sign Control Intersection Summary HCM 6th TWSC 500: Shiloh Dr & Manassas Dr 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 17 Intersection Int Delay, s/veh 1.7 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 6 60 151 18 4 135 8 12 4 4 5 4 42 Future Vol, veh/h 6 60 151 18 4 135 8 12 4 4 5 4 42 Conflicting Peds, #/hr 0 000000000000 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - - None - - None - - None - - None Storage Length - 100 ----------- Veh in Median Storage, # - - 0 - - 0 - - 0 - - 0 - Grade, % - - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 222222222222 Mvmt Flow 7 67 168 20 4 150 9 13 4 4 6 4 47 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All - 159 0 0 188 0 0 500 493 178 479 499 155 Stage 1 -------312326-163163- Stage 2 -------188167-316336- Critical Hdwy - 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 -------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 -------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy - 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver - 1420 - - 1386 - - 481 477 865 497 473 891 Stage 1 -------699648-839763- Stage 2 -------814760-695642- Platoon blocked, % - - - - Mov Cap-1 Maneuver ~ -11 ~ -11 - - 1386 - - 452 476 865 490 472 891 Mov Cap-2 Maneuver -------452476-490472- Stage 1 -------699648-839761- Stage 2 -------765758-687642- Approach EB WB NB SB HCM Control Delay, s 0.2 12.5 10 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 505 + - - 1386 - - 775 HCM Lane V/C Ratio 0.044 - - - 0.003 - - 0.073 HCM Control Delay (s) 12.5 - - - 7.6 0 - 10 HCM Lane LOS B - - - A A - B HCM 95th %tile Q(veh) 0.1 - - - 0 - - 0.2 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 18 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 35 14 5 415 530 36 Future Volume (vph) 35 14 5 415 530 36 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.961 0.991 Flt Protected 0.966 0.999 Satd. Flow (prot) 1729 0 0 1861 1846 0 Flt Permitted 0.966 0.999 Satd. Flow (perm) 1729 0 0 1861 1846 0 Link Speed (mph) 25 30 30 Link Distance (ft) 3346 1040 1253 Travel Time (s) 91.3 23.6 28.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 39 16 6 461 589 40 Shared Lane Traffic (%) Lane Group Flow (vph) 55 0 0 467 629 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 40.1% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC 600: Myrtle Grove Road & Lieutenant Congleton Rd 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 19 Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 35 14 5 415 530 36 Future Vol, veh/h 35 14 5 415 530 36 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 39 16 6 461 589 40 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1082 609 629 0 - 0 Stage 1 609 ----- Stage 2 473 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 241 495 953 - - - Stage 1 543 ----- Stage 2 627 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 239 495 953 - - - Mov Cap-2 Maneuver 239 ----- Stage 1 539 ----- Stage 2 627 ----- Approach EB NB SB HCM Control Delay, s 20.9 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 953 - 280 - - HCM Lane V/C Ratio 0.006 - 0.194 - - HCM Control Delay (s) 8.8 0 20.9 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.7 - - Lanes, Volumes, Timings 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 20 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 0 43 2024 104 0 0 Future Volume (vph) 0 43 2024 104 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 0 Storage Lanes 0 1 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 0.95 1.00 1.00 1.00 Frt 0.865 0.850 Flt Protected Satd. Flow (prot) 0 1611 3539 1583 0 0 Flt Permitted Satd. Flow (perm) 0 1611 3539 1583 0 0 Link Speed (mph) 25 55 55 Link Distance (ft) 1033 413 1162 Travel Time (s) 28.2 5.1 14.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 48 2249 116 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 48 2249 116 0 0 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 65.9% ICU Level of Service C Analysis Period (min) 15 HCM 6th TWSC 700: US 421 & Site Access 1 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 21 Intersection Int Delay, s/veh 0.6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 43 2024 104 0 0 Future Vol, veh/h 0 43 2024 104 0 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - 250 - - Veh in Median Storage, # 0 - 0 - - 16979 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 48 2249 116 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - 1125 0 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 199 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 199 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach WB NB HCM Control Delay, s 28.7 0 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1 Capacity (veh/h) - - 199 HCM Lane V/C Ratio - - 0.24 HCM Control Delay (s) - - 28.7 HCM Lane LOS - - D HCM 95th %tile Q(veh) - - 0.9 Lanes, Volumes, Timings 800: US 421 & Site Access 2 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 22 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 2472 0 0 19 0 1922 0000 Future Volume (vph) 0 0 2472 0 0 19 0 1922 0000 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.88 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.865 Flt Protected Satd. Flow (prot) 0 0 2787 0 0 1611 0 3539 0000 Flt Permitted Satd. Flow (perm) 0 0 2787 0 0 1611 0 3539 0000 Link Speed (mph) 55 25 55 55 Link Distance (ft) 1696 1318 407 1628 Travel Time (s) 21.0 35.9 5.0 20.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 2747 0 0 21 0 2136 0000 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 2747 0 0 21 0 2136 0000 Sign Control Free Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 89.8% ICU Level of Service E Analysis Period (min) 15 HCM 6th TWSC 800: US 421 & Site Access 2 05/05/2022 210291 Ironwood PM 2026 Phase 2 Build T. Lee Page 23 Intersection Int Delay, s/veh 0.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 2472 0 0 19 0 1922 0 0 0 0 Future Vol, veh/h 0 0 2472 0 0 19 0 1922 0 0 0 0 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - 0 - - 0 ------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 16979 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 0 0 2747 0 0 21 0 2136 0 0 0 0 Major/Minor Minor1 Major1 Conflicting Flow All - - 1068 - 0 - Stage 1 ------ Stage 2 ------ Critical Hdwy - - 6.94 - - - Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - - 3.32 - - - Pot Cap-1 Maneuver 0 0 218 0 - 0 Stage 1 0 0 - 0 - 0 Stage 2 0 0 - 0 - 0 Platoon blocked, % - Mov Cap-1 Maneuver - 0 218 - - - Mov Cap-2 Maneuver - 0 ---- Stage 1 - 0 ---- Stage 2 - 0 ---- Approach WB NB HCM Control Delay, s 23.3 0 HCM LOS C Minor Lane/Major Mvmt NBTWBLn1 Capacity (veh/h) - 218 HCM Lane V/C Ratio - 0.097 HCM Control Delay (s) - 23.3 HCM Lane LOS - C HCM 95th %tile Q(veh) - 0.3 Ironwood – Transportation Impact Analysis Queueing and Blocking Reports Ironwood – Transportation Impact Analysis AM 2021 Existing Queuing and Blocking Report AM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement SB Directions Served R Maximum Queue (ft) 38 Average Queue (ft) 1 95th Queue (ft) 19 Link Distance (ft) 372 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 75 104 115 Average Queue (ft) 44 15 24 95th Queue (ft) 84 65 87 Link Distance (ft) 20 66 66 Upstream Blk Time (%) 45 1 1 Queuing Penalty (veh) 37 9 17 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 18 Average Queue (ft) 1 95th Queue (ft) 8 Link Distance (ft) 28 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 76 Average Queue (ft) 10 95th Queue (ft) 43 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 14 22 Average Queue (ft) 1 1 95th Queue (ft) 13 14 Link Distance (ft) 1016 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 354 399 274 59 190 318 304 130 373 384 310 Average Queue (ft) 214 257 100 12 103 133 124 9 216 218 24 95th Queue (ft) 317 365 275 40 181 253 253 62 342 344 155 Link Distance (ft) 1006 1020 583 583 982 982 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 1 28 0 15 5 Queuing Penalty (veh) 2 106 1 2 12 Queuing and Blocking Report AM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB Directions Served R Maximum Queue (ft) 67 Average Queue (ft) 20 95th Queue (ft) 49 Link Distance (ft) 996 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB NB NB NB Directions Served LT R T T R Maximum Queue (ft) 87 637 120 127 50 Average Queue (ft) 59 373 100 86 8 95th Queue (ft) 98 630 140 147 32 Link Distance (ft) 33 910 49 49 49 Upstream Blk Time (%) 44 16 14 1 Queuing Penalty (veh) 54 92 84 3 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 50 72 122 115 10 Average Queue (ft) 15 32 39 40 1 95th Queue (ft) 41 68 107 104 7 Link Distance (ft) 1006 20 63 63 63 Upstream Blk Time (%) 22 2 2 Queuing Penalty (veh) 13 9 11 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 76 22 9 Average Queue (ft) 11 1 0 95th Queue (ft) 46 11 5 Link Distance (ft) 435 435 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB Directions Served L T T Maximum Queue (ft) 21 210 195 Average Queue (ft) 1 75 45 95th Queue (ft) 11 171 140 Link Distance (ft) 1286 1286 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) 5 Queuing Penalty (veh) 27 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB WB NB SB Directions Served ULTR LTR LTR LTR Maximum Queue (ft) 16 33 35 31 Average Queue (ft) 1 1 18 9 95th Queue (ft) 8 18 42 32 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 80 52 Average Queue (ft) 30 3 95th Queue (ft) 62 22 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB Directions Served R Maximum Queue (ft) 4 Average Queue (ft) 0 95th Queue (ft) 3 Link Distance (ft) 1060 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 480 Ironwood – Transportation Impact Analysis AM 2023 Future No Build Queuing and Blocking Report AM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB NB Directions Served T T Maximum Queue (ft) 212 211 Average Queue (ft) 48 48 95th Queue (ft) 289 289 Link Distance (ft) 396 396 Upstream Blk Time (%) 6 6 Queuing Penalty (veh) 63 60 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 87 123 124 Average Queue (ft) 58 41 51 95th Queue (ft) 91 113 125 Link Distance (ft) 20 66 66 Upstream Blk Time (%) 66 2 4 Queuing Penalty (veh) 55 27 44 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 25 Average Queue (ft) 5 95th Queue (ft) 20 Link Distance (ft) 28 Upstream Blk Time (%) 2 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 92 Average Queue (ft) 21 95th Queue (ft) 68 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 48 69 Average Queue (ft) 4 6 95th Queue (ft) 30 36 Link Distance (ft) 1016 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 311 378 275 59 466 603 587 130 378 423 305 Average Queue (ft) 202 243 86 15 338 333 288 11 223 226 28 95th Queue (ft) 296 346 250 45 621 667 576 75 348 361 181 Link Distance (ft) 1006 1020 587 587 982 982 Upstream Blk Time (%) 5 13 1 Queuing Penalty (veh) 0 128 5 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 0 24 0 22 2 15 5 Queuing Penalty (veh) 1 92 0 209 2 2 13 Queuing and Blocking Report AM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB SB Directions Served R UL T T R Maximum Queue (ft) 70 176 230 211 4 Average Queue (ft) 21 36 61 59 0 95th Queue (ft) 51 146 289 287 3 Link Distance (ft) 997 363 363 Upstream Blk Time (%) 0 8 8 Queuing Penalty (veh) 0 88 82 Storage Bay Dist (ft) 250 300 Storage Blk Time (%) 9 Queuing Penalty (veh) 3 Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 103 339 248 128 134 47 Average Queue (ft) 80 142 112 104 95 7 95th Queue (ft) 105 257 213 145 147 31 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 82 21 18 0 Queuing Penalty (veh) 108 124 110 2 Storage Bay Dist (ft) 225 Storage Blk Time (%) 4 3 Queuing Penalty (veh) 6 4 Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 63 79 128 129 38 Average Queue (ft) 17 59 67 70 2 95th Queue (ft) 49 90 136 140 17 Link Distance (ft) 1006 20 62 62 62 Upstream Blk Time (%) 64 4 5 0 Queuing Penalty (veh) 43 21 24 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 265 182 91 Average Queue (ft) 78 12 10 95th Queue (ft) 206 88 50 Link Distance (ft) 435 435 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 375 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 1 1 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 110 274 246 35 Average Queue (ft) 24 85 61 5 95th Queue (ft) 77 241 202 51 Link Distance (ft) 1286 1286 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 1 8 Queuing Penalty (veh) 1 46 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB EB WB NB SB Directions Served UL TR LTR LTR LTR Maximum Queue (ft) 12 6 28 35 39 Average Queue (ft) 0 0 2 17 14 95th Queue (ft) 6 4 17 41 40 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 68 64 Average Queue (ft) 30 5 95th Queue (ft) 61 30 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB Directions Served R Maximum Queue (ft) 16 Average Queue (ft) 1 95th Queue (ft) 11 Link Distance (ft) 1060 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1367 Ironwood – Transportation Impact Analysis AM 2023 Phase 1A Build Queuing and Blocking Report AM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB NB SB SB Directions Served T T R R Maximum Queue (ft) 256 239 391 435 Average Queue (ft) 53 52 247 226 95th Queue (ft) 298 294 536 553 Link Distance (ft) 396 396 372 372 Upstream Blk Time (%) 6 6 22 9 Queuing Penalty (veh) 63 59 173 73 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 83 125 124 Average Queue (ft) 57 50 63 95th Queue (ft) 89 128 142 Link Distance (ft) 18 66 66 Upstream Blk Time (%) 66 3 4 Queuing Penalty (veh) 56 40 55 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB SB SB Directions Served L T T Maximum Queue (ft) 28 22 26 Average Queue (ft) 3 3 4 95th Queue (ft) 15 33 36 Link Distance (ft) 28 52 52 Upstream Blk Time (%) 4 2 3 Queuing Penalty (veh) 0 18 22 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB SB SB Directions Served L T T Maximum Queue (ft) 194 115 116 Average Queue (ft) 32 13 13 95th Queue (ft) 118 141 147 Link Distance (ft) 1329 1329 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) 1 Queuing Penalty (veh) 1 Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 145 158 Average Queue (ft) 11 17 95th Queue (ft) 68 82 Link Distance (ft) 1016 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 360 415 275 67 538 627 610 132 543 562 305 Average Queue (ft) 199 244 98 17 394 394 344 14 331 330 69 95th Queue (ft) 311 360 255 51 635 708 629 87 730 731 300 Link Distance (ft) 1006 1020 583 583 982 982 Upstream Blk Time (%) 6 17 1 3 4 Queuing Penalty (veh) 0 173 9 28 29 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 0 22 0 33 3 25 15 Queuing Penalty (veh) 1 87 1 324 4 4 39 Queuing and Blocking Report AM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB SB SB SB Directions Served R UL TTTTR Maximum Queue (ft) 216 228 361 339 486 543 260 Average Queue (ft) 71 84 90 86 202 212 30 95th Queue (ft) 215 244 349 347 566 596 185 Link Distance (ft) 996 372 372 583 583 Upstream Blk Time (%)9836 Queuing Penalty (veh) 98 89 23 46 Storage Bay Dist (ft) 250 300 Storage Blk Time (%) 1 11 12 0 Queuing Penalty (veh) 9 6 3 0 Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 110 427 273 127 127 55 Average Queue (ft) 86 184 148 104 93 11 95th Queue (ft) 105 372 249 143 142 38 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 92 21 17 1 Queuing Penalty (veh) 137 130 101 4 Storage Bay Dist (ft) 225 Storage Blk Time (%) 6 5 Queuing Penalty (veh) 11 8 Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 51 78 129 125 23 Average Queue (ft) 17 56 57 64 1 95th Queue (ft) 44 92 127 131 11 Link Distance (ft) 1006 20 62 62 62 Upstream Blk Time (%) 62 3 4 Queuing Penalty (veh) 41 17 22 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 434 512 393 Average Queue (ft) 363 345 40 95th Queue (ft) 559 713 237 Link Distance (ft) 435 435 Upstream Blk Time (%) 47 57 0 Queuing Penalty (veh) 0 461 2 Storage Bay Dist (ft) 375 Storage Blk Time (%) 67 0 Queuing Penalty (veh) 324 1 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 99 220 191 35 Average Queue (ft) 22 82 52 1 95th Queue (ft) 71 183 154 25 Link Distance (ft) 1286 1286 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 6 Queuing Penalty (veh) 39 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB EB WB NB SB Directions Served UL TR LTR LTR LTR Maximum Queue (ft) 54 6 34 44 55 Average Queue (ft) 5 0 2 19 33 95th Queue (ft) 27 6 15 45 54 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 79 52 Average Queue (ft) 29 3 95th Queue (ft) 64 21 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 240 250 Average Queue (ft) 75 74 95th Queue (ft) 491 493 Link Distance (ft) 1060 1060 Upstream Blk Time (%) 3 3 Queuing Penalty (veh) 23 24 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 2876 Ironwood – Transportation Impact Analysis AM 2024 Future No Build Queuing and Blocking Report AM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB NB SB Directions Served T T R Maximum Queue (ft) 241 239 30 Average Queue (ft) 64 64 2 95th Queue (ft) 320 321 22 Link Distance (ft) 396 396 363 Upstream Blk Time (%) 5 5 Queuing Penalty (veh) 57 52 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 84 127 130 Average Queue (ft) 62 50 61 95th Queue (ft) 92 131 140 Link Distance (ft) 20 66 66 Upstream Blk Time (%) 71 3 5 Queuing Penalty (veh) 60 42 55 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 28 Average Queue (ft) 3 95th Queue (ft) 15 Link Distance (ft) 28 Upstream Blk Time (%) 1 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 106 Average Queue (ft) 25 95th Queue (ft) 75 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 79 106 Average Queue (ft) 8 13 95th Queue (ft) 47 64 Link Distance (ft) 1016 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 393 440 275 50 510 579 575 41 389 402 309 Average Queue (ft) 217 261 100 15 359 354 310 7 243 247 45 95th Queue (ft) 327 374 271 45 637 691 604 27 372 382 239 Link Distance (ft) 1006 1020 587 587 982 982 Upstream Blk Time (%) 4 16 1 Queuing Penalty (veh) 0 163 14 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 0 27 0 26 2 17 7 Queuing Penalty (veh) 1 106 0 254 3 2 20 Queuing and Blocking Report AM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB Directions Served R UL T T Maximum Queue (ft) 76 192 277 271 Average Queue (ft) 21 39 100 99 95th Queue (ft) 55 159 382 379 Link Distance (ft) 997 363 363 Upstream Blk Time (%) 0 11 10 Queuing Penalty (veh) 0 110 101 Storage Bay Dist (ft) 250 Storage Blk Time (%) 12 Queuing Penalty (veh) 4 Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 110 285 241 133 124 67 Average Queue (ft) 83 139 112 100 91 11 95th Queue (ft) 105 232 200 148 147 41 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 88 20 17 1 Queuing Penalty (veh) 116 124 103 5 Storage Bay Dist (ft) 225 Storage Blk Time (%) 2 2 Queuing Penalty (veh) 3 2 Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 72 80 127 132 24 Average Queue (ft) 16 56 66 70 1 95th Queue (ft) 46 89 141 141 11 Link Distance (ft) 1006 20 62 62 62 Upstream Blk Time (%) 63 4 5 Queuing Penalty (veh) 42 21 24 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 289 79 105 Average Queue (ft) 116 9 11 95th Queue (ft) 262 47 54 Link Distance (ft) 435 435 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 1 2 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 181 292 274 35 Average Queue (ft) 22 92 66 1 95th Queue (ft) 108 269 235 25 Link Distance (ft) 1286 1286 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 2 8 Queuing Penalty (veh) 1 47 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB EB WB NB SB Directions Served UL TR LTR LTR LTR Maximum Queue (ft) 20 10 32 44 44 Average Queue (ft) 1 0 1 20 15 95th Queue (ft) 10 7 15 47 42 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 70 49 Average Queue (ft) 29 3 95th Queue (ft) 61 22 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 25 20 Average Queue (ft) 1 1 95th Queue (ft) 22 14 Link Distance (ft) 1060 1060 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1536 Ironwood – Transportation Impact Analysis AM 2024 Phase 1B Build Queuing and Blocking Report AM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB NB SB SB Directions Served T T R R Maximum Queue (ft) 107 113 224 219 Average Queue (ft) 38 39 68 70 95th Queue (ft) 255 259 296 309 Link Distance (ft) 396 396 372 372 Upstream Blk Time (%)4423 Queuing Penalty (veh) 47 48 16 21 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 83 132 134 Average Queue (ft) 64 64 71 95th Queue (ft) 92 146 150 Link Distance (ft) 20 66 66 Upstream Blk Time (%) 72 5 7 Queuing Penalty (veh) 74 64 83 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 23 Average Queue (ft) 2 95th Queue (ft) 13 Link Distance (ft) 28 Upstream Blk Time (%) 1 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB SB Directions Served L T Maximum Queue (ft) 154 10 Average Queue (ft) 43 0 95th Queue (ft) 117 7 Link Distance (ft) 1329 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 158 204 Average Queue (ft) 21 30 95th Queue (ft) 102 127 Link Distance (ft) 1016 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 362 401 275 55 527 568 557 178 401 414 234 Average Queue (ft) 205 250 106 14 356 321 289 12 236 239 18 95th Queue (ft) 299 355 272 44 599 617 548 86 357 369 129 Link Distance (ft) 1006 1020 583 583 982 982 Upstream Blk Time (%) 6 9 0 Queuing Penalty (veh) 0 92 5 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 0 26 0 17 2 18 7 Queuing Penalty (veh) 1 100 0 160 2 2 20 Queuing and Blocking Report AM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB SB SB SB Directions Served R UL TTTTR Maximum Queue (ft) 125 172 138 102 170 158 65 Average Queue (ft) 30 67 48 46 34 33 4 95th Queue (ft) 89 191 261 263 198 193 66 Link Distance (ft) 996 372 372 583 583 Upstream Blk Time (%) 6 6 Queuing Penalty (veh) 68 64 Storage Bay Dist (ft) 250 300 Storage Blk Time (%) 7 2 0 Queuing Penalty (veh) 4 0 0 Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 102 394 252 126 132 38 Average Queue (ft) 83 171 133 102 94 7 95th Queue (ft) 104 389 234 142 147 28 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 88 1 20 17 0 Queuing Penalty (veh) 123 4 121 106 1 Storage Bay Dist (ft) 225 Storage Blk Time (%) 6 4 Queuing Penalty (veh) 9 6 Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 53 77 131 125 32 Average Queue (ft) 14 55 66 73 2 95th Queue (ft) 39 90 135 141 16 Link Distance (ft) 1006 20 62 62 62 Upstream Blk Time (%) 60 4 5 0 Queuing Penalty (veh) 41 21 25 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 409 333 247 Average Queue (ft) 219 109 20 95th Queue (ft) 465 436 151 Link Distance (ft) 435 435 Upstream Blk Time (%) 8 15 0 Queuing Penalty (veh) 0 122 1 Storage Bay Dist (ft) 375 Storage Blk Time (%) 20 0 0 Queuing Penalty (veh) 99 0 1 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 201 245 220 35 Average Queue (ft) 25 92 64 6 95th Queue (ft) 137 273 238 58 Link Distance (ft) 1286 1286 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 2 9 Queuing Penalty (veh) 1 53 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB EB WB NB SB Directions Served UL TR LTR LTR LTR Maximum Queue (ft) 38 6 55 44 67 Average Queue (ft) 3 0 3 20 29 95th Queue (ft) 20 6 24 45 55 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 80 48 Average Queue (ft) 29 3 95th Queue (ft) 66 22 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 700: US 421 & Site Access 1 Movement WB NB Directions Served R TR Maximum Queue (ft) 169 18 Average Queue (ft) 65 1 95th Queue (ft) 128 8 Link Distance (ft) 1271 358 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 20 10 Average Queue (ft) 1 0 95th Queue (ft) 13 7 Link Distance (ft) 1060 1060 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1605 Ironwood – Transportation Impact Analysis AM 2024 Phase 1B Build + Improvements Queuing and Blocking Report AM 2024 Phase 1B Build with Improvements 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 91 126 136 Average Queue (ft) 63 53 65 95th Queue (ft) 96 131 144 Link Distance (ft) 20 66 66 Upstream Blk Time (%) 75 4 5 Queuing Penalty (veh) 76 45 64 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 137 Average Queue (ft) 37 95th Queue (ft) 102 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 450 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 700: US 421 & Site Access 1 Movement WB Directions Served R Maximum Queue (ft) 173 Average Queue (ft) 68 95th Queue (ft) 140 Link Distance (ft) 1258 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Zone Summary Zone wide Queuing Penalty: 186 Ironwood – Transportation Impact Analysis AM 2026 Future No Build Queuing and Blocking Report AM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB NB SB SB Directions Served T T R R Maximum Queue (ft) 217 217 140 140 Average Queue (ft) 63 63 16 17 95th Queue (ft) 333 332 133 142 Link Distance (ft) 396 396 363 363 Upstream Blk Time (%)7510 Queuing Penalty (veh) 72 58 12 2 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 84 127 140 Average Queue (ft) 61 59 72 95th Queue (ft) 93 141 154 Link Distance (ft) 20 66 66 Upstream Blk Time (%) 71 5 6 Queuing Penalty (veh) 62 56 78 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 24 Average Queue (ft) 3 95th Queue (ft) 14 Link Distance (ft) 28 Upstream Blk Time (%) 2 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB SB Directions Served L T Maximum Queue (ft) 120 11 Average Queue (ft) 33 0 95th Queue (ft) 97 8 Link Distance (ft) 1329 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 163 197 Average Queue (ft) 17 29 95th Queue (ft) 93 127 Link Distance (ft) 1016 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 370 416 275 54 522 618 607 130 455 460 375 Average Queue (ft) 213 251 113 16 368 345 307 8 253 256 34 95th Queue (ft) 325 367 285 43 609 657 578 62 391 400 200 Link Distance (ft) 1006 1020 587 587 982 982 Upstream Blk Time (%) 4 13 1 Queuing Penalty (veh) 0 138 9 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 0 25 0 21 2 18 8 Queuing Penalty (veh) 2 98 1 204 2 3 23 Queuing and Blocking Report AM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB SB SB SB Directions Served R UL TTTTR Maximum Queue (ft) 86 183 240 227 74 80 10 Average Queue (ft) 25 35 69 69 7 7 0 95th Queue (ft) 68 146 315 315 86 87 5 Link Distance (ft) 997 363 363 587 587 Upstream Blk Time (%) 0 10 9 Queuing Penalty (veh) 0 108 95 Storage Bay Dist (ft) 250 300 Storage Blk Time (%) 10 0 Queuing Penalty (veh) 4 0 Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 101 288 244 132 120 56 Average Queue (ft) 79 138 108 104 92 10 95th Queue (ft) 105 253 211 144 147 36 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 83 21 18 0 Queuing Penalty (veh) 112 132 111 2 Storage Bay Dist (ft) 225 Storage Blk Time (%) 4 3 Queuing Penalty (veh) 6 4 Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 59 73 137 133 34 Average Queue (ft) 17 58 74 78 2 95th Queue (ft) 48 90 148 148 14 Link Distance (ft) 1006 20 62 62 62 Upstream Blk Time (%) 66 5 6 0 Queuing Penalty (veh) 46 24 28 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 320 257 101 Average Queue (ft) 112 33 12 95th Queue (ft) 303 205 56 Link Distance (ft) 435 435 Upstream Blk Time (%) 2 3 Queuing Penalty (veh) 0 26 Storage Bay Dist (ft) 375 Storage Blk Time (%) 4 0 Queuing Penalty (veh) 21 2 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 114 333 334 70 Average Queue (ft) 24 100 76 7 95th Queue (ft) 81 295 279 63 Link Distance (ft) 1286 1286 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 2 9 Queuing Penalty (veh) 2 55 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB EB WB NB SB Directions Served UL TR LTR LTR LTR Maximum Queue (ft) 12 34 42 40 40 Average Queue (ft) 1 1 2 16 13 95th Queue (ft) 9 18 17 41 39 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Queuing and Blocking Report AM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 60 40 Average Queue (ft) 27 3 95th Queue (ft) 60 21 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 27 22 Average Queue (ft) 1 1 95th Queue (ft) 14 11 Link Distance (ft) 1060 1060 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1595 Ironwood – Transportation Impact Analysis AM 2026 Phase 2 Build Queuing and Blocking Report AM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB NB SB SB Directions Served T T R R Maximum Queue (ft) 242 254 88 84 Average Queue (ft) 13 12 19 20 95th Queue (ft) 124 126 151 163 Link Distance (ft) 396 396 372 372 Upstream Blk Time (%)1111 Queuing Penalty (veh) 9 10 7 9 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 80 128 143 Average Queue (ft) 66 68 81 95th Queue (ft) 89 151 157 Link Distance (ft) 20 66 66 Upstream Blk Time (%) 73 5 7 Queuing Penalty (veh) 79 66 86 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 24 Average Queue (ft) 3 95th Queue (ft) 15 Link Distance (ft) 28 Upstream Blk Time (%) 2 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 132 Average Queue (ft) 40 95th Queue (ft) 104 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 450 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 182 211 Average Queue (ft) 29 37 95th Queue (ft) 117 134 Link Distance (ft) 1676 1676 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) 1 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 374 468 275 66 569 623 620 226 350 344 312 Average Queue (ft) 212 260 110 16 374 356 336 24 275 272 78 95th Queue (ft) 327 401 279 47 610 670 637 131 374 381 293 Link Distance (ft) 1006 1020 583 583 312 312 Upstream Blk Time (%) 5 8 1 5 4 0 Queuing Penalty (veh) 0 86 8 43 35 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 0 25 0 18 4 22 11 Queuing Penalty (veh) 1 101 0 175 6 3 31 Queuing and Blocking Report AM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB SB SB SB Directions Served R UL TTTTR Maximum Queue (ft) 90 204 361 374 115 122 75 Average Queue (ft) 24 58 44 42 17 16 3 95th Queue (ft) 63 141 231 233 155 149 47 Link Distance (ft) 996 372 372 583 583 Upstream Blk Time (%)3300 Queuing Penalty (veh) 31 34 0 0 Storage Bay Dist (ft) 250 300 Storage Blk Time (%) 4 2 Queuing Penalty (veh) 3 0 Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 115 264 222 122 125 41 Average Queue (ft) 84 150 123 100 93 7 95th Queue (ft) 106 229 199 145 147 28 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 87 17 14 0 Queuing Penalty (veh) 128 105 89 2 Storage Bay Dist (ft) 225 Storage Blk Time (%) 1 0 Queuing Penalty (veh) 2 0 Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 62 78 136 129 30 Average Queue (ft) 14 57 69 77 3 95th Queue (ft) 43 93 145 148 16 Link Distance (ft) 1006 20 62 62 62 Upstream Blk Time (%) 65 5 6 Queuing Penalty (veh) 45 23 29 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 353 223 179 Average Queue (ft) 152 37 14 95th Queue (ft) 351 221 90 Link Distance (ft) 435 435 Upstream Blk Time (%) 4 4 0 Queuing Penalty (veh) 0 37 0 Storage Bay Dist (ft) 375 Storage Blk Time (%) 6 0 Queuing Penalty (veh) 30 2 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 91 204 161 34 Average Queue (ft) 18 72 44 1 95th Queue (ft) 59 167 127 24 Link Distance (ft) 1286 1286 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 5 Queuing Penalty (veh) 30 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB EB WB NB SB Directions Served UL TR LTR LTR LTR Maximum Queue (ft) 29 26 43 48 64 Average Queue (ft) 4 1 2 18 31 95th Queue (ft) 20 11 19 44 54 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report AM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB SB Directions Served LR LT TR Maximum Queue (ft) 85 49 4 Average Queue (ft) 32 3 0 95th Queue (ft) 68 22 3 Link Distance (ft) 3292 1016 1215 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 700: US 421 & Site Access 1 Movement WB Directions Served R Maximum Queue (ft) 174 Average Queue (ft) 63 95th Queue (ft) 137 Link Distance (ft) 1125 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 & Site Access 2 Movement EB EB WB Directions Served R R R Maximum Queue (ft) 251 279 86 Average Queue (ft) 65 66 31 95th Queue (ft) 191 200 72 Link Distance (ft) 1729 1729 1022 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1346 Ironwood – Transportation Impact Analysis PM 2021 Existing Queuing and Blocking Report