Loading...
HomeMy WebLinkAboutTRC Agenda Packet 3-1-20231 TECHNICAL REVIEW COMMITTEE AGENDA March 1, 2023 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, March 1, 2023 at 2:00 p.m. to discuss the below items. PLEASE NOTE: This meeting will be conducted remotely via teleconference. Interested parties can contact the Planning and Land Use Department at 910-798-7165 for more information. Item 1: Blue Clay Industrial Building – Major Site Plan – SITECN-23-000005 Request by Dustin Braudway with Bluetail Properties, LLC for an industrial building. The site is 2.39 acres and is located at 2701 Blue Clay Road, zoned AC. The engineer is Adam Ellis with Intracoastal Engineering (adam@intracoastalengineering.com). The planner assigned is Amy Doss (adoss@nhcgov.com, 910-798-7571) Item 2 : Ruth Avenue Apartments – Major Site Plan – SITECN-23-000006 Request by Cornelius Nixon Trust for a new apartment complex. The site is 10.9 acres and is located at 7011 Ruth Ave- this project is tied to a rezoning, case Z22-21, which was approved earlier this year. GIS may not yet reflect the new zoning district of (CZD) RMF-M. The engineer is Allison Engebretson with Paramounte Engineering (aengebretson@paramounte-eng.com) . The planner assigned is Amy Doss (adoss@nhcgov.com, 910-798-7571). Item 3: The Enclave – Major Subdivision – SUBPP-23-0001 Request by Steve Shuttleworth with J&S Land Development LLC for a 10-lot major subdivision. The site is 4.29 acres and is located at 1040 Piner Road. The engineer is Shane Lippard with Right Angle Engineering (raepcsl@bellsouth.net). The planner assigned is Zach Dickerson, (zdickerson@nhcgov.com, 910-798- 7450). This meeting is open to the public by calling 1-336-218-2051 and entering Phone Conference ID: 441 773 776 Bluetail Properties – Commercial Site Plan – TRC Review Page | 1 To: Adam Ellis – Intracoastal Engineering, PLLC (adam@intracoastalengineering.com) From: Amy Doss Current Planner Date: March 1, 2023 Energov #: SITECN-23-000005 PID: R03316-004-002-000 Subject: Bluetail Properties, LLC – Artisan Manufacturing – 2701 Blue Clay Rd. – Commercial Site Plan – TRC Review The following comments have been received for the March 1, 2023, TRC meeting. Please note: following the TRC meeting, a revised site plan addressing each of the below items must be resubmitted prior to receiving approval. Planning, Amy Doss 910-798-7571 Please update the plan with the following general corrections: 1. Zoning: AC 2. Building Height: 18’ or 1 story, site plan in compliance. 3. Uses (1): a. The defined use is Artisan manufacturing: On-site production of goods by hand manufacturing involving the use of hand tools and small-scale light mechanical equipment. Typical uses include woodworking and cabinet shops, ceramic studios, jewelry manufacturing and similar types of arts and crafts or very small-scale manufacturing uses that have very limited, if any, negative external impacts on surrounding properties, water resources, air quality, and/or public health. 4. General Comments: a. Please change the title to Commercial Site Plan. b. Please ensure to note: Elevations must be tied to North American Vertical Datum of 1988 (NAVD 88) and horizontal coordinates must be tied to the North Carolina Grid System. c. Please show the distance of the relocated shed to the property line on the southern boundary. d. Please label well, including repair area. e. Please label fire hydrants and fire apparatus access to buildings. 5. Landscape notes: Bluetail Properties – Commercial Site Plan – TRC Review Page | 2 a. Landscape requirement calculations on page C-1 appear to be correct. b. Please provide a detailed landscape plan schedule illustrating the requirements for interior landscaping, street yards, foundation planting, and buffers have been met. 6. Tree Retention: a. No trees exist on site, therefore a tree removal permit is not necessary. 7. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 8. Parking/Loading: a. Please show the location of any off-street loading berths if present on site, please refer to Section 5.1.5 of the UDO for the specifications. 9. Lighting: a. Please note that with the latest update to the UDO, a lighting plan is not required at time of TRC Approval. See below excerpt from Section 5.5.3: i. Information about the exterior lighting for the site that demonstrates compliance with the standards in this section shall be submitted in conjunction with an application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first, approved no later than at time of construction plan approval. b. When lighting plan is submitted, please ensure that the foot candles from the street lights at the lot lines do not exceed 0.5, as the adjacent land is residential. Fire Services, Ray Griswold 910-798-7448 I have visited the site recently. Here are my comments: 1. A fire hydrant is required to be located at the entrance to the project. 