Loading...
03 - WMPO Comment Response Letter 03-08-2023 ENGINEERING | DESIGN | TECHNOLOGY 5410 Trinity Road Suite 102 Raleigh, NC 27607 P 919.866.4951 F 919.859.5663 www.timmons.com Date: March 8, 2023 Project: Circle K – R&R 2720915 – Castle Hayne, NC Subject: Comment Response letter for 1st WMPO review comments received 12/09/2022 Project Contact: Mike Davidson Phone: 984.222.1610 Email: mike.davidson@timmons.com To: WMPO Response to review comments have been added below each comment in bold font. 1. Turning template shows the largest design vehicle chosen, WB-67, will not be able to perform a right turn ingress or egress movement at the intersection of US 117 (Castle Hayne Rd) and SR- 1002 (Holly Shelter Rd). Please revise site access. Response: We have had multiple meetings with the NCDOT district engineer’s office and received detailed feedback from them. The revised site plans reflect the conditions which NCDOT requested in order to approve a Driveway Permit on Castle Hayne Road. 2. Advisory Comment: Consider revising the proposed stormwater control pond to provide additional maneuvering room on site. Response: See response to Comment #1 above. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)