PM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement SB SB Directions Served R R Maximum Queue (ft) 26 27 Average Queue (ft) 1 1 95th Queue (ft) 12 16 Link Distance (ft) 368 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 84 11 15 Average Queue (ft) 35 0 0 95th Queue (ft) 68 7 10 Link Distance (ft) 32 92 92 Upstream Blk Time (%) 10 0 Queuing Penalty (veh) 12 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 60 Average Queue (ft) 14 95th Queue (ft) 47 Link Distance (ft) 29 Upstream Blk Time (%) 32 Queuing Penalty (veh) 3 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 7 Average Queue (ft) 0 95th Queue (ft) 5 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 400 1062 275 59 181 113 128 119 424 438 375 Average Queue (ft) 393 950 219 13 93 38 39 6 246 246 50 95th Queue (ft) 423 1240 395 42 172 89 99 70 407 411 237 Link Distance (ft) 1006 928 583 583 975 975 Upstream Blk Time (%) 73 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 82 98 0 15 7 Queuing Penalty (veh) 226 267 1 2 26 Queuing and Blocking Report PM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB SB Directions Served R T Maximum Queue (ft) 191 11 Average Queue (ft) 81 0 95th Queue (ft) 151 8 Link Distance (ft) 1013 583 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB NB NB NB Directions Served LT R T T R Maximum Queue (ft) 86 222 122 112 41 Average Queue (ft) 55 112 79 55 5 95th Queue (ft) 93 189 138 117 24 Link Distance (ft) 33 910 49 49 49 Upstream Blk Time (%) 33 10 7 0 Queuing Penalty (veh) 51 45 33 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 159 72 141 135 46 Average Queue (ft) 71 45 103 104 8 95th Queue (ft) 131 82 162 159 32 Link Distance (ft) 1006 21 63 63 63 Upstream Blk Time (%) 42 9 10 0 Queuing Penalty (veh) 30 57 64 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 91 162 168 Average Queue (ft) 10 42 43 95th Queue (ft) 48 119 124 Link Distance (ft) 439 439 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) 2 Queuing Penalty (veh) 14 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB Directions Served L T T Maximum Queue (ft) 54 135 123 Average Queue (ft) 6 23 10 95th Queue (ft) 29 85 55 Link Distance (ft) 1235 1235 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) 1 Queuing Penalty (veh) 5 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB WB NB SB Directions Served ULTR LTR LTR LTR Maximum Queue (ft) 15 9 45 31 Average Queue (ft) 1 0 15 11 95th Queue (ft) 9 6 41 35 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2021 Existing 05/06/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 65 43 Average Queue (ft) 23 3 95th Queue (ft) 53 23 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 27 64 Average Queue (ft) 1 2 95th Queue (ft) 14 29 Link Distance (ft) 995 995 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 836 Ironwood – Transportation Impact Analysis PM 2023 Future No Build Queuing and Blocking Report PM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB SB SB Directions Served T R R Maximum Queue (ft) 4 5 101 Average Queue (ft) 0 0 4 95th Queue (ft) 3 3 50 Link Distance (ft) 400 368 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 100 157 156 Average Queue (ft) 78 81 94 95th Queue (ft) 111 163 176 Link Distance (ft) 32 92 92 Upstream Blk Time (%) 60 4 6 Queuing Penalty (veh) 74 40 52 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 58 Average Queue (ft) 14 95th Queue (ft) 46 Link Distance (ft) 29 Upstream Blk Time (%) 27 Queuing Penalty (veh) 3 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 145 Average Queue (ft) 46 95th Queue (ft) 121 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB Directions Served T T Maximum Queue (ft) 76 86 Average Queue (ft) 6 12 95th Queue (ft) 42 54 Link Distance (ft) 942 942 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 400 1049 275 62 280 204 159 173 408 428 306 Average Queue (ft) 381 809 225 16 149 59 61 10 268 262 48 95th Queue (ft) 442 1258 390 46 286 148 132 83 396 408 247 Link Distance (ft) 1006 928 583 583 975 975 Upstream Blk Time (%) 39 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 67 95 1 16 8 Queuing Penalty (veh) 189 264 2 2 28 Queuing and Blocking Report PM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB SB Directions Served R UL T R Maximum Queue (ft) 187 60 42 5 Average Queue (ft) 92 23 2 0 95th Queue (ft) 169 53 20 4 Link Distance (ft) 1013 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 250 300 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 105 148 112 131 117 49 Average Queue (ft) 84 70 46 92 74 9 95th Queue (ft) 98 122 98 143 138 33 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 76 15 12 1 Queuing Penalty (veh) 134 71 57 3 Storage Bay Dist (ft) 225 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 180 83 135 135 48 Average Queue (ft) 76 54 106 105 8 95th Queue (ft) 145 90 161 157 32 Link Distance (ft) 1006 21 62 62 62 Upstream Blk Time (%) 57 10 10 0 Queuing Penalty (veh) 43 64 66 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB SB Directions Served L T T T Maximum Queue (ft) 239 213 205 87 Average Queue (ft) 98 56 54 3 95th Queue (ft) 206 160 156 44 Link Distance (ft) 439 439 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 75 Storage Blk Time (%) 3 Queuing Penalty (veh) 20 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB Directions Served L T T Maximum Queue (ft) 110 181 147 Average Queue (ft) 17 45 24 95th Queue (ft) 68 134 89 Link Distance (ft) 1235 1235 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) 3 Queuing Penalty (veh) 13 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB WB NB SB Directions Served UL LTR LTR LTR Maximum Queue (ft) 22 9 38 40 Average Queue (ft) 1 0 16 13 95th Queue (ft) 10 7 41 38 Link Distance (ft) 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2023 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB SB Directions Served LR LT TR Maximum Queue (ft) 96 60 8 Average Queue (ft) 30 4 0 95th Queue (ft) 70 30 6 Link Distance (ft) 3292 1016 1215 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 12 55 Average Queue (ft) 0 2 95th Queue (ft) 6 22 Link Distance (ft) 995 995 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1126 Ironwood – Transportation Impact Analysis PM 2023 Phase 1A Build Queuing and Blocking Report PM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement NB SB SB Directions Served T R R Maximum Queue (ft) 11 15 10 Average Queue (ft) 0 0 0 95th Queue (ft) 8 8 6 Link Distance (ft) 400 368 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 94 158 154 Average Queue (ft) 80 75 88 95th Queue (ft) 105 160 166 Link Distance (ft) 32 92 92 Upstream Blk Time (%) 59 4 5 Queuing Penalty (veh) 73 35 44 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 52 Average Queue (ft) 16 95th Queue (ft) 55 Link Distance (ft) 29 Upstream Blk Time (%) 29 Queuing Penalty (veh) 3 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 143 Average Queue (ft) 39 95th Queue (ft) 107 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB NB Directions Served L T T Maximum Queue (ft) 12 84 98 Average Queue (ft) 2 6 8 95th Queue (ft) 15 40 46 Link Distance (ft) 942 942 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 150 Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 400 1058 275 66 226 217 192 72 476 495 373 Average Queue (ft) 375 858 213 11 111 62 64 6 260 253 40 95th Queue (ft) 464 1301 392 43 231 152 150 59 432 432 224 Link Distance (ft) 1006 928 583 583 975 975 Upstream Blk Time (%) 52 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 71 93 15 7 Queuing Penalty (veh) 205 263 2 24 Queuing and Blocking Report PM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB SB Directions Served R UL T T Maximum Queue (ft) 293 87 59 75 Average Queue (ft) 110 33 4 2 95th Queue (ft) 233 73 29 53 Link Distance (ft) 1013 368 583 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 250 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 96 154 137 128 114 58 Average Queue (ft) 85 76 65 99 82 13 95th Queue (ft) 97 133 122 142 139 44 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 77 17 14 1 Queuing Penalty (veh) 181 86 66 7 Storage Bay Dist (ft) 225 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 170 78 156 139 56 Average Queue (ft) 80 55 106 104 9 95th Queue (ft) 144 90 167 161 36 Link Distance (ft) 1006 21 62 62 62 Upstream Blk Time (%) 60 10 10 0 Queuing Penalty (veh) 45 65 68 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 309 204 206 Average Queue (ft) 147 59 57 95th Queue (ft) 278 155 158 Link Distance (ft) 439 439 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) 0 3 Queuing Penalty (veh) 2 21 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 101 219 218 70 Average Queue (ft) 21 66 37 2 95th Queue (ft) 71 164 135 35 Link Distance (ft) 1235 1235 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 4 Queuing Penalty (veh) 18 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB WB NB SB Directions Served UL LTR LTR LTR Maximum Queue (ft) 54 34 55 63 Average Queue (ft) 10 1 17 31 95th Queue (ft) 37 13 46 52 Link Distance (ft) 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2023 Phase 1A Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 86 43 Average Queue (ft) 29 3 95th Queue (ft) 66 23 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 18 76 Average Queue (ft) 1 4 95th Queue (ft) 11 39 Link Distance (ft) 995 995 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1211 Ironwood – Transportation Impact Analysis PM 2024 Future No Build Queuing and Blocking Report PM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement SB SB Directions Served R R Maximum Queue (ft) 30 79 Average Queue (ft) 1 3 95th Queue (ft) 12 43 Link Distance (ft) 368 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 96 155 154 Average Queue (ft) 75 75 88 95th Queue (ft) 107 156 167 Link Distance (ft) 32 92 92 Upstream Blk Time (%) 53 3 5 Queuing Penalty (veh) 66 32 46 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 62 Average Queue (ft) 20 95th Queue (ft) 61 Link Distance (ft) 29 Upstream Blk Time (%) 38 Queuing Penalty (veh) 4 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 136 Average Queue (ft) 36 95th Queue (ft) 103 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB NB Directions Served L T T Maximum Queue (ft) 7 76 82 Average Queue (ft) 0 6 12 95th Queue (ft) 6 38 53 Link Distance (ft) 942 942 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 150 Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 400 1051 275 49 282 275 241 124 490 499 375 Average Queue (ft) 387 874 225 13 176 90 86 7 273 275 63 95th Queue (ft) 430 1251 389 38 388 302 274 61 429 444 287 Link Distance (ft) 1006 928 583 583 975 975 Upstream Blk Time (%) 52 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 78 97 2 0 16 9 Queuing Penalty (veh) 222 273 12 0 2 33 Queuing and Blocking Report PM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB SB Directions Served R UL T T Maximum Queue (ft) 173 87 32 6 Average Queue (ft) 79 26 2 0 95th Queue (ft) 146 65 19 4 Link Distance (ft) 1013 368 583 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 250 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 110 120 115 114 116 46 Average Queue (ft) 85 66 50 85 70 6 95th Queue (ft) 99 114 103 144 132 28 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 75 13 11 0 Queuing Penalty (veh) 134 65 54 2 Storage Bay Dist (ft) 225 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 201 80 135 141 43 Average Queue (ft) 83 57 105 105 8 95th Queue (ft) 163 89 163 158 31 Link Distance (ft) 1006 21 62 62 62 Upstream Blk Time (%) 59 10 11 0 Queuing Penalty (veh) 45 66 71 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 242 209 229 Average Queue (ft) 89 61 60 95th Queue (ft) 184 167 174 Link Distance (ft) 439 439 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) 4 Queuing Penalty (veh) 25 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB Directions Served L T T Maximum Queue (ft) 98 158 125 Average Queue (ft) 20 39 20 95th Queue (ft) 67 118 79 Link Distance (ft) 1235 1235 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) 2 Queuing Penalty (veh) 11 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB WB NB SB Directions Served UL LTR LTR LTR Maximum Queue (ft) 28 19 44 36 Average Queue (ft) 2 1 14 16 95th Queue (ft) 12 9 39 41 Link Distance (ft) 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2024 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 78 57 Average Queue (ft) 29 3 95th Queue (ft) 66 24 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 48 35 Average Queue (ft) 2 2 95th Queue (ft) 29 28 Link Distance (ft) 995 995 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1165 Ironwood – Transportation Impact Analysis PM 2024 Phase 1B Build Queuing and Blocking Report PM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement SB Directions Served R Maximum Queue (ft) 52 Average Queue (ft) 2 95th Queue (ft) 22 Link Distance (ft) 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 100 152 160 Average Queue (ft) 86 99 114 95th Queue (ft) 103 180 188 Link Distance (ft) 32 92 92 Upstream Blk Time (%) 68 6 8 Queuing Penalty (veh) 123 61 77 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB Directions Served L Maximum Queue (ft) 69 Average Queue (ft) 18 95th Queue (ft) 55 Link Distance (ft) 29 Upstream Blk Time (%) 35 Queuing Penalty (veh) 4 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 189 Average Queue (ft) 82 95th Queue (ft) 175 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB NB Directions Served L T T Maximum Queue (ft) 21 86 111 Average Queue (ft) 1 10 22 95th Queue (ft) 14 49 74 Link Distance (ft) 942 942 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 150 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 400 1054 275 54 322 275 282 79 583 606 375 Average Queue (ft) 383 904 223 15 185 90 88 5 285 280 80 95th Queue (ft) 453 1280 389 42 380 267 247 44 494 496 323 Link Distance (ft) 1006 928 583 583 975 975 Upstream Blk Time (%) 63 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 76 95 0 16 9 Queuing Penalty (veh) 220 270 0 2 33 Queuing and Blocking Report PM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB SB Directions Served R UL T T T Maximum Queue (ft) 296 97 55 6 14 Average Queue (ft) 131 39 3 0 0 95th Queue (ft) 263 83 27 4 10 Link Distance (ft) 1013 368 368 583 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 250 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 109 162 148 126 114 38 Average Queue (ft) 85 70 55 94 71 6 95th Queue (ft) 98 128 115 143 131 27 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 74 14 10 0 Queuing Penalty (veh) 152 71 52 1 Storage Bay Dist (ft) 225 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 156 74 128 137 54 Average Queue (ft) 75 53 103 101 9 95th Queue (ft) 137 89 159 157 34 Link Distance (ft) 1006 21 62 62 62 Upstream Blk Time (%) 60 9 10 0 Queuing Penalty (veh) 46 63 66 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 263 205 195 Average Queue (ft) 100 49 48 95th Queue (ft) 203 144 146 Link Distance (ft) 439 439 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) 3 Queuing Penalty (veh) 19 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB Directions Served L T T Maximum Queue (ft) 80 183 143 Average Queue (ft) 12 45 24 95th Queue (ft) 49 127 90 Link Distance (ft) 1235 1235 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) 2 Queuing Penalty (veh) 11 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB EB WB NB SB Directions Served UL TR LTR LTR LTR Maximum Queue (ft) 42 3 15 35 49 Average Queue (ft) 4 0 1 13 25 95th Queue (ft) 23 2 8 39 49 Link Distance (ft) 910 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2024 Phase 1B Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 87 61 Average Queue (ft) 32 5 95th Queue (ft) 68 32 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 700: US 421 & Site Access 1 Movement WB NB Directions Served R TR Maximum Queue (ft) 89 22 Average Queue (ft) 37 1 95th Queue (ft) 73 10 Link Distance (ft) 1692 376 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 