2. A Section 510 study is required for First Responder Radio Coverage per the fire code. 3. Building Information Signage is required per Appendix J of the fire Code. NHC Engineering, Galen Jamison 910-798-7072 1. The stormwater permit application has been reviewed and request for additional information was sent to the designer via email on February 8. Please resubmit the additional information for County permit issuance. 2. A land disturbing issued by the County is required for this project in addition to the State stormwater permit. Please submit for permits as the design is completed. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 CFPUA TRC Comments provided are preliminary comments only. 1. CFPUA sewer available by installing a semi-positive displacement pump and connecting to the existing force main. 2. The project is currently in CFPUA Review. NCDOT, Nick Drees/Mike Frank, 910-398-9100 1. NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal. a. https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx 2. A driveway permit has been submitted to NCDOT for review. 3. A NCDOT Encroachment Agreement is required for any utility connections or installations within NCDOT right-of-way. Environmental Health, Dustin Fenske 910-798-6732 1. Site plan reflects connection to public sewer. Bluetail Properties – Commercial Site Plan – TRC Review Page | 3 2. Proposed infrastructure such as the retention pond meet setbacks to adjacent septic systems. WMPO, Jamar Johnson 910-343-3915 Addressing, Katherine May 910-798-7443 1. Address of existing metal building (2701) can stay as is. 2. Additional building will need a new address. 3. Please state whether the new building will have individual suites for separate tenets, if so those will also need individual addresses. 4. Contact me following TRC approval for address assignment. USACE, Brad Shaver 910-251-4611 1. The Corps has reviewed their files and can not find any records for the property located at 2701 Blue Clay Road. FLYILM, Dick Granseur 1. The developer shall submit to FAA a Form 7460-1 in accordance with Code of Federal Regulations Chapter 14, Subpart B, Section 77.9 as early in the design process as possible to determine impacts of proposed permanent structures, temporary measures and construction activities. 2. In no case shall the building or construction activities be permitted to penetrate the Part 77 imaginary airport surfaces, as defined by a 50’H:1’V slope from 200’ off the end of the runway pavement threshold (Threshold Elevation: 30.9’ MSL). Developer should provide a drawing showing elevation of all building corners and proposed high points in MSL (including light poles, flag poles, roof peak, etc) of all permanent and temporary structures and equipment on drawings. (Excerpt from Airport Layout Drawing below for reference.) Bluetail Properties – Commercial Site Plan – TRC Review Page | 4 3. Per NCGS 143-214.7, development within a five mile radius of an airport shall not be required to use stormwater retention ponds, detention ponds or any stormwater control measure (SCM) that promotes standing water and can attract wildlife including birds. As this development is located along the runway centerline and beneath aircraft flight paths less than 2000’ feet from the end of the runway, the Airport requests that the developer use a BMP that does not require ponding water. Comments not received at this time from: Emergency Services & E911, Steven Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt Ruth Avenue Apartments – Commercial Site Plan – TRC Review Page | 1 To: Allison Engebretson, RLA – Paramounte Engineering, INC (aengebretson@paramounte- eng.com) From: Amy Doss Current Planner Date: March 1, 2023 Energov #: SITECN-23-000006 PID: R04409-004-006-000, R04409-004-004-000, R04400-002-008-000, R04400-002-016-000 Subject: Ruth Avenue Apartments – 7011 Ruth Avenue, 7032 Ruth Avenue, 7001 Market St, 7035 Market St – Commercial Site Plan – TRC Review The following comments have been received for the March 1, 2023, TRC meeting. Please note: following the TRC meeting, a revised site plan addressing each of the below items must be resubmitted prior to receiving approval. Planning, Amy Doss 910-798-7571 Please update the plan with the following general corrections: 1. Zoning: CZD RMF-M 2. Building Height: 100’ or 4 stories, site plan in compliance. 3. Uses (1): a. The defined use is Conditional Residential Multi-Family as specified in CZD Z22-21 4. General Comments: a. Please change the title to Commercial Site Plan. b. Please ensure to note: Elevations must be tied to North American Vertical Datum of 1988 (NAVD 88) and horizontal coordinates must be tied to the North Carolina Grid System. c. Please specify materials in a typical detail to be used for screening or decorative purposes. d. Please confirm that the amenity leasing office will be no more than one story in height per the condition outlined in Rezoning Z22-21. 