Loading...
HomeMy WebLinkAboutCape Fear RaceWay TIA DRAFT_v1 1 MARCH 2, 2023 IMPACT DESIGNS, INC. Prepared by: Nicholas Burns, PE TRAFFIC IMPACT ANALYSIS Cape Fear Raceway Convenience Store Wilmington, North Carolina TRAFFIC IMPACT ANALYSIS Cape Fear Raceway Convenience Store WILMINGTON, NORTH CAROLINA REPORT PREPARED FOR: Racetrac Petroleum, Inc. 200 Galleria Parkway, Suite 900 Atlanta, GA 30339 REPORT PREPARED BY Impact Designs, Inc. PO Box 3728 Mooresville, NC 28117 nick@impactdesignsinc.com Cape Fear Raceway |1 Table of Contents EXECUTIVE SUMMARY .................................................................................................................. 3 1. INTRODUCTION ......................................................................................................................... 4 1.1. Project Summary .............................................................................................................. 4 1.2. Existing Roadway Conditions .......................................................................................... 5 1.3. Driveway Location ............................................................................................................ 5 2. TRAFFIC VOLUME DEVELOPMENT..................................................................................... 9 2.1. Existing Traffic Volumes .................................................................................................. 9 2.2. Projected Traffic Volumes ............................................................................................... 9 2.3. Proposed Development Traffic Volumes ........................................................................ 9 2.4. Future Build Traffic Volumes ....................................................................................... 10 3. TRAFFIC IMPACT ANALYSIS ............................................................................................... 18 3.1. Turn Lane Analysis ........................................................................................................ 18 3.2. Intersection LOS Analysis .............................................................................................. 18 3.3. Mitigation Requirements ............................................................................................... 19 3.4. Capacity Analysis ............................................................................................................ 19 3.5. Queuing Analysis ............................................................................................................ 20 4. SUMMARY OF FINDINGS AND RECOMMENDATIONS .................................................. 21 Cape Fear Raceway |2 Tables Table 1 – Study Area Summary .................................................................................................................... 5 Table 2 – Trip Generation ............................................................................................................................. 9 Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections ............................ 18 Table 4 – Intersection Capacity Analysis Results ....................................................................................... 19 Table 6 – Queuing Analysis ........................................................................................................................ 20 Figures Figure 1 – Project Location ........................................................................................................................... 6 Figure 2 – Conceptual Site Plan .................................................................................................................... 7 Figure 3 – Existing Lane Configuration ....................................................................................................... 8 Figure 4 – Existing (2023) Traffic Volumes ............................................................................................... 11 Figure 5 – No-Build (2024) Traffic Volumes ............................................................................................. 12 Figure 6 – Site Trip Distribution ................................................................................................................. 13 Figure 7 – Primary Trip Assignment .......................................................................................................... 14 Figure 8 – Pass-By Distribution .................................................................................................................. 15 Figure 9 – Pass-By Trip Assignment .......................................................................................................... 16 Figure 10 – Build (2024) Traffic Volumes ................................................................................................. 17 Figure 11 – Proposed Lane Configuration .................................................................................................. 