39 64 Average Queue (ft) 1 3 95th Queue (ft) 16 25 Link Distance (ft) 995 995 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1269 Ironwood – Transportation Impact Analysis PM 2024 Phase 1B Build + Improvements Queuing and Blocking Report PM 2024 Phase 1B Build with Improvements 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 117 155 157 Average Queue (ft) 87 95 106 95th Queue (ft) 108 175 180 Link Distance (ft) 32 92 92 Upstream Blk Time (%) 70 5 7 Queuing Penalty (veh) 127 50 63 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 219 Average Queue (ft) 94 95th Queue (ft) 197 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 450 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 700: US 421 & Site Access 1 Movement WB Directions Served R Maximum Queue (ft) 75 Average Queue (ft) 27 95th Queue (ft) 58 Link Distance (ft) 1680 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Zone Summary Zone wide Queuing Penalty: 240 Ironwood – Transportation Impact Analysis PM 2026 Future No Build Queuing and Blocking Report PM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement SB SB Directions Served R R Maximum Queue (ft) 22 21 Average Queue (ft) 1 1 95th Queue (ft) 13 12 Link Distance (ft) 368 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 96 169 153 Average Queue (ft) 80 76 91 95th Queue (ft) 105 158 167 Link Distance (ft) 32 92 92 Upstream Blk Time (%) 60 3 5 Queuing Penalty (veh) 77 32 49 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB SB Directions Served L T Maximum Queue (ft) 65 6 Average Queue (ft) 20 0 95th Queue (ft) 59 4 Link Distance (ft) 29 98 Upstream Blk Time (%) 49 Queuing Penalty (veh) 5 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB Directions Served L Maximum Queue (ft) 121 Average Queue (ft) 39 95th Queue (ft) 106 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB NB Directions Served L T T Maximum Queue (ft) 15 65 62 Average Queue (ft) 1 4 6 95th Queue (ft) 9 28 33 Link Distance (ft) 942 942 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 150 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 400 1045 275 54 300 231 241 227 603 637 375 Average Queue (ft) 386 816 229 15 147 64 68 14 318 325 100 95th Queue (ft) 445 1234 389 42 293 167 166 103 501 527 368 Link Distance (ft) 1006 928 583 583 975 975 Upstream Blk Time (%) 47 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 76 96 18 11 Queuing Penalty (veh) 222 276 3 43 Queuing and Blocking Report PM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB SB SB Directions Served R UL T T R Maximum Queue (ft) 230 86 23 22 4 Average Queue (ft) 103 30 1 1 0 95th Queue (ft) 202 70 16 15 3 Link Distance (ft) 1013 368 583 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 250 300 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 102 126 122 129 117 46 Average Queue (ft) 84 66 50 91 79 7 95th Queue (ft) 101 114 105 144 136 28 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 77 15 13 0 Queuing Penalty (veh) 140 74 64 1 Storage Bay Dist (ft) 225 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 161 87 129 139 52 Average Queue (ft) 84 55 111 111 8 95th Queue (ft) 146 96 158 156 35 Link Distance (ft) 1006 21 62 62 62 Upstream Blk Time (%) 61 10 11 0 Queuing Penalty (veh) 47 70 76 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB Directions Served L T T Maximum Queue (ft) 238 195 218 Average Queue (ft) 98 66 66 95th Queue (ft) 199 162 172 Link Distance (ft) 439 439 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) 4 Queuing Penalty (veh) 26 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB Directions Served L T T Maximum Queue (ft) 112 188 153 Average Queue (ft) 21 56 31 95th Queue (ft) 72 152 105 Link Distance (ft) 1235 1235 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 Storage Blk Time (%) 3 Queuing Penalty (veh) 16 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB WB NB SB Directions Served UL LTR LTR LTR Maximum Queue (ft) 27 10 35 44 Average Queue (ft) 2 0 14 16 95th Queue (ft) 14 6 39 43 Link Distance (ft) 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2026 Future No Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB Directions Served LR LT Maximum Queue (ft) 75 48 Average Queue (ft) 29 3 95th Queue (ft) 65 24 Link Distance (ft) 3292 1016 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 Movement EB EB Directions Served R R Maximum Queue (ft) 42 51 Average Queue (ft) 2 3 95th Queue (ft) 25 21 Link Distance (ft) 995 995 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1222 Ironwood – Transportation Impact Analysis PM 2026 Phase 2 Build Queuing and Blocking Report PM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 1 Intersection: 9: US 421 Movement SB SB Directions Served R R Maximum Queue (ft) 39 9 Average Queue (ft) 1 0 95th Queue (ft) 28 5 Link Distance (ft) 368 368 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 100: US 421 & SB-NB U turn south of Rosa Movement EB NB NB Directions Served L T T Maximum Queue (ft) 103 159 167 Average Queue (ft) 87 109 125 95th Queue (ft) 97 184 193 Link Distance (ft) 31 92 92 Upstream Blk Time (%) 73 8 9 Queuing Penalty (veh) 146 74 91 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 101: US 421 & NB-SB U turn south of Rosa Movement WB SB SB Directions Served L T T Maximum Queue (ft) 70 31 39 Average Queue (ft) 29 2 4 95th Queue (ft) 78 32 41 Link Distance (ft) 30 98 98 Upstream Blk Time (%) 32 0 0 Queuing Penalty (veh) 4 5 5 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 2 Intersection: 102: US 421 & SB-NB U turn south of Rosa Movement SB SB SB Directions Served L T T Maximum Queue (ft) 250 22 45 Average Queue (ft) 110 1 2 95th Queue (ft) 224 18 32 Link Distance (ft) 1285 1285 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 450 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 103: US 421 & NB-SB U turn south of Rosa Movement NB NB NB Directions Served L T T Maximum Queue (ft) 53 94 126 Average Queue (ft) 15 16 30 95th Queue (ft) 76 61 91 Link Distance (ft) 1578 1578 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 150 Storage Blk Time (%) 5 Queuing Penalty (veh) 50 Intersection: 200: US 421 & Sanders Rd/North State Storage Driveway Movement EB EB EB WB NB NB NB SB SB SB SB Directions Served L LT R LTR UL T TR UL T T R Maximum Queue (ft) 400 1047 275 67 236 142 160 178 367 388 336 Average Queue (ft) 386 828 218 18 140 52 59 8 333 333 149 95th Queue (ft) 439 1239 388 55 240 121 133 72 395 410 412 Link Distance (ft) 1006 930 583 583 336 336 Upstream Blk Time (%) 40 9 7 0 Queuing Penalty (veh) 0 106 82 0 Storage Bay Dist (ft) 300 200 500 150 250 Storage Blk Time (%) 72 95 1 22 19 Queuing Penalty (veh) 214 277 2 3 71 Queuing and Blocking Report PM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 3 Intersection: 300: US 421 & Beau Rivage Driveway Movement EB NB NB NB SB SB Directions Served R UL T T T R Maximum Queue (ft) 364 107 85 32 8 8 Average Queue (ft) 168 42 4100 95th Queue (ft) 371 88 37 22 5 4 Link Distance (ft) 1013 368 368 583 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 250 300 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 421 & SB Manassas Crossover/Manassas Dr Movement EB WB WB NB NB NB Directions Served LT R R T T R Maximum Queue (ft) 109 125 125 126 119 53 Average Queue (ft) 86 68 59 95 84 7 95th Queue (ft) 96 117 115 144 141 31 Link Distance (ft) 33 910 50 50 50 Upstream Blk Time (%) 78 16 14 1 Queuing Penalty (veh) 173 82 73 6 Storage Bay Dist (ft) 225 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 401: US 421 & Sharks Eye Lane/NB Manassas Crossover Movement EB WB SB SB SB Directions Served R LT T T R Maximum Queue (ft) 162 81 148 141 48 Average Queue (ft) 73 60 106 104 8 95th Queue (ft) 138 91 165 162 33 Link Distance (ft) 1006 21 62 62 62 Upstream Blk Time (%) 62 10 10 0 Queuing Penalty (veh) 48 67 72 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 4 Intersection: 402: US 421 & SB Manassas Crossover Movement SB SB SB SB Directions Served L T T T Maximum Queue (ft) 244 193 205 45 Average Queue (ft) 118 51 56 2 95th Queue (ft) 221 141 158 32 Link Distance (ft) 439 439 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 75 Storage Blk Time (%) 3 Queuing Penalty (veh) 21 Intersection: 403: US 421 & NB Manassas Crossover Movement NB NB NB NB Directions Served L T T T Maximum Queue (ft) 98 193 186 35 Average Queue (ft) 21 55 38 1 95th Queue (ft) 63 146 126 25 Link Distance (ft) 1235 1235 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 400 25 Storage Blk Time (%) 4 Queuing Penalty (veh) 22 Intersection: 500: Shiloh Dr & Manassas Dr Movement EB WB NB SB Directions Served UL LTR LTR LTR Maximum Queue (ft) 34 10 35 54 Average Queue (ft) 6 0 15 26 95th Queue (ft) 27 6 39 50 Link Distance (ft) 234 1092 1030 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report PM 2026 Phase 2 Build 05/05/2022 210291 Ironwood SimTraffic Report T. Lee Page 5 Intersection: 600: Myrtle Grove Road & Lieutenant Congleton Rd Movement EB NB SB Directions Served LR LT TR Maximum Queue (ft) 98 32 4 Average Queue (ft) 33 2 0 95th Queue (ft) 72 17 3 Link Distance (ft) 3292 1016 1215 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 700: US 421 & Site Access 1 Movement WB Directions Served R Maximum Queue (ft) 71 Average Queue (ft) 25 95th Queue (ft) 54 Link Distance (ft) 980 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 800: US 421 & Site Access 2 Movement EB EB WB Directions Served R R R Maximum Queue (ft) 1154 1169 51 Average Queue (ft) 636 657 18 95th Queue (ft) 1381 1408 46 Link Distance (ft) 1636 1636 1264 Upstream Blk Time (%) 1 1 Queuing Penalty (veh) 10 15 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1718 Ironwood – Transportation Impact Analysis Trip Generation Trip Generation Summary Open Date: Analysis Date: 10/10/2021 10/10/2021 Alternative: Phase 1A Phase: Project: Ironwood ITE Land Use Enter Exit Enter ExitEnter Exit TotalTotal Total *** Weekday Average Daily Trips Weekday AM Peak Hour of Adjacent Street Traffic Weekday PM Peak Hour of Adjacent Street Traffic 210 SFHOUSE 1 125 Dwelling Units 639 638 1277 24 70 94 79 47 126 Unadjusted Volume 639 638 1277 24 70 94 79 47 126 Internal Capture Trips 0 0 0 0 0 0 0 0 0 000 000 000 639 638 1277 24 70 94 79 47 126 Pass-By Trips Volume Added to Adjacent Streets Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent P. 1TRIP GENERATION 10, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 10th Edition - Custom rate used for selected time period.* Trip Generation Summary Open Date: Analysis Date: 10/10/2021 10/10/2021 Alternative: Phase 1B Phase: Project: Ironwood ITE Land Use Enter Exit Enter ExitEnter Exit TotalTotal Total *** Weekday Average Daily Trips Weekday AM Peak Hour of Adjacent Street Traffic Weekday PM Peak Hour of Adjacent Street Traffic 210 SFHOUSE 1 125 Dwelling Units 639 638 1277 24 70 94 79 47 126 220 LOW-RISE 1 125 Dwelling Units 452 452 904 14 45 59 45 27 72 Unadjusted Volume 1091 1090 2181 38 115 153 124 74 198 Internal Capture Trips 0 0 0 0 0 0 0 0 0 000 000 000 1091 1090 2181 38 115 153 124 74 198 Pass-By Trips Volume Added to Adjacent Streets Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent P. 1TRIP GENERATION 10, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 10th Edition - Custom rate used for selected time period.* Trip Generation Summary Open Date: Analysis Date: 10/10/2021 10/10/2021 Alternative: Phase 2 Phase: Project: Ironwood ITE Land Use Enter Exit Enter ExitEnter Exit TotalTotal Total *** Weekday Average Daily Trips Weekday AM Peak Hour of Adjacent Street Traffic Weekday PM Peak Hour of Adjacent Street Traffic 210 SFHOUSE 1 125 Dwelling Units 639 638 1277 24 70 94 79 47 126 220 LOW-RISE 1 241 Dwelling Units 891 890 1781 25 85 110 81 48 129 Unadjusted Volume 1530 1528 3058 49 155 204 160 95 255 Internal Capture Trips 0 0 0 0 0 0 0 0 0 000 000 000 1530 1528 3058 49 155 204 160 95 255 Pass-By Trips Volume Added to Adjacent Streets Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent P. 1TRIP GENERATION 10, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 10th Edition - Custom rate used for selected time period.* Ironwood – Transportation Impact Analysis Traffic Volume Data Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- U-Turn Junction south of Rosa Parks Ln QC JOB #: QC JOB #: 15620001 CITY/STATE: CITY/STATE: Silver Lake, NC DATE: DATE: Thu, Dec 9 2021 1677 2153 0 1595 82 0 0 0 0 0 0.960.96 0 0 0 0 0 2 2071 0 1597 2073 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 7 3.3 0 7.4 0 0 0 0 0 0 0 0 0 0 0 0 3.4 0 7.4 3.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) U-Turn Junction south of RosaU-Turn Junction south of Rosa Parks LnParks Ln (Eastbound)(Eastbound) U-Turn Junction south of RosaU-Turn Junction south of Rosa Parks LnParks Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotals LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU 7:00 AM 0 360 0 2 0 214 0 8 0 0 0 0 0 0 0 0 584 7:15 AM 0 509 0 0 0 297 0 16 0 0 0 0 0 0 0 0 822 7:30 AM 0 512 0 0 0 443 0 18 0 0 0 0 0 0 0 0 973 7:45 AM 0 544 0 0 0 413 0 24 0 0 0 0 0 0 0 0 981 3360 8:00 AM 0 526 0 2 0 394 0 21 0 0 0 0 0 0 0 0 943 3719 8:15 AM 0 489 0 0 0 345 0 19 0 0 0 0 0 0 0 0 853 3750 8:30 AM 0 434 0 4 0 329 0 18 0 0 0 0 0 0 0 0 785 3562 8:45 AM 0 404 0 1 0 329 0 13 0 0 0 0 0 0 0 0 747 3328 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 2176 0 0 0 1652 0 96 0 0 0 0 0 0 0 0 3924 Heavy Trucks 0 52 0 0 120 0 0 0 0 0 0 0 172 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- U-Turn Junction south of Rosa Parks Ln QC JOB #: QC JOB #: 15620002 CITY/STATE: CITY/STATE: Silver Lake, NC DATE: DATE: Thu, Dec 2 2021 2126 1816 0 2005 121 0 0 0 0 0 0.960.96 0 0 0 0 0 10 1695 0 2015 1705 Peak-Hour: 4:15 PM -- 5:15 PMPeak-Hour: 4:15 PM -- 5:15 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 2.3 3.5 0 2.4 0 0 0 0 0 0 0 0 0 0 0 0 3.7 0 2.4 3.7 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) U-Turn Junction south of RosaU-Turn Junction south of Rosa Parks LnParks Ln (Eastbound)(Eastbound) U-Turn Junction south of RosaU-Turn Junction south of Rosa Parks LnParks Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotals LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU 4:00 PM 0 407 0 0 0 430 0 45 0 0 0 0 0 0 0 0 882 4:15 PM 0 445 0 2 0 465 0 32 0 0 0 0 0 0 0 0 944 4:30 PM 0 413 0 4 0 504 0 27 0 0 0 0 0 0 0 0 948 4:45 PM 0 366 0 2 0 543 0 33 0 0 0 0 0 0 0 0 944 3718 5:00 PM 0 471 0 2 0 493 0 29 0 0 0 0 0 0 0 0 995 3831 5:15 PM 0 379 0 1 0 511 0 25 0 0 0 0 0 0 0 0 916 3803 5:30 PM 0 389 0 1 0 489 0 32 0 0 0 0 0 0 0 0 911 3766 5:45 PM 0 331 0 1 0 519 0 31 0 0 0 0 0 0 0 0 882 3704 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 1884 0 8 0 1972 0 116 0 0 0 0 0 0 0 0 3980 Heavy Trucks 0 40 0 0 52 0 0 0 0 0 0 0 92 Buses Pedestrians 0 0 0 0 0 Bicycles 0 4 0 0 0 0 0 0 0 0 0 0 4 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- Sanders Rd QC JOB #: QC JOB #: 15620003 CITY/STATE: CITY/STATE: Silver Lake, NC DATE: DATE: Thu, Dec 9 2021 1617 2094 157 1400 60 248 215 1 1 0 0.920.92 0 291 76 0 1 143 1819 0 1528 1962 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:30 AM -- 7:45 AMPeak 15-Min: 7:30 AM -- 7:45 AM 6.8 3.2 1.9 7.6 1.7 3.6 2.3 100 100 0 0 2.7 3.9 0 100 4.2 3.3 0 7.1 3.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) Sanders RdSanders Rd (Eastbound)(Eastbound) Sanders RdSanders Rd (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 19 337 0 2 0 175 36 12 14 0 1 0 0 0 0 0 596 7:15 AM 22 471 0 4 0 235 49 7 48 0 24 0 0 0 0 0 860 7:30 AM 46 423 0 8 1 341 93 12 88 0 34 0 0 0 1 0 1047 7:45 AM 24 473 0 18 0 369 33 11 64 0 35 0 0 0 0 0 1027 3530 8:00 AM 12 457 0 20 0 368 15 22 34 0 4 0 0 0 0 0 932 3866 8:15 AM 9 466 0 6 0 322 16 14 29 0 3 0 0 0 0 0 865 3871 8:30 AM 5 382 0 6 0 297 19 17 29 1 4 0 0 0 0 0 760 3584 8:45 AM 5 372 0 17 0 291 25 12 27 0 6 0 0 0 0 0 755 3312 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 184 1692 0 32 4 1364 372 48 352 0 136 0 0 0 4 0 4188 Heavy Trucks 8 56 0 4 76 4 4 0 4 0 0 4 160 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Special request for cameras to be aimed certain direction at this location. Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- Sanders Rd QC JOB #: QC JOB #: 15620004 CITY/STATE: CITY/STATE: Silver Lake, NC DATE: DATE: Thu, Dec 2 2021 2056 1675 199 1811 46 235 205 3 4 0 0.950.95 1 249 44 0 3 81 1422 2 1901 1505 Peak-Hour: 4:30 PM -- 5:30 PMPeak-Hour: 4:30 PM -- 5:30 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 1.8 3 1.5 1.9 0 1.3 2.4 0 0 0 0 2.4 2.3 0 0 0 3.2 0 1.8 3.1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) Sanders RdSanders Rd (Eastbound)(Eastbound) Sanders RdSanders Rd (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 16 375 0 9 1 405 37 12 39 0 11 0 0 0 0 0 905 4:15 PM 11 391 0 8 1 405 39 4 39 0 11 0 0 1 0 0 910 4:30 PM 3 337 0 10 0 437 56 11 63 0 10 0 0 1 0 0 928 4:45 PM 16 340 0 16 1 475 53 5 39 0 10 0 0 0 2 0 957 3700 5:00 PM 8 415 0 12 0 438 55 11 49 0 15 0 0 0 0 0 1003 3798 5:15 PM 8 330 2 8 0 461 35 18 54 0 9 0 0 0 1 0 926 3814 5:30 PM 6 344 2 8 1 448 21 6 43 0 8 0 1 0 0 0 888 3774 5:45 PM 7 262 0 8 0 463 36 11 45 0 7 0 1 0 2 0 842 3659 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 32 1660 0 48 0 1752 220 44 196 0 60 0 0 0 0 0 4012 Heavy Trucks 0 44 0 0 40 8 4 0 4 0 0 0 100 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Special request for cameras to be aimed certain direction at this location. Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- Beau Rivage Marketplace Dwy QC JOB #: QC JOB #: 15620005 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 9 2021 1517 1970 33 1484 0 33 0 5 5 0 0.950.95 0 34 34 0 0 0 1965 0 1518 1965 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 7.8 3.2 3 7.9 0 3 0 20 20 0 0 0 0 0 0 0 3.2 0 7.7 3.2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) Beau Rivage Marketplace DwyBeau Rivage Marketplace Dwy (Eastbound)(Eastbound) Beau Rivage Marketplace DwyBeau Rivage Marketplace Dwy (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 358 0 0 0 171 7 0 0 0 4 0 0 0 0 0 540 7:15 AM 0 499 0 0 0 256 5 0 0 0 2 0 0 0 0 0 762 7:30 AM 0 503 0 0 0 365 9 0 0 0 7 0 0 0 1 0 885 7:45 AM 0 502 0 0 0 408 9 0 0 0 9 0 0 0 0 0 928 3115 8:00 AM 0 491 0 0 0 388 10 0 0 0 8 0 0 0 0 0 897 3472 8:15 AM 0 469 0 0 0 323 5 0 0 0 10 0 0 0 4 0 811 3521 8:30 AM 0 396 0 0 0 297 8 0 0 0 7 0 0 0 1 0 709 3345 8:45 AM 0 392 0 0 0 285 20 0 0 0 9 0 0 0 2 0 708 3125 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 2008 0 0 0 1632 36 0 0 0 36 0 0 0 0 0 3712 Heavy Trucks 0 40 0 0 116 0 0 0 0 0 0 0 156 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Special request for cameras to be aimed certain direction at this location. Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- Beau Rivage Marketplace Dwy QC JOB #: QC JOB #: 15620006 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 2 2021 1841 1575 87 1754 0 87 0 14 14 0 0.940.94 0 107 107 0 0 0 1561 0 1861 1561 Peak-Hour: 4:15 PM -- 5:15 PMPeak-Hour: 4:15 PM -- 5:15 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 2.3 3.4 0 2.4 0 0 0 14.3 14.3 0 0 0 0 0 0 0 3.3 0 2.3 3.3 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) Beau Rivage Marketplace DwyBeau Rivage Marketplace Dwy (Eastbound)(Eastbound) Beau Rivage Marketplace DwyBeau Rivage Marketplace Dwy (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 0 385 0 0 0 407 19 0 0 0 23 0 0 0 2 0 836 4:15 PM 0 399 0 0 0 410 15 0 0 0 23 0 0 0 5 0 852 4:30 PM 0 363 0 0 0 438 22 0 0 0 35 0 0 0 2 0 860 4:45 PM 0 348 0 0 0 469 28 0 0 0 25 0 0 0 2 0 872 3420 5:00 PM 0 451 0 0 0 437 22 0 0 0 24 0 0 0 5 0 939 3523 5:15 PM 0 338 0 0 0 457 14 0 0 0 33 0 0 0 2 0 844 3515 5:30 PM 0 354 0 0 0 438 19 0 0 0 31 0 0 0 0 0 842 3497 5:45 PM 0 278 0 0 0 440 18 0 0 0 25 0 0 0 0 0 761 3386 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 1804 0 0 0 1748 88 0 0 0 96 0 0 0 20 0 3756 Heavy Trucks 0 36 0 0 40 0 0 0 0 0 0 0 76 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Special request for cameras to be aimed certain direction at this location. Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- Manassas Dr_Sharks Eye Ln QC JOB #: QC JOB #: 15620007 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 9 2021 1513 1989 12 1379 122 73 0 252 254 0 0.960.96 0 20 20 2 136 62 1711 38 1400 1811 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 5.9 3.2 0 5.7 9 0 0 1.6 1.6 0 0 0 0 0 9.6 0 3.5 5.3 5.6 3.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) Manassas Dr_Sharks Eye LnManassas Dr_Sharks Eye Ln (Eastbound)(Eastbound) Manassas Dr_Sharks Eye LnManassas Dr_Sharks Eye Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 4 308 1 0 13 155 3 4 0 0 2 0 0 0 51 0 541 7:15 AM 7 423 4 0 19 235 4 0 0 0 6 0 0 0 70 0 768 7:30 AM 14 444 6 0 29 316 2 1 0 0 5 0 0 0 86 0 903 7:45 AM 12 411 7 1 30 384 3 8 0 0 4 0 0 0 71 2 933 3145 8:00 AM 17 430 9 0 15 380 3 9 0 0 6 0 0 0 57 0 926 3530 8:15 AM 18 426 16 0 22 299 4 8 0 0 5 0 0 0 38 0 836 3598 8:30 AM 12 366 13 1 22 265 8 3 0 0 9 0 0 0 35 2 736 3431 8:45 AM 19 338 3 1 26 256 4 8 0 0 10 0 0 0 42 1 708 3206 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 48 1644 28 4 120 1536 12 32 0 0 16 0 0 0 284 8 3732 Heavy Trucks 0 32 4 16 76 0 0 0 0 0 0 8 136 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 421_Carolina Beach Rd -- Manassas Dr_Sharks Eye Ln QC JOB #: QC JOB #: 15620008 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 2 2021 1861 1523 44 1660 157 113 0 141 142 0 0.950.95 0 92 92 1 163 71 1358 29 1754 1458 Peak-Hour: 4:15 PM -- 5:15 PMPeak-Hour: 4:15 PM -- 5:15 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 1.9 3.8 0 2.2 0 0 0 3.5 3.5 0 0 0 0 0 0 0 3.9 0 2.1 3.6 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Northbound)(Northbound) US 421_Carolina Beach Rd US 421_Carolina Beach Rd (Southbound)(Southbound) Manassas Dr_Sharks Eye LnManassas Dr_Sharks Eye Ln (Eastbound)(Eastbound) Manassas Dr_Sharks Eye LnManassas Dr_Sharks Eye Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 32 337 19 0 20 385 9 8 0 0 23 0 0 0 41 1 875 4:15 PM 15 367 8 2 27 381 12 9 0 0 14 0 0 0 20 1 856 4:30 PM 17 324 5 0 34 414 12 6 0 0 35 0 0 0 42 0 889 4:45 PM 16 306 5 0 44 436 11 5 0 0 17 0 0 0 37 0 877 3497 5:00 PM 21 361 11 0 28 429 9 4 0 0 26 0 0 0 42 0 931 3553 5:15 PM 14 305 11 0 38 410 11 6 0 0 16 0 0 0 30 1 842 3539 5:30 PM 23 314 8 0 42 388 12 3 0 0 16 0 0 0 34 0 840 3490 5:45 PM 15 241 11 0 48 386 7 4 0 0 22 0 0 0 28 1 763 3376 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 84 1444 44 0 112 1716 36 16 0 0 104 0 0 0 168 0 3724 Heavy Trucks 0 40 0 0 36 0 0 0 0 0 0 4 80 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Manassas Dr -- Shiloh Dr QC JOB #: QC JOB #: 15620009 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 9 2021 1 1 1 0 0 280 2 0 263 101 0.780.78 263 108 5 0 105 15 0 4 5 19 Peak-Hour: 7:15 AM -- 8:15 AMPeak-Hour: 7:15 AM -- 8:15 AM Peak 15-Min: 7:30 AM -- 7:45 AMPeak 15-Min: 7:30 AM -- 7:45 AM 0 100 0 0 0 2.5 50 0 2.7 6.9 2.7 7.4 0 0 6.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Manassas Dr Manassas Dr (Northbound)(Northbound) Manassas Dr Manassas Dr (Southbound)(Southbound) Shiloh DrShiloh Dr (Eastbound)(Eastbound) Shiloh DrShiloh Dr (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 4 0 0 0 0 0 0 0 0 9 1 0 0 51 0 0 65 7:15 AM 5 0 1 0 0 0 1 0 0 17 1 0 0 67 0 0 92 7:30 AM 3 0 0 0 0 0 0 0 0 32 3 1 0 87 0 0 126 7:45 AM 3 0 1 0 0 0 0 0 0 29 0 0 0 61 0 0 94 377 8:00 AM 4 0 2 0 0 0 0 0 1 23 1 0 0 48 0 0 79 391 8:15 AM 5 0 0 0 0 0 0 0 0 29 2 0 1 34 0 0 71 370 8:30 AM 8 0 0 0 0 0 1 0 0 36 5 1 0 25 0 0 76 320 8:45 AM 3 0 0 0 0 0 0 0 0 26 0 1 0 34 0 0 64 290 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 12 0 0 0 0 0 0 0 0 128 12 4 0 348 0 0 504 Heavy Trucks 0 0 0 0 0 0 0 12 0 0 8 0 20 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Manassas Dr -- Shiloh Dr QC JOB #: QC JOB #: 15620010 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 2 2021 6 1 6 0 0 150 3 0 140 164 0.920.92 136 187 20 4 169 6 0 2 21 8 Peak-Hour: 4:45 PM -- 5:45 PMPeak-Hour: 4:45 PM -- 5:45 PM Peak 15-Min: 5:30 PM -- 5:45 PMPeak 15-Min: 5:30 PM -- 5:45 PM 0 100 0 0 0 4.7 33.3 0 5 0 5.1 0.5 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Manassas Dr Manassas Dr (Northbound)(Northbound) Manassas Dr Manassas Dr (Southbound)(Southbound) Shiloh DrShiloh Dr (Eastbound)(Eastbound) Shiloh DrShiloh Dr (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 2 0 1 0 0 0 1 0 0 36 5 7 0 34 0 0 86 4:15 PM 5 0 0 0 0 0 0 0 2 27 3 3 1 13 0 0 54 4:30 PM 4 0 1 0 0 0 1 0 0 34 3 2 0 34 0 0 79 4:45 PM 1 0 0 0 0 0 2 0 1 39 5 0 1 39 0 1 89 308 5:00 PM 1 0 0 0 0 0 4 0 0 32 6 0 0 34 0 0 77 299 5:15 PM 0 0 1 0 0 0 0 0 0 42 6 1 0 30 0 2 82 327 5:30 PM 4 0 1 0 0 0 0 0 0 51 3 1 0 33 0 0 93 341 5:45 PM 1 0 0 0 0 0 0 0 0 54 3 0 0 17 0 0 75 327 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 16 0 4 0 0 0 0 0 0 204 12 4 0 132 0 0 372 Heavy Trucks 0 0 0 0 0 0 0 0 0 0 4 0 4 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Myrtle Grove Rd -- Lieutenant Conglenton Rd QC JOB #: QC JOB #: 15620011 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 9 2021 393 390 20 373 0 28 18 0 0 0 0.900.90 0 47 29 0 0 8 372 0 402 380 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 5.9 3.3 5 5.9 0 3.6 0 0 0 0 0 0 0 0 0 0 3.5 0 5.5 3.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Myrtle Grove Rd Myrtle Grove Rd (Northbound)(Northbound) Myrtle Grove Rd Myrtle Grove Rd (Southbound)(Southbound) Lieutenant Conglenton RdLieutenant Conglenton Rd (Eastbound)(Eastbound) Lieutenant Conglenton RdLieutenant Conglenton Rd (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 74 0 0 0 24 2 0 7 0 1 0 0 0 0 0 108 7:15 AM 0 59 0 0 0 42 2 0 5 0 0 0 0 0 0 0 108 7:30 AM 0 93 0 0 0 65 5 0 3 0 6 0 0 0 0 0 172 7:45 AM 2 87 0 0 0 115 5 0 5 0 13 0 0 0 0 0 227 615 8:00 AM 3 92 0 0 0 106 3 0 4 0 7 0 0 0 0 0 215 722 8:15 AM 3 100 0 0 0 87 7 0 6 0 3 0 0 0 0 0 206 820 8:30 AM 0 98 0 0 0 62 1 0 8 0 1 0 0 0 0 0 170 818 8:45 AM 1 79 0 0 0 63 7 0 3 0 3 0 0 0 0 0 156 747 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 8 348 0 0 0 460 20 0 20 0 52 0 0 0 0 0 908 Heavy Trucks 0 8 0 0 20 0 0 0 0 0 0 0 28 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Myrtle Grove Rd -- Lieutenant Conglenton Rd QC JOB #: QC JOB #: 15620012 CITY/STATE: CITY/STATE: Myrtle Grove, NC DATE: DATE: Thu, Dec 2 2021 561 423 40 520 1 49 28 0 0 0 0.870.87 0 40 12 0 0 9 394 0 532 403 Peak-Hour: 4:00 PM -- 5:00 PMPeak-Hour: 4:00 PM -- 5:00 PM Peak 15-Min: 4:00 PM -- 4:15 PMPeak 15-Min: 4:00 PM -- 4:15 PM 4.6 4.5 5 4.6 0 4.1 7.1 0 0 0 0 7.5 8.3 0 0 0 4.3 0 4.7 4.2 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Myrtle Grove Rd Myrtle Grove Rd (Northbound)(Northbound) Myrtle Grove Rd Myrtle Grove Rd (Southbound)(Southbound) Lieutenant Conglenton RdLieutenant Conglenton Rd (Eastbound)(Eastbound) Lieutenant Conglenton RdLieutenant Conglenton Rd (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 5 109 0 0 0 143 17 0 9 0 5 0 0 0 0 0 288 4:15 PM 2 115 0 0 0 130 4 0 6 0 2 0 0 0 0 0 259 4:30 PM 1 80 0 0 0 141 10 0 8 0 1 0 0 0 0 0 241 4:45 PM 1 90 0 0 0 106 9 1 5 0 4 0 0 0 0 0 216 1004 5:00 PM 0 109 0 0 0 127 3 0 9 0 6 0 0 0 0 0 254 970 5:15 PM 2 87 0 0 0 128 10 0 13 0 5 0 0 0 0 0 245 956 5:30 PM 2 104 0 0 0 109 7 0 8 0 7 0 0 0 0 0 237 952 5:45 PM 2 58 0 0 0 88 7 0 5 0 4 0 0 0 0 0 164 900 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 20 436 0 0 0 572 68 0 36 0 20 0 0 0 0 0 1152 Heavy Trucks 0 28 0 0 28 8 0 0 0 0 0 0 64 Buses Pedestrians 0 0 4 0 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 12/14/2021 1:46 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 File Name : Wilmington(US 421 and Sanders) AM Peak Site Code : Start Date : 9/2/2021 Page No : 1 Groups Printed- Cars + - Trucks US 421 Southbound Self Storage Access Westbound US 421 Northbound Sanders Road Eastbound Start Time Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Int. Total 07:00 AM 60 165 0 3 228 1 0 0 0 1 0 309 37 6 352 10 0 52 0 62 643 07:15 AM 64 253 1 2 320 0 0 0 0 0 0 426 30 3 459 32 0 116 0 148 927 07:30 AM 80 346 1 5 432 1 0 0 0 1 1 379 33 10 423 49 0 156 0 205 1061 07:45 AM 61 364 0 3 428 2 0 0 0 2 3 505 33 14 555 58 0 114 0 172 1157 Total 265 1128 2 13 1408 4 0 0 0 4 4 1619 133 33 1789 149 0 438 0 587 3788 08:00 AM 54 319 0 0 373 1 0 0 0 1 0 460 21 15 496 23 0 83 1 107 977 08:15 AM 68 280 1 1 350 1 0 0 0 1 0 392 15 15 422 17 1 109 0 127 900 08:30 AM 45 292 0 0 337 2 0 0 0 2 0 371 15 6 392 17 0 99 0 116 847 08:45 AM 57 276 0 2 335 0 0 0 0 0 0 272 15 8 295 18 0 79 0 97 727 Total 224 1167 1 3 1395 4 0 0 0 4 0 1495 66 44 1605 75 1 370 1 447 3451 Grand Total 489 2295 3 16 2803 8 0 0 0 8 4 3114 199 77 3394 224 1 808 1 1034 7239 Apprch %17.4 81.9 0.1 0.6 100 0 0 0 0.1 91.8 5.9 2.3 21.7 0.1 78.1 0.1 Total %6.8 31.7 0 0.2 38.7 0.1 0 0 0 0.1 0.1 43 2.7 1.1 46.9 3.1 0 11.2 0 14.3 Cars +476 2226 3 15 2720 8 0 0 0 8 4 3065 197 75 3341 220 1 797 1 1019 7088 % Cars +97.3 97 100 93.8 97 100 0 0 0 100 100 98.4 99 97.4 98.4 98.2 100 98.6 100 98.5 97.9 Trucks 13 69 0 1 83 0 0 0 0 0 0 49 2 2 53 4 0 11 0 15 151 % Trucks 2.7 3 0 6.2 3 0 0 0 0 0 0 1.6 1 2.6 1.6 1.8 0 1.4 0 1.5 2.1 File Name : Wilmington(US 421 and Sanders) AM Peak Site Code : Start Date : 9/2/2021 Page No : 2 US 421 Southbound Self Storage Access Westbound US 421 Northbound Sanders Road Eastbound Start Time Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 64 253 1 2 320 0 0 0 0 0 0 426 30 3 459 32 0 116 0 148 927 07:30 AM 80 346 1 5 432 1 0 0 0 1 1 379 33 10 423 49 0 156 0 205 1061 07:45 AM 61 364 0 3 428 2 0 0 0 2 3 505 33 14 555 58 0 114 0 172 1157 08:00 AM 54 319 0 0 373 1 0 0 0 1 0 460 21 15 496 23 0 83 1 107 977 Total Volume 259 1282 2 10 1553 4 0 0 0 4 4 1770 117 42 1933 162 0 469 1 632 4122 % App. Total 16.7 82.5 0.1 0.6 100 0 0 0 0.2 91.6 6.1 2.2 25.6 0 74.2 0.2 PHF .809 .880 .500 .500 .899 .500 .000 .000 .000 .500 .333 .876 .886 .700 .871 .698 .000 .752 .250 .771 .891 US 421 S a n d e r s R o a d S e l f S t o r a g e A c c e s s US 421 Right 259 Thru 1282 Left 2 UTrn 10 InOut Total 2243 1553 3796 Out 10 In 0 Total 10 Ri g h t 4 Th r u 0 Le f t 0 UT r n 0 Ou t To t a l In 6 4 10 Ou t 0 In 0 To t a l 0 UTrn 42 Left 117 Thru 1770 Right 4 Out TotalIn 1444 1933 3377 Out 42 In 0 Total42 UT r n 1 Le f t 46 9 Th r u 0 Ri g h t 16 2 To t a l Ou t In 37 6 63 2 10 0 8 Ou t 1 In 0 To t a l 1 Peak Hour Begins at 07:15 AM Cars + Trucks Peak Hour Data North File Name : Wilmington(US 421 and Sanders) PM Peak Site Code : Start Date : 9/2/2021 Page No : 1 Groups Printed- Cars + - Trucks US 421 Southbound Self Storage Access Westbound US 421 Northbound Sanders Road Eastbound Start Time Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Int. Total 04:00 PM 87 412 1 3 503 1 0 1 0 2 0 400 28 10 438 26 0 121 0 147 1090 04:15 PM 88 470 0 3 561 1 0 0 0 1 1 335 17 11 364 22 0 107 0 129 1055 04:30 PM 90 474 2 4 570 0 0 1 0 1 1 358 22 7 388 26 0 80 0 106 1065 04:45 PM 88 491 0 1 580 2 0 2 0 4 1 324 34 10 369 27 0 59 0 86 1039 Total 353 1847 3 11 2214 4 0 4 0 8 3 1417 101 38 1559 101 0 367 0 468 4249 05:00 PM 96 497 1 1 595 1 2 0 0 3 2 354 16 7 379 26 0 96 0 122 1099 05:15 PM 82 508 2 1 593 2 0 1 0 3 0 311 29 10 350 36 0 89 0 125 1071 05:30 PM 96 506 0 3 605 0 0 0 0 0 0 305 18 16 339 54 0 68 0 122 1066 05:45 PM 81 509 0 0 590 0 0 0 0 0 0 310 22 11 343 36 0 77 0 113 1046 Total 355 2020 3 5 2383 3 2 1 0 6 2 1280 85 44 1411 152 0 330 0 482 4282 Grand Total 708 3867 6 16 4597 7 2 5 0 14 5 2697 186 82 2970 253 0 697 0 950 8531 Apprch %15.4 84.1 0.1 0.3 50 14.3 35.7 0 0.2 90.8 6.3 2.8 26.6 0 73.4 0 Total %8.3 45.3 0.1 0.2 53.9 0.1 0 0.1 0 0.2 0.1 31.6 2.2 1 34.8 3 0 8.2 0 11.1 Cars +702 3840 5 16 4563 7 2 4 0 13 5 2657 185 80 2927 253 0 691 0 944 8447 % Cars +99.2 99.3 83.3 100 99.3 100 100 80 0 92.9 100 98.5 99.5 97.6 98.6 100 0 99.1 0 99.4 99 Trucks 6 27 1 0 34 0 0 1 0 1 0 40 1 2 43 0 0 6 0 6 84 % Trucks 0.8 0.7 16.7 0 0.7 0 0 20 0 7.1 0 1.5 0.5 2.4 1.4 0 0 0.9 0 0.6 1 File Name : Wilmington(US 421 and Sanders) PM Peak Site Code : Start Date : 9/2/2021 Page No : 2 US 421 Southbound Self Storage Access Westbound US 421 Northbound Sanders Road Eastbound Start Time Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Right Thru Left UTrn App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 96 497 1 1 595 1 2 0 0 3 2 354 16 7 379 26 0 96 0 122 1099 05:15 PM 82 508 2 1 593 2 0 1 0 3 0 311 29 10 350 36 0 89 0 125 1071 05:30 PM 96 506 0 3 605 0 0 0 0 0 0 305 18 16 339 54 0 68 0 122 1066 05:45 PM 81 509 0 0 590 0 0 0 0 0 0 310 22 11 343 36 0 77 0 113 1046 Total Volume 355 2020 3 5 2383 3 2 1 0 6 2 1280 85 44 1411 152 0 330 0 482 4282 % App. Total 14.9 84.8 0.1 0.2 50 33.3 16.7 0 0.1 90.7 6 3.1 31.5 0 68.5 0 PHF .924 .992 .375 .417 .985 .375 .250 .250 .000 .500 .250 .904 .733 .688 .931 .704 .000 .859 .000 .964 .974 US 421 S a n d e r s R o a d S e l f S t o r a g e A c c e s s US 421 Right 355 Thru 2020 Left 3 UTrn 5 InOut Total 1613 2383 3996 Out 5 In 0 Total 5 Ri g h t 3 Th r u 2 Le f t 1 UT r n 0 Ou t To t a l In 5 6 11 Ou t 0 In 0 To t a l 0 UTrn 44 Left 85 Thru 1280 Right 2 Out TotalIn 2173 1411 3584 Out 44 In 0 Total44 UT r n 0 Le f t 33 0 Th r u 0 Ri g h t 15 2 To t a l Ou t In 44 2 48 2 92 4 Ou t 0 In 0 To t a l 0 Peak Hour Begins at 05:00 PM Cars + Trucks Peak Hour Data North Ironwood – Transportation Impact Analysis Approved Development Information Trip Generation Summary Open Date: Analysis Date: 2/17/2022 2/17/2022Project: 210192 Alternative: Alternative 1 Phase: ITE Land Use Enter Exit Enter ExitEnter Exit TotalTotal Total *** Weekday Average Daily Trips Weekday AM Peak Hour of Adjacent Street Traffic Weekday PM Peak Hour of Adjacent Street Traffic 210 SFHOUSE 1 30 Dwelling Units 172 171 343 7 19 26 20 12 32 Unadjusted Volume 172 171 343 7 19 26 20 12 32 Internal Capture Trips 0 0 0 0 0 0 0 0 0 000 000 000 172 171 343 7 19 26 20 12 32 Pass-By Trips Volume Added to Adjacent Streets Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent P. 1TRIP GENERATION 10, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 10th Edition - Custom rate used for selected time period.