5. Landscape notes: a. Landscaping calculations and plan requirements are sufficient, thank you. 6. Tree Retention: a. Please submit a tree removal permit application to accompany the tree removal plan. 7. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. Ruth Avenue Apartments – Commercial Site Plan – TRC Review Page | 2 8. Parking/Loading: a. It appears that the parking count exceeds the ordinance standards- is permeable pavement a consideration for the excess parking? This is not a requirement, just a staff note. 9. Lighting: a. Please note that with the latest update to the UDO, a lighting plan is not required at time of TRC Approval. See below excerpt from Section 5.5.3: 1. Information about the exterior lighting for the site that demonstrates compliance with the standards in this section shall be submitted in conjunction with an application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first, approved no later than at time of construction plan approval. b. When lighting plan is submitted, please ensure that the foot candles from the streetlights at the lot lines do not exceed 0.5, as the adjacent land is residential. Fire Services, David Stone 910-798-7458 I have visited the site recently. Here are my comments: 1. All new structures larger than 7,500 square feet must comply with Section 510 of the NC Fire code. Emergency Responder Radio Coverage (ERRC) survey must be conducted, and results given to the Building Safety Fire Plan Reviewer. All buildings that are more than one story, underground, windowless or buildings with a basement must complete an ERRC survey. (It is highly recommended that a pre-construction survey be conducted however a pre-construction survey is not required). 2. Fire apparatus access roads are required at time of construction. They are to be capable of handling the weight of fire apparatus and be passable in all weather conditions. Fire apparatus access roads are to be a minimum of 20 feet wide (Chapter 5), unless there are fire hydrants installed along the roadway then minimum is 26 feet wide (Appendix D). The fire code official may increase this width as necessary based on potential for fire apparatus response. Dead end roads greater than 150 feet in length shall require an approved means for fire apparatus to turn around (Chapter 5 and Appendix D). Fire apparatus access roads shall provide a clear vertical clearance of 14 feet including trees, canopies, bridges, etc. (Chapter 5 requirement is 13 feet 6 inches, however AHJ requires 14 feet based on local apparatus). 3. Street and road signs are required, temporary signs during construction are acceptable as long as they are legible and weather resistant. (Chapter 5). 4. Parking shall not be allowed on either side of the above-mentioned roadway. If roadside parking is desired the minimum road width shall be increased, contact the fire code official for further information. No Parking signs shall be a minimum of 12 inches wide and 18 inches tall. Commercial buildings shall have fire lanes marked (Chapter 5) 5. Fire apparatus access roads shall provide access to within 150 feet of each side of the first -floor exterior walls unless the building is equipped throughout with an approved automatic sprinkler system then the distance increases to 200 feet (Chapter 5). If these options are not selected, please contact the fire code official and fire department for guidance. 6. Gates on fire apparatus access roads are discouraged due to the delay in response. If a gated access is deemed necessary it shall be either staffed with personnel 24 hours per day every day, 365 days of the year or must include KNOX key bypass switch and siren activation (both). (Chapter 5). Ruth Avenue Apartments – Commercial Site Plan – TRC Review Page | 3 7. Traffic calming devices are highly discouraged due to the delay in response. Speed bumps/humps are prohibited. Requests for other traffic calming devices must be evaluated during the Technical Review (TRC). 8. Fire lanes shall be a minimum of 18 feet wide and 14 feet vertical clearance feet including trees, canopies, bridges, etc. and must be marked. 9. Key Boxes (KNOX Boxes) 10. Required if structure is required to have a fire alarm system and or automatic sprinkler system. 11. Knox Box required at front (main) entrance, above eye level. Larger facilities may require more than one. 12. The customer may order online from Knox. 13. Premises identification is required. Address and or unit numbers are required on the street side as well as unit identification on rear access doors. Letters and Numbers shall not be less than 6 inches tall and ¾ inches wide; must be weather resistant and contrasting in color to their background. (Chapter 5). Buildings constructed under the 2018 code shall require additional signage per Appendix J. 14. Rooms containing controls for HVAC, fire sprinkler risers, fire alarm control panels, or other fire detection/protection equipment must be identified with signage (Chapter 5). 