22 Appendices A) NCDOT TIA Scoping Checklist B) Traffic Count Data C) Turn Lane Warrant Analysis D) Synchro Capacity Analysis Reports E) SimTraffic Analysis Reports Cape Fear Raceway |3 EXECUTIVE SUMMARY A traffic impact study was conducted for the proposed Cape Fear Raceway convenience store development in accordance NCDOT guidelines. The proposed development is located on the east side of US 421, north of US 74, in Wilmington, North Carolina. The development is expected to consist of a 3,500 sq. ft. convenience store with 16 vehicle fueling stations and four truck fueling stations. The project is expected to be completed in 2024. Access to the site is to be provided via one full movement connection and one right-in/right-out connection to US 421 and a full movement connection to N. Terminal Road. The study was determined through coordination with NCDOT and consists of the following intersections:  US 421 and N. Terminal Road  US 421 and Access A  US 421 and Access B  N. Terminal Road and Access C For the purpose of this analysis, the study intersections listed above were analyzed under the following scenarios:  Existing (2023) Conditions  No-Build (2024) Conditions  Build (2024) Conditions Traffic operations during the AM and PM peak hours were modeled for each scenario. The results of each scenario were compared to determine impacts from background traffic growth and the proposed development. The capacity analysis indicates that the side street movements onto US 421 are expected to operate at LOS F under Build conditions. Higher side street delay is not uncommon at unsignalized intersections on heavily traveled thoroughfares, particularly during peak hours when mainline volumes are highest. The intersections of US 421 and N. Terminal Road is not an ideal candidate for signalizations as N. Terminal Road is a dead- end street with minimal traffic. Similarly, signalizing US 421 and Access A would not be a viable option, as stopping US 421 solely to facilitate access to single private development would not be advisable. No mitigation is recommended based on the capacity analysis. The queueing analysis indicates that no movements are expected to experience queuing that exceeds the available storage. Recommendations:  Construct a northbound right turn lane on US 421 at Access B with 50 feet of storage and appropriate taper. Cape Fear Raceway |4 1. INTRODUCTION The purpose of this report is to summarize the traffic impact analysis that was completed for the proposed Cape Fear Raceway convenience store development in Wilmington, North Carolina. The study was developed in accordance with NCDOT guidelines. The purpose of the study is to determine the potential impact to the surrounding transportation system caused by the traffic generated by the development. This report summarizes the procedures and findings of the traffic impact study. 1.1. Project Summary The proposed development is located on east side of US 421, north of US 74, in Wilmington, North Carolina. The development is expected to consist of a 3,500 sq. ft. convenience store with 16 vehicle fueling stations and four truck fueling stations. The project is expected to be completed by 2024. This traffic impact study analyzes the effects of the additional traffic associated with the proposed development during the weekday AM (7:00 AM - 9:00 AM) and the weekday PM (4:00 PM - 6:00 PM) peak periods. The study area for the purpose of the analysis includes:  US 421 and N. Terminal Road  US 421 and Access A  US 421 and Access B  N. Terminal Road and Access C Refer to Figures 1 and 2 for the site location and the conceptual site plan. For the purpose of this analysis, the study intersections listed above were analyzed under the following scenarios:  Existing (2023) Conditions  No-Build (2024) Conditions  Build (2024) Conditions Refer to Appendix A for a copy of the NCDOT TIA Scoping Checklist. Cape Fear Raceway |5 1.2. Existing Roadway Conditions The primary roadways within the study area are US 421 and N. Terminal Road. A summary of their existing characteristics is shown in Table 1. Table 1 – Study Area Summary Facility Name Route # Typical Cross Section Posted Speed Limit Maintained By AADT US 421 5-lane undivided 55 MPH NCDOT 19,500 (2021) N. Terminal Road SR 2133 2-lane undivided 25 MPH NCDOT No Data Refer to Figure 3 for an illustration of the existing lane geometry and traffic control at the study intersections. 1.3. Driveway Location Access to the site is to be provided via one full movement connection and one right-in/right-out connection to US 421 and a full movement connection to N. Terminal Road. RACEWAY MARKET 3,500 SQ. FT. DEFFE T DEFFE T DEFFE T MASTER SATELLITEMASTER SATELLITE DEFFE TSATELLITEMASTER T A A A 20 K - R E G U L A R 12 K - P R E M I U M 24 K - D I E S E L 12 K - D E F 12 K - B 1 0 0 AL T E R N A T E 45.00' 40.00' 40 . 0 0 ' 40 . 0 0 ' 40.00' 100.00'80.00' 30.00' 70.00'75.00'80.00'80.00' 65.00'65.00' 28 . 0 0 ' 5. 0 0 ' 30 . 0 0 ' 30. 0 0 ' 36. 0 0 ' 36. 0 0 ' FF DEFFFFF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 NO A U T O E N T R Y NO AUTO ENTRY 170 SQ. FT. LED, PRICE LOGO SIGN, 30' TO TOP OF SIGN NO TRUCK PARKING 18 . 0 0 ' 13 . 