* *** NOT TO SCALE *** PROJECT NUMBER 160278 TARIN W OODS II N SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE BPHASE 2B(1)TRIP DISTRIBUTION DESTINATION NODE% RIGHT IN / RIGHT OUT 100% OUT Kings  Highway Lieutenant Congleton Road Sanders Road Manassas Drive Sh i l o h   D r i v e Ap p o m a t t o x   Dr i v e Ta r i n Ro a d US   4 2 1 75% 20% 20 % I N 80 % I N 75 % O U T 20 % O U T 75 % I N 75 % I N 75 % O U T 55% IN 5% IN 5% IN 5% O U T 5% O U T 55 % O U T 60% OUT 40% IN 5% IN 5% 5% O U T DIRECTIONAL CROSSOVER Ta r i n Ro a d Ap p o m a t t o x   Dr i v e 75 % I N 75 % O U T BLACK = EXISTING BLUE = PROPOSED GREY = UNANALYZED GREEN = COMMITTED Autumn Care  Nursing Home 75 % I N 75 % O U T Harris Teeter  Driveway 10 % O U T 10 % O U T 80 % O U T 40 % O U T 60% IN 80 % I N *** NOT TO SCALE *** N 0 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM/PM PEAK BLACK = EXISTING GREY = UNANALYZED GREEN = APPROVED DEVELOPMENT PROJECT NUMBER 210291 FIGURE A APPROVED DEVELOPMENTS IRONWOOD DEVELOPMENT NEW HANOVER COUNTY, NC Sanders Road Beau Rivage  Marketplace Driveway Manassas DriveSharks Eye Lane Lieutenant  Congleton Road 15 / 9 0 / 0 6 / 1 5 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 1 / 1 6 / 1 6 0 / 0 0 / 0 0 / 0 0 / 0 2 / 4 0 / 0 0 / 0 6 / 1 6 16 / 1 0 0 / 0 0 / 0 0 / 0 8 / 5 19 / 12 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 12 / 8 3 / 8 5 / 12 0 / 0 DIRECTIONAL CROSSOVER Sanders Road 2 / 2 2 / 2 16 / 1 0 0 / 0 15 / 9 1 / 1 0 / 0 0 / 0 0 / 0 6 / 1 5 0 / 0 0 / 0 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 US   4 2 1 Sh i l o h   D r i v e My r t l e   G r o v e   R o a d Ironwood – Transportation Impact Analysis Supporting Documentation Opposing Lefts Opposing Rights AM N/A N/A AM 1274 25 PM N/A N/A PM 1064 81 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY PHASE 1B SITE ACCESS 1 Opposing Lefts Opposing Rights AM n/a n/a AM 1321 32 PM n/a n/a PM 1116 104 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY PHASE 2 SITE ACCESS 1 FEATURE PHASE 1 2 M in G reen 1 * Extension 1 * M ax G reen 1 * Yellow Clearance Red Clearance W alk 1 * Don’t W alk 1 Seconds Per Actuation * M ax Variable Initial * Tim e Before Reduction * Tim e To Reduction * M inim um Gap Recall M ode Vehicle Call M em ory Dual Entry Sim ultaneous Gap phases should not be lower than 4 seconds. than what is shown. M in Green for all other M in Green and Extension tim es for phase 2 lower * These values m ay be field adjusted. Do not adjust OASIS 2070 TIMING CHART SIGNAL FACE I.D. NOTES SHEET NO.PROJECT REFERENCE NO. PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY:PLAN DATE: 0 30 N p a l e x a n d e r R : \ T r a f f i c \ S i g n a l s \ D e s i g n \ S i g n a l s \ 0 3 - 1 0 1 4 \ 0 3 1 0 1 4 _ s i g _ d s n _ 2 0 1 5 m m d d . d g n 2 7 - J U L - 2 0 1 5 1 4 : 5 3 All Heads L.E.D. Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way 2A 2B 1A S1 ex PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND 0 0 F L A S H TABLE OF OPERATION FACE SIGNAL PHASE 1 2 11, 12 21, 22 F Y Y R G Y R Y G 12" R Y FY 12" 11,12 21,22 PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND 0 0 F L A S H TABLE OF OPERATION FACE SIGNAL PHASE 1 2 11, 12 21, 22 Y R G Y R Myrtle Grove South U-Turn at US 421 (Carolina Beach Road) Division 3 New Hanover County Myrtle Grove February 2008 K. Moore R. Hinshaw Signal Upgrade 1"=30’ B A Thru Arrow "ONLY" Sign (R3-5a) "STOP HERE ON RED" Sign (R10-6) TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE SIZE (FT)TIME STRETCH N E W C A R D N E W L O O P FU L L T I M E D E L A Y E X T E N S I O N C A L L I N G S Y S T E M L O O P 2A 2B S1 OASIS 2070 LOOP & DETECTOR INSTALLATION - - - - Y Y Y Y Wilmington Signal System Fully Actuated 2 Phase -- - - 1A 6X6 6X6 6X6 6X40 0 300 300 180 3 5 5 2-4-2 - 2 2 1 Y Y Y Y YY - - - -- - - -- - - - Y *15 * Disable delay during Alternate Phasing Operation. US 421 (Carolina Beach Road) L o b o s L a n e 45 MPH 0% Grade US 421 (Carolina Beach Road) 45 MPH 0% Grade 22 21 11 12 3.0 2.8 25 2.0 7 12 6.0 120 4.5 1.0 1.5 - -- - - - - - - - - - ON ON - YELLOW MIN RECALL 3.0 60 30 34 W-5103A DATE REVISION SEAL NO RTH CAR O LI N A E NGIN E ER P ROFESS IO NAL P A MEL A L . ALEXAN D E R023489 SEAL 1 1 03-1014 as to the revisions. This document is only certified on 05/06/2008 F. Royal Hinshaw, PE-032117 issued and sealed by This document originally Only as to the Revisions - to the Original Document but Not a certified document as Metal Pole with Mastarm existing existing exType II Signal Pedestal DEFAULT PHASING DIAGRAM Controller Asset #: 1014. 6. Signal system data: supersede these values. signal system timing values operation only. Coordinated chart are for free-run 5. Maximum times shown in timing plan. hours of use for each phasing Engineer will determine the 4. The City Traffic presence mode. 3. Set all detector units to the Engineer. unless otherwise directed by night flashing operation 2. Do not program signal for late Structures" dated January 2012. Specifications for Roads and 2012 and "Standard Drawings NCDOT" dated January 1. Refer to "Roadway Standard existing existing ex DEFAULT ALTERNATE 36249.2694 Metal Pole #2 Roadway Sheet 20 Sig. 6.0 Install loops (KGP) T N T T I N D E P A R T ME N OF TR A SPORT A IO N S T A E OF NORTH C AROL A n oi s i v i D ytefaS d n a ytiliboM noitatr o p s n a r T noitceS ngiseD l a n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared in the Offices of: A A B B 7/22/15 7/22/15 1014 - Beach Rd @ South U-Turn 9 - Coordination Plan 4 1/14/2022 2:52 PM Coordination Plan # 4 Cycle length (0-999 sec)156 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)109 0 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 33 123 0 0 0 0 0 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)1 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data 1014 - Beach Rd @ South U-Turn 2-1 Phase Control Functions Page 1 1/14/2022 2:51 PM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time Min 2 Ped Soft Recall Time Extension 2 Ped Recall Time Max 2 Rest In Walk Soft Recall Modified Rest In Walk Minimum Recall 2 Ped Reservice Maximum Recall 1 Flashing Walk Maximum Recall 2 Advanced Walk Call Non-Act 1 Delayed Walk Call Non-Act 2 Ped Yellow Clear Omit Phase Ped Red Clear Dual Entry Startup In Green 2 No Skip Startup In Yellow Added Extension Startup Red Clear Simultaneous Gap 1 2 3 4 5 6 7 8 First Phases Guaranteed Passage Startup Calls Green Interval Flash Startup Ped Calls Fast Green Flash Flash Entry 2 Red Rest Yellow Flash 2 Backup Protection Wag Phases 1 3 6 8 Inhibit Reservice Wag Overlaps Inhibit Max (Coord)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Manual Control 1 2 3 4 5 6 7 8 Inhibit Coordination Manual Control Omit Ped Dynamic Max/Max3 Red Detector Lock Variable Initial 2 Yellow Detector Lock 2 Gap Reduction 2 Active Logic 1 - 16 1 2 3 Omit Pedestrian Active Logic 17 - 32 Time Walk 2 Dynamic/Backup Time FDWalk 2 1014 - Beach Rd @ South U-Turn 4 - Phase Sequence Page 1 1/14/2022 2:52 PM Rings Barrier 1 Barrier 2 Barrier 3 Barrier 4 1 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rings Barrier 5 Barrier 6 Barrier 7 Barrier 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Phase Directions 10 50 90 130 20 60 100 140 30 70 110 150 40 80 120 160 1014 - Beach Rd @ South U-Turn 3 - Phase Timing 2 1/14/2022 2:51 PM Phase Phase Timing Elements 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Minimum Green 1 5 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Minimum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Re-service Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Extension 1 (Gap 1)2.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Extension 2 (Gap 2)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Maximum Green 1 45 120 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Maximum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Yellow Clearance 3.0 4.5 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Red Clearance 2.8 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Red Revert 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk Advance Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Walk Delay Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alternate Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Dont Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Min Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max / Max 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max Adjust 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Seconds / Actuation 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Max Variable Initial 0 34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Time Before Reduction 0 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Time To Reduce 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Minimum Gap 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alt Flash Frequency (0-25.5 Hz)1.0 1014 - Beach Rd @ South U-Turn 9 - Coordination Plan 13 1/14/2022 2:53 PM Coordination Plan # 13 Cycle length (0-999 sec)152 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)0 40 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 30 122 0 0 0 0 0 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)1 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data ex ex ex ex SIGNAL FACE I.D. NOTES PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND PHASING DIAGRAM TABLE OF OPERATION FACE SIGNAL PHASE FLASH0 1 + 6 0 1 + 5 02+5 02+6 SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: 0 Division 3 New Hanover County S. of Wilmington ABA Ministorage SR 1187 (Sanders Road) / at US 421 (Carolina Beach Road) February 2010 J Cross S Phillips 1"=40' 40 Plan of Record 03-0733 POR j r s p e n c e S : \ I T S & S U \ I T S S i g n a l s \ S i g n a l D e s i g n S e c t i o n \ E a s t e r n R e g i o n \ D i v - 0 3 \ P O R \ 0 3 - 0 7 3 3 \ 0 3 0 7 3 3 _ s i g _ p o r _ 2 0 2 0 m m d d . d g n 0 9 - J U L - 2 0 2 0 0 7 : 4 5 All Heads L.E.D. Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way 01+6 01+5 02+6 02+5 TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W L O O P F U L L T I M E D E L A Y EX T E N S I O N CA L L I N G S Y S T E M L O O P - - - - ---- - - - - - - - - - - ----- -- - - - - - - - - ---- --- - - - -- - - - - -- - - - - - OASIS 2070 LOOP & DETECTOR INSTALLATION CHART ex ex e x e xe x ex ex e x e x A ALeft Arrow "ONLY" Sign (R3-5L) B B Combined Through and Left Arrow Sign (R3-6L) C C "LEFT TURN YIELD ON GREEN" Sign (R10-12) "YIELD" Sign (R1-2)D D Wilmington Signal System Fully Actuated 6 Phase N 61 62 21 22 3132 414243 FEATURE PHASE 1 2 3 4 5 6 MIN RECALL MIN RECALL YELLOW YELLOW ON ON ---- ------ ---- -- ---- ---- ------ ---- ---- ON ON ON ON OASIS 2070 TIMING CHART M in Green 1 * Extension 1 M ax Green 1 * Yellow Clearance Red Clearance W alk 1 * Don't W alk 1 Seconds Per Actuation * M ax Variable Initial * Tim e Before Reduction * Tim e To Reduce * M inim um G ap Recall M ode Vehicle Call M em ory Dual Entry Sim ultaneous G ap - - - -- -- - is shown. M in G reen for all other phases should not be lower than 4 seconds. * These values m ay be field adjusted. Do not adjust M in Green and Extension tim es for phases 2 and 6 lower than what Red Revert 5 2.0 15 3.0 2.9 2.0 5.0 1.0 5.3 120 6.0 14 5 2.0 20 3.2 3.2 2.0 5 2.0 45 5.0 1.9 2.0 5 2.0 20 3.0 3.1 2.0 14 6.0 120 5.3 1.3 5.0 1.5 46 15 45 3.4 1.5 46 15 45 3.4 - - - - - - - ------ - - - - ---- - - -- - --- - -- - 1A 2A 2B 3A 4A 4B 5A 5B 6A 6B S1 S2 S3 S4 S5 6X40 6X40 6X40 6X40 6X40 6X20 6X6 6X6 6X6 6X6 6X6 6X6 6X6 6X6 6X6 0 0 0 0 0 0 420 420 420 420 145 220 195 195 195 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 5 5 5 5 5 5 5 5 5 Y Y Y Y Y 1 6 2 2 3 4 4 5 2 5 6 6 - - - - - Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y 10 3 10 10 3 15 R Y Y G 12" 12" R Y R Y G 12" R Y G 12" R Y Y G 12" 61 21 41 42 31 62 32 22 43 21 22 31 32 41 42 43 61 62 03 04 03 04 R R R R R RR Y YG G G R G R R R R RGR R R R R R G R R R R R R R R R R R R RG R R R R R RG R R R R Y Y G G G R RRRG 55 Mph -1% Grade 55 Mph -1% Grade US 421 (Carolina Beach Road) US 421 (Carolina Beach Road) S R 1187 (Sanders Road) 55 Mph +2 % Grade 0 % G r a d e 2 5 Mp h ( A s s u m e d ) ex ex ex ex ex ex ex ex Sig.1.0 document. considered a certified This document shall not be on 4/1/2010 Stacie L. Phillips, 032607 issued and sealed by This document originally Not a certified document. PREPARED BY: Jeff Spence July 2020 DATE: DATE: July 2020 REVIEWED BY: KGP,Jr. COMMENTS Plan of Record its original state. by field personnel. This plan may have been modified from This plan of record reflects existing field conditions as submitted DATE: SIGNATURE: DO CUM ENT NO T CO NSIDERED FINAL UNLESS ALL SIG NATURES CO M PLETED ex ex - - - - - - - - Controller Asset # 0733. 7. Signal system data: supersede these values. signal system timing values operation only. Coordinated chart are for free-run 6. Maximum times shown in timing presence mode. 5. Set all detector units to 4 may be reversed. 4. The order of phase 3 and phase display. progressing through an all red 2+6 to phase 1 and/or 5 by controller to clear from phase phase 2+6 to allow the 3. Enable Backup Protect for the Engineer. unless otherwise directed by night flashing operation 2. Do not program signal for late Structures" dated January 2018. Specifications for Roads and 2018 and "Standard Drawings NCDOT" dated January 1. Refer to "Roadway Standard Driveway Self Storage SecurCare Revised loops and changed min. green times and added yield line S3 S4 S5 S1 S2 2A 2B 5A 3A 1A 6B 6A 5B 4B 4A T N T T I N D E P A R T ME N OF T R A SPORT A IO N S T A E OF N ORTH C AROL A n oi s i v i D ytefaS d n a ytiliboM noitatr o p s n a r T noitceS ngiseD l a n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared in the Offices of: C C B A D 7/9/2020 733 - Beach Rd @ Sanders Rd 9 - Coordination Plan 4 1/14/2022 2:56 PM Coordination Plan # 4 Cycle length (0-999 sec)156 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)116 0 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 16 87 15 38 16 87 0 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 6 Float Force Offs 1 5 Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)1 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data 733 - Beach Rd @ Sanders Rd 2-1 Phase Control Functions Page 1 1/14/2022 2:55 PM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time Min 2 Ped Soft Recall Time Extension 2 Ped Recall Time Max 2 Rest In Walk Soft Recall Modified Rest In Walk Minimum Recall 2 6 Ped Reservice Maximum Recall 1 Flashing Walk Maximum Recall 2 Advanced Walk Call Non-Act 1 Delayed Walk Call Non-Act 2 Ped Yellow Clear Omit Phase Ped Red Clear Dual Entry Startup In Green 2 6 No Skip Startup In Yellow Added Extension Startup Red Clear Simultaneous Gap 1 2 3 4 5 6 7 8 First Phases Guaranteed Passage Startup Calls 1 2 3 4 5 6 Green Interval Flash Startup Ped Calls Fast Green Flash Flash Entry 2 6 Red Rest Yellow Flash 2 6 Backup Protection 2 6 Wag Phases 1 3 6 8 Inhibit Reservice Wag Overlaps Inhibit Max (Coord)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Manual Control 1 2 3 4 5 6 7 8 Inhibit Coordination Manual Control Omit Ped Dynamic Max/Max3 Red Detector Lock Variable Initial 2 6 Yellow Detector Lock 2 6 Gap Reduction 2 6 Active Logic 1 - 16 Omit Pedestrian Active Logic 17 - 32 Time Walk 2 Dynamic/Backup Time FDWalk 2 733 - Beach Rd @ Sanders Rd 4 - Phase Sequence Page 1 1/14/2022 2:56 PM Rings Barrier 1 Barrier 2 Barrier 3 Barrier 4 1 1 2 0 0 3 4 0 0 0 0 0 0 0 0 0 0 2 5 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rings Barrier 5 Barrier 6 Barrier 7 Barrier 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Phase Directions 10 50 90 130 20 60 100 140 30 70 110 150 40 80 120 160 733 - Beach Rd @ Sanders Rd 3 - Phase Timing 2 1/14/2022 2:55 PM Phase Phase Timing Elements 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Minimum Green 1 5 14 4 5 5 14 0 0 0 0 0 0 0 0 0 0 Minimum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Re-service Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Extension 1 (Gap 1)2.0 6.0 2.0 2.0 2.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Extension 2 (Gap 2)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Maximum Green 1 15 120 20 45 20 120 0 0 0 0 0 0 0 0 0 0 Maximum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Yellow Clearance 3.0 5.3 3.2 5.0 3.0 5.3 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Red Clearance 2.9 1.0 3.2 1.9 3.1 1.3 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Red Revert 2.0 5.0 2.0 2.0 2.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk Advance Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Walk Delay Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alternate Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Dont Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Min Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max / Max 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max Adjust 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Seconds / Actuation 0.0 1.5 0.0 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Max Variable Initial 0 46 0 0 0 46 0 0 0 0 0 0 0 0 0 0 Time Before Reduction 0 15 0 0 0 15 0 0 0 0 0 0 0 0 0 0 Time To Reduce 0 45 0 0 0 45 0 0 0 0 0 0 0 0 0 0 Minimum Gap 0.0 3.4 0.0 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alt Flash Frequency (0-25.5 Hz)1.0 733 - Beach Rd @ Sanders Rd 9 - Coordination Plan 13 1/14/2022 2:56 PM Coordination Plan # 13 Cycle length (0-999 sec)152 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)0 0 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 15 105 12 20 15 105 0 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 6 Float Force Offs 1 Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)1 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data FACE SIGNAL PHASE SIGNAL FACE I.D. PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: 0 N $ $ $ $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ FEATURE PHASE YELLOW -- -- - - - - - - ON ON - Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don’t Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap - - All Heads L.E.D. OASIS 2070 TIMING CHART Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way lower than what is shown. Min Green for all other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 Red Revert TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W L O O P F U L L T I M E D E LA Y E X T E N S I O N C A L L I N G S Y S T E M L O O P Y Y ---- Y Y Y Y ---- - -Y Y -- -- OASIS 2070 LOOP & DETECTOR INSTALLATION CHART DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 02 07 T N T T I N D E P A R T ME N OF T RA SPORT A I O N S T A E OF NORTH C ARO L A n oi s i v i D y tefaS dn a ytiliboM noitatro p s n a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared for the Offices of: 30 1"=30’ Divison 03 New Hanover County Wilmington NOVEMBER 2016 21 22 72 12" R Y R Y F Y 12" R Y G 12" 21,22 72,73 0 2 0 7 F L A S H G R Y Y R 2A 2B 7A 7B 6X6 6X6 420 420 Y5 5 Y 2 2 6X40 0 06X40 2-4-2 2-4-2 Y Y 7 7 10 15 Y Y Y Y 21,22 72,73 2 7 5 5 MP H - 1 % G R A D E 5 5 M P H + 1 % G R A D E SHARKS EYE LANE 25 MPH (ASSUMED) -1% GRADE STOP LINE AND POLE LOCATION DIAGRAM 1 3 ’ 23’ 1 6’ 6’ 1 0 ’ 1 0 ’ 22’ NEW INSTALLATION U S 4 2 1 ( C a r o l i n a B e a c h R o a d ) U S 4 2 1 ( C a r o l i n a B e a c h R o a d ) 2.0 2.0 14 5 120 30 6.0 2.0 Directional Drill Conduit N/A 5.3 1.0 3.0 2.8 2A 2B 7A 7B 6 ’ SIG. 1 DEFAULT PHASING DIAGRAM PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND 02 07 ALTERNATE PHASING DIAGRAM R TABLE OF OPERATION ALTERNATE PHASING R * exType II Signal Pedestal METAL POLE AND MASTARM #1 FACE SIGNAL PHASE 21,22 72,73 0 2 0 7 F L A S H G R Y Y R R TABLE OF OPERATION DEFAULT PHASING F Y MIN RECALL of Southbound Signal Plan. Pedestal Installed as a part 1.5 15 45 3.4 46 PLANS PREPARED IN THE OFFICE OF: NC LICENSE # F-0102 Charlotte, North Carolina 28202 Suite 200, 200 South Tryon Street 35 MPH +2% GRADE SR 1581 (Manassas Drive) at US 421 (Carolina Beach Road) 03-1110 36249.3560 Cotroller Asset #1111. 7.Signal System Data: shall supersede these values. operation only. Coordinated signal system timing values 6. Maximum times shown in timing chart are for free-run each phasing plan. 5. The City Traffic Engineer will determine the hours of use for of vehicles turning right on red. 4. Locate new cabinet so as not to obstruct sight distance 3. Set all detector units to presence mode. operation unless otherwise directed by the Engineer. 2. Do not program signal for late night flashing http://www.ncdot.org/doh/preconstruct/traffic/itss/ at the following website: Project Special Provisions. The PSP can be accessed sections of the latest version of the generic Structures" dated January 2012, and all applicable January 2012, "Standard Specifications for Roads and 1. Refer to "Roadway Standard Drawings NCDOT" dated S1 S2 * Disable delay during Alternate Phasing Operation S2 S1 70 Y Y - -- - Y Y 6X6 6X6 420 5 5 Y Y- - - - - - - - B A"Stop Here On Red" Sign (R10-6) No U-Turn Sign (R3-4) A B A B C 2016 D. TURNER S. PENNINGTON 71 Wilmington Signal System Fully Actuated 2 Phase NOTES of Southbound Signal Plan. Pedestal Installed as a part 73 of Southbound Signal Plan. Pedestal Installed as a part of Southbound Signal Plan. Pedestal Installed as a part 2 7 ’ 71 71 SR 1581 (MANASSAS DRIVE) 71 1 0 ’ 2’ 3 0 ’ Division of Highways NC Dept of Transportation Final Drawing Date: ITS & Signals Unit R H E ON P RT N FE O NAO E SEAL INNG L RE SSI AC O IL R A 032725 N .GUY R J O A T HAN COL COL PLANTER EOP EOP EOP E O P EOP EOP EOP EOP C O N C R E T E M E DI A N EOP EOP 24"C&G 24"C&G CHAINLINK FENCE PAVEMENT EOP EOP EOP 15"C MP 1 5 "CMP 15"CMP MB 55, PG 24; DB 5051, PG 2786 FOR BENEFIT OF LOT 4 ACCESS & UTILITY EASEMENT SHARK’S EYE LANE MB 5 5 , P G 2 4 ; DB 7 0 7 , P G 1 4 1 1 6 0 ’ P UB LIC R IGH T- O F - WAY C AR O L I N A B E AC H R O AD U . S . H I G H WAY 4 2 1 - MANASSAS DRIVE RIGHT-OF-WAY APPROXIMATE APPROXIMATE RIGHT-OF-WAY AP P R O XIMATE R IG H T- O F - WAYR IG H T- O F - WAY AP P R O XIMATE EO P EOP E O P DocuSign Envelope ID: DD2FC40B-87ED-468D-9D27-9F0D5057FC07 2/23/2017 2/23/2017 DEFAULT PHASING DIAGRAM PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND F L A S H FACE SIGNAL PHASE SIGNAL FACE I.D. NOTES Wilmington Signal System Fully Actuated 2 Phase SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: 0 Sig. 1 N $ $ $ $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ FEATURE PHASE 2 MIN RECALL YELLOW ON - - - -- - - - - ON - - Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don't Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap - All Heads L.E.D. Directional Arrow Controller & Cabinet With Push Button & Sign Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W LO O P F U L L T I M E D E L A Y E X T E N S I O N C A L LI N G S Y S T E M L O O P - - - - Y Y ----- - - - - - Y Y Y Y Y Y Y Y ---- - - - Y Y Y Y Y Y -- - - -- - - - -- - - - - Red Revert OASIS 2070 LOOP & DETECTOR INSTALLATION CHART DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 21,22 71 41,42 2 0 R R R YG F Y Y02 R Y F Y 12" R Y G 12"12" R Y 71 21,22 41,42 02 TABLE OF OPERATION DEFAULT PHASING F L A S H FACE SIGNAL PHASE 21,22 71 41,42 2 0 R R R YG Y TABLE OF OPERATION ALTERNATE PHASING R 4 TIMING CHART OASIS 2070 14 5 6.0 2.0 120 30 2.0 2.0 1.5 46 15 45 3.4 X Signal Upgrade SR 1581 (Manassas Drive) at US 421 (Carolina Beach Road) Divison 03 New Hanover County Wilmington May 2020 L. Boyer A. Hayes 03-1110 40 1"=40' exType II Signal Pedestal Metal Pole with Mastarm existing existing A A"Stop Here On Red" Sign (R10-6) A B 71 41 42 21 22 7A 4A 4B S2 S3 S1 2A 2B T N T T I N D E P A R T ME N OF T RA SPORT A IO N S T A E OF NORTH C ARO L A n oi s i v i D y tefaS dn a ytiliboM noitatro p s n a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Division of Highways NC Dept of Transportation Final Drawing Date: ITS & Signals Unit PORTDAVEN NCBELS FIRM LICENSE NO. C-2522 HOME OFFICE: www.davenportworld.com336.744.1636 WINSTON-SALEM, NC 27101 119 BROOKSTOWN AVENUE, SUITE PH1 6. Signal System Data: Controller Asset #1110. Coordinated signal system timing values supersede these values. 5. Maximum times shown in timing chart are for free-run operation only. phasing plan. 4. The Division (City) Traffic Engineer will determine the hours of use for each 3. Set all detector units to presence mode. directed by the Engineer. 2. Do not program signal for late night flashing operation unless otherwise http://connect.ncdot.gov/resources/safety/Pages/ITS-Design-Resources.aspx. Special Provisions. The PSP can be accessed at the following website: and all applicable sections of the latest version of the generic Project "Standard Specifications for Roads and Structures" dated January 2018, 1. Refer to "Roadway Standard Drawings NCDOT" dated January 2018 and METAL POLE AND MASTARM #1 U S 4 2 1 ( C A R O L I N A B E A C H R O A D ) 5 5 MP H - 1 % G R A D E 5 5 MP H + 1 % G R A D E 35 MPH +2% GRADE 25 MPH (ASSUMED) -1% GRADE SHARKS EYE LANE SR 1581 (MANASSAS DRIVE) U S 4 2 1 ( C A R O L I N A B E A C H R O A D ) 2A 2B 7A 4A 4B S1 S2 S3 6X6 6X6 6X6 6X6 6X6 6X40 6X40 6X40 420 420 420 0 0 0 70 70 5 5 5 5 5 2-4-2 2-4-2 2-4-2 Y Y 2 2 7 4 4 - - - 10 15 15 * Disable delay during Alternate Phasing Operation. * ALTERNATE PHASING DIAGRAM 5.3 1.0 3.0 2.6 Y Y Y Y Y Y Y 36249.4125 be lower than 4 seconds. what is shown. Min Green for all other phases should not Green and Extension times for phase 2 lower than * These values may be field adjusted. Do not adjust Min Project #: 160278 B BSign (R10-16) "U-Turn Yield to Right Turn" ON - - - - - - - - - 7 5 2.0 30 2.0 X 3.0 2.6 04+7 04+7 7 + 4 0 7 + 4 0 existing existing e x e x ex ex ex ex e x ex e x ex ex Not to Scale Existing Proposed 27' PROPOSED STOP BAR DIAGRAM existing existing DocuSign Envelope ID: 501AA4E9-4F20-4501-B457-C6DA7C192FBD 05/28/2020 DocuSign Envelope ID: F5B12419-FD76-42A7-8436-99393342C0F6 06/05/2020 1110 - Beach Rd @ Manassas 9 - Coordination Plan 4 1/14/2022 3:05 PM Coordination Plan # 4 Cycle length (0-999 sec)156 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)60 0 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 0 125 0 0 0 0 31 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)1 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data 1110 - Beach Rd @ Manassas 2-1 Phase Control Functions Page 1 1/14/2022 3:04 PM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time Min 2 Ped Soft Recall Time Extension 2 Ped Recall Time Max 2 Rest In Walk Soft Recall Modified Rest In Walk Minimum Recall 2 Ped Reservice Maximum Recall 1 Flashing Walk Maximum Recall 2 Advanced Walk Call Non-Act 1 Delayed Walk Call Non-Act 2 Ped Yellow Clear Omit Phase Ped Red Clear Dual Entry Startup In Green 2 No Skip Startup In Yellow Added Extension Startup Red Clear Simultaneous Gap 1 2 3 4 5 6 7 8 First Phases Guaranteed Passage Startup Calls Green Interval Flash Startup Ped Calls Fast Green Flash Flash Entry 2 Red Rest Yellow Flash 2 Backup Protection Wag Phases 1 3 6 8 Inhibit Reservice Wag Overlaps Inhibit Max (Coord)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Manual Control 1 2 3 4 5 6 7 8 Inhibit Coordination Manual Control Omit Ped Dynamic Max/Max3 Red Detector Lock Variable Initial 2 Yellow Detector Lock 2 Gap Reduction 2 Active Logic 1 - 16 1 2 3 Omit Pedestrian Active Logic 17 - 32 Time Walk 2 Dynamic/Backup Time FDWalk 2 1110 - Beach Rd @ Manassas 4 - Phase Sequence Page 1 1/14/2022 3:05 PM Rings Barrier 1 Barrier 2 Barrier 3 Barrier 4 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rings Barrier 5 Barrier 6 Barrier 7 Barrier 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Phase Directions 10 50 90 130 20 60 100 140 30 70 110 150 40 80 120 160 1110 - Beach Rd @ Manassas 3 - Phase Timing 2 1/14/2022 3:05 PM Phase Phase Timing Elements 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Minimum Green 1 0 14 0 0 0 0 5 0 0 0 0 0 0 0 0 0 Minimum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Re-service Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Extension 1 (Gap 1)0.0 6.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Extension 2 (Gap 2)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Maximum Green 1 0 120 0 0 0 0 30 0 0 0 0 0 0 0 0 0 Maximum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Yellow Clearance 4.0 5.3 4.0 4.0 4.