15. Generator and solar installations shall be in accordance with Chapter 6. Water Supply (Chapter 5 and Appendix C) 16. If a water supply is required for fire protection a fire hydrant system or other means approved by the fire code official must be present prior to beginning construction and be maintained operable during the construction period. (for construction, fire dept. water shuttle counts as long there is a fill site within range) 17. If an approved water supply capable of supplying the required fire flow for fire protection is available fire hydrants shall be provided. 18. If the approved water supply is not capable of supplying the required fire flow for fire protection a private system shall be engineered to meet the required fire flow for both automatic sprinkler systems and fire hydrants. 19. Fire Hydrants 20. All fire hydrants shall have a 5 ¼ inch barrel, a 5 ¼ inch valve opening, two 2 ½ inch NST side discharges and a 5 inch pumper nozzle with a 5 inch STORZ connection. Further information on the technical specifications is available from the fire code official or Cape Fear Public Utility Authority. 21. All fire hydrants shall be installed so they are visible from the fire apparatus access road with unobstructed access and a clear space no less than 36 inches in all directions. They shall be protected from vehicle impact by curbing, guard posts or other means approved by the fire code official. They shall be oriented with the large discharge facing the nearest street. All discharges shall meet the NFPA requirements for distance above grade. 22. Fire hydrants in general residential areas shall be installed so that all insured properties are within 500 feet of a hydrant (hydrant spacing approximately 1000 feet apart along a fire apparatus access road, installed at intersections where possible). The first fire hydrant should be installed at or near the entrance to the residential area. 23. Fire hydrants in mixed use and commercial areas shall be installed so that all insured properties are within 250 feet of a hydrant (hydrant spacing approximately 500 feet apart along fire apparatus access roads and preferably located at intersections when possible). 24. Fire hydrants for industrial and manufacturing areas shall be installed so that all structures are within 250 feet of a fire hydrant, distances may be adjusted more or less based on approval of the fire code official and based on the hazards present. Ruth Avenue Apartments – Commercial Site Plan – TRC Review Page | 4 25. Additional fire hydrants may be required by the fire code official based on the type of hazard or use of the protected structure. (Appendix C) 26. Fire hydrants should be located 50 feet or more from the structure they protect. 27. Fire Department Connections (FDC) 28. Fire Department connections shall utilize 5 inch Storz connections with a 30 degree down angle. Remote FDC’s are discouraged. 29. A fire hydrant shall be located no less than 50 feet from the structure and no greater than 100 feet from the fire department connection. For buildings with multiple fire department connections, each one shall have a dedicated fire hydrant. 30. The fire department connection shall be located that the fire apparatus and the hoses connecting it to the fire hydrant and to the fire department connection do not obstruct access to the buildings for other fire apparatus. 31. Fire department connections shall not be obstructed by fences, bushes, dumpster, utilities or vehicles. 32. Fire department connections are to be unobstructed with 36 inches clearance to both sides and 78 inches vertically. 33. An audible/visual device indicating water flow or fire alarm activation shall be located above the fire department connection. 34. The fire department connection shall be labeled with code compliant signage indicating the type of connection and where more than one fire department connection exists additional signage is required to indicate the area protected. NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and a stormwater permit issued by the County are required for this project in addition to the State stormwater permit. Please submit for permits as the design is completed. 2. There appears to be offsite stormwater drainage coming from the east that doesn’t qualify for NHC Stormwater Services maintenance. The grading design shall ensure conveyance of this offsite drainage such that the adjoining properties are not impacted by the changes in grade. 3. Please identify pond outfall location and show NCDOT improvements when this project be submitted to TRC. 4. Ensure adequate access for pond maintenance is provided. 5. The existing headstone access is considered from the adjacent parcel. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 CFPUA TRC Comments provided are preliminary comments only. 1. CFPUA Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 2. CFPUA water and sewer available via a mainline extension. 3. At this time capacity is available; DWQ permit application will require a Planning FTSE. 4. Capacity is also dependent on the analysis of the pipe collection system (gravity and force mains). 5. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 6. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. 7. CFPUA Meter Sizing Form required. Ruth Avenue Apartments – Commercial Site Plan – TRC Review Page | 5 NCDOT, Nick Drees/Mike Frank, 910-398-9100 These preliminary comments and are based on the plans as submitted for the proposed site and are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. 1. NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal. https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx 2. A NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. 3. Show/Label the 10’ X 70’ NCDOT sight triangles. 4. No obstructions shall be placed within the NCDOT sight triangles. 5. Label the radius for the driveway connection. 6. Label the stem length for the driveway connection. 7. A NCDOT Encroachment Agreement is required for any utility connections or installations within NCDOT right-of-way. 8. This development is located within TIP U-4751. With that in mind, any accesses that conflict with the planned transportation infrastructure may be modified and/or removed and there shall not be any compensation made by NCDOT. The current TIP U-4751 is proposed as divided facility. Therefore, the permitted accesses will be restricted as right-in/right-out only in the future. Environmental Health, Dustin Fenske 910-798-6732 1. Site plan reflects connection to public sewer. Proposed infrastructure will not affect any adjacent properties. 2. Site Plan reflects the site will be on public water. Surrounding properties: 7011, 7015 and 7019 reflect they are still on drinking water wells. Further investigation with CFPUA may be needed. If the above mentioned sites are on wells then the well heads must maintain 50 feet from the normal pool elevation for the storm water retention ponds. All surrounding properties that are on wells will not be affected by infrastructure developments. Ruth Avenue Apartments – Commercial Site Plan – TRC Review Page | 6 WMPO, Jamar Johnson 910-343-3915 Addressing, Katherine May 910-798-7443 1. Access road will require a name. 2. Anticipating using Ruth Ave as the street address, but subject to change. 3. Mark location(s) of mail kiosk. 4. Contact me when nearing TRC approval to start the addressing process. USACE, Brad Shaver 910-251-4611 1. No waters of the US would be expected on this property. Comments not received at this time from: Emergency Services & E911, Steven Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt The Enclave – 1040 Piner Road - Major Subdivision – TRC Review Page | 1 To: Shane Lippard, Right Angle Engineering (raepcsl@bellsouth.net) From: Zach Dickerson Current Planner Date: March 1st 2023 TRC Review PID#: R07615-002-001-000 Egov# SUBPP-22-0001 Subject: 1040 Piner Road– The Enclave – Major Subdivision – TRC Review The following comments have been received for the December 21st, 2022 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. Planning, Zach Dickerson 910-798-7450 1. Zoning – R-15 2. Use: a. Performance Residential Subdivision 3. General comments a. The 35% open space requirement is only applicable to EDZD districts- performance residential requires a minimum of 20% open space. The open space shown on the plan exceeds the minimum and is in compliance. b. Please update the table to reflect correct amount of open space required: 4.29 acres at 20% required = 0.85 acres of open space. c. Please indicate zoning of all adjacent parcels on the site plan. 4. Tree Retention: a. Tree Removal Permit has been processed- please pay $45.00 invoice INV-00095513 at www.nhcgov.com/coast or by calling 910-798-7308 5. Lighting: a. Is any lighting proposed for the development? b. Please note that with the latest update to the UDO, a lighting plan is not required at time of TRC Approval. See below excerpt from Section 5.5.3: i. Information about the exterior lighting for the site that demonstrates compliance with the standards in this section shall be submitted in conjunction with an application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance The Enclave- 1040 Piner Road- Major Subdivision – TRC Review Page | 2 approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first, approved no later than at time of construction plan approval. b. When lighting plan is submitted, please ensure that the foot candles from the street lights at the lot lines do not exceed 0.5, as the adjacent land is residential. 