0 0 ' NO TRUCK PARKING NO TRUCK PARKING NO TRUCK PARKING 30.00' 15.0 0 '15.00' 50' BUILDING & CANOPY SETBACK 12.5' LANDSCAPE SETBACK 10' SIGN SETBACK 30.00' SI T E P L A N 1/12/2023 KBEL 1582 - RW3.5K (EDO) Cape Fear V2.dwg0306015 1" = 30' CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. R Know what's below. Call before you dig. SITE DESIGN STANDARDS CANOPY & BLDG SETBACK FRONT (SOUTH) SIDE, STREET (EAST) SIDE, INTERIOR (WEST) REAR (NORTH) REQUIRED PROVIDED 50' 50' - - LANDSCAPE BUFFER REQUIREMENTS PROPERTY LINE FRONT (SOUTH) SIDE, STREET (EAST) SIDE, INTERIOR (WEST) REAR (NORTH) - - - - (D) (D) = SUBJECT TO DEVIATION REQUEST. SIGN SETBACK REQUIRED PROVIDED FRONT (SOUTH) SIDE, STREET (WEST) 10' - REQUIRED PROVIDED 12.5' - - - (D) (D) (D) -(D) -(D) -(D) - - - (D) = SUBJECT TO DEVIATION REQUEST. LAND USE SUMMARY (ON SITE) CATEGORY 6" CONCRETE 8" CONCRETE CURB 52,797 FT2 SITE DESIGN NOTES: MAX. SIGN DIMS. = 175 SQ. FT. @ 30 FT HEIGHT1. PR O J E C T N A M E / I N T E R S E C T I O N NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 HW Y 4 2 1 @ N T E R M I N A L R D WI L M I N G T O N , N C NE W H A N O V E R C O U N T Y DR A F T S U R V E Y 47,960 3,547 FT2 LINEAR FT 2.LOADING ZONES MUST BE IN REAR ADJACENT TO DOORS Cape Fear Raceway |9 2. TRAFFIC VOLUME DEVELOPMENT 2.1. Existing Traffic Volumes Existing turning movement counts were conducted at the intersections during the weekday AM (7:00 AM to 9:00 AM) and weekday PM (4:00 PM to 6:00 PM) peak periods in February 2023. The existing (2023) traffic volumes are illustrated in Figure 4. Refer to Appendix B for a copy of the raw traffic count data. 2.2. Projected Traffic Volumes Based on coordination with NCDOT, a 2% annual growth was applied to the 2023 counts to project traffic volumes for the future year (2024). This growth rate was applied to account for all background growth in the area without any adjacent and/or the proposed development. Refer to Figure 5 for an illustration of the No- Build (2024) traffic volumes. 2.3. Proposed Development Traffic Volumes As mentioned previously, the proposed development is expected to consist of up a 3,500 sq. ft. convenience store with 16 vehicle fueling stations and four truck fueling stations. The project is expected to be completed by 2024. The trip generation potential for the development was estimated utilizing methodology contained within the ITE’s Trip Generation Manual, 11th Edition. Utilizing ITE equations for ITE Code 945, traffic volumes were generated for the weekday daily, the weekday AM peak hour, and the weekday PM peak hour. Refer to Table 2 for a summary of the trip generation potential of the proposed development. Table 2 – Trip Generation ITE Land Use (Code) Density Independent Variable Daily Traffic AM Peak PM Peak Enter Exit Enter Exit Convenience Store/ Gas Station (GFA 2-4k) (ITE Code 945) 20 Vehicle Fueling Positions 5,302 161 160 184 184 Pass-By Trips [62% AM, 56% PM]* 100 100 103 103 TOTAL 5,302 61 60 81 81 It is estimated that the proposed development could generate a total of 5,302 trips (in and out) during a typical 24-hour weekday period with 321 new trips (161 entering and 160 exiting) generated during the AM peak hour and 368 new trips (184 entering and 184 exiting) generated during the PM peak hour at full build-out in 2024. Cape Fear Raceway |10 Site traffic associated with the proposed development was distributed and assigned to the roadway network based upon existing travel patterns and are summarized below:  50% to/from the north via US 421  50% to/from the south via US 421 Refer to Figures 6 through 9 for illustrations of the site trip distributions and assignments for the proposed development. 2.4. Future Build Traffic Volumes The site generated traffic volumes were added to the No-Build traffic volumes to determine the Build traffic volumes. The Build (2024) volumes are illustrated in Figures 10. Cape Fear Raceway |18 3. TRAFFIC IMPACT ANALYSIS 3.1. Turn Lane Analysis A turn lane analysis was conducted for the site accesses utilizing the Build (2024). Based on build out volumes, a northbound right turn lane is warranted on US 421 at Access B. It is recommended that a northbound right turn lane be constructed on US 421 at Access B with 50 feet of storage and appropriate taper. A left turn lane warrant was not performed for Access A due to the availability of the existing two- way left turn lane on US 421. Refer to Appendix C for the turn lane warrants with volumes graphed. 3.2. Intersection LOS Analysis Using the existing, no-build, and build traffic volumes, intersection analyses were conducted for the study intersections under Existing (2023) conditions, No-Build (2024) conditions, and Build (2024) conditions. This analysis was conducted using the Transportation Research Board’s Highway Capacity Manual 6th Edition (HCM 6th Edition) methodologies of the Synchro, Version 11 software. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically represent poor, forced-flow (bumper-to-bumper) conditions with high vehicular delays, and are generally considered undesirable. Table 3 summarizes the HCM 6th Edition control delay thresholds associated with each LOS grade for signalized and unsignalized intersections. Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections Signalized Intersections Unsignalized Intersections LOS Control Delay per Vehicle (seconds) LOS Control Delay per Vehicle (seconds) A ≤ 10 A ≤ 10 B > 10 and ≤ 20 B > 10 and ≤ 15 C > 20 and ≤ 35 C > 15 and ≤ 25 D > 35 and ≤ 55 D > 25 and ≤ 35 E > 55 and ≤ 80 E > 35 and ≤ 50 F > 85 F > 50 A PHF of 0.90 was applied and a heavy vehicle percentage of 2% was utilized for the purpose of this analysis. Cape Fear Raceway |19 3.3. Mitigation Requirements NCDOT typically requires mitigation to be identified when developments are expected to impact the traffic operations as described below:  Overall intersection or intersection approach delay increases by 25%.  LOS degrades by at least one level.  LOS is F.  Synchro 95th or SimTraffic maximum queue results are greater than the existing turn lane storage length. 3.4. Capacity Analysis The results of the capacity analysis for the unsignalized study intersections under existing traffic control are summarized below in Table 4. Refer to Appendix D for the detailed capacity analysis reports. Table 4 – Intersection Capacity Analysis Results Intersection Approach LOS (Delay in seconds per vehicle) Existing (2023) Conditions No-Build (2024) Conditions Build (2024) Conditions AM PM AM PM AM PM US 421 and N. Terminal Road WB D (25.1) D (29.1) D (26.0) D (30.3) F (52.7) F (71.3) NB - - - - - - SB A (9.3) B (10.9) A (9.4) B (11.0) A (9.5) B (11.2) US 421 and Access A WB Analyzed under Build conditions ONLY F (59.1) F (144.3) NB - - SB A (9.7) B (11.8) US 421 and Access B WB Analyzed under Build conditions ONLY B (11.5) B (13.9) NB - - SB - - N. Terminal Road and Access C EB Analyzed under Build conditions ONLY A (7.2) A (7.2) WB - - SB A (8.5) A (8.5) The capacity analysis indicates that the side street movements onto US 421 are expected to operate at LOS F under Build conditions. Higher side street delay is not uncommon at unsignalized intersections on heavily traveled thoroughfares, particularly during peak hours when mainline volumes are highest. The intersections of US 421 and N. Terminal Road is not an ideal candidate for signalizations as N. Terminal Road is a dead- end street with minimal traffic. Similarly, signalizing US 421 and Access A would not be a viable option, as stopping US 421 solely to facilitate access to single private development would not be advisable. No mitigation is recommended based on the capacity analysis. Cape Fear Raceway |20 3.5. Queuing Analysis A queuing analysis was also completed for all No-Build and Build Improved traffic. Reported in Table 6 is the maximum value between the Synchro 95th percentile queue and the SimTraffic maximum queue for each turn lane at study intersections. Refer to Appendix D for detailed Synchro capacity analysis reports and Appendix E for detailed SimTraffic reports. Table 5 – Queuing Analysis Intersections Lane Group No-Build Storage (feet) Max Queue (feet) AM Peak Hour PM Peak Hour No-Build Build No-Build Build US 421 & N. Terminal Road WB-LTR Full 37 79 33 87 SB-L 125 17 25 20 25 US 421 & Access A WB-LTR Full 0 194 0 174 SBL TWLTL 0 46 0 64 US 421 & Access B WBLTR Full 0 50 0 55 N. Terminal Road & Access C SB-LR Full 0 50 0 78 The queueing analysis indicates that no movements are expected to experience queuing that exceeds the available storage. Cape Fear Raceway |21 4. SUMMARY OF FINDINGS AND RECOMMENDATIONS A traffic impact study was conducted for the proposed Cape Fear Raceway convenience store development in accordance NCDOT guidelines. The proposed development is located on the east side of US 421, north of US 74, in Wilmington, North Carolina. The development is expected to consist of a 3,500 sq. ft. convenience store with 16 vehicle fueling stations and four truck fueling stations. The project is expected to be completed in 2024. Access to the site is to be provided via one full movement connection and one right-in/right-out connection to US 421 and a full movement connection to N. Terminal Road. The study was determined through coordination with NCDOT and consists of the following intersections:  US 421 and N. Terminal Road  US 421 and Access A  US 421 and Access B  N. Terminal Road and Access C For the purpose of this analysis, the study intersections listed above were analyzed under the following scenarios:  Existing (2023) Conditions  No-Build (2024) Conditions  Build (2024) Conditions Traffic operations during the AM and PM peak hours were modeled for each scenario. The results of each scenario were compared to determine impacts from background traffic growth and the proposed development. The capacity analysis indicates that the side street movements onto US 421 are expected to operate at LOS F under Build conditions. Higher side street delay is not uncommon at unsignalized intersections on heavily traveled thoroughfares, particularly during peak hours when mainline volumes are highest. The intersections of US 421 and N. Terminal Road is not an ideal candidate for signalizations as N. Terminal Road is a dead- end street with minimal traffic. Similarly, signalizing US 421 and Access A would not be a viable option, as stopping US 421 solely to facilitate access to single private development would not be advisable. No mitigation is recommended based on the capacity analysis. The queueing analysis indicates that no movements are expected to experience queuing that exceeds the available storage. Recommendations:  Construct a northbound right turn lane on US 421 at Access B with 50 feet of storage and appropriate taper.