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Red Clearance 2.0 1.0 2.0 2.0 2.0 2.0 2.8 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Red Revert 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk Advance Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Walk Delay Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alternate Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Dont Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Min Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max / Max 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max Adjust 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Seconds / Actuation 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Max Variable Initial 0 46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Time Before Reduction 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Time To Reduce 0 45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Minimum Gap 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alt Flash Frequency (0-25.5 Hz)1.0 1110 - Beach Rd @ Manassas 9 - Coordination Plan 13 1/14/2022 3:06 PM Coordination Plan # 13 Cycle length (0-999 sec)152 Min Transition Cycle (0-999 sec)120 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)0 135 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 0 112 0 0 0 0 40 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)0 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data FACE SIGNAL PHASE SIGNAL FACE I.D. PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND DEFAULT PHASING DIAGRAM SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: 0 N $ $ $ $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ FEATURE PHASE YELLOW -- -- - - - - - ONON - Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don’t Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap - - All Heads L.E.D. OASIS 2070 TIMING CHART Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGENDPROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way lower than what is shown. Min Green for all other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 Red Revert TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W L O O P F U L L T I M E D E LA Y E X T E N S I O N C A L L I N G S Y S T E M L O O P Y Y ---- Y Y Y Y ---- - -Y Y -- -- OASIS 2070 LOOP & DETECTOR INSTALLATION CHART DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED T N T T I N D E P A R T ME N OF T RA SPORT A I O N S T A E OF NORTH C ARO L A n oi s i v i D y tefaS dn a ytiliboM noitatro p s n a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared for the Offices of: 30 1"=30’ Divison 03 New Hanover County Wilmington NOVEMBER 2016 D. TURNER 12" R Y R Y F Y 12" R Y G 12" 61,62 32,33 0 6 0 3 F L A S H GR Y F Y Y R 6A 6B 3A 3B 6X6 6X6 420 420 Y5 5 Y 6 6 6X40 0 06X40 2-4-2 2-4-2 Y Y 3 3 10 15 Y Y Y Y 61,62 32,33 3 6 5 5 M P H + 1 % G R A D E SHARKS EYE LANE NEW INSTALLATION U S 4 2 1 ( C a r o l i n a B e a c h R o a d ) U S 4 2 1 ( C a r o l i n a B e a c h R o a d ) 2.02.0 145 12030 6.02.0 Directional Drill Conduit N/A 62 33 06 03 3B 3A 6A6B SIG.7 Sharks Eye Lane at US 421 (Carolina Beach Road) - - PLANS PREPARED IN THE OFFICE OF: NC LICENSE # F-0102 METAL POLE AND MASTARM #2 exType II Signal Pedestal TABLE OF OPERATION DEFAULT FACE SIGNAL PHASE F L A S H PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND 03 ALTERNATE PHASING DIAGRAM TABLE OF OPERATION ALTERNATE PHASING R 0 3 Y YG R R 0 6 32,33 61,62 * * Disable delay during Alternate Phasing Operation NOTES 61 MIN RECALL 3.4 45 15 46 1.5 Charlotte, North Carolina 28202 Suite 200, 200 South Tryon Street 25 MPH (ASSUMED) -1% GRADE 5 5 MP H - 1 % G R A D E 31 36249.3560 06 03-1111 SR 1581 (MANASSAS DRIVE) 35 MPH +2% GRADE R R Cotroller Asset #1111. 7.Signal System Data: shall supersede these values. operation only. Coordinated signal system timing values 6. Maximum times shown in timing chart are for free-run each phasing plan. 5. The City Traffic Engineer will determine the hours of use for of vehicles turning right on red. 4. Locate new cabinet so as not to obstruct sight distance 3. Set all detector units to presence mode. operation unless otherwise directed by the Engineer. 2. Do not program signal for late night flashing http://www.ncdot.org/doh/preconstruct/traffic/itss/ at the following website: Project Special Provisions. The PSP can be accessed sections of the latest version of the generic Structures" dated January 2012, and all applicable January 2012, "Standard Specifications for Roads and 1. Refer to "Roadway Standard Drawings NCDOT" dated S1 S2 4206X6S1 5 Y --Y- 6X6S2 5 Y --Y-- - - - - - Y Y 70 "Stop Here On Red" Sign (R10-6)AA A B B BNo U-Turn Sign (R3-4) Permanent Utility Easement N/A 3.0 2.3 5.1 1.0 C 2016 S. PENNINGTON of Northbound Signal Plan. Pedestals and Pullbox Installed as a part Wilmington Signal System Fully Actuated 2 Phase 32 31 31 31 STOP LINE AND POLE LOCATION DIAGRAM 1 9 ’ 2 7 ’ 1 6 ’ 13’ 26’ 24’ 41’ 1 4 ’ 5’ 3 0’ 1’ 1 7 ’ Division of Highways NC Dept of Transportation Final Drawing Date: ITS & Signals Unit R H E ON P RT NFEO NAO E SEAL INNG L RE SSI AC O IL R A 032725 N .GUY R J O A T HAN COL COL PLANTER EOP EOP EOP E O P EOP EOP EOP EOP C O N C R E T E M E DI A N EOP EOP 24"C&G 24"C&G CHAINLINK FENCE PAVEMENT EOP EOP EOP 15"C MP 1 5 "CMP 15"CMP MB 55, PG 24; DB 5051, PG 2786 FOR BENEFIT OF LOT 4 ACCESS & UTILITY EASEMENT SHARK’S EYE LANE MB 5 5 , P G 2 4 ; DB 7 0 7 , P G 1 4 1 1 6 0 ’ P UB LIC R IGH T- O F - WAY C AR O L I N A B E AC H R O AD U . S . H I G H WAY 4 2 1 - MANASSAS DRIVE RIGHT-OF-WAY APPROXIMATE APPROXIMATE RIGHT-OF-WAY AP P R O XIMATE R IG H T- O F - WAYR IG H T- O F - WAY AP P R O XIMATE EO P EOP E O P 2306 44.72 LNMRK DocuSign Envelope ID: DD2FC40B-87ED-468D-9D27-9F0D5057FC07 2/23/2017 2/23/2017 1111 - Beach Rd @ Sharks Eye 9 - Coordination Plan 4 1/14/2022 3:01 PM Coordination Plan # 4 Cycle length (0-999 sec)156 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)94 0 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 0 0 25 0 0 131 0 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 6 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)1 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data 1111 - Beach Rd @ Sharks Eye 2-1 Phase Control Functions Page 1 1/14/2022 2:59 PM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time Min 2 Ped Soft Recall Time Extension 2 Ped Recall Time Max 2 Rest In Walk Soft Recall Modified Rest In Walk Minimum Recall 6 Ped Reservice Maximum Recall 1 Flashing Walk Maximum Recall 2 Advanced Walk Call Non-Act 1 Delayed Walk Call Non-Act 2 Ped Yellow Clear Omit Phase Ped Red Clear Dual Entry Startup In Green 6 No Skip Startup In Yellow Added Extension Startup Red Clear Simultaneous Gap 1 2 3 4 5 6 7 8 First Phases Guaranteed Passage Startup Calls Green Interval Flash Startup Ped Calls Fast Green Flash Flash Entry 6 Red Rest Yellow Flash 6 Backup Protection Wag Phases 1 3 6 8 Inhibit Reservice Wag Overlaps Inhibit Max (Coord)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Manual Control 1 2 3 4 5 6 7 8 Inhibit Coordination Manual Control Omit Ped Dynamic Max/Max3 Red Detector Lock Variable Initial 6 Yellow Detector Lock 6 Gap Reduction 6 Active Logic 1 - 16 1 2 3 Omit Pedestrian Active Logic 17 - 32 Time Walk 2 Dynamic/Backup Time FDWalk 2 1111 - Beach Rd @ Sharks Eye 4 - Phase Sequence Page 1 1/14/2022 3:00 PM Rings Barrier 1 Barrier 2 Barrier 3 Barrier 4 1 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 2 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rings Barrier 5 Barrier 6 Barrier 7 Barrier 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Phase Directions 10 50 90 130 20 60 100 140 30 70 110 150 40 80 120 160 1111 - Beach Rd @ Sharks Eye 3 - Phase Timing 2 1/14/2022 2:59 PM Phase Phase Timing Elements 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Minimum Green 1 0 0 5 0 0 14 0 0 0 0 0 0 0 0 0 0 Minimum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Re-service Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Extension 1 (Gap 1)0.0 0.0 2.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Extension 2 (Gap 2)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Maximum Green 1 0 0 30 0 0 120 0 0 0 0 0 0 0 0 0 0 Maximum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Yellow Clearance 4.0 4.0 3.0 4.0 4.0 5.1 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Red Clearance 2.0 2.0 2.3 2.0 2.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Red Revert 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk Advance Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Walk Delay Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alternate Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Dont Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Min Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max / Max 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max Adjust 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Seconds / Actuation 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Max Variable Initial 0 0 0 0 0 46 0 0 0 0 0 0 0 0 0 0 Time Before Reduction 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 Time To Reduce 0 0 0 0 0 45 0 0 0 0 0 0 0 0 0 0 Minimum Gap 0.0 0.0 0.0 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alt Flash Frequency (0-25.5 Hz)1.0 1111 - Beach Rd @ Sharks Eye 9 - Coordination Plan 13 1/14/2022 3:01 PM Coordination Plan # 13 Cycle length (0-999 sec)152 Min Transition Cycle (0-999 sec)120 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)0 5 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 0 0 32 0 0 120 0 0 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 6 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)1 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)1 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data CVAF Flow Rate Adjusted Flow Rate Turning Demand AM Peak 1 1491 AM Peak 1491 34 PM Peak 1 1984 PM Peak 1984 107 Peak Hour Volumes Peak Hour Volumes 2022 EXISTING BEAU RIVAGE AM Peak PM Peak SIGNAL WARRANT ANALYSIS INTERSECTIONS WITH TWO OR THREE APPROACHES CVAF Flow Rate Adjusted Flow Rate Turning Demand AM Peak 1 1555 AM Peak 1555 53 PM Peak 1 2169 PM Peak 2169 41 Peak Hour Volumes Peak Hour Volumes 2023 FB BEAU RIVAGE NEW CROSSOVER AM Peak PM Peak SIGNAL WARRANT ANALYSIS INTERSECTIONS WITH TWO OR THREE APPROACHES CVAF Flow Rate Adjusted Flow Rate Turning Demand AM Peak 1 1562 AM Peak 1562 63 PM Peak 1 2161 PM Peak 2161 49 Peak Hour Volumes Peak Hour Volumes 2024 FB BEAU RIVAGE NEW CROSSOVER AM Peak PM Peak SIGNAL WARRANT ANALYSIS INTERSECTIONS WITH TWO OR THREE APPROACHES CVAF Flow Rate Adjusted Flow Rate Turning Demand AM Peak 1 1596 AM Peak 1596 73 PM Peak 1 2211 PM Peak 2211 54 Peak Hour Volumes Peak Hour Volumes 2026 FB BEAU RIVAGE NEW CROSSOVER AM Peak PM Peak SIGNAL WARRANT ANALYSIS INTERSECTIONS WITH TWO OR THREE APPROACHES Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 5917 Oleander Dr, Suite 206 Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 March 11, 2022 Transportation Impact Analysis (TIA) Step 3 Submittal DAVENPORT Project Number 210291 Ironwood Development New Hanover County, NC 2021 Existing Traffic Volumes – New turning movement counts were deployed on December 9, 2021. Review of these counts showed unusually low values leaving Sanders Road and a thorough investigation indicated that Sanders Road was still closed at the time of recording. After discussion with reviewing agencies, counts taken in September 2021 at Sanders Road were provided to use in place of the December 2021. Balancing was applied to the through traffic volumes along US 421 to account for the differences in volumes due to the closure of Sanders Road, rerouting due to the closure and different date of recording. The volume difference between the upstream and downstream intersection were added to the lesser of the two through movements. The difference zeros out and no volumes were removed from the corridor. No adjustments were made to the December 2021 minor movement volumes at intersections upstream and downstream from Sanders Road. Proposed site trip directional distribution – See attached figures. Future Volumes at Beau Rivage Marketplace Committed Crossover – There are existing northbound left turns on US 421 at Sanders that currently turn left and then turn left again into the Marketplace. There are also northbound U-turns that will either follow by subsequent right into the Marketplace or proceeds southbound. In future conditions, when the committed crossover is built, the existing traffic is expected to reroute to the new crossover. For a conservative approach, it is assumed that not all of the volumes making these movements will reroute to the new crossover, therefore, 50% of these volumes were rerouted. Counts were taken to determine the # of NB lefts at Sanders that subsequently turned left into Beau Rivage Marketplace. AM: 14 vehicles, reroute 7 vehicles PM: 23 vehicles, reroute 11 vehicles # of NB U-turn at Sanders that subsequently turned right into Beau Rivage Marketplace. AM: 19 vehicles, reroute 9 vehicles PM: 6 vehicles, reroute 3 vehicles # of NB U-turn at Sanders that proceeds southbound through Beau Rivage Marketplace Drive. AM: 28 vehicles, reroute 14 vehicles PM: 24 vehicles, reroute 12 vehicles New Leftover/U Volumes AM: 14 U-turn / 16 lefts PM: 12 U-turn / 14 lefts October 29, 2021 Mr. Don Bennett, PE DAVENPORT 5917 Oleander Drive, Suite 206 Wilmington, NC 28403 RE: Scope approval for the Traffic Impact Analysis (TIA) associated with the proposed Ironwood residential development in New Hanover County, NC (adjacent to Tarin Woods II) Dear Mr. Bennett, Based on the information provided and conversations held to date, it is our understanding that the proposed development will consist of: • ITE Land Use Code 210 – Single Family Detached Housing – 125 DU • ITE Land Use Code 220 – Multi-family residential (low-rise) – 241 DU The project is proposed in three (3) phases, with build out years of 2023 (Phase 1), 2024 (Phase 2) and 2026 (Phase 3). Below please find the scope to be used for the Traffic Impact Analysis: 1. Data Collection - Analysis Parameters: a) Study Intersections i. For existing intersections, provide turning movement counts for weekday AM (7:00am-9:00am) and afternoon PM (4:00pm-6:00pm) travel periods, signal timing (if applicable), and lane geometry. • US 421 (Carolina Beach Road) at southbound to northbound U-Turn near Rosa Parks Lane • US 421 (Carolina Beach Road) at Sanders Road • US 421 (Carolina Beach Road) at Beau Rivage Marketplace driveway (Harris Teeter) • US 421 (Carolina Beach Road) at Manassas Drive/Sharks Eye Lane • Manassas Drive at Shiloh Drive • Myrtle Grove Road at Lieutenant Conglenton Road • US 421 (Carolina Beach Road) and site access north of Rosa Parks – RI/RO • US 421 (Carolina Beach Road) and site access south of Tregembo Animal Park – egress only Ironwood residential development Traffic Impact Analysis (TIA) scope Page 2 of 3 b) Site Trip Generation, Site Trip Distribution and Background Traffic Assumptions i. Site Trip Generation Estimate • See attached trip generation ii. Site Trip Distribution • To be submitted and approved prior to use in TIA iii. Adjacent Development (approved but not yet built): • Tarin Woods II Development (215 single family detached housing) iv. Planned Roadway/Intersection Improvements • Manassas Drive dual right turn lanes • Beau Rivage Marketplace (Harris Teeter) leftover v. Background Traffic Assumptions • Full Build - 2026 • Growth rate – 1% per year 2. Capacity Analysis: Week day AM & PM Peak Hour a) Technical Analysis i. 2021 Existing Conditions ii. 2023 Future No-Build [Existing + 1% background growth] iii. 2023 Phase 1 Build Conditions (125 DU) [Existing + 1% background growth + site trips] iv. 2023 Phase 1 Conditions w/ Mitigation [Existing + 1% background growth + site trips + improvements] v. 2024 Future No Build [Existing + 1% background growth] vi. 2024 Phases 1 & 2 Build Conditions (250 DU) [Existing + 1% background growth + site trips + Phase 1 improvements] vii. 2024 Phases 1 & 2 Conditions w/ Mitigation [Existing + 1% background growth + site trips + Phases 1 & 2 improvements] viii. 2026 Future No Build [Existing + 1% background growth] ix. 2026 Full Build (Phases 1 – 3) Conditions (366 DU) [Existing + 1% background growth + site trips + Phases 1 & 2 improvements] x. 2026 Full Build (Phases 1 - 3) Conditions w/ Mitigation [Existing + 1% background growth + site trips + all improvements] Ironwood residential development Traffic Impact Analysis (TIA) scope Page 3 of 3 3. Final Report Submittal: a) Completed TIA Application b) Signed and sealed by a NC Professional Engineer c) Electronic copies to include PDF of TIA, appendices and original Synchro analysis and output files 4. Notes: a) This scope shall remain valid for three months from the date of this letter. b) Please note that if any changes occur (including but not limited to: land use, intensity, signal phasing, and/or site access) additional analysis may be required. Please contact me at (910) 473 – 5130 with any questions regarding this scope. Sincerely, Scott A. James, PE Transportation Planning Engineer Wilmington Urban Area MPO Attachments: Traffic Impact Analysis Supplemental Guidelines Scoping request packet with Trip Generation Summary and Site Map (provided by Davenport) ec: Ben Hughes, PE, District Engineer, NCDOT Jessi Leonard, PE, Division Traffic Engineer, NCDOT Stonewall Mathis, PE, Deputy Division Traffic Engineer, NCDOT Madi Lee, EI, Development Review Engineer, NCDOT Ken Vafier, Planning Manager, New Hanover County Nicole Smith, Senior Planner, New Hanover County Denys Vielkanowitz, PE, City Traffic Engineer, City of Wilmington Thomas Bradshaw, PE, ITS Engineer, City of Wilmington Mike Kozlosky, Executive Director, WMPO Bill McDow, Associate Planner, WMPO