6. Landscaping: a. If any landscaping is proposed for the site, please indicate it on the site plan. b. A street yard is not required for residential subdivisions. c. No buffering is required for R-15 abutting R-15. 7. Signs: a. Please note that all signs are subject to section 5.6 of the UDO. b. Please submit for sign permits prior to installation. 8. Mailbox Kiosk a. Please show location of mailbox kiosk on site plan. b. Please indicate the length and width of the pull-off area on the site plan. 9. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the approval. Evidence of approval shall accompany the application for building permit. Fire Services, Sunnie Batson 910-798-7464 1. Roads and driveways: a. The hammerhead turnaround at the end of Hillestad Court must be 120’ long and 20’ wide, or another approved turnaround may be utilized. b. All-weather, hard surface access is required during construction to accommodate our fire apparatus, at least 85,000 lbs. (NCFC, D102.1) c. Road grade shall not exceed 10%. (NCFC, D103.2) d. Road width shall not be less than 26’ with no on-street parking. e. Gates: electric gates shall have a Knox key override and siren activated opener. f. Traffic Calming Devices: plans must be submitted and evaluated during the Technical Review process. g. Street signs must be posted once roadway is developed to a point that allows for travel/traffic. Temporary signage may be used until the permanent ones are in place. h. Residence addresses must be posted and visible from the street. i. Dumpsters, dormant construction equipment, and other encumbrances cannot be left in the roadway and cannot impede fire or emergency vehicles. 2. Hydrants: a. Water to hydrants must be turned on prior to the start of construction. b. Hydrant required at the entrance to neighborhood, on the corner of Piner Road and Hillestad Court near the “common area” adjacent to Lot #1. c. Second hydrant shall be located on Hillestad Court between Lot #2 and Lot #3, instead of Lot #5. d. Hydrants must be CFPUA specifications. e. No obstructions within a 3’ radius of the hydrant. Obstructions include, but are not limited to street signs, utility equipment, transformers, fences, or vegetation. NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and a stormwater permit issued by the County are required for this project in addition to the State stormwater permit. Please submit for permits as the design is completed. The Enclave- 1040 Piner Road- Major Subdivision – TRC Review Page | 3 2. A public drainage easement sized in accordance with Section 2.6.5 of the NHC Stormwater Design Manual is requested for the existing ditch in the south of the site. The easement shall be centered on the ditch and the County will work with the adjacent parcel for full easement width. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available via a mainline extension. 4. At this time capacity is available; DWQ permit application will require a Planning FTSE. 5. Capacity is also dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. 8. CFPUA Meter Sizing Form required. NCDOT, Nick Drees 910-398-9100 These preliminary comments and are based on the plans as submitted for the proposed site and are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. 1. NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal. 2. https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx 3. A NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. 4. No obstructions shall be placed within the NCDOT sight triangles. 5. Label the radius for the driveway connection. 6. Label the stem length for the driveway connection. 7. A NCDOT Encroachment Agreement is required for any utility connections or installations within NCDOT right-of-way. Environmental Health, Dustin Fenske 910-798-6732 1. Plans indicate connection to the public sewer system via individual grinder pumps. Proposed infrastructure such as storm water pond will not violate setbacks to surrounding properties septic systems. 2. Site plan indicates connection to public water. Proposed infrastructure will not violate setbacks to surrounding properties wells. The Enclave- 1040 Piner Road- Major Subdivision – TRC Review Page | 4 WMPO, Jamar Johnson 910-473-5130 Bras Shaver USACOE Brad.E.Shaver@usace.army.mil 1. The Corps recently issued a jurisdictional determination for 1040 Piner Road with a determination of no waters of the US present. Addressing, Katherine May 910-798-7443 1. Street name, Hillestad Court, is approved. 2. Please mark the location of the mail kiosk. It must be in a common area and USPS prefers it to be at the front of the neighborhood. 3. Contact me prior to TRC approval to start the addressing process. Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn The Enclave- 1040 Piner Road- Major Subdivision – TRC Review Page | 5 New Hanover Soil & Water, Dru Harrison USACE, Rachel Capito NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt